| Line 3: | Line 3: | ||
| issue date = 02/24/2014 | | issue date = 02/24/2014 | ||
| title = E-mail from J Whited to P Lashley: Second Draft RAI on Capsule Withdrawal Schedule Review | | title = E-mail from J Whited to P Lashley: Second Draft RAI on Capsule Withdrawal Schedule Review | ||
| author name = Whited J | | author name = Whited J | ||
| author affiliation = NRC/NRR/DORL/LPLI-2 | | author affiliation = NRC/NRR/DORL/LPLI-2 | ||
| addressee name = Lashley P | | addressee name = Lashley P | ||
| addressee affiliation = FirstEnergy Nuclear Operating Co | | addressee affiliation = FirstEnergy Nuclear Operating Co | ||
| docket = 05000334, 05000412 | | docket = 05000334, 05000412 | ||
| license number = | | license number = | ||
| contact person = Whited J | | contact person = Whited J | ||
| package number = ml14055a387 | | package number = ml14055a387 | ||
| document type = E-Mail | | document type = E-Mail | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:1 Whited, Jeffrey From: | ||
Whited, Jeffrey Sent: | |||
Monday, February 24, 2014 1:13 PM To: | |||
phlashley@firstenergycorp.com Cc: | |||
talentz@firstenergycorp.com | |||
==Subject:== | ==Subject:== | ||
SECOND DRAFT-RAI to FENOC | SECOND DRAFT-RAI to FENOC PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES Attachments: | ||
DRAFT Capsule Second RAIs.docx Mr. Lashley, By letter dated May 28, 2013 (Agencywide | DRAFT Capsule Second RAIs.docx Mr. Lashley, By {{letter dated|date=May 28, 2013|text=letter dated May 28, 2013}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13151A058), as supplemented by {{letter dated|date=December 13, 2013|text=letter dated December 13, 2013}} (ADAMS Accession No. ML13350A581), First Energy Nuclear Operating Company submitted a request to revise the reactor vessel surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2. | ||
ML13350A581), First Energy Nuclear Operating Company submitted a request to revise the reactor vessel surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2. | The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined additional information is required to complete the assessment of the submitted information. Please find attached a Draft Request For Additional Information. It is being sent to you to ensure that the question is understandable, the regulatory basis for the question is clear, and to determine if the information was previously docketed. Please respond to me by Friday, February 28, 2013, and notify me if you desire to hold a teleconference to discuss the question. The NRC staff will request a response to the RAIs within 30 days of the formal NRC RAI transmittal letter. | ||
Thank you, JeffreyWhited ProjectManagerBeaverValleyandSusquehanna PlantLicensingBranchI2 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation U.S.NuclearRegulatoryCommission (301)4154090 jeffrey.whited@nrc.gov}} | |||
The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined additional information is required to complete the assessment of the submitted information. Please find attached a Draft Request For Additional Information. It is being sent to you to ensure that the question is understandable, the regulatory basis for the question is clear, and to determine if the information was previously docketed. Please respond to me by Friday, February 28, 2013, and notify me if you desire to hold a teleconference to discuss the question. The NRC staff will request a response to the RAIs within 30 days of the formal NRC RAI transmittal letter. | |||
Thank you, | |||
Latest revision as of 23:03, 10 January 2025
| ML14055A307 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/24/2014 |
| From: | Jeffrey Whited Plant Licensing Branch 1 |
| To: | Lashley P FirstEnergy Nuclear Operating Co |
| Whited J | |
| Shared Package | |
| ml14055a387 | List: |
| References | |
| Download: ML14055A307 (1) | |
Text
1 Whited, Jeffrey From:
Whited, Jeffrey Sent:
Monday, February 24, 2014 1:13 PM To:
phlashley@firstenergycorp.com Cc:
talentz@firstenergycorp.com
Subject:
SECOND DRAFT-RAI to FENOC PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES Attachments:
DRAFT Capsule Second RAIs.docx Mr. Lashley, By letter dated May 28, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13151A058), as supplemented by letter dated December 13, 2013 (ADAMS Accession No. ML13350A581), First Energy Nuclear Operating Company submitted a request to revise the reactor vessel surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2.
The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined additional information is required to complete the assessment of the submitted information. Please find attached a Draft Request For Additional Information. It is being sent to you to ensure that the question is understandable, the regulatory basis for the question is clear, and to determine if the information was previously docketed. Please respond to me by Friday, February 28, 2013, and notify me if you desire to hold a teleconference to discuss the question. The NRC staff will request a response to the RAIs within 30 days of the formal NRC RAI transmittal letter.
Thank you, JeffreyWhited ProjectManagerBeaverValleyandSusquehanna PlantLicensingBranchI2 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation U.S.NuclearRegulatoryCommission (301)4154090 jeffrey.whited@nrc.gov