ML17094A237: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:April 18, 2017
{{#Wiki_filter:April 18, 2017  


Dr. Cameron Goodwin, Director Rhode Island Nuclear Science Center Rhode Island Atomic Energy Commission 16 Reactor Road Narragansett, RI  02882-1165  
Dr. Cameron Goodwin, Director Rhode Island Nuclear Science Center Rhode Island Atomic Energy Commission  
 
16 Reactor Road  
 
Narragansett, RI  02882-1165  


==SUBJECT:==
==SUBJECT:==
EXAMINATION REPORT NO. 50-193/OL-17-01, RHODE ISLAND ATOMIC ENERGY COMMISSION
EXAMINATION REPORT NO. 50-193/OL-17-01, RHODE ISLAND ATOMIC ENERGY COMMISSION  


==Dear Dr. Goodwin:==
==Dear Dr. Goodwin:==
During the week of March 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at your Rhode Island Nuclear Science Center Reactor. The examinations were conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report. In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Mr. John T. Nguyen at (301) 415-4007 or via e-mail at John.Nguyen@nrc.gov.        Sincerely,  
During the week of March 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at your Rhode Island Nuclear Science Center Reactor. The examinations were conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report.
In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
 
The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Mr. John T. Nguyen at (301) 415-4007 or via e-mail at John.Nguyen@nrc.gov
.        Sincerely,
 
         /RA/
         /RA/
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation  
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation  


Docket No. 50-193
Docket No. 50-193  


==Enclosures:==
==Enclosures:==
: 1. Examination Report No. 50-193/OL-17-01  
: 1. Examination Report No. 50-193/OL-17-01  
: 2. Written Examination cc: Jeff Davis, Assistant Director, Operations cc w/o enclosures:  See next page C. Goodwin 2
: 2. Written Examination cc: Jeff Davis, Assistant Director, Operations cc w/o enclosures:  See next page C. Goodwin 2  


==SUBJECT:==
==SUBJECT:==
EXAMINATION REPORT NO. 50-193/OL-17-01, RHODE ISLAND ATOMIC ENERGY COMMISSION DATED APRIL 18, 2017 DISTRIBUTION   PUBLIC  AMendiola  AAdams  PBoyle  CBassett   
EXAMINATION REPORT NO. 50-193/OL-17-01, RHODE ISLAND ATOMIC ENERGY COMMISSION DATED APRIL 18, 2017  
 
DISTRIBUTION PUBLIC  AMendiola  AAdams  PBoyle  CBassett   
 
ADAMS ACCESSION #: ML17094A237 OFFICE NRR/DPR/PROB:CE NRR/DPR/PROB:OLA NRR/DPR/PROB:BC NAME JNguyen ABaxter AMendiola DATE 3/28/2017 4/04/2017 4/18/2017  OFFICIAL RECORD COPY Rhode Island Atomic Energy Commission Docket No. 50-193
 
cc:  Governor 
 
222 State House Room 115
 
Providence, RI  02903
 
Howard Chun, Commissioner Cranston High School East 899 Park Avenue
 
Cranston, RI  02910
 
Dr. Clinton Chichester, Chairman Rhode Island Atomic Energy Commission College of Pharmacy Pharmacy Building
 
7 Greenhouse Road
 
Kingston, RI  02881 Dr. John Breen, Chairman
 
Nuclear and Radiation Safety Committee


ADAMS ACCESSION #: ML17094A237 OFFICE NRR/DPR/PROB:CE NRR/DPR/PROB:OLA NRR/DPR/PROB:BC NAME JNguyen ABaxter AMendiola DATE 3/28/2017 4/04/2017 4/18/2017  OFFICIAL RECORD COPY Rhode Island Atomic Energy Commission Docket No. 50-193 cc:  Governor 222 State House Room 115 Providence, RI  02903
Providence College Department of Chemistry and Biochemistry 1 Cunningham Square Providence, RI  02918


Howard Chun, Commissioner Cranston High School East 899 Park Avenue Cranston, RI  02910
Dr. Nitin Padture, Commissioner School of Engineering, Brown University


Dr. Clinton Chichester, Chairman Rhode Island Atomic Energy Commission College of Pharmacy Pharmacy Building 7 Greenhouse Road Kingston, RI  02881  Dr. John Breen, Chairman Nuclear and Radiation Safety Committee Providence College Department of Chemistry and Biochemistry 1 Cunningham Square Providence, RI  02918 Dr. Nitin Padture, Commissioner School of Engineering, Brown University 184 Hope Street, Box D Barus & Holley Building, Room 608 Providence, RI 02912  
184 Hope Street, Box D Barus & Holley Building, Room 608 Providence, RI 02912  


Dr. Yana K. Reshetnyak, Commissioner Department of Physics University of Rhode Island East Hall, 2 Lippitt Road Kingston, RI  02881  
Dr. Yana K. Reshetnyak, Commissioner Department of Physics University of Rhode Island East Hall, 2 Lippitt Road Kingston, RI  02881  
Line 50: Line 81:
Dr. Nancy E. Breen, Commissioner Marine and Natural Science Building 226 Roger Williams University One Old Ferry Road Bristol, RI 02809  
Dr. Nancy E. Breen, Commissioner Marine and Natural Science Building 226 Roger Williams University One Old Ferry Road Bristol, RI 02809  


Docket No. 50-193 Supervising Radiological Health Specialist Office of Occupational and Radiological Health Rhode Island Department of Health 3 Capitol Hill, Room 206 Providence, RI  02908-5097 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL  32611  
Docket No. 50-193  
 
Supervising Radiological Health Specialist Office of Occupational and
 
Radiological Health Rhode Island Department of Health  
 
3 Capitol Hill, Room 206 Providence, RI  02908-5097  
 
Test, Research and Training  
 
Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL  32611  
 
ENCLOSURE 1 U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:  50-193/OL-17-01


ENCLOSURE 1 U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT  REPORT NO.:  50-193/OL-17-01 FACILITY DOCKET NO.: 50-193  
FACILITY DOCKET NO.: 50-193  


FACILITY LICENSE NO.: R-95  
FACILITY LICENSE NO.: R-95  
Line 64: Line 107:
SUMMARY:  
SUMMARY:  


During the week of March 20, 2017, the NRC administered operator licensing examination to two Reactor Operator (RO) candidates. The candidates passed all portions of the operating examination. REPORT DETAILS 1. Examiner:  John T. Nguyen, Chief Examiner
During the week of March 20, 2017, the NRC ad ministered operator licensing examination to two Reactor Operator (RO) candidates. The candidates passed all portions of the operating examination.
: 2. Results:  RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 2/0 N/A 2/0 Operating Tests 2/0 N/A 2/0 Overall 2/0 N/A 2/0 3. Exit Meeting:
REPORT DETAILS
Jeff Davis, RINSC, Associate Director Paul Martin, RINSC, Training Supervisor John Nguyen, NRC, Chief Examiner The NRC examiners thanked the facility for their support in the administration of the examinations. Mr. Nguyen discussed with the facility management the generic weaknesses observed during their operating tests to include occupational dose limits for adults specified in 10 CFR Part 20.
: 1. Examiner:  John T. Nguyen, Chief Examiner  
ENCLOSURE 2       
: 2. Results:  RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 2/0 N/A 2/0 Operating Tests 2/0 N/A 2/0 Overall 2/0 N/A 2/0  
: 3. Exit Meeting:  
 
Jeff Davis, RINSC, Associate Director Paul Martin, RINSC, Training Supervisor John Nguyen, NRC, Chief Examiner  
 
The NRC examiners thanked the facility for their support in the administration of the examinations. Mr. Nguyen discussed with the facility management the generic weaknesses observed during their operating tests to include occupational dose limits for adults specified in 10 CFR Part 20.
ENCLOSURE 2  
 
U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR LICENSE EXAMINATION FACILITY:  RINSC
 
REACTOR TYPE:        Pool
 
DATE ADMINISTERED: 03/21/2017 CANDIDATE:  _______________________
 
INSTRUCTIONS TO CANDIDATE: Answers are to be written on the Answer sheet provided. Attach all Answer sheets to the examination. Point values are indicated in parentheses for each question. A 70% in each category is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
                                                                % OF CATEGORY  % OF  CANDIDATE'S  CATEGORY  VALUE     TOTAL    SCORE            VALUE              CATEGORY                                     


U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR LICENSE EXAMINATION    FACILITY:  RINSC
20.00        33.3                                                  A. REACTOR THEORY, THERMODYNAMICS  AND FACILITY OPERATING CHARACTERISTICS


REACTOR TYPE:        Pool DATE ADMINISTERED: 03/21/2017  CANDIDATE:  _______________________
20.00        33.3                                                  B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS 20.00        33.3                                                  C. FACILITY AND RADIATION MONITORING SYSTEMS 60.00                                                            %  TOTALS                                  FINAL GRADE All work done on this examination is my own. I have neither given nor received aid.  
INSTRUCTIONS TO CANDIDATE: Answers are to be written on the Answer sheet provided. Attach all Answer sheets to the examination. Point values are indicated in parentheses for each question. A 70% in each category is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.                                                                % OF CATEGORY  % OF  CANDIDATE'S  CATEGORY  VALUE      TOTAL    SCORE            VALUE              CATEGORY 20.00        33.3                                                  A. REACTOR THEORY, THERMODYNAMICS  AND FACILITY OPERATING CHARACTERISTICS 20.00        33.3                                                  B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS     20.00        33.3                                                  C. FACILITY AND RADIATION MONITORING SYSTEMS 60.00                                                            %  TOTALS                                  FINAL GRADE All work done on this examination is my own. I have neither given nor received aid.


______________________________________  Candidate's Signature                   
______________________________________  Candidate's Signature                   


A. RX THEORY, THERMO & FAC OP CHARS   A N S W E R  S H E E T       Multiple Choice  (Circle or X your choice)
A. RX THEORY, THERMO & FAC OP CHARS A N S W E R  S H E E T Multiple Choice  (Circle or X your choice)  
If you change your Answer, write your selection in the blank.     A01  a ___  b ___  c ___  (0.33 each)  
 
If you change your Answer, write your selection in the blank.
A01  a ___  b ___  c ___  (0.33 each)  
 
A02  a  b  c  d  ___
 
A03  a  b  c  d  ___


A02  a  b  c  d  ___
A03  a  b  c  d  ___
A04  a  b  c  d  ___  
A04  a  b  c  d  ___  


A05  a  b  c  d  ___   A06  a  b  c  d  ___  
A05  a  b  c  d  ___
A06  a  b  c  d  ___  


A07  a  b  c  d  ___  
A07  a  b  c  d  ___  


A08  a  b  c  d  ___   A09  a  b  c  d  ___  
A08  a  b  c  d  ___
A09   a  b  c  d  ___
 
A10  a  b  c  d  ___
 
A11   a  b  c  d  ___  


A10  a  b  c  d  ___
A11  a  b  c  d  ___
A12  a  b  c  d  ___  
A12  a  b  c  d  ___  


A13  a  b  c  d  ___
A13  a  b  c  d  ___  
A14  a  b  c  d  ___
 
A14  a  b  c  d  ___  
 
A15  a  b  c  d  ___  
A15  a  b  c  d  ___  


A16  a  b  c  d  ___   A17  a  b  c  d  ___  
A16  a  b  c  d  ___
A17  a  b  c  d  ___  


A18  a  b  c  d  ___  
A18  a  b  c  d  ___  


A19  a  b  c  d  ___   A20  a  b  c  d  ___  
A19  a  b  c  d  ___
A20  a  b  c  d  ___  


  (***** END OF CATEGORY  A *****)
  (***** END OF CATEGORY  A *****)
B. NORMAL/EMERG PROCEDURES & RAD CON   A N S W E R  S H E E T       Multiple Choice  (Circle or X your choice)
B. NORMAL/EMERG PROCEDURES & RAD CON A N S W E R  S H E E T Multiple Choice  (Circle or X your choice)  
If you change your Answer, write your selection in the blank. B01  a ______  b ______  c ______  (0.33 each)  
 
If you change your Answer, write your selection in the blank.
B01  a ______  b ______  c ______  (0.33 each)  
 
B02  a  b  c  d  ___
 
B03  a  b  c  d  ___


B02  a  b  c  d  ___
B03  a  b  c  d  ___
B04  a  b  c  d  ___  
B04  a  b  c  d  ___  


B05  a  b  c  d  ___   B06  a ___  b ___  c ___  d  ___ (0.25 each)  
B05  a  b  c  d  ___
B06  a ___  b ___  c ___  d  ___ (0.25 each)  


B07  a  b  c  d  ___  
B07  a  b  c  d  ___  


B08  a  b  c  d  ___   B09  a  b  c  d  ___  
B08  a  b  c  d  ___
B09   a  b  c  d  ___
 
B10  a  b  c  d  ___
 
B11   a  b  c  d  ___  


B10  a  b  c  d  ___
B11  a  b  c  d  ___
B12  a  b  c  d  ___  
B12  a  b  c  d  ___  


B13  a  b  c  d  ___
B13  a  b  c  d  ___  
B14  a ___  b ___  c ___  d  ___ (0.25 each)
 
B14  a ___  b ___  c ___  d  ___ (0.25 each)  
 
B15  a  b  c  d  ___  
B15  a  b  c  d  ___  


B16  a  b  c  d  ___   B17  a  b  c  d  ___  
B16  a  b  c  d  ___
B17  a  b  c  d  ___  


B18  a  b  c  d  ___  
B18  a  b  c  d  ___  


B19  a  b  c  d  ___   B20  a  b  c  d  ___  
B19  a  b  c  d  ___
B20  a  b  c  d  ___  


  (***** END OF CATEGORY  B *****)
  (***** END OF CATEGORY  B *****)
C. PLANT AND RAD MONITORING SYSTEMS   A N S W E R  S H E E T       Multiple Choice  (Circle or X your choice)
C. PLANT AND RAD MONITORING SYSTEMS A N S W E R  S H E E T Multiple Choice  (Circle or X your choice)  
If you change your Answer, write your selection in the blank. C01  a ___  b ___  c ___  d  ___ (0.25 each)
 
