ML16277A117: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 14: | Line 14: | ||
| page count = 21 | | page count = 21 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:}} |
Revision as of 00:09, 5 May 2018
ML16277A117 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 08/09/2011 |
From: | Lebda J T FirstEnergy Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation |
References | |
ERS-JTL-99-005, Rev 3 | |
Download: ML16277A117 (21) | |
Similar Documents at Beaver Valley | |
---|---|
Category:Report
MONTHYEARL-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023
[Table view]Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-22-154, Pressure and Temperature Limits Report Revision2022-07-0606 July 2022 Pressure and Temperature Limits Report Revision L-22-054, Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-02-10010 February 2022 Steam Generator Inspection Report- Fall 2021 Refueling Outage IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21131A0242021-05-17017 May 2021 Review of Reactor Pressure Vessel Capsule Y Analysis Report ML21055A0582021-03-10010 March 2021 Review of the Refueling Outage 21 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and F* Reports L-21-063, Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks2021-02-0101 February 2021 Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks ML21026A3372021-01-26026 January 2021 Steam Generator Inspection Report Revision - Spring 2020 Refueling Outage L-20-257, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML21127A1652020-07-17017 July 2020 ODCM: Index, Matrix and History of ODCM Changes L-21-135, ODCM: Liquid Effluents2020-07-17017 July 2020 ODCM: Liquid Effluents ML21127A1482020-07-17017 July 2020 ODCM: Controls for RETS and REMP Programs L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency2020-04-0101 April 2020 CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency ML19280A0382019-10-22022 October 2019 Ti 2515-191 Summary of Findings ML21127A1562019-07-17017 July 2019 ODCM: Gaseous Effluents ML19051A1092019-02-20020 February 2019 LTR-SDA-18-054-NP, Revision 0 - Technical Justification to Support the Extended Volumetric Examination Interval for Beaver Valley Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds L-19-053, Emergency Response Data System Data Point Library Update2019-02-20020 February 2019 Emergency Response Data System Data Point Library Update L-18-037, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2018-06-18018 June 2018 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.2018-03-15015 March 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. ML21127A1592018-01-22022 January 2018 ODCM: Radiological Environmental Monitoring Program L-17-277, Pressure and Temperature Limits Reports, Revisions 8 and 92017-10-0404 October 2017 Pressure and Temperature Limits Reports, Revisions 8 and 9 L-17-259, Mitigating Strategies Assessment (MSA) for Flooding2017-09-20020 September 2017 Mitigating Strategies Assessment (MSA) for Flooding ML17213A0162017-05-11011 May 2017 Enclosure a: Beaver Valley, Units 1, Seismic Probabilistic Risk Assessment in Response to 50.54(f) Letter with Regard to NTTF 2.1 ML17213A0172017-05-11011 May 2017 Enclosure B: Beaver Valley, Unit 2, Seismic Probabilistic Risk Assessment in Response to 50.54(0 Letter with Regard to NTTF 2.1 ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16312A3112016-11-0707 November 2016 Spent Fuel Pool Evaluation Supplemental Report. Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Ntif) Review... L-16-327, Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair2016-10-31031 October 2016 Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair L-16-093, Report of Facility Changes, Tests and Experiments2016-06-0303 June 2016 Report of Facility Changes, Tests and Experiments L-16-065, Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22016-04-0606 April 2016 Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 L-16-006, Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information2016-01-20020 January 2016 Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information L-15-386, Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time2016-01-0505 January 2016 Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time L-15-337, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool..2015-12-21021 December 2015 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool.. ML16277A1142015-10-28028 October 2015 ERS-MPD-93-007, Rev. 11, BVPS-U1 Gaseous Radioactivity