{{#Wiki_filter:ATTACHMENT B EXPEDITED SEISMIC EQUIPMENT LIST Fermi 2 Expedited Seismic Evaluation Process     Page Bi of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
{{#Wiki_filter:ATTACHMENT B EXPEDITED SEISMIC EQUIPMENT LIST Fermi 2 Expedited Seismic Evaluation Process Page Bi of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                   OPERATING STATE NORMAL       DESIRED               NOTES/COMMENTS NMBER                ID                          DESCRIPTION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 1           B2104F013A                     NB MSL "D" RELIEF VLV     NC         OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 2           B2104F013B                     NB MSL "C" RELIEF VLV       NC       AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 3           B2104F013C                     NB MSL "B" RELIEF VLV       NC       AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 4           B2104F013D                     NB MSL "B" RELIEF VLV       NC       AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 5           B2104F013E                     NB MSL "C" RELIEF VLV       NC       OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process                 Page B2 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 1
B2104F013A NB MSL "D" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 2
B2104F013B NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 3
B2104F013C NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 4
B2104F013D NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 5
B2104F013E NB MSL "C" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B2 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                   OPERATING STATE NORMAL       DESIRED               NOTES/COMMENTS NMBER                ID                          DESCRIPTION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 6         B2104F013F                     NB MSL "B" RELIEF VLV       NC       AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 7         B2104F013G                     NB MSL "B" RELIEF VLV       NC       AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 8         B2104F013H                     NB MSL "C" RELIEF VLV       NC       OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 9         B2104F013J                     NB MSL "C" RELIEF VLV       NC       AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 10         B2104F013K                     NB MSL "B" RELIEF VLV       NC       AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process                   Page B3 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 6
B2104F013F NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 7
B2104F013G NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 8
B2104F013H NB MSL "C" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 9
B2104F013J NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 10 B2104F013K NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B3 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                   OPERATING STATE NORMAL       DESIRED                 NOTES/COMMENTS NMBER                ID                          DESCRIPTION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT   FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 11         B2104F013L                     NB MSL "A" RELIEF VLV       NC       AVAILABLE   OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER AVAIABLE     SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT   FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 12         B2104F013M                     NB MSL "A" RELIEF VLV       NC       AVAILABLE   OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT   FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 13         B2104F013N                     NB MSL "A" RELIEF VLV       NC       AVAILABLE   OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT   FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 14         B2104F013P                     NB MSL "D" RELIEF VLV       NC       AVAILABLE   OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT   FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 15         B2104F013R                     NB MSL "C" RELIEF VLV       NC       AVAILABLE   OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process                 Page B4 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 11 B2104F013L NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER AVAIABLE SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 12 B2104F013M NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 13 B2104F013N NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 14 B2104F013P NB MSL "D" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 15 B2104F013R NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B4 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                           OPERATING STATE NORMAL       DESIRED               NOTES/COMMENTS NMBER                ID                            DESCRIPTION SCHUTTE & KOERTING HYDRAULIC OPERATED E4100F067                 HPCI TURB STM ISO VLV (H.O.)           NC       OPERABLE   STOP VALVE. OPENS ON E4101C005 START AND 16 TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED HPCI GOVERNOR VALVE (EGR CONTROLLED).
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS SCHUTTE & KOERTING HYDRAULIC OPERATED 16 E4100F067 HPCI TURB STM ISO VLV (H.O.)
E4100F068               HPCI TURB STM CTRL VLV (H.O.)           NC       OPERABLE E41K203. MODULATES+AF94 ON E4101C005 START 17 AND TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED 18           E5150F044               RCIC TURB GOVERNOR CTRL VLV             NO       OPERABLE             RCIC GOVERNOR VALVE.
NC OPERABLE STOP VALVE. OPENS ON E4101C005 START AND TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED HPCI GOVERNOR VALVE (EGR CONTROLLED).
E4100F018               HPCI BARO CNDR VACUUM TANK               NC       THROTTLE   WILL OPEN AND OVERFLOW ONTO HPCI ROOM 19 PRESS RELIEF VLV                                                   FLOOR 20           E4100F122               HPCIRES       REG   UNIT OIL SPLY       NE       ENERGIZED     E41NA01 PS LOGIC IN PUMP RUN CIRCUIT 21           E4100F128             HPCI OIL COOLER THERMOSTATIC         THROTTLE     THROTTLE BYPASS/OUTLET VLV ALLOWS AUTOMATIC RESET OF OVERSPEED 22           E4100F133               HPCI O/S TRIP AUTOMATIC RESET       THROTTLE     THROTTLE     TRIP.FUNCTIONS ON E4101C005 START AND CTRL VLV                                     TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED.
17 E4100F068 HPCI TURB STM CTRL VLV (H.O.)
HPCI COOLING WATER TO TURBINE 23             E41F035                   LUBE OIL COOLER E4100B002         THROTTLE     THROTTLE PRESSURE CONTROL VLV 24           E5100F033           RCIC BARO CNDR PRESS RELIEF VLV             NC       OPERABLE Fermi 2 Expedited Seismic Evaluation Process                         Page B5 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
NC OPERABLE E41K203. MODULATES+AF94 ON E4101C005 START AND TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED 18 E5150F044 RCIC TURB GOVERNOR CTRL VLV NO OPERABLE RCIC GOVERNOR VALVE.
19 E4100F018 HPCI BARO CNDR VACUUM TANK NC THROTTLE WILL OPEN AND OVERFLOW ONTO HPCI ROOM PRESS RELIEF VLV FLOOR 20 E4100F122 HPCIRES REG UNIT OIL SPLY NE ENERGIZED E41NA01 PS LOGIC IN PUMP RUN CIRCUIT 21 E4100F128 HPCI OIL COOLER THERMOSTATIC THROTTLE THROTTLE BYPASS/OUTLET VLV ALLOWS AUTOMATIC RESET OF OVERSPEED 22 E4100F133 HPCI O/S TRIP AUTOMATIC RESET THROTTLE THROTTLE TRIP.FUNCTIONS ON E4101C005 START AND CTRL VLV TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED.
HPCI COOLING WATER TO TURBINE 23 E41F035 LUBE OIL COOLER E4100B002 THROTTLE THROTTLE PRESSURE CONTROL VLV 24 E5100F033 RCIC BARO CNDR PRESS RELIEF VLV NC OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B5 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE ITEM                 ID                           DESCRIPTION           NORMAL         DESIRED             NOTES/COMMENTS NUMBER       ____
ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER RCIC COOLING WATER TO LUBE OIL 25 E51F015 COOLER E5100B002 PRESSURE OFF OPERABLE CONTROL VLV 26 E51F200 RCIC TURB BARO CNDR VACUUM NC OPERABLE TANK VLV V8-4618 PRESS CTRL VLV 27 T4901F613 PCP DIV 2 B/U N2 SPLY PRV BETWEEN NC CLOSED PRESSURE REGULATORS 28 T49F470 PCP DIV 2 B/U N2 SPLY 2ND STAGE THROTTLE THROTTLE PCV DOWN STREAM OF RELIEF VLV 29 T49F471 PCP DIV 2 B/U N2 SPLY 1ST STAGE THROTTLE THROTTLE PCV 30 R1400S022 SWGR 480V INDOOR UNIT NE ENERGIZED NON-VALVE ITEMS. 52X, 52 TC & 52XX ARE PART SUBSTATIONS BUS NO. 72B OF MCC 31 R1400SO23 SWGR 480V INDOOR UNIT NE ENERGIZED NON-VALVE ITEMS. 52X, 52 TC & 52XX ARE PART SUBSTATION BUS NO. 72C OF MCC 32 R1600S002A MCC/DIST CAB 480V MCC 72B-2A NE ENERGIZED NON-VALVE ITEMS 33 R1600S002B MCC/DIST CAB 480V MCC NO 72B-3A NE ENERGIZED NON-VALVE ITEMS 34 R1600S002C MCC/DIST CAB 480V MCC NO 72B-3A NE ENERGIZED NON-VALVE ITEMS 35 R1600S003D MCC 72C-F NE ENERGIZED NON-VALVE ITEMS 36 R1600S004B MCC/DIST CAB 480V MCC NO 72E-5A NE ENERGIZED 37 R1600S005A MCC/DIST CAB 480V MCC NO 72F-2A NE ENERGIZED NON-VALVE ITEMS Fermi 2 Expedited Seismic Evaluation Process Page B6 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
RCIC COOLING WATER TO LUBE OIL 25             E51F015                 COOLER E5100B002 PRESSURE         OFF       OPERABLE CONTROL VLV 26             E51F200               RCIC TURB BARO CNDR VACUUM           NC       OPERABLE TANK VLV V8-4618 PRESS CTRL VLV 27           T4901F613           PCP DIV 2 B/U N2 SPLY PRV BETWEEN       NC         CLOSED PRESSURE REGULATORS 28             T49F470             PCP DIV 2 B/U N2 SPLY 2ND STAGE   THROTTLE     THROTTLE PCV DOWN STREAM OF RELIEF VLV 29             T49F471               PCP DIV 2 B/U N2 SPLY 1ST STAGE   THROTTLE     THROTTLE PCV 30           R1400S022                   SWGR 480V INDOOR UNIT           NE       ENERGIZED NON-VALVE ITEMS. 52X, 52 TC & 52XX ARE PART SUBSTATIONS BUS NO. 72B                                             OF MCC 31           R1400SO23                   SWGR 480V INDOOR UNIT           NE       ENERGIZED NON-VALVE ITEMS. 52X, 52 TC & 52XX ARE PART SUBSTATION BUS NO. 72C                                             OF MCC 32           R1600S002A               MCC/DIST CAB 480V MCC 72B-2A         NE       ENERGIZED             NON-VALVE ITEMS 33           R1600S002B           MCC/DIST CAB 480V MCC NO 72B-3A         NE       ENERGIZED             NON-VALVE ITEMS 34           R1600S002C           MCC/DIST CAB 480V MCC NO 72B-3A         NE       ENERGIZED             NON-VALVE ITEMS 35           R1600S003D                         MCC 72C-F                 NE       ENERGIZED             NON-VALVE ITEMS 36           R1600S004B           MCC/DIST CAB 480V MCC NO 72E-5A         NE       ENERGIZED 37           R1600S005A           MCC/DIST CAB 480V MCC NO 72F-2A         NE       ENERGIZED             NON-VALVE ITEMS Fermi 2 Expedited Seismic Evaluation Process                     Page B6 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
A
A


ESEL       EQUIPMENT                                                         OPERATING STATE NORMAL       DESIRED           NOTES/COMMENTS NMBER                ID                              DESCRIPTION 38           R1600S014A           MCC/DIST CAB 480V MCC NO 72B-4A             NE       ENERGIZED           NON-VALVE ITEMS 39           R3200S015                     DC 260V DC MCC (2PA-1)             NE       ENERGIZED           NON-VALVE ITEMS 40           R3200S016                     DC 260V DC MCC (2PB-1)           NE       ENERGIZED           NON-VALVE ITEMS 41           R1600SOO1C           MCC/DIST CAB 480V MCC NO 72A-4A             NE       ENERGIZED (72A-4A) 42           R3200S003               DC DIV     130/260V DUAL BATT 2PA       NE       ENERGIZED 43           R3200S004                 DC 260/130V DUAL BATT (2PB)           NE       ENERGIZED 44           R3200S020A                 DIV 1 BATTERY CHARGER 2A-1             NE       ENERGIZED           NON-VALVE ITEMS 45           R3200S020C           DV1SAEBT                 RCHGR2A           ND)       ENERGIZED           NON-VALVE ITEMS 46           R3200S021B                 DIV 2 BATTERY CHARGER 2B-2             NE       ENERGIZED           NON-VALVE ITEMS 47           R3200S021C               DC DIV2 2B 1-2 130V BATT CHGR         ND       ENERGIZED           NON-VALVE ITEMS CRTL & AUX RM PNL (MR ONLY)                               POWERE FROM R3200S0061B FEED B21R623A.
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 38 R1600S014A MCC/DIST CAB 480V MCC NO 72B-4A NE ENERGIZED NON-VALVE ITEMS 39 R3200S015 DC 260V DC MCC (2PA-1)
48             HI lP601                   ECCS DIV1 COMBINATION           SUPPORT     SUPPORT   POWER FOR RCIC DEVICES IN Hl 1P601 ARE OPERATING PANEL                                       POWERED FROM H 11P621 PANEL.
NE ENERGIZED NON-VALVE ITEMS 40 R3200S016 DC 260V DC MCC (2PB-1)
CRTL & AUX RM PNL (MR ONLY) 49             HI lP602                   ECCS DIV2 COMBINATION           SUPPORT     SUPPORT     NON-VALVE ITEMS. NO RELAY LOGIC OPERATING PANEL 50             HI11P612           CRTL & AUX RM PNL (MR ONLY) NSSS         SUPPORT     SUPPORT     NON-VALVE ITEMS. NO RELAY LOGIC PROCESS INST CAB DIV2 INST RACK Fermi 2 Expedited Seismic Evaluation Process                         Page B7 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
NE ENERGIZED NON-VALVE ITEMS 41 R1600SOO1C MCC/DIST CAB 480V MCC NO 72A-4A NE ENERGIZED (72A-4A) 42 R3200S003 DC DIV 130/260V DUAL BATT 2PA NE ENERGIZED 43 R3200S004 DC 260/130V DUAL BATT (2PB)
NE ENERGIZED 44 R3200S020A DIV 1 BATTERY CHARGER 2A-1 NE ENERGIZED NON-VALVE ITEMS 45 R3200S020C DV1SAEBT RCHGR2A ND)
ENERGIZED NON-VALVE ITEMS 46 R3200S021B DIV 2 BATTERY CHARGER 2B-2 NE ENERGIZED NON-VALVE ITEMS 47 R3200S021C DC DIV2 2B 1-2 130V BATT CHGR ND ENERGIZED NON-VALVE ITEMS CRTL & AUX RM PNL (MR ONLY)
POWERE FROM R3200S0061B FEED B21R623A.
48 HI lP601 ECCS DIV1 COMBINATION SUPPORT SUPPORT POWER FOR RCIC DEVICES IN Hl 1P601 ARE OPERATING PANEL POWERED FROM H 11P621 PANEL.
CRTL & AUX RM PNL (MR ONLY) 49 HI lP602 ECCS DIV2 COMBINATION SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC OPERATING PANEL 50 HI11P612 CRTL & AUX RM PNL (MR ONLY) NSSS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC PROCESS INST CAB DIV2 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B7 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                         OPERATING STATE NORMAL       DESIRED       NOTES/COMMENTS NMBER                ID                            DESCRIPTION 51           H 1P613           CPROCS&     AU S   CAB Ii INTY NSSS   SUPPORT     SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 52           HI lP621           CRTL & AUX RM PNL (MR ONLY) RCIC       SUPPORT     SUPPORT DIV1 INST RACK 53           H 1P620                       HPCI RELAYS/LIGHTS         SUPPORT     SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 54           H 1P628             CRTL & AUX RM PNL (MR ONLY) SRV       SUPPORT     SUPPORT DIV1 ADS RELAY CAB 55           HI lP622             CTRL AND AUX RM PNL INBD VLV         SUPPORT     SUPPORT CTRL RELAY CAB DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY) 56           HI lP870             MISC DC RELAY PANEL DIV2 INST       SUPPORT     SUPPORT RACK CRTL & AUX RM PNL (MR ONLY) 57           H 1P914             PCAM EQUIP AND MISC RELAY DIV1       SUPPORT     SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC INST RACK CRTL & AUX RM PNL (MR ONLY) PC 58           HIIP915             MON EQUIP & MISC RELAY DIV2 INST       SUPPORT     SUPPORT RACK 59           H21P080             LOC PNL/RACK (MR ONLY) ECCS TRIP       SUPPORT     SUPPORT UNIT CAB DIV1 INST RACK LOC PNL/RACK (MR ONLY) LOCAL 60           H21PO81               PNL AND RACKS DIV2 ECCS TRIP       SUPPORT     SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC UNIT INST RACK Fermi 2 Expedited Seismic Evaluation Process                       Page B8 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 51 H 1P613 CPROCS&
AU S CAB Ii INTY NSSS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 52 HI lP621 CRTL & AUX RM PNL (MR ONLY) RCIC SUPPORT SUPPORT DIV1 INST RACK 53 H 1P620 HPCI RELAYS/LIGHTS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 54 H 1P628 CRTL & AUX RM PNL (MR ONLY) SRV SUPPORT SUPPORT DIV1 ADS RELAY CAB 55 HI lP622 CTRL AND AUX RM PNL INBD VLV SUPPORT SUPPORT CTRL RELAY CAB DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY) 56 HI lP870 MISC DC RELAY PANEL DIV2 INST SUPPORT SUPPORT RACK CRTL & AUX RM PNL (MR ONLY) 57 H 1P914 PCAM EQUIP AND MISC RELAY DIV1 SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC INST RACK CRTL & AUX RM PNL (MR ONLY) PC 58 HIIP915 MON EQUIP & MISC RELAY DIV2 INST SUPPORT SUPPORT RACK 59 H21P080 LOC PNL/RACK (MR ONLY) ECCS TRIP SUPPORT SUPPORT UNIT CAB DIV1 INST RACK LOC PNL/RACK (MR ONLY) LOCAL 60 H21PO81 PNL AND RACKS DIV2 ECCS TRIP SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC UNIT INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B8 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                           OPERATING STATE ITEM                 ID                           DESCRIPTION               NORMAL       DESIRED             NOTES/COMMENTS NUMBER       _  _  _    _  _  _  _    _  _  _  _ _  _ _  _ _ _  _  _    _  _  _  _
ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER 61 H21P082 LOC PNL/RACK (MR ONLY) ECCS RIP SUPPORT SUPPORT POWERED FROM R31K001 IN Hi 1P613 PANEL UNIT CAB DIVi1 INST RACK 62 Hi 1P609 CRTL & AUX RM PNL (MR ONLY) RPS SUPPORT SUPPORT TRIP CAB DIV1 INST RACK 63 Hi 1P611 CRTL & AUX RM PNL (MR ONLY) RPS SUPPORT SUPPORT TRIP CAB DIV2 INST RACK 64 H11P617 CRTL & AUX RM PNL (MR ONLY) DIV1 SUPPORT SUPPORT RHR RELAY CAB INST RACK 65 H11P618 CRTL & AUX RM PNL (MR ONLY) DIV2 SUPPORT SUPPORT T46F046 HPCI BARO CON VAC PUMP DISCHARGE RHR RELAY CAB INST RACK VALVE 66 B21P400 NB SRV DIV2 RELAY CABINET SUPPORT SUPPORT HOUSES RELAY WHICH IF ACTUATED WOULD CAUSE INADVERTANT SRV OPENING 67 B21P401 NB SRV DIV2 RELAY CABINET SUPPORT SUPPORT HOUSESRELAY WHICH IF ACTUATED WOULD CAUSE INADVERTANT SRV OPENING 68 H21P004 VESSEL LV RESS IV INST RACK SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 69 H21P595B LOC PNL/RACK (MR ONLY) DRYWELL SUPPORT SUPPORT MON DIV2 INST RACK 70 H21P408 LOC PNL/RACK (MR ONLY) AIR SUPPORT SUPPORT COMPS INST RACK 71 H21P614B LOC PNL/RACK (MR ONLY) TORUS SUPPORT SUPPORT MON SYS INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B9 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
61             H21P082           LOC PNL/RACK (MR ONLY) ECCS       RIP   SUPPORT     SUPPORT   POWERED FROM R31K001 IN Hi 1P613 PANEL UNIT CAB DIVi1 INST RACK 62             Hi 1P609           CRTL & AUX RM PNL (MR ONLY) RPS         SUPPORT     SUPPORT TRIP CAB DIV1 INST RACK 63             Hi1P611            CRTL & AUX RM PNL (MR ONLY) RPS         SUPPORT     SUPPORT TRIP CAB DIV2 INST RACK 64             H11P617           CRTL & AUX RM PNL (MR ONLY) DIV1         SUPPORT     SUPPORT RHR RELAY CAB INST RACK 65             H11P618           CRTL & AUX RM PNL (MR ONLY) DIV2         SUPPORT     SUPPORT T46F046 HPCI BARO CON VAC PUMP DISCHARGE RHR RELAY CAB INST RACK                                                 VALVE 66             B21P400                 NB SRV DIV2 RELAY CABINET         SUPPORT     SUPPORT HOUSES RELAY WHICH IF ACTUATED WOULD CAUSE INADVERTANT SRV OPENING 67             B21P401                 NB SRV DIV2 RELAY CABINET         SUPPORT     SUPPORT HOUSESRELAY WHICH IF ACTUATED WOULD CAUSE INADVERTANT SRV OPENING 68             H21P004           VESSEL LV           RESS IV INST RACK   SUPPORT     SUPPORT     NON-VALVE ITEMS. NO RELAY LOGIC 69           H21P595B             LOC PNL/RACK (MR ONLY) DRYWELL           SUPPORT     SUPPORT MON DIV2 INST RACK 70             H21P408                 LOC PNL/RACK (MR ONLY) AIR         SUPPORT     SUPPORT COMPS INST RACK 71           H21P614B               LOC PNL/RACK (MR ONLY) TORUS         SUPPORT     SUPPORT MON SYS INST RACK Fermi 2 Expedited Seismic Evaluation Process                         Page B9 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                     OPERATING STATE NORMAL         DESIRED NOTES/COMMENTS NMBER                ID                            DESCRIPTION 72           H21P631B             LOCAL PNL AND RACKS DIV2 TORUS     SUPPORT       SUPPORT PRESS INSTRUMENTATION RACK 73             H21P014             LOC PNL/RACK (MR ONLY) HPCI ESS   SUPPORT       SUPPORT DIV2 INST RACK 74             H21P017             LOC PNL/RACK (MR ONLY) RCIC DIVI   SUPPORT       SUPPORT INST RACK 75           T49P400B                 PC PNEU DIV2 SPLY INST RACK   SUPPORT       SUPPORT 76           H21P501A               LOC PNL/RACK (MR ONLY) PILOT     SUPPORT       SUPPORT VLVDIV1 INST RACK 77           H21P501B             LOC PNL/RACK (MR ONLY) CA DIV2     SUPPORT       SUPPORT PILOT VLVINST RACK 78             HI lP923           CRTL & AUX RM PNL (MR ONLY) RCIC     SUPPORT       SUPPORT TURB CTRL PANEL INST RACK CRTL & AUX RM PNL (MR ONLY) HPCI 79             HI lP929             RELAY RM GOVERNOR CTRL INST       SUPPORT       SUPPORT RACK 80           R3200SO26             DC BATT SPB MAIN DIST CABINET         NE       ENERGIZED 2PA-2 81           R3200SO27             DC BATT 2PB MAIN DIST CABINET         NE       ENERGIZED 2PB-2 82           R3200S062             DC SWGR ROOM 130V DIST CABINET         NE       ENERGIZED 2PA2-14 Fermi 2 Expedited Seismic Evaluation Process                   Page B 10 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 72 H21P631B LOCAL PNL AND RACKS DIV2 TORUS SUPPORT SUPPORT PRESS INSTRUMENTATION RACK 73 H21P014 LOC PNL/RACK (MR ONLY) HPCI ESS SUPPORT SUPPORT DIV2 INST RACK 74 H21P017 LOC PNL/RACK (MR ONLY) RCIC DIVI SUPPORT SUPPORT INST RACK 75 T49P400B PC PNEU DIV2 SPLY INST RACK SUPPORT SUPPORT 76 H21P501A LOC PNL/RACK (MR ONLY) PILOT SUPPORT SUPPORT VLVDIV1 INST RACK 77 H21P501B LOC PNL/RACK (MR ONLY) CA DIV2 SUPPORT SUPPORT PILOT VLVINST RACK 78 HI lP923 CRTL & AUX RM PNL (MR ONLY) RCIC SUPPORT SUPPORT TURB CTRL PANEL INST RACK CRTL & AUX RM PNL (MR ONLY) HPCI 79 HI lP929 RELAY RM GOVERNOR CTRL INST SUPPORT SUPPORT RACK 80 R3200SO26 DC BATT SPB MAIN DIST CABINET NE ENERGIZED 2PA-2 81 R3200SO27 DC BATT 2PB MAIN DIST CABINET NE ENERGIZED 2PB-2 82 R3200S062 DC SWGR ROOM 130V DIST CABINET NE ENERGIZED 2PA2-14 Fermi 2 Expedited Seismic Evaluation Process Page B 10 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE NORMAL         DESIRED                 NOTES/COMMENTS NMBER                ID                            DESCRIPTION 83           E5101C002               RCIC REACTOR CORE ISOLATION           OFF       OPERABLE COOLING TURBINE 84           E4101COO1A                           HPCI MAIN PUMP           OFF       OPERABLE 85           E4101C003                 E4101C003 HPCI BAROMETRIC         OFF       OPERABLE TRIP AFTER 5 MINUTES ON LOCA HI DW PRESSURE CONDENSER VACUUM PUMP                                                       ACTUATION 86           E5101C001               RCIC REACTOR CORE ISOLATION           OFF       OPERABLE COOLING PUMP HPCI TEST LINE ISO / PRESS CTRL                           ELECTRICAL TEST CIRCUIT ONLY. SEE I-2225-01; I-87             E41F011                                 AOV                 NC           OPEN     2221-06; M-5721-1 MANUALLY OPENED UNDER FLEX POWERED IN HI 1P870 CKT 27 REQUIRED AS SRVS 88           T4901F469               PC PNEU DIV2 N2 SPLY ISO AOV       NO/FC         OPEN       F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE ACCUMULATOR BANK CURRENT AC SOLENOID (T50F420B) ENERGIZE TO OPEN USES T50K800B TO INVERT FROM 2PB2-5.
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 83 E5101C002 RCIC REACTOR CORE ISOLATION OFF OPERABLE COOLING TURBINE 84 E4101COO1A HPCI MAIN PUMP OFF OPERABLE 85 E4101C003 E4101C003 HPCI BAROMETRIC OFF OPERABLE TRIP AFTER 5 MINUTES ON LOCA HI DW PRESSURE CONDENSER VACUUM PUMP ACTUATION 86 E5101C001 RCIC REACTOR CORE ISOLATION OFF OPERABLE COOLING PUMP HPCI TEST LINE ISO / PRESS CTRL ELECTRICAL TEST CIRCUIT ONLY. SEE I-2225-01; I-87 E41F011 AOV NC OPEN 2221-06; M-5721-1 MANUALLY OPENED UNDER FLEX POWERED IN HI 1P870 CKT 27 REQUIRED AS SRVS 88 T4901F469 PC PNEU DIV2 N2 SPLY ISO AOV NO/FC OPEN F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE ACCUMULATOR BANK CURRENT AC SOLENOID (T50F420B) ENERGIZE TO OPEN USES T50K800B TO INVERT FROM 2PB2-5.
89           T5000F420B               PCAM PC PRESS MON T50L406B PT         FC       OPERABLE MODIFICATION 37114 WILL INSTALL FOR FLEX AN OTBD SAMPLE AOV                                   MANUALLY ACTIVATED DC OPERATED SV AND AIRSUPPLY TO OPEN THIS VALVE UNDER FLEX STRATEGY.
89 T5000F420B PCAM PC PRESS MON T50L406B PT FC OPERABLE MODIFICATION 37114 WILL INSTALL FOR FLEX AN OTBD SAMPLE AOV MANUALLY ACTIVATED DC OPERATED SV AND AIRSUPPLY TO OPEN THIS VALVE UNDER FLEX STRATEGY.
CURRENT AC SOLENOID (T50F420B) ENERGIZE TO OPEN USES T50K800B TO INVERT FROM R3 1K005 90           T5000F421B           PCAM PC TORUS WTR LVL MON DIV2           FC       OPERABLE FROM 2PB2-5. MODIFICATION 37114 WILL INSTALL TORUS LVL INST LINE ISO AOV                                 FOR FLEX AN MANUALLY ACTIVATED DC OPERATED SV AND AIRSUPPLY TO OPEN THIS VALVE UNDER FLEX STRATEGY.
CURRENT AC SOLENOID (T50F420B) ENERGIZE TO OPEN USES T50K800B TO INVERT FROM R3 1K005 90 T5000F421B PCAM PC TORUS WTR LVL MON DIV2 FC OPERABLE FROM 2PB2-5. MODIFICATION 37114 WILL INSTALL TORUS LVL INST LINE ISO AOV FOR FLEX AN MANUALLY ACTIVATED DC OPERATED SV AND AIRSUPPLY TO OPEN THIS VALVE UNDER FLEX STRATEGY.
Fermi 2 Expedited Seismic Evaluation Process                     Page B 11 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
Fermi 2 Expedited Seismic Evaluation Process Page B 11 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                     OPERATING STATE NORMAL       DESIRED               NOTES/COMMENTS NMBER                ID                          DESCRIPTION GENERIC ALL MSIVS ARE NOT INCLUDED AS A LOSS OF RPS ON LOSS OF 480V AC TRIPS THE RPS WHICH OPENS THE K7 SERIES CONTACTS FOR 91           B2103F022A                 NB MSL "A" INBD PC ISO AOV       NO       CLOSED BOTH DC AND AC SOLENIODS. NEEDS TO CHANGE STATE FROM OPEN TO CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS GENERIC ALL MSIVS ARE NOT INCLUDED AS A LOSS OF RPS ON LOSS OF 480V AC TRIPS THE RPS WHICH OPENS THE K7 SERIES CONTACTS FOR 91 B2103F022A NB MSL "A" INBD PC ISO AOV NO CLOSED BOTH DC AND AC SOLENIODS. NEEDS TO CHANGE STATE FROM OPEN TO CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
NEEDS TO CHANGE STATE FROM OPEN TO 92           B2103F022B                 NB MSL "B" INBD PC ISO AOV       NO       CLOSED   CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
NEEDS TO CHANGE STATE FROM OPEN TO 92 B2103F022B NB MSL "B" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
SPRING TO CLOSE OPERATOR.
SPRING TO CLOSE OPERATOR.
NEEDS TO CHANGE STATE FROM OPEN TO 93           B2103F022C                 NB MSL "C" INBD PC ISO AOV       NO       CLOSED   CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
NEEDS TO CHANGE STATE FROM OPEN TO 93 B2103F022C NB MSL "C" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
SPRING TO CLOSE OPERATOR.
SPRING TO CLOSE OPERATOR.
NEEDS TO CHANGE STATE FROM OPEN TO 94           B2103F022D                 NB MSL "D" INBD PC ISO AOV       NO       CLOSED   CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
NEEDS TO CHANGE STATE FROM OPEN TO 94 B2103F022D NB MSL "D" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
SPRING TO CLOSE OPERATOR.
SPRING TO CLOSE OPERATOR.
NEEDS TO CHANGE STATE FROM OPEN TO 95           B2103F028A                 NB MSL "A" OTBD PC ISO AOV       NO       CLOSED   CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
NEEDS TO CHANGE STATE FROM OPEN TO 95 B2103F028A NB MSL "A" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
SPRING TO CLOSE OPERATOR.
SPRING TO CLOSE OPERATOR.
Fermi 2 Expedited Seismic Evaluation Process                   Page B 12 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
Fermi 2 Expedited Seismic Evaluation Process Page B 12 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
A'
A'


