{{#Wiki_filter:__ 0'"""'* Test Quality Checklist Form ES-301*3 Operating Test Number 1. General Criteria *----------*----The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance. safety function distribution). b. There is no day-to-day repetition between this and other operating tests to be administered dunng this examination. Initials The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see / SectlonD.1.a.) .\ c. 11--------------------------------*---------------t=.L.L+-lr-+_;__-ll d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated lic<mse level. Criteria a. Each JPM includes U1e foilowmg, as applicable:
* initial conditions
* initiating cues
* references and tools. including associated procedures
* reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be lime-critical by the facility licensee
* operationally important specific performance criteria that include. o detailed expected actions with exact criteria and nomenclature o system response and other examiner cues ') statements describing important observations to be made by the applic:ant o criteria for successful completion of the task o identification of critical steps and their associated performance standards lf---------'-o-restrictions on the sequence of steps. if applicable b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use. repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. The associated simulator Form ES-301-4 and Author Facility R(';vle'Ner(') d. NRC Supervisor NOTE* 3. Simulator Criteria tests (scenario sets) have be*.m revieweci in accordance with is net applicable f*x NRC .. dev*;loped tests. revievver In Co!urnn chief conc:urrf;:;nce required Date dw..}}

Revision as of 20:23, 16 June 2018

2014 DC Cook Nuclear Power Plant Initial License Examination Form ES-301-3
ML14316A306
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
References
Download: ML14316A306 (1)


Text

__ 0'"""'* Test Quality Checklist Form ES-301*3 Operating Test Number 1. General Criteria *----------*----The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance. safety function distribution). b. There is no day-to-day repetition between this and other operating tests to be administered dunng this examination. Initials The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see / SectlonD.1.a.) .\ c. 11--------------------------------*---------------t=.L.L+-lr-+_;__-ll d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated lic<mse level. Criteria a. Each JPM includes U1e foilowmg, as applicable:

  • initial conditions
  • initiating cues
  • references and tools. including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be lime-critical by the facility licensee
  • operationally important specific performance criteria that include. o detailed expected actions with exact criteria and nomenclature o system response and other examiner cues ') statements describing important observations to be made by the applic:ant o criteria for successful completion of the task o identification of critical steps and their associated performance standards lf---------'-o-restrictions on the sequence of steps. if applicable b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use. repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. The associated simulator Form ES-301-4 and Author Facility R(';vle'Ner(') d. NRC Supervisor NOTE* 3. Simulator Criteria tests (scenario sets) have be*.m revieweci in accordance with is net applicable f*x NRC .. dev*;loped tests. revievver In Co!urnn chief conc:urrf;:;nce required Date dw..