If you change your Answer, write your selection in the blank.
C01  a ___  b ___  c ___  d  ___ (0.25 each)  
 
C02  a  b  c  d  ___  
C02  a  b  c  d  ___  


C03  a  b  c  d  ___   C04  a  b  c  d  ___  
C03  a  b  c  d  ___
C04   a  b  c  d  ___
 
C05  a  b  c  d  ___
 
C06   a  b  c  d  ___  


C05  a  b  c  d  ___
C06  a  b  c  d  ___
C07  a  b  c  d  ___  
C07  a  b  c  d  ___  


C08  a  b  c  d  ___
C08  a  b  c  d  ___  
C09  a ___  b ___  c ___  d  ___  (0.5 each)
 
C09  a ___  b ___  c ___  d  ___  (0.5 each)  
 
C10  a  b  c  d  ___  
C10  a  b  c  d  ___  


C11  a  b  c  d  ___   C12  a  b  c  d  ___  
C11  a  b  c  d  ___
C12  a  b  c  d  ___  


C13  a  b  c  d  ___  
C13  a  b  c  d  ___  


C14  a  b  c  d  ___   C15  a  b  c  d  ___  
C14  a  b  c  d  ___
C15   a  b  c  d  ___
 
C16  a  b  c  d  ___
 
C17   a  b  c  d  ___  


C16  a  b  c  d  ___
C17  a  b  c  d  ___
C18  a  b  c  d  ___  
C18  a  b  c  d  ___  


C19  a  b  c  d  ___  
C19  a  b  c  d  ___  
     (***** END OF CATEGORY  C *****) (********** END OF EXAMINATION **********)
     (***** END OF CATEGORY  C *****) (********** END OF EXAMINATION **********)
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:  
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:  
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.  
: 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
: 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.  
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.  
: 4. Use black ink or dark pencil only to facilitate legible reproductions.
: 4. Use black ink or dark pencil only to facilitate legible reproductions.  
: 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each Answer sheet.
: 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each Answer sheet.  
: 6. Mark your Answers on the Answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
: 6. Mark your Answers on the Answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.  
: 7. The point value for each question is indicated in [brackets] after the question.  
: 7. The point value for each question is indicated in [brackets] after the question.  
: 8. If the intent of a question is unclear, ask questions of the examiner only.  
: 8. If the intent of a question is unclear, ask questions of the examiner only.  
: 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and Answer sheets. In addition turn in all scrap paper.
: 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and Answer sheets. In addition turn in all scrap paper.  
: 10. Ensure all information you wish to have evaluated as part of your Answer is on your Answer sheet. Scrap paper will be disposed of immediately following the examination.
: 10. Ensure all information you wish to have evaluated as part of your Answer is on your Answer sheet. Scrap paper will be disposed of immediately following the examination.  
: 11. To pass the examination you must achieve a grade of 70 percent or greater in each category.  
: 11. To pass the examination you must achieve a grade of 70 percent or greater in each category.  
: 12. There is a time limit of three (3) hours for completion of the examination.
: 12. There is a time limit of three (3) hours for completion of the examination.
EQUATION SHEET                 Q = m cp T            Q = m h    SCR = S/(1-Keff)      Q = UA T    CR1 (1-Keff)1 = CR2 (1-Keff)2      26.06 (eff)    (1-Keff)0 SUR =            M =      ( - )      (1-Keff)1  SUR = 26.06/    M = 1/(1-Keff) = CR1/CR0  P = P0 10SUR(t)    SDM = (1-Keff)/Keff P = P0 e(t/)    I = Io e-ux  (1-) P = Po    * = 1 x 10-4 seconds -              _      _    = (*/) + [(-)/eff]    = */(-)  = (Keff-1)/Keff    R = 6 C E n/r2     = Keff/Keff      0.693 _      T1/2 =    = 0.007          DR1D12 = DR2D22    DR = DRoe-t  Cp (H20) = 0.146    kw            P = S / (1 - Keff)     gpm  F    eff = 0.1/sec                     1 Curie = 3.7x1010 dps  1 kg = 2.21 lbm 1 hp = 2.54x103 BTU/hr  1 Mw = 3.41x106 BTU/hr  1 BTU = 778 ft-lbf    F = 9/5C + 32  931 Mev = 1 amu            C = 5/9 (F - 32) 2112effeffeffeffKKKK=
EQUATION SHEET  
Section A:  Reactor Theory, Thermo, and Fac. Operating Characteristics     QUESTION  A.01 [1.0 point, 0.33 each] Match the term listed in Column A with its corresponding unit listed in column B.
 
Column A    Column B
Q = m cp T            Q = m h    SCR = S/(1-Keff)      Q = UA T    CR1 (1-Keff) 1 = CR2 (1-Keff) 2      26.06 (eff)    (1-Keff) 0 SUR =            M =      ( - )      (1-Keff) 1  SUR = 26.06/    M = 1/(1-Keff) = CR 1/CR0  P = P0 10SUR(t)    SDM = (1-Keff)/Keff P = P0 e(t/)    I = I o e-ux  (1-) P =
: a. 1 barn      1. cm -1   
Po    * = 1 x 10
: b. Macroscopic Cross Section  2. 10 -24 cm 2  c. Neutron Flux    3. Neutrons / cm 2 /sec   
-4 seconds -              _      _    = (*/) + [(-)/eff]    = */(-)  = (Keff-1)/Keff    R = 6 C E n/r 2     = Keff/Keff      0.693 _      T1/2 =    = 0.007          DR1D12 = DR2D22    DR = DR oe-t  Cp (H20) = 0.146    kw            P = S / (1 - Keff) gpm  F    eff = 0.1/sec
 
1 Curie = 3.7x10 10 dps  1 kg = 2.21 lbm 1 hp = 2.54x10 3 BTU/hr  1 Mw = 3.41x10 6 BTU/hr  1 BTU = 778 ft-lbf    F = 9/5C + 32  931 Mev = 1 amu            C = 5/9 (F - 32) 2112effeffeffeffKKKK=
Section A:  Reactor Theory, Thermo, and Fac. Operating Characteristics QUESTION  A.01 [1.0 point, 0.33 each] Match the term listed in Column A with its corresponding unit listed in column B.  
 
Column A    Column B  
: a. 1 barn      1. cm  
-1   
: b. Macroscopic Cross Section  2. 10  
-24 cm 2  c. Neutron Flux    3. Neutrons / cm 2 /sec   
 
QUESTION    A.02 [1.0 point] For the alpha decay of a nuclide, the number of protons will ___________ and its atomic mass


QUESTION    A.02 [1.0 point] For the alpha decay of a nuclide, the number of protons will ___________ and its atomic mass number will __________.
number will __________.  
: a. increase by 2 / increase by 2  
: a. increase by 2 / increase by 2  
: b. decrease by 2 /decrease by 4 c. decrease by 4 / decrease by 2  
: b. decrease by 2 /decrease by 4  
: d. increase by 4 / increase by 2 QUESTION    A.03 [1.0 point] The FAST FISSION FACTOR is defined as a ratio of:  
: c. decrease by 4 / decrease by 2  
: a. the number of neutrons that reach thermal energy over the number of fast neutrons that start to slow down. b. the number of fast neutrons produced from fission in a generation over the number of fast neutrons produced from fission in the previous generation.  
: d. increase by 4 / increase by 2  
: c. the number of fast neutrons produced from U-238 over the number of thermal neutrons produced from U-235.
 
: d. the number of fast neutrons produced from all fission over the number of fast neutrons produced from thermal fission.
QUESTION    A.03 [1.0 point] The FAST FISSION FACTOR is defined as a ratio of:
Section  A L Theory, Thermo & Fac. Operating Characteristics   QUESTION A.04 [1.0 points]       Which ONE of the following is the stable reactor period which will result in a power rise from 1% to 100% power in 2 minutes? a. 0.5 second  
: a. the number of neutrons that reach thermal energy over the number of fast neutrons that start to slow down.  
: b. the number of fast neutrons produced from fission in a generation over the number of fast neutrons produced from fission in the previous generation.  
: c. the number of fast neutrons produced from U-238 over the number of thermal neutrons produced from U-235.  
: d. the number of fast neutrons produced from all fission over the number of fast neutrons produced from thermal fission.  
 
Section  A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.04 [1.0 points]
Which ONE of the following is the stable reactor period which will result in a power rise from 1% to 100% power in 2 minutes?  
: a. 0.5 second  
: b. 13 seconds  
: b. 13 seconds  
: c. 26 seconds d. 43 seconds  
: c. 26 seconds  
: d. 43 seconds  


QUESTION    A.05  [1.0 point] Given a source strength of 1000 neutrons per second (N/sec) and a multiplication factor of 0.8, which ONE of the following is the expected stable neutron count rate?  
QUESTION    A.05  [1.0 point] Given a source strength of 1000 neutrons per second (N/sec) and a multiplication factor of 0.8, which ONE of the following is the expected stable neutron count rate?  
: a. 700 N/sec  
: a. 700 N/sec  
: b. 5000 N/sec c. 10000 N/sec  
: b. 5000 N/sec  
: d. 20000 N/sec QUESTION  A.06 [1.0 point]   The reactor is SHUTDOWN by 5 %k/k with the count rate of 1000 counts per second (cps). The control rods are withdrawn until the count rate is quadrupled. What is the value of Keff?    a. 0.952  
: c. 10000 N/sec  
: d. 20000 N/sec  
 
QUESTION  A.06 [1.0 point]
The reactor is SHUTDOWN by 5 %k/k with the count rate of 1000 counts per second (cps). The control rods are withdrawn until the count rate is quadrupled. What is the value of K eff?    a. 0.952  
: b. 0.976  
: b. 0.976  
: c. 0.988 d. 1.002   
: c. 0.988  
: d. 1.002   


Section  A L Theory, Thermo & Fac. Operating Characteristics   QUESTION  A.07    [1.0 point] Inelastic scattering can be described as a process whereby a neutron collides with a nucleus and leaves the nucleus in an excited state. The nucleus later:  
Section  A L Theory, Thermo & Fac. Operating Characteristics QUESTION  A.07    [1.0 point] Inelastic scattering can be described as a process whereby a neutron collides with a nucleus and leaves the nucleus in an excited state. The nucleus later:  
: a. emits a gamma ray and a neutron with lower energy.  
: a. emits a gamma ray and a neutron with lower energy.  
: b. emits a gamma ray and a neutron with higher energy.  
: b. emits a gamma ray and a neutron with higher energy.  
: c. emits a beta particle and a neutron with lower energy. d. emits an alpha particle ONLY.  
: c. emits a beta particle and a neutron with lower energy.  
: d. emits an alpha particle ONLY.  


QUESTION A.08 [1.0 point]     While a reactor is at 5 watts, the reactor operator is withdrawing a control rod to insert a positive reactivity of 0.156 %k/k. Which ONE of the following will be the stable reactor period as a result of this withdrawal?  Given beta-effective = 0.0073 and eff= 0.1.   
QUESTION A.08 [1.0 point]
: a. 17 seconds   b. 27 seconds   
While a reactor is at 5 watts, the reactor operator is withdrawing a control rod to insert a positive reactivity of 0.156 %k/k. Which ONE of the following will be the stable reactor period as a result of this withdrawal?  Given beta-effective = 0.0073 and eff= 0.1.   
: a. 17 seconds  
: b. 27 seconds   
: c. 37 seconds  
: c. 37 seconds  
: d. 47 seconds
: d. 47 seconds  


QUESTION    A.09 [1.0 point] Which term is described by the following? "Depart from criticality."   
QUESTION    A.09 [1.0 point] Which term is described by the following? "Depart from criticality."   
: a. 1/M  
: a. 1/M  
: b. K-effective c. Reactor period   
: b. K-effective  
: c. Reactor period   
: d. Reactivity  
: d. Reactivity  


Section  A L Theory, Thermo & Fac. Operating Characteristics   QUESTION    A.10 [1.0 point] A reactor is subcritical with a Keff of 0.927. If you add 7.875% k/k into the core, the reactor will be:  a. subcritical  
Section  A L Theory, Thermo & Fac. Operating Characteristics QUESTION    A.10 [1.0 point] A reactor is subcritical with a K eff of 0.927. If you add 7.875% k/k into the core, the reactor will be:  a. subcritical  
: b. critical  
: b. critical  
: c. supercritical   d. prompt critical QUESTION  A.11  [1.0 point] A reactor is slightly supercritical with the following values for each of the factors in the six-factor formula: Fast fission factor 1.05 Fast non-leakage probability 0.80 Resonance escape probability 0.90 Thermal non-leakage probability 0.92 Thermal utilization factor 0.80 Reproduction factor 1.86 A control rod is inserted to bring the reactor back to critical. Assuming all other factors remain unchanged, the new value for the thermal utilization factor is: a. 0.698  
: c. supercritical  
: d. prompt critical  
 
QUESTION  A.11  [1.0 point] A reactor is slightly supercritical with the following values for each of the factors in the six-factor formula:
Fast fission factor 1.05 Fast non-leakage probability 0.80 Resonance escape probability 0.90 Thermal non-leakage probability 0.92 Thermal utilization factor 0.80 Reproduction factor 1.86 A control rod is inserted to bring the reactor back to critical. Assuming all other factors remain unchanged, the new value for the thermal utilization factor is:  
: a. 0.698  
: b. 0.702  
: b. 0.702  
: c. 0.743
: c. 0.743  
: d. 0.773  
: d. 0.773  


Section  A L Theory, Thermo & Fac. Operating Characteristics   QUESTION A.12 [1.0 point]      The following data was obtained during a reactor fuel load. Step  No. of Elements  Detector A (count/sec)  1      0    100  2  4    120  3  8    140 4  12    200  5  15    400 The estimated number of additional elements required to achieve criticality is between: a. 2 to 3 b. 4 to 5 c. 6 to 8 d. 8 to 10
Section  A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.12 [1.0 point]      The following data was obtained during a reactor fuel load. Step  No. of Elements  Detector A (count/sec)  1      0    100  2  4    120  3  8    140 4  12    200  5  15    400  
 