ESEL       EQUIPMENT                                                     OPERATING STATE NORMAL       DESIRED               NOTES/COMMENTS NMBER                ID                          DESCRIPTION NEEDS TO CHANGE STATE FROM OPEN TO 96           B2103F028B                 NB MSL "B" OTBD PC ISO AOV       NO         CLOSED   CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NEEDS TO CHANGE STATE FROM OPEN TO 96 B2103F028B NB MSL "B" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
SPRING TO CLOSE OPERATOR.
SPRING TO CLOSE OPERATOR.
NEEDS TO CHANGE STATE FROM OPEN TO 97           B2103F028C                 NB MSL "C" OTBD PC ISO AOV       NO         CLOSED   CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
NEEDS TO CHANGE STATE FROM OPEN TO 97 B2103F028C NB MSL "C" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
SPRING TO CLOSE OPERATOR.
SPRING TO CLOSE OPERATOR.
NEEDS TO CHANGE STATE FROM OPEN TO 98           B2103F028D                 NB MSL "D" OTBD PC ISO AOV       NO         CLOSED   CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
NEEDS TO CHANGE STATE FROM OPEN TO 98 B2103F028D NB MSL "D" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.
SPRING TO CLOSE OPERATOR.
SPRING TO CLOSE OPERATOR.
LOSS OF 120V AC POWER TO BOP BUS (R3101S002) 99           P5000F440           NIAS STATION AIR TO CONTROL AIR       NO         CLOSED   DEENERGIZES SOLENOID IN H21P501A RACK.
LOSS OF 120V AC POWER TO BOP BUS (R3101S002) 99 P5000F440 NIAS STATION AIR TO CONTROL AIR NO CLOSED DEENERGIZES SOLENOID IN H21P501A RACK.
ISO AOV                                 VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S001) 100           P5000F441           NIAS STATION AIR TO CONTROL AIR       NO         CLOSED   DEENERGIZES SOLENOID IN H2iP50B RACK.
ISO AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S001) 100 P5000F441 NIAS STATION AIR TO CONTROL AIR NO CLOSED DEENERGIZES SOLENOID IN H2iP50B RACK.
ISO AOV                                 VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S003) 101           P5000F401             SA TURBINE BUILDING HEADER ISO       NO         CLOSED     DEENERGIZES SOLENOID IN H21P408 RACK.
ISO AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S003) 101 P5000F401 SA TURBINE BUILDING HEADER ISO NO CLOSED DEENERGIZES SOLENOID IN H21P408 RACK.
AOV                                   VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION 102           E5150F095             RCIC WARM-UP BYPASS INLET MOV       NC       OPERABLE Fermi 2 Expedited Seismic Evaluation Process                   Page B13 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION 102 E5150F095 RCIC WARM-UP BYPASS INLET MOV NC OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B13 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE NORMAL       DESIRED NOTES/COMMENTS NMBER                ID                            DESCRIPTION CLOSURE OF REACTOR RECIRC PUMP 103         B3105F023A               A SEAL LEAKAGE SOURCE, RRA           NO       CLOSED SUCTION VALVE CLOSURE OF REACTOR RECIRC PUMP 104         B3105F023B               B SEAL LEAKAGE SOURCE, RRB           NO       CLOSED SUCTION VALVE CLOSURE OF REACTOR RECIRC PUMP 105         B3105F031A               A SEAL LEAKAGE SOURCE, RRA           NO       CLOSED DISCHARGE VALVE CLOSURE OF REACTOR RECIRC PUMP 106         B3105F031B               B SEAL LEAKAGE SOURCE, RRB           NO       CLOSED DISCHARGE VALVE 107         E1150F015A                 RHR DIV1 LPCI INBD ISO MOV         NC         OPEN 108         E1150F015B           E1150F015B, RHR DIV2 LPCI INBD ISO       NC         OPEN MOV 109         E1150F017A                       RHR DIV1 LPCI MOV           NO         OPEN 110         E1150F017B               E1150F17B,RHR DIV2 LPCI MOV         NO         OPEN 111         E1150F024A             RHR DIV1 CNTM COOLING/TEST ISO           C       OPEN MOV 112         E1150F024B                 E1150F024B, RHR DIV2 CNTM         NC         OPEN COOLING/ TEST ISO MOV, DIV. 2 113         E1150F028A             RHR DIV1 SUPR POOL CNTM SPRAY TEST ISO MOV, DIV. 1         NC         OPEN Fermi 2 Expedited Seismic Evaluation Process                     Page B14 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS CLOSURE OF REACTOR RECIRC PUMP 103 B3105F023A A SEAL LEAKAGE SOURCE, RRA NO CLOSED SUCTION VALVE CLOSURE OF REACTOR RECIRC PUMP 104 B3105F023B B SEAL LEAKAGE SOURCE, RRB NO CLOSED SUCTION VALVE CLOSURE OF REACTOR RECIRC PUMP 105 B3105F031A A SEAL LEAKAGE SOURCE, RRA NO CLOSED DISCHARGE VALVE CLOSURE OF REACTOR RECIRC PUMP 106 B3105F031B B SEAL LEAKAGE SOURCE, RRB NO CLOSED DISCHARGE VALVE 107 E1150F015A RHR DIV1 LPCI INBD ISO MOV NC OPEN 108 E1150F015B E1150F015B, RHR DIV2 LPCI INBD ISO NC OPEN MOV 109 E1150F017A RHR DIV1 LPCI MOV NO OPEN 110 E1150F017B E1150F17B, RHR DIV2 LPCI MOV NO OPEN 111 E1150F024A RHR DIV1 CNTM COOLING/TEST ISO C
OPEN MOV 112 E1150F024B E1150F024B, RHR DIV2 CNTM NC OPEN COOLING/ TEST ISO MOV, DIV. 2 113 E1150F028A RHR DIV1 SUPR POOL CNTM SPRAY TEST ISO MOV, DIV. 1 NC OPEN Fermi 2 Expedited Seismic Evaluation Process Page B14 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE NORMAL         DESIRED           NOTES/COMMENTS NMBER                ID                          DESCRIPTION 114         E1150F028B               E1150F028B, RHR DIV2 SUPR POOL       NC           OPEN CNTM SPRAY/TEST ISO MOV 115           E4150F001                 HPCI STEAM SUPPLY TO TURB           NC       OPERABLE DRIVEN PUMP 116           E4150F002                         RPV INJECTION             NO         OPERABLE   SEISMIC WALKDOWN DEFERED TO RF16 117           E4150F003                         RPV INJECTION             NC       OPERABLE 118           E4150F004                         RPV INJECTION             NO         CLOSED NOT REQUIRED AS ITS ASSUMED CST FAILS NEEDS TO BE CLOSED TO OPEN E4150F041 119           E4150F021             HPCI TURB EXHAUST STOP GLOBE         NC         OPERABLE MOV 120           E4150F059               HPCI LUBE OIL COOLING WATER         NC           OPEN SPLY ISO MOV 121           E4150F008           HPCI MAIN PUMP TEST LINE ISO MOV       NC         OPERABLE 122           E4150F022           HPCI TURB EXH CONDENSATE DRAIN     THROTTLE       THROTTLE TO SUPR POOL STOP CHECK MOV 123           E5150F001             RCIC TURB EXHAUST LINE ISO MOV         NC       OPERABLE 124           E415OF041               HPCI BOOSTER PUMP SUCT FROM SUPR POOL ISO MOV           NC           OPEN       NEED F004 CLOSED TO OPEN F041 125           E4150F042               HPCI BOOSTER PUMP SUCT FROM         NC           OPEN SUPR POOL ISO MOV 126           E5150F002               RCIC BARO CNDR VACUUM PUMP           NC         OPERABLE DISCHARGE STOP CHECK MOV Fermi 2 Expedited Seismic Evaluation Process                     Page B 15 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 114 E1150F028B E1150F028B, RHR DIV2 SUPR POOL NC OPEN CNTM SPRAY/TEST ISO MOV 115 E4150F001 HPCI STEAM SUPPLY TO TURB NC OPERABLE DRIVEN PUMP 116 E4150F002 RPV INJECTION NO OPERABLE SEISMIC WALKDOWN DEFERED TO RF16 117 E4150F003 RPV INJECTION NC OPERABLE 118 E4150F004 RPV INJECTION NO CLOSED NOT REQUIRED AS ITS ASSUMED CST FAILS NEEDS TO BE CLOSED TO OPEN E4150F041 119 E4150F021 HPCI TURB EXHAUST STOP GLOBE NC OPERABLE MOV 120 E4150F059 HPCI LUBE OIL COOLING WATER NC OPEN SPLY ISO MOV 121 E4150F008 HPCI MAIN PUMP TEST LINE ISO MOV NC OPERABLE 122 E4150F022 HPCI TURB EXH CONDENSATE DRAIN THROTTLE THROTTLE TO SUPR POOL STOP CHECK MOV 123 E5150F001 RCIC TURB EXHAUST LINE ISO MOV NC OPERABLE 124 E415OF041 HPCI BOOSTER PUMP SUCT FROM SUPR POOL ISO MOV NC OPEN NEED F004 CLOSED TO OPEN F041 125 E4150F042 HPCI BOOSTER PUMP SUCT FROM NC OPEN SUPR POOL ISO MOV 126 E5150F002 RCIC BARO CNDR VACUUM PUMP NC OPERABLE DISCHARGE STOP CHECK MOV Fermi 2 Expedited Seismic Evaluation Process Page B 15 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL         EQUIPMENT                                                     OPERATING STATE ITEM                   ID                           DESCRIPTION         NORMAL       DESIRED                           NOTES/COMMENTS NUMBER       __________                                                                          ________________________________
ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER 127 E5150F007 RCICI TURB STM SPLY INBO CNTM NO/FO OPEN ISO MOV 128 E5150F008 RCICI TURB STM SPLY ONBO CNTM NO/FO OPEN ISO MOV 129 E5150F012 RCIC PUMP DISCHARGE ISO MOV NO OPERABLE 130 E5150F013 RCIC PUMP SPLY TO FEEDWATER NC OPERABLE HEADER ISO MOV 131 T4901F602 COMPR AIR PC PNEU DIV2 INST N2 NO OPEN INERTING SPY INBRD PC ISO MOV 132 E5150F019 RCIC PUMP MIN FLOW RECIRC NC CLOSED BYPASS MOV 133 E5150F029 RCIC PUMP SPLY FROM TORUS ISO NC OPERABLE MOV 134 E5150F031 RCIC PUMP SPLY FROM TORUS ISO NC OPERABLE MOV 135 E5150F045 RCIC TURB STM INLET ISO MOV NC OPERABLE 136 E5150F046 RCIC LUBE OIL COOLER COOLING NC OPEN WATER SPLY ISO MOV 137 E41F400 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 1B; 33X-IA) 138 E41F401 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 2BC; 33X-2A)
127             E5150F007             RCICI TURB STM SPLY INBO CNTM     NO/FO         OPEN ISO MOV 128           E5150F008           RCICI TURB STM SPLY ONBO CNTM       NO/FO         OPEN ISO MOV 129           E5150F012               RCIC PUMP DISCHARGE ISO MOV       NO       OPERABLE 130           E5150F013             RCIC PUMP SPLY TO FEEDWATER         NC       OPERABLE HEADER ISO MOV 131           T4901F602             COMPR AIR PC PNEU DIV2 INST N2       NO           OPEN INERTING SPY INBRD PC ISO MOV 132           E5150F019               RCIC PUMP MIN FLOW RECIRC         NC         CLOSED BYPASS MOV 133           E5150F029             RCIC PUMP SPLY FROM TORUS ISO       NC       OPERABLE MOV 134           E5150F031             RCIC PUMP SPLY FROM TORUS ISO       NC       OPERABLE MOV 135           E5150F045               RCIC TURB STM INLET ISO MOV       NC         OPERABLE 136           E5150F046             RCIC LUBE OIL COOLER COOLING       NC           OPEN WATER SPLY ISO MOV 137             E41F400             HPCI PCM - SUPR POOL SOLENOID       NE       ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV                                                                     1B; 33X-IA) 138             E41F401             HPCI PCM - SUPR POOL SOLENOID       NE       ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV                                                                   2BC; 33X-2A)
Fermi 2 Expedited Seismic Evaluation Process Page B16 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
Fermi 2 Expedited Seismic Evaluation Process                   Page B16 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE NORMAL       DESIRED               NOTES/COMMENTS NMBER                ID                            DESCRIPTION 139           T50F412A             PCAM PC TORUS LVL MON DIV1 SOV         ND       OPERABLE SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-SOV                                                       _A; 33X-_B) 140           T50F412B           PCAM PC TORUS LVL MON DIV2 SOV         ND       OPERABLE   RELAYS ARE INSIDE VALVE HOUSING. (33X-_A; SOV                                                         33X-_B) 141           E5100B001                         RCIC BARO CNDR         SUPPORT       SUPPORT   E501C003 & E5101C004 OPERATE THIS DEVICE 142           E41K603             HPCI DC TO AC VOLTAGE INVERTER         NE       ENERGIZED               NON-VALVE ITEMS PWR SPLY 143           R31K001             VITAL PWR DIT 120 VAC DIV1 2KVA         NE       ENERGIZED               NON-VALVE ITEMS 144           R31K002             VITAL PWR DIST 120 VAC DIV1 2KVA       NE       ENERGIZED         SUPPLIES POWER TO B21R623A INVERTER VITAL PWR DIST 120 VAC DIVi1 2KVA 145           R31K004             V           W1ERTER                     NE       ENERGIZED               NON-VALVE ITEMS 146           R31K005             VITAL PWR DIST 120 VAC DIV1 2KVA       NE       ENERGIZED               NON-VALVE ITEMS INVERTER               N         NRIE                   O-AV         TM LOC PNL/RACK (MR ONLY) DSD MCC 147           H21P625               72C-3A LOCAL CTRL PANEL LOCAL     SUPPORT       SUPPORT PNL & RACKS T50P402               PCAM PC TEMP MON DIV2 SUPR 148         (H21P584L)               CHAMBER N403B, N402B, N404B &     SUPPORT       SUPPORT N405B TERM PNL 149         R3200S061A               DC RR 130V DIST CABINET 2PA2-5       NE       ENERGIZED Fermi 2 Expedited Seismic Evaluation Process                     Page B17 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 139 T50F412A PCAM PC TORUS LVL MON DIV1 SOV ND OPERABLE SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-SOV
_A; 33X-_B) 140 T50F412B PCAM PC TORUS LVL MON DIV2 SOV ND OPERABLE RELAYS ARE INSIDE VALVE HOUSING. (33X-_A; SOV 33X-_B) 141 E5100B001 RCIC BARO CNDR SUPPORT SUPPORT E501C003 & E5101C004 OPERATE THIS DEVICE 142 E41K603 HPCI DC TO AC VOLTAGE INVERTER NE ENERGIZED NON-VALVE ITEMS PWR SPLY 143 R31K001 VITAL PWR DIT 120 VAC DIV1 2KVA NE ENERGIZED NON-VALVE ITEMS 144 R31K002 VITAL PWR DIST 120 VAC DIV1 2KVA NE ENERGIZED SUPPLIES POWER TO B21R623A INVERTER VITAL PWR DIST 120 VAC DIVi1 2KVA 145 R31K004 V
W1ERTER NE ENERGIZED NON-VALVE ITEMS 146 R31K005 VITAL PWR DIST 120 VAC DIV1 2KVA NE ENERGIZED NON-VALVE ITEMS INVERTER N
NRIE O-AV TM LOC PNL/RACK (MR ONLY) DSD MCC 147 H21P625 72C-3A LOCAL CTRL PANEL LOCAL SUPPORT SUPPORT PNL & RACKS T50P402 PCAM PC TEMP MON DIV2 SUPR 148 (H21P584L)
CHAMBER N403B, N402B, N404B &
SUPPORT SUPPORT N405B TERM PNL 149 R3200S061A DC RR 130V DIST CABINET 2PA2-5 NE ENERGIZED Fermi 2 Expedited Seismic Evaluation Process Page B17 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                         OPERATING STATE NORMAL         DESIRED             NOTES/COMMENTS NMBER                ID                          DESCRIPTION 150         R3200S061B               DC RR 130V DIST CABINET 2PA2-6         NE       ENERGIZED 151         R3200S064A               DC RR 130V DIST CABINET 2PB2-5         NE       ENERGIZED 152         R3200S064B               DC RR 130V DIST CABINET 2PB2-6         NE       ENERGIZED 153           B21NO51A             NB RPV PXE DIV 1 REACTOR VESSEL           NE       ENERGIZED             NON-VALVE ITEMS 154           E41N019                 HPCI SUCTION/ DISCH PRESSURE         NE       ENERGIZED             NON-VALVE ITEMS GAUGE 155           B21NO91A             NB RX LVL 1LTRIP WIDE RNG) DIV1         NE       ENERGIZED             NON-VALVE ITEMS REACTOR WATR VLWD 156           B21NO91C                 REACTOR WATER LEVEL - WIDE           NE       ENERGIZED             NON-VALVE ITEMS 157           B21N691A               NB RX LVL (1)TRIP UNIT DIV1 LVL         NE       ENERGIZED NON-VALVE ITEMS. SEE RELAY FOR B21NO91A 158           B21N691C               NB RX LVL (1) TRIP UNIT DIV1 LVL       NE       ENERGIZED NON-VALVE ITEMS. SEE RELAY FOR B21N091C NB RPV LVL & PRESS RECORDER 159           B21R623A                 POST ACCIDENT MONITORING             NE       ENERGIZED       POWERED FROM R3 1K002 IN H 11P613 RECORDER THIS EQUIPMENT DOES NOT NEED TO OPERATE 160           E41N062B             HPCI HI LVL SIGNAL TO SUPR POOL         NE       DEENERGIZE BUT IS NEEDED FOR THE COMPLETION OF THE SUCT VLV LVL TRANSMITTER                           D         "SUCCESS PATH" DUE TO THE PRESSURE BOUNDARY REASONS. NON-VALVE ITEMS Fermi 2 Expedited Seismic Evaluation Process                     Page B 18 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 150 R3200S061B DC RR 130V DIST CABINET 2PA2-6 NE ENERGIZED 151 R3200S064A DC RR 130V DIST CABINET 2PB2-5 NE ENERGIZED 152 R3200S064B DC RR 130V DIST CABINET 2PB2-6 NE ENERGIZED 153 B21NO51A NB RPV PXE DIV 1 REACTOR VESSEL NE ENERGIZED NON-VALVE ITEMS 154 E41N019 HPCI SUCTION/ DISCH PRESSURE NE ENERGIZED NON-VALVE ITEMS GAUGE 155 B21NO91A NB RX LVL 1LTRIP WIDE RNG) DIV1 NE ENERGIZED NON-VALVE ITEMS REACTOR WATR VLWD 156 B21NO91C REACTOR WATER LEVEL - WIDE NE ENERGIZED NON-VALVE ITEMS 157 B21N691A NB RX LVL (1)TRIP UNIT DIV1 LVL NE ENERGIZED NON-VALVE ITEMS. SEE RELAY FOR B21NO91A 158 B21N691C NB RX LVL (1) TRIP UNIT DIV1 LVL NE ENERGIZED NON-VALVE ITEMS. SEE RELAY FOR B21N091C NB RPV LVL & PRESS RECORDER 159 B21R623A POST ACCIDENT MONITORING NE ENERGIZED POWERED FROM R3 1K002 IN H 11P613 RECORDER THIS EQUIPMENT DOES NOT NEED TO OPERATE 160 E41N062B HPCI HI LVL SIGNAL TO SUPR POOL NE DEENERGIZE BUT IS NEEDED FOR THE COMPLETION OF THE SUCT VLV LVL TRANSMITTER D  
"SUCCESS PATH" DUE TO THE PRESSURE BOUNDARY REASONS. NON-VALVE ITEMS Fermi 2 Expedited Seismic Evaluation Process Page B 18 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE NORMAL       DESIRED                 NOTES/COMMENTS NMBER                ID                          DESCRIPTION E51R001                 RCIC PUMP DISCHARGE PRESS         NE       ENERGIZED       NON-VALVE ITEMS. NOT ELECTRICALLY 161 INDICATOR                                               CONNECTED. SEE I-2282-22 RCIC PUMP SUCT PRESS INDICATOR       NE       ENERGIZED       NON-VALV     TEMS. NOT ELECT-CALLY 162            E51R002 163           E41K200               HPCI TURB GOVERNOR (EG-M) SPD       NE       ENERGIZED         ON HI 1P929 POWERED FROM H 11P620 CTRLR 164           E41K201                 HPCI TURB SPD MILLIVOLT TO       NE       ENERGIZED         ON H 11P929 POWERED FROM H 11P620 CURRENT CONVERTER CONVERTER SPD SIG CND (EG-R) 166           E41K204                 HPCI TURB GOVERNOR HI 1P929                                               POWERED FROM HI1P620 RESISTOR BOX             N         NRIE             NH   P2   OEE     RMH P2 167           E41K615               HPCI PUMP FLOW RATE FLOW IND         NE       ENERGIZED           LOCATED ON H 11P602 PANEL 168           E41K826                 HPCI FLOW CTRL (TURB CTRL)       NE       ENERGIZED                 IN PANEL Hi 1P620 SIGNAL HPCI PUMP DISCHARGE FLOW 169           E41NO08                   SIGNAL TO TURB CTRL FLOW         NE       ENERGIZED                 ON PANEL H21P014 TRANSMITTER 170           E41N212             HPCI TURB MAGNETIC PICK-UP SPD       NE       ENERGIZED               ON HPCI TURBINE SKID ELEMENT 171           E41NA01             HPCI AUX OIL PUMP START/MAIN OIL       OFF       OPERABLE               ON HPCI TURBINE SKID PUMP TRIP PRESS SWOF                 OPRBEOHCITBIESD Fermi 2 Expedited Seismic Evaluation Process                   Page B19 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 161 E51R001 RCIC PUMP DISCHARGE PRESS NE ENERGIZED NON-VALVE ITEMS. NOT ELECTRICALLY INDICATOR CONNECTED. SEE I-2282-22 162 E51R002 RCIC PUMP SUCT PRESS INDICATOR NE ENERGIZED NON-VALV TEMS. NOT ELECT-CALLY 163 E41K200 HPCI TURB GOVERNOR (EG-M) SPD NE ENERGIZED ON HI 1P929 POWERED FROM H 11P620 CTRLR 164 E41K201 HPCI TURB SPD MILLIVOLT TO NE ENERGIZED ON H 11P929 POWERED FROM H 11P620 CURRENT CONVERTER CONVERTER SPD SIG CND (EG-R) 166 E41K204 HPCI TURB GOVERNOR HI 1P929 POWERED FROM HI1P620 RESISTOR BOX N
NRIE NH P2 OEE RMH P2 167 E41K615 HPCI PUMP FLOW RATE FLOW IND NE ENERGIZED LOCATED ON H 11P602 PANEL 168 E41K826 HPCI FLOW CTRL (TURB CTRL)
NE ENERGIZED IN PANEL Hi 1P620 SIGNAL HPCI PUMP DISCHARGE FLOW 169 E41NO08 SIGNAL TO TURB CTRL FLOW NE ENERGIZED ON PANEL H21P014 TRANSMITTER 170 E41N212 HPCI TURB MAGNETIC PICK-UP SPD NE ENERGIZED ON HPCI TURBINE SKID ELEMENT 171 E41NA01 HPCI AUX OIL PUMP START/MAIN OIL OFF OPERABLE ON HPCI TURBINE SKID PUMP TRIP PRESS SWOF OPRBEOHCITBIESD Fermi 2 Expedited Seismic Evaluation Process Page B19 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                     OPERATING STATE NORMAL       DESIRED NOTES/COMMENTS NMBER                ID                            DESCRIPTION 172           E41R613                   HPCI MAIN PUMP E410100C1A       NE       ENERGIZED   ON H11P602 DISCHARGE ELEC FLOW INDICATOR         N         NRIE         NH P0 173           E51K200                 RCIC TURB EGM'CTRL BOX SPD       NE         OPERABLE CTRLR ELEC 174           E51K201               RCIC TURB CTRL SPD CURRENT TO       NE         OPERABLE VOLTAGE CONVERTER 175           E51K203             RCIC SPD SIG CND EGR HYDRAULIC       NE         OPERABLE ACTUATOR RCIC TURB EG-M CTRL BOX PWR 176           E51K204               SOURCE DROPPING RESISTOR BOX       NE         OPERABLE SPD CTRLR ELEC 177           E51K615             RCIC PUMP DISCHARGE FLOW CTRLR       NE         OPERABLE ELECNE                     OEAL RCIC FLOW CTRL SIGNAL ISOLATOR FOR TURB CTRL         NE       OPERABLE 179           E51NO03                 RCIC PUMP DISCHARGE FLOW TRANSMITTER ELEC         NE       ENERGIZED 180           ES 1N205                 RCIC TURB SPD SENSOR SPD ELEMENT             NE       OPERABLE 181           E51R608             RCIC TURB STM INLET AND EXHAUST       NE       OPERABLE PRESS INDICATOR 182           E51R609                 RCIC PUMP DISCHARGE & SUCT PRESS INDICATOR         NE       OPERABLE Fermi 2 Expedited Seismic Evaluation Process                   Page B20 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 172 E41R613 HPCI MAIN PUMP E410100C1A NE ENERGIZED ON H11P602 DISCHARGE ELEC FLOW INDICATOR N
NRIE NH P0 173 E51K200 RCIC TURB EGM'CTRL BOX SPD NE OPERABLE CTRLR ELEC 174 E51K201 RCIC TURB CTRL SPD CURRENT TO NE OPERABLE VOLTAGE CONVERTER 175 E51K203 RCIC SPD SIG CND EGR HYDRAULIC NE OPERABLE ACTUATOR RCIC TURB EG-M CTRL BOX PWR 176 E51K204 SOURCE DROPPING RESISTOR BOX NE OPERABLE SPD CTRLR ELEC 177 E51K615 RCIC PUMP DISCHARGE FLOW CTRLR NE OPERABLE ELECNE OEAL RCIC FLOW CTRL SIGNAL ISOLATOR FOR TURB CTRL NE OPERABLE 179 E51NO03 RCIC PUMP DISCHARGE FLOW TRANSMITTER ELEC NE ENERGIZED 180 ES 1N205 RCIC TURB SPD SENSOR SPD ELEMENT NE OPERABLE 181 E51R608 RCIC TURB STM INLET AND EXHAUST NE OPERABLE PRESS INDICATOR 182 E51R609 RCIC PUMP DISCHARGE & SUCT PRESS INDICATOR NE OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B20 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE NORMAL       DESIRED           NOTES/COMMENTS NMBER                ID                            DESCRIPTION 183           E51R613                   RCIC PUMP DISCHARGE FLOW         NE       OPERABLE INDICATOR 184           E51R700                   RCIC TURB SPD INDICATOR         NE         OPERABLE 185           T50N402B               PCAM PC TEMP MON TORUS SUPR         NE       OPERABLE CHAMBER (ATM) DIV2 T/C 186           T50N403B               PCAM PC TEMP MON TORUS SUPR         NE       OPERABLE CHAMBER (ATM) DIV2 T/C 187           T50N404B               PCAM PC TEMP MON TORUS SUPR         NE       OPERABLE CHAMBER (WTR) DIV2 T/C 188           T50N405B               PCAM PC TEMP MON TORUS SUPR         NE       OPERABLE CHAMBER (WTR) DIV2 T/C PCAM PC TORUS WTR LVL MON 189           T50N406B                 TORUS WTR LVL DIV2 LVL XMTR         NE       OPERABLE ELEC 190           T50N414B             PCAM DIV2 TORUS WR PRESS XMTR         NE         OPERABLE 191           T50N415B             PCAM PC       PRESS MTREE   WR       NE       OPERABLE     POWERED FROM T50K800B IN H1 1P615 192           T50R800B               PCAM PC ATMOSPHERIC MON DIV2         NE       ENERGIZED POWERED FROM INVERTER R3 1K005 IN PANEL DW AND TORUS TEMP RECORDER                                             H11P612 193           T50R802B             PCAM PRESS MON DIV2 DW & TORUS                             POWERED FROM INVERTER R31K005 IN PANEL PRESS RECORDER           NE       ENERGIZED               HN1P612 Fermi 2 Expedited Seismic Evaluation Process                     Page B21 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 183 E51R613 RCIC PUMP DISCHARGE FLOW NE OPERABLE INDICATOR 184 E51R700 RCIC TURB SPD INDICATOR NE OPERABLE 185 T50N402B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (ATM) DIV2 T/C 186 T50N403B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (ATM) DIV2 T/C 187 T50N404B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (WTR) DIV2 T/C 188 T50N405B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (WTR) DIV2 T/C PCAM PC TORUS WTR LVL MON 189 T50N406B TORUS WTR LVL DIV2 LVL XMTR NE OPERABLE ELEC 190 T50N414B PCAM DIV2 TORUS WR PRESS XMTR NE OPERABLE 191 T50N415B PCAM PC PRESS MTREE WR NE OPERABLE POWERED FROM T50K800B IN H1 1P615 192 T50R800B PCAM PC ATMOSPHERIC MON DIV2 NE ENERGIZED POWERED FROM INVERTER R3 1K005 IN PANEL DW AND TORUS TEMP RECORDER H11P612 193 T50R802B PCAM PRESS MON DIV2 DW & TORUS POWERED FROM INVERTER R31K005 IN PANEL PRESS RECORDER NE ENERGIZED HN1P612 Fermi 2 Expedited Seismic Evaluation Process Page B21 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
I'
I'


ESEL       EQUIPMENT                                                       OPERATING STATE NORMAL       DESIRED               NOTES/COMMENTS NMBER                ID                            DESCRIPTION POEEDFOMMBETRR3ERO               N AE 194           T50R804B             PCAM TORUS WTR LVL MON DIV2 PC                               POWERED FROM INVERTER R31K005 IN PANEL LVL RECORDER             NE       ENERGIZED                   HI lP612 195           E5150F059             RCIC TURB INLET TRIP THROTTLE         NO         OPERABLE MOV LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "A" INBD PC ISO AOV -                 DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 196         B2103F022A-3                           MANIFOLDC                              D       AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS POEEDFOMMBETRR3ERO N AE 194 T50R804B PCAM TORUS WTR LVL MON DIV2 PC POWERED FROM INVERTER R31K005 IN PANEL LVL RECORDER NE ENERGIZED HI lP612 195 E5150F059 RCIC TURB INLET TRIP THROTTLE NO OPERABLE MOV LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "A" INBD PC ISO AOV -
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "B" INBD PC ISO AOV -                 DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 197         B2103F022B-3                           MANIFOLD               NE             D       AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 196 B2103F022A-3 MANIFOLD C
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "C" INBD PC ISO AOV -                 DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 198         B2103F022C-3                           MANIFOLD               NE             D       AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "D" INBD PC ISO AOV -                 DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 199         B2103F022D-3                           MANIFOLDC                              D       AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "B" INBD PC ISO AOV -
Fermi 2 Expedited Seismic Evaluation Process R14 12-4899/14 Rev. 0 (December 2, 2014)
DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 197 B2103F022B-3 MANIFOLD NE D
Page B22 of B32 7
AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "C" INBD PC ISO AOV -
DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 198 B2103F022C-3 MANIFOLD NE D
AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "D" INBD PC ISO AOV -
DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 199 B2103F022D-3 MANIFOLD C
D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
Fermi 2 Expedited Seismic Evaluation Process Page B22 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) 7


ESEL       EQUIPMENT                                                       OPERATING STATE ID                           DESCRIPTION           NORMAL       DESIRED                 NOTES/COMMENTS NTM NUMBER LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "A" OTBD PC ISO AOV -                 DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 200         B2103F028A-6                         MANIFOLD                 NED                     AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
ESEL EQUIPMENT OPERATING STATE NTM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "A" OTBD PC ISO AOV -
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "B" OTBD PC ISO AOV -                 DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 201         B2103F028B-6                         MANIFOLDC                              D         AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 200 B2103F028A-6 MANIFOLD NED AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "C" OTBD PC ISO AOV -                 DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 202         B2103F028C-6                         MANIFOLD                 NE             D         AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "B" OTBD PC ISO AOV -
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "D" OTBD PC ISO AOV -                 DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 203         B2103F028D-6                         MANIFOLD                 NE             D         AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 201 B2103F028B-6 MANIFOLD C
HPCI REMOTE TURB TRIP SOLENOID                               REMOTE TRIP SV NOT REQUIRED TO OPERATE 204           E41F200                               VLV                   NC         CLOSED     THE SYSTEM MUST ENSURE THE SV DOES NOT SPURIOUSLY OPEN LOSS OF 120V AC POWER TO BOP BUS (R3101S003) 205           P50F401             SA ISO VLV P5000F401 SOLENOID VLV       NE         CLOSED       DEENERGIZES SOLENOID IN H21P408 RACK.
D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION Fermi 2 Expedited Seismic Evaluation Process                     Page B23 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "C" OTBD PC ISO AOV -
DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 202 B2103F028C-6 MANIFOLD NE D
AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "D" OTBD PC ISO AOV -
DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 203 B2103F028D-6 MANIFOLD NE D
AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.
HPCI REMOTE TURB TRIP SOLENOID REMOTE TRIP SV NOT REQUIRED TO OPERATE 204 E41F200 VLV NC CLOSED THE SYSTEM MUST ENSURE THE SV DOES NOT SPURIOUSLY OPEN LOSS OF 120V AC POWER TO BOP BUS (R3101S003) 205 P50F401 SA ISO VLV P5000F401 SOLENOID VLV NE CLOSED DEENERGIZES SOLENOID IN H21P408 RACK.
VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION Fermi 2 Expedited Seismic Evaluation Process Page B23 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                         OPERATING STATE NORMAL         DESIRED                 NOTES/COMMENTS NMBER                ID                            DESCRIPTION LOSS OF 120V AC POWER TO BOP BUS (R3101S002)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS LOSS OF 120V AC POWER TO BOP BUS (R3101S002) 206 P50F516A CA DIV1 NIAS ISO VLV P5000F440 CLOSED DEENERGIZES SOLENOID INH21P501A RACK.
P50F516A                 CA DIV1 NIAS ISO VLV P5000F440                   CLOSED     DEENERGIZES SOLENOID INH21P501A RACK.
SOLENOID VLV VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S001) 207 P50F516B CA DIV2 NIAS ISO VLV P5000F441 CLOSED DEENERGIZES SOLENOID IN H21P501B RACK.
206 SOLENOID VLV                       VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S001)
SOLENOID VLV VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION PC PNEU DIV2 SPLY N2 INERTING POWERED IN H1 1P870 CKT 27 REQUIRED AS SRVS 208 T49F469 SPLY ISO VLV T4901F469 SOV NE ENERGIZED F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE ACCUMULATOR BANK 209 B2100MO 1A NB MSL "D" RELIEF VLV B2104F013A ND OPERABLE 20 (B21CK1A)
P50F516B               CA DIV2 NIAS ISO VLV P5000F441                   CLOSED     DEENERGIZES SOLENOID IN H21P501B RACK.
CTRL PWR RELAY ND OPERABLE 210 B2100M329A NB MSL INBD ISO VLV B2103F022A LATCHED OPERABLE LATCHING RELAY IN HII-P609 AUX DC RELAY 212 B2100M329C NB MSL INBD ISO VLV B2103F022B LATCHED OPERABLE LATCHING RELAY IN H11-P609 AUX DC RELAY LTHD OEAL ACIGRLYI I1P0 212 B2100M329C NB MSL INBD ISO VLV B2103F022C LATCHED OPERABLE LATCHING RELAY IN HI 1-P609 AUX DC RELAY 213 B2100M329D NB MSL INBD ISO VLV B2103F022D LTHD OEAL ACIGRLYI IIP0 213 B2100M329D AUX DC RELAY LTHD OEAL ACIGRLYI i1P0 214 B2100M331A NB MSL OTBD ISO VLV B2103F028A LATCHED OPERABLE LATCHING RELAY IN H 11-P611 AUX DC RELAY Fermi 2 Expedited Seismic Evaluation Process Page B24 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
207 SOLENOID VLV                       VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION PC PNEU DIV2 SPLY N2 INERTING                               POWERED IN H1 1P870 CKT 27 REQUIRED AS SRVS 208             T49F469                 SPLY ISO VLV T4901F469 SOV         NE         ENERGIZED     F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE ACCUMULATOR BANK 209         B2100MO 1A             NB MSL "D" RELIEF VLV B2104F013A       ND         OPERABLE 20           (B21CK1A)                           CTRL PWR RELAY             ND         OPERABLE 210         B2100M329A               NB MSL INBD ISO VLV B2103F022A     LATCHED       OPERABLE           LATCHING RELAY IN HII-P609 AUX DC RELAY 212         B2100M329C               NB MSL INBD ISO VLV B2103F022B     LATCHED       OPERABLE           LATCHING RELAY IN H11-P609 AUX DC RELAY           LTHD           OEAL                 ACIGRLYI           I1P0 212         B2100M329C               NB MSL INBD ISO VLV B2103F022C     LATCHED       OPERABLE           LATCHING RELAY IN HI 1-P609 AUX DC RELAY 213 B2100M329D               NB MSL INBD ISO VLV B2103F022D     LTHD           OEAL                 ACIGRLYI           IIP0 213 B2100M329D                           AUX DC RELAY           LTHD           OEAL                 ACIGRLYI           i1P0 214         B2100M331A             NB MSL OTBD ISO VLV B2103F028A     LATCHED       OPERABLE           LATCHING RELAY IN H 11-P611 AUX DC RELAY Fermi 2 Expedited Seismic Evaluation Process                     Page B24 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
                                                                                                                                              ;< '


