ATTACHMENT B EXPEDITED SEISMIC EQUIPMENT LIST Fermi 2 Expedited Seismic Evaluation Process Page Bi of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 1 B2104F013A NB MSL "D" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 2 B2104F013B NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 3 B2104F013C NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 4 B2104F013D NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 5 B2104F013E NB MSL "C" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B2 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 6 B2104F013F NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 7 B2104F013G NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION DESIGNATED PRIMARY SUCCESS PATHWAY-ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED 8 B2104F013H NB MSL "C" RELIEF VLV NC OPERABLE FROM THE CR, RSD PANEL, ALTERNATE SD PANEL OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 9 B2104F013J NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 10 B2104F013K NB MSL "B" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B3 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 11 B2104F013L NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER AVAIABLE SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 12 B2104F013M NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 13 B2104F013N NB MSL "A" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 14 B2104F013P NB MSL "D" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION ANY 3 OF THE 15 SRVS (B2104F013X) OPERATED CLOSED BUT FROM THE CR, RSD PANEL, ALTERNATE SD PANEL 15 B2104F013R NB MSL "C" RELIEF VLV NC AVAILABLE OR FROM THE 29.EDM.15 LOCATIONS. ALL OTHER SRV MUST REMAIN CLOSED TO PREVENT INADVERTANT RPV DEPRESSURAIZATION Fermi 2 Expedited Seismic Evaluation Process Page B4 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION SCHUTTE & KOERTING HYDRAULIC OPERATED E4100F067 HPCI TURB STM ISO VLV (H.O.) NC OPERABLE STOP VALVE. OPENS ON E4101C005 START AND 16 TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED HPCI GOVERNOR VALVE (EGR CONTROLLED).

E4100F068 HPCI TURB STM CTRL VLV (H.O.) NC OPERABLE E41K203. MODULATES+AF94 ON E4101C005 START 17 AND TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED 18 E5150F044 RCIC TURB GOVERNOR CTRL VLV NO OPERABLE RCIC GOVERNOR VALVE.

E4100F018 HPCI BARO CNDR VACUUM TANK NC THROTTLE WILL OPEN AND OVERFLOW ONTO HPCI ROOM 19 PRESS RELIEF VLV FLOOR 20 E4100F122 HPCIRES REG UNIT OIL SPLY NE ENERGIZED E41NA01 PS LOGIC IN PUMP RUN CIRCUIT 21 E4100F128 HPCI OIL COOLER THERMOSTATIC THROTTLE THROTTLE BYPASS/OUTLET VLV ALLOWS AUTOMATIC RESET OF OVERSPEED 22 E4100F133 HPCI O/S TRIP AUTOMATIC RESET THROTTLE THROTTLE TRIP.FUNCTIONS ON E4101C005 START AND CTRL VLV TRANSITION TO E4101C001C WHEN TURBINE GETS TO SPEED.

HPCI COOLING WATER TO TURBINE 23 E41F035 LUBE OIL COOLER E4100B002 THROTTLE THROTTLE PRESSURE CONTROL VLV 24 E5100F033 RCIC BARO CNDR PRESS RELIEF VLV NC OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B5 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER ____

RCIC COOLING WATER TO LUBE OIL 25 E51F015 COOLER E5100B002 PRESSURE OFF OPERABLE CONTROL VLV 26 E51F200 RCIC TURB BARO CNDR VACUUM NC OPERABLE TANK VLV V8-4618 PRESS CTRL VLV 27 T4901F613 PCP DIV 2 B/U N2 SPLY PRV BETWEEN NC CLOSED PRESSURE REGULATORS 28 T49F470 PCP DIV 2 B/U N2 SPLY 2ND STAGE THROTTLE THROTTLE PCV DOWN STREAM OF RELIEF VLV 29 T49F471 PCP DIV 2 B/U N2 SPLY 1ST STAGE THROTTLE THROTTLE PCV 30 R1400S022 SWGR 480V INDOOR UNIT NE ENERGIZED NON-VALVE ITEMS. 52X, 52 TC & 52XX ARE PART SUBSTATIONS BUS NO. 72B OF MCC 31 R1400SO23 SWGR 480V INDOOR UNIT NE ENERGIZED NON-VALVE ITEMS. 52X, 52 TC & 52XX ARE PART SUBSTATION BUS NO. 72C OF MCC 32 R1600S002A MCC/DIST CAB 480V MCC 72B-2A NE ENERGIZED NON-VALVE ITEMS 33 R1600S002B MCC/DIST CAB 480V MCC NO 72B-3A NE ENERGIZED NON-VALVE ITEMS 34 R1600S002C MCC/DIST CAB 480V MCC NO 72B-3A NE ENERGIZED NON-VALVE ITEMS 35 R1600S003D MCC 72C-F NE ENERGIZED NON-VALVE ITEMS 36 R1600S004B MCC/DIST CAB 480V MCC NO 72E-5A NE ENERGIZED 37 R1600S005A MCC/DIST CAB 480V MCC NO 72F-2A NE ENERGIZED NON-VALVE ITEMS Fermi 2 Expedited Seismic Evaluation Process Page B6 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