The estimated number of additional elements required to achieve criticality is between:  
: a. 2 to 3 b. 4 to 5 c. 6 to 8 d. 8 to 10  


QUESTION  A.13 [1.0 point] Which term is described by the following? "The increase in neutron population by providing a positive additional reactivity while the reactor is subcritical"   
QUESTION  A.13 [1.0 point] Which term is described by the following? "The increase in neutron population by providing a positive additional reactivity while the reactor is subcritical"   
: a. Inverse Multiplication
: a. Inverse Multiplication  
: b. Subcritical Multiplication  
: b. Subcritical Multiplication  
: c. Neutron Production  
: c. Neutron Production  
: d. Source Strength
: d. Source Strength  


QUESTION    A.14 [1.0 point]  On the average, how many neutrons are produced for each fission of U-235?
QUESTION    A.14 [1.0 point]  On the average, how many neutrons are produced for each fission of U-235?  
: a. 2.00 neutrons  
: a. 2.00 neutrons  
: b. 2.09 neutrons c. 2.43 neutrons  
: b. 2.09 neutrons  
: c. 2.43 neutrons  
: d. 2.93 neutrons  
: d. 2.93 neutrons  


Section  A L Theory, Thermo & Fac. Operating Characteristics   QUESTION A.15 [1.0 point]     Which ONE of the following most correctly describes the SIX- FACTOR FORMULA?   a. Keff = K
Section  A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.15 [1.0 point]
Which ONE of the following most correctly describes the SIX- FACTOR FORMULA?
: a. Keff = K
* the total non-leakage probability
: b. K = Keff
* the total non-leakage probability   
* the total non-leakage probability   
: b. K = Keff
* the total non-leakage probability 
: c. Keff = K
: c. Keff = K
* the total leakage probability   d. K = Keff
* the total leakage probability
* the utilization factor
: d. K = Keff
* the utilization factor  


QUESTION A.16 [1.0 point]      Which ONE of the following types of neutrons has a mean neutron generation lifetime of 12.5 seconds?  
QUESTION A.16 [1.0 point]      Which ONE of the following types of neutrons has a mean neutron generation lifetime of 12.5 seconds?  
: a. Prompt   
: a. Prompt   
: b. Delayed c. Fast   
: b. Delayed  
: d. Thermal QUESTION  A.17 [1.0 point] The reactor is at 5 watts. The reactor operator accidentally inserts a fuel element worth of 0.8 %k/k into the core. With this insertion, the reactor will be:   a. subcritical  
: c. Fast   
: d. Thermal  
 
QUESTION  A.17 [1.0 point] The reactor is at 5 watts. The reactor operator accidentally inserts a fuel element worth of 0.8  
%k/k into the core. With this insertion, the reactor will be:
: a. subcritical  
: b. critical   
: b. critical   
: c. supercritical d. prompt critical  
: c. supercritical  
: d. prompt critical  


Section  A L Theory, Thermo & Fac. Operating Characteristics   QUESTION A.18 [1.0 point]     A mechanism by which a nucleus can gain stability by converting a neutron to a proton or vice versa is called: a. gamma decay  
Section  A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.18 [1.0 point]
A mechanism by which a nucleus can gain stability by converting a neutron to a proton or vice versa is called:  
: a. gamma decay  
: b. beta decay  
: b. beta decay  
: c. alpha decay d. photoelectric effect   
: c. alpha decay  
: d. photoelectric effect   


QUESTION A.19 [1.0 point]  During a reactor scram from full power, which ONE of the following best describes the values of K-effective and ?  a. Keff = 1 and  = 0  b. Keff < 1 and 0 <  < -eff  c. Keff < 1 and  < 0  d. Keff < 1 and 1 <  < infinity ()    QUESTION    A.20 [1.0 point] Which ONE of the following is a correct statement of why delayed neutrons enhance the ability to control reactor power than prompt neutrons?  
QUESTION A.19 [1.0 point]  During a reactor scram from full power, which ONE of the following best describes the values of K-effective and ?  a. Keff = 1 and  = 0  b. Keff < 1 and 0 <  < -eff  c. Keff < 1 and  < 0  d. Keff < 1 and 1 <  < infinity ()    QUESTION    A.20 [1.0 point] Which ONE of the following is a correct statement of why delayed neutrons enhance the ability to control reactor power than prompt neutrons?  
: a. Delayed neutrons are born at higher energy levels than prompt neutrons, so delayed neutron can easily cause fission in U-235 with their high energies.
: a. Delayed neutrons are born at higher energy levels than prompt neutrons, so delayed neutron can easily cause fission in U-235 with their high energies.  
: b. Delayed neutrons increase the average neutron lifetime that allows the reactor control rods control the population of delayed neutrons. c. Prompt neutrons can cause fissions in both U-235 and U-238; whereas delayed neutrons can only cause fissions in U-235.
: b. Delayed neutrons increase the average neutron lifetime that allows the reactor control rods control the population of delayed neutrons.  
: d. The absorption cross section of delayed neutrons is lower than the absorption cross section of prompt neutrons with U-235.  
: c. Prompt neutrons can cause fissions in both U-235 and U-238; whereas delayed neutrons can only cause fissions in U-235.  
: d. The absorption cross section of delayed neutrons is lower than the absorption cross section of prompt neutrons with U-235.  


  (***** END OF CATEGORY A *****)  
  (***** END OF CATEGORY A *****)  


Section B Normal/Emergency Procedures and Radiological Controls   QUESTION B.01 [1.0 point, 0.33 each] Fill out a blank with appropriate data provided in the bracket. During the Natural Convection Mode, the Limiting Safety System Settings:  
Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.01 [1.0 point, 0.33 each] Fill out a blank with appropriate data provided in the bracket. During the Natural Convection Mode, the Limiting Safety System Settings:
: a. for reactor thermal power shall be ______. (115 kW/125 kW/2.5 MW)   
: a. for reactor thermal power shall be ______. (115 kW/125 kW/2.5 MW)   
: b. for the height of coolant above the top of the uranium silicide fuel shall be ______.  
: b. for the height of coolant above the top of the uranium silicide fuel shall be ______.  
  (21'7''/22'7''/23'7") c. for the bulk pool temperature shall be _______. (122 &deg;F/125 &deg;F/127 &deg;F)  
  (21'7''/22'7''/23'7")  
: c. for the bulk pool temperature shall be _______. (122 &deg;F/125 &deg;F/127 &deg;F)  


QUESTION B.02 [1.0 point]
QUESTION B.02 [1.0 point]
Reactor Operator works in a high radiation area for eight (8) hours a day. The dose rate in the area is 100 mR/hour. Which ONE of the following is the MAXIMUM number of days in which Reactor Operator may perform his duties WITHOUT exceeding 10 CFR 20 limits?  
Reactor Operator works in a high radiation area for eight (8) hours a day. The dose rate in the area is 100 mR/hour. Which ONE of the following is the MAXIMUM number of days in which Reactor Operator may perform his duties WITHOUT exceeding 10 CFR 20 limits?  
: a. 5 days
: a. 5 days  
: b. 6 days  
: b. 6 days  
: c. 7 days  
: c. 7 days  
: d. 12 days   QUESTION B.03  [1.0 point] You receive a quarterly dosimetry report stating that you have received whole body occupational exposures of:
: d. 12 days QUESTION B.03  [1.0 point]
1 mrem of beta 1 mrem of alphas 1 mrem of neutrons of unknown energy What would be the total effective dose equivalent?   a. 3 mrem  
You receive a quarterly dosimetry report stating that you have received whole body occupational exposures of:
1 mrem of beta 1 mrem of alphas 1 mrem of neutrons of unknown energy What would be the total effective dose equivalent?
: a. 3 mrem  
: b. 12 mrem  
: b. 12 mrem  
: c. 22 mrem
: c. 22 mrem  
: d. 31 mrem  
: d. 31 mrem  


Section B Normal/Emergency Procedures and Radiological Controls   QUESTION B.04 [1.0 point] Which ONE of the following correctly describes the limitations of experiment?  The experiment with _____ shall NOT be irradiated in the reactor.  
Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.04 [1.0 point] Which ONE of the following correctly describes the limitations of experiment?  The experiment with _____ shall NOT be irradiated in the reactor.  
: a. total non-secured reactivity worth exceeding 0.06 %k/k     
: a. total non-secured reactivity worth exceeding 0.06 %k/k     
: b. total secured reactivity worth exceeding 0.4 %k/k    c. explosive materials
: b. total secured reactivity worth exceeding 0.4 %k/k    c. explosive materials  
: d. fissionable materials  
: d. fissionable materials  


QUESTION B.05 [1.0 point] A radioactive source reads 5 Rem/hr on contact. Five hours later, the same source reads 1.25 Rem/hr. How long is the time for the source to decay from a reading of 5 Rem/hr to 625 mRem/hr? a. 6.5 hours  
QUESTION B.05 [1.0 point] A radioactive source reads 5 Rem/hr on contact. Five hours later, the same source reads 1.25 Rem/hr. How long is the time for the source to decay from a reading of 5 Rem/hr to 625 mRem/hr?  
: a. 6.5 hours  
: b. 7.5 hours  
: b. 7.5 hours  
: c. 8.5 hours d. 9.5 hours  
: c. 8.5 hours  
: d. 9.5 hours  


QUESTION B.06 [1.0 point, 0.25 each] Match the events listed in column A with its emergency classification listed in column B. Values in Column B can be used once, more than once or not at all.  
QUESTION B.06 [1.0 point, 0.25 each] Match the events listed in column A with its emergency classification listed in column B. Values in Column B can be used once, more than once or not at all.  


Column A      Column B a. Loss of building electricity    1. Unusual Event  
Column A      Column B  
: a. Loss of building electricity    1. Unusual Event  
: b. Fire in the reactor control room    2. Alert  
: b. Fire in the reactor control room    2. Alert  
: c. Hurricane causing damage to the reactor building and  3. Site Area Emergency  reactor pool resulting in major coolant leakage  
: c. Hurricane causing damage to the reactor building and  3. Site Area Emergency  reactor pool resulting in major coolant leakage  
: d. Receipt of a bomb threat directly to the reactor facility 4. General Emergency    
: d. Receipt of a bomb threat directly to the reactor facility 4. General Emergency  
 
Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.07 [1.0 point] Which ONE of the following is NOT a guidance/recommendation under "Planned Occupational Exposure under Emergency Conditions" for Life Saving Actions?
: a. Persons receiving exposures under the planned actions should avoid procreation for a few months.
: b. Planned dose to hands and forearms not to exceed 300 rems.
: c. Persons receiving exposures can receive multiple times in a future until exceeding 5 Rem TEDE.
: d. Persons receiving exposures shall receive medical attention as soon as possible after their exposure.


Section B Normal/Emergency Procedures and Radiological Controls  QUESTION B.07 [1.0 point] Which ONE of the following is NOT a guidance/recommendation under "Planned Occupational Exposure under Emergency Conditions" for Life Saving Actions?
QUESTION B.08 [1.0 point] An annual test of the nuclear instrument was performed. Which ONE of the following is the latest the test that must be performed again without violation of the Technical Specifications?  
: a. Persons receiving exposures under the planned actions should avoid procreation for a few months
: a. Not to exceed 13 months  
: b. Planned dose to hands and forearms not to exceed 300 rems. c. Persons receiving exposures can receive multiple times in a future until exceeding 5 Rem TEDE.  
: b. Not to exceed 14 months 
: d. Persons receiving exposures shall receive medical attention as soon as possible after their exposure.  
: c. Not to exceed 15 months  
: d. Not to exceed 16 months  


QUESTION B.08 [1.0 point] An annual test of the nuclear instrument was performed. Which ONE of the following is the latest the test that must be performed again without violation of the Technical Specifications?    a. Not to exceed 13 months 
QUESTION B.09 [1.0 point] A radioactive material is decayed 30% after one hour. Determine its half-life?  
: b. Not to exceed 14 months  c. Not to exceed 15 months 
: a. 2 hours  
: d. Not to exceed 16 months QUESTION B.09 [1.0 point] A radioactive material is decayed 30% after one hour. Determine its half-life?
: b. 3 hours  
: a. 2 hours b. 3 hours  
: c. 4 hours  
: c. 4 hours  
: d. 5 hours
: d. 5 hours  


Section B Normal/Emergency Procedures and Radiological Controls   QUESTION B.10 [1.0 point] A system or component is defined as "OPERABLE" by Technical Specifications when: a. a system is operational when reactor is in the unsecured condition.   
Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.10 [1.0 point] A system or component is defined as "OPERABLE" by Technical Specifications when:  
: a. a system is operational when reactor is in the unsecured condition.   
: b. a system is operational when reactor is in the shutdown condition.  
: b. a system is operational when reactor is in the shutdown condition.  
: c. operating whenever it is not unsecured or shutdown. d. it is capable of performing its intended function.  
: c. operating whenever it is not unsecured or shutdown.  
: d. it is capable of performing its intended function.  


