ML23345A067: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023-14481 USER INFORMATION: | ||
GERLACH*ROSEY M Address: NUCSA2 Phone#: | |||
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023-14481 | 542-3194 EMPL#:028401 CA#: | ||
0363 TRANSMITTAL INFORMATION: | |||
USER INFORMATION: | TO: | ||
GERLACH*ROSEY M | GERLACH*ROSEY M 11/28/2023 LOCATION: | ||
USNRC FROM: | |||
TRANSMITTAL INFORMATION: | NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) | ||
Page 1 | |||
TO: GERLACH*ROSEY M 11/28/2023 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) | THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. | ||
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. | HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. | ||
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. | |||
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. | |||
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material. | ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material. | ||
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 11/02/2023 ADD MANUAL TABLE OF CONTENTS DATE: 11/27/2023 CATEGORY: DOCUMENTS TYPE: TSB2 of 2 | |||
l.\JUV. | |||
L;0 1 L;UL;..:> | |||
ID: | |||
TEXT 3.6.1.4 REMOVE: | |||
REV: 2 ADD: | |||
REV: 3 Page 2 | |||
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. | |||
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. | |||
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. | |||
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX. | |||
ID: TEXT 3.6.1.4 REMOVE: REV: 2 | of 2 | ||
ADD: REV: 3 | |||
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX. | |||
SSES MANUAL Manual Name: | |||
TSB2 | |||
.nual | .nual | ||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date: | ||
11/27/2023 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/2019 | |||
Table Of Contents Issue Date: 11/27/2023 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/2019 | |||
==Title:== | ==Title:== | ||
LIST OF EFFECTIVE SECTIONS | LIST OF EFFECTIVE SECTIONS TEXT TOC 25 03/05/2019 | ||
TEXT TOC 25 03/05/2019 | |||
==Title:== | ==Title:== | ||
TABLE OF CONTENTS | TABLE OF CONTENTS TEXT 2.1.1 7 | ||
03/30/2023 | |||
TEXT 2.1.1 7 03/30/2023 | |||
==Title:== | ==Title:== | ||
SAFETY LIMITS (SLS) REACTOR CORE SLS | SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1. 2 1 | ||
EXT 3.0 | |||
TEXT 2.1. 2 1 | |||
EXT 3.0 | |||
==Title:== | ==Title:== | ||
LIMITING CONDITION FOR | LIMITING CONDITION FOR 5 | ||
01/15/2023 TEXT 3.1.4 5 | |||
01/15/2023 | 11/16/2016 | ||
TEXT 3.1.4 5 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES ' | REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES ' | ||
TEXT 3.1. 5 2 | |||
TEXT 3.1. 5 2 11/16/2016 | 11/16/2016 | ||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS | REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1. 6 6 | ||
01/15/2023 | |||
TEXT 3.1. 6 6 01/15/2023 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL | REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Page 1 of 8 | ||
Report Date: 11/27/23 | |||
Page 1 of 8 Report Date: 11/27/23 | |||
Manual | SSES MANUAL Manual Name: | ||
TSB2 Manual | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1. 7 5 | ||
01/05/2023 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM | REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEX'+. 3.1. 8 4 | ||
11/16/2016 | |||
TEX'+. 3.1. 8 4 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES | REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 6 | ||
03/31/2021 | |||
TEXT 3.2.1 6 03/31/2021 | |||
==Title:== | ==Title:== | ||
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR} | POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR} | ||
TEXT 3.2.2 6 | |||
TEXT 3.2.2 6 03/30/2023 | 03/30/2023 | ||
==Title:== | ==Title:== | ||
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR) | POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR) | ||
TEXT 3.2.3 4 | |||
TEXT 3.2.3 4 03/31/2021 | 03/31/2021 | ||
==Title:== | ==Title:== | ||
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR | POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 7 | ||
01/05/2023 | |||
TEXT 3.3.1.1 7 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION | INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 4 | ||
01/23/2018 | |||
TEXT 3.3.1.2 4 01/23/2018 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION | INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 6 | ||
01/15/2023 | |||
TEXT 3.3.2.1 6 01/15/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION | INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 4 | ||
01/05/2023 | |||
TEXT 3.3.2.2 4 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION | INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 9 | ||
11/16/2016 | |||
TEXT 3.3.3.1 9 11/16/2016 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION | INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 2 | ||
11/16/2016 | |||
TEXT 3.3.3.2 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM | INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 3 | ||
01/05/2023 | |||
TEXT 3.3.4.1 3 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION. | INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION. | ||
Page 2 of 8 | |||
