{{#Wiki_filter:* July 17, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360  
{{#Wiki_filter:*
July 17, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth.
MA 02360  


==SUBJECT:==
==SUBJECT:==
Emergency Plan Implementing Procedure Revisions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.17.053  
Emergency Plan Implementing Procedure Revisions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.17.053  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Title 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the Entergy EP-AD-601. The procedure revisions were reviewed in accordance with 10 CFR 50.54(q). The 50.54(q) review is also provided in the letter attachment. The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval. If you have any questions or require additional information, please contact me at (508) 830-8227. There are no regulatory commitments contained in this letter. KLS/jc  
In accordance with Title 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the Entergy EP-AD-601.
The procedure revisions were reviewed in accordance with 10 CFR 50.54(q).
The 50.54(q) review is also provided in the letter attachment.
The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.
If you have any questions or require additional information, please contact me at (508) 830-8227.
There are no regulatory commitments contained in this letter. KLS/jc  


==Attachment:==
==Attachment:==
: 1. EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and *associated 10 CFR 50.54(q) Review.
: 1. EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and *associated 10 CFR 50.54(q)
Review.
Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 -Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John G. Lamb, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-881-A Washington, DC 20555-0001 NRC Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.17.053 Page 2}}
Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 -Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John G. Lamb, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-881-A Washington, DC 20555-0001 NRC Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.17.053 Page 2}}

Revision as of 18:40, 29 June 2018

Pilgrim - Transmittal of Emergency Plan Implementing Procedure Revisions
ML17202G679
Person / Time
Site: Pilgrim
Issue date: 07/17/2017
From: Calabrese D
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17202G654 List:
References
2.17.053, EP-AD-301, Rev. 8
Download: ML17202G679 (2)


Text

July 17, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth.

MA 02360

SUBJECT:

Emergency Plan Implementing Procedure Revisions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.17.053

Dear Sir or Madam:

In accordance with Title 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the Entergy EP-AD-601.

The procedure revisions were reviewed in accordance with 10 CFR 50.54(q).

The 50.54(q) review is also provided in the letter attachment.

The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.

If you have any questions or require additional information, please contact me at (508) 830-8227.

There are no regulatory commitments contained in this letter. KLS/jc

Attachment:

1. EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and *associated 10 CFR 50.54(q)

Review.

Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 -Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John G. Lamb, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-881-A Washington, DC 20555-0001 NRC Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.17.053 Page 2