QUESTION B.11 [1.0 point] The reactivity worth of the regulating rod shall not exceed ________.
QUESTION B.11 [1.0 point] The reactivity worth of the regulating rod shall not exceed ________.  
: a. 0.08 %k/k  b. 0.6 %k/k   
: a. 0.08 %k/k  b. 0.6 %k/k   
: c. 1.0 %k/k   
: c. 1.0 %k/k   
: d. 3.0 %k/k    QUESTION B.12 [1.0 point] A two-curie source emits 80% of a 500 K-ev gamma, what is its dose rate at 1 foot? a. 0.8 R/hr at 1 ft
: d. 3.0 %k/k    QUESTION B.12 [1.0 point] A two-curie source emits 80% of a 500 K-ev gamma, what is its dose rate at 1 foot?  
: a. 0.8 R/hr at 1 ft  
: b. 4.8 R/hr at 1 ft  
: b. 4.8 R/hr at 1 ft  
: c. 80 R/hr at 1 ft  
: c. 80 R/hr at 1 ft  
: d. 480 R/hr at 1 ft
: d. 480 R/hr at 1 ft  


Section B Normal/Emergency Procedures and Radiological Controls   QUESTION B.13 [1.0 point] Per Procedure SP-01, Facility Access for Visitors, the area that includes the reactor building and the reactor building basement is considered to be the _________.
Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.13 [1.0 point] Per Procedure SP-01, Facility Access for Visitors, the area that includes the reactor building and the reactor building basement is considered to be the _________.  
: a. Controlled Access Area   
: a. Controlled Access Area   
: b. Vital Area  
: b. Vital Area  
: c. Unescorted Area
: c. Unescorted Area  
: d. Reconvening Area  
: d. Reconvening Area  


QUESTION B.14 [1.0 point, 0.25 each] Match each of the Technical Specification Limits in column A with its corresponding value in column B.  (Each limit has only one answer, values in Column B may be used once, more than once or not at all.)   Column A      Column B  
QUESTION B.14 [1.0 point, 0.25 each] Match each of the Technical Specification Limits in column A with its corresponding value in column B.  (Each limit has only one answer, values in Column B may be used once, more than once or not at all.)
Column A      Column B  
: a. Worth of single secured experiment  1. 0.08 %k/k         
: a. Worth of single secured experiment  1. 0.08 %k/k         
: b. Non-Secured experiment  2.      0.1 %k/k  c. Excess reactivity    3.      0.6 %k/k         
: b. Non-Secured experiment  2.      0.1 %k/k  c. Excess reactivity    3.      0.6 %k/k         
: d. Shutdown margin  
: d. Shutdown margin  
: 4.      1.00 %k/k              5. 3.00 %k/k   
: 4.      1.00 %k/k              5. 3.00 %k/k   
: 6. 4.7 %k/k QUESTION    B.15 [1.0 point] Which ONE of the following hospitals has agreed to accept contaminated victims for medical treatments?  
: 6. 4.7 %k/k QUESTION    B.15 [1.0 point]
: a. Rhode Island Hospital in Providence
Which ONE of the following hospitals has agreed to accept contaminated victims for medical treatments?  
: a. Rhode Island Hospital in Providence  
: b. Kent County Hospital in Warwick  
: b. Kent County Hospital in Warwick  
: c. South County Hospital in Wakefield  
: c. South County Hospital in Wakefield  
: d. Newport Hospital in Newport
: d. Newport Hospital in Newport  


Section B Normal/Emergency Procedures and Radiological Controls   QUESTION B.16 [1.0 point] The ventilation flow through the Emergency Filter Bank shall be verified to be less than or equal to 1500 SCFM. The verification shall be performed at least:  
Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.16 [1.0 point] The ventilation flow through the Emergency Filter Bank shall be verified to be less than or equal to 1500 SCFM. The verification shall be performed at least:
: a. quarterly  
: a. quarterly  
: b. semi-annually  
: b. semi-annually  
: c. annually
: c. annually  
: d. biennially  
: d. biennially  


QUESTION B.17 [1.0 point] The below items are listed as a reportable occurrence, EXCEPT:  
QUESTION B.17 [1.0 point] The below items are listed as a reportable occurrence, EXCEPT:
: a. Fuel cladding failure. b. An uncontrolled reactivity change of 0.7 %K/K.     
: a. Fuel cladding failure.  
: b. An uncontrolled reactivity change of 0.7 %K/K.     
: c. Reactor operation at 2.0 MW with primary pump OFF.  
: c. Reactor operation at 2.0 MW with primary pump OFF.  
: d. Performance of Reactor operation without a completion of the startup checklist.
: d. Performance of Reactor operation without a completion of the startup checklist.  
QUESTION B.18 [1.0 point] The principal barrier to be used for specification of the safety limit is the:   a. Reactor fuel cladding temperature.  
 
QUESTION B.18 [1.0 point] The principal barrier to be used for specification of the safety limit is the:
: a. Reactor fuel cladding temperature.  
: b. Reactor thermal power.  
: b. Reactor thermal power.  
: c. Bulk pool temperature. d. Coolant height.  
: c. Bulk pool temperature.  
: d. Coolant height.  


Section B Normal/Emergency Procedures and Radiological Controls   QUESTION B.19 [1.0 point] Which ONE of the following changes must be submitted to NRC for approval prior to implementation?
Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.19 [1.0 point] Which ONE of the following changes must be submitted to NRC for approval prior to implementation?  
: a. Replace a primary cooling pump with an identical pump  
: a. Replace a primary cooling pump with an identical pump  
: b. Add new limitation to the Pre-Startup Checklist Procedure  
: b. Add new limitation to the Pre-Startup Checklist Procedure  
: c. Add more responsibilities to the Radiation Protection Officer listed in the health physics procedure
: c. Add more responsibilities to the Radiation Protection Officer listed in the health physics procedure  
: d. Delete a definition of Channel Test listed in the RINSC Technical Specifications QUESTION    B.20 [1.0 point] Per RINSC Technical Specifications, the insertion rates of individual control rod and Reg rod simultaneously shall not exceed _____. a. 0.02 k/k per second
: d. Delete a definition of Channel Test listed in the RINSC Technical Specifications  
: b. 0.005 k/k per second
 
: c. 0.0002 k/k per second d. 0.0005 k/k per second   
QUESTION    B.20 [1.0 point] Per RINSC Technical Specifications, the insertion rates of individual control rod and Reg rod simultaneously shall not exceed _____.
: a. 0.02 k/k per second  
: b. 0.005 k/k per second  
: c. 0.0002 k/k per second  
: d. 0.0005 k/k per second  
 
  (***** END OF CATEGORY B *****)


(***** END OF CATEGORY B *****) 
Section C Facility and Radiation Monitoring Systems QUESTION    C.01 [1.0 point, 0.25 each] The figure below depicts the RINSC water make-up system. Match the water flowing location (to/from) listed in Column A to the appropriate numeral label in Column B?


Section C Facility and Radiation Monitoring Systems  QUESTION    C.01 [1.0 point, 0.25 each] The figure below depicts the RINSC water make-up system. Match the water flowing location (to/from) listed in Column A to the appropriate numeral label in Column B?
Column A   Column B  
Column A  Column B  a. Clean up system    1   
: a. Clean up system    1   
: b. City water supply    2   
: b. City water supply    2   
: c. RINSC labs    3   d. potable water supply to    4 the facility    
: c. RINSC labs    3
: d. potable water supply to    4 the facility  


Section C Facility and Radiation Monitoring Systems   QUESTION    C.02    [1.0 point] Which ONE of the following will convert the 480 VAC to 220/110 VAC in the RINSC electrical distribution system?  
Section C Facility and Radiation Monitoring Systems QUESTION    C.02    [1.0 point] Which ONE of the following will convert the 480 VAC to 220/110 VAC in the RINSC electrical distribution system?  
: a. Line Transfer Switch  
: a. Line Transfer Switch  
: b. 15-kW Power Generator   
: b. 15-kW Power Generator   
: c. Electrical Inverter
: c. Electrical Inverter  
: d. Electrical Transformer     QUESTION    C.03    [1.0 point]  During emergency conditions, the MAIN purpose of the activated charcoal section in the filter bank is to remove 99% of any airborne radioactive _______ present in the reactor room air.  
: d. Electrical Transformer QUESTION    C.03    [1.0 point]  During emergency conditions, the MAIN purpose of the activated charcoal section in the filter bank is to remove 99% of any airborne radioactive _______ present in the reactor room air.  
: a. Argon-41
: a. Argon-41  
: b. Nitrogen -16  
: b. Nitrogen -16  
: c. Iodine  
: c. Iodine  
: d. Xenon
: d. Xenon  


QUESTION C.04 [1.0 point] Which ONE of the following statement correctly describes the automatic servo control interlock?  An interlock will prevent auto servo control if:     
QUESTION C.04 [1.0 point] Which ONE of the following statement correctly describes the automatic servo control interlock?  An interlock will prevent auto servo control if:     
: a. the inlet coolant gate opens.   
: a. the inlet coolant gate opens.   
: b. the servo blade is fully withdrawn. c. Inserted two control blades simultaneously.  
: b. the servo blade is fully withdrawn.  
: c. Inserted two control blades simultaneously.  
: d. the reactor period is less than 30 seconds.  
: d. the reactor period is less than 30 seconds.  


Section C Facility and Radiation Monitoring Systems   QUESTION C.05 [1.0 point] The "TEST" position of the Master Switch allows to:   
Section C Facility and Radiation Monitoring Systems QUESTION C.05 [1.0 point] The "TEST" position of the Master Switch allows to:   
: a. exercise the control blade drive motion without energizing the scram magnets.  
: a. exercise the control blade drive motion without energizing the scram magnets.  
: b. calibrate the period less than 30 second without energizing the interlock system.  
: b. calibrate the period less than 30 second without energizing the interlock system.  
: c. exceed the Wide Range Linear Power limit without energizing the scram. d. exercise the control blade drive motion with energizing the scram magnets  
: c. exceed the Wide Range Linear Power limit without energizing the scram.  
: d. exercise the control blade drive motion with energizing the scram magnets  


QUESTION    C.06    [1.0 point] When a SIGNIFICANT loss of water from the reactor pool (low pool water alarm initiated), which ONE of the following is an appropriate system for adding the make-up water to the pool?   
QUESTION    C.06    [1.0 point] When a SIGNIFICANT loss of water from the reactor pool (low pool water alarm initiated), which ONE of the following is an appropriate system for adding the make-up water to the pool?   
: a. The Emergency Core Cooling System (ECCS) will automatically add water to the reactor pool when low pool water alarm initiated.  
: a. The Emergency Core Cooling System (ECCS) will automatically add water to the reactor pool when low pool water alarm initiated.
: b. The ECCS will be turned on manually through a series of manual valves.  
: b. The ECCS will be turned on manually through a series of manual valves.  
: c. The delay tank will automatically add water to the reactor pool when low pool water alarm initiated. d. The RINSC does NOT have any ECCS.  
: c. The delay tank will automatically add water to the reactor pool when low pool water alarm initiated.
: d. The RINSC does NOT have any ECCS.  


QUESTION    C.07    [1.0 point] You perform a High-Voltage (HV) Loss-Scram check for the Log Power Channel. The output of voltage meter reads 4.28 Volts. A High Voltage applied to the Log Power chamber is set at
QUESTION    C.07    [1.0 point] You perform a High-Voltage (HV) Loss-Scram check for the Log Power Channel. The output of voltage meter reads 4.28 Volts. A High Voltage applied to the Log Power chamber is set at
_______ Volts.   
_______ Volts.   
: a. 726   b. 856   
: a. 726  
: b. 856   
: c. 876   
: c. 876   
: d. 896     
: d. 896     


Section C Facility and Radiation Monitoring Systems   QUESTION    C.08    [1.0 point] Which ONE of the following best describes how the Uncompensated Ion Chamber (UIC) and Compensated Ion Chamber (CIC) operate?
Section C Facility and Radiation Monitoring Systems QUESTION    C.08    [1.0 point]
: a. The CIC has only one chamber coated with U-235 for fission reaction, whereas the UIC has two chambers, both can sense gamma rays but only one is coated with  boron-10 for (n,) reaction. b. The CIC has two chambers, one is coated with U-235 for fission reaction and the other is coated with boron-10 for (n,) reaction; whereas the UIC has only one chamber coated with U-235 for fission reaction.
Which ONE of the following best describes how the Uncompensated Ion Chamber (UIC) and Compensated Ion Chamber (CIC) operate?  
: c. The CIC has only one chamber coated with boron-10 for (n,) reaction; whereas the UIC has two chambers, one is coated with U-235 for fission reaction and the other is coated with boron-10 for (n,) reaction.  
: a. The CIC has only one chamber coated with U-235 for fission reaction, whereas the UIC has two chambers, both can sense gamma rays but only one is coated with  boron-10 for (n,) reaction.  
: d. The CIC has two chambers, both can sense gamma rays but only one is coated with boron-10 for (n,) reaction; whereas the UIC has only one chamber coated with  boron-10 for (n,) reaction.
: b. The CIC has two chambers, one is coated with U-235 for fission reaction and the other is coated with boron-10 for (n,) reaction; whereas the UIC has only one chamber coated with U-235 for fission reaction.  
QUESTION  C.09 [2.0 point, 0.5 each] Match the following actions used in Column A with their respective definitions in Column B:
: c. The CIC has only one chamber coated with boron-10 for (n,) reaction; whereas the UIC has two chambers, one is coated with U-235 for fission reaction and the other is coated with boron-10 for (n,) reaction.
COLUMN A          COLUMN B
: d. The CIC has two chambers, both can sense gamma rays but only one is coated with boron-10 for (n,) reaction; whereas the UIC has only one chamber coated with  boron-10 for (n,) reaction.  
 