Monitor Emergency Action Levels. ML15274A3072015-10-0505 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54 Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review L-15-187, Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2015-09-16016 September 2015 Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models ML15132A4962015-05-22022 May 2015 Review of the 2014 Steam Generator Tube Inspection Report (TAC No. M4620) ML16277A1222015-04-20020 April 2015 ERS-LMR-14-001, Rev. 1, Liquid Monitor Alert Emergency Action Level (EAL) Set Points. ML15119A1042015-03-31031 March 2015 SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 1 of 4 L-15-091, SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 42015-03-31031 March 2015 SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 4 ML21127A1582015-02-11011 February 2015 ODCM: Bases for ODCM Controls ML16277A1152015-01-30030 January 2015 ERS-HHM-87-014, Rev. 8, Unit 1 / Unit 2 ODCM Gaseous Effluent Monitor Setpoints. ML15027A2352015-01-28028 January 2015 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based, Fire Protection Program (Tac Nos. MF3301 & MF3302) L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In L-14-352, Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22014-11-0505 November 2014 Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 ML21127A1442014-10-0707 October 2014 ODCM: Information Related to 40 CFR 190 L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14224A5772014-07-31031 July 2014 SG-SGMP-14-17, Revision 1, Beaver Valley, Unit 2, End-of-Cycle 17 Analysis and Prediction for End-of-Cycle 18 Voltage-Based Repair Criteria 90-Day Report. ML14224A5762014-07-31031 July 2014 SG-CCOE-14-1, Revision 0, Generic Letter 95-05 Tube Intersection Burst Test, Leakage Test, and Morphology Conclusions. ML14224A5752014-06-25025 June 2014 R17 Steam Generator F* (F Star) Report ML14009A0892014-02-10010 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Daiichi Nuclear Power Plant Accident 2023-08-07 Category:Technical MONTHYEARL-22-154, Pressure and Temperature Limits Report Revision2022-07-0606 July 2022
[Table view]Pressure and Temperature Limits Report Revision L-22-054, Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-02-10010 February 2022 Steam Generator Inspection Report- Fall 2021 Refueling Outage ML21026A3372021-01-26026 January 2021 Steam Generator Inspection Report Revision - Spring 2020 Refueling Outage L-21-135, ODCM: Liquid Effluents2020-07-17017 July 2020 ODCM: Liquid Effluents ML21127A1652020-07-17017 July 2020 ODCM: Index, Matrix and History of ODCM Changes ML21127A1482020-07-17017 July 2020 ODCM: Controls for RETS and REMP Programs L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency2020-04-0101 April 2020 CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency ML21127A1562019-07-17017 July 2019 ODCM: Gaseous Effluents ML19051A1092019-02-20020 February 2019 LTR-SDA-18-054-NP, Revision 0 - Technical Justification to Support the Extended Volumetric Examination Interval for Beaver Valley Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds ML21127A1592018-01-22022 January 2018 ODCM: Radiological Environmental Monitoring Program L-17-277, Pressure and Temperature Limits Reports, Revisions 8 and 92017-10-0404 October 2017 Pressure and Temperature Limits Reports, Revisions 8 and 9 L-17-259, Mitigating Strategies Assessment (MSA) for Flooding2017-09-20020 September 2017 Mitigating Strategies Assessment (MSA) for Flooding ML17213A0172017-05-11011 May 2017 Enclosure B: Beaver Valley, Unit 2, Seismic Probabilistic Risk Assessment in Response to 50.54(0 Letter with Regard to NTTF 2.1 ML17213A0162017-05-11011 May 2017 Enclosure a: Beaver Valley, Units 1, Seismic Probabilistic Risk Assessment in Response to 50.54(f) Letter with Regard to NTTF 2.1 L-16-327, Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair2016-10-31031 October 2016 Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair ML16277A1142015-10-28028 October 2015 ERS-MPD-93-007, Rev. 11, BVPS-U1 Gaseous Radioactivity Monitor Emergency Action Levels. ML16277A1222015-04-20020 April 2015 ERS-LMR-14-001, Rev. 1, Liquid Monitor Alert Emergency Action Level (EAL) Set Points. ML15119A1042015-03-31031 March 2015 SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 1 of 4 L-15-091, SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 42015-03-31031 March 2015 SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 4 ML21127A1582015-02-11011 February 2015 ODCM: Bases for ODCM Controls