A

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 38 R1600S014A MCC/DIST CAB 480V MCC NO 72B-4A NE ENERGIZED NON-VALVE ITEMS 39 R3200S015 DC 260V DC MCC (2PA-1) NE ENERGIZED NON-VALVE ITEMS 40 R3200S016 DC 260V DC MCC (2PB-1) NE ENERGIZED NON-VALVE ITEMS 41 R1600SOO1C MCC/DIST CAB 480V MCC NO 72A-4A NE ENERGIZED (72A-4A) 42 R3200S003 DC DIV 130/260V DUAL BATT 2PA NE ENERGIZED 43 R3200S004 DC 260/130V DUAL BATT (2PB) NE ENERGIZED 44 R3200S020A DIV 1 BATTERY CHARGER 2A-1 NE ENERGIZED NON-VALVE ITEMS 45 R3200S020C DV1SAEBT RCHGR2A ND) ENERGIZED NON-VALVE ITEMS 46 R3200S021B DIV 2 BATTERY CHARGER 2B-2 NE ENERGIZED NON-VALVE ITEMS 47 R3200S021C DC DIV2 2B 1-2 130V BATT CHGR ND ENERGIZED NON-VALVE ITEMS CRTL & AUX RM PNL (MR ONLY) POWERE FROM R3200S0061B FEED B21R623A.

48 HI lP601 ECCS DIV1 COMBINATION SUPPORT SUPPORT POWER FOR RCIC DEVICES IN Hl 1P601 ARE OPERATING PANEL POWERED FROM H 11P621 PANEL.

CRTL & AUX RM PNL (MR ONLY) 49 HI lP602 ECCS DIV2 COMBINATION SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC OPERATING PANEL 50 HI11P612 CRTL & AUX RM PNL (MR ONLY) NSSS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC PROCESS INST CAB DIV2 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B7 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 51 H 1P613 CPROCS& AU S CAB Ii INTY NSSS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 52 HI lP621 CRTL & AUX RM PNL (MR ONLY) RCIC SUPPORT SUPPORT DIV1 INST RACK 53 H 1P620 HPCI RELAYS/LIGHTS SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 54 H 1P628 CRTL & AUX RM PNL (MR ONLY) SRV SUPPORT SUPPORT DIV1 ADS RELAY CAB 55 HI lP622 CTRL AND AUX RM PNL INBD VLV SUPPORT SUPPORT CTRL RELAY CAB DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY) 56 HI lP870 MISC DC RELAY PANEL DIV2 INST SUPPORT SUPPORT RACK CRTL & AUX RM PNL (MR ONLY) 57 H 1P914 PCAM EQUIP AND MISC RELAY DIV1 SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC INST RACK CRTL & AUX RM PNL (MR ONLY) PC 58 HIIP915 MON EQUIP & MISC RELAY DIV2 INST SUPPORT SUPPORT RACK 59 H21P080 LOC PNL/RACK (MR ONLY) ECCS TRIP SUPPORT SUPPORT UNIT CAB DIV1 INST RACK LOC PNL/RACK (MR ONLY) LOCAL 60 H21PO81 PNL AND RACKS DIV2 ECCS TRIP SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC UNIT INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B8 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