QUESTION  C.09 [2.0 point, 0.5 each] Match the following actions used in Column A with their respective definitions in Column B:
 
COLUMN A          COLUMN B  
: a. You compare readings of Safety Channel    1. Channel Check with Linear Channel during reactor operations            2. Channel Test b. During startup, you verify the reactor scram at 115 % power  
: a. You compare readings of Safety Channel    1. Channel Check with Linear Channel during reactor operations            2. Channel Test b. During startup, you verify the reactor scram at 115 % power  
: 3. Channel Calibration  
: 3. Channel Calibration  
: c. During startup, you verify the reactor scram due to a loss of Watchdog communication d. You adjust a safety channel reading after conducting a thermal power calibration  
: c. During startup, you verify the reactor scram due to a loss of Watchdog communication  
: d. You adjust a safety channel reading after conducting a thermal power calibration  
 
Section C Facility and Radiation Monitoring Systems QUESTION    C.10 [1.0 point] Which ONE of the following is currently the source of neutrons for INITIAL startup and low


Section C Facility and Radiation Monitoring Systems  QUESTION    C.10 [1.0 point] Which ONE of the following is currently the source of neutrons for INITIAL startup and low power operation of the RINSC reactor?
power operation of the RINSC reactor?  
: a. Americium-Beryllium (Am-Be)  
: a. Americium-Beryllium (Am-Be)  
: b. Plutonium-Beryllium (Pu-Be)  
: b. Plutonium-Beryllium (Pu-Be)  
: c. Radon-Beryllium (Ra-Be)
: c. Radon-Beryllium (Ra-Be)  
: d. Beryllium Reflector  
: d. Beryllium Reflector  


QUESTION    C.11 [1 point] During a reactor operation, you discover the Stack Particulate Monitor (SPM) pump has been turned OFF since yesterday. Which ONE of the following actions should you take?  
QUESTION    C.11 [1 point] During a reactor operation, you discover the Stack Particulate Monitor (SPM) pump has been turned OFF since yesterday. Which ONE of the following actions should you take?  
: a. Immediately secure reactor. This event is a Technical Specification (TS) violation.
: a. Immediately secure reactor. This event is a Technical Specification (TS) violation.  
: b. Immediately secure reactor, but this event is NOT a TS violation because the SPM is still operable.
: b. Immediately secure reactor, but this event is NOT a TS violation because the SPM is still operable.  
: c. Continue with reactor operation. Up to 24 hours is allowed to run reactor before replacing the Stack Particulate Monitor.
: c. Continue with reactor operation. Up to 24 hours is allowed to run reactor before replacing the Stack Particulate Monitor.  
: d. Continue with reactor operation. The Technical Specifications require only RAMs and Stack Gas monitors during reactor operation. QUESTION C.12 [1.0 point] The Main purpose for setting a conductivity limit of the pool water is to:
: d. Continue with reactor operation. The Technical Specifications require only RAMs and Stack Gas monitors during reactor operation.
: a. Maintain the departure of nucleate boiling ratio (DNBR) greater than the unity b. Minimize the possibility of corrosion of the cladding on the fuel elements  
QUESTION C.12 [1.0 point] The Main purpose for setting a conductivity limit of the pool water is to:  
: a. Maintain the departure of nucleate boiling ratio (DNBR) greater than the unity  
: b. Minimize the possibility of corrosion of the cladding on the fuel elements  
: c. Extend integrity of resin bed on the demineralizer   
: c. Extend integrity of resin bed on the demineralizer   
: d. Minimize Ar-41 released to the public  
: d. Minimize Ar-41 released to the public  


Section C Facility and Radiation Monitoring Systems   QUESTION C.13 [1.0 point] Which ONE of the following provides a reactor scram in any mode of operations?  
Section C Facility and Radiation Monitoring Systems QUESTION C.13 [1.0 point] Which ONE of the following provides a reactor scram in any mode of operations?  
: a. Pool Temperature = 122 &deg;F  
: a. Pool Temperature = 122 &deg;F  
: b. Seismic Disturbance  
: b. Seismic Disturbance  
: c. No Flow Thermal Column   d. Primary Coolant Flow Rate = 1600 gpm  
: c. No Flow Thermal Column
: d. Primary Coolant Flow Rate = 1600 gpm  


QUESTION    C.14    [1.0 point] In order to test the Watchdog Scram, you should:    
QUESTION    C.14    [1.0 point] In order to test the Watchdog Scram, you should:  
: a. Disconnect the building internet server that supports the internet for the RINSC computers. b. Withdraw the Regulating blades at full out position and hold the manual scram for 10 secconds.
: a. Disconnect the building internet server that supports the internet for the RINSC computers.
: b. Withdraw the Regulating blades at full out position and hold the manual scram for 10 secconds.  
: c. Turn the Watchdog Scram Test and the Master Switches to "TEST" simultaneously.  
: c. Turn the Watchdog Scram Test and the Master Switches to "TEST" simultaneously.  
: d. Turn the Watchdog Scram Test Switch to "TEST". QUESTION  C.15 [1.0 point] Which ONE of the following is the material used for the fission chamber?
: d. Turn the Watchdog Scram Test Switch to "TEST".
: a. BF3 fill gas  
QUESTION  C.15 [1.0 point]
Which ONE of the following is the material used for the fission chamber?  
: a. BF3 fill gas
: b. B-10  
: b. B-10  
: c. U-235
: c. U-235  
: d. Pu-233  
: d. Pu-233  


Section C Facility and Radiation Monitoring Systems   QUESTION  C.16  [1.0 point]       Which ONE of the following is NOT required to be determined for core shutdown margin?   
Section C Facility and Radiation Monitoring Systems QUESTION  C.16  [1.0 point]
Which ONE of the following is NOT required to be determined for core shutdown margin?   
: a. Annually surveillance is required   
: a. Annually surveillance is required   
: b. Core reflection is changed  
: b. Core reflection is changed  
: c. Following control blade is changed d. The reactivity worth of experiments is changed QUESTION C.17 [1.0 point] Which ONE of the following can be determined if there is a leak in the heat exchanger?
: c. Following control blade is changed  
: d. The reactivity worth of experiments is changed  
 
QUESTION C.17 [1.0 point] Which ONE of the following can be determined if there is a leak in the heat exchanger?  
: a. Present of a sodium-24 nuclide in the secondary coolant system.  
: a. Present of a sodium-24 nuclide in the secondary coolant system.  
: b. Pool level will increase due to leakage into the secondary.
: b. Pool level will increase due to leakage into the secondary.  
: c. Decrease a flow rate in the secondary makeup system.  
: c. Decrease a flow rate in the secondary makeup system.  
: d. Present of an argon-41 nuclide in the secondary coolant system.
: d. Present of an argon-41 nuclide in the secondary coolant system.  
QUESTION  C.18 [1.0 point] The design basis for the thermal column is to provide:   a. the biological shield from the reactor core.
 
QUESTION  C.18 [1.0 point] The design basis for the thermal column is to provide:  
: a. the biological shield from the reactor core.  
: b. a fast neutron flux for experiments.  
: b. a fast neutron flux for experiments.  
: c. a thermal neutron flux for experiments  
: c. a thermal neutron flux for experiments  
: d. a shield of fast neutrons entered to the experiments.
: d. a shield of fast neutrons entered to the experiments.  


Section C Facility and Radiation Monitoring Systems   QUESTION  C.19 [1.0 point] Which ONE of the following best describes how the Emergency Core Cooling System (ECCS) operates?  In the event of a loss of coolant accident, the ECCS water is provided from ________ up to the top of the pool.     
Section C Facility and Radiation Monitoring Systems QUESTION  C.19 [1.0 point]
Which ONE of the following best describes how the Emergency Core Cooling System (ECCS) operates?  In the event of a loss of coolant accident, the ECCS water is provided from ________ up to the top of the pool.     
: a. the delay tank  
: a. the delay tank  
: b. the 3000 gallon holding tank c. the public water supply through a backflow-preventer  
: b. the 3000 gallon holding tank  
: c. the public water supply through a backflow-preventer  
: d. the fire sprinkler system supply, through a series of manual valves  
: d. the fire sprinkler system supply, through a series of manual valves  


  (***** END OF CATEGORY C *****) (***** END OF EXAMINATION *****)
  (***** END OF CATEGORY C *****) (***** END OF EXAMINATION *****)  
Section  A L Theory, Thermo & Fac. Operating Characteristics   A.01 Answer:  a(2) b(1) c(3) (0.33 each)  
 
Section  A L Theory, Thermo & Fac. Operating Characteristics A.01 Answer:  a(2) b(1) c(3) (0.33 each)  


==Reference:==
==Reference:==
Burn, R., Introduction to Nuclear Reactor Operations, &#xa9; 1988, Sec 2.6   A.02 Answer:  b   
Burn, R., Introduction to Nuclear Reactor Operations, &#xa9; 1988, Sec 2.6 A.02 Answer:  b   


==Reference:==
==Reference:==
Chart of the Nuclides A.03 Answer:  d  
Chart of the Nuclides  
 
A.03 Answer:  d  


==Reference:==
==Reference:==
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1982, Sec 3.3.1,    page 3-16.
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1982, Sec 3.3.1,    page 3-16.
 
A.04 Answer:  c  
A.04 Answer:  c  


==Reference:==
==Reference:==
P = P0 et/T  --> T= t/Ln(P/ P0 )    T= 120/Ln(100 ); T = 26 sec.
P = P 0 et/T  --> T= t/Ln(P/ P 0 )    T= 120/Ln(100 ); T = 26 sec.  
 
A.05  Answer:    b  
A.05  Answer:    b  


==Reference:==
==Reference:==
CR = S/(1-K)    CR = 1000/(1 - 0.8) = 5000 N/sec A.06 Answer:  c
CR = S/(1-K)    CR = 1000/(1 - 0.8) = 5000 N/sec  
 
A.06 Answer:  c  


==Reference:==
==Reference:==
Keff1=1/1- 1  Keff1 =1/(1-(-.05)) -->Keff1= 0.952, Count1*(1-Keff1) = Count2*(1-Keff2)
Keff1=1/1- 1  Keff1 =1/(1-(-.05)) -->Keff1= 0.952, Count1*(1-Keff1) = Count2*(1-Keff2)
Count1*(1-0.952) = Count2*(1-Keff2)  1000*(1-0.952) = 4000(1- Keff2);  Keff2 = 0.988 A.07 Answer:  a  
Count1*(1-0.952) = Count2*(1-Keff2)  1000*(1-0.952) = 4000(1- Keff2);  Keff2 = 0.988 A.07 Answer:  a  


==Reference:==
==Reference:==
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 2.4.5, page 2-29. A.08 Answer:  c  
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 2.4.5, page 2-
: 29. A.08 Answer:  c  


==Reference:==
==Reference:==
Reactivity added = 0.156 %k/k = 0.00156 k/k      = (-)/eff =  (0.0073 - 0.00156)/ ((0.1)*(0.00156))    = 37 seconds A.09 Answer:  d
Reactivity added = 0.156 %k/k = 0.00156 k/k      = (-)/eff =  (0.0073 - 0.00156)/ ((0.1)*(0.00156))    = 37 seconds A.09 Answer:  d  


==Reference:==
==Reference:==
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 3.3.4 Section  A L Theory, Thermo & Fac. Operating Characteristics   A.10 Answer:  b  
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 3.3.4
 
Section  A L Theory, Thermo & Fac. Operating Characteristics A.10 Answer:  b  


==Reference:==
==Reference:==
SDM = (1- keff)/keff = (1-0.927)/0.927 = 0.07875 k/k. So if you add the same amount of SDM, the reactor is critical. Another method: you can find the new value of Keff when adding 0.07875 k/k to  reactor. p = (k2 -k1)/ k1*k2  0.07875 = (k2- 0.927)/(0.927* k2), solve for k2 K2 = 1, hence the reactor is critical A.11 Answer:    d  
SDM = (1- keff)/keff = (1-0.927)/0.927 = 0.07875 k/k. So if you add the same amount of SDM, the reactor is critical. Another method: you can find the new value of Keff when adding 0.07875 k/k to  reactor.
p = (k2 -k1)/ k1*k2  0.07875 = (k2- 0.927)/(0.927* k2), solve for k2 K2 = 1, hence the reactor is critical A.11 Answer:    d  


==Reference:==
==Reference:==
Line 493: Line 701:


==Reference:==
==Reference:==
Burn, R., Introduction to Nuclear Reactor Operations, &#xa9; 1988, Section 5.1, Subcritical Multiplication A.14 Answer:  c  
Burn, R., Introduction to Nuclear Reactor Operations, &#xa9; 1988, Section 5.1, Subcritical Multiplication
 
A.14 Answer:  c  


==Reference:==
==Reference:==
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Section 3.2, Table 3.1 A.15 Answer:  a
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Section 3.2, Table 3.1 A.15 Answer:  a  


==Reference:==
==Reference:==
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 3.3.1 A.16 Answer:  b  
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 3.3.1 A.16 Answer:  b  


==Reference:==
==Reference:==
DOE Handbook Vol. 1 Module 2, Section 3.0 A.17 Answer:  d  
DOE Handbook Vol. 1 Module 2, Section 3.0 A.17 Answer:  d  


==Reference:==
==Reference:==
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 4.2 A.18 Answer: b  
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 4.2 A.18 Answer: b  


==Reference:==
==Reference:==
NRC Standard Question  
NRC Standard Question  


Section  A L Theory, Thermo & Fac. Operating Characteristics   A.19 Answer:  c
Section  A L Theory, Thermo & Fac. Operating Characteristics A.19 Answer:  c  


==Reference:==
==Reference:==
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 4.2 A.20 Answer:  b  
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1988, Sec 4.2 A.20 Answer:  b  


==Reference:==
==Reference:==
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1982, Section 3.3.7, page 3-37            
Burn, R., Introduction of Nuclear Reactor Operations, &#xa9; 1982, Section 3.3.7, page 3-37  


Section B Normal/Emergency Procedures and Radiological Controls   B.01 Answer:  a (115 kW) b (23' 7 ") c (127 degree F)  (0.33 each)  
Section B Normal/Emergency Procedures and Radiological Controls B.01 Answer:  a (115 kW) b (23' 7 ") c (127 degree F)  (0.33 each)  


==Reference:==
==Reference:==
TS 2.2.1   B.02 Answer:  b  
TS 2.2.1 B.02 Answer:  b  


==Reference:==
==Reference:==
10CFR20.1201(a)(1) [5000 mr x 1 hr  x day  = 6.25 days            100 mr  8 hr B.03 Answer:  a  
10CFR20.1201(a)(1) [5000 mr x 1 hr  x day  = 6.25 days            100 mr  8 hr B.03 Answer:  a  


==Reference:==
==Reference:==
The report already provides a conversion in mrem, so you just add them up.
The report already provides a c onversion in mrem, so you just add them up.  
 