ESEL       EQUIPMENT                                                       OPERATING STATE NORMAL       DESIRED             NOTES/COMMENTS NMBER                ID                            DESCRIPTION 215         B2100M331B             NB MSL OTBD ISO VLV B2103F028B   LATCHED     OPERABLE         LATCHING RELAY IN H11-P611 AUX DC RELAY AUX DC RELAY 217         B2100M331D             NB MSL OTBD ISO VLV B2103F028D   LATCHED     OPERABLE         LATCHING RELAY IN H11-P611 218           B2104M084           NB SAFETY AND RELIEF VLV RELAY         ND       OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427C)                                                                         CAUSE INADVERTANT SRV OPENING 219           B2104M085                           NB SRV RELAY           ND       OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427D )                                                                     WOULD CAUSE INADVERTANT SRV OPENING 220           B2104MD86                           NB SRV RELAY           ND       OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427F)                                                                         CAUSE INADVERTANT SRV OPENING 221           B2104M87                           NB SRV RELAY           ND       OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427G)                                                                         CAUSE INADVERTANT SRV OPENING 222           B2104M88                           NB SRV RELAY           ND       OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427K)                                                                     WOULD CAUSE INADVERTANT SRV OPENING 23    (B21CK427K)                          NBSVRLYN                            PRBE  WOULD CAUSE INADVERTANT SRV OPENING 222           B2104M097                           NB SRV RELAY           ND       OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427L)                                                                     WOULD CAUSE INADVERTANT SRV OPENING 23         B2104MO97                         NB SRV REL A             NDEPERBL             INPS   RELAY WHICH IF ACTUATEDL 224           B1498               DEPRESSURIZATI01 VLV FO13M CTRL         ND       OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427M)                               REAYAUSE                                         INADVERTANT SRV OPENING RELAY Fermi 2 Expedited Seismic Evaluation Process                   Page B25 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 215 B2100M331B NB MSL OTBD ISO VLV B2103F028B LATCHED OPERABLE LATCHING RELAY IN H11-P611 AUX DC RELAY 217 B2100M331D NB MSL OTBD ISO VLV B2103F028D LATCHED OPERABLE LATCHING RELAY IN H11-P611 AUX DC RELAY 218 B2104M084 NB SAFETY AND RELIEF VLV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427C)
CAUSE INADVERTANT SRV OPENING 219 B2104M085 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427D )
WOULD CAUSE INADVERTANT SRV OPENING 220 B2104MD86 NB SRV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427F)
CAUSE INADVERTANT SRV OPENING 221 B2104M87 NB SRV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427G)
CAUSE INADVERTANT SRV OPENING 222 B2104M88 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427K)
WOULD CAUSE INADVERTANT SRV OPENING 222 B2104M097 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED 23 (B21CK427K)
NBSVRLYN PRBE WOULD CAUSE INADVERTANT SRV OPENING 23 B2104MO97 NB SRV REL A NDEPERBL INPS RELAY WHICH IF ACTUATEDL (B21CK427L)
WOULD CAUSE INADVERTANT SRV OPENING 224 B1498 DEPRESSURIZATI01 VLV FO13M CTRL ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427M)
REAYAUSE INADVERTANT SRV OPENING RELAY Fermi 2 Expedited Seismic Evaluation Process Page B25 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE DESCRIPTION         NORMAL         DESIRED               NOTES/COMMENTS NMBER                ID B210M099NB                     SRV DIV2 MAN 225             2104M99           DEPRESSURIZATION VLV F13N CTRL         ND         OPERABLE   SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427N)                               RELAY                                           CAUSE INADVERTANT SRV OPENING E1100MO94A                                                             DEENERGIZE LOCA INITIATION LOGIC RELAY CONTACT IN RUN 226           (E 1K94A)                           RHR K94A RELAY           ND             D     LOGICFOR E5101C003 AND AF180E5101C004 IN THE H 11P617 PANEL NEEDS TO BE DEENERGIZED E1100M094B                                                             DEENERGIZE LOCA INITIATION LOGIC RELAY CONTACT IN RUN 227           (E 11K94B)                         RHR K94B RELAY           ND             D     LOGICFOR E4101C003 AND E4101C004 IN THE HI1 P618 PANEL NEEDS TO BE DEENERGIZED RELAY OPERATES THE E41F200 SV REMOTE TRIP 228           E4100M012                           HPCI K12 RELAY           ND       DEENERGIZE   SV NOT REQUIRED TO OPERATE THE SYSTEM (E41AK12)                                                                   D       MUST ENSURE THE SV DOES NOT SPURIOUSLY OPEN LOCATED IN Hi 1-P620 PANEL 229           E4100M015                   HPCI K15 RELAY (LOW STM                   DEENERGIZE (E41K15)                     PRESSURE TRIP LOGIC)                         D 230           E4100M028               HPCI K28 RELAY (TURB EXH HIGH                 DEENERGIZE (E41K28)                   DIA PRESSURE TRIP LOGIC)                       D 231           E4100M035                 HPCI K35 RELAY (HPCI AUTO                   DEENERGIZE (E41K35)                         INITIATION LOGIC)                       D 232           E4100M036                 HPCI K36 RELAY (HPCI AUTO         ND       DEENERGIZE (E41K36)                         INITIATION LOGIC)                       D 233           E4100M043           HPCI K43 RELAY (STEAM LINE HI DP)       ND       DEENERGIZE (E41K43)                                                                   D Fermi 2 Expedited Seismic Evaluation Process                     Page B26 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS B210M099NB SRV DIV2 MAN 225 2104M99 DEPRESSURIZATION VLV F13N CTRL ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427N)
RELAY CAUSE INADVERTANT SRV OPENING E1100MO94A DEENERGIZE LOCA INITIATION LOGIC RELAY CONTACT IN RUN 226 (E 1K94A)
RHR K94A RELAY ND D
LOGICFOR E5101C003 AND AF180E5101C004 IN THE H 11 P617 PANEL NEEDS TO BE DEENERGIZED E1100M094B DEENERGIZE LOCA INITIATION LOGIC RELAY CONTACT IN RUN 227 (E 11K94B)
RHR K94B RELAY ND D
LOGICFOR E4101C003 AND E4101C004 IN THE HI1 P618 PANEL NEEDS TO BE DEENERGIZED RELAY OPERATES THE E41F200 SV REMOTE TRIP 228 E4100M012 HPCI K12 RELAY ND DEENERGIZE SV NOT REQUIRED TO OPERATE THE SYSTEM (E41AK12)
D MUST ENSURE THE SV DOES NOT SPURIOUSLY OPEN LOCATED IN Hi 1-P620 PANEL 229 E4100M015 HPCI K15 RELAY (LOW STM DEENERGIZE (E41K15)
PRESSURE TRIP LOGIC)
D 230 E4100M028 HPCI K28 RELAY (TURB EXH HIGH DEENERGIZE (E41K28)
DIA PRESSURE TRIP LOGIC)
D 231 E4100M035 HPCI K35 RELAY (HPCI AUTO DEENERGIZE (E41K35)
INITIATION LOGIC)
D 232 E4100M036 HPCI K36 RELAY (HPCI AUTO ND DEENERGIZE (E41K36)
INITIATION LOGIC)
D 233 E4100M043 HPCI K43 RELAY (STEAM LINE HI DP)
ND DEENERGIZE (E41K43)
D Fermi 2 Expedited Seismic Evaluation Process Page B26 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                     OPERATING STATE NORMAL         DESIRED             NOTES/COMMENTS NMBER                ID                          DESCRIPTION E4100M080                   HPCI K80 RELAY (LOW STM                 DEENERGIZE 234 (E41K80)                     PRESSURE TRIP LOGIC)                       D 235           E5100MR52                     GELRATOR TRIGGER            ND         OPERABLE   ENERGIZES WHEN E5101F045 IS OFF SEAT 236         H 1P622-22               CTRL AND AUX RM PNL INBD VLV     NC/NO         NC/NO       POWERED FROM R31K002 IN H 11P613 (A71BK53)             CTRL RELAY CAB DIV1 INST RACK 237         H 1P628- 1           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE (B21CK06A)                       DIV1 ADS RELAY CAB 238         HI iP628-12           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE (B21CK06B)                       DIV1 ADS RELAY CAB 239         HI IP628-13           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE (B21CK07A)                       DIV1 ADS RELAY CAB 240         HI IP628-14           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE (B21CK07B)                       DIV1 ADS RELAY CAB 241         H 1IP628-23           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE (B21CK1IE)                       DIV1 ADS RELAY CAB 242         HI 1P628-24           CRTL & AUX RM PNL (MR ONLY) SRV (B21CKIIH)                       DIV1 ADS RELAY CAB         ND         OPERABLE 243         Hi 1P628-32           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE   INTERPOSING RELAY WHICH IF ACTUATED (B21CK27A)                       DIV1 ADS RELAY CAB                             WOULD CAUSE INADVERTANT SRV OPENING 244         HI IP628-33           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE   INTERPOSING RELAY WHICH IF ACTUATED (B21CK27E)                       DIV1 ADS RELAY CAB                             WOULD CAUSE INADVERTANT SRV OPENING Fermi 2 Expedited Seismic Evaluation Process                   Page B27 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)                                                                                       r
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 234 E4100M080 HPCI K80 RELAY (LOW STM DEENERGIZE (E41K80)
PRESSURE TRIP LOGIC)
D 235 E5100MR52 GELRATOR TRI GGER ND OPERABLE ENERGIZES WHEN E5101F045 IS OFF SEAT 236 H 1P622-22 CTRL AND AUX RM PNL INBD VLV NC/NO NC/NO POWERED FROM R31K002 IN H 11P613 (A71BK53)
CTRL RELAY CAB DIV1 INST RACK 237 H 1P628-1 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK06A)
DIV1 ADS RELAY CAB 238 HI iP628-12 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK06B)
DIV1 ADS RELAY CAB 239 HI IP628-13 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK07A)
DIV1 ADS RELAY CAB 240 HI IP628-14 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK07B)
DIV1 ADS RELAY CAB 241 H 1IP628-23 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK1IE)
DIV1 ADS RELAY CAB 242 HI 1P628-24 CRTL & AUX RM PNL (MR ONLY) SRV (B21CKIIH)
DIV1 ADS RELAY CAB ND OPERABLE 243 Hi 1P628-32 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27A)
DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 244 HI IP628-33 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27E)
DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING Fermi 2 Expedited Seismic Evaluation Process Page B27 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) r


ESEL       EQUIPMENT                                                     OPERATING STATE NORMAL         DESIRED               NOTES/COMMENTS NMBER                ID                            DESCRIPTION 245           Hi 1P628-34         CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE   INTERPOSING RELAY WHICH IF ACTUATED (B21CK27H)                       DIV1 ADS RELAY CAB                                 WOULD CAUSE INADVERTANT SRV OPENING 246           H 11P628-35         CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE   INTERPOSING RELAY WHICH IF ACTUATED (B21CK27J)                     DIV1 ADS RELAY CAB                                 WOULD CAUSE INADVERTANT SRV OPENING 247           H 1P628-36           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE   INTERPOSING RELAY WHICH IF ACTUATED (B21CK27P)                       DIV1 ADS RELAY CAB                                 WOULD CAUSE INADVERTANT SRV OPENING 248           H 1P628-37           CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE   INTERPOSING RELAY WHICH IF ACTUATED (B21CK27R)                       DIV1 ADS RELAY CAB                                 WOULD CAUSE INADVERTANT SRV OPENING 249           HI lP628-44         CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE (B21CK31)                     DIV1 ADS RELAY CAB 250           HI IP628-45         CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE (B21CK31A)                       DIV1 ADS RELAY CAB 251           HI iP628-65         CRTL & AUX RM PNL (MR ONLY) SRV       ND         OPERABLE   SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK27B)                       DIV1 ADS RELAY CAB                                     CAUSE INADVERTANT SRV OPENING H11P870-34               CRTL & AUX RM PNL (MR ONLY)                             POWERED IN HI IP870 CKT 27 REQUIRED AS SRVS 252             T41M804               MISC DC RELAY PANEL DIV2 INST       NE       ENERGIZED   F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE RACK                                               ACCUMULATOR BANK LOC PNL/RACK (MR ONLY) LOCAL 253           H21P080-22               PNL AND RACKS DIV2 ECCS TRIP                 DEENERGIZE (E41K202A)                           UNIT INST RACK                         D (STEAM LINE HI DP)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 245 Hi 1P628-34 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27H)
Fermi 2 Expedited Seismic Evaluation Process                   Page B28 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 246 H 11P628-35 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27J)
DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 247 H 1P628-36 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27P)
DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 248 H 1P628-37 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27R)
DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 249 HI lP628-44 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK31)
DIV1 ADS RELAY CAB 250 HI IP628-45 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK31A)
DIV1 ADS RELAY CAB 251 HI iP628-65 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK27B)
DIV1 ADS RELAY CAB CAUSE INADVERTANT SRV OPENING H11P870-34 CRTL & AUX RM PNL (MR ONLY)
POWERED IN HI IP870 CKT 27 REQUIRED AS SRVS 252 T41M804 MISC DC RELAY PANEL DIV2 INST NE ENERGIZED F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE RACK ACCUMULATOR BANK LOC PNL/RACK (MR ONLY) LOCAL 253 H21P080-22 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE (E41K202A)
UNIT INST RACK D
(STEAM LINE HI DP)
Fermi 2 Expedited Seismic Evaluation Process Page B28 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                     OPERATING STATE ID                             DESCRIPTION         NORMAL       DESIRED           NOTES/COMMENTS NTM NUMBER                                                                 _    _    _  _  _  _  _ _    _  _  _    _  _    _    _ _
ESEL EQUIPMENT OPERATING STATE NTM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL 254 H21P081-20 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIR FOR E4100M015 (E41K15)
LOC PNL/RACK (MR ONLY) LOCAL 254         H21P081-20               PNL AND RACKS DIV2 ECCS TRIP                 DEENERGIZE     CIRCUIR FOR E4100M015 (E41K15)
(E41K201B)
(E41K201B)                   UNIT INST RACK (LOW STM                         D PRESSURE TRIP LOGIC)
UNIT INST RACK (LOW STM D
LOC PNL/RACK (MR ONLY) LOCAL 255         H21P81-21                 PNL AND RACKS DIV2 ECCS TRIP                 DEENERGIZE     CIRCUIT FOR E4100M080 (E41K80)
PRESSURE TRIP LOGIC)
(E41K201D)                   UNIT INST RACK (LOW STM                         D PRESSURE TRIP LOGIC)
LOC PNL/RACK (MR ONLY) LOCAL 255 H21P81-21 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M080 (E41K80)
LOC PNL/RACK (MR ONLY) LOCAL PNL AND RACKS DIV2 ECCS TRIP                 DEENERGIZE 256          H21P081-22 (E41K202B)                           UNIT INST RACK                         D (STEAM LINE HI DP)
(E41K201D)
LOC PNL/RACK (MR ONLY) LOCAL H21P081-24               PNL AND RACKS DIV2 ECCS TRIP                 DEENERGIZE     CIRCUIT FOR E4100M028 (E41K28)
UNIT INST RACK (LOW STM D
(E41K204B)             UNIT INST RACK (TURB EXH HIGH                       D DIA PRESSURE TRIP LOGIC)
PRESSURE TRIP LOGIC)
LOC PNL/RACK (MR ONLY) LOCAL H21P081-25               PNL AND RACKS DIV2 ECCS TRIP                 DEENERGIZE     CIRCUIT FOR E4100M028 (E41K28)
LOC PNL/RACK (MR ONLY) LOCAL 256 H21P081-22 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE (E41K202B)
(E41K204D)             UNIT INST RACK (TURB EXH HIGH                       D DIA PRESSURE TRIP LOGIC)
UNIT INST RACK D
H21P081-28               LOC PNL/RACK (MR ONLY) LOCAL                 DEENERGIZE 259         (E41K206B)               PNL AND RACKS DIV2 ECCS TRIP       ND             D UNIT INST RACK H21P082-10           LOC PNL/RACK (MR ONLY) ECCS TRIP                 DEENERGIZE (B21K203A)                   UNIT CAB DIV1 INST RACK                       D Fermi 2 Expedited Seismic Evaluation Process                   Page B29 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) ad
(STEAM LINE HI DP)
LOC PNL/RACK (MR ONLY) LOCAL H21P081-24 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M028 (E41K28)
(E41K204B)
UNIT INST RACK (TURB EXH HIGH D
DIA PRESSURE TRIP LOGIC)
LOC PNL/RACK (MR ONLY) LOCAL H21P081-25 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M028 (E41K28)
(E41K204D)
UNIT INST RACK (TURB EXH HIGH D
DIA PRESSURE TRIP LOGIC)
H21P081-28 LOC PNL/RACK (MR ONLY) LOCAL DEENERGIZE 259 (E41K206B)
PNL AND RACKS DIV2 ECCS TRIP ND D
UNIT INST RACK H21P082-10 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE (B21K203A)
UNIT CAB DIV1 INST RACK D
Fermi 2 Expedited Seismic Evaluation Process Page B29 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) ad


ESEL       EQUIPMENT                                                     OPERATING STATE ITEM                 ID                           DESCRIPTION           NORMAL       DESIRED     NOTES/COMMENTS NUMBER               I                             ECITO                 OML         DSRDNTSCMET LOC PNL/RACK (MR ONLY) ECCS TRIP       ND       DEENERGIZE 261          H21P082-11 (B21K203C)                   UNIT CAB DIV1 INST RACK                     D H21P082-21           LOC PNL/RACK (MR ONLY) ECCS TRIP       ND       DEENERGIZE 262 (B21K250A)                   UNIT CAB DIV1 INST RACK                       D H21P082-22           LOC PNL/RACK (MR ONLY) ECCS TRIP       ND       DEENERGIZE 263 (B21K250C)                   UNIT CAB DIV1 INST RACK                       D H21P082-6           LOC PNL/RACK (MR ONLY) ECCS TRIP                 DEENERGIZE 264         (B21K201A)                   UNIT CAB DIV1 INST RACK         ND           D H21P082-7           LOC PNL/RACK (MR ONLY) ECCS TRIP                 DEENERGIZE 265 (B21K201C)                   UNIT CAB DIV1 INST RACK                       D H21P082-8           LOC PNL/RACK (MR ONLY) ECCS TRIP       ND       DEENERGIZE 266 (B21K202A)                   UNIT CAB DIV1 INST RACK                       D H21P082-9           LOC PNL/RACK (MR ONLY) ECCS TRIP       ND       DEENERGIZE 267 (B21K202C)                   UNIT CAB DIV1 INST RACK                       D TRi RELAY: LOC PNL/RACK (MR 268               N/A             ONLY DSD MCC 72C-3A LOCAL CTRL       NE       ENERGIZED PANEL LOCAL PNL & RACKS TR2 RELAY: LOC PNL/RACK (MR 269               N/A             ONLY DSD MCC 72C-3A LOCAL CTRL       NE       ENERGIZED PANEL LOCAL PNL & RACKS TR3 RELAY: LOC PNL/RACK (MR 270               N/A             ONLY DSD MCC 72C-3A LOCAL CTRL       NE       ENERGIZED PANEL LOCAL PNL & RACKS Fermi 2 Expedited Seismic Evaluation Process                   Page B30 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER I
ECITO OML DSRDNTSCMET 261 H21P082-11 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K203C)
UNIT CAB DIV1 INST RACK D
262 H21P082-21 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K250A)
UNIT CAB DIV1 INST RACK D
263 H21P082-22 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K250C)
UNIT CAB DIV1 INST RACK D
H21P082-6 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE 264 (B21K201A)
UNIT CAB DIV1 INST RACK ND D
265 H21P082-7 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE (B21K201C)
UNIT CAB DIV1 INST RACK D
266 H21P082-8 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K202A)
UNIT CAB DIV1 INST RACK D
267 H21P082-9 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K202C)
UNIT CAB DIV1 INST RACK D
TRi RELAY: LOC PNL/RACK (MR 268 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS TR2 RELAY: LOC PNL/RACK (MR 269 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS TR3 RELAY: LOC PNL/RACK (MR 270 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS Fermi 2 Expedited Seismic Evaluation Process Page B30 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
Ed
Ed


ESEL       EQUIPMENT                                                     OPERATING STATE NORMAL       DESIRED               NOTES/COMMENTS NMBER                ID                            DESCRIPTION TR4 RELAY: LOC PNL/RACK (MR 271               N/A             ONLY DSD MCC 72C-3A LOCAL CTRL       NE       ENERGIZED PANEL LOCAL PNL & RACKS B21K609B             NBS TRANS ECCS SERVICE DIV2 PWR       NE       ENERGIZED   NON-VALVE ITEMS. NO SEAL IN / LOCKOUT 272 SPLY                                                     CONTACTS B21K610A             NB TRANS ECCS SERVICE DIV1 PWR       NE       ENERGIZED   NON-VALVE ITEMS. NO SEAL IN / LOCKOUT 273 SPLY                                                     CONTACTS 274           E4100B001                         HPCI BARO CNDR       SUPPORT       SUPPORT   E4101C003 & E4101C004 OPERATE THIS DEVICE 275           E4100B002                 HPCI TURB LUBE OIL COOLER       NA           NA 276         E4101C001B                       HPCI BOOSTER PUMP         OFF       OPERABLE 277         E4101C001C                 HPCI TURB DRIVEN OIL PUMP       OFF       OPERABLE 278           E4101C002           HIGH PRESSURE COOLANT INJECTION       OFF       OPERABLE TURBINE 279           E4101C004                 E4101C004, HPCI BAROMETRIC       OFF       OPERABLE TRIP AFTER 5 MINUTES ON LOCA HI DW PRESSURE CONDENSER CONDENSATE PUMP                                               ACTUATION 280           E4101C005                       HPCI AUX OIL PUMP         OFF       OPERABLE 281           E5100B002                     RCIC LUBE OIL COOLER         OFF       OPERABLE 282           E5101C003               RCIC BAROMETRIC CONDENSER         OFF       OPERABLE CONDENSATE PUMP 283           E5101C004               RCIC BAROMETRIC CONDENSER         OFF       OPERABLE VACUUM PUMP Fermi 2 Expedited Seismic Evaluation Process                   Page B31 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS TR4 RELAY: LOC PNL/RACK (MR 271 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS 272 B21K609B NBS TRANS ECCS SERVICE DIV2 PWR NE ENERGIZED NON-VALVE ITEMS. NO SEAL IN / LOCKOUT SPLY CONTACTS 273 B21K610A NB TRANS ECCS SERVICE DIV1 PWR NE ENERGIZED NON-VALVE ITEMS. NO SEAL IN / LOCKOUT SPLY CONTACTS 274 E4100B001 HPCI BARO CNDR SUPPORT SUPPORT E4101C003 & E4101C004 OPERATE THIS DEVICE 275 E4100B002 HPCI TURB LUBE OIL COOLER NA NA 276 E4101C001B HPCI BOOSTER PUMP OFF OPERABLE 277 E4101C001C HPCI TURB DRIVEN OIL PUMP OFF OPERABLE 278 E4101C002 HIGH PRESSURE COOLANT INJECTION OFF OPERABLE TURBINE 279 E4101C004 E4101C004, HPCI BAROMETRIC OFF OPERABLE TRIP AFTER 5 MINUTES ON LOCA HI DW PRESSURE CONDENSER CONDENSATE PUMP ACTUATION 280 E4101C005 HPCI AUX OIL PUMP OFF OPERABLE 281 E5100B002 RCIC LUBE OIL COOLER OFF OPERABLE 282 E5101C003 RCIC BAROMETRIC CONDENSER OFF OPERABLE CONDENSATE PUMP 283 E5101C004 RCIC BAROMETRIC CONDENSER OFF OPERABLE VACUUM PUMP Fermi 2 Expedited Seismic Evaluation Process Page B31 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL       EQUIPMENT                                                       OPERATING STATE ITEM                 ID                           DESCRIPTION           NORMAL       DESIRED               NOTES/COMMENTS NUMBER                 I                             ECITO                 OML         DSRDNTSCMET 284           E51K600                           RCIC PWR SPLY             NE       ENERGIZED     H11P623 BB-95 & BB-96 ARE THE POWER CONNECTION TO R3200S061A (I-2045-27) 285       R1600SO03D -38               MCC/DIST CAB 480V 72C-F MCC       NE       ENERGIZED (72C-F) 286       R1600S003D-48               MCC/DIST CAB 480V 72C-F MCC       NE       ENERGIZED (72C-F) 287           T50K800A                       PCAM DIV2 PWR SPLY           NE       ENERGIZED       T50K800A TO INVERT FROM R31K002 288           T50K800B                       PCAM DIV2 PWR SPLY           NE       ENERGIZED       INVERT FROM R31K005 FROM 2PB2-5 289             T49P401               PCP DIV 2 B/U N2 SPLY NITROGEN   SUPPORT       SUPPORT           RACK QUALIFIED BY DC-6342 BOTTLE RACK 290           E41F402               HPCI PCM - SUPR POOL SOLENOID       NE       ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV                                                       3BC; 33X-_3A) 291           E41F403               HPCI PCM - SUPR POOL SOLENOID       NE       ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33 VLV                                                         4B; 33X-4A)
ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER I
Fermi 2 Expedited Seismic Evaluation Process                     Page B32 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
ECITO OML DSRDNTSCMET 284 E51K600 RCIC PWR SPLY NE ENERGIZED H11P623 BB-95 & BB-96 ARE THE POWER CONNECTION TO R3200S061A (I-2045-27) 285 R1600SO03D -38 MCC/DIST CAB 480V 72C-F MCC NE ENERGIZED (72C-F) 286 R1600S003D-48 MCC/DIST CAB 480V 72C-F MCC NE ENERGIZED (72C-F) 287 T50K800A PCAM DIV2 PWR SPLY NE ENERGIZED T50K800A TO INVERT FROM R31K002 288 T50K800B PCAM DIV2 PWR SPLY NE ENERGIZED INVERT FROM R31K005 FROM 2PB2-5 289 T49P401 PCP DIV 2 B/U N2 SPLY NITROGEN SUPPORT SUPPORT RACK QUALIFIED BY DC-6342 BOTTLE RACK 290 E41F402 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 3BC; 33X-_3A) 291 E41F403 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33 VLV 4B; 33X-4A)
Fermi 2 Expedited Seismic Evaluation Process Page B32 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)
I'
I'


ATTACHMENT C ESEP HCLPF VALUES AND FAILURE MODES TABULATION Fermi 2 Expedited Seismic Evaluation Process Page Cl1of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ATTACHMENT C ESEP HCLPF VALUES AND FAILURE MODES TABULATION Fermi 2 Expedited Seismic Evaluation Process Page Cl 1of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                           FRAGILITY   NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM           EQUIPMENT                 DESCRIPTION         ON       HCLPF(G)   FAILURE MODE FGTY       COMMENTS NUMBER NB MSL "D" RELIEF                                                   EPRI NP-6041, 1           B2104F013A                     VB2104F03A                 ScreenedTable                           2-4 2           B2104F013B             NB MSL "C" RELIEF B2104F013B       Screened                         EPRI NP-6041, VLV                                                           Table 2-4 NB MSL "B" RELIEF                                                   EPRI NP-6041, 2           B2104F013C                     VLV       B2104F013B       Screened                           Table 2-4 4           B2104F013D             NB MSL "B" RELIEF B2104F013D       Screened                         EPRI NP-6041, VLV                                                           Table 2-4 5           B2104F013E             NB MSL "C" RELIEF B2104F013E       Screened                         EPRI NP-6041, VLV                                                           Table 2-4 NB MSL "B" RELIEF                                                   EPRI NP-6041, S           B2104F013VLV                             B2104F013       Screened                           Table 2-4 7           B2104F013G             NB MSL "B" RELIEF B2104F013G       Screened                         EPRI NP-6041, VLV                                                           Table 2-4 7 21401GVLV                                B140G            ScendTable                              2-4 8           B2104F013H             NB MSL "C" RELIEF B2104F013H       Screened                         EPRI NP-6041, 9NB B2104F013J MSL "C" RELIEF B2104F013J     Screened EPRI NP-6041, VLV                                                           Table 2-4 10           B2104F013K             NB MSL "B" RELIEF B2104F013K       Screened                         EPRI NP-6041, VLV                                                           Table 2-4 Fermi 2 Expedited Seismic Evaluation Process                       Page C2 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE FGTY COMMENTS NUMBER NB MSL "D" RELIEF EPRI NP-6041, 1
B2104F013A VB2104F03A ScreenedTable 2-4 2
B2104F013B NB MSL "C" RELIEF B2104F013B Screened EPRI NP-6041, VLV Table 2-4 NB MSL "B" RELIEF EPRI NP-6041, 2
B2104F013C VLV B2104F013B Screened Table 2-4 4
B2104F013D NB MSL "B" RELIEF B2104F013D Screened EPRI NP-6041, VLV Table 2-4 5
B2104F013E NB MSL "C" RELIEF B2104F013E Screened EPRI NP-6041, VLV Table 2-4 NB MSL "B" RELIEF EPRI NP-6041, S
B2104F013VLV B2104F013 Screened Table 2-4 7
B2104F013G NB MSL "B" RELIEF B2104F013G Screened EPRI NP-6041, VLV Table 2-4 8
B2104F013H NB MSL "C" RELIEF B2104F013H Screened EPRI NP-6041, 7 21401GVLV B140G ScendTable 2-4 9
B2104F013J NB MSL "C" RELIEF B2104F013J Screened EPRI NP-6041, VLV Table 2-4 10 B2104F013K NB MSL "B" RELIEF B2104F013K Screened EPRI NP-6041, VLV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C2 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                               FRAGILITY   NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION         ON         HCLPF(G)     FAILURE MODE FGTY       COMMENTS NUMBER NB MSL "A" RELIEF                                                       EPRI NP-6041, 11           B2104F013L                     LV           B2104F013L       Screened                             Tabl -4 VLV                                                               Table 2-4 NB MSL "A" RELIEF                                                       EPRI NP-6041, 12           B2104F013M                     LV           B2104F013M       Screened                             Tabl -4 NB MSL "A"RELIEF                                                         EPRI NP-6041, 13           B2104F013N                     VVB2104F013N                 ScreenedTal2-VLV                                                               Table 2-4 NB MSL "D" RELIEF                                                       EPRI NP-6041, 14             B2104F013P                   VLV         B2104F013P       Screened VLV                                                                Tabl Table 2-4
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
                                                                                                                            -4 NB MSL "C"RELIEF                                                         EPRI NP-6041, 15           B2104F013R                     VVB2104F013R                 ScreenedTal2-OVLV (HO)Table                                                            2-4 16 E40F07                     HPCI TURB STM     E410F6           cendEPRI                               NP-6041, 16 E1007                       SO VLV (H.O.)     E40F6           cendTable                                 2-4 17             E4100F068               HPCI TURB STM     E4100F068       Screened                           EPRI NP-6041, CTRL VLV (H.O.)                                                         Table 2-4 RCIC TURB         RCICTURBEPRI                                           NP-6041, 18             E5150F044             GOVERNOR CTRL       E5150F044       Screened Table 2-4 VLV HPCI BARO CNDR 19             E4100F018               VACUUM TANK       E4100F018       Screened                           EPRI NP-6041, Table 2-4 PRESS RELIEF VLV Fermi 2 Expedited Seismic Evaluation Process                         Page C3 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE FGTY COMMENTS NUMBER NB MSL "A" RELIEF EPRI NP-6041, 11 B2104F013L LV B2104F013L Screened Tabl  
-4 VLV Table 2-4 NB MSL "A" RELIEF EPRI NP-6041, 12 B2104F013M LV B2104F013M Screened Tabl  
-4 VLV Table 2-4 NB MSL "A" RELIEF EPRI NP-6041, 13 B2104F013N VVB2104F013N ScreenedTal2-VLV Table 2-4 NB MSL "D" RELIEF EPRI NP-6041, 14 B2104F013P VLV B2104F013P Screened Tabl  
-4 OVLV (HO)Table 2-4 NB MSL "C" RELIEF EPRI NP-6041, 15 B2104F013R VVB2104F013R ScreenedTal2-16 E40F07 HPCI TURB STM E410F6 cendEPRI NP-6041, 16 E1007 SO VLV (H.O.)
E40F6 cendTable 2-4 17 E4100F068 HPCI TURB STM E4100F068 Screened EPRI NP-6041, CTRL VLV (H.O.)
Table 2-4 RCIC TURB RCICTURBEPRI NP-6041, 18 E5150F044 GOVERNOR CTRL E5150F044 Screened VLV Table 2-4 HPCI BARO CNDR 19 E4100F018 VACUUM TANK E4100F018 Screened EPRI NP-6041, PRESS RELIEF VLV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C3 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EQUIPMENT                                 MOUNTED                               FRAGILITY   NOTES/
ESEL EQUIPMENT MOUNTED FRAGILITY NOTES/
ITEM                   IP                   DESCRIPTION       ON         HCLPF(G) FAILURE MODE METHOD   COMMENTS NUMBER HPCI OIL CLR/TRIP UNIT OIL SPLY                                                 EPRI NP-6041, 20               E4100F122                   PRESS     E4101C002       Screened                         Table 2-4 REGULATING VLV HPCI OIL COOLER THERMOSTA TIC                                                   EPRI NP-6041, 21             E4100F128               BYPA S T LT     E4100B002       Screened                           Tabl -4 BYPASS/OUTLET                                                     Table 2-4 VLV HPCI O/S TRIP EPR N601, 22             E4100F133                 AUTOMATIC     E4101C002       Screened                         Table 2-4 RESET CTRL VLV HPCI COOLING WATER TO TURBINE LUBE OIL                                                 EPRI NP-6041, 23               E41F035             COOLER E41B002   E41002 02       Screened                         Table 2-4 PRESSURE CONTROL VLV RCIC BARO CNDR                                                   EPRI NP-6041, PRESS RELIEF VLV                                                   Table 2-4 RCIC COOLING WATER TO LUBE 25               E51F015                 OIL COOLER   E5100B002       Screened                       EPRI NP-6041 E5100B3002                                                     Table 2-4 PRESSURE CONTROL VLV Fermi 2 Expedited Seismic Evaluation Process                       Page C4 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM IP DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER HPCI OIL CLR/TRIP UNIT OIL SPLY EPRI NP-6041, 20 E4100F122 PRESS E4101C002 Screened Table 2-4 REGULATING VLV HPCI OIL COOLER THERMOSTA TIC EPRI NP-6041, 21 E4100F128 BYPA S T LT E4100B002 Screened Tabl  
-4 BYPASS/OUTLET Table 2-4 VLV HPCI O/S TRIP EPR N601, 22 E4100F133 AUTOMATIC E4101C002 Screened Table 2-4 RESET CTRL VLV HPCI COOLING WATER TO TURBINE LUBE OIL EPRI NP-6041, 23 E41F035 COOLER E41B002 E41002 02 Screened Table 2-4 PRESSURE CONTROL VLV RCIC BARO CNDR EPRI NP-6041, PRESS RELIEF VLV Table 2-4 RCIC COOLING WATER TO LUBE 25 E51F015 OIL COOLER E5100B002 Screened EPRI NP-6041 E5100B3002 Table 2-4 PRESSURE CONTROL VLV Fermi 2 Expedited Seismic Evaluation Process Page C4 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
I'
I'


ESEL             EUP           NTMOUNTED                                                             FRAGILITY   NOTES!
ESEL EUP NTMOUNTED FRAGILITY NOTES!
ITEM             EQUIPMENT                   DESCRIPTION       ON         HCLPF(G) FAILURE MODE     METY     COMMENTS NUMBER                   ID RCIC TURB BARO 26               E51F200               CNDR VACUUM       5100B001       Screened                           EPRI NP-6041, TANK VLV V8-4618                                                         Table 2-4 PRESS CTRL VLV PCP DIV 2 B/U N2 SPLY PRV 27             T4901F613                   BETWEEN       T49P401       Screened                           EPRI NP-6041, Table 2-4 PRESSURE REGULATORS PCP DIV 2 B/U N2 SPLY 2ND STAGE 28               T49F470                   PCV DOWN       T49P401       Screened                           EPRI NP-6041, Table 2-4 STREAM OF RELIEF VLV PCP DIV 2 B/U N2 29               T49F471               SPLY 1ST STAGE     T49P401       Screened Table 2-4 PCV SWGR 480V 30             R1400SO22                         UNIS BDOOR FLOOR             0.3     Functionality   GERS NO. 72B SWGR 480V 31        31 R1405023 R1400SO23                INDOOR UNIT SUBSTATION   BUS   FLOOR             0.3   Functionality   GERS NO. 72C Fermi 2 Expedited Seismic Evaluation Process                         Page C5 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METY COMMENTS NUMBER ID RCIC TURB BARO 26 E51F200 CNDR VACUUM 5100B001 Screened EPRI NP-6041, TANK VLV V8-4618 Table 2-4 PRESS CTRL VLV PCP DIV 2 B/U N2 SPLY PRV 27 T4901F613 BETWEEN T49P401 Screened EPRI NP-6041, PRESSURE Table 2-4 REGULATORS PCP DIV 2 B/U N2 SPLY 2ND STAGE 28 T49F470 PCV DOWN T49P401 Screened EPRI NP-6041, STREAM OF RELIEF Table 2-4 VLV PCP DIV 2 B/U N2 29 T49F471 SPLY 1ST STAGE T49P401 Screened PCV Table 2-4 SWGR 480V 30 R1400SO22 BDOOR UNIS FLOOR 0.3 Functionality GERS NO. 72B SWGR 480V 31 R1405023 INDOOR UNIT 31 R1400SO23 SUBSTATION BUS FLOOR 0.3 Functionality GERS NO. 72C Fermi 2 Expedited Seismic Evaluation Process Page C5 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


