Duke Energy Date: 8/27/2015 Document Transmittal  
Duke Energy Date: 8/27/2015 Document Transmittal  
#: TR-NUC-MC-000527
#: TR-NUC-MC-000527
: 1. Gardner, Tray R D C M N R N M T A O M Proe su2. Mc Ginnis, Vickie L (At Mcguire)
: 1. Gardner, Tray R D C M N R N M T A O M Proe su 2. Mc Ginnis, Vickie L (At Mcguire) D C M N R N M T A O MProe su 3. McCree, Victor M Released By: 4. SCIENTECH CLEARWTR, FL Facility:
D C M N R N M T A O MProe su3. McCree, Victor M Released By:4. SCIENTECH  
MCGUIRE NUCLEAR STATION Duke Enerciy 5. SERV BLDG FILE ROOM -SUBJECT 13225 Haqiers Ferry Road 6. U S NUC REG WASHINGTON, DC Tech Spec Bases 3.8.4 -DC Sources -Operatina Document Management
: CLEARWTR, FL Facility:
: 7. USNRC MG02M 8. WESTINGHOUSE ELECTRIC CO LLC Huntersville, NC 28078 Page 1 of 1 MNSDCRI~c~duke-enerav.com Remarks: This is Rev 137 of the Tech Spec Bases. Please chancie out the entire section 3.8.4. Reference TR-NUC-MC-O00446 p
MCGUIRE NUCLEAR STATION Duke Enerciy5. SERV BLDG FILE ROOM -SUBJECT 13225 Haqiers Ferry Road6. U S NUC REG WASHINGTON, DC Tech Spec Bases 3.8.4 -DC Sources -Operatina Document Management
DC Sources--Operating B 3.8.4 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.4 DC Sources-Operating BASES BACKGROUND The station DC electrical power system provides the AC emergency power system with control power. It also provides both motive and control power to selected safety related equipment and preferred AC vital bus power (via inverters).
: 7. USNRC MG02M8. WESTINGHOUSE ELECTRIC CO LLC Huntersville, NC 28078Page 1 of 1 MNSDCRI~c~duke-enerav.com Remarks:
As required by 10 CFR 50, Appendix A, GDC 17 (Ref. 1), the DC electrical power system is designed to have sufficient independence, redundancy, and testability to perform its safety functions, assuming a single failure. The DC electrical power system also conforms to the recommendations of Regulatory Guide 1.6 (Ref. 2) and IEEE-308 (Ref. 3).The 125 VDC electrical power system consists of two independent and redundant safety related Class 1 E DC electrical power subsystems (Train A and Train B). Each subsystem consists of two channels of 125 VDC batteries (each battery 100% capacity), the associated battery charger(s) for each battery, and all the associated control equipment and interconnecting cabling.Additionally there is one spare battery charger, which provides backup service in the event that the preferred battery charger is out of service. If the spare battery charger is substituted for one of the preferred battery chargers, then the requirements of independence and redundancy between subsystems are maintained.
This is Rev 137 of the Tech Spec Bases. Please chancie out the entire section 3.8.4. Reference TR-NUC-MC-O00446 p
During normal operation, the 125 VDC load is powered from the battery chargers with the batteries floating on the system. In case of loss of normal power to the battery charger, the DC load is automatically powered from the station batteries.
DC Sources--Operating B 3.8.4B 3.8 ELECTRICAL POWER SYSTEMSB 3.8.4 DC Sources-Operating BASESBACKGROUND The station DC electrical power system provides the AC emergency power system with control power. It also provides both motive andcontrol power to selected safety related equipment and preferred AC vitalbus power (via inverters).
The Train A and Train B DC electrical power subsystems provide the control power for its associated Class 1 E AC power load group, 4.16 kV switchgear, and 600 V load centers. The DC electrical power subsystems also provide DC electrical power to the inverters, which in turn power the AC vital buses.The DC power distribution system is described in more detail in Bases for LCO 3.8.9, "Distribution System--Operating," and LCO 3.8.10,"Distribution Systems--Shutdown." McGuire Units 1 and 2 B3841Rvso o 3 B 3.8.4-1 Revision No. 137 DC Sources-Operating B 3.8.4 BASES BACKGROUND (continued)
As required by 10 CFR 50, Appendix A,GDC 17 (Ref. 1), the DC electrical power system is designed to havesufficient independence, redundancy, and testability to perform its safetyfunctions, assuming a single failure.
Each battery (EVCA, EVCB, EVCC, EVOD) has adequate storage capacity to carry the required duty cycle for one hour after the loss of the battery charger output. In addition, the battery is capable of supplying power for the operation of anticipated momentary loads during the one hour period.Each 125 VDC battery is separately housed in a ventilated room apart from its charger and distribution centers. Each channel is located in an area separated physically and electrically from the other channel to ensure that a single failure in one subsystem does not cause a failure in a redundant subsystem.
The DC electrical power system alsoconforms to the recommendations of Regulatory Guide 1.6 (Ref. 2) andIEEE-308 (Ref. 3).The 125 VDC electrical power system consists of two independent andredundant safety related Class 1 E DC electrical power subsystems (Train A and Train B). Each subsystem consists of two channels of125 VDC batteries (each battery 100% capacity),
There is no sharing between redundant Class 1 E subsystems, such as batteries, battery chargers, or distribution panels.The batteries for the channels of DC are sized to produce required capacity at 80% of nameplate rating, corresponding to warranted capacity at end of life cycles and the 100% design demand. Battery size is based on 125% of required capacity and, after selection of an available commercial battery, results in a battery capacity in excess of 150% of required capacity.
the associated batterycharger(s) for each battery, and all the associated control equipment andinterconnecting cabling.Additionally there is one spare battery charger, which provides backupservice in the event that the preferred battery charger is out of service.
The individual cell voltage limit is 2.13 V per cell. The minimum battery terminal voltage limit is greater than or equal to 125 V while on float charge as discussed in the UFSAR, Chapter 8 (Ref. 4).The criteria for sizing large lead storage batteries are defined in IEEE-485 (Ref. 5).Each channel of DC has ample power output capacity for the steady state operation of connected loads required during normal operation, while at the same time maintaining its battery bank fully charged. Each battery charger also has sufficient capacity to restore the battery from the design minimum charge to its fully charged state within 8 hours while supplying normal steady state loads discussed in the UFSAR, Chapter 8 (Ref. 4).APPLICABLE The initial conditions of Design Basis Accident (DBA) and transient SAFETY ANALYSES analyses in the UFSAR, Chapter 6 (Ref. 6), and in the UFSAR, Chapter 15 (Ref. 7), assume that Engineered Safety Feature (ESE)systems are OPERABLE.The OPERABILITY of the DC sources is consistent with the initial assumptions of the accident analyses and is based upon meeting the design basis of the unit. This includes maintaining the DC sources OPERABLE during accident conditions in the event of: McGuire Units 1 and 2 B3842Rvso o 3 B 3.8.4-2 Revision No. 137 DC Sources--Operating B 3.8.4 BASES APPLICABLE SAFETY ANALYSES (continued)
Ifthe spare battery charger is substituted for one of the preferred batterychargers, then the requirements of independence and redundancy between subsystems are maintained.