Report Date: 11/27/23 | |||
SSES MANUAL Manual Name: | |||
TSB2 | |||
Manual Name: TSB2 | |||
.anual | .anual | ||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 2 | ||
01/05/2023 | |||
TEXT 3.3.4.2 2 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION | INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 8 | ||
01/05/2023 | |||
TEXT 3.3.5.1 8 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION | INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 3 | ||
03/18/2021 | |||
TEXT 3.3.5.2 3 03/18/2021 | |||
==Title:== | ==Title:== | ||
REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION | REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION TEXT 3.3.5.3 1 | ||
01/05/2023 | |||
TEXT 3.3.5.3 1 01/05/2023 | |||
==Title:== | ==Title:== | ||
UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES | UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES TEXT 3.3.6.1 10 01/05/2023 | ||
TEXT 3.3.6.1 10 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION | INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION | ||
.EXT 3.3.6.2 6 | |||
.EXT 3.3.6.2 6 03/05/2019 | 03/05/2019 | ||
==Title:== | ==Title:== | ||
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION | INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 4 | ||
03/05/2019 | |||
TEXT 3.3.7.1 4 03/05/2019 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION | INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 7 | ||
01/05/2023 | |||
TEXT 3.3.8.1 7 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION | INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 1 | ||
11/16/2016 | |||
TEXT 3.3.8.2 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING | INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 6 | ||
03/31/2021 | |||
TEXT 3.4.1 6 03/31/2021 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING | REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 4 | ||
11/16/2016 | |||
TEXT 3.4.2 4 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) JET PUMPS | REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3 | ||
01/13/2012 | |||
TEXT 3.4.3 3 01/13/2012 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS) | REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS) | ||
Page 3 of 8 | |||
Report Date: 11/27/23 | |||
SSES MANUAL Manual Name: | |||
TSB2 Manual | |||
Manual Name: TSB2 | |||
Manual | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.4 1 | ||
11/16/2016 | |||
TEXT 3.4.4 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE | REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 3 | ||
03/10/2010 | |||
TEXT 3.4.5 3 03/10/2010 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE | REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 5 | ||
11/16/2016 | |||
TEXT 3.4.6 5 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION | REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 3 | ||
11/16/2016 | |||
TEXT 3.4.7 3 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY | REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 3 | ||
11/16/2016 | |||
TEXT 3.4.8 3 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING | REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING | ||
- HOT SHUTDOWN TEXT 3.4.9 2 | |||
11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING | REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING COLD SHUTDOWN TEXT 3.4.10 6 | ||
05/14/2019 | |||
TEXT 3.4.10 6 05/14/2019 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS | REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 1 | ||
11/16/2016 | |||
TEXT 3.4.11 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE | REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 9 | ||
01/05/2023 | |||
TEXT 3.5.1 9 01/05/2023 | |||
==Title:== | ==Title:== | ||
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 7 06/09/2022 | EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 7 | ||
06/09/2022 | |||
==Title:== | ==Title:== | ||
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 7 01/05/2023 | EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 7 | ||
01/05/2023 | |||
==Title:== | ==Title:== | ||
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING | EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING SYSTEM | ||
* SYSTEM Page 4 of 8 | |||
Page 4 of 8 Report Date: 11/27/23 | Report Date: 11/27/23 | ||
SSES MANUAL Manual Name: | |||
TSB2 | |||
.anual | .anual | ||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.1 6 | ||
11/16/2016 | |||
TEXT 3.6.1.1 6 11/16/2016 | |||
==Title:== | ==Title:== | ||
PRIMARY CONTAINMENT | PRIMARY CONTAINMENT TEXT 3.6.1.2 3 | ||
01/05/2023 | |||
TEXT 3.6.1.2 3 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK | CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 20 01/05/2023 | ||
TEXT 3.6.1.3 20 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS) | CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS) | ||
TEXT 3.6.1.4 3 | |||
TEXT 3.6.1.4 3 11/27/2023 | 11/27/2023 | ||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE | CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 2 | ||
11/16/2016 | |||
TEXT 3.6.1.5 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE | CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE | ||
.EXT 3.6.1.6 2 | |||
