orominion Nuclear Connecticut, Inc. _oi,-n11EiPbg- . . i-°iif°-O

'

5000 Dominion Boulevard, Glen Allen, VA 23060

,Web Address: www.dom.com May 20, 2015 U. S. Nuclear Regulatory Commission Serial No.15-248 Attention: Document Control Desk NLOS/DEA RO Washington, DC 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNIT 2 IMPLEMENTATION OF LICENSE RENEWAL COMMITMENTS By letter dated January 20, 2004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML040260070), Dominion Nuclear Connecticut, Inc (DNC) submitted an application pursuant to Title 10 of the Code of FederalRegulations (CFR), Part 54 for renewal of Operating Licenses DPR-65 and NPF-49 for Millstone Power Station (MPS), Units 2 and 3, respectively. In accordance with 10CFR54.21(d),

an FSAR supplement was provided with the application for renewed operating licenses. Table 15.6-1 of the FSAR supplement for MPS Unit 2 (MPS2) contained thirty seven commitments that were to be completed prior to the period of extended operation. Completion of these commitments prior to the period of extended operation was also specified in MPS2 Renewed License Condition 2.C(1 1) issued on November 28, 2005 (ML053220409).

Specifically, MPS2 Renewed License Condition 2.C(1 1) states, "The FSAR supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. DNC shall complete these activities no later than July 31, 2015, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection".

Pursuant to MPS2 Renewed License Condition 2.C(1 1), DNC is providing written notification that the thirty seven commitments listed in Table 15.6-1 of the MPS2 FSAR have been completed and are ready for verification by NRC inspection.

If you have any questions regarding this submittal, please contact Diane Aitken at (804) 273-2694.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering

Serial No.15-248 Docket No. 50-336 Page 2 of 2 Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. Guzman Senior Project Manager - Millstone Power Station Units 2 and 3 U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station