IEME             EQUIPMENT UEID                    DESCRIPTION MOUNTED ON         HCLPF(G) FAILURE MODE FRAGILITY METHOD
IEME EQUIPMENT MOUNTED FRAGILITY ]
                                                                                                              ]  NOTES/
NOTES/
COMMENTS NUMBER 32           R1600S002A               48MCC/DI 72B-A   FLOOR           0.3   Functionality   GERS MCC/DIST CAB 33             R1600S002B             480V MCC NO 72B- FLOOR           0.3   Functionality   GERS 3A MCC/DIST CAB 34             R1600SO02C             480V MCC NO 72B- FLOOR           0.3   Functionality   GERS 3A 35           R1600S003D                   MCC 72C-F     FLOOR           0.3   Functionality   GERS MCC/DIST CAB 36           R1600SO04B               480V MCC NO 72E- FLOOR           0.3   Functionality   GERS 5A MCC/DIST CAB 37           R1600S005A               480V MCC NO 72F- FLOOR           0.3   Functionality   GERS 2A MCC/DIST CAB 38           R1600SO14A               480V MCC NO 72B- FLOOR           0.3   Functionality   GERS 4A 39        39 R320S015 R3200S015              DC 260V DC MCC (2PA-1)     FLOOR           0.3   Functionality   GERS 40             R3200S(16               DC 260PBDC MCC   FLOOR           0.3   Functionality   GERS Fermi 2 Expedited Seismic Evaluation Process                     Page C6 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
UE ID DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER 32 R1600S002A 48MCC/DI 72B-A FLOOR 0.3 Functionality GERS MCC/DIST CAB 33 R1600S002B 480V MCC NO 72B-FLOOR 0.3 Functionality GERS 3A MCC/DIST CAB 34 R1600SO02C 480V MCC NO 72B-FLOOR 0.3 Functionality GERS 3A 35 R1600S003D MCC 72C-F FLOOR 0.3 Functionality GERS MCC/DIST CAB 36 R1600SO04B 480V MCC NO 72E-FLOOR 0.3 Functionality GERS 5A MCC/DIST CAB 37 R1600S005A 480V MCC NO 72F-FLOOR 0.3 Functionality GERS 2A MCC/DIST CAB 38 R1600SO14A 480V MCC NO 72B-FLOOR 0.3 Functionality GERS 4A 39 R320S015 DC 260V DC MCC 39 R3200S015 (2PA-1)
FLOOR 0.3 Functionality GERS 40 R3200S(16 DC 260PBDC MCC FLOOR 0.3 Functionality GERS Fermi 2 Expedited Seismic Evaluation Process Page C6 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                           FRAGILITY       NOTES!
ESEL EUP NTMOUNTED FRAGILITY NOTES!
ITEM             EQUIPMENT                   DESCRIPTION         ON         HCLPF(G) FAILURE MODE     METHOD       COMMENTS NUMBER R1600SO01C               MCC/DIST CAB 41                                     480V MCC NO 72A-     FLOOR           0.37   Functionality   GERS (72A-4A)                       4A DC DIV1 130/260V 42             R3200S003               DUAL BAT T 2PA     FLOOR           0.52     Anchorage   New Analysis 43        43 R320S004 R3200S004              DC 260/130V   DUAL BA TT3(2PB)     FLOOR           0.52     Anchorage   New Analysis R3200S020A             Div 1 Battery Charger FLOOR           0.27   Functionality Qualification 44 2A-1                                                   Data R3200SO20C               Div 1 Spare Battery FLOOR           0.27   Functionality Qualification 45 Charger 2A 1-2                                             Data R3200SO21B             Div 2 Battery Charger FLOOR           0.27   Functionality Qualification 46 2B-2                                                   Data R3200S21C               1DC DIAT C GR       FLOOR           0.27   Functionality Qualification 47 CRTL & AUX RM PNL (MR ONLY)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
HI1P601                   ECCS DIV1       FLOOR           0.34   Functionality Experience 48 COMBINATION                                             Data Method OPERATING PANEL Fermi 2 Expedited Seismic Evaluation Process                         Page C7 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER R1600SO01C MCC/DIST CAB 41 480V MCC NO 72A-FLOOR 0.37 Functionality GERS (72A-4A) 4A DC DIV1 130/260V 42 R3200S003 DUAL BAT T 2PA FLOOR 0.52 Anchorage New Analysis 43 R320S004 DC 260/130V DUAL 43 R3200S004 BA TT3(2PB)
FLOOR 0.52 Anchorage New Analysis 44 R3200S020A Div 1 Battery Charger FLOOR 0.27 Functionality Qualification 2A-1 Data 45 R3200SO20C Div 1 Spare Battery FLOOR 0.27 Functionality Qualification Charger 2A 1-2 Data 46 R3200SO21B Div 2 Battery Charger FLOOR 0.27 Functionality Qualification 2B-2 Data 47 R3200S21C 1DC DIAT C GR FLOOR 0.27 Functionality Qualification CRTL & AUX RM PNL (MR ONLY) 48 HI1P601 ECCS DIV1 FLOOR 0.34 Functionality Experience COMBINATION Data Method OPERATING PANEL Fermi 2 Expedited Seismic Evaluation Process Page C7 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                           FRAIIYNTS ITEM             EQUIPMENT                 DESCRIPTION       ON         HCLPF(G) FAILURE MODE     RAGILITY     COMENTS NUMBER CRTL & AUX RM PNL (MR ONLY)
ESEL EUP NTMOUNTED FRAIIYNTS ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
ECCS DIV2     FLOOR           0.34   Functionality Experience 49              H 1P602 Data Method COMBINATION OPERATING PANEL CRTL & AUX RM PNL (MR ONLY) 50               HI1P612                NSSS PROCESS     FLOOR           0.69   Functionality Qualification INST CAB DIV2 INST RACK CRTL & AUX RM PNL (MR ONLY) 51               HI 1P613               NSSS PROCESS     FLOOR           0.69   Functionality Qualification INST CAB DIV1 INST RACK CRTL & AUX RM H11P621               PNL (MR ONLY)     FLOOR           0.69   Functionality Qualification 52 RCIC DIV1 INST                                               Data RACK 53               H 1P620               HPCI Relays/lights FLOOR           0.32   Functionality Data Method CRTL & AUX RM 54               H 1P628               PNL (MR ONLY)     FLOOR           0.32   Functionality Experience SRV DIVi1 ADS                                         Data Method RELAY CAB Fermi 2 Expedited Seismic Evaluation Process                       Page C8 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE RAGILITY COMENTS NUMBER CRTL & AUX RM PNL (MR ONLY) 49 H 1P602 ECCS DIV2 FLOOR 0.34 Functionality Experience COMBINATION Data Method OPERATING PANEL CRTL & AUX RM PNL (MR ONLY) 50 HI 1P612 NSSS PROCESS FLOOR 0.69 Functionality Qualification INST CAB DIV2 INST RACK CRTL & AUX RM PNL (MR ONLY) 51 HI 1P613 NSSS PROCESS FLOOR 0.69 Functionality Qualification INST CAB DIV1 INST RACK CRTL & AUX RM 52 H11P621 PNL (MR ONLY)
FLOOR 0.69 Functionality Qualification RCIC DIV1 INST Data RACK 53 H 1P620 HPCI Relays/lights FLOOR 0.32 Functionality Data Method CRTL & AUX RM 54 H 1P628 PNL (MR ONLY)
FLOOR 0.32 Functionality Experience SRV DIVi1 ADS Data Method RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C8 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUPNTMOUNTED                                                                   FRAGILITY     NOTES/
ESEL EUPNTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION     ON         HCLPF(G) FAILURE MODE     METHOD     COMMENTS NUMBER CTRL AND AUX RM PNL INBD VLV                                     . Experience 55               H 11P622             CTRL RELAY CAB   FLOOR           0.47   Functionality Data Method DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
MISC DC RELAY FLOOR           0.47   Functionality Experience 56              HI1P870 Data Method PANEL DIV2 INST RACK CRTL & AUX RM PNL (MR ONLY)
FAILURE MODE METHOD COMMENTS NUMBER CTRL AND AUX RM PNL INBD VLV Experience 55 H 11P622 CTRL RELAY CAB FLOOR 0.47 Functionality Data Method DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY) 56 HI 1P870 MISC DC RELAY FLOOR 0.47 Functionality Experience PANEL DIV2 INST Data Method RACK CRTL & AUX RM PNL (MR ONLY) 57 H 1P914 PCAM EQUIP AND FLOOR 0.47 Functionality Experience MISC RELAY DIV1 Data Method INST RACK CRTL & AUX RM PNL (MR ONLY) PC 58 HI 1P915 MON EQUIP & MISC FLOOR 0.47 Functionality Experience RELAY DIV2 INST RACK LOC PNL/RACK 59 H2P080 (MR ONLY) ECCS 59 H21P080 TRIP UNIT CAB FLOOR 0.28 Anchorage New Analysis DIV1 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C9 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
H 1P914               PCAM EQUIP AND   FLOOR           0.47   Functionality Experience 57 Data Method MISC RELAY DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY) PC HI1P915            MON EQUIP & MISC   FLOOR           0.47   Functionality Experience 58 RELAY DIV2 INST RACK LOC PNL/RACK 59       59    H2P080 H21P080                (MR TRIPONLY)
UNIT ECCS CAB FLOOR           0.28     Anchorage   New Analysis DIV1 INST RACK Fermi 2 Expedited Seismic Evaluation Process                     Page C9 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUPNTMOUNTED                                                                     FRAGILITY     NOTES!
ESEL EUPNTMOUNTED FRAGILITY NOTES!
ITEM             EQUIPMENT                   DESCRIPTION     ON         HCLPF(G) FAILURE MODE     METHOD     COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL 60               H21P081               PNL AND RACKS   FLOOR           0.28     Anchorage   New Analysis DIV2 ECCS TRIP UNIT INST RACK LOC PNL/RACK 61       61    H2P082 H21P082                (MR TRIPONLY)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
UNIT ECCS CAB FLOOR           0.28     Anchorage   New Analysis DIVI INST RACK CRTL & AUX RM 62               HI 1P609             RPS TRP CA   D   FLOOR           0.32   Functionality DExpelthod INST RACK CRTL & AUX RM 63               H 1P611             RPS     R CN DV2 FLOOR           0.32   Functionality DExpelthod INST RACK CRTL & AUX RM 64               H11P617                 PNL(MR         FLOOR           0.32   Functionality Experience DIVI RHR RELAY FLO               .2   Fntoaiy       Data Method CAB INST RACK CRTL & AUX RM 65               H11P618                 PNL(MR         FLOOR           0.32   Functionality Experience DIV2 RHR RELAY FLO               .2   Fntoaiy       Data Method CAB INST RACK Fermi 2 Expedited Seismic Evaluation Process                     Page C 10 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL 60 H21P081 PNL AND RACKS FLOOR 0.28 Anchorage New Analysis DIV2 ECCS TRIP UNIT INST RACK LOC PNL/RACK 61 H2P082 (MR ONLY) ECCS 61 H21P082 TRIP UNIT CAB FLOOR 0.28 Anchorage New Analysis DIVI INST RACK CRTL & AUX RM 62 HI 1P609 RPS TRP CA D FLOOR 0.32 Functionality DExpelthod INST RACK CRTL & AUX RM 63 H 1P611 RPS R CN DV2 FLOOR 0.32 Functionality DExpelthod INST RACK CRTL & AUX RM 64 H11P617 PNL(MR FLOOR 0.32 Functionality Experience DIVI RHR RELAY FLO  
.2 Fntoaiy Data Method CAB INST RACK CRTL & AUX RM 65 H11P618 PNL(MR FLOOR 0.32 Functionality Experience DIV2 RHR RELAY FLO  
.2 Fntoaiy Data Method CAB INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C 10 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                         FRAGILITY   NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION     ON         HCLPF(G) FAILURE MODE     METHOD   COMMENTS NUMBER 66               B21P400               RELB SRV DINT   WALL             0.32   Functionality DExpelthod 67               B21P401                 NB SRV DINET WALL             0.32   Functionality DExpethod LOC PNL/RACK (MR ONLY) RX 68               H21P004                 VESSEL LVL &   FLOOR           0.59   Functionality   GERS PRESS DIV1 INST RACK LOC PNL/RACK 69        69 H~PS9SB(MR H21P595B                      ONLY)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
RWELL   MON WALL             1.12   Functionality   GERS DIV2 INST RACK LOC PNL/RACK 70               H21P408               (MR ONLY) AIR   FLOOR           0.38   Functionality   GERS COMPS INST RACK LOC PNL/RACK 71        71 H     1P1 4B H2MP614B              (MR MON   SYS TORUS ONLY)  INST FLOOR           1.36   Functionality   GERS RACK Fermi 2 Expedited Seismic Evaluation Process                     Page C1I of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER 66 B21P400 RELB SRV DINT WALL 0.32 Functionality DExpelthod 67 B21P401 NB SRV DINET WALL 0.32 Functionality DExpethod LOC PNL/RACK (MR ONLY) RX 68 H21P004 VESSEL LVL &
FLOOR 0.59 Functionality GERS PRESS DIV1 INST RACK LOC PNL/RACK 69 H~PS9SB(MR ONLY) 69 H21P595B RWELL MON WALL 1.12 Functionality GERS DIV2 INST RACK LOC PNL/RACK 70 H21P408 (MR ONLY) AIR FLOOR 0.38 Functionality GERS COMPS INST RACK LOC PNL/RACK 71 H 1 P1 4B (MR ONLY) TORUS 71 H2MP614B MON SYS INST FLOOR 1.36 Functionality GERS RACK Fermi 2 Expedited Seismic Evaluation Process Page C1I of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                               FRAGILITY     NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION           ON         HCLPF(G) FAILURE MODE   METHOD     COMMENTS NUMBER LOCAL PNL AND RACKS DIV2 72             H21P631B                   TORUS PRESS         WALL             0.53 Functionality   GERS INSTRUMENTATIO N RACK LOC PNL/RACK 73               1121P014               (MR ONLY) HPCI ESS DIV2 INST       FLOOR           0.89   Anchorage   New Analysis RACK LOC PNL/RACK 74               H21P017                 (MR ONLY) RCIC       FLOOR           0.89   Anchorage   New Analysis DIV1 INST RACK 75             T49P400B3                 PC PNEU DIV2       FLO                 .9 Fntoaiy       Experience SPLY INST RACK       FLOOR             1.29 Functionality Data Method LOC PNL/RACK (MR ONLY) PILOTScaling                                             from 76             H21P501A                 VLVDIV1 INST       FLOOR             0.43   Anchorage     Existing RACK                                                   Analysis LOC PNL/RACK (MR ONLY) CA                                             Scaling from 77             H21P501B                 ( DIV2 PILOT       FLOOR             0.43   Anchorage     Existing VLVINST RACK                                               Analysis Fermi 2 Expedited Seismic Evaluation Process                           Page C12 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER LOCAL PNL AND RACKS DIV2 72 H21P631B TORUS PRESS WALL 0.53 Functionality GERS INSTRUMENTATIO N RACK LOC PNL/RACK 73 1121P014 (MR ONLY) HPCI ESS DIV2 INST FLOOR 0.89 Anchorage New Analysis RACK LOC PNL/RACK 74 H21P017 (MR ONLY) RCIC FLOOR 0.89 Anchorage New Analysis DIV1 INST RACK 75 T49P400B3 PC PNEU DIV2 FLO  
.9 Fntoaiy Experience SPLY INST RACK FLOOR 1.29 Functionality Data Method LOC PNL/RACK (MR ONLY) PILOTScaling from 76 H21P501A VLVDIV1 INST FLOOR 0.43 Anchorage Existing RACK Analysis LOC PNL/RACK (MR ONLY) CA Scaling from 77 H21P501B
( DIV2 PILOT FLOOR 0.43 Anchorage Existing VLVINST RACK Analysis Fermi 2 Expedited Seismic Evaluation Process Page C12 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                         FRAGILITY     NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION       ON         HCLPF(G) FAILURE MODE   METHOD       COMMENTS NUMBER CRTL & AUX RM 78               HIIP923                 PNL (MR ONLY)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
RCIC TURB CTRL     WALL           0.22 Functionality   GERS PANEL INST RACK CRTL & AUX RM PNL (MR ONLY) 79               H 1P929               HPCI RELAY RM     WALL           0.22 Functionality   GERS GOVERNOR CTRL INST RACK DC BATT SPB MAIN 80             R3200SO26           DIST CABINET 2PA-   FLOOR           0.39 Functionality   GERS 2
FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 78 HIIP923 PNL (MR ONLY)
DC BATT 2PB MAIN 81             R3200SO27             DIST CABINET 2PB-   FLOOR           0.39 Functionality   GERS 2
RCIC TURB CTRL WALL 0.22 Functionality GERS PANEL INST RACK CRTL & AUX RM PNL (MR ONLY) 79 H 1P929 HPCI RELAY RM WALL 0.22 Functionality GERS GOVERNOR CTRL INST RACK DC BATT SPB MAIN 80 R3200SO26 DIST CABINET 2PA-FLOOR 0.39 Functionality GERS 2
DC SWGR ROOM 82             R3200S062             130V DIST CABINET   FLOOR           0.22 Functionality   GERS 2PA2-14 RCIC REACTOR 83             E5101C002             CORE ISOLATION   E5101C002         1.24 Functionality Qualification COOLING TURBINE                                             Data 84             E4101C00IA               HPCI MAIN PUMP E410100I1A         0.58 Functionality Experience Data Method Fermi 2 Expedited Seismic Evaluation Process                       Page C13 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
DC BATT 2PB MAIN 81 R3200SO27 DIST CABINET 2PB-FLOOR 0.39 Functionality GERS 2
DC SWGR ROOM 82 R3200S062 130V DIST CABINET FLOOR 0.22 Functionality GERS 2PA2-14 RCIC REACTOR 83 E5101C002 CORE ISOLATION E5101C002 1.24 Functionality Qualification COOLING TURBINE Data 84 E4101C00IA HPCI MAIN PUMP E410100I1A 0.58 Functionality Experience Data Method Fermi 2 Expedited Seismic Evaluation Process Page C13 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                         FRAGILITY       NOTES!
ESEL EUP NTMOUNTED FRAGILITY NOTES!
ITEM             EQUIPMENT                 DESCRIPTION       ON         HCLPF(G) FAILURE MODE   METHOD       COMMENTS NUMBER E4101C003 HPCI BAROMETRIC                                             Experience 85             E4101C003                 CONDENSER     E4100B001         0.57 Functionality Data Method VACUUM PUMP RCIC REACTOR CORE ISOLATION   E5101C001         0.54 Functionality Experience 86            E5101C001 Data Method COOLING PUMP HPCI TEST LINE 87               E41F011               ISO / PRESS CTRL   E41F011         1.87 Functionality Qualification AOV       AOV                                       Data PC PNEU DIV2 N2 88             T4901F469               SPLY ISO AOV   T4901F469         0.64 Functionality New Analysis PCAM PC PRESS MON T50L406B PT 89             T5000F420B               OTBD SAMPLE   T5000F420B         0.64 Functionality New Analysis AOV PCAM PC TORUS 90        90 T000F21B T5000F421B                WTR LVL MON DIV2 TORUS LVL T5000F421B         0.64 Functionality New Analysis INST LINE ISO AOV NB MSL "A" INBD                                         Scaling from 91           B2103F022A                 PC ISO AOV   B2103F022A         0.33 Functionality   Existing Analysis Fermi 2 Expedited Seismic Evaluation Process                       Page C14 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER E4101C003 HPCI BAROMETRIC Experience 85 E4101C003 CONDENSER E4100B001 0.57 Functionality Data Method VACUUM PUMP RCIC REACTOR 86 E5101C001 CORE ISOLATION E5101C001 0.54 Functionality Experience COOLING PUMP Data Method HPCI TEST LINE 87 E41F011 ISO / PRESS CTRL E41F011 1.87 Functionality Qualification AOV Data AOV PC PNEU DIV2 N2 88 T4901F469 SPLY ISO AOV T4901F469 0.64 Functionality New Analysis PCAM PC PRESS MON T50L406B PT 89 T5000F420B OTBD SAMPLE T5000F420B 0.64 Functionality New Analysis AOV PCAM PC TORUS 90 T000F21B WTR LVL MON 90 T5000F421B DIV2 TORUS LVL T5000F421B 0.64 Functionality New Analysis INST LINE ISO AOV NB MSL "A" INBD Scaling from 91 B2103F022A PC ISO AOV B2103F022A 0.33 Functionality Existing Analysis Fermi 2 Expedited Seismic Evaluation Process Page C14 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


EQUIPMENT                                 MOUNTED                                         FRAGILITY     NOTES/
ITEM EQUIPMENT MOUNTED FRAGILITY NOTES/
ITEM EME                   ID                   DESCRIPTION         ON           HCLPF(G) FAILURE MODE       METHOD     COMMENTS NUMBER           ______                  ________          __________                    _____          __
EME ID DESCRIPTION ON HCLPF(G)
Scaling from NB MSL "B" INBD 92           B2103F022B                   PC ISO AOV B2103F022B             0.33     Functionality   Existing Analysis NB MSL "C" INBD                                                   Scaling from 93           B2103F022C                   PC ISO AOV B2103F022C             0.33     Functionality   Existing Analysis Scaling from NB MSL "D" INBD 94           B2103F022D                   PC ISO AOV B2103F022D             0.33     Functionality   Existing Analysis NB MSL "A" OTBD                                                   Scaling from 95           B2103F028A                   PC ISO AOV B2103F028A             0.33     Functionality   Existing Analysis NB MSL "B" OTBD                                                   Scaling from 96           B2103F028B                   PC ISO AOV B2103F028B             0.33     Functionality   Existing Analysis Scaling from NB MSL "C" OTBD 97           B2103F028C                   PC ISO AOV B2103F028C             0.33     Functionality   Existing Analysis NB MSL "D" OTBD                                                   Scaling from 98           B2103F028D                   PC ISO AOV B2103F028D             0.33     Functionality   Existing Analysis Fermi 2 Expedited Seismic Evaluation Process                           Page C 15 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER NB MSL "B" INBD Scaling from 92 B2103F022B PC ISO AOV B2103F022B 0.33 Functionality Existing Analysis NB MSL "C" INBD Scaling from 93 B2103F022C PC ISO AOV B2103F022C 0.33 Functionality Existing Analysis NB MSL "D" INBD Scaling from 94 B2103F022D PC ISO AOV B2103F022D 0.33 Functionality Existing Analysis NB MSL "A" OTBD Scaling from 95 B2103F028A PC ISO AOV B2103F028A 0.33 Functionality Existing Analysis NB MSL "B" OTBD Scaling from 96 B2103F028B PC ISO AOV B2103F028B 0.33 Functionality Existing Analysis NB MSL "C" OTBD Scaling from 97 B2103F028C PC ISO AOV B2103F028C 0.33 Functionality Existing Analysis NB MSL "D" OTBD Scaling from 98 B2103F028D PC ISO AOV B2103F028D 0.33 Functionality Existing Analysis Fermi 2 Expedited Seismic Evaluation Process Page C 15 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                             FRAGILITY   NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION           ON         HCLPF(G)   FAILURE MODE METHOD   COMMENTS NUMBER NIAS STATION AIR 99             P5000F440             TO CONTROL AIR       P5000F440       Screened                       EPRI NP-6041, Table 2-4 ISO AOV NIAS STATION AIR 100             P5000F441             TO CONTROL AIR       P5000F441       Screened                       EPRI NP-6041, ISO AOV                                                         Table 2-4 SA TURBINE       SA       TUBINEEPRI                                 NP-604 101             P5000F401             BUILDING HEADER       P5000F401       Screened                         Table 2-4 1, ISO AOV RCIC WARM-UP 102             E5150F095               BYPASS INLET       E5150F095       Screened                       EPRI NP-6041, Table 2-4 MOV Closure of Reactor 103           B3105F023A               Recirc Pump A seal B3105F023A       Screened                       EPRI NP-6041, leakage source, RRA                                                     Table 2-4 Suction Valve Closure of Reactor 104           B3105F023B               Recirc Pump B seal B3105F023B     Screened                         EPRI NP-6041, leakage source, RRB                                                     Table 2-4 Suction Valve Closure of Reactor 105           B3105F031A                 cre   o   Asal B3105F031A     Screened                         EPRI NP-6041, leakage source, RRA                                                     Table 2-4 Discharge Valve Fermi 2 Expedited Seismic Evaluation Process                           Page C16 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER NIAS STATION AIR 99 P5000F440 TO CONTROL AIR P5000F440 Screened EPRI NP-6041, ISO AOV Table 2-4 NIAS STATION AIR 100 P5000F441 TO CONTROL AIR P5000F441 Screened EPRI NP-6041, ISO AOV Table 2-4 SA TURBINE SA TUBINEEPRI NP-604 1, 101 P5000F401 BUILDING HEADER P5000F401 Screened Table 2-4 ISO AOV RCIC WARM-UP 102 E5150F095 BYPASS INLET E5150F095 Screened EPRI NP-6041, MOV Table 2-4 Closure of Reactor 103 B3105F023A Recirc Pump A seal B3105F023A Screened EPRI NP-6041, leakage source, RRA Table 2-4 Suction Valve Closure of Reactor 104 B3105F023B Recirc Pump B seal B3105F023B Screened EPRI NP-6041, leakage source, RRB Table 2-4 Suction Valve Closure of Reactor 105 B3105F031A cre o
Asal B3105F031A Screened EPRI NP-6041, leakage source, RRA Table 2-4 Discharge Valve Fermi 2 Expedited Seismic Evaluation Process Page C16 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                               FRAGILITY   NOTES!
ESEL EUP NTMOUNTED FRAGILITY NOTES!
ITEM             EQUIPMENT                   DESCRIPTION         ON         HCLPF(G)     FAILURE MODE METHOD   COMMENTS NUMBER Closure of Reactor 106           B3105F031B               Recirc Pump B seal B3105F031B     Screened                           EPRI NP-6041, leakage source, RRB                                                     Table 2-4 Discharge Valve 107           E1150F015A                 RHR DIV1 LPCI     E1150F015A     Screened                           EPRI NP-6041, INBD ISO MOV                                                           Table 2-4 E1150F015B, RHR                                                       EPRI NP-6041, 108             E1150F015B           DIV2 LPCI INBD ISO   E1150F015B     Screened                           EPRI N-4 MOV                                                             Table 2-4 109           E1150F017A                 RHR DIV1 LPCI     E1150F017A     Screened                           EPRI NP-6041, MOV                                                             Table 2-4 110             E1150F017B               E1150FOI7B, RHR   E1150F017B     Screened                           EPRI NP-6041, DIV2 LPCI MOV                                                         Table 2-4 RHR DIV1 CNTM 111           E1150F024A             COOLING/TEST ISO     E1150F024A     Screened                           EPRI       1, Table 2-4 MOV E1150F024B, RHR 112           E1150F024B                   DIV2 CNTM       El150F024B     Screened                           EPRI NP-6041, COOLING! Test ISO   El1004           cendTable                               2-4 MOV, Div. 2 Fermi 2 Expedited Seismic Evaluation Process                         Page C17 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER Closure of Reactor 106 B3105F031B Recirc Pump B seal B3105F031B Screened EPRI NP-6041, leakage source, RRB Table 2-4 Discharge Valve 107 E1150F015A RHR DIV1 LPCI E1150F015A Screened EPRI NP-6041, INBD ISO MOV Table 2-4 E1150F015B, RHR EPRI NP-6041, 108 E1150F015B DIV2 LPCI INBD ISO E1150F015B Screened EPRI N-4 MOV Table 2-4 109 E1150F017A RHR DIV1 LPCI E1150F017A Screened EPRI NP-6041, MOV Table 2-4 110 E1150F017B E1150FOI7B, RHR E1150F017B Screened EPRI NP-6041, DIV2 LPCI MOV Table 2-4 RHR DIV1 CNTM 111 E1150F024A COOLING/TEST ISO E1150F024A Screened EPRI 1,
MOV Table 2-4 E1150F024B, RHR 112 E1150F024B DIV2 CNTM El150F024B Screened EPRI NP-6041, COOLING! Test ISO El1004 cendTable 2-4 MOV, Div. 2 Fermi 2 Expedited Seismic Evaluation Process Page C17 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                             FRAGILITY   NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION             ON         HCLPF(G)   FAILURE MODE METHOD   COMMENTS NUMBER RHR DIV1 SUPR POOL CNTM SPRAY                                                         EPRI NP-6041, 113           E1150F028A               TEST ISOM       Div. E1150F028A       Screened                           Tabl -4 TEST ISO MOV, Div.                                                       Table 2-4 1
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
El 150F028B, RHR 114             E1150F028B             DIV2 SUPR POOL       E1150F028B       Screened                       EPRI NP-6041, CNTM SPRAY/TEST                                                           Table 2-4 ISO MOV HPCI STEAM 115             E4150F001             SUPPLY TO TURB       E4150F001       Screened                       EPRI NP-6041, DRIVEN PUMP                                                           Table 2-4 116             E4150F002                 RPV Injection     E4150F002       Screened                       EPRI NP-6041, Table 2-4 117             E4150F003                 RPV Injection     E4150F003       Screened                       EPRI NP-6041, Table 2-4 118             E4150F004                 RPV Injection     E4150F004       Screened                       EPRI NP-6041, Table 2-4 HPCI TURB 119             E4150F021               EXHAUST STOP         E4150F021       Screened                         EPRI NP-6041, GLOBE MOV                                                             Table 2-4 HPCI LUBE OIL 120             E4150F059               COOLING WATER         E4100B002       Screened                         EPRI NP-6041, SPLY ISO MOV                                                           Table 2-4 Fermi 2 Expedited Seismic Evaluation Process                           Page C18 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER RHR DIV1 SUPR POOL CNTM SPRAY EPRI NP-6041, 113 E1150F028A TEST ISOM Div. E1150F028A Screened Tabl -4 TEST ISO MOV, Div.
Table 2-4 1
El 150F028B, RHR 114 E1150F028B DIV2 SUPR POOL E1150F028B Screened EPRI NP-6041, CNTM SPRAY/TEST Table 2-4 ISO MOV HPCI STEAM 115 E4150F001 SUPPLY TO TURB E4150F001 Screened EPRI NP-6041, DRIVEN PUMP Table 2-4 116 E4150F002 RPV Injection E4150F002 Screened EPRI NP-6041, Table 2-4 117 E4150F003 RPV Injection E4150F003 Screened EPRI NP-6041, Table 2-4 118 E4150F004 RPV Injection E4150F004 Screened EPRI NP-6041, Table 2-4 HPCI TURB 119 E4150F021 EXHAUST STOP E4150F021 Screened EPRI NP-6041, GLOBE MOV Table 2-4 HPCI LUBE OIL 120 E4150F059 COOLING WATER E4100B002 Screened EPRI NP-6041, SPLY ISO MOV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C18 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                         FRAGILITY       NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM           EQUIPMENT                   DESCRIPTION     ON         HCLPF(G)   FAILURE MODE   METHOD       COMMENTS NUMBER HPCI MAIN PUMP                                         Scaling based 121             E4150F008               TEST LINE ISO E4150F008         0.47   Functionality on Existing MOV                                                 Analysis HPCI TURB EXH CONDENSATE 122             E4150F022               DRAIN TO SUPR E4150F022       Screened                             EPRI NP-6041, Table 2-4 POOL STOP CHECK MOV RCIC TURB 123             E5150F001           EXHAUST LINE ISO E5150F001       Screened                             EPRI NP-6041, Table 2-4 MOV HPCI BOOSTER 124             E4150F041             PUMP SUCT FROM E4150F041       Screened                             EPRI NP-6041, SUPR POOL ISO                                                         Table 2-4 MOV HPCI BOOSTER 125             E4150F042             PUMP SUCT FROM E4150F042       Screened                             EPRI NP-6041, SUPR POOL ISO                                                         Table 2-4 MOV RCIC BARO CNDR 126             ES150F002               VACUUM PUMP   E5100B001       Screened                             EPRI NP-6041, DISCHARGE STOP                                                           Table 2-4 CHECK MOV Fermi 2 Expedited Seismic Evaluation Process                     Page C19 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER HPCI MAIN PUMP Scaling based 121 E4150F008 TEST LINE ISO E4150F008 0.47 Functionality on Existing MOV Analysis HPCI TURB EXH CONDENSATE 122 E4150F022 DRAIN TO SUPR E4150F022 Screened EPRI NP-6041, POOL STOP CHECK Table 2-4 MOV RCIC TURB 123 E5150F001 EXHAUST LINE ISO E5150F001 Screened EPRI NP-6041, MOV Table 2-4 HPCI BOOSTER 124 E4150F041 PUMP SUCT FROM E4150F041 Screened EPRI NP-6041, SUPR POOL ISO Table 2-4 MOV HPCI BOOSTER 125 E4150F042 PUMP SUCT FROM E4150F042 Screened EPRI NP-6041, SUPR POOL ISO Table 2-4 MOV RCIC BARO CNDR 126 ES150F002 VACUUM PUMP E5100B001 Screened EPRI NP-6041, DISCHARGE STOP Table 2-4 CHECK MOV Fermi 2 Expedited Seismic Evaluation Process Page C19 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EQIMN                                     MOUNTED                               FRAGILITY   NOTES/
ESEL EQIMN MOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION     ON         HCLPF(G)   FAILURE MODE METHOD   COMMENTS NUMBER RCICI TURB STM 127             E5150F007               SPLY INBO CNTM E5150F007     Screened Table 2-4 ISO MOV RCICI TURB STM 128             E5150F008             SPLY ONBO CNTM   E5150F008     Screened                         EPRI N-4 ISO MOV      ISO              MOVTable                           2-4 RCIC PUMP   RCICPUMPEPRI                                       NP-6041, 129             E5150F012               DISCHARGE ISO E5150F012     Screened                         EPRI N-4 MOV                                           Table 2-4 MOV RCIC PUMP SPLY EPRI N-01,   ,
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
130             E5150F013               TO FEEDWATER   E5150F013     Screened Table 2-4 HEADER ISO MOV COMPR AIR PC 131             T490IF602             PNEU DIV2 INST N2 T4901F602     Screened                         EPRI NP-6041, INERTING SPY                                                   Table 2-4 INBRD PC ISO MOV RCIC PUMP MIN 132             E5150F019                 FLOW RECIRC   E5150F019     Screened                         EPRI NP-6041, BYPASS MOV                                                     Table 2-4 RCIC PUMP SPLY 133             E5150F029             FROM TORUS ISO   E5150F029     Screened                         EPRI NP-6041, Table 2-4 MOV Fermi 2 Expedited Seismic Evaluation Process                     Page C20 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER RCICI TURB STM 127 E5150F007 SPLY INBO CNTM E5150F007 Screened Table 2-4 ISO MOV RCICI TURB STM 128 E5150F008 SPLY ONBO CNTM E5150F008 Screened EPRI N-4 ISO MOVTable 2-4 ISO MOV RCIC PUMP RCICPUMPEPRI NP-6041, 129 E5150F012 DISCHARGE ISO E5150F012 Screened EPRI N-4 MOV Table 2-4 MOV RCIC PUMP SPLY EPRI N-01, 130 E5150F013 TO FEEDWATER E5150F013 Screened HEADER ISO MOV Table 2-4 COMPR AIR PC 131 T490IF602 PNEU DIV2 INST N2 T4901F602 Screened EPRI NP-6041, INERTING SPY Table 2-4 INBRD PC ISO MOV RCIC PUMP MIN 132 E5150F019 FLOW RECIRC E5150F019 Screened EPRI NP-6041, BYPASS MOV Table 2-4 RCIC PUMP SPLY 133 E5150F029 FROM TORUS ISO E5150F029 Screened EPRI NP-6041, MOV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C20 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                         FRAGILITY       NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION     ON         HCLPF(G)   FAILURE MODE METHOD       COMMENTS NUMBER RCIC PUMP SPLY EPRI NP-6041 134             E5150F031             FROM TORUS ISO   E5150F031       Screened MOV           MOV                                              Table 2-4 135             E5150F045               RCIC TURB STM   E5150F045       Screened                           EPRI NP-6041, INLET ISO MOV                                                       Table 2-4 RCIC LUBE OIL 136             E5150F046             COOLER COOLING   E5150F046       Screened                           EPRI NP-6041, WATER SPLY ISO                                                       Table 2-4 MOV HPCI PCM - SUPR 137               E41F400               POOL SOLENOID   E41F400         Screened                           EPRI NP-6041, Table 2-4 VLV HPCI PCM - SUPR 138               E41F401               POOL SOLENOID   E41F401         Screened                           EPRI NP-6041, Table 2-4 VLV PCAM PC TORUS 139             T50F412A                 LVL MON DIV1   T50F412A       Screened                           EPRI NP-6041, Table 2-4 SOV SOV PCAM PC TORUS 140             T50F412B                 LVL MON DIV2   T50F412B       Screened                           EPRI NP-6041, Table 2-4 SOV SOV 141             E5100B001             RCIC BARO CNDR   E5100B001         4.47     Anchorage New Analysis Fermi 2 Expedited Seismic Evaluation Process                       Page C21 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER RCIC PUMP SPLY EPRI NP-6041 134 E5150F031 FROM TORUS ISO E5150F031 Screened MOV Table 2-4 MOV 135 E5150F045 RCIC TURB STM E5150F045 Screened EPRI NP-6041, INLET ISO MOV Table 2-4 RCIC LUBE OIL 136 E5150F046 COOLER COOLING E5150F046 Screened EPRI NP-6041, WATER SPLY ISO Table 2-4 MOV HPCI PCM - SUPR 137 E41F400 POOL SOLENOID E41F400 Screened EPRI NP-6041, VLV Table 2-4 HPCI PCM - SUPR 138 E41F401 POOL SOLENOID E41F401 Screened EPRI NP-6041, VLV Table 2-4 PCAM PC TORUS 139 T50F412A LVL MON DIV1 T50F412A Screened EPRI NP-6041, SOV SOV Table 2-4 PCAM PC TORUS 140 T50F412B LVL MON DIV2 T50F412B Screened EPRI NP-6041, SOV SOV Table 2-4 141 E5100B001 RCIC BARO CNDR E5100B001 4.47 Anchorage New Analysis Fermi 2 Expedited Seismic Evaluation Process Page C21 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                       FRAGILITY       NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION     ON         HCLPF(G) FAILURE MODE   F   GTY       COMMENTS NUMBER HPCI DC TO AC 142               E41K603               INVERTER P     Hi1P612         0.29 Functionality   GERS SPLY VITAL PWR DIST 143               R31KO01                 120 VAC DIV1   H11P613         0.32 Functionality Qualification 2KVA INVERTER VITAL PWR DIST 144               R31K002                 120 VAC DIV1   H11P613         0.32 Functionality Qualification 2KVA INVERTER VITAL PWR DIST 145               R31K004                 120 VAC DIV1   H11P612         0.32 Functionality Qualification 2KVA INVERTER                                           Data VITAL PWR DIST 146               R31K005                 120 VAC DIV1   HI1P612         0.32 Functionality Qualification 2KVA INVERTER                                           Data LOC PNL/RACK (MR ONLY) DSD 147               H21P625             MCC 7   -A   LCAL FLOOR           0.59 Functionality DExpe ethod LOCAL PNL &
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
RACKS Fermi 2 Expedited Seismic Evaluation Process                     Page C22 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE F
GTY COMMENTS NUMBER HPCI DC TO AC 142 E41K603 INVERTER P Hi1P612 0.29 Functionality GERS SPLY VITAL PWR DIST 143 R31KO01 120 VAC DIV1 H11P613 0.32 Functionality Qualification 2KVA INVERTER VITAL PWR DIST 144 R31K002 120 VAC DIV1 H11P613 0.32 Functionality Qualification 2KVA INVERTER VITAL PWR DIST 145 R31K004 120 VAC DIV1 H11P612 0.32 Functionality Qualification 2KVA INVERTER Data VITAL PWR DIST 146 R31K005 120 VAC DIV1 HI1P612 0.32 Functionality Qualification 2KVA INVERTER Data LOC PNL/RACK (MR ONLY) DSD 147 H21P625 MCC 7  
-A LCAL FLOOR 0.59 Functionality DExpe ethod LOCAL PNL &
RACKS Fermi 2 Expedited Seismic Evaluation Process Page C22 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                                 FRAGILITY     NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION             ON         HCLPF(G) FAILURE MODE     METHOD     COMMENTS NUMBER PCAM PC TEMP 148P402               MON DIV2 SUPR         T50P402       Screened 148               T50P402               CHAMBER N403BT,                                                             Light weight, (H21P584L)               N402B, N404B &       (H21P584L)                                               Rugged N405B TERM PNL 149           R3200S061A               DCRRI       23VDIST     FLOOR           0.22     Functionality   GERS CABINET 2PA2-5 150           R3200S061B               DRR10DIT               FLOOR           0.22     Functionality   GERS DC RR 130V DIST 151           R3200S064A               CABINET 2PA2-6         FLOOR           0.22     Functionality   GERS 12 R20O4                     DCABINET02PB2-T         FLOOR           0.22   Functionality     GERS 152R320S04B                  DC RR 130VDIST CABINET 2PB2-6         FLOOR           0.22   Functionality     GERS 153       153 B21N051A 21N51A               NB RPV PXE REACTOR      DIV 1 VESSEL     H21P004         0.59   Functionality     GERS       Rule of Box 154       154    E41N019 E41N19                HPCI Suction!aH21P014 Disch   H21P4           0.89     Anchorage   New Analysis Rule of Box Pressure Gauge NB RX L VL 1 TRIP 155             B21NO91A               (WIDE RNG) DIVI       H21P004         0.59   Functionality     GERS       Rule of Box LVL XMTR 156             B21NO91C               Reactor water level - H21P004         0.59   Functionality     GERS       Rule of Box wide range Fermi 2 Expedited Seismic Evaluation Process                           Page C23 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER PCAM PC TEMP 148P402 MON DIV2 SUPR T50P402 Screened 148 T50P402 CHAMBER N403BT, Light weight, (H21P584L)
N402B, N404B &
(H21P584L)
Rugged N405B TERM PNL 149 R3200S061A DCRRI 23VDIST FLOOR 0.22 Functionality GERS CABINET 2PA2-5 150 R3200S061B DRR10DIT FLOOR 0.22 Functionality GERS DC RR 130V DIST 151 R3200S064A CABINET 2PA2-6 FLOOR 0.22 Functionality GERS 12 R20O4 DCABINET02PB2-T FLOOR 0.22 Functionality GERS 152 R320S04B DC RR 130VDIST CABINET 2PB2-6 FLOOR 0.22 Functionality GERS 153 21N51A NB RPV PXE DIV 1 153 B21N051A REACTOR VESSEL H21P004 0.59 Functionality GERS Rule of Box 154 E41N019 HPCI Suction! Disch H21P4 154 E41N19 aH21P014 0.89 Anchorage New Analysis Rule of Box Pressure Gauge NB RX L VL 1 TRIP 155 B21NO91A (WIDE RNG) DIVI H21P004 0.59 Functionality GERS Rule of Box LVL XMTR 156 B21NO91C Reactor water level -
H21P004 0.59 Functionality GERS Rule of Box wide range Fermi 2 Expedited Seismic Evaluation Process Page C23 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


