Category:TSTF: Difference between revisions
Jump to navigation
Jump to search
(previous page) (next page)
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
Line 2: | Line 2: | ||
{{#default_form:TSTF}} | {{#default_form:TSTF}} | ||
{{#arraymap:B&W-L-LP, B&W-R-LP, CE, GE-2, GE-3, GE-4, GE-5, GE-6, W-AP1000, Westinghouse PWR 2-Loop, Westinghouse PWR 3-Loop, Westinghouse PWR 4-Loop|,|xx|{{#ask:[[Category:TSTF]][[Applies to reactor type::xx]] | |||
|?title | |||
|?Number of sites implemented=I | |||
|?Number of sites open=O | |||
|?Number of sites withdrawn=W | |||
|sort=Number of sites implemented | |||
|order=descending | |||
|limit=0 | |||
|searchlabel=[For xx] | |||
}}| {{!}} }} | |||
{{#ask:[[Category:TSTF]] | {{#ask:[[Category:TSTF]] |
Revision as of 09:29, 16 May 2018
for TSTF
This category uses the form TSTF.
[For B&W-L-LP] | [For B&W-R-LP] | [For CE] | [For GE-2] | [For GE-3] | [For GE-4] | [For GE-5] | [For GE-6] | [For W-AP1000] | [For Westinghouse PWR 2-Loop] | [For Westinghouse PWR 3-Loop] | [For Westinghouse PWR 4-Loop]
Title | I | O | W | |
---|---|---|---|---|
TSTF-425 | Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | 109 | 34 | 6 |
TSTF-448 | Control Room Habitability | 109 | 47 | 4 |
TSTF-449 | Steam Generator Tube Integrity | 60 | 27 | 1 |
TSTF-493 | Clarify Application of Setpoint Methodology for LSSS Functions | 56 | 22 | 5 |
TSTF-505 | Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B | 53 | 34 | 4 |
TSTF-051 | Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations | 42 | 15 | 2 |
TSTF-510 | Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection | 39 | 5 | 3 |
TSTF-542 | Reactor Pressure Vessel Water Inventory Control | 36 | 10 | 0 |
TSTF-523 | Generic Letter 2008-01, Managing Gas Accumulation | 35 | 13 | 0 |
TSTF-577 | Performance Based Frequencies for Steam Generator Tube Inspections | 32 | 5 | 1 |
TSTF-372 | Addition of LCO 3.0.8, Inoperability of Snubbers | 30 | 5 | 0 |
TSTF-545 | TS Inservice Testing (IST) Program Removal | 26 | 11 | 0 |
TSTF-359 | Increase Flexibility in Mode Restraints | 26 | 13 | 0 |
TSTF-360 | DC Electrical Rewrite | 25 | 6 | 6 |
TSTF-447 | Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors | 25 | 13 | 0 |
TSTF-529, Clarify Use and Application Rules | Clarify Use and Application Rules | 22 | 2 | 0 |
TSTF-490 | Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec | 22 | 8 | 2 |
TSTF-501 | Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | 21 | 7 | 2 |
TSTF-419 | Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR | 20 | 2 | 1 |
TSTF-439 | Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | 20 | 6 | 2 |
TSTF-484 | Use of TS 3.10.1 for SCRAM Time Testing Activities | 19 | 3 | 2 |
TSTF-427 | Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 18 | 9 | 1 |
TSTF-563 | Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 18 | 5 | 0 |
TSTF-535 | Revise Shutdown Margin Definition to Address Advanced Fuel Designs | 18 | 4 | 0 |
TSTF-564 | Safety Limit MCPR to COLR | 17 | 4 | 0 |
TSTF-511 | Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 | 17 | 9 | 0 |
TSTF-522 | Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month | 17 | 6 | 0 |
TSTF-500 | DC Electrical Rewrite - Update to TSTF-360 | 16 | 4 | 2 |
TSTF-582 | RPV WIC Enhancements | 16 | 2 | 0 |
TSTF-479 | Changes to Reflect Revision of 10 CFR 50.55A | 16 | 9 | 0 |
TSTF-52 | Implement 10 CFR 50, Appendix J, Option B | 15 | 3 | 1 |
TSTF-418 | RPS and ESFAS Test Times and Completion Times - WCAP-14333 | 14 | 5 | 0 |
TSTF-363 | Revise Topical Report References in ITS 5.6.5, Colr | 14 | 2 | 0 |
TSTF-567 | Add Containment Sump TS to Address GSI-191 Issues | 13 | 3 | 2 |
TSTF-514 | Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation | 13 | 0 | 0 |
TSTF-513 | Revise Operability Requirements and Actions for RCS Leakage Instrumentation | 13 | 3 | 0 |
TSTF-411 | Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P | 12 | 4 | 0 |
TSTF-547 | Clarification of Rod Position Requirements | 12 | 0 | 0 |
TSTF-374 | Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil | 12 | 3 | 2 |
TSTF-421 | Revision to RCP Flywheel Inspection Program - WCAP-15666 | 12 | 3 | 0 |
TSTF-312 | Administratively Control Containment Penetrations | 12 | 4 | 1 |
TSTF-491 | Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications | 11 | 4 | 0 |
TSTF-569 | Revise Response Time Testing Definition | 11 | 6 | 0 |
TSTF-258 | Changes to Section 5.0, Administrative Controls | 11 | 14 | 0 |
TSTF-541 | Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed | 11 | 2 | 0 |
TSTF-423 | Technical Specifications End States, NEDC-32988-A | 11 | 5 | 0 |
TSTF-369 | Removal of Monthly Operating Report and Occupational Radiation Exposure Report | 11 | 23 | 0 |
TSTF-497 | Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less | 11 | 6 | 0 |
TSTF-554 | Revise Reactor Coolant Leakage Requirements | 10 | 1 | 0 |
TSTF-306 | Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 10 | 1 | 0 |
... further results |
Pages in category "TSTF"
The following 200 pages are in this category, out of 562 total.