: a. An assumed loss of all offsite AC power or all onsite AC power; and b. A worst case single failure.The DC sources satisfy Criterion 3 of 10 CFR 50.36 (Ref. 8).LCO Each DC channel consisting of one battery, battery charger for each battery and the corresponding control equipment and interconnecting cabling supplying power to the associated bus within the train is required to be OPERABLE to ensure the availability of the required power to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence (AOO) or a postulated DBA. Loss of any channel of DC does not prevent the minimum safety function from being performed (Ref. 4).An OPERABLE channel of DC requires the battery and respective charger to be operating and connected to the associated DC bus.APPLICABILITY The DC electrical power sources are required to be OPERABLE in MODES 1, 2, 3, and 4 to ensure safe unit operation and to ensure that: a. Acceptable fuel design limits and reactor coolant pressure boundary limits are not exceeded as a result of AOOs or abnormal transients; and b. Adequate core cooling is provided, and containment integrity and other vital functions are maintained in the event of a postulated DBA.The DC electrical power requirements for MODES 5 and 6 are addressed in the Bases for LCO 3.8.5, "DC Sources--
During normal operation, the 125 VDC load is powered from the batterychargers with the batteries floating on the system. In case of loss ofnormal power to the battery charger, the DC load is automatically powered from the station batteries.
Shutdown." ACTIONS A.1 and A.2 Condition A represents one channel of DC with a loss of ability to fully respond to a DBA with the worst case single failure. Two hours is provided to restore the channel of DC to OPERABLE status and is consistent with the allowed time for an inoperable channel of DC distribution system requirement.
The Train A and Train B DC electrical power subsystems provide thecontrol power for its associated Class 1 E AC power load group, 4.16 kVswitchgear, and 600 V load centers.
McGuire Units 1 and 2 B3843Rvso o 3 B 3.8.4-3 Revision No. 137 DC Sources-Operating B 3.8.4 BASES ACTIONS (continued)
The DC electrical power subsystems also provide DC electrical power to the inverters, which in turn power theAC vital buses.The DC power distribution system is described in more detail in Bases forLCO 3.8.9, "Distribution System--Operating,"
If one of the required channels of DC is inoperable (e.g., inoperable battery, inoperable battery charger(s), or inoperable battery charger and associated inoperable battery), the remaining DC channels have the capacity to support a safe shutdown and to mitigate an accident condition.
and LCO 3.8.10,"Distribution Systems--Shutdown."
If the channel of DC cannot be restored to OPERABLE status, Action A.2 must be entered and the DC channel must be energized from an OPERABLE channel, from the same train, within 2 hours. The capacity of the redundant channel is sufficient to supply its normally supplied channel and cross tied channel for the required time, in case of a DBA event. The inoperable channel of DC must be returned to OPERABLE status within 72 hours and the cross ties to the other channel open. The 72 hour Completion Time reflects a reasonable time to assess unit status as a function of the inoperable channel of DC and, if the DC channel is not restored to OPERABLE status, to prepare to effect an orderly and safe unit shutdown.As part of the battery replacement project, the Completion Time that one channel of DC source can be inoperable as specified by Required Action A.2.2 may be extended beyond the "72 hours" for up to 14 days. This allowance may be used one-time for each of the four DC channels.
McGuire Units 1 and 2 B3841Rvso o 3B 3.8.4-1Revision No. 137 DC Sources-Operating B 3.8.4BASESBACKGROUND (continued)
Upon completion of the battery replacement project, the Completion Time footnote is no longer applicable and will expire on December 31, 2016.B.1 and B.2 If the inoperable channel of DC cannot be restored to OPERABLE status within the required Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 6 hours and to MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging plant systems.The Completion Time to bring the unit to MODE 5 is consistent with the time required in Regulatory Guide 1.93 (Ref. 9).SURVEILLANCE SR 3.8.4.1 REQUIREMENTS Verifying battery terminal voltage while on float charge for the batteries helps to ensure the effectiveness of the charging system and the ability of the batteries to perform their intended function.
Each battery (EVCA, EVCB, EVCC, EVOD) has adequate storagecapacity to carry the required duty cycle for one hour after the loss of thebattery charger output. In addition, the battery is capable of supplying power for the operation of anticipated momentary loads during the onehour period.Each 125 VDC battery is separately housed in a ventilated room apartfrom its charger and distribution centers.
Float charge is the condition in which the charger is supplying the continuous charge required to overcome the internal losses of a battery (or battery cell) and maintain the battery (or a battery cell) in a fully charged state. The voltage requirements are based on the nominal design voltage of the battery and are consistent with the initial voltages assumed in the battery McGuire Units 1 and 2 B3844Rvso o 3 B3.8.4-4 Revision No. 137 DC Sources-Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued) sizing calculations.
Each channel is located in anarea separated physically and electrically from the other channel toensure that a single failure in one subsystem does not cause a failure in aredundant subsystem.
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.8.4.2 Visual inspection to detect corrosion of the battery cells and connections, or measurement of the resistance of each intercell, interrack, intertier, and terminal connection, provides an indication of physical damage or abnormal deterioration that could potentially degrade battery performance.
There is no sharing between redundant Class 1 Esubsystems, such as batteries, battery chargers, or distribution panels.The batteries for the channels of DC are sized to produce requiredcapacity at 80% of nameplate rating, corresponding to warranted capacityat end of life cycles and the 100% design demand. Battery size is basedon 125% of required capacity and, after selection of an available commercial  
For any connection that shows corrosion, the resistance shall be measured at that connection to verify acceptable connection resistance (Ref. 10). The limits for battery connection resistance are specified in Table 3.8.4-1.The plant safety analyses do not assume a specific battery connection resistance value, but typically assume that the batteries will supply adequate power for a specified period of time. The resistance of each battery connection varies independently from all the others. Some of these individual connection resistance values may be higher or lower than the others, and the battery will still be able to perform its design function.Overall connection resistance, which is the sum total of all connection resistances, has a direct impact on battery operability.
: battery, results in a battery capacity in excess of 150% ofrequired capacity.
The values listed in Table 3.8.4-1 are based on the battery manufacturers recommended connection voltage drop. As long as battery connection resistance values are at or below the values listed in Table 3.8.4-1, battery operability will not be in question based on intercell, interrack, intertier, and terminal connection resistance.
The individual cell voltage limit is 2.13 V per cell. Theminimum battery terminal voltage limit is greater than or equal to 125 Vwhile on float charge as discussed in the UFSAR, Chapter 8 (Ref. 4).The criteria for sizing large lead storage batteries are defined in IEEE-485(Ref. 5).Each channel of DC has ample power output capacity for the steady stateoperation of connected loads required during normal operation, while atthe same time maintaining its battery bank fully charged.