IEME           EQUIPMENT                   DSRPIN         MOUNTED                                 FRAGILITY     NOTES/
IEME EQUIPMENT DSRPIN MOUNTED FRAGILITY NOTES/
M                   ID                   DESCRIPTION   MON           HCLPF(G) FAILURE MODE   METHOD     COMMENTS NUMBER NB RX LVL (1) TRIP 157             B21N691A             UNIT DIV1 LVL IND   H21P082           0.28     Anchorage   New Analysis Rule of Box SW NB RX LVL (1) TRIP 158             B21N691C             UNIT DIV1 LVL IND   H21P082           0.28     Anchorage   New Analysis Rule of Box SW NB RPV LVL &
M ID DESCRIPTION MON HCLPF(G)
PRESS RECORDER 159             B21R623A               POST ACCIDENT     H 11P601         0.34   Functionality Experience Rule of Box Data Method MONITORING RECORDER HPCI HI LVL 160             E41N062B               SIGNAL TO SUPR     WALL         Screened                             Light weight, POOL SUCT VLV                                                           Rugged LVL TRANSMITTER RCIC PUMP 161             E51RO01             DISCHARGE PRESS     H21P017           0.89   Anchorage   New Analysis Rule of Box INDICATOR 162      162 E1R002 E51R002                RCIC PUMP PRESS       SUCT INDICATOR   H21P017           0.89   Anchorage   New Analysis Rule of Box HPCI TURB 163             E41K200             GOVERNOR (EG-M)     H 1P929           0.22   Functionality   GERS     Rule of Box SPD CTRLR Fermi 2 Expedited Seismic Evaluation Process                       Page C24 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER NB RX LVL (1) TRIP 157 B21N691A UNIT DIV1 LVL IND H21P082 0.28 Anchorage New Analysis Rule of Box SW NB RX LVL (1) TRIP 158 B21N691C UNIT DIV1 LVL IND H21P082 0.28 Anchorage New Analysis Rule of Box SW NB RPV LVL &
PRESS RECORDER 159 B21R623A POST ACCIDENT H 11P601 0.34 Functionality Experience Rule of Box MONITORING Data Method RECORDER HPCI HI LVL 160 E41N062B SIGNAL TO SUPR WALL Screened Light weight, POOL SUCT VLV Rugged LVL TRANSMITTER RCIC PUMP 161 E51RO01 DISCHARGE PRESS H21P017 0.89 Anchorage New Analysis Rule of Box INDICATOR 162 E1R002 RCIC PUMP SUCT 162 E51R002 PRESS INDICATOR H21P017 0.89 Anchorage New Analysis Rule of Box HPCI TURB 163 E41K200 GOVERNOR (EG-M)
H 1P929 0.22 Functionality GERS Rule of Box SPD CTRLR Fermi 2 Expedited Seismic Evaluation Process Page C24 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESL EUPETMOUNTED                                                               FRAGILITY     NOTES/
ESL EUPETMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION     ON         HCLPF(G) FAILURE MODE     METHOD     COMMENTS NUMBER HPCI TURB SPD 164       164 E1K201 E41K201                 MILLIVOLT CURRENT TO  H 11P929         0.22   Functionality     GERS     Rule of Box CONVERTER HPCI TURB SPD ELEC TO 165               E41K203                   HYDRAULIC   E4101C002         0.58   Functionality   Experience Rule of Box Data Method CONVERTER SPD SIG CND (EG-R)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
HPCI TURB 166       166E1K204GOVERNOR E41K204               H1P929 RESISTOR HI1P929          0.22   Functionality     GERS     Rule of Box BOX HPCI PUMP FLOW 167               E41K615               RATE FLOW IND   Hi1P602         0.34   Functionality   Experience Rule of Box CTRLR                                             Data Method HPCI FLOW CTRL 168               E41K826                 (TURB CTRL)   H11P620         0.32   Functionality   Experience Rule of Box SIGNAL                                           Data Method HPCI PUMP DISCHARGE FLOW 169               E41N008               SIGNAL TO TURB   H21P014         0.89     Anchorage   New Analysis Rule of Box CTRL FLOW TRANSMITTER Fermi 2 Expedited Seismic Evaluation Process                     Page C25 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER HPCI TURB SPD 164 E1K201 MILLIVOLT TO 164 E41K201 CURRENT H 11P929 0.22 Functionality GERS Rule of Box CONVERTER HPCI TURB SPD ELEC TO 165 E41K203 HYDRAULIC E4101C002 0.58 Functionality Experience Rule of Box CONVERTER SPD Data Method SIG CND (EG-R)
HPCI TURB 166 E1K204GOVERNOR 166 E41K204 H1P929 RESISTOR HI 1P929 0.22 Functionality GERS Rule of Box BOX HPCI PUMP FLOW 167 E41K615 RATE FLOW IND Hi1P602 0.34 Functionality Experience Rule of Box CTRLR Data Method HPCI FLOW CTRL 168 E41K826 (TURB CTRL)
H11P620 0.32 Functionality Experience Rule of Box SIGNAL Data Method HPCI PUMP DISCHARGE FLOW 169 E41N008 SIGNAL TO TURB H21P014 0.89 Anchorage New Analysis Rule of Box CTRL FLOW TRANSMITTER Fermi 2 Expedited Seismic Evaluation Process Page C25 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EQUIPMENT           FMOUNTED                                                     FRAGILITY       NOTES/
ESEL EQUIPMENT FMOUNTED FRAGILITY NOTES/
NEM                     ID                   DESCRIPTION       ON         HCLPF(G) FAILURE MODE     METHOD       COMMENTS NUMBER HPCI TURB 170               E41N212               MAGNETIC PICK-   E4101C002         0.58   Functionality Experience   Rule of Box Data Method UP SPD ELEMENT HPCI AUX OIL 171             E41NA01             PUMP S     RTT IN E4101C002         0.58   Functionality DExpe ethod   Rule of Box PRESS SW HPCI MAIN PUMP 172               E41R613                 SE4101001E     Hi1P602         0.34   Functionality Experience   Rule of Box DISCHARGE ELEC                                           Data Method FLOW INDICATOR RCIC TURB EGM 173               E51K200                 CTRL BOX SPD     H11P923         0.22   Functionality   GERS       Rule of Box CTRLR ELEC RCIC TURB CTRL 174               E51K201               SPD CURRENT TO     HI 1P923         0.22   Functionality   GERS       Rule of Box VOLTAGE CONVERTER RCIC SPD SIG CND 175               E51 K203             EGR HYDRAULIC     E5101 C002         1.24   Functionality Qualification Rule of Box ACTUATOR                                                 Data Fermi 2 Expedited Seismic Evaluation Process                       Page C26 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
NEM ID DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER HPCI TURB 170 E41N212 MAGNETIC PICK-E4101C002 0.58 Functionality Experience Rule of Box UP SPD ELEMENT Data Method HPCI AUX OIL 171 E41NA01 PUMP S RTT IN E4101C002 0.58 Functionality DExpe ethod Rule of Box PRESS SW HPCI MAIN PUMP 172 E41R613 SE4101001E Hi1P602 0.34 Functionality Experience Rule of Box DISCHARGE ELEC Data Method FLOW INDICATOR RCIC TURB EGM 173 E51K200 CTRL BOX SPD H11P923 0.22 Functionality GERS Rule of Box CTRLR ELEC RCIC TURB CTRL 174 E51K201 SPD CURRENT TO HI 1P923 0.22 Functionality GERS Rule of Box VOLTAGE CONVERTER RCIC SPD SIG CND 175 E51 K203 EGR HYDRAULIC E5101 C002 1.24 Functionality Qualification Rule of Box ACTUATOR Data Fermi 2 Expedited Seismic Evaluation Process Page C26 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                         FRAGILITY       NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION     ON         HCLPF(G) FAILURE MODE     METHOD       COMMENTS NUMBER RCIC TURB EG-M CTRL BOX PWR 176               E51K204             SOURCE DROPPING   H 11P923         0.22   Functionality   GERS       Rule of Box RESISTOR BOX SPD CTRLR ELEC RCIC PUMP 177               E51K615               DISCHARGE FLOW   H 11P601         0.34   Functionality Experience   Rule of Box Data Method CTRLR ELEC RCIC FLOW CTRL 178               E51K820               SIGNAL ISOLATOR H11P621           0.69   Functionality Qualification Rule of Box FOR TURB CTRL                                             Data RCIC PUMP 179               E51N003               DISCHARGE FLOW   H21P017           0.89   Anchorage   New Analysis Rule of Box TRANSMITTER ELEC RCIC TURB SPD 180               E51N205                 SENSOR SPD   E5101C002         1.24   Functionality Qualification Rule of Box ELEMENT                                               Data RCIC TURB STM 181               E51R608                   INLET AND                                           Experience EXHAUST PRESS   H11P601         0.34   Functionality Data Method   Rule of Box INDICATOR Fermi 2 Expedited Seismic Evaluation Process                     Page C27 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER RCIC TURB EG-M CTRL BOX PWR 176 E51K204 SOURCE DROPPING H 11P923 0.22 Functionality GERS Rule of Box RESISTOR BOX SPD CTRLR ELEC RCIC PUMP 177 E51K615 DISCHARGE FLOW H 11P601 0.34 Functionality Experience Rule of Box CTRLR ELEC Data Method RCIC FLOW CTRL 178 E51K820 SIGNAL ISOLATOR H11P621 0.69 Functionality Qualification Rule of Box FOR TURB CTRL Data RCIC PUMP 179 E51N003 DISCHARGE FLOW H21P017 0.89 Anchorage New Analysis Rule of Box TRANSMITTER ELEC RCIC TURB SPD 180 E51N205 SENSOR SPD E5101C002 1.24 Functionality Qualification Rule of Box ELEMENT Data RCIC TURB STM 181 E51R608 INLET AND Experience EXHAUST PRESS H11P601 0.34 Functionality Data Method Rule of Box INDICATOR Fermi 2 Expedited Seismic Evaluation Process Page C27 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                       FRAGILITY     NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION   ON         HCLPF(G) FAILURE MODE   METHOD     COMMENTS NUMBER RCIC PUMP 182               E51R609                 DSCT PRE S   H 11P601         0.34   Functionality Data Method Rule of Box INDICATOR RCIC PUMP 183               E51R613             DISCHARGE FLOW H 11P601         0.34   Functionality Experienc Rule of Box Data Method INDICATOR 184               E51R700               RCIC TURB SPD H 11P601         0.34   Functionality Experience Rule of Box INDICATOR                                         Data Method PCAM PC TEMP MON TORUS SUPR 185             T50N402B                 M BR (ATM   T50P402       Screened                           Rule of Box CHAMBER (ATM)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
DIV2 T/C PCAM PC TEMP 186             T50N403B3             MON TORUS SUPR                                                   Rule of Box CHAMBER (ATM) T50P402       Screened DIV2 T/C PCAM PC TEMP MON TORUS SUPR 187             T50N404B                 M BR (WTR   T50P402       Screened                           Rule of Box CHAMBER (WTR)
FAILURE MODE METHOD COMMENTS NUMBER RCIC PUMP 182 E51R609 DSCT PRE S H 11P601 0.34 Functionality Data Method Rule of Box INDICATOR RCIC PUMP 183 E51R613 DISCHARGE FLOW H 11P601 0.34 Functionality Experienc Rule of Box INDICATOR Data Method 184 E51R700 RCIC TURB SPD H 11P601 0.34 Functionality Experience Rule of Box INDICATOR Data Method PCAM PC TEMP MON TORUS SUPR 185 T50N402B M
DIV2 T/C Fermi 2 Expedited Seismic Evaluation Process                   Page C28 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
BR (ATM T50P402 Screened Rule of Box CHAMBER (ATM)
DIV2 T/C PCAM PC TEMP 186 T50N403B3 MON TORUS SUPR Rule of Box CHAMBER (ATM)
T50P402 Screened DIV2 T/C PCAM PC TEMP MON TORUS SUPR 187 T50N404B M
BR (WTR T50P402 Screened Rule of Box CHAMBER (WTR)
DIV2 T/C Fermi 2 Expedited Seismic Evaluation Process Page C28 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
I'
I'


ESL EUPETMOUNTED                                                             FRAGILITY     NOTES/
ESL EUPETMOUNTED FRAGILITY NOTES/
ITEM           EQUIPMENT                   DESCRIPTION     ON         HCLPF(G) FAILURE MODE   METHOD     COMMENTS NUMBER PCAM PC TEMP MON TORUS SUPR 188             T50N405B3               CHAMBER (WTR)   T50P402       Screened                           Rule of Box DIV2 T/C PCAM PC TORUS WTR LVL MON 189             T50N406B               TORUS WTR LVL H21P614B         1.36   Functionality   GERS     Rule of Box DIV2 LVL XMTR ELEC 190 T5N414B                 PCAM DIV2 TORUS 190             T50N414B               WR PRESS XMTR H21P631B         0.53   Functionality   GERS     Rule of Box PCAM PC PRESS 191        191 T5N415B T50N415B                MON   DW PRESS WR DIV2 PRESS H21P595B         1.12   Functionality   GERS     Rule of Box XMTR ELEC PCAM PC ATMOSPHERIC 192             T50R800B             MON DIV2 DW AND   HI 1P602         0.34   Functionality Experience Rule of Box TORUS TEMP                                         Data Method RECORDER PCAM PRESS MON 193             T50R802B               DIV2 DW & TORUS H 11P602         0.34   Functionality Experience Rule of Box PRESS RECORDER                                         Data Method Fermi 2 Expedited Seismic Evaluation Process                     Page C29 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER PCAM PC TEMP MON TORUS SUPR 188 T50N405B3 CHAMBER (WTR)
T50P402 Screened Rule of Box DIV2 T/C PCAM PC TORUS WTR LVL MON 189 T50N406B TORUS WTR LVL H21P614B 1.36 Functionality GERS Rule of Box DIV2 LVL XMTR ELEC 190 T5N414B PCAM DIV2 TORUS 190 T50N414B WR PRESS XMTR H21P631B 0.53 Functionality GERS Rule of Box PCAM PC PRESS 191 T5N415B MON DW PRESS 191 T50N415B WR DIV2 PRESS H21P595B 1.12 Functionality GERS Rule of Box XMTR ELEC PCAM PC ATMOSPHERIC 192 T50R800B MON DIV2 DW AND HI 1P602 0.34 Functionality Experience Rule of Box TORUS TEMP Data Method RECORDER PCAM PRESS MON 193 T50R802B DIV2 DW & TORUS H 11P602 0.34 Functionality Experience Rule of Box PRESS RECORDER Data Method Fermi 2 Expedited Seismic Evaluation Process Page C29 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESL EUPETMOUNTED                                                               FRAGILITY       NOTES/
ESL EUPETMOUNTED FRAGILITY NOTES/
ITEM           EQUIPMENT                   DESCRIPTION       ON         HCLPF(G) FAILURE MODE   METHOD       COMMENTS NUMBER PCAM TORUS WTR 194             T50R804B               LVL MON DIV2 PC   H 1P602         0.34 Functionality Experience   Rule of Box Data Method LVL RECORDER RCIC TURB INLET 195             E5150F059               TRIP THROTTLE   E5150F059         1.24 Functionality Qualification Rule of Box Data MOV NB MSL "A" INBD                                       Scaling from 196           B2103F022A-3                 PC ISO AOV - B2103F022A         0.33 Functionality   Existing   Rule of Box Manifold                                           Analysis NB MSL "B" INBD                                       Scaling from 197           B2103F022B-3                 PC ISO AOV - B2103F022B         0.33 Functionality   Existing   Rule of Box Manifold                                           Analysis NB MSL "C" INBD                                       Scaling from 198           B2103F022C-3                 PC ISO AOV - B2103F022C         0.33 Functionality   Existing   Rule of Box Manifold                                           Analysis NB MSL "D" INBD                                       Scaling from 199           B2103F022D-3                 PC ISO AOV - B2103F022D         0.33 Functionality   Existing   Rule of Box Manifold                                           Analysis NB MSL "A" OTBD                                         Scaling from 200           B2103F028A-6                 PC ISO AOV - B2103F028A         0.33 Functionality   Existing   Rule of Box Manifold                                             Analysis Fermi 2 Expedited Seismic Evaluation Process                       Page C30 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER PCAM TORUS WTR 194 T50R804B LVL MON DIV2 PC H 1P602 0.34 Functionality Experience Rule of Box LVL RECORDER Data Method RCIC TURB INLET 195 E5150F059 TRIP THROTTLE E5150F059 1.24 Functionality Qualification Rule of Box MOV Data NB MSL "A" INBD Scaling from 196 B2103F022A-3 PC ISO AOV -
B2103F022A 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "B" INBD Scaling from 197 B2103F022B-3 PC ISO AOV -
B2103F022B 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "C" INBD Scaling from 198 B2103F022C-3 PC ISO AOV -
B2103F022C 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "D" INBD Scaling from 199 B2103F022D-3 PC ISO AOV -
B2103F022D 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "A" OTBD Scaling from 200 B2103F028A-6 PC ISO AOV -
B2103F028A 0.33 Functionality Existing Rule of Box Manifold Analysis Fermi 2 Expedited Seismic Evaluation Process Page C30 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESL EUPETMOUNTED                                                               FRAGILITY     NOTES/
ESL EUPETMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION       ON         HCLPF(G) FAILURE MODE     METHOD     COMMENTS NUMBER                   I NB MSL "B" OTBD                                           Scaling from 201         B2103F028B-6               PC ISO AOV -   B2103F028B         0.33   Functionality   Existing   Rule of Box Manifold                                               Analysis NB MSL "C" OTBD                                           Scaling from 202         B2103F028C-6               PC ISO AOV -   B2103F028C         0.33   Functionality   Existing   Rule of Box Manifold                                               Analysis NB MSL "D" OTBD                                           Scaling from 203         B2103F028D-6               PC ISO AOV -   B2103F028D         0.33   Functionality   Existing   Rule of Box Manifold                                               Analysis HPCI REMOTE 204             E41F200                 TURB TRIP     E4101C002         0.58   Functionality   Experience Rule of Box SOLENOID VLV                                             Data Method SA ISO VLV 205               P50F401                   P5000F401     H21P408         0.38   Functionality     GERS     Rule of Box SOLENOID VLV CA DIV1 NIAS ISO                                         Scaling from 206             P50F516A               VLV P5000F440   H21P501A         0.43     Anchorage     Existing   Rule of Box SOLENOID VLV                                               Analysis CA DIV2 NIAS ISO                                         Scaling from 207             P50F516B               VLV P5000F441   H21P501B         0.43     Anchorage     Existing   Rule of Box SOLENOID VLV                                               Analysis Fermi 2 Expedited Seismic Evaluation Process                       Page C31 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER I
NB MSL "B" OTBD Scaling from 201 B2103F028B-6 PC ISO AOV -
B2103F028B 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "C" OTBD Scaling from 202 B2103F028C-6 PC ISO AOV -
B2103F028C 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "D" OTBD Scaling from 203 B2103F028D-6 PC ISO AOV -
B2103F028D 0.33 Functionality Existing Rule of Box Manifold Analysis HPCI REMOTE 204 E41F200 TURB TRIP E4101C002 0.58 Functionality Experience Rule of Box SOLENOID VLV Data Method SA ISO VLV 205 P50F401 P5000F401 H21P408 0.38 Functionality GERS Rule of Box SOLENOID VLV CA DIV1 NIAS ISO Scaling from 206 P50F516A VLV P5000F440 H21P501A 0.43 Anchorage Existing Rule of Box SOLENOID VLV Analysis CA DIV2 NIAS ISO Scaling from 207 P50F516B VLV P5000F441 H21P501B 0.43 Anchorage Existing Rule of Box SOLENOID VLV Analysis Fermi 2 Expedited Seismic Evaluation Process Page C31 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                           FRAGILITY       NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM           EQUIPMENT                 DESCRIPTION       ON         HCLPF(G) FAILURE MODE   METHOD       COMMENTS NUMBER PC PNEU DIV2 208               T49F469                 SPLYN2 INERTING T49P400B         1.29   Functionality DExpe ethod   Rule of Box T4901F469 SOV NB MSL "D" RELIEF 209           B2100M01A                 VLV B2104F013A   H11P628           0.32   Relay Chatter Qualification (B21CK11A)             CData CTRL PWR RELAY NB MSL INBD ISO 210           B2100M329A               VLV B2103F022A   H 11P609       Screened                               IPEEE AUX DC RELAY NB MSL INBD ISO 211           B2100M329B               VLV B2103F022B   HI 1P609       Screened                               IPEEE AUX DC RELAY NB MSL INBD ISO 212           B2100M329C               VLV B2103F022C   HI 1P609       Screened                               IPEEE AUX DC RELAY NB MSL INBD ISO 213           B2100M329D                 VLV B2103F022D   H11P609       Screened                               IPEEE AUX DC RELAY NB MSL OTBD ISO 214           B2100M331A                 VLV B2103FO28A   H11P611       Screened                               IPEEE AUX DC RELAY Fermi 2 Expedited Seismic Evaluation Process                       Page C32 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER PC PNEU DIV2 208 T49F469 SPLYN2 INERTING T49P400B 1.29 Functionality DExpe ethod Rule of Box T4901F469 SOV NB MSL "D" RELIEF 209 B2100M01A VLV B2104F013A H11P628 0.32 Relay Chatter Qualification (B21CK11A)
CData CTRL PWR RELAY NB MSL INBD ISO 210 B2100M329A VLV B2103F022A H 11P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 211 B2100M329B VLV B2103F022B HI 1P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 212 B2100M329C VLV B2103F022C HI 1P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 213 B2100M329D VLV B2103F022D H11P609 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 214 B2100M331A VLV B2103FO28A H11P611 Screened IPEEE AUX DC RELAY Fermi 2 Expedited Seismic Evaluation Process Page C32 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                       FRAGILITY   NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM           EQUIPMENT                   DESCRIPTION   ON         HCLPF(G)   FAILURE MODE METHOD   COMMENTS NUMBER NB MSL OTBD ISO 215           B2100M331B               VLV B2103FO28B H11P611       Screened                           IPEEE AUX DC RELAY NB MSL OTBD ISO 216           B2100M331C               VLV B2103FO28C H11P611       Screened                           IPEEE AUX DC RELAY NB MSL OTBD ISO 217           B2100M331D               VLV B2103FO28D HI1P611       Screened                           IPEEE AUX DC RELAY B2104M084               NB SAFETY AND 218           (B21C427C )             RLFVEY           B21P401       Screened                           IPEEE (B21CK427C)             RELIEF VLV RELAY 219             B2104M285               NB SRV RELAY B21P401       Screened                           IPEEE (B21 CK427D )
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
22           B2104M086IEE 220           (B21CK427F)               NB SRV RELAY B21P401       Screened                           IPEEE (B210C407F 221             B2104M287               NB SRV RELAY   B21P401       Screened                         IPEEE (B2 1CK427G) 22           B2104M088IPE 222           (B21CK427K)               NB SRV RELAY   B21P401       Screened                           IPEEE B2104M097 223             B21C427                 NB SRV RELAY   B21P400       Screened                           IPEEE (B21CK427L )
FAILURE MODE METHOD COMMENTS NUMBER NB MSL OTBD ISO 215 B2100M331B VLV B2103FO28B H11P611 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 216 B2100M331C VLV B2103FO28C H11P611 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 217 B2100M331D VLV B2103FO28D HI1P611 Screened IPEEE AUX DC RELAY B2104M084 NB SAFETY AND 218 (B21C427C )
Fermi 2 Expedited Seismic Evaluation Process                   Page C33 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
RLFVEY B21P401 Screened IPEEE (B21CK427C)
RELIEF VLV RELAY 219 B2104M285 NB SRV RELAY B21P401 Screened IPEEE (B21 CK427D )
22 B2104M086IEE 220 (B21CK427F)
NB SRV RELAY B21P401 Screened IPEEE (B210C407F 221 B2104M287 NB SRV RELAY B21P401 Screened IPEEE (B2 1 CK427G) 22 B2104M088IPE 222 (B21CK427K)
NB SRV RELAY B21P401 Screened IPEEE B2104M097 223 B21C427 NB SRV RELAY B21P400 Screened IPEEE (B21CK427L )
Fermi 2 Expedited Seismic Evaluation Process Page C33 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                               FRAGILITY     NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION           ON         HCLPF(G) FAILURE MODE   METHOD     COMMENTS NUMBER NB SRV DIV2 MAN B2104M098             DEPRESSURIZATIO (B21CK427M)             N VLV F013M CTRL       B21P400       Screened RELAY NB SRV DIV2 MAN 225             B2104M099             DEPRESSURIZATIO         121P400       Screened                               IPEE (B21CK427N)             N VLV F013N CTRL RELAY El1100M094A 226             E11K94A                 RHR K94A RELAY       H 11P617       Screened                               IPEEE (El1 K94A)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
El1100M094B 227             E11K94B                 RHR K94B RELAY       H11P617       Screened                               IPEEE (El 1K94B)
FAILURE MODE METHOD COMMENTS NUMBER NB SRV DIV2 MAN B2104M098 DEPRESSURIZATIO (B21CK427M)
HPCI K12 RELAY       H11P620           0.32   Functionality Experience 228            E4100M012 (E41AK12)                                                                           Data Method E4100MO15 2290M15Experience                  HPCI K15 RELAY 229             (E41K15)             (Low stm pressure trip H 11P620         0.32   Functionality Data Method logic) 2302                   HPCI K28 RELAY 230             (E41K28)               (Turb exh high dia   H 1P620           0.32   Functionality Data Method pressure trip logic)
N VLV F013M CTRL B21P400 Screened RELAY NB SRV DIV2 MAN 225 B2104M099 DEPRESSURIZATIO 121P400 Screened IPEE (B21CK427N)
E4100M035               HPCI K35 RELAY                                               Experience 231             (E41K35)                 (HPCI AUTO         H 11P620         0.32   Functionality Data Method INITIATION LOGIC)
N VLV F013N CTRL RELAY El1100M094A 226 E11K94A RHR K94A RELAY H 11P617 Screened IPEEE (El1 K94A)
Fermi 2 Expedited Seismic Evaluation Process                           Page C34 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
El1100M094B 227 E11K94B RHR K94B RELAY H11P617 Screened IPEEE (El 1K94B) 228 E4100M012 HPCI K12 RELAY H11P620 0.32 Functionality Experience (E41AK12)
Data Method E4100MO15 HPCI K15 RELAY 2290M15Experience 229 (E41K15)
(Low stm pressure trip H 11P620 0.32 Functionality Data Method logic) 2302 HPCI K28 RELAY 230 (E41K28)
(Turb exh high dia H 1P620 0.32 Functionality Data Method pressure trip logic)
E4100M035 HPCI K35 RELAY Experience 231 (E41K35)
(HPCI AUTO H 11P620 0.32 Functionality Data Method INITIATION LOGIC)
Fermi 2 Expedited Seismic Evaluation Process Page C34 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


IEME             EQUIPMENT UEID                    DESCRIPTION MOUNTED ON IFRAGILITY HCLPF(G) FAILURE MODE     METHOD NOTES/
IEME EQUIPMENT MOUNTED IFRAGILITY NOTES/
COMMENTS NUMBER E4100M036               HPCI K36 RELAY 232               (E41K36)                 (HPCI AUTO         HI 1P617       Screened                               IPEEE INITIATION LOGIC)
UE ID DESCRIPTION ON HCLPF(G)
E4100M043             HPCI K43 RELAY (E41K43)               (Steam line Hi dP)
FAILURE MODE METHOD COMMENTS NUMBER E4100M036 HPCI K36 RELAY 232 (E41K36)
HPCI K80 RELAY E4100M0 K8Experience 234               (E41K80)           (Low stm pressure trip HI lP620         0.32     Functionality Data Method logic)
(HPCI AUTO HI 1P617 Screened IPEEE INITIATION LOGIC)
E5100M052             RCIC K52 RELAY 235               (E51K52)                 (RCIC Ramp       H 11P621       Screened                               IPEEE Generator Trigger)
E4100M043 HPCI K43 RELAY (E41K43)
CTRL AND AUX RM Hi11P622-22               PNL INBD VLV 236                 I6-2                 PNINDVV HIl              H   P622       Screened                               IPEEE (A71BK53)             CTRL RELAY CAB DIV1 INST RACK CRTL & AUX RM HI iP628-11             PNL (MR ONLY)
(Steam line Hi dP)
SRV DIV1 ADS       H11P628       Screened                               IPEEE 237            (B21CK06A)
HPCI K80 RELAY E4100M0 K8Experience 234 (E41K80)
RELAY CAB CRTL & AUX RM 238             H11P628-12               PNL (MR ONLY)       HI1P628       Screened                               IPEEE (B21CK06B)               SRV DIV1 ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process                           Page C35 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
(Low stm pressure trip HI lP620 0.32 Functionality Data Method logic)
E5100M052 RCIC K52 RELAY 235 (E51K52)
(RCIC Ramp H 11P621 Screened IPEEE Generator Trigger)
CTRL AND AUX RM Hi11P622-22 PNL INBD VLV 236 HIl I6-2 PNINDVV H
P622 Screened IPEEE (A71BK53)
CTRL RELAY CAB DIV1 INST RACK CRTL & AUX RM HI iP628-11 PNL (MR ONLY) 237 (B21CK06A)
SRV DIV1 ADS H11P628 Screened IPEEE RELAY CAB CRTL & AUX RM 238 H11P628-12 PNL (MR ONLY)
HI1P628 Screened IPEEE (B21CK06B)
SRV DIV1 ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C35 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                     FRAGILITY   NOTES!
ESEL EUP NTMOUNTED FRAGILITY NOTES!
ITEM             EQUIPMENT                 DESCRIPTION   ON         HCLPF(G)   FAILURE MODE METHOD   COMMENTS NUMBER CRTL & AUX RM 239             H 11P628-13             PNL (MR ONLY) H 11P628       Screened                           IPEEE (B21CK07A)               SRV DIVI ADS RELAY CAB CRTL & AUX RM 240             H 1P628-14             PNL (MR ONLY) H 1P628         Screened                           IPEEE (B21CK07B)               SRV DIVI ADS RELAY CAB CRTL & AUX RM 241             H 1P628-23             PNL (MR ONLY) HI1P628        Screened                           IPEEE (B21CK11E)               SRV DIVI ADS RELAY CAB CRTL & AUX RM 242             H11P628-24             PNL (MR ONLY) HI IP628       Screened                           IPEE (B21CK11H)               SRV DIV1 ADS RELAY CAB CRTL & AUX RM 243             HI IP628-32             PNL (MR ONLY) HI IP628       Screened                           IPEEE (B21CK27A)               SRV DIVI ADS RELAY CAB CRTL & AUX RM 244             H 11P628-33             PNL (MR ONLY) H 1P628       Screened                           IPEE (B21CK27E)               SRV DIVI ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process                   Page C36 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 239 H 11P628-13 PNL (MR ONLY)
H 11P628 Screened IPEEE (B21CK07A)
SRV DIVI ADS RELAY CAB CRTL & AUX RM 240 H 1P628-14 PNL (MR ONLY)
H 1P628 Screened IPEEE (B21CK07B)
SRV DIVI ADS RELAY CAB CRTL & AUX RM 241 H 1P628-23 PNL (MR ONLY)
HI 1P628 Screened IPEEE (B21CK11E)
SRV DIVI ADS RELAY CAB CRTL & AUX RM 242 H11P628-24 PNL (MR ONLY)
HI IP628 Screened IPEE (B21CK11H)
SRV DIV1 ADS RELAY CAB CRTL & AUX RM 243 HI IP628-32 PNL (MR ONLY)
HI IP628 Screened IPEEE (B21CK27A)
SRV DIVI ADS RELAY CAB CRTL & AUX RM 244 H 11P628-33 PNL (MR ONLY)
H 1P628 Screened IPEE (B21CK27E)
SRV DIVI ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C36 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                     FRAGILITY   NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION     ON         HCLPF(G) FAILURE MODE METHOD   COMMENTS NUMBER CRTL & AUX RM 245             HI 1P628-34             PNL (MR ONLY) HI 1P628       Screened                         IPEEE (B21CK27H)               SRV DIV1 ADS RELAY CAB CRTL & AUX RM 246             HI 1P628-35             PNL (MR ONLY) HI 1P628       Screened                         IPEE (B21CK27J)               SRV DIV1 ADS RELAY CAB CRTL & AUX RM 247             HI 1P628-36             PNL (MR ONLY) HI 1P628       Screened                         IPEEE (B21CK27P)               SRV DIV1 ADS RELAY CAB CRTL & AUX RM 248             HI 1P628-37             PNL (MR ONLY) HI 1P628       Screened                         IPEEE (B21CK27R)               SRV DIV1 ADS RELAY CAB CRTL & AUX RM H11 P628-44             PNL (MR ONLY) 249             (B21CK31)               SRV DIV1 ADS H lP628       Screened                         IPEEE RELAY CAB CRTL & AUX RM 250             HI1P628-45             PNL (MR ONLY) HI 1P628       Screened                         IPEE (B21CK31A)               SRV DIV1 ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process                   Page C37 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 245 HI 1P628-34 PNL (MR ONLY)
HI 1P628 Screened IPEEE (B21CK27H)
SRV DIV1 ADS RELAY CAB CRTL & AUX RM 246 HI 1P628-35 PNL (MR ONLY)
HI 1P628 Screened IPEE (B21CK27J)
SRV DIV1 ADS RELAY CAB CRTL & AUX RM 247 HI 1P628-36 PNL (MR ONLY)
HI 1P628 Screened IPEEE (B21CK27P)
SRV DIV1 ADS RELAY CAB CRTL & AUX RM 248 HI 1P628-37 PNL (MR ONLY)
HI 1P628 Screened IPEEE (B21CK27R)
SRV DIV1 ADS RELAY CAB CRTL & AUX RM H11 P628-44 PNL (MR ONLY) 249 (B21CK31)
SRV DIV1 ADS H lP628 Screened IPEEE RELAY CAB CRTL & AUX RM 250 HI 1P628-45 PNL (MR ONLY)
HI 1P628 Screened IPEE (B21CK31A)
SRV DIV1 ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C37 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                             FRAGILITY     NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                   DESCRIPTION         ON         HCLPF(G) FAILURE MODE METHOD     COMMENTS NUMBER CRTL & AUX RM 251             HI 1P628-65               PNL (MR ONLY)       HI 1P628       Screened                             IPEE (B21CK27B)                 SRV DIV1 ADS RELAY CAB CRTL & AUX RM H 1P870-34               PNL (MR ONLY) 252               T41M804                 MISC DC RELAY       H 11P870       Screened                             IPEEE PANEL DIV2 INST RACK LOC PNL/RACK (MR ONLY) LOCAL 253             H21P080-22               PNL AND RACKS       H21PO80       Screened                             IPEE (E41K202A)               DIV2 ECCS TRIP UNIT INST RACK (Steam line Hi dP)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
LOC PNL/RACK (MR ONLY) LOCAL H21P081-20               PNL AND RACKS 254             (E41K201B)               DIV2 ECCS TRIP     H21P081           0.28   Anchorage New Analysis Rule of Box UNIT INST RACK (Low stm pressure trip logic)
FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 251 HI 1P628-65 PNL (MR ONLY)
Fermi 2 Expedited Seismic Evaluation Process                           Page C38 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
HI 1P628 Screened IPEE (B21CK27B)
SRV DIV1 ADS RELAY CAB CRTL & AUX RM H 1P870-34 PNL (MR ONLY) 252 T41M804 MISC DC RELAY H 11P870 Screened IPEEE PANEL DIV2 INST RACK LOC PNL/RACK (MR ONLY) LOCAL 253 H21P080-22 PNL AND RACKS H21PO80 Screened IPEE (E41K202A)
DIV2 ECCS TRIP UNIT INST RACK (Steam line Hi dP)
LOC PNL/RACK (MR ONLY) LOCAL H21P081-20 PNL AND RACKS 254 (E41K201B)
DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Low stm pressure trip logic)
Fermi 2 Expedited Seismic Evaluation Process Page C38 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                         FRAGILITY     NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
M                   ID                 DESCRIPTION         ON         HCLPF(G) FAILURE MODE METHOD     COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL H21P081-21             PNL AND RACKS 255             (E41K201D)               DIV2 ECCS TRIP     H21P081         0.28   Anchorage New Analysis Rule of Box UNIT INST RACK (Low stm pressure trip logic)
M ID DESCRIPTION ON HCLPF(G)
LOC PNL/RACK (MR ONLY) LOCAL 256             H21P081-22             PNL AND RACKS       H21P081         0.28   Anchorage New Analysis Rule ofBox (E41K202B)               DIV2 ECCS TRIP UNIT INST RACK (Steam line Hi dP)
FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL H21P081-21 PNL AND RACKS 255 (E41K201D)
LOC PNL/RACK (MR ONLY) LOCAL H21P081-24             PNL AND RACKS 257             (E41K204B)               DIV2 ECCS TRIP     H21P081         0.28   Anchorage New Analysis Rule of Box UNIT INST RACK (Turb exh high dia pressure trip logic)
DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Low stm pressure trip logic)
Fermi 2 Expedited Seismic Evaluation Process                         Page C39 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
LOC PNL/RACK (MR ONLY) LOCAL 256 H21P081-22 PNL AND RACKS H21P081 0.28 Anchorage New Analysis Rule ofBox (E41K202B)
DIV2 ECCS TRIP UNIT INST RACK (Steam line Hi dP)
LOC PNL/RACK (MR ONLY) LOCAL H21P081-24 PNL AND RACKS 257 (E41K204B)
DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Turb exh high dia pressure trip logic)
Fermi 2 Expedited Seismic Evaluation Process Page C39 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EQUIPMENT                                       MOUNTED                             FRAGILITY     NOTES!
ESEL EQUIPMENT MOUNTED FRAGILITY NOTES!
ITEM                   IP                   DESCRIPTION           ON         HCLPF(G) FAILURE MODE METHOD     COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL H21P081-25               PNL AND RACKS 258             (E41K204D)               DIV2 ECCS TRIP       H21P081         0.28   Anchorage New Analysis Rule of Box UNIT INST RACK (Turb exh high dia pressure trip logic)
ITEM IP DESCRIPTION ON HCLPF(G)
LOC PNL/RACK H21P081-28             (MR ONLY) LOCAL 259             (E41K206B)               PNL AND RACKS         H21P081         0.28   Anchorage New Analysis Rule of Box DIV2 ECCS TRIP UNIT INST RACK LOC PNL/RACK 260             H21P082-10               (MR ONLY) ECCS         H21P082         0.28   Anchorage New Analysis Rule of Box (B21K203A)                 TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 261             H21PK82-11               (MR ONLY) EGGS         H21P082         0.28   Anchorage New Analysis Rule of Box (B21K203G)                 TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 262             H21P082-21               (MR ONLY) ECCS         H21P082         0.28   Anchorage New Analysis Rule of Box (B21K250A)                 TRIP UNIT CAB DIVI INST RACK Fermi 2 Expedited Seismic Evaluation Process                           Page C40 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL H21P081-25 PNL AND RACKS 258 (E41K204D)
DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Turb exh high dia pressure trip logic)
LOC PNL/RACK H21P081-28 (MR ONLY) LOCAL 259 (E41K206B)
PNL AND RACKS H21P081 0.28 Anchorage New Analysis Rule of Box DIV2 ECCS TRIP UNIT INST RACK LOC PNL/RACK 260 H21P082-10 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K203A)
TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 261 H21PK82-11 (MR ONLY) EGGS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K203G)
TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 262 H21P082-21 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K250A)
TRIP UNIT CAB DIVI INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C40 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


EQSUIEPLMEENT                        M OU N TED                            F A I I YN       T S E           EQUIPMENT                 DESCRIPTION     ON         HCLPF(G) FAILURE MODE FRAGILITY   COMENTS NUMBER LOC PNL/RACK 263             H21P082-22             (MR ONLY) ECCS H21P082           0.28   Anchorage New Analysis Rule of Box (B21K250C)               TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 264             H21P082-6             (MR ONLY) ECCS H21P082           0.28   Anchorage New Analysis Rule of Box (B21K201A)               TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 265             H21P082-7             (MR ONLY) ECCS H21PO82           0.28   Anchorage New Analysis Rule of Box (B21K201C)               TRIP UNIT CAB DIV1 INST RACK LOC PNL/RACK 266             H21P082-8             (MR ONLY) ECCS H21PO82           0.28   Anchorage New Analysis Rule of Box (B21K202A)               TRIP UNIT CAB DIV1 INST RACK LOC PNL/RACK H21P082-9             (MR ONLY) ECCS 267             (B21K202C)               TRIP UNIT CAB H21P082           0.28   Anchorage New Analysis Rule of Box DIV1 INST RACK Fermi 2 Expedited Seismic Evaluation Process                     Page C41 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
E S E L E Q U I P M E N T M O U N T E D F A I I YN T S E
EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE FRAGILITY COMENTS NUMBER LOC PNL/RACK 263 H21P082-22 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K250C)
TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 264 H21P082-6 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K201A)
TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 265 H21P082-7 (MR ONLY) ECCS H21PO82 0.28 Anchorage New Analysis Rule of Box (B21K201C)
TRIP UNIT CAB DIV1 INST RACK LOC PNL/RACK 266 H21P082-8 (MR ONLY) ECCS H21PO82 0.28 Anchorage New Analysis Rule of Box (B21K202A)
TRIP UNIT CAB DIV1 INST RACK LOC PNL/RACK H21P082-9 (MR ONLY) ECCS 267 (B21K202C)
TRIP UNIT CAB H21P082 0.28 Anchorage New Analysis Rule of Box DIV1 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C41 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUPNTMOUNTED                                                                 FRAGILITY       NOTES/
ESEL EUPNTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION   ON         HCLPF(G) FAILURE MODE   FGTY         COMMENTS NUMBER TR1 RELAY: LOC PNL/RACK (MR ONLY DSD MCC N/A                 72C-3A LOCAL H21P625         0.32 Relay Chatter Qualification 268 CTRL PANEL                                         Data LOCAL PNL &
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
RACKS TR2 RELAY: LOC PNL/RACK (MR ONLY DSD MCC N/A                 72C-3A LOCAL H21P625         0.32 Relay Chatter Qualification 269 Data CTRL PANEL LOCAL PNL &
FAILURE MODE FGTY COMMENTS NUMBER TR1 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 268 N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification CTRL PANEL Data LOCAL PNL &
RACKS TR3 RELAY: LOC PNL/RACK (MR ONLY DSD MCC N/A                 72C-3A LOCAL H21P625         0.32 Relay Chatter Qualification 270 Data CTRL PANEL LOCAL PNL &
RACKS TR2 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 269 N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification Data CTRL PANEL LOCAL PNL &
RACKS Fermi 2 Expedited Seismic Evaluation Process                   Page C42 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
RACKS TR3 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 270 N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification Data CTRL PANEL LOCAL PNL &
RACKS Fermi 2 Expedited Seismic Evaluation Process Page C42 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EUP           NTMOUNTED                                                         FRAGILITY     NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM           EQUIPMENT                   DESCRIPTION       ON         HCLPF(G) FAILURE MODE   F   GTY       COMMENTS NUMBER TR4 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 72C-3A LOCAL   H21P625         0.32   Relay Chatter Qualification 271                  N/A Data CTRL PANEL LOCAL PNL &
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
RACKS NBS TRANS ECCS 272               B21K609B             SERVICE DIV2 PWR H21P081         0.28     Anchorage   New Analysis Rule of Box SPLY NB TRANS ECCS 273               B21K610A             SERVICE DIV1 PWR   H21P082         0.28     Anchorage   New Analysis Rule of Box SPLY 274             E4100B001               HPCI BARO CNDR E4100B001         0.57   Functionality Experience   Rule of Box Data Method 275             E4100B002                 OILTCO LUBE E4100B002         0.58   Functionality Data Method   Rule of Box HPCI BOOSTER                                           Expenc 276             E4101C001B                     PP       E4101C001B       0.58   Functionality Experience   Rule of Box PUMP                                             Data Method 277             E4101C001C             HPCIOIURB DIVEN   E4101C001C       0.58   Functionality Data Method   Rule of Box Fermi 2 Expedited Seismic Evaluation Process                     Page C43 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILURE MODE F
GTY COMMENTS NUMBER TR4 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 271 N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification Data CTRL PANEL LOCAL PNL &
RACKS NBS TRANS ECCS 272 B21K609B SERVICE DIV2 PWR H21P081 0.28 Anchorage New Analysis Rule of Box SPLY NB TRANS ECCS 273 B21K610A SERVICE DIV1 PWR H21P082 0.28 Anchorage New Analysis Rule of Box SPLY 274 E4100B001 HPCI BARO CNDR E4100B001 0.57 Functionality Experience Rule of Box Data Method 275 E4100B002 OIL TCO LUBE E4100B002 0.58 Functionality Data Method Rule of Box HPCI BOOSTER Expenc 276 E4101C001B PP E4101C001B 0.58 Functionality Experience Rule of Box PUMP Data Method 277 E4101C001C HPCIOIURB DIVEN E4101C001C 0.58 Functionality Data Method Rule of Box Fermi 2 Expedited Seismic Evaluation Process Page C43 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL             EUP           NTMOUNTED                                                         FRAGILITY       NOTES/
ESEL EUP NTMOUNTED FRAGILITY NOTES/
ITEM             EQUIPMENT                 DESCRIPTION       ON         HCLPF(G) FAILURE MODE   F   GTY     COMMENTS NUMBER HIGH PRESSURE 278             E4101C002                 INCON       E4101C002         0.58   Functionality Data   ethod Rule of Box TURBINE E4101C004, HPCI BAROMETRIC 279             E4101C004               CONDENSER     E4100B001         0.57   Functionality Experienc   Rule of Box Data Method CONDENSATE PUMP 280             E4101C005               HPCI AUX OIL   E4101C002         0.58   Functionality Experience   Rule of Box PUMP                                               Data Method 281             E5100B002             RCIC LUBE OIL   E5100B002         0.54   Functionality Experience   Rule of Box COOLER                                             Data Method RCIC BAROMETRIC 282       282E5101C003 5101003               CONDENSER CONDENSATE     E5100B001         4.47     Anchorage   New Analysis   Rule of Box PUMP RCIC BAROMETRIC 283             E5101C004               CONDENSER     E5100B001         4.47     Anchorage   New Analysis Rule of Box VACUUM PUMP 284               E51K600               RCIC PWR SPLY   HI1P613          0.69   Functionality Qualification Rule of Box Data Fermi 2 Expedited Seismic Evaluation Process                     Page C44 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)
FAILURE MODE F
GTY COMMENTS NUMBER HIGH PRESSURE 278 E4101C002 INCON E4101C002 0.58 Functionality Data ethod Rule of Box TURBINE E4101C004, HPCI BAROMETRIC 279 E4101C004 CONDENSER E4100B001 0.57 Functionality Experienc Rule of Box CONDENSATE Data Method PUMP 280 E4101C005 HPCI AUX OIL E4101C002 0.58 Functionality Experience Rule of Box PUMP Data Method 281 E5100B002 RCIC LUBE OIL E5100B002 0.54 Functionality Experience Rule of Box COOLER Data Method RCIC BAROMETRIC 282 5101003 CONDENSER 282 E5101C003 CONDENSATE E5100B001 4.47 Anchorage New Analysis Rule of Box PUMP RCIC BAROMETRIC 283 E5101C004 CONDENSER E5100B001 4.47 Anchorage New Analysis Rule of Box VACUUM PUMP 284 E51K600 RCIC PWR SPLY HI 1P613 0.69 Functionality Qualification Rule of Box Data Fermi 2 Expedited Seismic Evaluation Process Page C44 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)


ESEL           EQUIPMENT                 DESCRIPTION   MOUNTED       HCLPF(G) FAILUR   MODE FRAGILITY       NOTES!
ESEL EQUIPMENT DESCRIPTION MOUNTED HCLPF(G)
NUME                     ID                 DSRPINON                     HLFG     FAURMOE         METHOD       COMMENTS NUMBER 285           R1600S03D -               480CV   C-F CC   FLOOR             0.3     Functionality   GERS       Rule of Box 286           R1600S003D-               MCC/DIST CAB     FLOOR             0.3     Functionality   GERS       Rule of Box 48 (72C-F)             480V 72C-F MCC 287             T50K800A               PCAM DIV1 PWR     H 1P914         0.47     Functionality Experience   Rule of Box SPLY                                               Data Method 288             T50K800B               PCAMS      P     HI lP915         0.47     Functionality Data   ethod   Rule of Box PCP DIV 2 B/U N2                                         Scaling from 289               T49P401               SPLY NITROGEN     FLOOR           0.21     Anchorage     Existing BOTTLE RACK                                               Analysis HPCI PCM - SUPR 290               E41F402               POOL SOLENOID     E41F402       Screened                             E             1, Table 2-4 VLV HPCI PCM - SUPR EPRI N-011, 291               E41F403               POOL SOLENOID     E41F403       Screened Table 2-4 VLV Fermi 2 Expedited Seismic Evaluation Process                       Page C45 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
FAILUR MODE FRAGILITY NOTES!
NUME ID DSRPINON HLFG FAURMOE METHOD COMMENTS NUMBER 285 R1600S03D -
480CV C-F CC FLOOR 0.3 Functionality GERS Rule of Box 286 R1600S003D-MCC/DIST CAB FLOOR 0.3 Functionality GERS Rule of Box 48 (72C-F) 480V 72C-F MCC 287 T50K800A PCAM DIV1 PWR H 1P914 0.47 Functionality Experience Rule of Box SPLY Data Method 288 T50K800B PCAM S P
HI lP915 0.47 Functionality Data ethod Rule of Box PCP DIV 2 B/U N2 Scaling from 289 T49P401 SPLY NITROGEN FLOOR 0.21 Anchorage Existing BOTTLE RACK Analysis HPCI PCM - SUPR 290 E41F402 POOL SOLENOID E41F402 Screened E
1, VLV Table 2-4 HPCI PCM - SUPR EPRI N-01 291 E41F403 POOL SOLENOID E41F403 Screened 1,
VLV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C45 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)
I'}}
I'}}

Latest revision as of 15:28, 10 January 2025

Expedited Seismic Equipment List, Attachment B
ML14345A477
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/02/2014
From:
DTE Energy
To:
Division of Operating Reactor Licensing
Shared Package
ML14346A331 List:
References
Download: ML14345A477 (77)


Text

ATTACHMENT B EXPEDITED SEISMIC EQUIPMENT LIST Fermi 2 Expedited Seismic Evaluation Process Page Bi of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 1

B2104F013A NB MSL "D" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 2

B2104F013B NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 3

B2104F013C NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 4

B2104F013D NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 5

B2104F013E NB MSL "C" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B2 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 6

B2104F013F NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 7

B2104F013G NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 8

B2104F013H NB MSL "C" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 9

B2104F013J NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 10 B2104F013K NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B3 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 11 B2104F013L NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER AVAIABLE SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 12 B2104F013M NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 13 B2104F013N NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 14 B2104F013P NB MSL "D" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 15 B2104F013R NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B4 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS SCHUTTE & KOERTING HYDRAULIC OPERATED 16 E4100F067 HPCI TURB STM ISO VLV (H.O.)

NC OPERABLE STOP VALVE. OPENS ON E4101C005 START AND TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED HPCI GOVERNOR VALVE (EGR CONTROLLED).

17 E4100F068 HPCI TURB STM CTRL VLV (H.O.)

NC OPERABLE E41K203. MODULATES+AF94 ON E4101C005 START AND TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED 18 E5150F044 RCIC TURB GOVERNOR CTRL VLV NO OPERABLE RCIC GOVERNOR VALVE.

19 E4100F018 HPCI BARO CNDR VACUUM TANK NC THROTTLE WILL OPEN AND OVERFLOW ONTO HPCI ROOM PRESS RELIEF VLV FLOOR 20 E4100F122 HPCIRES REG UNIT OIL SPLY NE ENERGIZED E41NA01 PS LOGIC IN PUMP RUN CIRCUIT 21 E4100F128 HPCI OIL COOLER THERMOSTATIC THROTTLE THROTTLE BYPASS/OUTLET VLV ALLOWS AUTOMATIC RESET OF OVERSPEED 22 E4100F133 HPCI O/S TRIP AUTOMATIC RESET THROTTLE THROTTLE TRIP.FUNCTIONS ON E4101C005 START AND CTRL VLV TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED.

HPCI COOLING WATER TO TURBINE 23 E41F035 LUBE OIL COOLER E4100B002 THROTTLE THROTTLE PRESSURE CONTROL VLV 24 E5100F033 RCIC BARO CNDR PRESS RELIEF VLV NC OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B5 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER RCIC COOLING WATER TO LUBE OIL 25 E51F015 COOLER E5100B002 PRESSURE OFF OPERABLE CONTROL VLV 26 E51F200 RCIC TURB BARO CNDR VACUUM NC OPERABLE TANK VLV V8-4618 PRESS CTRL VLV 27 T4901F613 PCP DIV 2 B/U N2 SPLY PRV BETWEEN NC CLOSED PRESSURE REGULATORS 28 T49F470 PCP DIV 2 B/U N2 SPLY 2ND STAGE THROTTLE THROTTLE PCV DOWN STREAM OF RELIEF VLV 29 T49F471 PCP DIV 2 B/U N2 SPLY 1ST STAGE THROTTLE THROTTLE PCV 30 R1400S022 SWGR 480V INDOOR UNIT NE ENERGIZED NON-VALVE ITEMS. 52X, 52 TC & 52XX ARE PART SUBSTATIONS BUS NO. 72B OF MCC 31 R1400SO23 SWGR 480V INDOOR UNIT NE ENERGIZED NON-VALVE ITEMS. 52X, 52 TC & 52XX ARE PART SUBSTATION BUS NO. 72C OF MCC 32 R1600S002A MCC/DIST CAB 480V MCC 72B-2A NE ENERGIZED NON-VALVE ITEMS 33 R1600S002B MCC/DIST CAB 480V MCC NO 72B-3A NE ENERGIZED NON-VALVE ITEMS 34 R1600S002C MCC/DIST CAB 480V MCC NO 72B-3A NE ENERGIZED NON-VALVE ITEMS 35 R1600S003D MCC 72C-F NE ENERGIZED NON-VALVE ITEMS 36 R1600S004B MCC/DIST CAB 480V MCC NO 72E-5A NE ENERGIZED 37 R1600S005A MCC/DIST CAB 480V MCC NO 72F-2A NE ENERGIZED NON-VALVE ITEMS Fermi 2 Expedited Seismic Evaluation Process Page B6 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

A

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 38 R1600S014A MCC/DIST CAB 480V MCC NO 72B-4A NE ENERGIZED NON-VALVE ITEMS 39 R3200S015 DC 260V DC MCC (2PA-1)

NE ENERGIZED NON-VALVE ITEMS 40 R3200S016 DC 260V DC MCC (2PB-1)

NE ENERGIZED NON-VALVE ITEMS 41 R1600SOO1C MCC/DIST CAB 480V MCC NO 72A-4A NE ENERGIZED (72A-4A) 42 R3200S003 DC DIV 130/260V DUAL BATT 2PA NE ENERGIZED 43 R3200S004 DC 260/130V DUAL BATT (2PB)

NE ENERGIZED 44 R3200S020A DIV 1 BATTERY CHARGER 2A-1 NE ENERGIZED NON-VALVE ITEMS 45 R3200S020C DV1SAEBT RCHGR2A ND)

ENERGIZED NON-VALVE ITEMS 46 R3200S021B DIV 2 BATTERY CHARGER 2B-2 NE ENERGIZED NON-VALVE ITEMS 47 R3200S021C DC DIV2 2B 1-2 130V BATT CHGR ND ENERGIZED NON-VALVE ITEMS CRTL & AUX RM PNL (MR ONLY)

POWERE FROM R3200S0061B FEED B21R623A.

48 HI lP601 ECCS DIV1 COMBINATION SUPPORT SUPPORT POWER FOR RCIC DEVICES IN Hl 1P601 ARE OPERATING PANEL POWERED FROM H 11P621 PANEL.

CRTL & AUX RM PNL (MR ONLY) 49 HI lP602 ECCS DIV2 COMBINATION SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC OPERATING PANEL 50 HI11P612 CRTL & AUX RM PNL (MR ONLY) NSSS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC PROCESS INST CAB DIV2 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B7 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 51 H 1P613 CPROCS&

AU S CAB Ii INTY NSSS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 52 HI lP621 CRTL & AUX RM PNL (MR ONLY) RCIC SUPPORT SUPPORT DIV1 INST RACK 53 H 1P620 HPCI RELAYS/LIGHTS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 54 H 1P628 CRTL & AUX RM PNL (MR ONLY) SRV SUPPORT SUPPORT DIV1 ADS RELAY CAB 55 HI lP622 CTRL AND AUX RM PNL INBD VLV SUPPORT SUPPORT CTRL RELAY CAB DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY) 56 HI lP870 MISC DC RELAY PANEL DIV2 INST SUPPORT SUPPORT RACK CRTL & AUX RM PNL (MR ONLY) 57 H 1P914 PCAM EQUIP AND MISC RELAY DIV1 SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC INST RACK CRTL & AUX RM PNL (MR ONLY) PC 58 HIIP915 MON EQUIP & MISC RELAY DIV2 INST SUPPORT SUPPORT RACK 59 H21P080 LOC PNL/RACK (MR ONLY) ECCS TRIP SUPPORT SUPPORT UNIT CAB DIV1 INST RACK LOC PNL/RACK (MR ONLY) LOCAL 60 H21PO81 PNL AND RACKS DIV2 ECCS TRIP SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC UNIT INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B8 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER 61 H21P082 LOC PNL/RACK (MR ONLY) ECCS RIP SUPPORT SUPPORT POWERED FROM R31K001 IN Hi 1P613 PANEL UNIT CAB DIVi1 INST RACK 62 Hi 1P609 CRTL & AUX RM PNL (MR ONLY) RPS SUPPORT SUPPORT TRIP CAB DIV1 INST RACK 63 Hi 1P611 CRTL & AUX RM PNL (MR ONLY) RPS SUPPORT SUPPORT TRIP CAB DIV2 INST RACK 64 H11P617 CRTL & AUX RM PNL (MR ONLY) DIV1 SUPPORT SUPPORT RHR RELAY CAB INST RACK 65 H11P618 CRTL & AUX RM PNL (MR ONLY) DIV2 SUPPORT SUPPORT T46F046 HPCI BARO CON VAC PUMP DISCHARGE RHR RELAY CAB INST RACK VALVE 66 B21P400 NB SRV DIV2 RELAY CABINET SUPPORT SUPPORT HOUSES RELAY WHICH IF ACTUATED WOULD CAUSE INADVERTANT SRV OPENING 67 B21P401 NB SRV DIV2 RELAY CABINET SUPPORT SUPPORT HOUSESRELAY WHICH IF ACTUATED WOULD CAUSE INADVERTANT SRV OPENING 68 H21P004 VESSEL LV RESS IV INST RACK SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 69 H21P595B LOC PNL/RACK (MR ONLY) DRYWELL SUPPORT SUPPORT MON DIV2 INST RACK 70 H21P408 LOC PNL/RACK (MR ONLY) AIR SUPPORT SUPPORT COMPS INST RACK 71 H21P614B LOC PNL/RACK (MR ONLY) TORUS SUPPORT SUPPORT MON SYS INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B9 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 72 H21P631B LOCAL PNL AND RACKS DIV2 TORUS SUPPORT SUPPORT PRESS INSTRUMENTATION RACK 73 H21P014 LOC PNL/RACK (MR ONLY) HPCI ESS SUPPORT SUPPORT DIV2 INST RACK 74 H21P017 LOC PNL/RACK (MR ONLY) RCIC DIVI SUPPORT SUPPORT INST RACK 75 T49P400B PC PNEU DIV2 SPLY INST RACK SUPPORT SUPPORT 76 H21P501A LOC PNL/RACK (MR ONLY) PILOT SUPPORT SUPPORT VLVDIV1 INST RACK 77 H21P501B LOC PNL/RACK (MR ONLY) CA DIV2 SUPPORT SUPPORT PILOT VLVINST RACK 78 HI lP923 CRTL & AUX RM PNL (MR ONLY) RCIC SUPPORT SUPPORT TURB CTRL PANEL INST RACK CRTL & AUX RM PNL (MR ONLY) HPCI 79 HI lP929 RELAY RM GOVERNOR CTRL INST SUPPORT SUPPORT RACK 80 R3200SO26 DC BATT SPB MAIN DIST CABINET NE ENERGIZED 2PA-2 81 R3200SO27 DC BATT 2PB MAIN DIST CABINET NE ENERGIZED 2PB-2 82 R3200S062 DC SWGR ROOM 130V DIST CABINET NE ENERGIZED 2PA2-14 Fermi 2 Expedited Seismic Evaluation Process Page B 10 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 83 E5101C002 RCIC REACTOR CORE ISOLATION OFF OPERABLE COOLING TURBINE 84 E4101COO1A HPCI MAIN PUMP OFF OPERABLE 85 E4101C003 E4101C003 HPCI BAROMETRIC OFF OPERABLE TRIP AFTER 5 MINUTES ON LOCA HI DW PRESSURE CONDENSER VACUUM PUMP ACTUATION 86 E5101C001 RCIC REACTOR CORE ISOLATION OFF OPERABLE COOLING PUMP HPCI TEST LINE ISO / PRESS CTRL ELECTRICAL TEST CIRCUIT ONLY. SEE I-2225-01; I-87 E41F011 AOV NC OPEN 2221-06; M-5721-1 MANUALLY OPENED UNDER FLEX POWERED IN HI 1P870 CKT 27 REQUIRED AS SRVS 88 T4901F469 PC PNEU DIV2 N2 SPLY ISO AOV NO/FC OPEN F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE ACCUMULATOR BANK CURRENT AC SOLENOID (T50F420B) ENERGIZE TO OPEN USES T50K800B TO INVERT FROM 2PB2-5.

89 T5000F420B PCAM PC PRESS MON T50L406B PT FC OPERABLE MODIFICATION 37114 WILL INSTALL FOR FLEX AN OTBD SAMPLE AOV MANUALLY ACTIVATED DC OPERATED SV AND AIRSUPPLY TO OPEN THIS VALVE UNDER FLEX STRATEGY.

CURRENT AC SOLENOID (T50F420B) ENERGIZE TO OPEN USES T50K800B TO INVERT FROM R3 1K005 90 T5000F421B PCAM PC TORUS WTR LVL MON DIV2 FC OPERABLE FROM 2PB2-5. MODIFICATION 37114 WILL INSTALL TORUS LVL INST LINE ISO AOV FOR FLEX AN MANUALLY ACTIVATED DC OPERATED SV AND AIRSUPPLY TO OPEN THIS VALVE UNDER FLEX STRATEGY.

Fermi 2 Expedited Seismic Evaluation Process Page B 11 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS GENERIC ALL MSIVS ARE NOT INCLUDED AS A LOSS OF RPS ON LOSS OF 480V AC TRIPS THE RPS WHICH OPENS THE K7 SERIES CONTACTS FOR 91 B2103F022A NB MSL "A" INBD PC ISO AOV NO CLOSED BOTH DC AND AC SOLENIODS. NEEDS TO CHANGE STATE FROM OPEN TO CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 92 B2103F022B NB MSL "B" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 93 B2103F022C NB MSL "C" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 94 B2103F022D NB MSL "D" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 95 B2103F028A NB MSL "A" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

Fermi 2 Expedited Seismic Evaluation Process Page B 12 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

A'

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NEEDS TO CHANGE STATE FROM OPEN TO 96 B2103F028B NB MSL "B" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 97 B2103F028C NB MSL "C" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 98 B2103F028D NB MSL "D" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

LOSS OF 120V AC POWER TO BOP BUS (R3101S002) 99 P5000F440 NIAS STATION AIR TO CONTROL AIR NO CLOSED DEENERGIZES SOLENOID IN H21P501A RACK.

ISO AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S001) 100 P5000F441 NIAS STATION AIR TO CONTROL AIR NO CLOSED DEENERGIZES SOLENOID IN H2iP50B RACK.

ISO AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S003) 101 P5000F401 SA TURBINE BUILDING HEADER ISO NO CLOSED DEENERGIZES SOLENOID IN H21P408 RACK.

AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION 102 E5150F095 RCIC WARM-UP BYPASS INLET MOV NC OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B13 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS CLOSURE OF REACTOR RECIRC PUMP 103 B3105F023A A SEAL LEAKAGE SOURCE, RRA NO CLOSED SUCTION VALVE CLOSURE OF REACTOR RECIRC PUMP 104 B3105F023B B SEAL LEAKAGE SOURCE, RRB NO CLOSED SUCTION VALVE CLOSURE OF REACTOR RECIRC PUMP 105 B3105F031A A SEAL LEAKAGE SOURCE, RRA NO CLOSED DISCHARGE VALVE CLOSURE OF REACTOR RECIRC PUMP 106 B3105F031B B SEAL LEAKAGE SOURCE, RRB NO CLOSED DISCHARGE VALVE 107 E1150F015A RHR DIV1 LPCI INBD ISO MOV NC OPEN 108 E1150F015B E1150F015B, RHR DIV2 LPCI INBD ISO NC OPEN MOV 109 E1150F017A RHR DIV1 LPCI MOV NO OPEN 110 E1150F017B E1150F17B, RHR DIV2 LPCI MOV NO OPEN 111 E1150F024A RHR DIV1 CNTM COOLING/TEST ISO C

OPEN MOV 112 E1150F024B E1150F024B, RHR DIV2 CNTM NC OPEN COOLING/ TEST ISO MOV, DIV. 2 113 E1150F028A RHR DIV1 SUPR POOL CNTM SPRAY TEST ISO MOV, DIV. 1 NC OPEN Fermi 2 Expedited Seismic Evaluation Process Page B14 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 114 E1150F028B E1150F028B, RHR DIV2 SUPR POOL NC OPEN CNTM SPRAY/TEST ISO MOV 115 E4150F001 HPCI STEAM SUPPLY TO TURB NC OPERABLE DRIVEN PUMP 116 E4150F002 RPV INJECTION NO OPERABLE SEISMIC WALKDOWN DEFERED TO RF16 117 E4150F003 RPV INJECTION NC OPERABLE 118 E4150F004 RPV INJECTION NO CLOSED NOT REQUIRED AS ITS ASSUMED CST FAILS NEEDS TO BE CLOSED TO OPEN E4150F041 119 E4150F021 HPCI TURB EXHAUST STOP GLOBE NC OPERABLE MOV 120 E4150F059 HPCI LUBE OIL COOLING WATER NC OPEN SPLY ISO MOV 121 E4150F008 HPCI MAIN PUMP TEST LINE ISO MOV NC OPERABLE 122 E4150F022 HPCI TURB EXH CONDENSATE DRAIN THROTTLE THROTTLE TO SUPR POOL STOP CHECK MOV 123 E5150F001 RCIC TURB EXHAUST LINE ISO MOV NC OPERABLE 124 E415OF041 HPCI BOOSTER PUMP SUCT FROM SUPR POOL ISO MOV NC OPEN NEED F004 CLOSED TO OPEN F041 125 E4150F042 HPCI BOOSTER PUMP SUCT FROM NC OPEN SUPR POOL ISO MOV 126 E5150F002 RCIC BARO CNDR VACUUM PUMP NC OPERABLE DISCHARGE STOP CHECK MOV Fermi 2 Expedited Seismic Evaluation Process Page B 15 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER 127 E5150F007 RCICI TURB STM SPLY INBO CNTM NO/FO OPEN ISO MOV 128 E5150F008 RCICI TURB STM SPLY ONBO CNTM NO/FO OPEN ISO MOV 129 E5150F012 RCIC PUMP DISCHARGE ISO MOV NO OPERABLE 130 E5150F013 RCIC PUMP SPLY TO FEEDWATER NC OPERABLE HEADER ISO MOV 131 T4901F602 COMPR AIR PC PNEU DIV2 INST N2 NO OPEN INERTING SPY INBRD PC ISO MOV 132 E5150F019 RCIC PUMP MIN FLOW RECIRC NC CLOSED BYPASS MOV 133 E5150F029 RCIC PUMP SPLY FROM TORUS ISO NC OPERABLE MOV 134 E5150F031 RCIC PUMP SPLY FROM TORUS ISO NC OPERABLE MOV 135 E5150F045 RCIC TURB STM INLET ISO MOV NC OPERABLE 136 E5150F046 RCIC LUBE OIL COOLER COOLING NC OPEN WATER SPLY ISO MOV 137 E41F400 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 1B; 33X-IA) 138 E41F401 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 2BC; 33X-2A)

Fermi 2 Expedited Seismic Evaluation Process Page B16 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 139 T50F412A PCAM PC TORUS LVL MON DIV1 SOV ND OPERABLE SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-SOV

_A; 33X-_B) 140 T50F412B PCAM PC TORUS LVL MON DIV2 SOV ND OPERABLE RELAYS ARE INSIDE VALVE HOUSING. (33X-_A; SOV 33X-_B) 141 E5100B001 RCIC BARO CNDR SUPPORT SUPPORT E501C003 & E5101C004 OPERATE THIS DEVICE 142 E41K603 HPCI DC TO AC VOLTAGE INVERTER NE ENERGIZED NON-VALVE ITEMS PWR SPLY 143 R31K001 VITAL PWR DIT 120 VAC DIV1 2KVA NE ENERGIZED NON-VALVE ITEMS 144 R31K002 VITAL PWR DIST 120 VAC DIV1 2KVA NE ENERGIZED SUPPLIES POWER TO B21R623A INVERTER VITAL PWR DIST 120 VAC DIVi1 2KVA 145 R31K004 V

W1ERTER NE ENERGIZED NON-VALVE ITEMS 146 R31K005 VITAL PWR DIST 120 VAC DIV1 2KVA NE ENERGIZED NON-VALVE ITEMS INVERTER N

NRIE O-AV TM LOC PNL/RACK (MR ONLY) DSD MCC 147 H21P625 72C-3A LOCAL CTRL PANEL LOCAL SUPPORT SUPPORT PNL & RACKS T50P402 PCAM PC TEMP MON DIV2 SUPR 148 (H21P584L)

CHAMBER N403B, N402B, N404B &

SUPPORT SUPPORT N405B TERM PNL 149 R3200S061A DC RR 130V DIST CABINET 2PA2-5 NE ENERGIZED Fermi 2 Expedited Seismic Evaluation Process Page B17 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 150 R3200S061B DC RR 130V DIST CABINET 2PA2-6 NE ENERGIZED 151 R3200S064A DC RR 130V DIST CABINET 2PB2-5 NE ENERGIZED 152 R3200S064B DC RR 130V DIST CABINET 2PB2-6 NE ENERGIZED 153 B21NO51A NB RPV PXE DIV 1 REACTOR VESSEL NE ENERGIZED NON-VALVE ITEMS 154 E41N019 HPCI SUCTION/ DISCH PRESSURE NE ENERGIZED NON-VALVE ITEMS GAUGE 155 B21NO91A NB RX LVL 1LTRIP WIDE RNG) DIV1 NE ENERGIZED NON-VALVE ITEMS REACTOR WATR VLWD 156 B21NO91C REACTOR WATER LEVEL - WIDE NE ENERGIZED NON-VALVE ITEMS 157 B21N691A NB RX LVL (1)TRIP UNIT DIV1 LVL NE ENERGIZED NON-VALVE ITEMS. SEE RELAY FOR B21NO91A 158 B21N691C NB RX LVL (1) TRIP UNIT DIV1 LVL NE ENERGIZED NON-VALVE ITEMS. SEE RELAY FOR B21N091C NB RPV LVL & PRESS RECORDER 159 B21R623A POST ACCIDENT MONITORING NE ENERGIZED POWERED FROM R3 1K002 IN H 11P613 RECORDER THIS EQUIPMENT DOES NOT NEED TO OPERATE 160 E41N062B HPCI HI LVL SIGNAL TO SUPR POOL NE DEENERGIZE BUT IS NEEDED FOR THE COMPLETION OF THE SUCT VLV LVL TRANSMITTER D

"SUCCESS PATH" DUE TO THE PRESSURE BOUNDARY REASONS. NON-VALVE ITEMS Fermi 2 Expedited Seismic Evaluation Process Page B 18 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 161 E51R001 RCIC PUMP DISCHARGE PRESS NE ENERGIZED NON-VALVE ITEMS. NOT ELECTRICALLY INDICATOR CONNECTED. SEE I-2282-22 162 E51R002 RCIC PUMP SUCT PRESS INDICATOR NE ENERGIZED NON-VALV TEMS. NOT ELECT-CALLY 163 E41K200 HPCI TURB GOVERNOR (EG-M) SPD NE ENERGIZED ON HI 1P929 POWERED FROM H 11P620 CTRLR 164 E41K201 HPCI TURB SPD MILLIVOLT TO NE ENERGIZED ON H 11P929 POWERED FROM H 11P620 CURRENT CONVERTER CONVERTER SPD SIG CND (EG-R) 166 E41K204 HPCI TURB GOVERNOR HI 1P929 POWERED FROM HI1P620 RESISTOR BOX N

NRIE NH P2 OEE RMH P2 167 E41K615 HPCI PUMP FLOW RATE FLOW IND NE ENERGIZED LOCATED ON H 11P602 PANEL 168 E41K826 HPCI FLOW CTRL (TURB CTRL)

NE ENERGIZED IN PANEL Hi 1P620 SIGNAL HPCI PUMP DISCHARGE FLOW 169 E41NO08 SIGNAL TO TURB CTRL FLOW NE ENERGIZED ON PANEL H21P014 TRANSMITTER 170 E41N212 HPCI TURB MAGNETIC PICK-UP SPD NE ENERGIZED ON HPCI TURBINE SKID ELEMENT 171 E41NA01 HPCI AUX OIL PUMP START/MAIN OIL OFF OPERABLE ON HPCI TURBINE SKID PUMP TRIP PRESS SWOF OPRBEOHCITBIESD Fermi 2 Expedited Seismic Evaluation Process Page B19 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 172 E41R613 HPCI MAIN PUMP E410100C1A NE ENERGIZED ON H11P602 DISCHARGE ELEC FLOW INDICATOR N

NRIE NH P0 173 E51K200 RCIC TURB EGM'CTRL BOX SPD NE OPERABLE CTRLR ELEC 174 E51K201 RCIC TURB CTRL SPD CURRENT TO NE OPERABLE VOLTAGE CONVERTER 175 E51K203 RCIC SPD SIG CND EGR HYDRAULIC NE OPERABLE ACTUATOR RCIC TURB EG-M CTRL BOX PWR 176 E51K204 SOURCE DROPPING RESISTOR BOX NE OPERABLE SPD CTRLR ELEC 177 E51K615 RCIC PUMP DISCHARGE FLOW CTRLR NE OPERABLE ELECNE OEAL RCIC FLOW CTRL SIGNAL ISOLATOR FOR TURB CTRL NE OPERABLE 179 E51NO03 RCIC PUMP DISCHARGE FLOW TRANSMITTER ELEC NE ENERGIZED 180 ES 1N205 RCIC TURB SPD SENSOR SPD ELEMENT NE OPERABLE 181 E51R608 RCIC TURB STM INLET AND EXHAUST NE OPERABLE PRESS INDICATOR 182 E51R609 RCIC PUMP DISCHARGE & SUCT PRESS INDICATOR NE OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B20 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 183 E51R613 RCIC PUMP DISCHARGE FLOW NE OPERABLE INDICATOR 184 E51R700 RCIC TURB SPD INDICATOR NE OPERABLE 185 T50N402B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (ATM) DIV2 T/C 186 T50N403B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (ATM) DIV2 T/C 187 T50N404B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (WTR) DIV2 T/C 188 T50N405B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (WTR) DIV2 T/C PCAM PC TORUS WTR LVL MON 189 T50N406B TORUS WTR LVL DIV2 LVL XMTR NE OPERABLE ELEC 190 T50N414B PCAM DIV2 TORUS WR PRESS XMTR NE OPERABLE 191 T50N415B PCAM PC PRESS MTREE WR NE OPERABLE POWERED FROM T50K800B IN H1 1P615 192 T50R800B PCAM PC ATMOSPHERIC MON DIV2 NE ENERGIZED POWERED FROM INVERTER R3 1K005 IN PANEL DW AND TORUS TEMP RECORDER H11P612 193 T50R802B PCAM PRESS MON DIV2 DW & TORUS POWERED FROM INVERTER R31K005 IN PANEL PRESS RECORDER NE ENERGIZED HN1P612 Fermi 2 Expedited Seismic Evaluation Process Page B21 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS POEEDFOMMBETRR3ERO N AE 194 T50R804B PCAM TORUS WTR LVL MON DIV2 PC POWERED FROM INVERTER R31K005 IN PANEL LVL RECORDER NE ENERGIZED HI lP612 195 E5150F059 RCIC TURB INLET TRIP THROTTLE NO OPERABLE MOV LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "A" INBD PC ISO AOV -

DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 196 B2103F022A-3 MANIFOLD C

D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "B" INBD PC ISO AOV -

DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 197 B2103F022B-3 MANIFOLD NE D

AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "C" INBD PC ISO AOV -

DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 198 B2103F022C-3 MANIFOLD NE D

AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "D" INBD PC ISO AOV -

DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 199 B2103F022D-3 MANIFOLD C

D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

Fermi 2 Expedited Seismic Evaluation Process Page B22 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) 7

ESEL EQUIPMENT OPERATING STATE NTM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "A" OTBD PC ISO AOV -

DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 200 B2103F028A-6 MANIFOLD NED AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "B" OTBD PC ISO AOV -

DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 201 B2103F028B-6 MANIFOLD C

D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "C" OTBD PC ISO AOV -

DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 202 B2103F028C-6 MANIFOLD NE D

AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "D" OTBD PC ISO AOV -

DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 203 B2103F028D-6 MANIFOLD NE D

AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

HPCI REMOTE TURB TRIP SOLENOID REMOTE TRIP SV NOT REQUIRED TO OPERATE 204 E41F200 VLV NC CLOSED THE SYSTEM MUST ENSURE THE SV DOES NOT SPURIOUSLY OPEN LOSS OF 120V AC POWER TO BOP BUS (R3101S003) 205 P50F401 SA ISO VLV P5000F401 SOLENOID VLV NE CLOSED DEENERGIZES SOLENOID IN H21P408 RACK.

VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION Fermi 2 Expedited Seismic Evaluation Process Page B23 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS LOSS OF 120V AC POWER TO BOP BUS (R3101S002) 206 P50F516A CA DIV1 NIAS ISO VLV P5000F440 CLOSED DEENERGIZES SOLENOID INH21P501A RACK.

SOLENOID VLV VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S001) 207 P50F516B CA DIV2 NIAS ISO VLV P5000F441 CLOSED DEENERGIZES SOLENOID IN H21P501B RACK.

SOLENOID VLV VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION PC PNEU DIV2 SPLY N2 INERTING POWERED IN H1 1P870 CKT 27 REQUIRED AS SRVS 208 T49F469 SPLY ISO VLV T4901F469 SOV NE ENERGIZED F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE ACCUMULATOR BANK 209 B2100MO 1A NB MSL "D" RELIEF VLV B2104F013A ND OPERABLE 20 (B21CK1A)

CTRL PWR RELAY ND OPERABLE 210 B2100M329A NB MSL INBD ISO VLV B2103F022A LATCHED OPERABLE LATCHING RELAY IN HII-P609 AUX DC RELAY 212 B2100M329C NB MSL INBD ISO VLV B2103F022B LATCHED OPERABLE LATCHING RELAY IN H11-P609 AUX DC RELAY LTHD OEAL ACIGRLYI I1P0 212 B2100M329C NB MSL INBD ISO VLV B2103F022C LATCHED OPERABLE LATCHING RELAY IN HI 1-P609 AUX DC RELAY 213 B2100M329D NB MSL INBD ISO VLV B2103F022D LTHD OEAL ACIGRLYI IIP0 213 B2100M329D AUX DC RELAY LTHD OEAL ACIGRLYI i1P0 214 B2100M331A NB MSL OTBD ISO VLV B2103F028A LATCHED OPERABLE LATCHING RELAY IN H 11-P611 AUX DC RELAY Fermi 2 Expedited Seismic Evaluation Process Page B24 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 215 B2100M331B NB MSL OTBD ISO VLV B2103F028B LATCHED OPERABLE LATCHING RELAY IN H11-P611 AUX DC RELAY 217 B2100M331D NB MSL OTBD ISO VLV B2103F028D LATCHED OPERABLE LATCHING RELAY IN H11-P611 AUX DC RELAY 218 B2104M084 NB SAFETY AND RELIEF VLV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427C)

CAUSE INADVERTANT SRV OPENING 219 B2104M085 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427D )

WOULD CAUSE INADVERTANT SRV OPENING 220 B2104MD86 NB SRV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427F)

CAUSE INADVERTANT SRV OPENING 221 B2104M87 NB SRV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427G)

CAUSE INADVERTANT SRV OPENING 222 B2104M88 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427K)

WOULD CAUSE INADVERTANT SRV OPENING 222 B2104M097 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED 23 (B21CK427K)

NBSVRLYN PRBE WOULD CAUSE INADVERTANT SRV OPENING 23 B2104MO97 NB SRV REL A NDEPERBL INPS RELAY WHICH IF ACTUATEDL (B21CK427L)

WOULD CAUSE INADVERTANT SRV OPENING 224 B1498 DEPRESSURIZATI01 VLV FO13M CTRL ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427M)

REAYAUSE INADVERTANT SRV OPENING RELAY Fermi 2 Expedited Seismic Evaluation Process Page B25 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS B210M099NB SRV DIV2 MAN 225 2104M99 DEPRESSURIZATION VLV F13N CTRL ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427N)

RELAY CAUSE INADVERTANT SRV OPENING E1100MO94A DEENERGIZE LOCA INITIATION LOGIC RELAY CONTACT IN RUN 226 (E 1K94A)

RHR K94A RELAY ND D

LOGICFOR E5101C003 AND AF180E5101C004 IN THE H 11 P617 PANEL NEEDS TO BE DEENERGIZED E1100M094B DEENERGIZE LOCA INITIATION LOGIC RELAY CONTACT IN RUN 227 (E 11K94B)

RHR K94B RELAY ND D

LOGICFOR E4101C003 AND E4101C004 IN THE HI1 P618 PANEL NEEDS TO BE DEENERGIZED RELAY OPERATES THE E41F200 SV REMOTE TRIP 228 E4100M012 HPCI K12 RELAY ND DEENERGIZE SV NOT REQUIRED TO OPERATE THE SYSTEM (E41AK12)

D MUST ENSURE THE SV DOES NOT SPURIOUSLY OPEN LOCATED IN Hi 1-P620 PANEL 229 E4100M015 HPCI K15 RELAY (LOW STM DEENERGIZE (E41K15)

PRESSURE TRIP LOGIC)

D 230 E4100M028 HPCI K28 RELAY (TURB EXH HIGH DEENERGIZE (E41K28)

DIA PRESSURE TRIP LOGIC)

D 231 E4100M035 HPCI K35 RELAY (HPCI AUTO DEENERGIZE (E41K35)

INITIATION LOGIC)

D 232 E4100M036 HPCI K36 RELAY (HPCI AUTO ND DEENERGIZE (E41K36)

INITIATION LOGIC)

D 233 E4100M043 HPCI K43 RELAY (STEAM LINE HI DP)

ND DEENERGIZE (E41K43)

D Fermi 2 Expedited Seismic Evaluation Process Page B26 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 234 E4100M080 HPCI K80 RELAY (LOW STM DEENERGIZE (E41K80)

PRESSURE TRIP LOGIC)

D 235 E5100MR52 GELRATOR TRI GGER ND OPERABLE ENERGIZES WHEN E5101F045 IS OFF SEAT 236 H 1P622-22 CTRL AND AUX RM PNL INBD VLV NC/NO NC/NO POWERED FROM R31K002 IN H 11P613 (A71BK53)

CTRL RELAY CAB DIV1 INST RACK 237 H 1P628-1 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK06A)

DIV1 ADS RELAY CAB 238 HI iP628-12 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK06B)

DIV1 ADS RELAY CAB 239 HI IP628-13 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK07A)

DIV1 ADS RELAY CAB 240 HI IP628-14 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK07B)

DIV1 ADS RELAY CAB 241 H 1IP628-23 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK1IE)

DIV1 ADS RELAY CAB 242 HI 1P628-24 CRTL & AUX RM PNL (MR ONLY) SRV (B21CKIIH)

DIV1 ADS RELAY CAB ND OPERABLE 243 Hi 1P628-32 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27A)

DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 244 HI IP628-33 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27E)

DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING Fermi 2 Expedited Seismic Evaluation Process Page B27 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) r

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS 245 Hi 1P628-34 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27H)

DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 246 H 11P628-35 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27J)

DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 247 H 1P628-36 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27P)

DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 248 H 1P628-37 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27R)

DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 249 HI lP628-44 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK31)

DIV1 ADS RELAY CAB 250 HI IP628-45 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK31A)

DIV1 ADS RELAY CAB 251 HI iP628-65 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK27B)

DIV1 ADS RELAY CAB CAUSE INADVERTANT SRV OPENING H11P870-34 CRTL & AUX RM PNL (MR ONLY)

POWERED IN HI IP870 CKT 27 REQUIRED AS SRVS 252 T41M804 MISC DC RELAY PANEL DIV2 INST NE ENERGIZED F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE RACK ACCUMULATOR BANK LOC PNL/RACK (MR ONLY) LOCAL 253 H21P080-22 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE (E41K202A)

UNIT INST RACK D

(STEAM LINE HI DP)

Fermi 2 Expedited Seismic Evaluation Process Page B28 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NTM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL 254 H21P081-20 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIR FOR E4100M015 (E41K15)

(E41K201B)

UNIT INST RACK (LOW STM D

PRESSURE TRIP LOGIC)

LOC PNL/RACK (MR ONLY) LOCAL 255 H21P81-21 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M080 (E41K80)

(E41K201D)

UNIT INST RACK (LOW STM D

PRESSURE TRIP LOGIC)

LOC PNL/RACK (MR ONLY) LOCAL 256 H21P081-22 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE (E41K202B)

UNIT INST RACK D

(STEAM LINE HI DP)

LOC PNL/RACK (MR ONLY) LOCAL H21P081-24 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M028 (E41K28)

(E41K204B)

UNIT INST RACK (TURB EXH HIGH D

DIA PRESSURE TRIP LOGIC)

LOC PNL/RACK (MR ONLY) LOCAL H21P081-25 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M028 (E41K28)

(E41K204D)

UNIT INST RACK (TURB EXH HIGH D

DIA PRESSURE TRIP LOGIC)

H21P081-28 LOC PNL/RACK (MR ONLY) LOCAL DEENERGIZE 259 (E41K206B)

PNL AND RACKS DIV2 ECCS TRIP ND D

UNIT INST RACK H21P082-10 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE (B21K203A)

UNIT CAB DIV1 INST RACK D

Fermi 2 Expedited Seismic Evaluation Process Page B29 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) ad

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER I

ECITO OML DSRDNTSCMET 261 H21P082-11 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K203C)

UNIT CAB DIV1 INST RACK D

262 H21P082-21 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K250A)

UNIT CAB DIV1 INST RACK D

263 H21P082-22 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K250C)

UNIT CAB DIV1 INST RACK D

H21P082-6 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE 264 (B21K201A)

UNIT CAB DIV1 INST RACK ND D

265 H21P082-7 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE (B21K201C)

UNIT CAB DIV1 INST RACK D

266 H21P082-8 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K202A)

UNIT CAB DIV1 INST RACK D

267 H21P082-9 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE (B21K202C)

UNIT CAB DIV1 INST RACK D

TRi RELAY: LOC PNL/RACK (MR 268 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS TR2 RELAY: LOC PNL/RACK (MR 269 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS TR3 RELAY: LOC PNL/RACK (MR 270 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS Fermi 2 Expedited Seismic Evaluation Process Page B30 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

Ed

ESEL EQUIPMENT OPERATING STATE NMBER ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS TR4 RELAY: LOC PNL/RACK (MR 271 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS 272 B21K609B NBS TRANS ECCS SERVICE DIV2 PWR NE ENERGIZED NON-VALVE ITEMS. NO SEAL IN / LOCKOUT SPLY CONTACTS 273 B21K610A NB TRANS ECCS SERVICE DIV1 PWR NE ENERGIZED NON-VALVE ITEMS. NO SEAL IN / LOCKOUT SPLY CONTACTS 274 E4100B001 HPCI BARO CNDR SUPPORT SUPPORT E4101C003 & E4101C004 OPERATE THIS DEVICE 275 E4100B002 HPCI TURB LUBE OIL COOLER NA NA 276 E4101C001B HPCI BOOSTER PUMP OFF OPERABLE 277 E4101C001C HPCI TURB DRIVEN OIL PUMP OFF OPERABLE 278 E4101C002 HIGH PRESSURE COOLANT INJECTION OFF OPERABLE TURBINE 279 E4101C004 E4101C004, HPCI BAROMETRIC OFF OPERABLE TRIP AFTER 5 MINUTES ON LOCA HI DW PRESSURE CONDENSER CONDENSATE PUMP ACTUATION 280 E4101C005 HPCI AUX OIL PUMP OFF OPERABLE 281 E5100B002 RCIC LUBE OIL COOLER OFF OPERABLE 282 E5101C003 RCIC BAROMETRIC CONDENSER OFF OPERABLE CONDENSATE PUMP 283 E5101C004 RCIC BAROMETRIC CONDENSER OFF OPERABLE VACUUM PUMP Fermi 2 Expedited Seismic Evaluation Process Page B31 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER I

ECITO OML DSRDNTSCMET 284 E51K600 RCIC PWR SPLY NE ENERGIZED H11P623 BB-95 & BB-96 ARE THE POWER CONNECTION TO R3200S061A (I-2045-27) 285 R1600SO03D -38 MCC/DIST CAB 480V 72C-F MCC NE ENERGIZED (72C-F) 286 R1600S003D-48 MCC/DIST CAB 480V 72C-F MCC NE ENERGIZED (72C-F) 287 T50K800A PCAM DIV2 PWR SPLY NE ENERGIZED T50K800A TO INVERT FROM R31K002 288 T50K800B PCAM DIV2 PWR SPLY NE ENERGIZED INVERT FROM R31K005 FROM 2PB2-5 289 T49P401 PCP DIV 2 B/U N2 SPLY NITROGEN SUPPORT SUPPORT RACK QUALIFIED BY DC-6342 BOTTLE RACK 290 E41F402 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 3BC; 33X-_3A) 291 E41F403 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33 VLV 4B; 33X-4A)

Fermi 2 Expedited Seismic Evaluation Process Page B32 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'

ATTACHMENT C ESEP HCLPF VALUES AND FAILURE MODES TABULATION Fermi 2 Expedited Seismic Evaluation Process Page Cl 1of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE FGTY COMMENTS NUMBER NB MSL "D" RELIEF EPRI NP-6041, 1

B2104F013A VB2104F03A ScreenedTable 2-4 2

B2104F013B NB MSL "C" RELIEF B2104F013B Screened EPRI NP-6041, VLV Table 2-4 NB MSL "B" RELIEF EPRI NP-6041, 2

B2104F013C VLV B2104F013B Screened Table 2-4 4

B2104F013D NB MSL "B" RELIEF B2104F013D Screened EPRI NP-6041, VLV Table 2-4 5

B2104F013E NB MSL "C" RELIEF B2104F013E Screened EPRI NP-6041, VLV Table 2-4 NB MSL "B" RELIEF EPRI NP-6041, S

B2104F013VLV B2104F013 Screened Table 2-4 7

B2104F013G NB MSL "B" RELIEF B2104F013G Screened EPRI NP-6041, VLV Table 2-4 8

B2104F013H NB MSL "C" RELIEF B2104F013H Screened EPRI NP-6041, 7 21401GVLV B140G ScendTable 2-4 9

B2104F013J NB MSL "C" RELIEF B2104F013J Screened EPRI NP-6041, VLV Table 2-4 10 B2104F013K NB MSL "B" RELIEF B2104F013K Screened EPRI NP-6041, VLV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C2 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE FGTY COMMENTS NUMBER NB MSL "A" RELIEF EPRI NP-6041, 11 B2104F013L LV B2104F013L Screened Tabl

-4 VLV Table 2-4 NB MSL "A" RELIEF EPRI NP-6041, 12 B2104F013M LV B2104F013M Screened Tabl

-4 VLV Table 2-4 NB MSL "A" RELIEF EPRI NP-6041, 13 B2104F013N VVB2104F013N ScreenedTal2-VLV Table 2-4 NB MSL "D" RELIEF EPRI NP-6041, 14 B2104F013P VLV B2104F013P Screened Tabl

-4 OVLV (HO)Table 2-4 NB MSL "C" RELIEF EPRI NP-6041, 15 B2104F013R VVB2104F013R ScreenedTal2-16 E40F07 HPCI TURB STM E410F6 cendEPRI NP-6041, 16 E1007 SO VLV (H.O.)

E40F6 cendTable 2-4 17 E4100F068 HPCI TURB STM E4100F068 Screened EPRI NP-6041, CTRL VLV (H.O.)

Table 2-4 RCIC TURB RCICTURBEPRI NP-6041, 18 E5150F044 GOVERNOR CTRL E5150F044 Screened VLV Table 2-4 HPCI BARO CNDR 19 E4100F018 VACUUM TANK E4100F018 Screened EPRI NP-6041, PRESS RELIEF VLV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C3 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT MOUNTED FRAGILITY NOTES/

ITEM IP DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER HPCI OIL CLR/TRIP UNIT OIL SPLY EPRI NP-6041, 20 E4100F122 PRESS E4101C002 Screened Table 2-4 REGULATING VLV HPCI OIL COOLER THERMOSTA TIC EPRI NP-6041, 21 E4100F128 BYPA S T LT E4100B002 Screened Tabl

-4 BYPASS/OUTLET Table 2-4 VLV HPCI O/S TRIP EPR N601, 22 E4100F133 AUTOMATIC E4101C002 Screened Table 2-4 RESET CTRL VLV HPCI COOLING WATER TO TURBINE LUBE OIL EPRI NP-6041, 23 E41F035 COOLER E41B002 E41002 02 Screened Table 2-4 PRESSURE CONTROL VLV RCIC BARO CNDR EPRI NP-6041, PRESS RELIEF VLV Table 2-4 RCIC COOLING WATER TO LUBE 25 E51F015 OIL COOLER E5100B002 Screened EPRI NP-6041 E5100B3002 Table 2-4 PRESSURE CONTROL VLV Fermi 2 Expedited Seismic Evaluation Process Page C4 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METY COMMENTS NUMBER ID RCIC TURB BARO 26 E51F200 CNDR VACUUM 5100B001 Screened EPRI NP-6041, TANK VLV V8-4618 Table 2-4 PRESS CTRL VLV PCP DIV 2 B/U N2 SPLY PRV 27 T4901F613 BETWEEN T49P401 Screened EPRI NP-6041, PRESSURE Table 2-4 REGULATORS PCP DIV 2 B/U N2 SPLY 2ND STAGE 28 T49F470 PCV DOWN T49P401 Screened EPRI NP-6041, STREAM OF RELIEF Table 2-4 VLV PCP DIV 2 B/U N2 29 T49F471 SPLY 1ST STAGE T49P401 Screened PCV Table 2-4 SWGR 480V 30 R1400SO22 BDOOR UNIS FLOOR 0.3 Functionality GERS NO. 72B SWGR 480V 31 R1405023 INDOOR UNIT 31 R1400SO23 SUBSTATION BUS FLOOR 0.3 Functionality GERS NO. 72C Fermi 2 Expedited Seismic Evaluation Process Page C5 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

IEME EQUIPMENT MOUNTED FRAGILITY ]

NOTES/

UE ID DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER 32 R1600S002A 48MCC/DI 72B-A FLOOR 0.3 Functionality GERS MCC/DIST CAB 33 R1600S002B 480V MCC NO 72B-FLOOR 0.3 Functionality GERS 3A MCC/DIST CAB 34 R1600SO02C 480V MCC NO 72B-FLOOR 0.3 Functionality GERS 3A 35 R1600S003D MCC 72C-F FLOOR 0.3 Functionality GERS MCC/DIST CAB 36 R1600SO04B 480V MCC NO 72E-FLOOR 0.3 Functionality GERS 5A MCC/DIST CAB 37 R1600S005A 480V MCC NO 72F-FLOOR 0.3 Functionality GERS 2A MCC/DIST CAB 38 R1600SO14A 480V MCC NO 72B-FLOOR 0.3 Functionality GERS 4A 39 R320S015 DC 260V DC MCC 39 R3200S015 (2PA-1)

FLOOR 0.3 Functionality GERS 40 R3200S(16 DC 260PBDC MCC FLOOR 0.3 Functionality GERS Fermi 2 Expedited Seismic Evaluation Process Page C6 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER R1600SO01C MCC/DIST CAB 41 480V MCC NO 72A-FLOOR 0.37 Functionality GERS (72A-4A) 4A DC DIV1 130/260V 42 R3200S003 DUAL BAT T 2PA FLOOR 0.52 Anchorage New Analysis 43 R320S004 DC 260/130V DUAL 43 R3200S004 BA TT3(2PB)

FLOOR 0.52 Anchorage New Analysis 44 R3200S020A Div 1 Battery Charger FLOOR 0.27 Functionality Qualification 2A-1 Data 45 R3200SO20C Div 1 Spare Battery FLOOR 0.27 Functionality Qualification Charger 2A 1-2 Data 46 R3200SO21B Div 2 Battery Charger FLOOR 0.27 Functionality Qualification 2B-2 Data 47 R3200S21C 1DC DIAT C GR FLOOR 0.27 Functionality Qualification CRTL & AUX RM PNL (MR ONLY) 48 HI1P601 ECCS DIV1 FLOOR 0.34 Functionality Experience COMBINATION Data Method OPERATING PANEL Fermi 2 Expedited Seismic Evaluation Process Page C7 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAIIYNTS ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE RAGILITY COMENTS NUMBER CRTL & AUX RM PNL (MR ONLY) 49 H 1P602 ECCS DIV2 FLOOR 0.34 Functionality Experience COMBINATION Data Method OPERATING PANEL CRTL & AUX RM PNL (MR ONLY) 50 HI 1P612 NSSS PROCESS FLOOR 0.69 Functionality Qualification INST CAB DIV2 INST RACK CRTL & AUX RM PNL (MR ONLY) 51 HI 1P613 NSSS PROCESS FLOOR 0.69 Functionality Qualification INST CAB DIV1 INST RACK CRTL & AUX RM 52 H11P621 PNL (MR ONLY)

FLOOR 0.69 Functionality Qualification RCIC DIV1 INST Data RACK 53 H 1P620 HPCI Relays/lights FLOOR 0.32 Functionality Data Method CRTL & AUX RM 54 H 1P628 PNL (MR ONLY)

FLOOR 0.32 Functionality Experience SRV DIVi1 ADS Data Method RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C8 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUPNTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER CTRL AND AUX RM PNL INBD VLV Experience 55 H 11P622 CTRL RELAY CAB FLOOR 0.47 Functionality Data Method DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY) 56 HI 1P870 MISC DC RELAY FLOOR 0.47 Functionality Experience PANEL DIV2 INST Data Method RACK CRTL & AUX RM PNL (MR ONLY) 57 H 1P914 PCAM EQUIP AND FLOOR 0.47 Functionality Experience MISC RELAY DIV1 Data Method INST RACK CRTL & AUX RM PNL (MR ONLY) PC 58 HI 1P915 MON EQUIP & MISC FLOOR 0.47 Functionality Experience RELAY DIV2 INST RACK LOC PNL/RACK 59 H2P080 (MR ONLY) ECCS 59 H21P080 TRIP UNIT CAB FLOOR 0.28 Anchorage New Analysis DIV1 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C9 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUPNTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL 60 H21P081 PNL AND RACKS FLOOR 0.28 Anchorage New Analysis DIV2 ECCS TRIP UNIT INST RACK LOC PNL/RACK 61 H2P082 (MR ONLY) ECCS 61 H21P082 TRIP UNIT CAB FLOOR 0.28 Anchorage New Analysis DIVI INST RACK CRTL & AUX RM 62 HI 1P609 RPS TRP CA D FLOOR 0.32 Functionality DExpelthod INST RACK CRTL & AUX RM 63 H 1P611 RPS R CN DV2 FLOOR 0.32 Functionality DExpelthod INST RACK CRTL & AUX RM 64 H11P617 PNL(MR FLOOR 0.32 Functionality Experience DIVI RHR RELAY FLO

.2 Fntoaiy Data Method CAB INST RACK CRTL & AUX RM 65 H11P618 PNL(MR FLOOR 0.32 Functionality Experience DIV2 RHR RELAY FLO

.2 Fntoaiy Data Method CAB INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C 10 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER 66 B21P400 RELB SRV DINT WALL 0.32 Functionality DExpelthod 67 B21P401 NB SRV DINET WALL 0.32 Functionality DExpethod LOC PNL/RACK (MR ONLY) RX 68 H21P004 VESSEL LVL &

FLOOR 0.59 Functionality GERS PRESS DIV1 INST RACK LOC PNL/RACK 69 H~PS9SB(MR ONLY) 69 H21P595B RWELL MON WALL 1.12 Functionality GERS DIV2 INST RACK LOC PNL/RACK 70 H21P408 (MR ONLY) AIR FLOOR 0.38 Functionality GERS COMPS INST RACK LOC PNL/RACK 71 H 1 P1 4B (MR ONLY) TORUS 71 H2MP614B MON SYS INST FLOOR 1.36 Functionality GERS RACK Fermi 2 Expedited Seismic Evaluation Process Page C1I of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER LOCAL PNL AND RACKS DIV2 72 H21P631B TORUS PRESS WALL 0.53 Functionality GERS INSTRUMENTATIO N RACK LOC PNL/RACK 73 1121P014 (MR ONLY) HPCI ESS DIV2 INST FLOOR 0.89 Anchorage New Analysis RACK LOC PNL/RACK 74 H21P017 (MR ONLY) RCIC FLOOR 0.89 Anchorage New Analysis DIV1 INST RACK 75 T49P400B3 PC PNEU DIV2 FLO

.9 Fntoaiy Experience SPLY INST RACK FLOOR 1.29 Functionality Data Method LOC PNL/RACK (MR ONLY) PILOTScaling from 76 H21P501A VLVDIV1 INST FLOOR 0.43 Anchorage Existing RACK Analysis LOC PNL/RACK (MR ONLY) CA Scaling from 77 H21P501B

( DIV2 PILOT FLOOR 0.43 Anchorage Existing VLVINST RACK Analysis Fermi 2 Expedited Seismic Evaluation Process Page C12 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 78 HIIP923 PNL (MR ONLY)

RCIC TURB CTRL WALL 0.22 Functionality GERS PANEL INST RACK CRTL & AUX RM PNL (MR ONLY) 79 H 1P929 HPCI RELAY RM WALL 0.22 Functionality GERS GOVERNOR CTRL INST RACK DC BATT SPB MAIN 80 R3200SO26 DIST CABINET 2PA-FLOOR 0.39 Functionality GERS 2

DC BATT 2PB MAIN 81 R3200SO27 DIST CABINET 2PB-FLOOR 0.39 Functionality GERS 2

DC SWGR ROOM 82 R3200S062 130V DIST CABINET FLOOR 0.22 Functionality GERS 2PA2-14 RCIC REACTOR 83 E5101C002 CORE ISOLATION E5101C002 1.24 Functionality Qualification COOLING TURBINE Data 84 E4101C00IA HPCI MAIN PUMP E410100I1A 0.58 Functionality Experience Data Method Fermi 2 Expedited Seismic Evaluation Process Page C13 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER E4101C003 HPCI BAROMETRIC Experience 85 E4101C003 CONDENSER E4100B001 0.57 Functionality Data Method VACUUM PUMP RCIC REACTOR 86 E5101C001 CORE ISOLATION E5101C001 0.54 Functionality Experience COOLING PUMP Data Method HPCI TEST LINE 87 E41F011 ISO / PRESS CTRL E41F011 1.87 Functionality Qualification AOV Data AOV PC PNEU DIV2 N2 88 T4901F469 SPLY ISO AOV T4901F469 0.64 Functionality New Analysis PCAM PC PRESS MON T50L406B PT 89 T5000F420B OTBD SAMPLE T5000F420B 0.64 Functionality New Analysis AOV PCAM PC TORUS 90 T000F21B WTR LVL MON 90 T5000F421B DIV2 TORUS LVL T5000F421B 0.64 Functionality New Analysis INST LINE ISO AOV NB MSL "A" INBD Scaling from 91 B2103F022A PC ISO AOV B2103F022A 0.33 Functionality Existing Analysis Fermi 2 Expedited Seismic Evaluation Process Page C14 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ITEM EQUIPMENT MOUNTED FRAGILITY NOTES/

EME ID DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER NB MSL "B" INBD Scaling from 92 B2103F022B PC ISO AOV B2103F022B 0.33 Functionality Existing Analysis NB MSL "C" INBD Scaling from 93 B2103F022C PC ISO AOV B2103F022C 0.33 Functionality Existing Analysis NB MSL "D" INBD Scaling from 94 B2103F022D PC ISO AOV B2103F022D 0.33 Functionality Existing Analysis NB MSL "A" OTBD Scaling from 95 B2103F028A PC ISO AOV B2103F028A 0.33 Functionality Existing Analysis NB MSL "B" OTBD Scaling from 96 B2103F028B PC ISO AOV B2103F028B 0.33 Functionality Existing Analysis NB MSL "C" OTBD Scaling from 97 B2103F028C PC ISO AOV B2103F028C 0.33 Functionality Existing Analysis NB MSL "D" OTBD Scaling from 98 B2103F028D PC ISO AOV B2103F028D 0.33 Functionality Existing Analysis Fermi 2 Expedited Seismic Evaluation Process Page C 15 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER NIAS STATION AIR 99 P5000F440 TO CONTROL AIR P5000F440 Screened EPRI NP-6041, ISO AOV Table 2-4 NIAS STATION AIR 100 P5000F441 TO CONTROL AIR P5000F441 Screened EPRI NP-6041, ISO AOV Table 2-4 SA TURBINE SA TUBINEEPRI NP-604 1, 101 P5000F401 BUILDING HEADER P5000F401 Screened Table 2-4 ISO AOV RCIC WARM-UP 102 E5150F095 BYPASS INLET E5150F095 Screened EPRI NP-6041, MOV Table 2-4 Closure of Reactor 103 B3105F023A Recirc Pump A seal B3105F023A Screened EPRI NP-6041, leakage source, RRA Table 2-4 Suction Valve Closure of Reactor 104 B3105F023B Recirc Pump B seal B3105F023B Screened EPRI NP-6041, leakage source, RRB Table 2-4 Suction Valve Closure of Reactor 105 B3105F031A cre o

Asal B3105F031A Screened EPRI NP-6041, leakage source, RRA Table 2-4 Discharge Valve Fermi 2 Expedited Seismic Evaluation Process Page C16 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER Closure of Reactor 106 B3105F031B Recirc Pump B seal B3105F031B Screened EPRI NP-6041, leakage source, RRB Table 2-4 Discharge Valve 107 E1150F015A RHR DIV1 LPCI E1150F015A Screened EPRI NP-6041, INBD ISO MOV Table 2-4 E1150F015B, RHR EPRI NP-6041, 108 E1150F015B DIV2 LPCI INBD ISO E1150F015B Screened EPRI N-4 MOV Table 2-4 109 E1150F017A RHR DIV1 LPCI E1150F017A Screened EPRI NP-6041, MOV Table 2-4 110 E1150F017B E1150FOI7B, RHR E1150F017B Screened EPRI NP-6041, DIV2 LPCI MOV Table 2-4 RHR DIV1 CNTM 111 E1150F024A COOLING/TEST ISO E1150F024A Screened EPRI 1,

MOV Table 2-4 E1150F024B, RHR 112 E1150F024B DIV2 CNTM El150F024B Screened EPRI NP-6041, COOLING! Test ISO El1004 cendTable 2-4 MOV, Div. 2 Fermi 2 Expedited Seismic Evaluation Process Page C17 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER RHR DIV1 SUPR POOL CNTM SPRAY EPRI NP-6041, 113 E1150F028A TEST ISOM Div. E1150F028A Screened Tabl -4 TEST ISO MOV, Div.

Table 2-4 1

El 150F028B, RHR 114 E1150F028B DIV2 SUPR POOL E1150F028B Screened EPRI NP-6041, CNTM SPRAY/TEST Table 2-4 ISO MOV HPCI STEAM 115 E4150F001 SUPPLY TO TURB E4150F001 Screened EPRI NP-6041, DRIVEN PUMP Table 2-4 116 E4150F002 RPV Injection E4150F002 Screened EPRI NP-6041, Table 2-4 117 E4150F003 RPV Injection E4150F003 Screened EPRI NP-6041, Table 2-4 118 E4150F004 RPV Injection E4150F004 Screened EPRI NP-6041, Table 2-4 HPCI TURB 119 E4150F021 EXHAUST STOP E4150F021 Screened EPRI NP-6041, GLOBE MOV Table 2-4 HPCI LUBE OIL 120 E4150F059 COOLING WATER E4100B002 Screened EPRI NP-6041, SPLY ISO MOV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C18 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER HPCI MAIN PUMP Scaling based 121 E4150F008 TEST LINE ISO E4150F008 0.47 Functionality on Existing MOV Analysis HPCI TURB EXH CONDENSATE 122 E4150F022 DRAIN TO SUPR E4150F022 Screened EPRI NP-6041, POOL STOP CHECK Table 2-4 MOV RCIC TURB 123 E5150F001 EXHAUST LINE ISO E5150F001 Screened EPRI NP-6041, MOV Table 2-4 HPCI BOOSTER 124 E4150F041 PUMP SUCT FROM E4150F041 Screened EPRI NP-6041, SUPR POOL ISO Table 2-4 MOV HPCI BOOSTER 125 E4150F042 PUMP SUCT FROM E4150F042 Screened EPRI NP-6041, SUPR POOL ISO Table 2-4 MOV RCIC BARO CNDR 126 ES150F002 VACUUM PUMP E5100B001 Screened EPRI NP-6041, DISCHARGE STOP Table 2-4 CHECK MOV Fermi 2 Expedited Seismic Evaluation Process Page C19 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQIMN MOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER RCICI TURB STM 127 E5150F007 SPLY INBO CNTM E5150F007 Screened Table 2-4 ISO MOV RCICI TURB STM 128 E5150F008 SPLY ONBO CNTM E5150F008 Screened EPRI N-4 ISO MOVTable 2-4 ISO MOV RCIC PUMP RCICPUMPEPRI NP-6041, 129 E5150F012 DISCHARGE ISO E5150F012 Screened EPRI N-4 MOV Table 2-4 MOV RCIC PUMP SPLY EPRI N-01, 130 E5150F013 TO FEEDWATER E5150F013 Screened HEADER ISO MOV Table 2-4 COMPR AIR PC 131 T490IF602 PNEU DIV2 INST N2 T4901F602 Screened EPRI NP-6041, INERTING SPY Table 2-4 INBRD PC ISO MOV RCIC PUMP MIN 132 E5150F019 FLOW RECIRC E5150F019 Screened EPRI NP-6041, BYPASS MOV Table 2-4 RCIC PUMP SPLY 133 E5150F029 FROM TORUS ISO E5150F029 Screened EPRI NP-6041, MOV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C20 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER RCIC PUMP SPLY EPRI NP-6041 134 E5150F031 FROM TORUS ISO E5150F031 Screened MOV Table 2-4 MOV 135 E5150F045 RCIC TURB STM E5150F045 Screened EPRI NP-6041, INLET ISO MOV Table 2-4 RCIC LUBE OIL 136 E5150F046 COOLER COOLING E5150F046 Screened EPRI NP-6041, WATER SPLY ISO Table 2-4 MOV HPCI PCM - SUPR 137 E41F400 POOL SOLENOID E41F400 Screened EPRI NP-6041, VLV Table 2-4 HPCI PCM - SUPR 138 E41F401 POOL SOLENOID E41F401 Screened EPRI NP-6041, VLV Table 2-4 PCAM PC TORUS 139 T50F412A LVL MON DIV1 T50F412A Screened EPRI NP-6041, SOV SOV Table 2-4 PCAM PC TORUS 140 T50F412B LVL MON DIV2 T50F412B Screened EPRI NP-6041, SOV SOV Table 2-4 141 E5100B001 RCIC BARO CNDR E5100B001 4.47 Anchorage New Analysis Fermi 2 Expedited Seismic Evaluation Process Page C21 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE F

GTY COMMENTS NUMBER HPCI DC TO AC 142 E41K603 INVERTER P Hi1P612 0.29 Functionality GERS SPLY VITAL PWR DIST 143 R31KO01 120 VAC DIV1 H11P613 0.32 Functionality Qualification 2KVA INVERTER VITAL PWR DIST 144 R31K002 120 VAC DIV1 H11P613 0.32 Functionality Qualification 2KVA INVERTER VITAL PWR DIST 145 R31K004 120 VAC DIV1 H11P612 0.32 Functionality Qualification 2KVA INVERTER Data VITAL PWR DIST 146 R31K005 120 VAC DIV1 HI1P612 0.32 Functionality Qualification 2KVA INVERTER Data LOC PNL/RACK (MR ONLY) DSD 147 H21P625 MCC 7

-A LCAL FLOOR 0.59 Functionality DExpe ethod LOCAL PNL &

RACKS Fermi 2 Expedited Seismic Evaluation Process Page C22 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER PCAM PC TEMP 148P402 MON DIV2 SUPR T50P402 Screened 148 T50P402 CHAMBER N403BT, Light weight, (H21P584L)

N402B, N404B &

(H21P584L)

Rugged N405B TERM PNL 149 R3200S061A DCRRI 23VDIST FLOOR 0.22 Functionality GERS CABINET 2PA2-5 150 R3200S061B DRR10DIT FLOOR 0.22 Functionality GERS DC RR 130V DIST 151 R3200S064A CABINET 2PA2-6 FLOOR 0.22 Functionality GERS 12 R20O4 DCABINET02PB2-T FLOOR 0.22 Functionality GERS 152 R320S04B DC RR 130VDIST CABINET 2PB2-6 FLOOR 0.22 Functionality GERS 153 21N51A NB RPV PXE DIV 1 153 B21N051A REACTOR VESSEL H21P004 0.59 Functionality GERS Rule of Box 154 E41N019 HPCI Suction! Disch H21P4 154 E41N19 aH21P014 0.89 Anchorage New Analysis Rule of Box Pressure Gauge NB RX L VL 1 TRIP 155 B21NO91A (WIDE RNG) DIVI H21P004 0.59 Functionality GERS Rule of Box LVL XMTR 156 B21NO91C Reactor water level -

H21P004 0.59 Functionality GERS Rule of Box wide range Fermi 2 Expedited Seismic Evaluation Process Page C23 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

IEME EQUIPMENT DSRPIN MOUNTED FRAGILITY NOTES/

M ID DESCRIPTION MON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER NB RX LVL (1) TRIP 157 B21N691A UNIT DIV1 LVL IND H21P082 0.28 Anchorage New Analysis Rule of Box SW NB RX LVL (1) TRIP 158 B21N691C UNIT DIV1 LVL IND H21P082 0.28 Anchorage New Analysis Rule of Box SW NB RPV LVL &

PRESS RECORDER 159 B21R623A POST ACCIDENT H 11P601 0.34 Functionality Experience Rule of Box MONITORING Data Method RECORDER HPCI HI LVL 160 E41N062B SIGNAL TO SUPR WALL Screened Light weight, POOL SUCT VLV Rugged LVL TRANSMITTER RCIC PUMP 161 E51RO01 DISCHARGE PRESS H21P017 0.89 Anchorage New Analysis Rule of Box INDICATOR 162 E1R002 RCIC PUMP SUCT 162 E51R002 PRESS INDICATOR H21P017 0.89 Anchorage New Analysis Rule of Box HPCI TURB 163 E41K200 GOVERNOR (EG-M)

H 1P929 0.22 Functionality GERS Rule of Box SPD CTRLR Fermi 2 Expedited Seismic Evaluation Process Page C24 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESL EUPETMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER HPCI TURB SPD 164 E1K201 MILLIVOLT TO 164 E41K201 CURRENT H 11P929 0.22 Functionality GERS Rule of Box CONVERTER HPCI TURB SPD ELEC TO 165 E41K203 HYDRAULIC E4101C002 0.58 Functionality Experience Rule of Box CONVERTER SPD Data Method SIG CND (EG-R)

HPCI TURB 166 E1K204GOVERNOR 166 E41K204 H1P929 RESISTOR HI 1P929 0.22 Functionality GERS Rule of Box BOX HPCI PUMP FLOW 167 E41K615 RATE FLOW IND Hi1P602 0.34 Functionality Experience Rule of Box CTRLR Data Method HPCI FLOW CTRL 168 E41K826 (TURB CTRL)

H11P620 0.32 Functionality Experience Rule of Box SIGNAL Data Method HPCI PUMP DISCHARGE FLOW 169 E41N008 SIGNAL TO TURB H21P014 0.89 Anchorage New Analysis Rule of Box CTRL FLOW TRANSMITTER Fermi 2 Expedited Seismic Evaluation Process Page C25 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT FMOUNTED FRAGILITY NOTES/

NEM ID DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER HPCI TURB 170 E41N212 MAGNETIC PICK-E4101C002 0.58 Functionality Experience Rule of Box UP SPD ELEMENT Data Method HPCI AUX OIL 171 E41NA01 PUMP S RTT IN E4101C002 0.58 Functionality DExpe ethod Rule of Box PRESS SW HPCI MAIN PUMP 172 E41R613 SE4101001E Hi1P602 0.34 Functionality Experience Rule of Box DISCHARGE ELEC Data Method FLOW INDICATOR RCIC TURB EGM 173 E51K200 CTRL BOX SPD H11P923 0.22 Functionality GERS Rule of Box CTRLR ELEC RCIC TURB CTRL 174 E51K201 SPD CURRENT TO HI 1P923 0.22 Functionality GERS Rule of Box VOLTAGE CONVERTER RCIC SPD SIG CND 175 E51 K203 EGR HYDRAULIC E5101 C002 1.24 Functionality Qualification Rule of Box ACTUATOR Data Fermi 2 Expedited Seismic Evaluation Process Page C26 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER RCIC TURB EG-M CTRL BOX PWR 176 E51K204 SOURCE DROPPING H 11P923 0.22 Functionality GERS Rule of Box RESISTOR BOX SPD CTRLR ELEC RCIC PUMP 177 E51K615 DISCHARGE FLOW H 11P601 0.34 Functionality Experience Rule of Box CTRLR ELEC Data Method RCIC FLOW CTRL 178 E51K820 SIGNAL ISOLATOR H11P621 0.69 Functionality Qualification Rule of Box FOR TURB CTRL Data RCIC PUMP 179 E51N003 DISCHARGE FLOW H21P017 0.89 Anchorage New Analysis Rule of Box TRANSMITTER ELEC RCIC TURB SPD 180 E51N205 SENSOR SPD E5101C002 1.24 Functionality Qualification Rule of Box ELEMENT Data RCIC TURB STM 181 E51R608 INLET AND Experience EXHAUST PRESS H11P601 0.34 Functionality Data Method Rule of Box INDICATOR Fermi 2 Expedited Seismic Evaluation Process Page C27 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER RCIC PUMP 182 E51R609 DSCT PRE S H 11P601 0.34 Functionality Data Method Rule of Box INDICATOR RCIC PUMP 183 E51R613 DISCHARGE FLOW H 11P601 0.34 Functionality Experienc Rule of Box INDICATOR Data Method 184 E51R700 RCIC TURB SPD H 11P601 0.34 Functionality Experience Rule of Box INDICATOR Data Method PCAM PC TEMP MON TORUS SUPR 185 T50N402B M

BR (ATM T50P402 Screened Rule of Box CHAMBER (ATM)

DIV2 T/C PCAM PC TEMP 186 T50N403B3 MON TORUS SUPR Rule of Box CHAMBER (ATM)

T50P402 Screened DIV2 T/C PCAM PC TEMP MON TORUS SUPR 187 T50N404B M

BR (WTR T50P402 Screened Rule of Box CHAMBER (WTR)

DIV2 T/C Fermi 2 Expedited Seismic Evaluation Process Page C28 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'

ESL EUPETMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER PCAM PC TEMP MON TORUS SUPR 188 T50N405B3 CHAMBER (WTR)

T50P402 Screened Rule of Box DIV2 T/C PCAM PC TORUS WTR LVL MON 189 T50N406B TORUS WTR LVL H21P614B 1.36 Functionality GERS Rule of Box DIV2 LVL XMTR ELEC 190 T5N414B PCAM DIV2 TORUS 190 T50N414B WR PRESS XMTR H21P631B 0.53 Functionality GERS Rule of Box PCAM PC PRESS 191 T5N415B MON DW PRESS 191 T50N415B WR DIV2 PRESS H21P595B 1.12 Functionality GERS Rule of Box XMTR ELEC PCAM PC ATMOSPHERIC 192 T50R800B MON DIV2 DW AND HI 1P602 0.34 Functionality Experience Rule of Box TORUS TEMP Data Method RECORDER PCAM PRESS MON 193 T50R802B DIV2 DW & TORUS H 11P602 0.34 Functionality Experience Rule of Box PRESS RECORDER Data Method Fermi 2 Expedited Seismic Evaluation Process Page C29 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESL EUPETMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER PCAM TORUS WTR 194 T50R804B LVL MON DIV2 PC H 1P602 0.34 Functionality Experience Rule of Box LVL RECORDER Data Method RCIC TURB INLET 195 E5150F059 TRIP THROTTLE E5150F059 1.24 Functionality Qualification Rule of Box MOV Data NB MSL "A" INBD Scaling from 196 B2103F022A-3 PC ISO AOV -

B2103F022A 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "B" INBD Scaling from 197 B2103F022B-3 PC ISO AOV -

B2103F022B 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "C" INBD Scaling from 198 B2103F022C-3 PC ISO AOV -

B2103F022C 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "D" INBD Scaling from 199 B2103F022D-3 PC ISO AOV -

B2103F022D 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "A" OTBD Scaling from 200 B2103F028A-6 PC ISO AOV -

B2103F028A 0.33 Functionality Existing Rule of Box Manifold Analysis Fermi 2 Expedited Seismic Evaluation Process Page C30 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESL EUPETMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER I

NB MSL "B" OTBD Scaling from 201 B2103F028B-6 PC ISO AOV -

B2103F028B 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "C" OTBD Scaling from 202 B2103F028C-6 PC ISO AOV -

B2103F028C 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "D" OTBD Scaling from 203 B2103F028D-6 PC ISO AOV -

B2103F028D 0.33 Functionality Existing Rule of Box Manifold Analysis HPCI REMOTE 204 E41F200 TURB TRIP E4101C002 0.58 Functionality Experience Rule of Box SOLENOID VLV Data Method SA ISO VLV 205 P50F401 P5000F401 H21P408 0.38 Functionality GERS Rule of Box SOLENOID VLV CA DIV1 NIAS ISO Scaling from 206 P50F516A VLV P5000F440 H21P501A 0.43 Anchorage Existing Rule of Box SOLENOID VLV Analysis CA DIV2 NIAS ISO Scaling from 207 P50F516B VLV P5000F441 H21P501B 0.43 Anchorage Existing Rule of Box SOLENOID VLV Analysis Fermi 2 Expedited Seismic Evaluation Process Page C31 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER PC PNEU DIV2 208 T49F469 SPLYN2 INERTING T49P400B 1.29 Functionality DExpe ethod Rule of Box T4901F469 SOV NB MSL "D" RELIEF 209 B2100M01A VLV B2104F013A H11P628 0.32 Relay Chatter Qualification (B21CK11A)

CData CTRL PWR RELAY NB MSL INBD ISO 210 B2100M329A VLV B2103F022A H 11P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 211 B2100M329B VLV B2103F022B HI 1P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 212 B2100M329C VLV B2103F022C HI 1P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 213 B2100M329D VLV B2103F022D H11P609 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 214 B2100M331A VLV B2103FO28A H11P611 Screened IPEEE AUX DC RELAY Fermi 2 Expedited Seismic Evaluation Process Page C32 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER NB MSL OTBD ISO 215 B2100M331B VLV B2103FO28B H11P611 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 216 B2100M331C VLV B2103FO28C H11P611 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 217 B2100M331D VLV B2103FO28D HI1P611 Screened IPEEE AUX DC RELAY B2104M084 NB SAFETY AND 218 (B21C427C )

RLFVEY B21P401 Screened IPEEE (B21CK427C)

RELIEF VLV RELAY 219 B2104M285 NB SRV RELAY B21P401 Screened IPEEE (B21 CK427D )

22 B2104M086IEE 220 (B21CK427F)

NB SRV RELAY B21P401 Screened IPEEE (B210C407F 221 B2104M287 NB SRV RELAY B21P401 Screened IPEEE (B2 1 CK427G) 22 B2104M088IPE 222 (B21CK427K)

NB SRV RELAY B21P401 Screened IPEEE B2104M097 223 B21C427 NB SRV RELAY B21P400 Screened IPEEE (B21CK427L )

Fermi 2 Expedited Seismic Evaluation Process Page C33 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER NB SRV DIV2 MAN B2104M098 DEPRESSURIZATIO (B21CK427M)

N VLV F013M CTRL B21P400 Screened RELAY NB SRV DIV2 MAN 225 B2104M099 DEPRESSURIZATIO 121P400 Screened IPEE (B21CK427N)

N VLV F013N CTRL RELAY El1100M094A 226 E11K94A RHR K94A RELAY H 11P617 Screened IPEEE (El1 K94A)

El1100M094B 227 E11K94B RHR K94B RELAY H11P617 Screened IPEEE (El 1K94B) 228 E4100M012 HPCI K12 RELAY H11P620 0.32 Functionality Experience (E41AK12)

Data Method E4100MO15 HPCI K15 RELAY 2290M15Experience 229 (E41K15)

(Low stm pressure trip H 11P620 0.32 Functionality Data Method logic) 2302 HPCI K28 RELAY 230 (E41K28)

(Turb exh high dia H 1P620 0.32 Functionality Data Method pressure trip logic)

E4100M035 HPCI K35 RELAY Experience 231 (E41K35)

(HPCI AUTO H 11P620 0.32 Functionality Data Method INITIATION LOGIC)

Fermi 2 Expedited Seismic Evaluation Process Page C34 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

IEME EQUIPMENT MOUNTED IFRAGILITY NOTES/

UE ID DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER E4100M036 HPCI K36 RELAY 232 (E41K36)

(HPCI AUTO HI 1P617 Screened IPEEE INITIATION LOGIC)

E4100M043 HPCI K43 RELAY (E41K43)

(Steam line Hi dP)

HPCI K80 RELAY E4100M0 K8Experience 234 (E41K80)

(Low stm pressure trip HI lP620 0.32 Functionality Data Method logic)

E5100M052 RCIC K52 RELAY 235 (E51K52)

(RCIC Ramp H 11P621 Screened IPEEE Generator Trigger)

CTRL AND AUX RM Hi11P622-22 PNL INBD VLV 236 HIl I6-2 PNINDVV H

P622 Screened IPEEE (A71BK53)

CTRL RELAY CAB DIV1 INST RACK CRTL & AUX RM HI iP628-11 PNL (MR ONLY) 237 (B21CK06A)

SRV DIV1 ADS H11P628 Screened IPEEE RELAY CAB CRTL & AUX RM 238 H11P628-12 PNL (MR ONLY)

HI1P628 Screened IPEEE (B21CK06B)

SRV DIV1 ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C35 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 239 H 11P628-13 PNL (MR ONLY)

H 11P628 Screened IPEEE (B21CK07A)

SRV DIVI ADS RELAY CAB CRTL & AUX RM 240 H 1P628-14 PNL (MR ONLY)

H 1P628 Screened IPEEE (B21CK07B)

SRV DIVI ADS RELAY CAB CRTL & AUX RM 241 H 1P628-23 PNL (MR ONLY)

HI 1P628 Screened IPEEE (B21CK11E)

SRV DIVI ADS RELAY CAB CRTL & AUX RM 242 H11P628-24 PNL (MR ONLY)

HI IP628 Screened IPEE (B21CK11H)

SRV DIV1 ADS RELAY CAB CRTL & AUX RM 243 HI IP628-32 PNL (MR ONLY)

HI IP628 Screened IPEEE (B21CK27A)

SRV DIVI ADS RELAY CAB CRTL & AUX RM 244 H 11P628-33 PNL (MR ONLY)

H 1P628 Screened IPEE (B21CK27E)

SRV DIVI ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C36 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 245 HI 1P628-34 PNL (MR ONLY)

HI 1P628 Screened IPEEE (B21CK27H)

SRV DIV1 ADS RELAY CAB CRTL & AUX RM 246 HI 1P628-35 PNL (MR ONLY)

HI 1P628 Screened IPEE (B21CK27J)

SRV DIV1 ADS RELAY CAB CRTL & AUX RM 247 HI 1P628-36 PNL (MR ONLY)

HI 1P628 Screened IPEEE (B21CK27P)

SRV DIV1 ADS RELAY CAB CRTL & AUX RM 248 HI 1P628-37 PNL (MR ONLY)

HI 1P628 Screened IPEEE (B21CK27R)

SRV DIV1 ADS RELAY CAB CRTL & AUX RM H11 P628-44 PNL (MR ONLY) 249 (B21CK31)

SRV DIV1 ADS H lP628 Screened IPEEE RELAY CAB CRTL & AUX RM 250 HI 1P628-45 PNL (MR ONLY)

HI 1P628 Screened IPEE (B21CK31A)

SRV DIV1 ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C37 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 251 HI 1P628-65 PNL (MR ONLY)

HI 1P628 Screened IPEE (B21CK27B)

SRV DIV1 ADS RELAY CAB CRTL & AUX RM H 1P870-34 PNL (MR ONLY) 252 T41M804 MISC DC RELAY H 11P870 Screened IPEEE PANEL DIV2 INST RACK LOC PNL/RACK (MR ONLY) LOCAL 253 H21P080-22 PNL AND RACKS H21PO80 Screened IPEE (E41K202A)

DIV2 ECCS TRIP UNIT INST RACK (Steam line Hi dP)

LOC PNL/RACK (MR ONLY) LOCAL H21P081-20 PNL AND RACKS 254 (E41K201B)

DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Low stm pressure trip logic)

Fermi 2 Expedited Seismic Evaluation Process Page C38 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

M ID DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL H21P081-21 PNL AND RACKS 255 (E41K201D)

DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Low stm pressure trip logic)

LOC PNL/RACK (MR ONLY) LOCAL 256 H21P081-22 PNL AND RACKS H21P081 0.28 Anchorage New Analysis Rule ofBox (E41K202B)

DIV2 ECCS TRIP UNIT INST RACK (Steam line Hi dP)

LOC PNL/RACK (MR ONLY) LOCAL H21P081-24 PNL AND RACKS 257 (E41K204B)

DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Turb exh high dia pressure trip logic)

Fermi 2 Expedited Seismic Evaluation Process Page C39 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT MOUNTED FRAGILITY NOTES!

ITEM IP DESCRIPTION ON HCLPF(G)

FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL H21P081-25 PNL AND RACKS 258 (E41K204D)

DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Turb exh high dia pressure trip logic)

LOC PNL/RACK H21P081-28 (MR ONLY) LOCAL 259 (E41K206B)

PNL AND RACKS H21P081 0.28 Anchorage New Analysis Rule of Box DIV2 ECCS TRIP UNIT INST RACK LOC PNL/RACK 260 H21P082-10 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K203A)

TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 261 H21PK82-11 (MR ONLY) EGGS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K203G)

TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 262 H21P082-21 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K250A)

TRIP UNIT CAB DIVI INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C40 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

E S E L E Q U I P M E N T M O U N T E D F A I I YN T S E

EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE FRAGILITY COMENTS NUMBER LOC PNL/RACK 263 H21P082-22 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K250C)

TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 264 H21P082-6 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K201A)

TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 265 H21P082-7 (MR ONLY) ECCS H21PO82 0.28 Anchorage New Analysis Rule of Box (B21K201C)

TRIP UNIT CAB DIV1 INST RACK LOC PNL/RACK 266 H21P082-8 (MR ONLY) ECCS H21PO82 0.28 Anchorage New Analysis Rule of Box (B21K202A)

TRIP UNIT CAB DIV1 INST RACK LOC PNL/RACK H21P082-9 (MR ONLY) ECCS 267 (B21K202C)

TRIP UNIT CAB H21P082 0.28 Anchorage New Analysis Rule of Box DIV1 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C41 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUPNTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE FGTY COMMENTS NUMBER TR1 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 268 N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification CTRL PANEL Data LOCAL PNL &

RACKS TR2 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 269 N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification Data CTRL PANEL LOCAL PNL &

RACKS TR3 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 270 N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification Data CTRL PANEL LOCAL PNL &

RACKS Fermi 2 Expedited Seismic Evaluation Process Page C42 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE F

GTY COMMENTS NUMBER TR4 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 271 N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification Data CTRL PANEL LOCAL PNL &

RACKS NBS TRANS ECCS 272 B21K609B SERVICE DIV2 PWR H21P081 0.28 Anchorage New Analysis Rule of Box SPLY NB TRANS ECCS 273 B21K610A SERVICE DIV1 PWR H21P082 0.28 Anchorage New Analysis Rule of Box SPLY 274 E4100B001 HPCI BARO CNDR E4100B001 0.57 Functionality Experience Rule of Box Data Method 275 E4100B002 OIL TCO LUBE E4100B002 0.58 Functionality Data Method Rule of Box HPCI BOOSTER Expenc 276 E4101C001B PP E4101C001B 0.58 Functionality Experience Rule of Box PUMP Data Method 277 E4101C001C HPCIOIURB DIVEN E4101C001C 0.58 Functionality Data Method Rule of Box Fermi 2 Expedited Seismic Evaluation Process Page C43 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G)

FAILURE MODE F

GTY COMMENTS NUMBER HIGH PRESSURE 278 E4101C002 INCON E4101C002 0.58 Functionality Data ethod Rule of Box TURBINE E4101C004, HPCI BAROMETRIC 279 E4101C004 CONDENSER E4100B001 0.57 Functionality Experienc Rule of Box CONDENSATE Data Method PUMP 280 E4101C005 HPCI AUX OIL E4101C002 0.58 Functionality Experience Rule of Box PUMP Data Method 281 E5100B002 RCIC LUBE OIL E5100B002 0.54 Functionality Experience Rule of Box COOLER Data Method RCIC BAROMETRIC 282 5101003 CONDENSER 282 E5101C003 CONDENSATE E5100B001 4.47 Anchorage New Analysis Rule of Box PUMP RCIC BAROMETRIC 283 E5101C004 CONDENSER E5100B001 4.47 Anchorage New Analysis Rule of Box VACUUM PUMP 284 E51K600 RCIC PWR SPLY HI 1P613 0.69 Functionality Qualification Rule of Box Data Fermi 2 Expedited Seismic Evaluation Process Page C44 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT DESCRIPTION MOUNTED HCLPF(G)

FAILUR MODE FRAGILITY NOTES!

NUME ID DSRPINON HLFG FAURMOE METHOD COMMENTS NUMBER 285 R1600S03D -

480CV C-F CC FLOOR 0.3 Functionality GERS Rule of Box 286 R1600S003D-MCC/DIST CAB FLOOR 0.3 Functionality GERS Rule of Box 48 (72C-F) 480V 72C-F MCC 287 T50K800A PCAM DIV1 PWR H 1P914 0.47 Functionality Experience Rule of Box SPLY Data Method 288 T50K800B PCAM S P

HI lP915 0.47 Functionality Data ethod Rule of Box PCP DIV 2 B/U N2 Scaling from 289 T49P401 SPLY NITROGEN FLOOR 0.21 Anchorage Existing BOTTLE RACK Analysis HPCI PCM - SUPR 290 E41F402 POOL SOLENOID E41F402 Screened E

1, VLV Table 2-4 HPCI PCM - SUPR EPRI N-01 291 E41F403 POOL SOLENOID E41F403 Screened 1,

VLV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C45 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'