{{#Wiki_filter:orominion Nuclear Connecticut, Inc. _oi,-n11EiPbg-  
{{#Wiki_filter:orominion Nuclear Connecticut, Inc. _oi,-n11EiPbg-  
..i-° iif°-O '5000 Dominion Boulevard, Glen Allen, VA 23060,Web Address:
..i-° iif°-O '5000 Dominion Boulevard, Glen Allen, VA 23060 ,Web Address: www.dom.com May 20, 2015 U. S. Nuclear Regulatory Commission Serial No. 15-248 Attention:
www.dom.com May 20, 2015U. S. Nuclear Regulatory Commission Serial No. 15-248Attention:
Document Control Desk NLOS/DEA RO Washington, DC 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT.
Document Control Desk NLOS/DEA ROWashington, DC 20555 Docket No. 50-336License No. DPR-65DOMINION NUCLEAR CONNECTICUT.
INC.MILLSTONE POWER STATION UNIT 2 IMPLEMENTATION OF LICENSE RENEWAL COMMITMENTS By letter dated January 20, 2004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 040260070), Dominion Nuclear Connecticut, Inc (DNC) submitted an application pursuant to Title 10 of the Code of Federal Regulations (CFR), Part 54 for renewal of Operating Licenses DPR-65 and NPF-49 for Millstone Power Station (MPS), Units 2 and 3, respectively.
INC.MILLSTONE POWER STATION UNIT 2IMPLEMENTATION OF LICENSE RENEWAL COMMITMENTS By letter dated January 20, 2004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 040260070),
In accordance with 10CFR54.21(d), an FSAR supplement was provided with the application for renewed operating licenses.
Dominion Nuclear Connecticut, Inc(DNC) submitted an application pursuant to Title 10 of the Code of Federal Regulations (CFR), Part 54 for renewal of Operating Licenses DPR-65 and NPF-49 for Millstone Power Station (MPS), Units 2 and 3, respectively.
Table 15.6-1 of the FSAR supplement for MPS Unit 2 (MPS2) contained thirty seven commitments that were to be completed prior to the period of extended operation.
In accordance with 10CFR54.21(d),
Completion of these commitments prior to the period of extended operation was also specified in MPS2 Renewed License Condition 2.C(1 1) issued on November 28, 2005 (ML 053220409).
an FSAR supplement was provided with the application for renewed operating licenses.
Specifically, MPS2 Renewed License Condition 2.C(1 1) states, "The FSAR supplement, as revised, describes certain future activities to be completed prior to the period of extended operation.
Table 15.6-1 of the FSAR supplement for MPS Unit 2 (MPS2) contained thirty seven commitments that were to be completed prior to the period of extendedoperation.
DNC shall complete these activities no later than July 31, 2015, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection".
Completion of these commitments prior to the period of extended operation was also specified in MPS2 Renewed License Condition 2.C(1 1) issued on November28, 2005 (ML 053220409).
Pursuant to MPS2 Renewed License Condition 2.C(1 1), DNC is providing written notification that the thirty seven commitments listed in Table 15.6-1 of the MPS2 FSAR have been completed and are ready for verification by NRC inspection.
Specifically, MPS2 Renewed License Condition 2.C(1 1) states, "The FSARsupplement, as revised, describes certain future activities to be completed prior to theperiod of extended operation.
If you have any questions regarding this submittal, please contact Diane Aitken at (804) 273-2694.Sincerely, Mark D. Sartain Vice President  
DNC shall complete these activities no later than July 31,2015, and shall notify the NRC in writing when implementation of these activities iscomplete and can be verified by NRC inspection".
-Nuclear Engineering Serial No. 15-248 Docket No. 50-336 Page 2 of 2 Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. Guzman Senior Project Manager -Millstone Power Station Units 2 and 3 U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station}}
Pursuant to MPS2 Renewed License Condition 2.C(1 1), DNC is providing writtennotification that the thirty seven commitments listed in Table 15.6-1 of the MPS2 FSARhave been completed and are ready for verification by NRC inspection.
If you have any questions regarding this submittal, please contact Diane Aitken at(804) 273-2694.
Sincerely, Mark D. SartainVice President  
-Nuclear Engineering Serial No. 15-248Docket No. 50-336Page 2 of 2Commitments made in this letter: Nonecc: U.S. Nuclear Regulatory Commission Region I2100 Renaissance Blvd, Suite 100King of Prussia, PA 19406-2713 R. GuzmanSenior Project Manager -Millstone Power Station Units 2 and 3U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C211555 Rockville PikeRockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station}}

Revision as of 03:18, 9 July 2018

Millstone, Unit 2 - Implementation of License Renewal Commitments
ML15154A489
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/20/2015
From: Sartain M D
Dominion, Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
15-248
Download: ML15154A489 (2)


Text

orominion Nuclear Connecticut, Inc. _oi,-n11EiPbg-

..i-° iif°-O '5000 Dominion Boulevard, Glen Allen, VA 23060 ,Web Address: www.dom.com May 20, 2015 U. S. Nuclear Regulatory Commission Serial No.15-248 Attention:

Document Control Desk NLOS/DEA RO Washington, DC 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT.

INC.MILLSTONE POWER STATION UNIT 2 IMPLEMENTATION OF LICENSE RENEWAL COMMITMENTS By letter dated January 20, 2004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 040260070), Dominion Nuclear Connecticut, Inc (DNC) submitted an application pursuant to Title 10 of the Code of Federal Regulations (CFR), Part 54 for renewal of Operating Licenses DPR-65 and NPF-49 for Millstone Power Station (MPS), Units 2 and 3, respectively.

In accordance with 10CFR54.21(d), an FSAR supplement was provided with the application for renewed operating licenses.

Table 15.6-1 of the FSAR supplement for MPS Unit 2 (MPS2) contained thirty seven commitments that were to be completed prior to the period of extended operation.

Completion of these commitments prior to the period of extended operation was also specified in MPS2 Renewed License Condition 2.C(1 1) issued on November 28, 2005 (ML 053220409).

Specifically, MPS2 Renewed License Condition 2.C(1 1) states, "The FSAR supplement, as revised, describes certain future activities to be completed prior to the period of extended operation.

DNC shall complete these activities no later than July 31, 2015, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection".

Pursuant to MPS2 Renewed License Condition 2.C(1 1), DNC is providing written notification that the thirty seven commitments listed in Table 15.6-1 of the MPS2 FSAR have been completed and are ready for verification by NRC inspection.

If you have any questions regarding this submittal, please contact Diane Aitken at (804) 273-2694.Sincerely, Mark D. Sartain Vice President

-Nuclear Engineering Serial No.15-248 Docket No. 50-336 Page 2 of 2 Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. Guzman Senior Project Manager -Millstone Power Station Units 2 and 3 U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station