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.8.4.3 Visual inspection of the battery cells, cell plates, and battery racks provides an indication of physical damage or abnormal deterioration that could potentially degrade battery performance.
Each batterycharger also has sufficient capacity to restore the battery from the designminimum charge to its fully charged state within 8 hours while supplying normal steady state loads discussed in the UFSAR, Chapter 8 (Ref. 4).APPLICABLE The initial conditions of Design Basis Accident (DBA) and transient SAFETY ANALYSES analyses in the UFSAR, Chapter 6 (Ref. 6), and in the UFSAR,Chapter 15 (Ref. 7), assume that Engineered Safety Feature (ESE)systems are OPERABLE.
The presence of physical damage or deterioration does not necessarily represent a failure of this SR, provided an evaluation determines that the physical damage or deterioration does not affect the OPERABILITY of the battery (its ability to perform its design function).
The OPERABILITY of the DC sources is consistent with the initialassumptions of the accident analyses and is based upon meeting thedesign basis of the unit. This includes maintaining the DC sourcesOPERABLE during accident conditions in the event of:McGuire Units 1 and 2 B3842Rvso o 3B 3.8.4-2Revision No. 137 DC Sources--Operating B 3.8.4BASESAPPLICABLE SAFETY ANALYSES (continued)
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3845Rvso o 3 B 3.8.4-5 Revision No. 137 DC Sources--Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)
: a. An assumed loss of all offsite AC power or all onsite AC power; andb. A worst case single failure.The DC sources satisfy Criterion 3 of 10 CFR 50.36 (Ref. 8).LCO Each DC channel consisting of one battery, battery charger for eachbattery and the corresponding control equipment and interconnecting cabling supplying power to the associated bus within the train is requiredto be OPERABLE to ensure the availability of the required power to shutdown the reactor and maintain it in a safe condition after an anticipated operational occurrence (AOO) or a postulated DBA. Loss of any channelof DC does not prevent the minimum safety function from beingperformed (Ref. 4).An OPERABLE channel of DC requires the battery and respective charger to be operating and connected to the associated DC bus.APPLICABILITY The DC electrical power sources are required to be OPERABLE inMODES 1, 2, 3, and 4 to ensure safe unit operation and to ensure that:a. Acceptable fuel design limits and reactor coolant pressureboundary limits are not exceeded as a result of AOOs or abnormaltransients; andb. Adequate core cooling is provided, and containment integrity andother vital functions are maintained in the event of a postulated DBA.The DC electrical power requirements for MODES 5 and 6 are addressed in the Bases for LCO 3.8.5, "DC Sources--
SR 3.8.4.4 and SR 3.8.4.5 Visual inspection and resistance measurements of intercell, interrack, intertier, terminal connections, and the average intercell connection resistance provide an indication of physical damage or abnormal deterioration that could indicate degraded battery condition.
Shutdown."
The limits for battery connection resistance are specified in Table 3.8.4-1. Single terminal connection resistance is defined as the measurement from each individual load cable lug to the battery cell post. Average intercell connection resistance is defined as the battery manufacturer's maximum allowed intercell connection voltage drop divided by the maximum battery duty cycle load current. The maximum allowable battery total intercell connection resistance can then be defined as the average intercell connection resistance times the total number of intercell connectors in the battery string. Intercell connection is referring to the 56 copper connection straps between the battery lar posts and the battery terminal connections.
ACTIONS A.1 and A.2Condition A represents one channel of DC with a loss of ability to fullyrespond to a DBA with the worst case single failure.
The plant safety analyses do not assume a specific battery connection resistance value, but typically assume that the batteries will supply adequate power for a specified period of time. The resistance of each battery connection varies independently from all the others. Some of these individual connection resistance values may be higher or lower than the others, and the battery will still be able to perform its design function.Overall connection resistance, which is the sum total of all connection resistances, has a direct impact on battery operability.
Two hours isprovided to restore the channel of DC to OPERABLE status and isconsistent with the allowed time for an inoperable channel of DCdistribution system requirement.
The values listed in Table 3.8.4-1 are based on the battery manufacturers recommended connection voltage drop. As long as battery connection resistance values are at or below the values listed in Table 3.8.4-1, battery operability will not be in question based on intercell, interrack, intertier, and terminal connection resistance.
McGuire Units 1 and 2 B3843Rvso o 3B 3.8.4-3Revision No. 137 DC Sources-Operating B 3.8.4BASESACTIONS (continued)
If one of the required channels of DC is inoperable (e.g., inoperable
: battery, inoperable battery charger(s),
or inoperable battery charger andassociated inoperable battery),
the remaining DC channels have thecapacity to support a safe shutdown and to mitigate an accidentcondition.
If the channel of DC cannot be restored to OPERABLE status,Action A.2 must be entered and the DC channel must be energized froman OPERABLE  
: channel, from the same train, within 2 hours. Thecapacity of the redundant channel is sufficient to supply its normallysupplied channel and cross tied channel for the required time, in case of aDBA event. The inoperable channel of DC must be returned toOPERABLE status within 72 hours and the cross ties to the other channelopen. The 72 hour Completion Time reflects a reasonable time to assessunit status as a function of the inoperable channel of DC and, if the DCchannel is not restored to OPERABLE status, to prepare to effect anorderly and safe unit shutdown.
As part of the battery replacement  
: project, the Completion Time that onechannel of DC source can be inoperable as specified by Required ActionA.2.2 may be extended beyond the "72 hours" for up to 14 days. Thisallowance may be used one-time for each of the four DC channels.
Uponcompletion of the battery replacement  
: project, the Completion Timefootnote is no longer applicable and will expire on December 31, 2016.B.1 and B.2If the inoperable channel of DC cannot be restored to OPERABLE statuswithin the required Completion Time, the unit must be brought to a MODEin which the LCO does not apply. To achieve this status, the unit must bebrought to at least MODE 3 within 6 hours and to MODE 5 within 36hours. The allowed Completion Times are reasonable, based onoperating experience, to reach the required unit conditions from full powerconditions in an orderly manner and without challenging plant systems.The Completion Time to bring the unit to MODE 5 is consistent with thetime required in Regulatory Guide 1.93 (Ref. 9).SURVEILLANCE SR 3.8.4.1REQUIREMENTS Verifying battery terminal voltage while on float charge for the batteries helps to ensure the effectiveness of the charging system and the ability ofthe batteries to perform their intended function.
