MONTHYEARML23145A1622023-05-25025 May 2023 0 to Updated Final Safety Analysis Report RA-23-0110, 8 to Independent Spent Fuel Storage Installation Safety Analysis Report2023-05-25025 May 2023 8 to Independent Spent Fuel Storage Installation Safety Analysis Report RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . ML17298A8782017-09-25025 September 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities ML17298A8412017-09-25025 September 2017 Revision 27 to Updated Final Safety Analysis Report, List of Effective Pages - Table of Contents ML17298A8432017-09-25025 September 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML17298A8702017-09-25025 September 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program RNP-RA/17-0063, Redacted - H.B. Robinson Steam Electric Plant, Unit 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection2017-09-25025 September 2017 Redacted - H.B. Robinson Steam Electric Plant, Unit 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML17298A8752017-09-25025 September 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML17298A8732017-09-25025 September 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML17298A8682017-09-25025 September 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML0422901942004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 10, Operating Controls & Limits ML0422901922004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 9, Conduct of Operations ML0422901992004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 11, Quality Assurance ML0422901902004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 8, Accident Analyses ML0422901872004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 7, Radiation Protection ML0422901852004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 6, Waste Confinement & Management ML0422901772004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 3, Principal Design Criteria ML0422901752004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 2, Site Characteristics ML0422901742004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 1, Introduction and General Description of Installation ML0422901712004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Table of Contents ML0422901682004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Effective Page List ML0505503542004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 5, Operation Systems ML0505503592004-08-10010 August 2004 Independent Spent Fuel Storage Installation Safety Analysis Report, Revision 19, Chapter 4, Installation Design 2023-05-25
[Table view] |
Text
CHAPTER 6 WASTE CONFINEMENT AND MANAGEMENT
HBRSEP ISFSI SAR 6.0 WASTE CONFINEMENT AND MANAGEMENT 6.1 WASTE SOURCES No contaminated wastes are generated during the storage of irradiated fuel in the H. B.
Robinson (HBR) Independent Spent Fuel Storage Installation (ISFSI). The contaminated waste generated as a result of loading the spent fuel into the dry shielded canister (DSC) and into the IF-300 shipping container (see Chapter 5 for discussion of operations) is handled using existing H. B. Robinson Steam Electric Plant Unit No. 2 (HBR2) systems and procedures.
The small amounts of contaminated waste which may be generated consist of the spent fuel pool water and air and inert gas which are vented from the DSC and the cask during the drying operation. The handling of spent fuel and loading into the canisters occurs in the existing cask handling area within the Fuel Handling Building of HBR2.
6.1-1
HBRSEP ISFSI SAR 6.2 OFFGAS TREATMENT AND VENTILATION Small amounts of slightly contaminated air and inert gas may be generated during loading of the spent fuel into the dry shielded canister and then the cask. Since the spent fuel will be handled as if it is being prepared for offsite shipment using the IF-300, no new procedures are required. The HBR2 ventilation systems will be used to control any gaseous wastes generated. The ventilation systems are described in Chapter 9 of the UFSAR.
6.2-1 Revision No. 19
HBRSEP ISFSI SAR 6.3 LIQUID WASTE TREATMENT AND RETENTION The only liquid waste generated from the ISFSI results from loading the spent fuel assemblies into the dry shielded canister and into the IF-300 shipping container. This liquid waste is handled using existing HBR2 systems and procedures. The liquid waste system is described in Section 11.2 of the UFSAR.
6.3-1 Revision No. 19
HBRSEP ISFSI SAR 6.4 SOLID WASTES The ISFSI is not expected to generate any solid waste. Should any solid waste be generated, however, the existing HBR2 procedures will be used to process and dispose of the waste. Section 11.4 of the UFSAR describes the HBR2 solid waste processing system, the design basis, and an identification of the normal types of solid waste generated by HBR2 operations.
6.4-1 Revision No. 19
HBRSEP ISFSI SAR 6.5 RADIOLOGICAL IMPACT OF NORMAL OPERATIONS -
SUMMARY
The H. B. Robinson ISFSI is a passive and independent system which provides for the dry storage of irradiated fuel.
The ISFSI will not cause a significant radiological impact; the ISFSI has no requirement for radwaste or auxiliary systems for normal operation. Liquid and gaseous effluents utilized in the loading and handling of the Dry Shielded Canisters will be handled using the plant's existing process systems. There will be essentially no solid, liquid, or gaseous wastes generated during normal operation of the ISFSI.
The existing HBR2 health physics program and procedures are followed to maintain exposures ALARA during routine surveillances of the ISFSI.
6.5-1 Revision No. 19
HBR ISFSI SAR
REFERENCE:
CHAPTER 6 6.1 Carolina Power & Light Company, "H. B. Robinson Steam Electric Plant Unit No. 2 Updated Final Safety Analysis Report," Docket No. 50-261, License No. DPR-23.
6.R-1