| title = Failure To Use Appropriate Acceptance Criteria For Testing Check Valves 1Sw-9 And 10
| title = Failure to Use Appropriate Acceptance Criteria for Testing Check Valves 1SW-9 and 10
 
| docket = 05000400
| docket = 05000400
| inspection report = IR 05000400/2008006
| inspection report = IR 05000400/2008006

Latest revision as of 23:06, 29 May 2018

01
Site: Harris Duke Energy icon.png
Report IR 05000400/2008006 Section 1R21
Date counted Jun 30, 2008 (2008Q2)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21
Inspectors (proximate) R Berryman
R Lewis
C Even
B Desai
B Mooney
C Baron
J Leivo
INPO aspect
'