Float charge is thecondition in which the charger is supplying the continuous chargerequired to overcome the internal losses of a battery (or battery cell) andmaintain the battery (or a battery cell) in a fully charged state. Thevoltage requirements are based on the nominal design voltage of thebattery and are consistent with the initial voltages assumed in the batteryMcGuire Units 1 and 2 B3844Rvso o 3B3.8.4-4Revision No. 137 DC Sources-Operating B 3.8.4BASESSURVEILLANCE REQUIREMENTS (continued) sizing calculations.
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled underthe Surveillance Frequency Control Program.SR 3.8.4.2Visual inspection to detect corrosion of the battery cells and connections, or measurement of the resistance of each intercell, interrack, intertier, andterminal connection, provides an indication of physical damage orabnormal deterioration that could potentially degrade batteryperformance.
For any connection that shows corrosion, the resistance shall be measured at that connection to verify acceptable connection resistance (Ref. 10). The limits for battery connection resistance arespecified in Table 3.8.4-1.The plant safety analyses do not assume a specific battery connection resistance value, but typically assume that the batteries will supplyadequate power for a specified period of time. The resistance of eachbattery connection varies independently from all the others. Some ofthese individual connection resistance values may be higher or lower thanthe others, and the battery will still be able to perform its design function.
Overall connection resistance, which is the sum total of all connection resistances, has a direct impact on battery operability.
The values listed inTable 3.8.4-1 are based on the battery manufacturers recommended connection voltage drop. As long as battery connection resistance valuesare at or below the values listed in Table 3.8.4-1, battery operability willnot be in question based on intercell, interrack, intertier, and terminalconnection resistance.
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.8.4.3Visual inspection of the battery cells, cell plates, and battery racksprovides an indication of physical damage or abnormal deterioration thatcould potentially degrade battery performance.
The presence of physicaldamage or deterioration does not necessarily represent a failure of thisSR, provided an evaluation determines that the physical damage ordeterioration does not affect the OPERABILITY of the battery (its ability toperform its design function).
The Surveillance Frequency is based onoperating experience, equipment reliability, and plant risk and iscontrolled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3845Rvso o 3B 3.8.4-5Revision No. 137 DC Sources--Operating B 3.8.4BASESSURVEILLANCE REQUIREMENTS (continued)
SR 3.8.4.4 and SR 3.8.4.5Visual inspection and resistance measurements of intercell, interrack, intertier, terminal connections, and the average intercell connection resistance provide an indication of physical damage or abnormaldeterioration that could indicate degraded battery condition.
The limits forbattery connection resistance are specified in Table 3.8.4-1.
Singleterminal connection resistance is defined as the measurement from eachindividual load cable lug to the battery cell post. Average intercell connection resistance is defined as the battery manufacturer's maximumallowed intercell connection voltage drop divided by the maximum batteryduty cycle load current.
The maximum allowable battery total intercell connection resistance can then be defined as the average intercell connection resistance times the total number of intercell connectors in thebattery string. Intercell connection is referring to the 56 copper connection straps between the battery lar posts and the battery terminal connections.
The plant safety analyses do not assume a specific battery connection resistance value, but typically assume that the batteries will supplyadequate power for a specified period of time. The resistance of eachbattery connection varies independently from all the others. Some ofthese individual connection resistance values may be higher or lower thanthe others, and the battery will still be able to perform its design function.
Overall connection resistance, which is the sum total of all connection resistances, has a direct impact on battery operability.
The values listed inTable 3.8.4-1 are based on the battery manufacturers recommended connection voltage drop. As long as battery connection resistance valuesare at or below the values listed in Table 3.8.4-1, battery operability willnot be in question based on intercell, interrack, intertier, and terminalconnection resistance.
The anticorrosion material is used to help ensure good electrical connections and to reduce terminal deterioration.
The anticorrosion material is used to help ensure good electrical connections and to reduce terminal deterioration.
The visual inspection for corrosion is not intended to require removal of and inspection undereach terminal connection.
The visual inspection for corrosion is not intended to require removal of and inspection under each terminal connection.
The removal of visible corrosion is apreventive maintenance SR. The presence of visible corrosion does notnecessarily represent a failure of this SR provided visible corrosion isremoved during performance of SR 3.8.4.4.
The removal of visible corrosion is a preventive maintenance SR. The presence of visible corrosion does not necessarily represent a failure of this SR provided visible corrosion is removed during performance of SR 3.8.4.4. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3846Rvso o 3 B 3.8.4-6 Revision No. 137 DC Sources--Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk andis controlled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3846Rvso o 3B 3.8.4-6Revision No. 137 DC Sources--Operating B 3.8.4BASESSURVEILLANCE REQUIREMENTS (continued)
SR 3.8.4.6 This SR requires that each battery charger be capable of supplying 400 amps and 125 V for > 1 hour. These requirements are based on the design requirements of the chargers.
SR 3.8.4.6This SR requires that each battery charger be capable of supplying 400 amps and 125 V for > 1 hour. These requirements are based on thedesign requirements of the chargers.
According to Regulatory Guide 1.32 (Ref. 11), the battery charger supply is required to be based on the largest combined demands of the various steady state loads and the charging capacity to restore the battery from the design minimum charge state to the fully charged state, irrespective of the status of the unit during these demand occurrences.
According to Regulatory Guide 1.32(Ref. 11), the battery charger supply is required to be based on thelargest combined demands of the various steady state loads and thecharging capacity to restore the battery from the design minimum chargestate to the fully charged state, irrespective of the status of the unit duringthese demand occurrences.
The minimum required amperes and duration ensures that these requirements can be satisfied.
The minimum required amperes andduration ensures that these requirements can be satisfied.
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.8.4.7 A battery service test is a special test of battery capability, as found, to satisfy the design requirements (battery duty cycle) of the DC electrical power system. The discharge rate and test length of 1 hour should correspond to the design duty cycle requirements as specified in Reference 4.The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.This SR is modified by a Note. The Note allows the performance of a modified performance discharge test in lieu of a service test.The modified performance discharge test, as defined by IEEE-450 (Ref. 10)is a simulated duty cycle consisting of just two rates; the one minute rate published for the battery or the largest current load of the duty cycle, followed by the test rate employed for the performance test, both of which envelope the duty cycle of the service test. Since the ampere-hours removed by a rated one minute discharge represents a very small portion of the battery capacity, the test rate can be changed to that for the performance test without compromising the results of the performance discharge test. The battery terminal voltage for the modified performance discharge test should remain above the minimum battery terminal voltage specified in the battery service test for the duration of time equal to that of the service test.McGuire Units 1 and 2 B3847Rvso o 3 B 3.8.4-7 DC Sources--Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.8.4.7A battery service test is a special test of battery capability, as found, tosatisfy the design requirements (battery duty cycle) of the DC electrical power system. The discharge rate and test length of 1 hour shouldcorrespond to the design duty cycle requirements as specified inReference 4.The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.This SR is modified by a Note. The Note allows the performance of amodified performance discharge test in lieu of a service test.The modified performance discharge test, as defined by IEEE-450 (Ref. 10)is a simulated duty cycle consisting of just two rates; the one minute ratepublished for the battery or the largest current load of the duty cycle,followed by the test rate employed for the performance test, both of whichenvelope the duty cycle of the service test. Since the ampere-hours removed by a rated one minute discharge represents a very small portion ofthe battery capacity, the test rate can be changed to that for theperformance test without compromising the results of the performance discharge test. The battery terminal voltage for the modified performance discharge test should remain above the minimum battery terminal voltagespecified in the battery service test for the duration of time equal to that ofthe service test.McGuire Units 1 and 2 B3847Rvso o 3B 3.8.4-7 DC Sources--Operating B 3.8.4BASESSURVEILLANCE REQUIREMENTS (continued)
A modified discharge test is a test of the battery capacity and its ability to provide a high rate, short duration load (usually the highest rate of the duty cycle). This will often confirm the battery's ability to meet the critical period of the load duty cycle, in addition to determining its percentage of rated capacity.
A modified discharge test is a test of the battery capacity and its ability toprovide a high rate, short duration load (usually the highest rate of the dutycycle). This will often confirm the battery's ability to meet the critical periodof the load duty cycle, in addition to determining its percentage of ratedcapacity.
Initial conditions for the modified performance discharge test should be identical to those specified for a service test.SR 3.8.4.8 A battery performance discharge test is a test of constant current capacity of a battery, normally done in the as found condition, after having been in service, to detect any change in the capacity determined by the acceptance test. The test is intended to determine overall battery degradation due to age and usage.A battery modified performance discharge test is described in the Bases for SR 3.8.4.7 and in IEEE-450 (Ref. 10): Either the battery performance discharge test or the modified performance discharge test is acceptable for satisfying SR 3.8.4.8; however, only the modified performance discharge test may be used to satisfy SR 3.8.4.8 while satisfying the requirements of SR 3.8.4.7 at the same time.The acceptance criteria for this Surveillance are consistent with IEEE-450 (Ref. 10). These references recommend that the battery be replaced if its capacity is below 80% of the manufacturer's rating. A capacity of 80%shows that the battery rate of deterioration is increasing, even if there is ample capacity to meet the load requirements.
Initial conditions for the modified performance discharge testshould be identical to those specified for a service test.SR 3.8.4.8A battery performance discharge test is a test of constant current capacity ofa battery, normally done in the as found condition, after having been inservice, to detect any change in the capacity determined by the acceptance test. The test is intended to determine overall battery degradation due toage and usage.A battery modified performance discharge test is described in the Bases forSR 3.8.4.7 and in IEEE-450 (Ref. 10): Either the battery performance discharge test or the modified performance discharge test is acceptable forsatisfying SR 3.8.4.8;  
If the battery shows degradation, or if the battery has reached 85% of its expected life and capacity is < 100% of the manufacturer's rating, the Surveillance Frequency is reduced to 12 months. However, if the battery shows no degradation but has reached 85% of its expected life, the Surveillance Frequency is only reduced to 24 months for batteries that retain capacity _ 100% of the manufacturer's rating. Degradation is indicated, according to IEEE-450 (Ref. 10), when the battery capacity drops by more than 10% relative to its capacity on the previous performance test or when it is > 10% below the manufacturer's rating. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3848Rvso o 3 B 3.8.4-8 Revision No. 137 DC Sources--Operating B 3.8.4 BASES REFERENCES 1.2.3.4.5.6.7.8.9.10.11.12.10 CFR 50, Appendix A, GDC 17.Regulatory Guide 1.6, March 10, 1971.IEEE-308-1 971.UFSAR, Chapter 8.IEEE-485-1 983, June 1983.UFSAR, Chapter 6.UFSAR, Chapter 15.10 CFR 50.36, Technical Specifications, (c)(2)(ii).
: however, only the modified performance discharge test may be used to satisfy SR 3.8.4.8 while satisfying the requirements ofSR 3.8.4.7 at the same time.The acceptance criteria for this Surveillance are consistent with IEEE-450(Ref. 10). These references recommend that the battery be replaced if itscapacity is below 80% of the manufacturer's rating. A capacity of 80%shows that the battery rate of deterioration is increasing, even if there isample capacity to meet the load requirements.
Regulatory Guide 1.93, December 1974.IEEE-450-1 995.Regulatory Guide 1.32, February 1977.IEEE-450-1 980.McGuire Units 1 and 2 B3849Rvso o 3 B 3.8.4-9 Revision No. 137}}
If the battery shows degradation, or if the battery has reached 85% of itsexpected life and capacity is < 100% of the manufacturer's rating, theSurveillance Frequency is reduced to 12 months. However, if the batteryshows no degradation but has reached 85% of its expected life, theSurveillance Frequency is only reduced to 24 months for batteries thatretain capacity
_ 100% of the manufacturer's rating. Degradation isindicated, according to IEEE-450 (Ref. 10), when the battery capacitydrops by more than 10% relative to its capacity on the previousperformance test or when it is > 10% below the manufacturer's rating. TheSurveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3848Rvso o 3B 3.8.4-8Revision No. 137 DC Sources--Operating B 3.8.4BASESREFERENCES 1.2.3.4.5.6.7.8.9.10.11.12.10 CFR 50, Appendix A, GDC 17.Regulatory Guide 1.6, March 10, 1971.IEEE-308-1 971.UFSAR, Chapter 8.IEEE-485-1 983, June 1983.UFSAR, Chapter 6.UFSAR, Chapter 15.10 CFR 50.36, Technical Specifications, (c)(2)(ii).
Regulatory Guide 1.93, December 1974.IEEE-450-1 995.Regulatory Guide 1.32, February 1977.IEEE-450-1 980.McGuire Units 1 and 2 B3849Rvso o 3B 3.8.4-9Revision No. 137}}

