ML15026A603: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:** KEY: <!I LOCATION OF WATER SUPPLY WELL NOTES: 1. This information was obtained from State of Maryland records for wells installed through 2/87. 2. Well locations are approximate, generally +/-:,500 feet. 0 2000 ft. SCALE FIGURE 2.5-3 MAP OF AREA SHOWING KNOWN WATER WELLS Dames & Moore}}

Revision as of 02:41, 15 June 2018

Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 23, Figure 2.5-3, Map of Area Showing Known Water Wells
ML15026A603
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/07/2015
From:
Exelon Generation Co
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML15023A514 List: ... further results
References
Download: ML15026A603 (1)


Text

    • KEY: <!I LOCATION OF WATER SUPPLY WELL NOTES: 1. This information was obtained from State of Maryland records for wells installed through 2/87. 2. Well locations are approximate, generally +/-:,500 feet. 0 2000 ft. SCALE FIGURE 2.5-3 MAP OF AREA SHOWING KNOWN WATER WELLS Dames & Moore