|
|
Line 13: |
Line 13: |
| | document type = E-Mail | | | document type = E-Mail |
| | page count = 2 | | | page count = 2 |
| | project = TAC:ME7947, TAC:ME7948 | | | project = TAC:ME7948, TAC:ME7947 |
| | stage = RAI | | | stage = RAI |
| }} | | }} |
Revision as of 14:12, 5 April 2018
Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML12086A0022012-03-23023 March 2012 Draft RAI on Licensee'S Response to 10 CFR 50.54(f) Letter Regarding Thermal Conductivity Degradation Project stage: Draft RAI ML12086A1372012-03-26026 March 2012 Audit Plan for Audit at Westinghouse - Thermal Conductivity Degradation in LBLOCA Analyses Project stage: Other ML12086A2032012-03-26026 March 2012 Transmitting Audit Plan Re Thermal Conductivity Degradation Project stage: Other ML12088A3762012-04-0202 April 2012 Letter to Close Out 10 CFR 50.54(f) Actions Re. Thermal Conductivity Degradation in LOCA Analysis Project stage: Other 2012-03-26
[Table View] |
Similar Documents at Cook |
---|
Category:E-Mail
MONTHYEARML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT ML20366A1012020-12-31031 December 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection ML20316A0152020-11-0606 November 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML20318A0202020-10-16016 October 2020 NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A7122020-10-15015 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20318A0192020-10-15015 October 2020 NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A1192020-10-0909 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request for Alternative to N-729-4 for RPV Head Visual Examination ML20318A0182020-10-0909 October 2020 NRR E-mail Capture - (External_Sender) Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20149K6272020-05-28028 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment and Exemptions Regarding UFSAR 10 CFR 50.71(e)(4) Update Schedule (Epids: L-2020-LLA-0100, L-2020-LLE-0052, L-2020-LLE-0053) ML20149K4332020-05-26026 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-567, Revision 1 ML20141L6062020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-541, Revision 2 ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20136A5162020-05-15015 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-412, Revision 3 ML20133J9662020-05-11011 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19345F9382019-12-0909 December 2019 D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward ML19333B8042019-11-29029 November 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-569 (L-2019-LLA-0248) ML19309F9212019-11-0505 November 2019 Request for Eportal Access for Audit Review of the DC Cook SPRA Supporting Documents ML19270E7372019-09-26026 September 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-421, Reactor Coolant Pump Flywheel Inspection Program ML19207A4642019-07-26026 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Delete Diesel Generator Load Test Resistor Banks ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19175A3032019-06-24024 June 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS ML19092A4802019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 ML19092A4792019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Address Issues Identified in Westinghouse Document NSAL-15-1 2024-08-01
[Table view] |
Text
Accession No. ML12086A002 From: Tam, Peter Sent: Friday, March 23, 2012 9:10 AM To: mkscarpello@aep.com; hletheridge@aep.com; 'jrwaters@aep.com' Cc: Parks, Benjamin; Woodyatt, Diana; Gall, Jennifer; Ulses, Anthony; Williams, Shawn; Lennartz, Jay; LaFlamme, Paul; Giessner, John
Subject:
D.C. Cook - Draft RAI on the response to the 10 CFR 50.54(f) letter re. thermal conductivity degradation (TAC ME7947 and ME7948) Michael:
We prepared the following draft RAI questions that we plan to discuss with you in the conference call that we have already set up for 1:00 p.m. Eastern time, 3/23/12 (Friday). In the conference call, we will discuss with you the proposed response date, and any need to revise these questions. 1. Provide a table of data that includes ASTRUM inputs treated statistically, as well as key results[1], by WCOBRA/TRAC case number used pre- and post-completion of the estimation of the effect of thermal conductivity degradation on peak cladding temperature. 2. Please highlight the limiting cases in the ASTRUM run matrices and explain how these cases were chosen. Provide details and explain the order statistics approach used on the selected cases. Justify the selection of the number of WCOBRA/TRAC cases that were re-executed, as opposed to a larger number of cases.
3. Provide the number of cases that were re-executed to develop the off-setting margin assessment. Please provide similar information justifying the selection of this number of cases as in 2., above. 4. Your submittal referenced a March 7, 2012 letter sent by Westinghouse Electric Company to the NRC. a. In the final paragraph on page 2 of 9, the document states, "Small differences between the void volumes may exist for rods with the same cladding diameter, however, these differences in void volumes have been compared, and the components of the void volume calculations are either conservative or the changes in void volume are negligible after considering other conservatisms. Core operating conditions and powers were also confirmed to either be bounding, the same, or offset by other margins. The representative fuel temperatures and rod internal pressures are either similar or bound those expected for plant specific calculations." Provide the results of this comparison for D.C. Cook, including the relevant conclusions and the technical basis supporting those conclusions. For any conclusion that differences in void volume are offset by other conservatisms, list those conservatisms and provide a [1] Key results include peak cladding temperature, local oxidation, time of PCT-quantitative estimate of each conservatism, as well as a brief description of the rigor associated with that estimate. b. Please provide the values for the coefficients A1 and A2 used in the PAD 4.0 + TCD UO2 thermal conductivity equation. c. Please explain any error corrections, code improvements, and miscellaneous code cleanup between the WCOBRA/TRAC and HOTSPOT code versions used in the TCD evaluations and those used in the plant's AOR. d. What is the thermal conductivity model impact of code version changes in HOTSPOT? e. 5. Explain the differences between the TRANSURANUS and PAD computer codes and the impact of those differences. Provide graphs or other quantified descriptions that aid in explanation. 6. Justify the containment pressure changes made to obtain margin and explain why this change does not warrant re-seeding. Provide reference to excerpts from the applicable modeling guidance documents to clarify the response.
7. Explain the double-ended adjustments made for the accumulator temperature and why they are not symmetric.
8. Fully explain all peaking factor adjustments and provide the rationale for each adjustment. 9. At the bottom of Page 1 of Enclosure 2 to AEP-NRC-2012-13 it is stated that "I&M and WEC utilized processes which ensure that the LBLOCA analysis input values conservatively bound the as-operated plant values for those parameters." Please explain these processes. 10. Please explain how the updated values on the table on Page 3 of 6 of Enclosure 2 to AEP-NRC-2012-13 will be verified during operation of the plant, i.e. TS limits, Surveillances, etc. Also, explain what compensatory actions will be taken if a value is found to be outside of the limits assumed in the analysis.
11. Please explain the process for determining the establishment of a trend in the context of the following statement: "For the margin PCT calculation, WCOBRA/TRAC cases were executed until an estimated trend could be established." Peter S. Tam Senior Project Manager (for D. C. Cook and Monticello) Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451