Revision as of 23:57, 8 July 2018

McGuire Nuclear Station Tech Spec Bases 3.8.4 - DC Sources - Operating
ML15251A204
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/27/2015
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
TR-NUC-MC-000527
Download: ML15251A204 (10)


Text

Distribution:

Duke Energy Date: 8/27/2015 Document Transmittal

  1. TR-NUC-MC-000527
1. Gardner, Tray R D C M N R N M T A O M Proe su 2. Mc Ginnis, Vickie L (At Mcguire) D C M N R N M T A O MProe su 3. McCree, Victor M Released By: 4. SCIENTECH CLEARWTR, FL Facility:

MCGUIRE NUCLEAR STATION Duke Enerciy 5. SERV BLDG FILE ROOM -SUBJECT 13225 Haqiers Ferry Road 6. U S NUC REG WASHINGTON, DC Tech Spec Bases 3.8.4 -DC Sources -Operatina Document Management

7. USNRC MG02M 8. WESTINGHOUSE ELECTRIC CO LLC Huntersville, NC 28078 Page 1 of 1 MNSDCRI~c~duke-enerav.com Remarks: This is Rev 137 of the Tech Spec Bases. Please chancie out the entire section 3.8.4. Reference TR-NUC-MC-O00446 p

DC Sources--Operating B 3.8.4 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.4 DC Sources-Operating BASES BACKGROUND The station DC electrical power system provides the AC emergency power system with control power. It also provides both motive and control power to selected safety related equipment and preferred AC vital bus power (via inverters).

As required by 10 CFR 50, Appendix A, GDC 17 (Ref. 1), the DC electrical power system is designed to have sufficient independence, redundancy, and testability to perform its safety functions, assuming a single failure. The DC electrical power system also conforms to the recommendations of Regulatory Guide 1.6 (Ref. 2) and IEEE-308 (Ref. 3).The 125 VDC electrical power system consists of two independent and redundant safety related Class 1 E DC electrical power subsystems (Train A and Train B). Each subsystem consists of two channels of 125 VDC batteries (each battery 100% capacity), the associated battery charger(s) for each battery, and all the associated control equipment and interconnecting cabling.Additionally there is one spare battery charger, which provides backup service in the event that the preferred battery charger is out of service. If the spare battery charger is substituted for one of the preferred battery chargers, then the requirements of independence and redundancy between subsystems are maintained.

During normal operation, the 125 VDC load is powered from the battery chargers with the batteries floating on the system. In case of loss of normal power to the battery charger, the DC load is automatically powered from the station batteries.

The Train A and Train B DC electrical power subsystems provide the control power for its associated Class 1 E AC power load group, 4.16 kV switchgear, and 600 V load centers. The DC electrical power subsystems also provide DC electrical power to the inverters, which in turn power the AC vital buses.The DC power distribution system is described in more detail in Bases for LCO 3.8.9, "Distribution System--Operating," and LCO 3.8.10,"Distribution Systems--Shutdown." McGuire Units 1 and 2 B3841Rvso o 3 B 3.8.4-1 Revision No. 137 DC Sources-Operating B 3.8.4 BASES BACKGROUND (continued)

Each battery (EVCA, EVCB, EVCC, EVOD) has adequate storage capacity to carry the required duty cycle for one hour after the loss of the battery charger output. In addition, the battery is capable of supplying power for the operation of anticipated momentary loads during the one hour period.Each 125 VDC battery is separately housed in a ventilated room apart from its charger and distribution centers. Each channel is located in an area separated physically and electrically from the other channel to ensure that a single failure in one subsystem does not cause a failure in a redundant subsystem.