ML16277A1152015-01-30030 January 2015 ERS-HHM-87-014, Rev. 8, Unit 1 / Unit 2 ODCM Gaseous Effluent Monitor Setpoints. ML21127A1442014-10-0707 October 2014 ODCM: Information Related to 40 CFR 190 ML14224A5772014-07-31031 July 2014 SG-SGMP-14-17, Revision 1, Beaver Valley, Unit 2, End-of-Cycle 17 Analysis and Prediction for End-of-Cycle 18 Voltage-Based Repair Criteria 90-Day Report. ML14224A5762014-07-31031 July 2014 SG-CCOE-14-1, Revision 0, Generic Letter 95-05 Tube Intersection Burst Test, Leakage Test, and Morphology Conclusions. ML14224A5752014-06-25025 June 2014 R17 Steam Generator F* (F Star) Report ML13364A1662014-01-29029 January 2014 Interim Staff Evaluation Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14029A0212014-01-28028 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Beaver Valley Power Station, Units 1 and 2, TAC Nos.: MF0841 and MF0842 (Revision 2) ML14030A1352014-01-27027 January 2014 WCAP-17790-NP, Revision 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals. ML14030A1342014-01-27027 January 2014 WCAP-17789-NP, Rev. 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals. L-13-387, Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-422013-11-30030 November 2013 Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-42 ML14002A0902013-11-30030 November 2013 Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Cover Through Page 283 ML13126A0422013-04-15015 April 2013 RTL A9.630F, 2012 Annual Environmental Operating Report, (Non-Radiological) ML13126A0392013-04-12012 April 2013 RTL A9.690E, 2012 Radioactive Effluent Release Report and 2012 Annual Radiological Environmental Operating Report, Enclosure 1, Cover Through Enclosure 2, Attachment 3 ML13028A4712013-01-14014 January 2013 SG-SGMP-13-2, Rev. 1, Beaver Valley Unit 2, End-of-Cycle 16 Voltage-Based Repair Criteria 90-Day Report. L-12-458, Unit 2 - 2R16 Steam Generator F* (F Star) Report2012-12-0404 December 2012 Unit #2 - 2R16 Steam Generator F* (F Star) Report ML13008A0482012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C, Area Walk-by Checklists, Sheet 79 of 123 Through End ML13008A0472012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C, Area Walk-by Checklists, Page C-1 Through Sheet 78 of 123 ML16277A1162012-04-26026 April 2012 ERS-ATL-93-021, Rev. 4, Process Alarm Setpoints for Liquid Effluent Monitors. ML16277A1232012-04-26026 April 2012 ERS-ATL-93-021, Rev. 4, Process Alarm Setpoints for Liquid Effluent Monitors. ML13151A0602011-09-30030 September 2011 Enclosure C, WCAP-16527-NP, Analysis of Capsule X from Firstenergy Nuclear Operating Company Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program, Supplement 1, Revision 1, Dated September 2011 ML13151A0592011-09-30030 September 2011 Enclosure B, WCAP-15571, Analysis of Capsule Y from Beaver Valley, Unit 1 Reactor Vessel Radiation Surveillance Program, Supplement 1, Revision 2, Dated September 2011 ML16277A1242011-08-10010 August 2011 ERS-SFL-88-027, Rev. 3, Process Safety Limits, Alarm Setpoints and EAL Indicator Value for 2CHS-RQ101A/B. ML16277A1172011-08-0909 August 2011 ERS-JTL-99-005, Rev. 3, Unit 1 Letdown Radiation Monitor (RM-1CH-101) Alarm Setpoint Calculation and Emergency Action Level (EAL) ERS-JTL-99-005 21 Value Determination. ML16277A1272011-08-0707 August 2011 ERS-SMM-11-002, Containment Radiation Monitor Readings Following Clad Damage (FC2 Loss, FC7 Loss, RC2 Loss and CT2 Potential Loss). ML16277A1182011-08-0707 August 2011 ERS-SMM-11-002, Containment Radiation Monitor Readings Following Clad Damage (FC2 Loss, FC7 Loss, RC2 Loss and CT2 Potential Loss). L-11-024, Chapters 5 and 7 of Holtec Licensing Report, in Support of License Amendment Request for Unit 2 Spent Fuel Pool Rerack2011-02-18018 February 2011 Chapters 5 and 7 of Holtec Licensing Report, in Support of License Amendment Request for Unit 2 Spent Fuel Pool Rerack ML1029404582010-10-18018 October 2010 Holtec Report No: HI-2084175, Licensing Report for Beaver Valley, Unit 2, Rerack. ML0912102632009-04-0909 April 2009 HI-2084175, Revision 3, Holtec Licensing Report for Beaver Valley, Unit 2 Rerack, Enclosure C ML0900203862008-12-30030 December 2008 WCAP-16144-NP, Revision 1, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Beaver Valley Unit 2 ML0829002092008-08-31031 August 2008 WCAP-16158-NP, Revision 0, Technical Basis for Repair Options for Reactor Vessel Head Penetration Nozzles and Attachment Welds: Beaver Valley Unit 2 2022-07-06 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML16277A117&oldid=632151"