IR 05000250/2016301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 44: Line 44:


Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos. 50-250, 50-251 License Nos. DRP-31, DPR-41  
Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos. 50-250, 50-251 License Nos. DRP-31, DPR-41  
cc: Distribution via Listserv Thank you for your cooperation in this matter. Mr. Wilson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination. procedures and guidelines, please contact Mr. Capehart at (404) 997- 4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997- 4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
Sincerely,/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DRP-31, DPR-41


cc: Distribution via Listserv  
cc: Distribution via Listserv  


PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE PGC VIA EMAIL GJM1 NAME PCAPEHART GMCCOY DATE .2/18/2016 .2/19/2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\TURKEY POINT EXAMINATIONS\INITIAL EXAM 2016-301 (PGC)\CORRESPONDENCE\TURKEY POINT 2016-301 CORPORATE NOTIFICATION LETTER REV 0.DOCX
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE PGC VIA EMAIL GJM1 NAME PCAPEHART GMCCOY DATE .2/18/2016 .2/19/2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Revision as of 09:45, 20 May 2018

Turkey Point Nuclear Plant - Notification of Licensed Operator Initial Examination 05000250/2016301 and 05000251/2016301
ML16054A487
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/19/2016
From: McCoy G J
Division of Reactor Safety II
To: Nazar M
Nextera Energy
References
IR 2016301
Download: ML16054A487 (4)


Text

February 19, 2016

Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000250/2016301 AND 05000251/2016301

Dear Mr. Nazar:

In a telephone conversation on February 16, 2016, between Mr. Mark Wilson, Exam Project Manager, and Mr. Phillip Capehart, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Turkey Point Nuclear Plant. The operating test is scheduled to be administered during the week of August 22, 2016. The written examination is scheduled to be administered the week of September 5, 2016. The on-site preparatory week is scheduled for the week of July 25, 2016.

As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by May 24, 2016. Mr. Capehart provided a written examination outline to your staff on February 15, 2016. The written examination, operating test and the supporting reference materials identified in Attachment 3, to ES-201, will be due by June 23, 2016. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"

of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Wilson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination. procedures and guidelines, please contact Mr. Capehart at (404) 997- 4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997- 4551, (Internet E-mail: Gerald.McCoy@nrc.gov).

Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos. 50-250, 50-251 License Nos. DRP-31, DPR-41

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE PGC VIA EMAIL GJM1 NAME PCAPEHART GMCCOY DATE .2/18/2016 .2/19/2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO