MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis ML23123A2792023-05-0202 May 2023 License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits and Exemption Request for Use of M5 Cladding ML23013A2242023-01-13013 January 2023 Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures ML22362A1022022-12-28028 December 2022 Proposed License Amendment Request to Supplement Spent Fuel Pool Criticality Safety Analysis ML22146A0272022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant. ML22096A2212022-04-0606 April 2022 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21053A3422021-02-22022 February 2021 Proposed License Amendment Request to Clarify Shutdown Bank Technical Specification Requirements and Add Alternative Control Rod Position Monitoring Requirements ML20343A2432020-12-0808 December 2020 Proposed License Amendment Request Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 ML20343A2592020-12-0808 December 2020 Supplement to Proposed License Amendment Request to Revise the Millstone Unit 2 Technical Specifications for Steam Generator Frequency ML20324A7032020-11-19019 November 2020 Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate ML20310A3242020-11-0505 November 2020 Proposed License Amendment Request, Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) ML20282A5942020-10-0808 October 2020 Proposed License Amendment Request to Revise the Millstone Unit 2 Technical Specifications for Steam Generator Inspection Frequency ML20224A4572020-08-11011 August 2020 Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections ML20121A2172020-04-30030 April 2020 Proposed Technical Specifications Change Battery Surveillance Requirements ML20105A0782020-04-14014 April 2020 Supplement to License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Components ML20065K9762020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20063L8232020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML19353A0222019-12-17017 December 2019 License Amendment Request to Revise TS 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML19304A2942019-10-22022 October 2019 Supplement to Proposed License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Componen ML19217A2082019-07-30030 July 2019 Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals ML19109A1002019-04-11011 April 2019 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. ML19023A4272019-01-17017 January 2019 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18128A0492018-05-0303 May 2018 License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage ML18100A0552018-04-0404 April 2018 License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML17284A1792017-10-0404 October 2017 Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals ML17171A2322017-06-15015 June 2017 License Amendment Request to Revise the Company Name ML17018A0002017-02-0707 February 2017 Issuance of Amendment Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 ML16354A4242016-12-14014 December 2016 License Amendment Request to Revise Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 for the Remainder of Cycle 24 ML16159A2592016-09-0606 September 2016 Enclosure 1 Millstone Power Station, Unit No. 1 Issuance of Amendment Administrative Changes and Corrections to the Technical Specifications ML16153A0262016-05-25025 May 2016 Proposed License Amendment Request Realistic Large Break Loss of Coolant Accident Analysis ML16153A0272016-05-25025 May 2016 ANP-3316(NP), Revision 0, Millstone, Unit 2, M5 Upgrade, Realistic Large Break Loca Analysis Licensing Report. ML16153A2342016-05-23023 May 2016 Supplement to License Amendment Request for Administrative Changes to the Permanently Defueled Technical Specifications ML16034A3582016-01-26026 January 2016 License Amendment Request, Spent Fuel Pool Heat Load Analysis ML16029A1682016-01-25025 January 2016 License Amendment Request to Revise ECCS TS 3/4.5.2 and FSAR Chapter 14 to Remove Charging ML15246A1172015-08-31031 August 2015 Supplement to License Amendment Request to Revise TS 6.19, Containment Leakage Testing Program ML15246A1182015-08-31031 August 2015 License Amendment Request to Revise Technical Specification 5.6.3, Fuel Storage Capacity ML15246A1242015-08-27027 August 2015 Connecticut, Inc. Millstone Power Station Unit 2 Supplement to License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 ML15183A0222015-06-30030 June 2015 License Amendment Request for Removal of Severe Line Outage Detection from the Offsite Power System ML15134A2442015-05-0808 May 2015 License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-15-1, and 06-IC-03 ML15065A3342015-02-26026 February 2015 Changes to Technical Specification Bases ML15021A1282015-01-15015 January 2015 Proposed License Amendment Requests to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML14310A1872014-10-31031 October 2014 License Amendment Request to Revise the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds ML14301A1122014-10-22022 October 2014 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 ML14188B1892014-06-30030 June 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C. ML14133A0092014-05-0808 May 2014 License Amendment Request, Implementation and Engineered WCAP-15376, Reactor Trip System Instrumentation Test Times and Engineered Safety Feature Actuation System Instrumentation Test and Completion Times ML14093A0282014-03-28028 March 2014 License Amendment Request for Administrative Changes to the Permanently Defueled Technical Specifications ML14093A0262014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14093A0272014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14070A3462014-03-0606 March 2014 Changes to Technical Specification Bases 2023-09-26
[Table view] |
Text
Dominion Nuclear Connecticut, Inc.