B.04 Answer:    c  
B.04 Answer:    c  


==Reference:==
==Reference:==
TS 3.8.1 & 3.1.1 B.05 Answer:  b  
TS 3.8.1 & 3.1.1  
 
B.05 Answer:  b  


==Reference:==
==Reference:==
DR = DR*e -t  1.25 rem/hr =5 rem/hr* e -(5hr)  Ln(1.25/5) = -*5 -->        =0.277; solve for t:  Ln(.625/5)=-0.277 *t   t=7.5 hours B.06 Answer:    a(1) b(2) c(3) d(1)  (0.25 each)  
DR = DR*e -t  1.25 rem/hr =5 rem/hr* e  
-(5hr)  Ln(1.25/5) = -*5 -->        =0.277; solve for t:  Ln(.625/5)=-0.277 *t t=7.5 hours  
 
B.06 Answer:    a(1) b(2) c(3) d(1)  (0.25 each)  


==Reference:==
==Reference:==
EP 4.1, EP 4.2, and EP 4.3 B.07 Answer:  c  
EP 4.1, EP 4.2, and EP 4.3
 
B.07 Answer:  c  


==Reference:==
==Reference:==
EP 7.5.1 B.08  Answer:  c  
EP 7.5.1  
 
B.08  Answer:  c  


==Reference:==
==Reference:==
TS Definition 1.43 (annual: interval NOT to exceed 15 months) B.09 Answer:  a  
TS Definition 1.43 (annual: interval NOT to exceed 15 months)
B.09 Answer:  a  


==Reference:==
==Reference:==
DR = DR*e -t  30% is decayed, so 70% is still there 70% =100%* e -(3hrs)  Ln(70/100) = -*1      -->=0.357      t1/2=Ln(2)/  -->.693/.357    t=1.94 hours   B.10  Answer: d  
DR = DR*e -t  30% is decayed, so 70% is still there 70% =100%* e  
-(3hrs)  Ln(70/100) = -*1      -->=0.357      t1/2=Ln(2)/  -->.693/.357    t=1.94 hours B.10  Answer: d  


==Reference:==
==Reference:==
Line 556: Line 778:
TS 3.1.1   
TS 3.1.1   


Section B Normal/Emergency Procedures and Radiological Controls   B.12    Answer:  b   
Section B Normal/Emergency Procedures and Radiological Controls B.12    Answer:  b   


==Reference:==
==Reference:==
6CEN = R/hr @ 1 ft. ->  6 x 2 x .8 x .5 = 4.8 R/hr at 1ft. B.13 Answer:    b  
6CEN = R/hr @ 1 ft. ->  6 x 2 x .8 x .5 = 4.8 R/hr at 1ft.
B.13 Answer:    b  


==Reference:==
==Reference:==
Line 567: Line 790:


==Reference:==
==Reference:==
TS 3.1.1 B.15 Answer:    a   
TS 3.1.1  
 
B.15 Answer:    a   


==Reference:==
==Reference:==
Emergency Plan 3.2.4 B.16  Answer:  c   
Emergency Plan 3.2.4
 
B.16  Answer:  c   


==Reference:==
==Reference:==
TS 4.5.5   B.17 Answer:    b   
TS 4.5.5 B.17 Answer:    b   


==Reference:==
==Reference:==
Line 581: Line 808:


==Reference:==
==Reference:==
TS 2.1 B.19 Answer:  d  
TS 2.1  
 
B.19 Answer:  d  


==Reference:==
==Reference:==
10 CFR 50.59 B.20 Answer:  c  
10 CFR 50.59
 
B.20 Answer:  c  


==Reference:==
==Reference:==
TS 3.2    
TS 3.2  


Section C Facility and Radiation Monitoring Systems   C.1 Answer:    a,2 b,3  c,1 d,4  (0.25 each)  
Section C Facility and Radiation Monitoring Systems C.1 Answer:    a,2 b,3  c,1 d,4  (0.25 each)  


==Reference:==
==Reference:==
SAR, Figure 5.7   C.02 Answer:  d  
SAR, Figure 5.7 C.02 Answer:  d  


==Reference:==
==Reference:==
SAR 8.2 C.03 Answer:  c  
SAR 8.2 C.03 Answer:  c  


==Reference:==
==Reference:==
SOP, MP-02 C.04 Answer:  d  
SOP, MP-02  
 
C.04 Answer:  d  


==Reference:==
==Reference:==
SAR 7.2.8 C.05 Answer:  a  
SAR 7.2.8  
 
C.05 Answer:  a  


==Reference:==
==Reference:==
SAR 7.2.3 C.06 Answer:  b  
SAR 7.2.3 C.06 Answer:  b  


==Reference:==
==Reference:==
Line 618: Line 853:


==Reference:==
==Reference:==
NRC Standard Question C.09 Answer: a(1) b(2) c(2) d(3) (0.5 each)  
NRC Standard Question  
 
C.09 Answer: a(1) b(2) c(2) d(3) (0.5 each)  


==Reference:==
==Reference:==
TS 1.2, 1.3 and 1.4 C.10 Answer:  d  
TS 1.2, 1.3 and 1.4 C.10 Answer:  d  


==Reference:==
==Reference:==
SAR 4.2.4 C.11 Answer: a  
SAR 4.2.4 C.11 Answer: a  


==Reference:==
==Reference:==
Line 632: Line 869:


==Reference:==
==Reference:==
TS 4.3.1.1 Section C Facility and Radiation Monitoring Systems   C.13 Answer: b  
TS 4.3.1.1  
 
Section C Facility and Radiation Monitoring Systems C.13 Answer: b  


==Reference:==
==Reference:==
TS 3.2 C.14 Answer:    d  
TS 3.2 C.14 Answer:    d  


==Reference:==
==Reference:==
Line 643: Line 882:


==Reference:==
==Reference:==
NRC Standard Question C.16 Answer: d  
NRC Standard Question  
 
C.16 Answer: d  


==Reference:==
==Reference:==
TS 4.1.1.1 C.17 Answer: a  
TS 4.1.1.1  
 
C.17 Answer: a  


==Reference:==
==Reference:==
TS 4.3.2.1 C.18 Answer: c  
TS 4.3.2.1 C.18 Answer: c  


==Reference:==
==Reference:==

Revision as of 20:47, 29 June 2018

Examination Report No. 50-193-OL-17-01, Rhode Island Atomic Energy Commission
ML17094A237
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 04/18/2017
From: Mendiola A J
Division of Policy and Rulemaking
To: Goodwin C
Rhode Island Nuclear Science Center
John T. Nguyen
Shared Package
ml16190a124 List:
References
50-193/OL-17-01 50-193/OL-17-01
Download: ML17094A237 (39)


Text

April 18, 2017

Dr. Cameron Goodwin, Director Rhode Island Nuclear Science Center Rhode Island Atomic Energy Commission

16 Reactor Road

Narragansett, RI 02882-1165

SUBJECT:

EXAMINATION REPORT NO. 50-193/OL-17-01, RHODE ISLAND ATOMIC ENERGY COMMISSION

Dear Dr. Goodwin:

During the week of March 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at your Rhode Island Nuclear Science Center Reactor. The examinations were conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report.

In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Mr. John T. Nguyen at (301) 415-4007 or via e-mail at John.Nguyen@nrc.gov

. Sincerely,

/RA/

Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Docket No. 50-193

Enclosures:

1. Examination Report No. 50-193/OL-17-01
2. Written Examination cc: Jeff Davis, Assistant Director, Operations cc w/o enclosures: See next page C. Goodwin 2

SUBJECT:

EXAMINATION REPORT NO. 50-193/OL-17-01, RHODE ISLAND ATOMIC ENERGY COMMISSION DATED APRIL 18, 2017

DISTRIBUTION PUBLIC AMendiola AAdams PBoyle CBassett

ADAMS ACCESSION #: ML17094A237 OFFICE NRR/DPR/PROB:CE NRR/DPR/PROB:OLA NRR/DPR/PROB:BC NAME JNguyen ABaxter AMendiola DATE 3/28/2017 4/04/2017 4/18/2017 OFFICIAL RECORD COPY Rhode Island Atomic Energy Commission Docket No. 50-193

cc: Governor

222 State House Room 115

Providence, RI 02903

Howard Chun, Commissioner Cranston High School East 899 Park Avenue

Cranston, RI 02910

Dr. Clinton Chichester, Chairman Rhode Island Atomic Energy Commission College of Pharmacy Pharmacy Building

7 Greenhouse Road

Kingston, RI 02881 Dr. John Breen, Chairman

Nuclear and Radiation Safety Committee

Providence College Department of Chemistry and Biochemistry 1 Cunningham Square Providence, RI 02918

Dr. Nitin Padture, Commissioner School of Engineering, Brown University

184 Hope Street, Box D Barus & Holley Building, Room 608 Providence, RI 02912

Dr. Yana K. Reshetnyak, Commissioner Department of Physics University of Rhode Island East Hall, 2 Lippitt Road Kingston, RI 02881

Dr. Nancy E. Breen, Commissioner Marine and Natural Science Building 226 Roger Williams University One Old Ferry Road Bristol, RI 02809

Docket No. 50-193

Supervising Radiological Health Specialist Office of Occupational and

Radiological Health Rhode Island Department of Health

3 Capitol Hill, Room 206 Providence, RI 02908-5097

Test, Research and Training

Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611

ENCLOSURE 1 U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.: 50-193/OL-17-01

FACILITY DOCKET NO.: 50-193

FACILITY LICENSE NO.: R-95

FACILITY: RHODE ISLAND ATOMIC ENERGY COMMISSION

EXAMINATION DATES: March 20 - March 22, 2017

SUBMITTED BY: _______/RA/_______________ _03/28/2017_ John T. Nguyen, Chief Examiner Date

SUMMARY:

During the week of March 20, 2017, the NRC ad ministered operator licensing examination to two Reactor Operator (RO) candidates. The candidates passed all portions of the operating examination.

REPORT DETAILS

1. Examiner: John T. Nguyen, Chief Examiner
2. Results: RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 2/0 N/A 2/0 Operating Tests 2/0 N/A 2/0 Overall 2/0 N/A 2/0
3. Exit Meeting:

Jeff Davis, RINSC, Associate Director Paul Martin, RINSC, Training Supervisor John Nguyen, NRC, Chief Examiner

The NRC examiners thanked the facility for their support in the administration of the examinations. Mr. Nguyen discussed with the facility management the generic weaknesses observed during their operating tests to include occupational dose limits for adults specified in 10 CFR Part 20.

ENCLOSURE 2

U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR LICENSE EXAMINATION FACILITY: RINSC

REACTOR TYPE: Pool

DATE ADMINISTERED: 03/21/2017 CANDIDATE: _______________________

INSTRUCTIONS TO CANDIDATE: Answers are to be written on the Answer sheet provided. Attach all Answer sheets to the examination. Point values are indicated in parentheses for each question. A 70% in each category is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.

% OF CATEGORY  % OF CANDIDATE'S CATEGORY VALUE TOTAL SCORE VALUE CATEGORY

20.00 33.3 A. REACTOR THEORY, THERMODYNAMICS AND FACILITY OPERATING CHARACTERISTICS

20.00 33.3 B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS 20.00 33.3 C. FACILITY AND RADIATION MONITORING SYSTEMS 60.00  % TOTALS FINAL GRADE All work done on this examination is my own. I have neither given nor received aid.

______________________________________ Candidate's Signature

A. RX THEORY, THERMO & FAC OP CHARS A N S W E R S H E E T Multiple Choice (Circle or X your choice)

If you change your Answer, write your selection in the blank.

A01 a ___ b ___ c ___ (0.33 each)

A02 a b c d ___

A03 a b c d ___

A04 a b c d ___

A05 a b c d ___

A06 a b c d ___

A07 a b c d ___

A08 a b c d ___

A09 a b c d ___

A10 a b c d ___

A11 a b c d ___

A12 a b c d ___

A13 a b c d ___

A14 a b c d ___

A15 a b c d ___

A16 a b c d ___

A17 a b c d ___

A18 a b c d ___

A19 a b c d ___

A20 a b c d ___

(***** END OF CATEGORY A *****)

B. NORMAL/EMERG PROCEDURES & RAD CON A N S W E R S H E E T Multiple Choice (Circle or X your choice)

If you change your Answer, write your selection in the blank.

B01 a ______ b ______ c ______ (0.33 each)

B02 a b c d ___

B03 a b c d ___

B04 a b c d ___

B05 a b c d ___

B06 a ___ b ___ c ___ d ___ (0.25 each)

B07 a b c d ___

B08 a b c d ___

B09 a b c d ___

B10 a b c d ___

B11 a b c d ___

B12 a b c d ___

B13 a b c d ___

B14 a ___ b ___ c ___ d ___ (0.25 each)

B15 a b c d ___

B16 a b c d ___

B17 a b c d ___

B18 a b c d ___

B19 a b c d ___

B20 a b c d ___

(***** END OF CATEGORY B *****)

C. PLANT AND RAD MONITORING SYSTEMS A N S W E R S H E E T Multiple Choice (Circle or X your choice)

If you change your Answer, write your selection in the blank.

C01 a ___ b ___ c ___ d ___ (0.25 each)

C02 a b c d ___

C03 a b c d ___

C04 a b c d ___

C05 a b c d ___

C06 a b c d ___

C07 a b c d ___

C08 a b c d ___

C09 a ___ b ___ c ___ d ___ (0.5 each)

C10 a b c d ___

C11 a b c d ___

C12 a b c d ___

C13 a b c d ___

C14 a b c d ___

C15 a b c d ___

C16 a b c d ___

C17 a b c d ___

C18 a b c d ___

C19 a b c d ___

(***** END OF CATEGORY C *****) (********** END OF EXAMINATION **********)

NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
4. Use black ink or dark pencil only to facilitate legible reproductions.
5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each Answer sheet.
6. Mark your Answers on the Answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
7. The point value for each question is indicated in [brackets] after the question.
8. If the intent of a question is unclear, ask questions of the examiner only.
9. When turning in your examination, assemble the completed examination with examination questions, examination aids and Answer sheets. In addition turn in all scrap paper.
10. Ensure all information you wish to have evaluated as part of your Answer is on your Answer sheet. Scrap paper will be disposed of immediately following the examination.
11. To pass the examination you must achieve a grade of 70 percent or greater in each category.
12. There is a time limit of three (3) hours for completion of the examination.