There is no sharing between redundant Class 1 E subsystems, such as batteries, battery chargers, or distribution panels.The batteries for the channels of DC are sized to produce required capacity at 80% of nameplate rating, corresponding to warranted capacity at end of life cycles and the 100% design demand. Battery size is based on 125% of required capacity and, after selection of an available commercial battery, results in a battery capacity in excess of 150% of required capacity.

The individual cell voltage limit is 2.13 V per cell. The minimum battery terminal voltage limit is greater than or equal to 125 V while on float charge as discussed in the UFSAR, Chapter 8 (Ref. 4).The criteria for sizing large lead storage batteries are defined in IEEE-485 (Ref. 5).Each channel of DC has ample power output capacity for the steady state operation of connected loads required during normal operation, while at the same time maintaining its battery bank fully charged. Each battery charger also has sufficient capacity to restore the battery from the design minimum charge to its fully charged state within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while supplying normal steady state loads discussed in the UFSAR, Chapter 8 (Ref. 4).APPLICABLE The initial conditions of Design Basis Accident (DBA) and transient SAFETY ANALYSES analyses in the UFSAR, Chapter 6 (Ref. 6), and in the UFSAR, Chapter 15 (Ref. 7), assume that Engineered Safety Feature (ESE)systems are OPERABLE.The OPERABILITY of the DC sources is consistent with the initial assumptions of the accident analyses and is based upon meeting the design basis of the unit. This includes maintaining the DC sources OPERABLE during accident conditions in the event of: McGuire Units 1 and 2 B3842Rvso o 3 B 3.8.4-2 Revision No. 137 DC Sources--Operating B 3.8.4 BASES APPLICABLE SAFETY ANALYSES (continued)

a. An assumed loss of all offsite AC power or all onsite AC power; and b. A worst case single failure.The DC sources satisfy Criterion 3 of 10 CFR 50.36 (Ref. 8).LCO Each DC channel consisting of one battery, battery charger for each battery and the corresponding control equipment and interconnecting cabling supplying power to the associated bus within the train is required to be OPERABLE to ensure the availability of the required power to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence (AOO) or a postulated DBA. Loss of any channel of DC does not prevent the minimum safety function from being performed (Ref. 4).An OPERABLE channel of DC requires the battery and respective charger to be operating and connected to the associated DC bus.APPLICABILITY The DC electrical power sources are required to be OPERABLE in MODES 1, 2, 3, and 4 to ensure safe unit operation and to ensure that: a. Acceptable fuel design limits and reactor coolant pressure boundary limits are not exceeded as a result of AOOs or abnormal transients; and b. Adequate core cooling is provided, and containment integrity and other vital functions are maintained in the event of a postulated DBA.The DC electrical power requirements for MODES 5 and 6 are addressed in the Bases for LCO 3.8.5, "DC Sources--

Shutdown." ACTIONS A.1 and A.2 Condition A represents one channel of DC with a loss of ability to fully respond to a DBA with the worst case single failure. Two hours is provided to restore the channel of DC to OPERABLE status and is consistent with the allowed time for an inoperable channel of DC distribution system requirement.

McGuire Units 1 and 2 B3843Rvso o 3 B 3.8.4-3 Revision No. 137 DC Sources-Operating B 3.8.4 BASES ACTIONS (continued)

If one of the required channels of DC is inoperable (e.g., inoperable battery, inoperable battery charger(s), or inoperable battery charger and associated inoperable battery), the remaining DC channels have the capacity to support a safe shutdown and to mitigate an accident condition.

If the channel of DC cannot be restored to OPERABLE status, Action A.2 must be entered and the DC channel must be energized from an OPERABLE channel, from the same train, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The capacity of the redundant channel is sufficient to supply its normally supplied channel and cross tied channel for the required time, in case of a DBA event. The inoperable channel of DC must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and the cross ties to the other channel open. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time reflects a reasonable time to assess unit status as a function of the inoperable channel of DC and, if the DC channel is not restored to OPERABLE status, to prepare to effect an orderly and safe unit shutdown.As part of the battery replacement project, the Completion Time that one channel of DC source can be inoperable as specified by Required Action A.2.2 may be extended beyond the "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />" for up to 14 days. This allowance may be used one-time for each of the four DC channels.

Upon completion of the battery replacement project, the Completion Time footnote is no longer applicable and will expire on December 31, 2016.B.1 and B.2 If the inoperable channel of DC cannot be restored to OPERABLE status within the required Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging plant systems.The Completion Time to bring the unit to MODE 5 is consistent with the time required in Regulatory Guide 1.93 (Ref. 9).SURVEILLANCE SR 3.8.4.1 REQUIREMENTS Verifying battery terminal voltage while on float charge for the batteries helps to ensure the effectiveness of the charging system and the ability of the batteries to perform their intended function.

Float charge is the condition in which the charger is supplying the continuous charge required to overcome the internal losses of a battery (or battery cell) and maintain the battery (or a battery cell) in a fully charged state. The voltage requirements are based on the nominal design voltage of the battery and are consistent with the initial voltages assumed in the battery McGuire Units 1 and 2 B3844Rvso o 3 B3.8.4-4 Revision No. 137 DC Sources-Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued) sizing calculations.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.8.4.2 Visual inspection to detect corrosion of the battery cells and connections, or measurement of the resistance of each intercell, interrack, intertier, and terminal connection, provides an indication of physical damage or abnormal deterioration that could potentially degrade battery performance.

For any connection that shows corrosion, the resistance shall be measured at that connection to verify acceptable connection resistance (Ref. 10). The limits for battery connection resistance are specified in Table 3.8.4-1.The plant safety analyses do not assume a specific battery connection resistance value, but typically assume that the batteries will supply adequate power for a specified period of time. The resistance of each battery connection varies independently from all the others. Some of these individual connection resistance values may be higher or lower than the others, and the battery will still be able to perform its design function.Overall connection resistance, which is the sum total of all connection resistances, has a direct impact on battery operability.