.EXT 3.6.1.6 2 01/05/2023 | 01/05/2023 | ||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS | CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 3 | ||
11/16/2016 | |||
TEXT 3.6.2.1 3 11/16/2016 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE | CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 2 | ||
03/05/2019 | |||
TEXT 3.6.2.2 2 03/05/2019 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL | CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 3 | ||
01/05/2023 | |||
TEXT 3.6.2.3 3 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING | CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 2 | ||
01/05/2023 | |||
TEXT 3.6.2.4 2 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY | CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 | ||
TEXT 3.6.3.1 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS INTENTIONALLY LEFT BLANK | CONTAINMENT SYSTEMS 2 | ||
06/13/2006 INTENTIONALLY LEFT BLANK TEXT 3.6.3.2 4 | |||
TEXT 3.6.3.2 4 08/02/2021 | 08/02/2021 | ||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM | CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM Page 5 of 8 | ||
Report Date: 11/27/23 | |||
Page 5 of 8 Report Date: 11/27/23 | |||
Manual | SSES MANUAL Manual Name: | ||
TSB2 Manual | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.3.3 3 | ||
09/2~/2017 | |||
TEXT 3.6.3.3 3 09/2~/2017 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION | CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 17 12/16/2020 | ||
TEXT 3.6.4.1 17 12/16/2020 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT | CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 14 03/05/2019 | ||
TEXT 3.6.4.2 14 03/05/2019 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS) | CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS) | ||
TEXT 3.6.4.3 7 | |||
TEXT 3.6.4.3 7 03/05/2019 | 03/05/2019 | ||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT SYSTEM | CONTAINMENT SYSTEMS STANDBY GAS TREATMENT SYSTEM TEXT 3.7.1 10 01/05/2023 | ||
TEXT 3.7.1 10 01/05/2023 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS) | PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS) | ||
TEXT 3.7.2 6 01/05/2023 | TEXT 3.7.2 6 | ||
01/05/2023 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM | PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 4 | ||
03/05/2019 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM | PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM TEXT 3.7.4 2 | ||
03/05/2019 | |||
TEXT 3.7.4 2 03/05/2019 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM | PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 2 | ||
11/16/2016 | |||
TEXT 3.7.5 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS MAIN CONDENSER ~FFGAS | PLANT SYSTEMS MAIN CONDENSER ~FFGAS TEXT 3.7.6 4 | ||
11/i6/2016 | |||
TEXT 3.7.6 4 11/i6/2016 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM | PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 2 | ||
11/16/2016 | |||
TEXT 3.7.7 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL | PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8 1 | ||
11/16/2016 | |||
TEXT 3.7.8 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
MAINE TURBINE PRESSURE REGULATION SYSTEM | MAINE TURBINE PRESSURE REGULATION SYSTEM Page 6 of 8 | ||
Report Date: 11/27/23 | |||
Page 6 of 8 Report Date: 11/27/23 | |||
SSES MANUAL Manual Name: | |||
TSB2 | |||
.anual | .anual | ||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.1 17 01/05/2023 | ||
TEXT 3.8.1 17 01/05/2023 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING | ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING TEXT 3.8.2 2 | ||
03/18/2021 | |||
TEXT 3.8.2 2 03/18/2021 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN | ELECTRICAL POWER SYSTEMS AC SOURCES - | ||
SHUTDOWN TEXT 3.8.3 7 | |||
TEXT 3.8.3 7 08/07/2019 | 08/07/2019 | ||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR | ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3. 8.4 5 | ||
01/05/2023 | |||
TEXT 3. 8.4 5 01/05/2023 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING | ELECTRICAL POWER SYSTEMS DC SOURCES - | ||
OPERATING TEXT 3.8.5 2 | |||
TEXT 3.8.5 2 03/05/2019 | 03/05/2019 | ||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN | ELECTRICAL POWER SYSTEMS DC SOURCES - | ||
SHUTDOWN | |||
.EXT 3.8.6 2 11/16/2016 Ti.tle: ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS | .EXT 3.8.6 2 | ||
11/16/2016 Ti.tle: ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 9 | |||
TEXT 3.8.7 9 01/05/2023 | 01/05/2023 | ||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING | ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 2 | ||
03/05/2019 | |||
TEXT 3.8.8 2 03/05/2019 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN | ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN TEXT 3.9.1 1 | ||
11/16/2016 | |||
TEXT 3.9.1 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS | REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 2 | ||
11/16/2016 | |||
TEXT 3.9.2 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK | REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 1 | ||
11/16/2016 | |||
TEXT 3.9.3 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS CONTROL ROD POSITION | REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 | ||
11/18/2002 | |||