EQUATION SHEET

Q = m cp T Q = m h SCR = S/(1-Keff) Q = UA T CR1 (1-Keff) 1 = CR2 (1-Keff) 2 26.06 (eff) (1-Keff) 0 SUR = M = ( - ) (1-Keff) 1 SUR = 26.06/ M = 1/(1-Keff) = CR 1/CR0 P = P0 10SUR(t) SDM = (1-Keff)/Keff P = P0 e(t/) I = I o e-ux (1-) P =

Po * = 1 x 10

-4 seconds - _ _ = (*/) + [(-)/eff] = */(-) = (Keff-1)/Keff R = 6 C E n/r 2 = Keff/Keff 0.693 _ T1/2 = = 0.007 DR1D12 = DR2D22 DR = DR oe-t Cp (H20) = 0.146 kw P = S / (1 - Keff) gpm F eff = 0.1/sec

1 Curie = 3.7x10 10 dps 1 kg = 2.21 lbm 1 hp = 2.54x10 3 BTU/hr 1 Mw = 3.41x10 6 BTU/hr 1 BTU = 778 ft-lbf F = 9/5C + 32 931 Mev = 1 amu C = 5/9 (F - 32) 2112effeffeffeffKKKK=

Section A: Reactor Theory, Thermo, and Fac. Operating Characteristics QUESTION A.01 [1.0 point, 0.33 each] Match the term listed in Column A with its corresponding unit listed in column B.

Column A Column B

a. 1 barn 1. cm

-1

b. Macroscopic Cross Section 2. 10

-24 cm 2 c. Neutron Flux 3. Neutrons / cm 2 /sec

QUESTION A.02 [1.0 point] For the alpha decay of a nuclide, the number of protons will ___________ and its atomic mass

number will __________.

a. increase by 2 / increase by 2
b. decrease by 2 /decrease by 4
c. decrease by 4 / decrease by 2
d. increase by 4 / increase by 2

QUESTION A.03 [1.0 point] The FAST FISSION FACTOR is defined as a ratio of:

a. the number of neutrons that reach thermal energy over the number of fast neutrons that start to slow down.
b. the number of fast neutrons produced from fission in a generation over the number of fast neutrons produced from fission in the previous generation.
c. the number of fast neutrons produced from U-238 over the number of thermal neutrons produced from U-235.
d. the number of fast neutrons produced from all fission over the number of fast neutrons produced from thermal fission.

Section A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.04 [1.0 points]

Which ONE of the following is the stable reactor period which will result in a power rise from 1% to 100% power in 2 minutes?

a. 0.5 second
b. 13 seconds
c. 26 seconds
d. 43 seconds

QUESTION A.05 [1.0 point] Given a source strength of 1000 neutrons per second (N/sec) and a multiplication factor of 0.8, which ONE of the following is the expected stable neutron count rate?

a. 700 N/sec
b. 5000 N/sec
c. 10000 N/sec
d. 20000 N/sec

QUESTION A.06 [1.0 point]

The reactor is SHUTDOWN by 5 %k/k with the count rate of 1000 counts per second (cps). The control rods are withdrawn until the count rate is quadrupled. What is the value of K eff? a. 0.952

b. 0.976
c. 0.988
d. 1.002

Section A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.07 [1.0 point] Inelastic scattering can be described as a process whereby a neutron collides with a nucleus and leaves the nucleus in an excited state. The nucleus later:

a. emits a gamma ray and a neutron with lower energy.
b. emits a gamma ray and a neutron with higher energy.
c. emits a beta particle and a neutron with lower energy.
d. emits an alpha particle ONLY.

QUESTION A.08 [1.0 point]

While a reactor is at 5 watts, the reactor operator is withdrawing a control rod to insert a positive reactivity of 0.156 %k/k. Which ONE of the following will be the stable reactor period as a result of this withdrawal? Given beta-effective = 0.0073 and eff= 0.1.

a. 17 seconds
b. 27 seconds
c. 37 seconds
d. 47 seconds

QUESTION A.09 [1.0 point] Which term is described by the following? "Depart from criticality."

a. 1/M
b. K-effective
c. Reactor period
d. Reactivity

Section A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.10 [1.0 point] A reactor is subcritical with a K eff of 0.927. If you add 7.875% k/k into the core, the reactor will be: a. subcritical

b. critical
c. supercritical
d. prompt critical

QUESTION A.11 [1.0 point] A reactor is slightly supercritical with the following values for each of the factors in the six-factor formula:

Fast fission factor 1.05 Fast non-leakage probability 0.80 Resonance escape probability 0.90 Thermal non-leakage probability 0.92 Thermal utilization factor 0.80 Reproduction factor 1.86 A control rod is inserted to bring the reactor back to critical. Assuming all other factors remain unchanged, the new value for the thermal utilization factor is:

a. 0.698
b. 0.702
c. 0.743
d. 0.773

Section A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.12 [1.0 point] The following data was obtained during a reactor fuel load. Step No. of Elements Detector A (count/sec) 1 0 100 2 4 120 3 8 140 4 12 200 5 15 400

The estimated number of additional elements required to achieve criticality is between:

a. 2 to 3 b. 4 to 5 c. 6 to 8 d. 8 to 10

QUESTION A.13 [1.0 point] Which term is described by the following? "The increase in neutron population by providing a positive additional reactivity while the reactor is subcritical"

a. Inverse Multiplication
b. Subcritical Multiplication
c. Neutron Production
d. Source Strength

QUESTION A.14 [1.0 point] On the average, how many neutrons are produced for each fission of U-235?

a. 2.00 neutrons
b. 2.09 neutrons
c. 2.43 neutrons
d. 2.93 neutrons

Section A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.15 [1.0 point]

Which ONE of the following most correctly describes the SIX- FACTOR FORMULA?

a. Keff = K
  • the total non-leakage probability
b. K = Keff
  • the total non-leakage probability
c. Keff = K
  • the total leakage probability
d. K = Keff
  • the utilization factor

QUESTION A.16 [1.0 point] Which ONE of the following types of neutrons has a mean neutron generation lifetime of 12.5 seconds?

a. Prompt
b. Delayed
c. Fast
d. Thermal

QUESTION A.17 [1.0 point] The reactor is at 5 watts. The reactor operator accidentally inserts a fuel element worth of 0.8

%k/k into the core. With this insertion, the reactor will be:

a. subcritical
b. critical
c. supercritical
d. prompt critical

Section A L Theory, Thermo & Fac. Operating Characteristics QUESTION A.18 [1.0 point]

A mechanism by which a nucleus can gain stability by converting a neutron to a proton or vice versa is called:

a. gamma decay
b. beta decay
c. alpha decay
d. photoelectric effect

QUESTION A.19 [1.0 point] During a reactor scram from full power, which ONE of the following best describes the values of K-effective and ? a. Keff = 1 and = 0 b. Keff < 1 and 0 < < -eff c. Keff < 1 and < 0 d. Keff < 1 and 1 < < infinity () QUESTION A.20 [1.0 point] Which ONE of the following is a correct statement of why delayed neutrons enhance the ability to control reactor power than prompt neutrons?

a. Delayed neutrons are born at higher energy levels than prompt neutrons, so delayed neutron can easily cause fission in U-235 with their high energies.
b. Delayed neutrons increase the average neutron lifetime that allows the reactor control rods control the population of delayed neutrons.
c. Prompt neutrons can cause fissions in both U-235 and U-238; whereas delayed neutrons can only cause fissions in U-235.
d. The absorption cross section of delayed neutrons is lower than the absorption cross section of prompt neutrons with U-235.

(***** END OF CATEGORY A *****)

Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.01 [1.0 point, 0.33 each] Fill out a blank with appropriate data provided in the bracket. During the Natural Convection Mode, the Limiting Safety System Settings:

a. for reactor thermal power shall be ______. (115 kW/125 kW/2.5 MW)
b. for the height of coolant above the top of the uranium silicide fuel shall be ______.

(21'7/22'7/23'7")

c. for the bulk pool temperature shall be _______. (122 °F/125 °F/127 °F)

QUESTION B.02 [1.0 point]

Reactor Operator works in a high radiation area for eight (8) hours a day. The dose rate in the area is 100 mR/hour. Which ONE of the following is the MAXIMUM number of days in which Reactor Operator may perform his duties WITHOUT exceeding 10 CFR 20 limits?

a. 5 days
b. 6 days
c. 7 days
d. 12 days QUESTION B.03 [1.0 point]

You receive a quarterly dosimetry report stating that you have received whole body occupational exposures of:

1 mrem of beta 1 mrem of alphas 1 mrem of neutrons of unknown energy What would be the total effective dose equivalent?

a. 3 mrem
b. 12 mrem
c. 22 mrem
d. 31 mrem

Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.04 [1.0 point] Which ONE of the following correctly describes the limitations of experiment? The experiment with _____ shall NOT be irradiated in the reactor.

a. total non-secured reactivity worth exceeding 0.06 %k/k
b. total secured reactivity worth exceeding 0.4 %k/k c. explosive materials
d. fissionable materials

QUESTION B.05 [1.0 point] A radioactive source reads 5 Rem/hr on contact. Five hours later, the same source reads 1.25 Rem/hr. How long is the time for the source to decay from a reading of 5 Rem/hr to 625 mRem/hr?

a. 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
b. 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
c. 8.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
d. 9.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

QUESTION B.06 [1.0 point, 0.25 each] Match the events listed in column A with its emergency classification listed in column B. Values in Column B can be used once, more than once or not at all.

Column A Column B

a. Loss of building electricity 1. Unusual Event
b. Fire in the reactor control room 2. Alert
c. Hurricane causing damage to the reactor building and 3. Site Area Emergency reactor pool resulting in major coolant leakage
d. Receipt of a bomb threat directly to the reactor facility 4. General Emergency

Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.07 [1.0 point] Which ONE of the following is NOT a guidance/recommendation under "Planned Occupational Exposure under Emergency Conditions" for Life Saving Actions?

a. Persons receiving exposures under the planned actions should avoid procreation for a few months.
b. Planned dose to hands and forearms not to exceed 300 rems.
c. Persons receiving exposures can receive multiple times in a future until exceeding 5 Rem TEDE.
d. Persons receiving exposures shall receive medical attention as soon as possible after their exposure.

QUESTION B.08 [1.0 point] An annual test of the nuclear instrument was performed. Which ONE of the following is the latest the test that must be performed again without violation of the Technical Specifications?

a. Not to exceed 13 months
b. Not to exceed 14 months
c. Not to exceed 15 months
d. Not to exceed 16 months

QUESTION B.09 [1.0 point] A radioactive material is decayed 30% after one hour. Determine its half-life?

a. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
b. 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />
c. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />
d. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.10 [1.0 point] A system or component is defined as "OPERABLE" by Technical Specifications when:

a. a system is operational when reactor is in the unsecured condition.
b. a system is operational when reactor is in the shutdown condition.
c. operating whenever it is not unsecured or shutdown.
d. it is capable of performing its intended function.

QUESTION B.11 [1.0 point] The reactivity worth of the regulating rod shall not exceed ________.

a. 0.08 %k/k b. 0.6 %k/k
c. 1.0 %k/k
d. 3.0 %k/k QUESTION B.12 [1.0 point] A two-curie source emits 80% of a 500 K-ev gamma, what is its dose rate at 1 foot?
a. 0.8 R/hr at 1 ft
b. 4.8 R/hr at 1 ft
c. 80 R/hr at 1 ft
d. 480 R/hr at 1 ft

Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.13 [1.0 point] Per Procedure SP-01, Facility Access for Visitors, the area that includes the reactor building and the reactor building basement is considered to be the _________.

a. Controlled Access Area
b. Vital Area
c. Unescorted Area
d. Reconvening Area

QUESTION B.14 [1.0 point, 0.25 each] Match each of the Technical Specification Limits in column A with its corresponding value in column B. (Each limit has only one answer, values in Column B may be used once, more than once or not at all.)

Column A Column B

a. Worth of single secured experiment 1. 0.08 %k/k
b. Non-Secured experiment 2. 0.1 %k/k c. Excess reactivity 3. 0.6 %k/k
d. Shutdown margin
4. 1.00 %k/k 5. 3.00 %k/k
6. 4.7 %k/k QUESTION B.15 [1.0 point]

Which ONE of the following hospitals has agreed to accept contaminated victims for medical treatments?

a. Rhode Island Hospital in Providence
b. Kent County Hospital in Warwick
c. South County Hospital in Wakefield
d. Newport Hospital in Newport

Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.16 [1.0 point] The ventilation flow through the Emergency Filter Bank shall be verified to be less than or equal to 1500 SCFM. The verification shall be performed at least:

a. quarterly
b. semi-annually
c. annually
d. biennially

QUESTION B.17 [1.0 point] The below items are listed as a reportable occurrence, EXCEPT:

a. Fuel cladding failure.
b. An uncontrolled reactivity change of 0.7 %K/K.
c. Reactor operation at 2.0 MW with primary pump OFF.
d. Performance of Reactor operation without a completion of the startup checklist.

QUESTION B.18 [1.0 point] The principal barrier to be used for specification of the safety limit is the:

a. Reactor fuel cladding temperature.
b. Reactor thermal power.
c. Bulk pool temperature.
d. Coolant height.

Section B Normal/Emergency Procedures and Radiological Controls QUESTION B.19 [1.0 point] Which ONE of the following changes must be submitted to NRC for approval prior to implementation?

a. Replace a primary cooling pump with an identical pump
b. Add new limitation to the Pre-Startup Checklist Procedure
c. Add more responsibilities to the Radiation Protection Officer listed in the health physics procedure
d. Delete a definition of Channel Test listed in the RINSC Technical Specifications

QUESTION B.20 [1.0 point] Per RINSC Technical Specifications, the insertion rates of individual control rod and Reg rod simultaneously shall not exceed _____.

a. 0.02 k/k per second
b. 0.005 k/k per second
c. 0.0002 k/k per second
d. 0.0005 k/k per second

(***** END OF CATEGORY B *****)

Section C Facility and Radiation Monitoring Systems QUESTION C.01 [1.0 point, 0.25 each] The figure below depicts the RINSC water make-up system. Match the water flowing location (to/from) listed in Column A to the appropriate numeral label in Column B?