The values listed in Table 3.8.4-1 are based on the battery manufacturers recommended connection voltage drop. As long as battery connection resistance values are at or below the values listed in Table 3.8.4-1, battery operability will not be in question based on intercell, interrack, intertier, and terminal connection resistance.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.8.4.3 Visual inspection of the battery cells, cell plates, and battery racks provides an indication of physical damage or abnormal deterioration that could potentially degrade battery performance.

The presence of physical damage or deterioration does not necessarily represent a failure of this SR, provided an evaluation determines that the physical damage or deterioration does not affect the OPERABILITY of the battery (its ability to perform its design function).

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3845Rvso o 3 B 3.8.4-5 Revision No. 137 DC Sources--Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.4.4 and SR 3.8.4.5 Visual inspection and resistance measurements of intercell, interrack, intertier, terminal connections, and the average intercell connection resistance provide an indication of physical damage or abnormal deterioration that could indicate degraded battery condition.

The limits for battery connection resistance are specified in Table 3.8.4-1. Single terminal connection resistance is defined as the measurement from each individual load cable lug to the battery cell post. Average intercell connection resistance is defined as the battery manufacturer's maximum allowed intercell connection voltage drop divided by the maximum battery duty cycle load current. The maximum allowable battery total intercell connection resistance can then be defined as the average intercell connection resistance times the total number of intercell connectors in the battery string. Intercell connection is referring to the 56 copper connection straps between the battery lar posts and the battery terminal connections.

The plant safety analyses do not assume a specific battery connection resistance value, but typically assume that the batteries will supply adequate power for a specified period of time. The resistance of each battery connection varies independently from all the others. Some of these individual connection resistance values may be higher or lower than the others, and the battery will still be able to perform its design function.Overall connection resistance, which is the sum total of all connection resistances, has a direct impact on battery operability.

The values listed in Table 3.8.4-1 are based on the battery manufacturers recommended connection voltage drop. As long as battery connection resistance values are at or below the values listed in Table 3.8.4-1, battery operability will not be in question based on intercell, interrack, intertier, and terminal connection resistance.

The anticorrosion material is used to help ensure good electrical connections and to reduce terminal deterioration.

The visual inspection for corrosion is not intended to require removal of and inspection under each terminal connection.

The removal of visible corrosion is a preventive maintenance SR. The presence of visible corrosion does not necessarily represent a failure of this SR provided visible corrosion is removed during performance of SR 3.8.4.4. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3846Rvso o 3 B 3.8.4-6 Revision No. 137 DC Sources--Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.4.6 This SR requires that each battery charger be capable of supplying 400 amps and 125 V for > 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. These requirements are based on the design requirements of the chargers.

According to Regulatory Guide 1.32 (Ref. 11), the battery charger supply is required to be based on the largest combined demands of the various steady state loads and the charging capacity to restore the battery from the design minimum charge state to the fully charged state, irrespective of the status of the unit during these demand occurrences.

The minimum required amperes and duration ensures that these requirements can be satisfied.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.8.4.7 A battery service test is a special test of battery capability, as found, to satisfy the design requirements (battery duty cycle) of the DC electrical power system. The discharge rate and test length of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> should correspond to the design duty cycle requirements as specified in Reference 4.The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.This SR is modified by a Note. The Note allows the performance of a modified performance discharge test in lieu of a service test.The modified performance discharge test, as defined by IEEE-450 (Ref. 10)is a simulated duty cycle consisting of just two rates; the one minute rate published for the battery or the largest current load of the duty cycle, followed by the test rate employed for the performance test, both of which envelope the duty cycle of the service test. Since the ampere-hours removed by a rated one minute discharge represents a very small portion of the battery capacity, the test rate can be changed to that for the performance test without compromising the results of the performance discharge test. The battery terminal voltage for the modified performance discharge test should remain above the minimum battery terminal voltage specified in the battery service test for the duration of time equal to that of the service test.McGuire Units 1 and 2 B3847Rvso o 3 B 3.8.4-7 DC Sources--Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)

A modified discharge test is a test of the battery capacity and its ability to provide a high rate, short duration load (usually the highest rate of the duty cycle). This will often confirm the battery's ability to meet the critical period of the load duty cycle, in addition to determining its percentage of rated capacity.

Initial conditions for the modified performance discharge test should be identical to those specified for a service test.SR 3.8.4.8 A battery performance discharge test is a test of constant current capacity of a battery, normally done in the as found condition, after having been in service, to detect any change in the capacity determined by the acceptance test. The test is intended to determine overall battery degradation due to age and usage.A battery modified performance discharge test is described in the Bases for SR 3.8.4.7 and in IEEE-450 (Ref. 10): Either the battery performance discharge test or the modified performance discharge test is acceptable for satisfying SR 3.8.4.8; however, only the modified performance discharge test may be used to satisfy SR 3.8.4.8 while satisfying the requirements of SR 3.8.4.7 at the same time.The acceptance criteria for this Surveillance are consistent with IEEE-450 (Ref. 10). These references recommend that the battery be replaced if its capacity is below 80% of the manufacturer's rating. A capacity of 80%shows that the battery rate of deterioration is increasing, even if there is ample capacity to meet the load requirements.

If the battery shows degradation, or if the battery has reached 85% of its expected life and capacity is < 100% of the manufacturer's rating, the Surveillance Frequency is reduced to 12 months. However, if the battery shows no degradation but has reached 85% of its expected life, the Surveillance Frequency is only reduced to 24 months for batteries that retain capacity _ 100% of the manufacturer's rating. Degradation is indicated, according to IEEE-450 (Ref. 10), when the battery capacity drops by more than 10% relative to its capacity on the previous performance test or when it is > 10% below the manufacturer's rating. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.McGuire Units 1 and 2 B3848Rvso o 3 B 3.8.4-8 Revision No. 137 DC Sources--Operating B 3.8.4 BASES REFERENCES 1.2.3.4.5.6.7.8.9.10.11.12.10 CFR 50, Appendix A, GDC 17.Regulatory Guide 1.6, March 10, 1971.IEEE-308-1 971.UFSAR, Chapter 8.IEEE-485-1 983, June 1983.UFSAR, Chapter 6.UFSAR, Chapter 15.10 CFR 50.36, Technical Specifications, (c)(2)(ii).