61 H21P082 LOC PNL/RACK (MR ONLY) ECCS RIP SUPPORT SUPPORT POWERED FROM R31K001 IN Hi 1P613 PANEL UNIT CAB DIVi1 INST RACK 62 Hi 1P609 CRTL & AUX RM PNL (MR ONLY) RPS SUPPORT SUPPORT TRIP CAB DIV1 INST RACK 63 Hi1P611 CRTL & AUX RM PNL (MR ONLY) RPS SUPPORT SUPPORT TRIP CAB DIV2 INST RACK 64 H11P617 CRTL & AUX RM PNL (MR ONLY) DIV1 SUPPORT SUPPORT RHR RELAY CAB INST RACK 65 H11P618 CRTL & AUX RM PNL (MR ONLY) DIV2 SUPPORT SUPPORT T46F046 HPCI BARO CON VAC PUMP DISCHARGE RHR RELAY CAB INST RACK VALVE 66 B21P400 NB SRV DIV2 RELAY CABINET SUPPORT SUPPORT HOUSES RELAY WHICH IF ACTUATED WOULD CAUSE INADVERTANT SRV OPENING 67 B21P401 NB SRV DIV2 RELAY CABINET SUPPORT SUPPORT HOUSESRELAY WHICH IF ACTUATED WOULD CAUSE INADVERTANT SRV OPENING 68 H21P004 VESSEL LV RESS IV INST RACK SUPPORT SUPPORT NON-VALVE ITEMS. NO RELAY LOGIC 69 H21P595B LOC PNL/RACK (MR ONLY) DRYWELL SUPPORT SUPPORT MON DIV2 INST RACK 70 H21P408 LOC PNL/RACK (MR ONLY) AIR SUPPORT SUPPORT COMPS INST RACK 71 H21P614B LOC PNL/RACK (MR ONLY) TORUS SUPPORT SUPPORT MON SYS INST RACK Fermi 2 Expedited Seismic Evaluation Process Page B9 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 72 H21P631B LOCAL PNL AND RACKS DIV2 TORUS SUPPORT SUPPORT PRESS INSTRUMENTATION RACK 73 H21P014 LOC PNL/RACK (MR ONLY) HPCI ESS SUPPORT SUPPORT DIV2 INST RACK 74 H21P017 LOC PNL/RACK (MR ONLY) RCIC DIVI SUPPORT SUPPORT INST RACK 75 T49P400B PC PNEU DIV2 SPLY INST RACK SUPPORT SUPPORT 76 H21P501A LOC PNL/RACK (MR ONLY) PILOT SUPPORT SUPPORT VLVDIV1 INST RACK 77 H21P501B LOC PNL/RACK (MR ONLY) CA DIV2 SUPPORT SUPPORT PILOT VLVINST RACK 78 HI lP923 CRTL & AUX RM PNL (MR ONLY) RCIC SUPPORT SUPPORT TURB CTRL PANEL INST RACK CRTL & AUX RM PNL (MR ONLY) HPCI 79 HI lP929 RELAY RM GOVERNOR CTRL INST SUPPORT SUPPORT RACK 80 R3200SO26 DC BATT SPB MAIN DIST CABINET NE ENERGIZED 2PA-2 81 R3200SO27 DC BATT 2PB MAIN DIST CABINET NE ENERGIZED 2PB-2 82 R3200S062 DC SWGR ROOM 130V DIST CABINET NE ENERGIZED 2PA2-14 Fermi 2 Expedited Seismic Evaluation Process Page B 10 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 83 E5101C002 RCIC REACTOR CORE ISOLATION OFF OPERABLE COOLING TURBINE 84 E4101COO1A HPCI MAIN PUMP OFF OPERABLE 85 E4101C003 E4101C003 HPCI BAROMETRIC OFF OPERABLE TRIP AFTER 5 MINUTES ON LOCA HI DW PRESSURE CONDENSER VACUUM PUMP ACTUATION 86 E5101C001 RCIC REACTOR CORE ISOLATION OFF OPERABLE COOLING PUMP HPCI TEST LINE ISO / PRESS CTRL ELECTRICAL TEST CIRCUIT ONLY. SEE I-2225-01; I-87 E41F011 AOV NC OPEN 2221-06; M-5721-1 MANUALLY OPENED UNDER FLEX POWERED IN HI 1P870 CKT 27 REQUIRED AS SRVS 88 T4901F469 PC PNEU DIV2 N2 SPLY ISO AOV NO/FC OPEN F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE ACCUMULATOR BANK CURRENT AC SOLENOID (T50F420B) ENERGIZE TO OPEN USES T50K800B TO INVERT FROM 2PB2-5.

89 T5000F420B PCAM PC PRESS MON T50L406B PT FC OPERABLE MODIFICATION 37114 WILL INSTALL FOR FLEX AN OTBD SAMPLE AOV MANUALLY ACTIVATED DC OPERATED SV AND AIRSUPPLY TO OPEN THIS VALVE UNDER FLEX STRATEGY.

CURRENT AC SOLENOID (T50F420B) ENERGIZE TO OPEN USES T50K800B TO INVERT FROM R3 1K005 90 T5000F421B PCAM PC TORUS WTR LVL MON DIV2 FC OPERABLE FROM 2PB2-5. MODIFICATION 37114 WILL INSTALL TORUS LVL INST LINE ISO AOV FOR FLEX AN MANUALLY ACTIVATED DC OPERATED SV AND AIRSUPPLY TO OPEN THIS VALVE UNDER FLEX STRATEGY.

Fermi 2 Expedited Seismic Evaluation Process Page B 11 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION GENERIC ALL MSIVS ARE NOT INCLUDED AS A LOSS OF RPS ON LOSS OF 480V AC TRIPS THE RPS WHICH OPENS THE K7 SERIES CONTACTS FOR 91 B2103F022A NB MSL "A" INBD PC ISO AOV NO CLOSED BOTH DC AND AC SOLENIODS. NEEDS TO CHANGE STATE FROM OPEN TO CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 92 B2103F022B NB MSL "B" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 93 B2103F022C NB MSL "C" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 94 B2103F022D NB MSL "D" INBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 95 B2103F028A NB MSL "A" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

Fermi 2 Expedited Seismic Evaluation Process Page B 12 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

A'

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION NEEDS TO CHANGE STATE FROM OPEN TO 96 B2103F028B NB MSL "B" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 97 B2103F028C NB MSL "C" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

NEEDS TO CHANGE STATE FROM OPEN TO 98 B2103F028D NB MSL "D" OTBD PC ISO AOV NO CLOSED CLOSED (SPRING TO CLOSE). LOSS OF AC OR DC POWER OPENS AIR BOOST RELAY TO VENT AO.

SPRING TO CLOSE OPERATOR.

LOSS OF 120V AC POWER TO BOP BUS (R3101S002) 99 P5000F440 NIAS STATION AIR TO CONTROL AIR NO CLOSED DEENERGIZES SOLENOID IN H21P501A RACK.

ISO AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S001) 100 P5000F441 NIAS STATION AIR TO CONTROL AIR NO CLOSED DEENERGIZES SOLENOID IN H2iP50B RACK.

ISO AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S003) 101 P5000F401 SA TURBINE BUILDING HEADER ISO NO CLOSED DEENERGIZES SOLENOID IN H21P408 RACK.

AOV VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION 102 E5150F095 RCIC WARM-UP BYPASS INLET MOV NC OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B13 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION CLOSURE OF REACTOR RECIRC PUMP 103 B3105F023A A SEAL LEAKAGE SOURCE, RRA NO CLOSED SUCTION VALVE CLOSURE OF REACTOR RECIRC PUMP 104 B3105F023B B SEAL LEAKAGE SOURCE, RRB NO CLOSED SUCTION VALVE CLOSURE OF REACTOR RECIRC PUMP 105 B3105F031A A SEAL LEAKAGE SOURCE, RRA NO CLOSED DISCHARGE VALVE CLOSURE OF REACTOR RECIRC PUMP 106 B3105F031B B SEAL LEAKAGE SOURCE, RRB NO CLOSED DISCHARGE VALVE 107 E1150F015A RHR DIV1 LPCI INBD ISO MOV NC OPEN 108 E1150F015B E1150F015B, RHR DIV2 LPCI INBD ISO NC OPEN MOV 109 E1150F017A RHR DIV1 LPCI MOV NO OPEN 110 E1150F017B E1150F17B,RHR DIV2 LPCI MOV NO OPEN 111 E1150F024A RHR DIV1 CNTM COOLING/TEST ISO C OPEN MOV 112 E1150F024B E1150F024B, RHR DIV2 CNTM NC OPEN COOLING/ TEST ISO MOV, DIV. 2 113 E1150F028A RHR DIV1 SUPR POOL CNTM SPRAY TEST ISO MOV, DIV. 1 NC OPEN Fermi 2 Expedited Seismic Evaluation Process Page B14 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 114 E1150F028B E1150F028B, RHR DIV2 SUPR POOL NC OPEN CNTM SPRAY/TEST ISO MOV 115 E4150F001 HPCI STEAM SUPPLY TO TURB NC OPERABLE DRIVEN PUMP 116 E4150F002 RPV INJECTION NO OPERABLE SEISMIC WALKDOWN DEFERED TO RF16 117 E4150F003 RPV INJECTION NC OPERABLE 118 E4150F004 RPV INJECTION NO CLOSED NOT REQUIRED AS ITS ASSUMED CST FAILS NEEDS TO BE CLOSED TO OPEN E4150F041 119 E4150F021 HPCI TURB EXHAUST STOP GLOBE NC OPERABLE MOV 120 E4150F059 HPCI LUBE OIL COOLING WATER NC OPEN SPLY ISO MOV 121 E4150F008 HPCI MAIN PUMP TEST LINE ISO MOV NC OPERABLE 122 E4150F022 HPCI TURB EXH CONDENSATE DRAIN THROTTLE THROTTLE TO SUPR POOL STOP CHECK MOV 123 E5150F001 RCIC TURB EXHAUST LINE ISO MOV NC OPERABLE 124 E415OF041 HPCI BOOSTER PUMP SUCT FROM SUPR POOL ISO MOV NC OPEN NEED F004 CLOSED TO OPEN F041 125 E4150F042 HPCI BOOSTER PUMP SUCT FROM NC OPEN SUPR POOL ISO MOV 126 E5150F002 RCIC BARO CNDR VACUUM PUMP NC OPERABLE DISCHARGE STOP CHECK MOV Fermi 2 Expedited Seismic Evaluation Process Page B 15 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER __________ ________________________________

127 E5150F007 RCICI TURB STM SPLY INBO CNTM NO/FO OPEN ISO MOV 128 E5150F008 RCICI TURB STM SPLY ONBO CNTM NO/FO OPEN ISO MOV 129 E5150F012 RCIC PUMP DISCHARGE ISO MOV NO OPERABLE 130 E5150F013 RCIC PUMP SPLY TO FEEDWATER NC OPERABLE HEADER ISO MOV 131 T4901F602 COMPR AIR PC PNEU DIV2 INST N2 NO OPEN INERTING SPY INBRD PC ISO MOV 132 E5150F019 RCIC PUMP MIN FLOW RECIRC NC CLOSED BYPASS MOV 133 E5150F029 RCIC PUMP SPLY FROM TORUS ISO NC OPERABLE MOV 134 E5150F031 RCIC PUMP SPLY FROM TORUS ISO NC OPERABLE MOV 135 E5150F045 RCIC TURB STM INLET ISO MOV NC OPERABLE 136 E5150F046 RCIC LUBE OIL COOLER COOLING NC OPEN WATER SPLY ISO MOV 137 E41F400 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 1B; 33X-IA) 138 E41F401 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 2BC; 33X-2A)

Fermi 2 Expedited Seismic Evaluation Process Page B16 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 139 T50F412A PCAM PC TORUS LVL MON DIV1 SOV ND OPERABLE SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-SOV _A; 33X-_B) 140 T50F412B PCAM PC TORUS LVL MON DIV2 SOV ND OPERABLE RELAYS ARE INSIDE VALVE HOUSING. (33X-_A; SOV 33X-_B) 141 E5100B001 RCIC BARO CNDR SUPPORT SUPPORT E501C003 & E5101C004 OPERATE THIS DEVICE 142 E41K603 HPCI DC TO AC VOLTAGE INVERTER NE ENERGIZED NON-VALVE ITEMS PWR SPLY 143 R31K001 VITAL PWR DIT 120 VAC DIV1 2KVA NE ENERGIZED NON-VALVE ITEMS 144 R31K002 VITAL PWR DIST 120 VAC DIV1 2KVA NE ENERGIZED SUPPLIES POWER TO B21R623A INVERTER VITAL PWR DIST 120 VAC DIVi1 2KVA 145 R31K004 V W1ERTER NE ENERGIZED NON-VALVE ITEMS 146 R31K005 VITAL PWR DIST 120 VAC DIV1 2KVA NE ENERGIZED NON-VALVE ITEMS INVERTER N NRIE O-AV TM LOC PNL/RACK (MR ONLY) DSD MCC 147 H21P625 72C-3A LOCAL CTRL PANEL LOCAL SUPPORT SUPPORT PNL & RACKS T50P402 PCAM PC TEMP MON DIV2 SUPR 148 (H21P584L) CHAMBER N403B, N402B, N404B & SUPPORT SUPPORT N405B TERM PNL 149 R3200S061A DC RR 130V DIST CABINET 2PA2-5 NE ENERGIZED Fermi 2 Expedited Seismic Evaluation Process Page B17 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 150 R3200S061B DC RR 130V DIST CABINET 2PA2-6 NE ENERGIZED 151 R3200S064A DC RR 130V DIST CABINET 2PB2-5 NE ENERGIZED 152 R3200S064B DC RR 130V DIST CABINET 2PB2-6 NE ENERGIZED 153 B21NO51A NB RPV PXE DIV 1 REACTOR VESSEL NE ENERGIZED NON-VALVE ITEMS 154 E41N019 HPCI SUCTION/ DISCH