05000416/FIN-2008006-02: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Fire Brigade Members Assigned Responsibilities That Conflicted with Fire Brigade Responsibilities | | title = Fire Brigade Members Assigned Responsibilities That Conflicted with Fire Brigade Responsibilities | ||
| docket = 05000416 | | docket = 05000416 | ||
| inspection report = IR 05000416/2008006 | | inspection report = IR 05000416/2008006 |
Latest revision as of 22:06, 29 May 2018
Site: | Grand Gulf |
---|---|
Report | IR 05000416/2008006 Section 1R05 |
Date counted | Sep 30, 2008 (2008Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | N O'Keefe K Sullivan S Alferink R Bywater R Mullikin P Qualls |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |