ML17298A873: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = Updated Final Safety Analysis Report (UFSAR)
| document type = Updated Final Safety Analysis Report (UFSAR)
| page count = 4
| page count = 4
}}
=Text=
{{#Wiki_filter: HBR 2  UPDATED FSAR  CHAPTER 16  16.0 TECHNICAL SPECIFICATIONS HBR 2  UPDATED FSAR  16-i  CHAPTER 16  TECHNICAL SPECIFICATIONS TABLE OF CONTENTS SECTION  TITLE PAGE 16.0 TECHNICAL SPECIFICATIONS 16.0.0-1 HBR 2 UPDATED FSAR  16.0.0-1 16.0 TECHNICAL SPECIFICATIONS  This chapter is not applicable to the Updated FSAR. The proposed technical specifications have been superseded by Technical Specifications issued by the Nuclear Regulatory Commission as Appendix A to the Facility Operating License.  (Reference 16.0-1).
HBR 2 UPDATED FSAR  16.0R-1
==REFERENCES:==
SECTION 16.0  16.0-1 H. B. Robinson Steam Electric Plant Unit Number 2 Technical Specifications, Appendix A to Facility Operating License Number DPR-23. 
}}
}}

Revision as of 04:25, 24 April 2018

H.B. Robinson Steam Electric Plant, Unit 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
ML17298A873
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/25/2017
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17298A847 List:
References
RNP-RA/17-0063
Download: ML17298A873 (4)


Text

HBR 2 UPDATED FSAR CHAPTER 16 16.0 TECHNICAL SPECIFICATIONS HBR 2 UPDATED FSAR 16-i CHAPTER 16 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS SECTION TITLE PAGE 16.0 TECHNICAL SPECIFICATIONS 16.0.0-1 HBR 2 UPDATED FSAR 16.0.0-1 16.0 TECHNICAL SPECIFICATIONS This chapter is not applicable to the Updated FSAR. The proposed technical specifications have been superseded by Technical Specifications issued by the Nuclear Regulatory Commission as Appendix A to the Facility Operating License. (Reference 16.0-1).

HBR 2 UPDATED FSAR 16.0R-1

REFERENCES:

SECTION 16.0 16.0-1 H. B. Robinson Steam Electric Plant Unit Number 2 Technical Specifications, Appendix A to Facility Operating License Number DPR-23.