IR 05000390/2017405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 40: Line 40:
Supplemental Information (OUO)  
Supplemental Information (OUO)  


cc: See page 3
cc: See page 3 cc: Mr. Paul R. Simmons Senior Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000, ADM 1V-WBN Spring City, TN 37381
 
Ms. K. D. Hulvey Manager, Site Licensing Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000, ADM 1L-WBN Spring City, TN 37381 Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP-1A Chattanooga, TN 37402-2801 Eynus C. Ellis Senior Manager, Site Security Operations Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 ADM 1S-WBN Spring City, TN 37381
 
___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 DWS5 AJB3 SMS NAME P. Braaten D. Strickland A. Blamey S. Shaeffer DATE 3/15/2017 3/15/2017 3/15/2017 3/15 /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Revision as of 10:00, 10 May 2018

Watts Bar Nuclear Plant - Cyber Security Follow-Up Inspection Report 05000390/2017405 and 05000391/2017405 - Letter Only
ML17081A399
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 03/15/2017
From: Shaeffer S M
NRC/RGN-II/DRS/EB2
To: Shea J W
Tennessee Valley Authority
References
IR 2017405
Download: ML17081A399 (4)


Text

March 15, 2017

Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT: WATTS BAR NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000390/2017405 AND 05000391/2017405

Dear Mr. Shea:

On February 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Watts Bar Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with Mr. Michael Durr and other members of your staff. The results of this inspection are documented in the enclosed report. No NRC-identified or self-revealing findings were identified during this inspection.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii)

Sincerely,/RA/ Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-390, 50-391 License Nos.: NPF-90, NPF-96

Enclosure:

Inspection Report 05000390/2017405 and 05000391/2017405

w/Attachment:

Supplemental Information (OUO)

cc: See page 3 cc: Mr. Paul R. Simmons Senior Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000, ADM 1V-WBN Spring City, TN 37381

Ms. K. D. Hulvey Manager, Site Licensing Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000, ADM 1L-WBN Spring City, TN 37381 Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP-1A Chattanooga, TN 37402-2801 Eynus C. Ellis Senior Manager, Site Security Operations Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 ADM 1S-WBN Spring City, TN 37381

___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 DWS5 AJB3 SMS NAME P. Braaten D. Strickland A. Blamey S. Shaeffer DATE 3/15/2017 3/15/2017 3/15/2017 3/15 /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO