MONTHYEARML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT ML20366A1012020-12-31031 December 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection ML20316A0152020-11-0606 November 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML20318A0202020-10-16016 October 2020 NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A7122020-10-15015 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20318A0192020-10-15015 October 2020 NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A1192020-10-0909 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request for Alternative to N-729-4 for RPV Head Visual Examination ML20318A0182020-10-0909 October 2020 NRR E-mail Capture - (External_Sender) Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20149K6272020-05-28028 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment and Exemptions Regarding UFSAR 10 CFR 50.71(e)(4) Update Schedule (Epids: L-2020-LLA-0100, L-2020-LLE-0052, L-2020-LLE-0053) ML20149K4332020-05-26026 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-567, Revision 1 ML20141L6062020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-541, Revision 2 ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20136A5162020-05-15015 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-412, Revision 3 ML20133J9662020-05-11011 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19345F9382019-12-0909 December 2019 D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward ML19333B8042019-11-29029 November 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-569 (L-2019-LLA-0248) ML19309F9212019-11-0505 November 2019 Request for Eportal Access for Audit Review of the DC Cook SPRA Supporting Documents ML19270E7372019-09-26026 September 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-421, Reactor Coolant Pump Flywheel Inspection Program ML19207A4642019-07-26026 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Delete Diesel Generator Load Test Resistor Banks ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19175A3032019-06-24024 June 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS ML19092A4802019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 ML19092A4792019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Address Issues Identified in Westinghouse Document NSAL-15-1 2024-08-01
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Wengert, Thomas Sent: Monday, May 19, 2014 12:59 PM To: kmhenderson@aep.com Cc: hletheridge@aep.com; 'mkscarpello@aep.com' (mkscarpello@aep.com); Holston, William
Subject:
D.C. Cook Nuclear Plant - Request for Addi tional Information RE: License Renewal Commitment Concerning Buried Piping (TACs MF3094 and MF3095)
Attachments:
DC Cook Buried Piping LR Commitment Change Draft RAI #1 Rev 1.docx By letter dated October 17, 2013 (Agencywide Documents Access and Managemen t System (ADAMS), Accession No. ML13295A422), Indiana Michigan Power Company (I&M) submitted a letter notifying the Nuclear Regulatory Commission (NRC) of a change to a commitment documented in the safety evaluation report (SER) related to the license renewal of the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2.
Attached is the NRC staff's request for additional Informat ion (RAI) for the subject review, as discussed during this morning's RAI clarification conference call. During the call, I&M agreed to provide a response within 30
days.
Please contact me if you have any further questions concerning this RAI.
Tom Wengert U.S. Nuclear Regulatory Commission
Project Manager - D.C. Cook Nuclear Plant NRR/DORL/LPL3-1
(301) 415-4037 Hearing Identifier: NRR_PMDA Email Number: 1291 Mail Envelope Properties (Thomas.Wengert@nrc.gov20140519125900)
Subject:
D.C. Cook Nuclear Plant - Request for Additional Information RE: License Renewal Commitment Concerning Buried Piping (TACs MF3094 and MF3095) Sent Date: 5/19/2014 12:59:17 PM Received Date: 5/19/2014 12:59:00 PM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients: "hletheridge@aep.com" <hletheridge@aep.com> Tracking Status: None
"'mkscarpello@aep.com' (mkscarpello@aep.com)" <mkscarpello@aep.com> Tracking Status: None "Holston, William" <William.Holston@nrc.gov>
Tracking Status: None "kmhenderson@aep.com" <kmhenderson@aep.com> Tracking Status: None
Post Office: Files Size Date & Time MESSAGE 857 5/19/2014 12:59:00 PM DC Cook Buried Piping LR Commitment Change Draft RAI #1 Rev 1.docx 31494
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 INDIANA MICHIGAN POWER COMPANY DOCKET NOS. 50-315 AND 50-316 By letter dated October 17, 2013 (Agencywide Documents Access and Management System (ADAMS), Accession No. ML13295A422), Indiana Michigan Power Company (I&M) submitted a letter notifying the Nuclear Regulatory Commission (NRC) of a change to a commitment documented in the safety evaluation report (SER) related to the license renewal of the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2. To complete its review of this commitment change, the NRC staff requests the following additional information.
Background:
By letter dated October 17, 2013, the SER related to the license renewal of the CNP, Units 1 and 2, dated May 2005, Appendix A, Commitment No. 5, was revised to include copper alloy, copper, and iron piping. License Renewal Application (LRA) Section B.1.6 states an exception to GALL Report AMP XI.M34 as follows:
NUREG-1801 refers to periodic inspections with a scheduled frequency. CNP intends to inspect buried tanks and piping only when excavated during maintenance activities.
SER Section 3.0.3.2.2, "Buried Piping Inspection," documents the NRC staff's evaluation of this exception. The staff's evaluation stated, "the staff finds that the frequency of excavating buried components for maintenance activities will be sufficient to provide reasonable assurance that the applicant will identify the effects of aging before the loss of intended function." The "operating experience" portion of SER, Section 3.0.3.2.2, states: "[f]ailures of fuel oil tanks and piping have been limited to small leaks resulting from localized corrosion, such as pitting." It is clear that the NRC staff found the number of maintenance activities associated with excavating buried components to be acceptable; and the staff was aware of the small leaks that have occurred at the station when it accepted the exception related to periodic inspections with a scheduled frequency for buried carbon steel piping. However, based on its review of the LRA, SER, and CNP Audit & Review Report, it is unclear whether: (a) any of the small leaks associated with localized corrosion have been associated with copper alloy or copper piping, and (b) whether the number of maintenance activities associated with excavating copper alloy and copper piping is sufficient. The number of leaks and maintenance inspections associated with copper alloy and copper piping could impact the staff's conclusion of the acceptability of the exception for copper alloy and copper piping.
Request for Additional Information (RAI):
RAI-01: State whether there have been any leaks in buried in-scope copper alloy or copper piping. If there have been leaks, state when they occurred, the extent of degradation, and the cause of the leakage, if known.
RAI-02: State how many excavated direct visual examinations have been conducted of in-scope buried copper alloy or copper piping in the 10-year period prior to the period of extended operation. If excavated direct visual examinations of buried copper alloy or copper piping that is not in-scope has been conducted and the coating and soil environment (e.g., backfill specifications, moisture) is the same, state how many have been conducted.
RAI-03: If the number of direct visual examinations of buried copper alloy and copper piping in the 10-year period prior to the period of extended operation has been less than that recommended in LR-ISG-2011-03, "Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 Aging Management Program (AMP)
XI.M41, 'Buried and Underground Piping and Tanks'," Table 4a., "Inspections of Buried Pipe," considering the associated table footnotes (e.g., cathodic protection availability, backfill quality, soil corrosivity), state the minimum number of inspections that will be conducted in each 10-year period of the period of extended operation.
RAI-04: Provide a marked-up copy of the revised Updated Final Safety Analysis Report (UFSAR) Section 15.1.6, to reflect the appropriate level of detail as described in LR-ISG-2011-03, "Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 Aging Management Program (AMP) XI.M41, 'Buried and Underground Piping and Tanks'," Table 3.0-1.