(previous page) (next page)T
- TSTF-001
- TSTF-002
- TSTF-003
- TSTF-004
- TSTF-005
- TSTF-006
- TSTF-007
- TSTF-008
- TSTF-009
- TSTF-010
- TSTF-011
- TSTF-012
- TSTF-013
- TSTF-014
- TSTF-015
- TSTF-016
- TSTF-017
- TSTF-018
- TSTF-018-A
- TSTF-019
- TSTF-020
- TSTF-021
- TSTF-022
- TSTF-023
- TSTF-024
- TSTF-025
- TSTF-026
- TSTF-027
- TSTF-028
- TSTF-029
- TSTF-030
- TSTF-031
- TSTF-032
- TSTF-033
- TSTF-034
- TSTF-035
- TSTF-036
- TSTF-037
- TSTF-038
- TSTF-039
- TSTF-040
- TSTF-041
- TSTF-042
- TSTF-043
- TSTF-044
- TSTF-045
- TSTF-046
- TSTF-047
- TSTF-048
- TSTF-049
- TSTF-050
- TSTF-051
- TSTF-052
- TSTF-053
- TSTF-054
- TSTF-055
- TSTF-056
- TSTF-057
- TSTF-058
- TSTF-059
- TSTF-060
- TSTF-061
- TSTF-062
- TSTF-063
- TSTF-064
- TSTF-065
- TSTF-066
- TSTF-067
- TSTF-068
- TSTF-069
- TSTF-070
- TSTF-071
- TSTF-072
- TSTF-073
- TSTF-073-A
- TSTF-074
- TSTF-075
- TSTF-076
- TSTF-077
- TSTF-078
- TSTF-079
- TSTF-080
- TSTF-081
- TSTF-082
- TSTF-083
- TSTF-084
- TSTF-085
- TSTF-086
- TSTF-087
- TSTF-088
- TSTF-089
- TSTF-090
- TSTF-091
- TSTF-092
- TSTF-093
- TSTF-094
- TSTF-095
- TSTF-096
- TSTF-097
- TSTF-098
- TSTF-099
- TSTF-100
- TSTF-101
- TSTF-102
- TSTF-103
- TSTF-104
- TSTF-105
- TSTF-106
- TSTF-107
- TSTF-108
- TSTF-109
- TSTF-110
- TSTF-111
- TSTF-112
- TSTF-113
- TSTF-114
- TSTF-115
- TSTF-116
- TSTF-117
- TSTF-118
- TSTF-119
- TSTF-120
- TSTF-121
- TSTF-122
- TSTF-123
- TSTF-124
- TSTF-125
- TSTF-126
- TSTF-127
- TSTF-128
- TSTF-129
- TSTF-130
- TSTF-131
- TSTF-132
- TSTF-133
- TSTF-134
- TSTF-135
- TSTF-136
- TSTF-137
- TSTF-138
- TSTF-139
- TSTF-140
- TSTF-141
- TSTF-142
- TSTF-143
- TSTF-144
- TSTF-145
- TSTF-146
- TSTF-147
- TSTF-148
- TSTF-149
- TSTF-150
- TSTF-151
- TSTF-152
- TSTF-153
- TSTF-154
- TSTF-155
- TSTF-156
- TSTF-157
- TSTF-158
- TSTF-159
- TSTF-160
- TSTF-161
- TSTF-162
- TSTF-163
- TSTF-164
- TSTF-165
- TSTF-166
- TSTF-167
- TSTF-168
- TSTF-169
- TSTF-170
- TSTF-171
- TSTF-172
- TSTF-173
- TSTF-174
- TSTF-175
- TSTF-176
- TSTF-177
- TSTF-178
- TSTF-179
- TSTF-180
- TSTF-181
- TSTF-182
- TSTF-183
- TSTF-184
- TSTF-185
- TSTF-186
- TSTF-187
- TSTF-188
- TSTF-189
- TSTF-190
- TSTF-191
- TSTF-192
- TSTF-193
- TSTF-194
- TSTF-195
- TSTF-196
- TSTF-197
- TSTF-198