,-NMillstone Power Station f2~Dominion-Rope Ferry Road Waterford. CT 06385 January 20, 2004 U.S. Nuclear Regulatory Commission Serial No.: 03-606 Attention: Document Control Desk LR/ELA RD Washington, D.C. 20555 Docket Nos.: 50-336 50-423 License Nos.: DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
MILLSTONE POWER STATION UNITS 2 AND 3 APPLICATIONS FOR RENEWED OPERATING LICENSES Pursuant to the requirements of Parts 50, 51, and 54, Dominion Nuclear Connecticut, Inc. (DNC) hereby applies for the renewal of the operating licenses for Millstone Power Station Units 2 and 3. The application for Unit 2 is filed within the interval specified in 10 CFR 54.17(c). The current operating license for Millstone Unit 2 (DPR-65) expires on July 31, 2015 and the operating license for Millstone Unit 3 (NPF-49) expires on November 25, 2025. The applications for both units meet the timeliness requirements of 10 CFR 2.109(b).
By letter dated December 13, 2002, DNC requested an exemption from the schedular requirements of 10 CFR 54.17(c) for Millstone Unit No. 3. By letter dated December 30, 2003 (69 FR 944) the NRC approved DNC's request for exemption from the schedular requirements of 10 CFR 54.17(c) for Millstone Unit 3. Based on this approval, DNC hereby submits the applications for Millstone Units 2 and 3 and requests that the operating license for each of these units be extended for twenty (20) years.
The license renewal applications for Millstone Unit 2 and Millstone Unit 3 contain the information required by 10 CFR 54.17, 54.19, 54.21, 54.22, 54.23, and 51.53 for the contents of an application for a renewed operating license.
CD-ROMs containing the Millstone Power Station Units 2 and 3 applications for renewed operating licenses, including the Environmental Report, are being provided to meet all distribution and copy requirements. One CD-ROM provided with this letter (Enclosure 1) is for use by the Document Control Desk. An additional copy is being . ,
sent directly to the Region I office. This fulfills the requirements of 10 CFR 50.4(b)(3) for acceptance review. The other CD-ROM provided with this letter (Enclosure 2) meets the requirements of 10 CFR 51.55(a).
A CD-ROM is being sent directly to the Senior Resident Inspector as required by 10 CFR 50.4(b)(2)(ii). CD-ROMs are also being sent directly to individuals and officials designated in the distribution of this letter, including the chief executive of the local government in accordance with 10 CFR 2.101(a)(3).
jgAS':d4 J1
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Page 2 of 9 Each CD-ROM copy includes the following:
Application for Renewed Operating License
- Millstone Power Station Unit 2, 001_MP2_LRA.pdf, 3,618 kilobytes, publicly available.
. Millstone Power Station Unit 3, 001_MP3_LRA.pdf, 4,077 kilobytes, publicly available.
Environmental Report
- Millstone Power Station Units 2 & 3 - Operating License Renewal Stage, 001_MPFER.pdf, 30,719 kilobytes, publicly available. of this letter contains excerpts from the license renewal applications for both Units 2 and 3, which provide the financial information required by 10 CFR 50.33(f)(2) for applications from non-electric utility sources. Dominion considers the information in Attachment 1 to be proprietary. To conform to the requirements of 10 CFR 2.790, concerning the protection of proprietary information, the proprietary information provided in Attachment 1 is contained within brackets. Attachment 2 has been redacted to provide a non-proprietary version of this financial information. The redacted version from Attachment 2 is the version provided in all electronic copies of the license renewal applications. Where the proprietary information has been deleted in the non-proprietary version, only the brackets and the statement "Company Confidential Information" remains. The basis for redacting certain information as proprietary is provided in the application for withholding and affidavit provided in Attachment 3 pursuant to 10 CFR 2.790(b)(1).
As required by 10 CFR 54.21(b), current licensing basis changes that have a material effect on the content of this application will be identified at least annually while the application is under NRC review and at least three months prior to the scheduled completion of the NRC review.
Should you have any questions regarding this submittal, please contact Mr. William D.
Corbin, Director, Nuclear Projects, Dominion Resources Services, Inc., 5000 Dominion Blvd., Glen Allen, VA, 23060, (804) 273-2365, e-mail: BillCorbin@dom.com.
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Page 3 of 9 Service upon the applicants of comments, hearing requests, intervention petitions, or other pleadings related to these applications should be made to Counsel for DNC as follows:
Lillian M. Cuoco David R. Lewis Senior Counsel Shaw Pittman, LLC Dominion Resources Services, Inc. 2300 N. Street N. W.
Rope Ferry Road Washington, DC 20037 Waterford, CT 06385 (202) 663-8474 (860) 444-5316 (202) 663-8007 fax (860) 444-4278 fax DavidLewis@shawpittman.com LillianCuoco@dom.com Very truly yours, David A. Christian afz---
Senior Vice President - Nuclear Operations and Chief Nuclear Officer COMMONWEALTH OF VIRGINIA
)
COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by David A. Christian, who is Senior Vice President -
Nuclear Operations and Chief Nuclear Officer, Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me thisJOM day of _6daLOKL-, 2004.
-7 n,,d1,A My Commission Expires: 3/ jI IVLV-
.' s ,. ----. . - ..