Column A Column B

a. Clean up system 1
b. City water supply 2
c. RINSC labs 3
d. potable water supply to 4 the facility

Section C Facility and Radiation Monitoring Systems QUESTION C.02 [1.0 point] Which ONE of the following will convert the 480 VAC to 220/110 VAC in the RINSC electrical distribution system?

a. Line Transfer Switch
b. 15-kW Power Generator
c. Electrical Inverter
d. Electrical Transformer QUESTION C.03 [1.0 point] During emergency conditions, the MAIN purpose of the activated charcoal section in the filter bank is to remove 99% of any airborne radioactive _______ present in the reactor room air.
a. Argon-41
b. Nitrogen -16
c. Iodine
d. Xenon

QUESTION C.04 [1.0 point] Which ONE of the following statement correctly describes the automatic servo control interlock? An interlock will prevent auto servo control if:

a. the inlet coolant gate opens.
b. the servo blade is fully withdrawn.
c. Inserted two control blades simultaneously.
d. the reactor period is less than 30 seconds.

Section C Facility and Radiation Monitoring Systems QUESTION C.05 [1.0 point] The "TEST" position of the Master Switch allows to:

a. exercise the control blade drive motion without energizing the scram magnets.
b. calibrate the period less than 30 second without energizing the interlock system.
c. exceed the Wide Range Linear Power limit without energizing the scram.
d. exercise the control blade drive motion with energizing the scram magnets

QUESTION C.06 [1.0 point] When a SIGNIFICANT loss of water from the reactor pool (low pool water alarm initiated), which ONE of the following is an appropriate system for adding the make-up water to the pool?

a. The Emergency Core Cooling System (ECCS) will automatically add water to the reactor pool when low pool water alarm initiated.
b. The ECCS will be turned on manually through a series of manual valves.
c. The delay tank will automatically add water to the reactor pool when low pool water alarm initiated.
d. The RINSC does NOT have any ECCS.

QUESTION C.07 [1.0 point] You perform a High-Voltage (HV) Loss-Scram check for the Log Power Channel. The output of voltage meter reads 4.28 Volts. A High Voltage applied to the Log Power chamber is set at

_______ Volts.

a. 726
b. 856
c. 876
d. 896

Section C Facility and Radiation Monitoring Systems QUESTION C.08 [1.0 point]

Which ONE of the following best describes how the Uncompensated Ion Chamber (UIC) and Compensated Ion Chamber (CIC) operate?

a. The CIC has only one chamber coated with U-235 for fission reaction, whereas the UIC has two chambers, both can sense gamma rays but only one is coated with boron-10 for (n,) reaction.
b. The CIC has two chambers, one is coated with U-235 for fission reaction and the other is coated with boron-10 for (n,) reaction; whereas the UIC has only one chamber coated with U-235 for fission reaction.
c. The CIC has only one chamber coated with boron-10 for (n,) reaction; whereas the UIC has two chambers, one is coated with U-235 for fission reaction and the other is coated with boron-10 for (n,) reaction.
d. The CIC has two chambers, both can sense gamma rays but only one is coated with boron-10 for (n,) reaction; whereas the UIC has only one chamber coated with boron-10 for (n,) reaction.

QUESTION C.09 [2.0 point, 0.5 each] Match the following actions used in Column A with their respective definitions in Column B:

COLUMN A COLUMN B

a. You compare readings of Safety Channel 1. Channel Check with Linear Channel during reactor operations 2. Channel Test b. During startup, you verify the reactor scram at 115 % power
3. Channel Calibration
c. During startup, you verify the reactor scram due to a loss of Watchdog communication
d. You adjust a safety channel reading after conducting a thermal power calibration

Section C Facility and Radiation Monitoring Systems QUESTION C.10 [1.0 point] Which ONE of the following is currently the source of neutrons for INITIAL startup and low

power operation of the RINSC reactor?

a. Americium-Beryllium (Am-Be)
b. Plutonium-Beryllium (Pu-Be)
c. Radon-Beryllium (Ra-Be)
d. Beryllium Reflector

QUESTION C.11 [1 point] During a reactor operation, you discover the Stack Particulate Monitor (SPM) pump has been turned OFF since yesterday. Which ONE of the following actions should you take?

a. Immediately secure reactor. This event is a Technical Specification (TS) violation.
b. Immediately secure reactor, but this event is NOT a TS violation because the SPM is still operable.
c. Continue with reactor operation. Up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is allowed to run reactor before replacing the Stack Particulate Monitor.
d. Continue with reactor operation. The Technical Specifications require only RAMs and Stack Gas monitors during reactor operation.

QUESTION C.12 [1.0 point] The Main purpose for setting a conductivity limit of the pool water is to:

a. Maintain the departure of nucleate boiling ratio (DNBR) greater than the unity
b. Minimize the possibility of corrosion of the cladding on the fuel elements
c. Extend integrity of resin bed on the demineralizer
d. Minimize Ar-41 released to the public

Section C Facility and Radiation Monitoring Systems QUESTION C.13 [1.0 point] Which ONE of the following provides a reactor scram in any mode of operations?

a. Pool Temperature = 122 °F
b. Seismic Disturbance
c. No Flow Thermal Column
d. Primary Coolant Flow Rate = 1600 gpm

QUESTION C.14 [1.0 point] In order to test the Watchdog Scram, you should:

a. Disconnect the building internet server that supports the internet for the RINSC computers.
b. Withdraw the Regulating blades at full out position and hold the manual scram for 10 secconds.
c. Turn the Watchdog Scram Test and the Master Switches to "TEST" simultaneously.
d. Turn the Watchdog Scram Test Switch to "TEST".

QUESTION C.15 [1.0 point]

Which ONE of the following is the material used for the fission chamber?

a. BF3 fill gas
b. B-10
c. U-235
d. Pu-233

Section C Facility and Radiation Monitoring Systems QUESTION C.16 [1.0 point]

Which ONE of the following is NOT required to be determined for core shutdown margin?

a. Annually surveillance is required
b. Core reflection is changed
c. Following control blade is changed
d. The reactivity worth of experiments is changed

QUESTION C.17 [1.0 point] Which ONE of the following can be determined if there is a leak in the heat exchanger?

a. Present of a sodium-24 nuclide in the secondary coolant system.
b. Pool level will increase due to leakage into the secondary.
c. Decrease a flow rate in the secondary makeup system.
d. Present of an argon-41 nuclide in the secondary coolant system.

QUESTION C.18 [1.0 point] The design basis for the thermal column is to provide:

a. the biological shield from the reactor core.
b. a fast neutron flux for experiments.
c. a thermal neutron flux for experiments
d. a shield of fast neutrons entered to the experiments.

Section C Facility and Radiation Monitoring Systems QUESTION C.19 [1.0 point]

Which ONE of the following best describes how the Emergency Core Cooling System (ECCS) operates? In the event of a loss of coolant accident, the ECCS water is provided from ________ up to the top of the pool.

a. the delay tank
b. the 3000 gallon holding tank
c. the public water supply through a backflow-preventer
d. the fire sprinkler system supply, through a series of manual valves

(***** END OF CATEGORY C *****) (***** END OF EXAMINATION *****)

Section A L Theory, Thermo & Fac. Operating Characteristics A.01 Answer: a(2) b(1) c(3) (0.33 each)

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, © 1988, Sec 2.6 A.02 Answer: b

Reference:

Chart of the Nuclides

A.03 Answer: d

Reference:

Burn, R., Introduction of Nuclear Reactor Operations, © 1982, Sec 3.3.1, page 3-16.

A.04 Answer: c

Reference:

P = P 0 et/T --> T= t/Ln(P/ P 0 ) T= 120/Ln(100 ); T = 26 sec.

A.05 Answer: b

Reference:

CR = S/(1-K) CR = 1000/(1 - 0.8) = 5000 N/sec

A.06 Answer: c

Reference:

Keff1=1/1- 1 Keff1 =1/(1-(-.05)) -->Keff1= 0.952, Count1*(1-Keff1) = Count2*(1-Keff2)

Count1*(1-0.952) = Count2*(1-Keff2) 1000*(1-0.952) = 4000(1- Keff2); Keff2 = 0.988 A.07 Answer: a

Reference:

Burn, R., Introduction of Nuclear Reactor Operations, © 1988, Sec 2.4.5, page 2-

29. A.08 Answer: c

Reference:

Reactivity added = 0.156 %k/k = 0.00156 k/k = (-)/eff = (0.0073 - 0.00156)/ ((0.1)*(0.00156)) = 37 seconds A.09 Answer: d

Reference:

Burn, R., Introduction of Nuclear Reactor Operations, © 1988, Sec 3.3.4

Section A L Theory, Thermo & Fac. Operating Characteristics A.10 Answer: b

Reference:

SDM = (1- keff)/keff = (1-0.927)/0.927 = 0.07875 k/k. So if you add the same amount of SDM, the reactor is critical. Another method: you can find the new value of Keff when adding 0.07875 k/k to reactor.

p = (k2 -k1)/ k1*k2 0.07875 = (k2- 0.927)/(0.927* k2), solve for k2 K2 = 1, hence the reactor is critical A.11 Answer: d

Reference:

K eff = 1.05*0.80*0.90*0.92*1.86*x X= 1/1.294 = 0.773

A.12 Answer: a

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, © 1982, Sec 5.5, page 5-18-5-25.

A.13 Answer: b

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, © 1988, Section 5.1, Subcritical Multiplication

A.14 Answer: c

Reference:

Burn, R., Introduction of Nuclear Reactor Operations, © 1988, Section 3.2, Table 3.1 A.15 Answer: a

Reference:

Burn, R., Introduction of Nuclear Reactor Operations, © 1988, Sec 3.3.1 A.16 Answer: b

Reference:

DOE Handbook Vol. 1 Module 2, Section 3.0 A.17 Answer: d

Reference:

Burn, R., Introduction of Nuclear Reactor Operations, © 1988, Sec 4.2 A.18 Answer: b

Reference:

NRC Standard Question

Section A L Theory, Thermo & Fac. Operating Characteristics A.19 Answer: c

Reference:

Burn, R., Introduction of Nuclear Reactor Operations, © 1988, Sec 4.2 A.20 Answer: b

Reference:

Burn, R., Introduction of Nuclear Reactor Operations, © 1982, Section 3.3.7, page 3-37

Section B Normal/Emergency Procedures and Radiological Controls B.01 Answer: a (115 kW) b (23' 7 ") c (127 degree F) (0.33 each)

Reference:

TS 2.2.1 B.02 Answer: b

Reference:

10CFR20.1201(a)(1) [5000 mr x 1 hr x day = 6.25 days 100 mr 8 hr B.03 Answer: a

Reference:

The report already provides a c onversion in mrem, so you just add them up.

B.04 Answer: c

Reference:

TS 3.8.1 & 3.1.1

B.05 Answer: b

Reference:

DR = DR*e -t 1.25 rem/hr =5 rem/hr* e

-(5hr) Ln(1.25/5) = -*5 --> =0.277; solve for t: Ln(.625/5)=-0.277 *t t=7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

B.06 Answer: a(1) b(2) c(3) d(1) (0.25 each)

Reference:

EP 4.1, EP 4.2, and EP 4.3

B.07 Answer: c

Reference:

EP 7.5.1

B.08 Answer: c

Reference:

TS Definition 1.43 (annual: interval NOT to exceed 15 months)

B.09 Answer: a

Reference:

DR = DR*e -t 30% is decayed, so 70% is still there 70% =100%* e

-(3hrs) Ln(70/100) = -*1 -->=0.357 t1/2=Ln(2)/ -->.693/.357 t=1.94 hours0.00109 days <br />0.0261 hours <br />1.554233e-4 weeks <br />3.5767e-5 months <br /> B.10 Answer: d

Reference:

TS 1.18

B.11 Answer: b

Reference:

TS 3.1.1

Section B Normal/Emergency Procedures and Radiological Controls B.12 Answer: b

Reference:

6CEN = R/hr @ 1 ft. -> 6 x 2 x .8 x .5 = 4.8 R/hr at 1ft.

B.13 Answer: b

Reference:

SOP, SP-01

B.14 Answer: a, 3 b,1 c,6 d,4 (0.25 each)

Reference:

TS 3.1.1

B.15 Answer: a

Reference:

Emergency Plan 3.2.4

B.16 Answer: c

Reference:

TS 4.5.5 B.17 Answer: b

Reference:

TS 1.31

B.18 Answer: a

Reference:

TS 2.1

B.19 Answer: d

Reference:

10 CFR 50.59

B.20 Answer: c

Reference:

TS 3.2

Section C Facility and Radiation Monitoring Systems C.1 Answer: a,2 b,3 c,1 d,4 (0.25 each)

Reference:

SAR, Figure 5.7 C.02 Answer: d

Reference:

SAR 8.2 C.03 Answer: c

Reference:

SOP, MP-02

C.04 Answer: d

Reference:

SAR 7.2.8

C.05 Answer: a

Reference:

SAR 7.2.3 C.06 Answer: b

Reference:

SAR 5.7.1

C.07 Answer: b

Reference:

Operational Procedures, CP-04 4.28 V

  • 200 = 856 V

C.08 Answer: d

Reference:

NRC Standard Question

C.09 Answer: a(1) b(2) c(2) d(3) (0.5 each)

Reference:

TS 1.2, 1.3 and 1.4 C.10 Answer: d

Reference:

SAR 4.2.4 C.11 Answer: a

Reference:

TS 3.7.1.2.2

C.12 Answer: b

Reference:

TS 4.3.1.1

Section C Facility and Radiation Monitoring Systems C.13 Answer: b

Reference:

TS 3.2 C.14 Answer: d

Reference:

Pre-Startup Procedures OP-02

C.15 Answer: c

Reference:

NRC Standard Question

C.16 Answer: d

Reference:

TS 4.1.1.1

C.17 Answer: a

Reference:

TS 4.3.2.1 C.18 Answer: c

Reference:

SAR 10.2.4

C.19 Answer: d

Reference:

SAR 5.7.1