TEXT 3.9.4 0 11/18/2002 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION | REFUELING OPERATIONS CONTROL ROD POSITION INDICATION Page 7 of 8 | ||
Report Date: 11/27/23 | |||
Page 7 of 8 Report Date: 11/27/23 | |||
Manual | SSES MANUAL Manual Name: | ||
TSB2 Manual | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.5 1 | ||
* 11/16/2016 | * 11/16/2016 | ||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING | REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 2 | ||
11/16/2016 | |||
TEXT 3.9.6 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL | REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 l | ||
11/16/2016 | |||
TEXT 3.9.7 l 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL | REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 1 | ||
11/16/2016 | |||
TEXT 3.9.8 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL | REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - | ||
LOW WATER LEVEL TEXT 3.10.1 2 | |||
TEXT 3.10.1 2 03/05/2019 | 03/05/2019 | ||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION | SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 1 | ||
11/16/2016 | |||
TEXT 3.10.2 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING | SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 1 | ||
11/16/2016 | |||
TEXT 3.10.3 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN | SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 1 | ||
11/16/2016 | |||
TEXT 3.10.4 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN | SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - | ||
COLD SHUTDOWN TEXT 3.10.5 l | |||
TEXT 3.10.5 l 11/16/2016 | 11/16/2016 | ||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING | SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 1 | ||
11/16/2016 | |||
TEXT 3.10.6 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING | SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7 2 | ||
03/31/2021 | |||
TEXT 3.10.7 2 03/31/2021 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING | SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING 3.10.8 4 | ||
03/31/2021 | |||
3.10.8 4 03/31/2021 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING | SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Page 8 of 8 | ||
Report Date: 11/27/23 | |||
Rev. 3 Containment Pressure B 3.6.1.4 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.4 Containment Pressure BASES BACKGROUND APPLICABLE SAFETY ANALYSES LCO APPLICABILITY The containment pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (OBA) or loss of coolant accident (LOCA). | |||
Primary containment performance is evaluated for the entire spectrum of break sizes for postulated LOCAs (Ref. 1 ). Among the inputs to the OBA is the initial primary containment internal pressure (Ref. 1 ). Analyses assume an initial containment pressure of-1.0 to 2.0 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA contain merit internal pressure does not exceed the maximum allowable. | |||
The maximum calculated containment pressure occurs during the reactor blowdown phase of the OBA, which assumes an instantaneous recirculation line break. The calculated peak containment pressure for this limiting event is 48.6 psig (Ref. 1 ). | The maximum calculated containment pressure occurs during the reactor blowdown phase of the OBA, which assumes an instantaneous recirculation line break. The calculated peak containment pressure for this limiting event is 48.6 psig (Ref. 1 ). | ||
The minimum containment pressure occurs during an inadvertent spray actuation. The calculated minimum drywell pressure for this limiting event is -4.72 psig. (Ref. 1) | |||
actuation. The calculated minimum drywell pressure for this limiting event is -4.72 psig. (Ref. 1) | |||
Containment pressure satisfies Criterion 2 of the NRC Policy Statement. | Containment pressure satisfies Criterion 2 of the NRC Policy Statement. | ||
(Ref. 2) | (Ref. 2) | ||
In the event of a OBA, with an initial containment pressure -1.0 to 2.0 psig, the resultant peak containment accident pressure will be maintained below the containment design pressure. The containment pressure is defined to include both the drywell pressure and the suppression chamber pressure. | |||
(Ref. 1) | (Ref. 1) | ||
In MODES 1, 2, and 3, a OBA-could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining containment pressure within limits is not required in MODE 4 or 5. | |||
SUSQUEHANNA - UNIT 2 3.6-40 | |||
BASES ACTIONS SURVEILLANCE REQUIREMENTS REFERENCES Rev. 3 Containment Pressure B 3.6.1.4 With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour. | |||
8.1 and 8.2 If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours and to MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. | |||
SR 3.6.1.4.1 Verifying that containment pressure is within limit ensures that unit operation remains within the limit assumed in the primary containmer:it analysis. The Surveillance Frequency is controlled under the Surveiliance Frequency Control Program. | |||
: 1. | |||
FSAR, Section 6.2. | |||
With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour. | : 2. | ||
Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132). | |||
8.1 and 8.2 | SUSQUEHANNA - UNIT 2 3.6-41 | ||
If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours and to MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. | |||
: 2. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132). | |||
SUSQUEHANNA - UNIT 2 3.6-41 | |||
SUSQUEHANNA - UNIT 2 3.6-42}} | BASES Rev. 3 Containment Pressure B 3.6.1.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 3.6-42}} | ||
Latest revision as of 05:18, 21 February 2026
| ML23345A067 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 11/28/2023 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML23345A067 (1) | |
Text
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023-14481 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
542-3194 EMPL#:028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 11/28/2023 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 11/02/2023 ADD MANUAL TABLE OF CONTENTS DATE: 11/27/2023 CATEGORY: DOCUMENTS TYPE: TSB2 of 2
l.\JUV.
L;0 1 L;UL;..:>
ID:
TEXT 3.6.1.4 REMOVE:
REV: 2 ADD:
REV: 3 Page 2
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
SSES MANUAL Manual Name:
TSB2
.nual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date:
11/27/2023 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/2019
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 25 03/05/2019
Title:
TABLE OF CONTENTS TEXT 2.1.1 7
03/30/2023
Title:
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1. 2 1
EXT 3.0
Title:
LIMITING CONDITION FOR 5
01/15/2023 TEXT 3.1.4 5
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES '
TEXT 3.1. 5 2
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1. 6 6
01/15/2023
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Page 1 of 8
Report Date: 11/27/23
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1. 7 5
01/05/2023
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEX'+. 3.1. 8 4
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 6
03/31/2021
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR}
TEXT 3.2.2 6
03/30/2023
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 4
03/31/2021
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 7
01/05/2023
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 4
01/23/2018
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 6
01/15/2023
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 4
01/05/2023
Title:
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 9
11/16/2016
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 2
11/16/2016
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 3
01/05/2023
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION.
Page 2 of 8
Report Date: 11/27/23
SSES MANUAL Manual Name:
TSB2
.anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 2
01/05/2023
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 8
01/05/2023
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 3
03/18/2021
Title:
REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION TEXT 3.3.5.3 1
01/05/2023
Title:
UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES TEXT 3.3.6.1 10 01/05/2023
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION
.EXT 3.3.6.2 6
03/05/2019
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 4
03/05/2019
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 7
01/05/2023
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 1
11/16/2016
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 6
03/31/2021
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 4
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3
01/13/2012
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
Page 3 of 8
Report Date: 11/27/23
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.4 1
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 3
03/10/2010
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 5
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 3
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 3
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING
- HOT SHUTDOWN TEXT 3.4.9 2
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING COLD SHUTDOWN TEXT 3.4.10 6
05/14/2019
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 1
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 9
01/05/2023
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 7
06/09/2022
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 7
01/05/2023
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING SYSTEM
- SYSTEM Page 4 of 8
Report Date: 11/27/23
SSES MANUAL Manual Name:
TSB2
.anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.1 6
11/16/2016
Title:
PRIMARY CONTAINMENT TEXT 3.6.1.2 3
01/05/2023
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 20 01/05/2023
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 3
11/27/2023
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 2
11/16/2016
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE
.EXT 3.6.1.6 2
01/05/2023
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 3
11/16/2016
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 2
03/05/2019
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 3
01/05/2023
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 2
01/05/2023
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1
Title:
CONTAINMENT SYSTEMS 2
06/13/2006 INTENTIONALLY LEFT BLANK TEXT 3.6.3.2 4
08/02/2021
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM Page 5 of 8
Report Date: 11/27/23
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.3.3 3
09/2~/2017
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 17 12/16/2020
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 14 03/05/2019
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 7
03/05/2019
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT SYSTEM TEXT 3.7.1 10 01/05/2023
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 6
01/05/2023
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 4
03/05/2019
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM TEXT 3.7.4 2
03/05/2019
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 2
11/16/2016
Title:
PLANT SYSTEMS MAIN CONDENSER ~FFGAS TEXT 3.7.6 4
11/i6/2016
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 2
11/16/2016
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8 1
11/16/2016
Title:
MAINE TURBINE PRESSURE REGULATION SYSTEM Page 6 of 8
Report Date: 11/27/23
SSES MANUAL Manual Name:
TSB2
.anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.1 17 01/05/2023
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING TEXT 3.8.2 2
03/18/2021
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES -
SHUTDOWN TEXT 3.8.3 7
08/07/2019
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3. 8.4 5
01/05/2023
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES -
OPERATING TEXT 3.8.5 2
03/05/2019
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES -
SHUTDOWN
.EXT 3.8.6 2
11/16/2016 Ti.tle: ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 9
01/05/2023
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 2
03/05/2019
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN TEXT 3.9.1 1
11/16/2016
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 2
11/16/2016
Title:
REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 1
11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0
11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION Page 7 of 8
Report Date: 11/27/23
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.5 1
- 11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 2
11/16/2016
Title:
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 l
11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 1
11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) -
LOW WATER LEVEL TEXT 3.10.1 2
03/05/2019
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 1
11/16/2016
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 1
11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 1
11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL -
COLD SHUTDOWN TEXT 3.10.5 l
11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 1
11/16/2016
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7 2
03/31/2021
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING 3.10.8 4
03/31/2021
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Page 8 of 8
Report Date: 11/27/23
Rev. 3 Containment Pressure B 3.6.1.4 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.4 Containment Pressure BASES BACKGROUND APPLICABLE SAFETY ANALYSES LCO APPLICABILITY The containment pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (OBA) or loss of coolant accident (LOCA).
Primary containment performance is evaluated for the entire spectrum of break sizes for postulated LOCAs (Ref. 1 ). Among the inputs to the OBA is the initial primary containment internal pressure (Ref. 1 ). Analyses assume an initial containment pressure of-1.0 to 2.0 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA contain merit internal pressure does not exceed the maximum allowable.
The maximum calculated containment pressure occurs during the reactor blowdown phase of the OBA, which assumes an instantaneous recirculation line break. The calculated peak containment pressure for this limiting event is 48.6 psig (Ref. 1 ).
The minimum containment pressure occurs during an inadvertent spray actuation. The calculated minimum drywell pressure for this limiting event is -4.72 psig. (Ref. 1)
Containment pressure satisfies Criterion 2 of the NRC Policy Statement.
(Ref. 2)
In the event of a OBA, with an initial containment pressure -1.0 to 2.0 psig, the resultant peak containment accident pressure will be maintained below the containment design pressure. The containment pressure is defined to include both the drywell pressure and the suppression chamber pressure.
(Ref. 1)
In MODES 1, 2, and 3, a OBA-could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining containment pressure within limits is not required in MODE 4 or 5.
SUSQUEHANNA - UNIT 2 3.6-40
BASES ACTIONS SURVEILLANCE REQUIREMENTS REFERENCES Rev. 3 Containment Pressure B 3.6.1.4 With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
8.1 and 8.2 If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SR 3.6.1.4.1 Verifying that containment pressure is within limit ensures that unit operation remains within the limit assumed in the primary containmer:it analysis. The Surveillance Frequency is controlled under the Surveiliance Frequency Control Program.
- 1.
FSAR, Section 6.2.
- 2.
Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 2 3.6-41
BASES Rev. 3 Containment Pressure B 3.6.1.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 3.6-42