Notary Public (SEAL):
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Page 4 of 9 Attachments:
- 1. Financial Information (proprietary).
- 2. Financial Information (redacted).
- 3. Application for withholding and affidavit.
Enclosures:
- 1. CD-ROM to meet the requirements of 10 CFR 50.4(b)(3).
- 2. CD-ROM to meet the requirements of 10 CFR 51.55(a).
Commitments made in this letter:
The Licensee Commitments identified in Table A6.0-1 of Appendix A, Final Safety Analysis Report Supplement, are proposed to support approval of the renewed operating licenses and may change during the NRC review period.
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Page 5 of 9 cc: (w/o Attachments, CD-ROM copy only)
U.S. Nuclear Regulatory Commission Region I 475 Allendale Rd King of Prussia, PA 19406-1415 Mr. R. M. Pulsifer USNRC OWFN 11555 Rockville Pike Rockville, MD 20852 Mr. V. Nerses USNRC OWFN 11555 Rockville Pike Rockville, MD 20852 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Rope Ferry Road Waterford, CT 06385 Honorable Wayne L. Fraser First Selectman P.O. Box 519 Niantic, CT 06357-0519 Mr. Denny Galloway Supervising Radiation Control Physicist State of Connecticut - DEP Division of Radiation 79 Elm Street Hartford, CT 06106-5127 Honorable Chris Dodd US Senate 100 Great Meadow Road Wethersfield, CT 06109
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Page 6 of 9 Michael Doyle Governor Rowland's Eastern Office 171 Salem Turnpike Norwich, CT 06360 William Meinert MMWEC P.O. Box 426 Ludlow, MA 01056-0426 Stephen Page Central VT PSC 77 Grove Street Rutland, VT 06701 Honorable Melody Peters CT State Senate 25 Osceola Trail Old Lyme, CT 06371 Honorable Andrea Stillman CT House of Representatives 5 Coolidge Court Waterford, CT 06385 Honorable Gary Orefice CT House of Representatives 47 Columbus Avenue Niantic, CT 06357 Honorable Robert Simmons US Congress 2 Courthouse Square Norwich, CT 06360 Thomas Wagner Town of Waterford Town Planner 15 Rope Ferry Road Waterford, CT 06385
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Page 7 of 9 Dr. Edward L. Wilds Director, Division of Radiation State of Connecticut - DEP 79 Elm Street Hartford, CT 06106-5127 Chairman Donald Downes DPUC 10 Franklin Square New Britain, CT 06051 Honorable Dennis L. Popp Chairman - Council of Governments Municipal Building 295 Meridian Street Groton, CT 06340 Chief Murray J. Pendleton Director of Emergency Management 41 Avery Lane Waterford, CT 06385-2806 Honorable Richard Blumenthal Attorney General 55 Elm Street Hartford, CT 06106-1774 John Markowicz Co-Chairman - NEAC 9 Susan Terrace Waterford, CT 06385 Evan Woolacott Co-Chairman - NEAC 128 Terry's Plain Road Simsbury, CT 06070 Honorable John Rowland Governor State Capitol Hartford, CT 06106
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Page 8 of 9 Mark Powers 4 Round Rock Road Niantic, CT 06357 Mr. Jay Levin 23 Worthington Road New London, CT 06320 Mr. Jim Butler Executive Director - Council of Governments 8 Connecticut Avenue Norwich, CT 06360 Mr. Bill Palomba Executive Director, DPUC 10 Franklin Square New Britain, CT 06051 Honorable Wade Hyslop State Representative, 3 9th District 32 Belden Street New London, CT 06320 Honorable Terry Backer CT State Representative Legislative Office Building Room 3902 Hartford, CT 06106 Honorable Kevin DelGobbo CT State Representative 83 Meadow Street Naugautuck, CT 06770 Honorable Thomas Herlihy CT Senate 12 Riverwalk Simsbury, CT 06089 Honorable Cathy Cook CT Senate, 1 8 th District 43 Pequot Avenue Mystic, CT 06355
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Page 9 of 9 Mr. Edward Mann Office of Senator Dodd Putnam Park 100 Great Meadow Road Wethersfield, CT 06109 Chairman Pam Katz CT Siting Council 10 Franklin Square New Britain, CT 06051 Mr. Ken Decko CBIA 350 Church Street Hartford, CT 06103 Honorable Paul Eccard First Selectman Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. Richard Brown City Manager New London City Hall 181 State Street New London, CT 06320
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Enclosure I CD-ROM Applications for Renewed Operating Licenses Millstone Power Station Units 2 and 3 to meet the requirements of 10 CFR 50.4(b)(3)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc.
Serial No.03-606 Docket Nos.: 50-336/423 Application for Renewed Operating Licenses Enclosure 2 CD-ROM Applications for Renewed Operating Licenses Millstone Power Station Units 2 and 3 to meet the requirements of 10 CFR 51.55(a)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc.