ML11174A142: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML11174A142
| number = ML11174A142
| issue date = 06/24/2011
| issue date = 06/24/2011
| title = Closure Letter for the Licensee'S Response to Generic Letter 200-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems.
| title = Closure Letter for the Licensees Response to Generic Letter 200-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems
| author name = Mozafari B
| author name = Mozafari B
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 24, 2011 Mr. Robert J. Duncan, \I Vice President Carolina Power and Light Company H.B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 24, 2011 Mr. Robert J. Duncan, \\I Vice President Carolina Power and Light Company H.B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550  


==SUBJECT:==
==SUBJECT:==
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - CLOSURE LETTER FOR THE LICENSEE'S RESPONSE TO GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7871)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - CLOSURE LETTER FOR THE LICENSEE'S RESPONSE TO GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7871)  


==Dear Mr. Duncan:==
==Dear Mr. Duncan:==
On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.
On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.
GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:
GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:
a) A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that the licensee is or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to Title 10 of the Code of Federal Regulations Part 50, as well as the licensing basis and operating license as those requirements apply to the subject systems; b) A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications, that the licensee determined were necessary to assure compliance with these regulations; and, c) A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.
a) A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that the licensee is or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to Title 10 of the Code of Federal Regulations Part 50, as well as the licensing basis and operating license as those requirements apply to the subject systems; b) A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications, that the licensee determined were necessary to assure compliance with these regulations; and, c) A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.  


R. Duncan                                       - 2 By letters dated October 14, 2008; February 13, 2009, and March 22, 2010 (ADAMS Accession Nos. ML082900579, ML090540060, and ML100840530, respectively), Carolina Power & Ught Company, the licensee for the H. B. Robinson Steam Electric Plant, Unit No.2, provided responses to GL 2008-01. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.
R. Duncan  
- 2 By letters dated October 14, 2008; February 13, 2009, and March 22, 2010 (ADAMS Accession Nos. ML082900579, ML090540060, and ML100840530, respectively), Carolina Power & Ught Company, the licensee for the H. B. Robinson Steam Electric Plant, Unit No.2, provided responses to GL 2008-01. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.
Consequently, the licensee's GL response is considered closed and no further information or action is requested from the licensee with the exception of any commitments made by the licensee with respect to the GL responses. Notwithstanding, the NRC's Region II staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
Consequently, the licensee's GL response is considered closed and no further information or action is requested from the licensee with the exception of any commitments made by the licensee with respect to the GL responses. Notwithstanding, the NRC's Region II staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.
Sincerely, prY     Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Distribution via Listserv
Sincerely, prY Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Distribution via Listserv  


R. Duncan                                             -2 By letters dated October 14, 2008; February 13, 2009, and March 22, 2010 (ADAMS Accession Nos. ML082900579, ML090540060, and I\I1L 100840530, respectively), Carolina Power & Light Company, the licensee for the H. B. Robinson Steam Electric Plant, Unit No.2, provided responses to GL 2008-01. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.
R. Duncan  
- 2 By letters dated October 14, 2008; February 13, 2009, and March 22, 2010 (ADAMS Accession Nos. ML082900579, ML090540060, and I\\I1L100840530, respectively), Carolina Power & Light Company, the licensee for the H. B. Robinson Steam Electric Plant, Unit No.2, provided responses to GL 2008-01. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.
Consequently, the licensee's GL response is considered closed and no further information or action is requested from the licensee with the exception of any commitments made by the licensee with respect to the GL responses. Notwithstanding, the NRC's Region II staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
Consequently, the licensee's GL response is considered closed and no further information or action is requested from the licensee with the exception of any commitments made by the licensee with respect to the GL responses. Notwithstanding, the NRC's Region II staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.
Sincerely, IRA by FSaba fori Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Distribution via Listserv DISTRIBUTION:
Sincerely, IRA by FSaba fori Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC                           LPL2-2 R/F               RidsNrrDorlLpl2-2         RidsNrrDssSrxb RidsNrrLACSola                   RidsNrrPMRobinson         RidsOgcRp                 RidsNrrDorlDpr RidsRgn2MailCenter               RidsAcrsAcnwMailCenter
PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrDssSrxb RidsNrrLACSola RidsNrrPMRobinson RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnwMailCenter ADAMS A
              . No. ML11174A142 ADAMS Accesslon                                                                                  *Bjymemo OFFICE   LPL2-2/PM           LPL2-2/LA           SRXB/BC*             LPL2-2BC             LPL2-2/PM NAME     BMozafari           CSoia               TUlses               DBroaddus           BMozafari (SLingam for)       (FSaba for)
: o. ML11174A142  
DATE     06/23/11           06/23/11             04/27/11             06/24/11             06/24/11 OFFICIAL AGENCY RECORD}}
*Bjymemo ccesslon N OFFICE LPL2-2/PM LPL2-2/LA SRXB/BC*
LPL2-2BC LPL2-2/PM NAME BMozafari CSoia TUlses DBroaddus (SLingam for)
BMozafari (FSaba for)
DATE 06/23/11 06/23/11 04/27/11 06/24/11 06/24/11 OFFICIAL AGENCY RECORD}}

Latest revision as of 05:43, 13 January 2025

Closure Letter for the Licensees Response to Generic Letter 200-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems
ML11174A142
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/24/2011
From: Mozafari B
Plant Licensing Branch II
To: Duncan R
Carolina Power & Light Co
Mozafari B
References
TAC MD7871, GL-08-001
Download: ML11174A142 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 24, 2011 Mr. Robert J. Duncan, \\I Vice President Carolina Power and Light Company H.B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - CLOSURE LETTER FOR THE LICENSEE'S RESPONSE TO GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7871)

Dear Mr. Duncan:

On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.

GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:

a) A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that the licensee is or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to Title 10 of the Code of Federal Regulations Part 50, as well as the licensing basis and operating license as those requirements apply to the subject systems; b) A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications, that the licensee determined were necessary to assure compliance with these regulations; and, c) A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.

R. Duncan

- 2 By letters dated October 14, 2008; February 13, 2009, and March 22, 2010 (ADAMS Accession Nos. ML082900579, ML090540060, and ML100840530, respectively), Carolina Power & Ught Company, the licensee for the H. B. Robinson Steam Electric Plant, Unit No.2, provided responses to GL 2008-01. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.

Consequently, the licensee's GL response is considered closed and no further information or action is requested from the licensee with the exception of any commitments made by the licensee with respect to the GL responses. Notwithstanding, the NRC's Region II staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.

Sincerely, prY Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Distribution via Listserv

R. Duncan

- 2 By letters dated October 14, 2008; February 13, 2009, and March 22, 2010 (ADAMS Accession Nos. ML082900579, ML090540060, and I\\I1L100840530, respectively), Carolina Power & Light Company, the licensee for the H. B. Robinson Steam Electric Plant, Unit No.2, provided responses to GL 2008-01. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.

Consequently, the licensee's GL response is considered closed and no further information or action is requested from the licensee with the exception of any commitments made by the licensee with respect to the GL responses. Notwithstanding, the NRC's Region II staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.

Sincerely, IRA by FSaba fori Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrDssSrxb RidsNrrLACSola RidsNrrPMRobinson RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnwMailCenter ADAMS A

o. ML11174A142
  • Bjymemo ccesslon N OFFICE LPL2-2/PM LPL2-2/LA SRXB/BC*

LPL2-2BC LPL2-2/PM NAME BMozafari CSoia TUlses DBroaddus (SLingam for)

BMozafari (FSaba for)

DATE 06/23/11 06/23/11 04/27/11 06/24/11 06/24/11 OFFICIAL AGENCY RECORD