PRESSURE NE ENERGIZED NON-VALVE ITEMS GAUGE 155 B21NO91A NB RX LVL 1LTRIP WIDE RNG) DIV1 NE ENERGIZED NON-VALVE ITEMS REACTOR WATR VLWD 156 B21NO91C REACTOR WATER LEVEL - WIDE NE ENERGIZED NON-VALVE ITEMS 157 B21N691A NB RX LVL (1)TRIP UNIT DIV1 LVL NE ENERGIZED NON-VALVE ITEMS. SEE RELAY FOR B21NO91A 158 B21N691C NB RX LVL (1) TRIP UNIT DIV1 LVL NE ENERGIZED NON-VALVE ITEMS. SEE RELAY FOR B21N091C NB RPV LVL & PRESS RECORDER 159 B21R623A POST ACCIDENT MONITORING NE ENERGIZED POWERED FROM R3 1K002 IN H 11P613 RECORDER THIS EQUIPMENT DOES NOT NEED TO OPERATE 160 E41N062B HPCI HI LVL SIGNAL TO SUPR POOL NE DEENERGIZE BUT IS NEEDED FOR THE COMPLETION OF THE SUCT VLV LVL TRANSMITTER D "SUCCESS PATH" DUE TO THE PRESSURE BOUNDARY REASONS. NON-VALVE ITEMS Fermi 2 Expedited Seismic Evaluation Process Page B 18 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION E51R001 RCIC PUMP DISCHARGE PRESS NE ENERGIZED NON-VALVE ITEMS. NOT ELECTRICALLY 161 INDICATOR CONNECTED. SEE I-2282-22 RCIC PUMP SUCT PRESS INDICATOR NE ENERGIZED NON-VALV TEMS. NOT ELECT-CALLY 162 E51R002 163 E41K200 HPCI TURB GOVERNOR (EG-M) SPD NE ENERGIZED ON HI 1P929 POWERED FROM H 11P620 CTRLR 164 E41K201 HPCI TURB SPD MILLIVOLT TO NE ENERGIZED ON H 11P929 POWERED FROM H 11P620 CURRENT CONVERTER CONVERTER SPD SIG CND (EG-R) 166 E41K204 HPCI TURB GOVERNOR HI 1P929 POWERED FROM HI1P620 RESISTOR BOX N NRIE NH P2 OEE RMH P2 167 E41K615 HPCI PUMP FLOW RATE FLOW IND NE ENERGIZED LOCATED ON H 11P602 PANEL 168 E41K826 HPCI FLOW CTRL (TURB CTRL) NE ENERGIZED IN PANEL Hi 1P620 SIGNAL HPCI PUMP DISCHARGE FLOW 169 E41NO08 SIGNAL TO TURB CTRL FLOW NE ENERGIZED ON PANEL H21P014 TRANSMITTER 170 E41N212 HPCI TURB MAGNETIC PICK-UP SPD NE ENERGIZED ON HPCI TURBINE SKID ELEMENT 171 E41NA01 HPCI AUX OIL PUMP START/MAIN OIL OFF OPERABLE ON HPCI TURBINE SKID PUMP TRIP PRESS SWOF OPRBEOHCITBIESD Fermi 2 Expedited Seismic Evaluation Process Page B19 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 172 E41R613 HPCI MAIN PUMP E410100C1A NE ENERGIZED ON H11P602 DISCHARGE ELEC FLOW INDICATOR N NRIE NH P0 173 E51K200 RCIC TURB EGM'CTRL BOX SPD NE OPERABLE CTRLR ELEC 174 E51K201 RCIC TURB CTRL SPD CURRENT TO NE OPERABLE VOLTAGE CONVERTER 175 E51K203 RCIC SPD SIG CND EGR HYDRAULIC NE OPERABLE ACTUATOR RCIC TURB EG-M CTRL BOX PWR 176 E51K204 SOURCE DROPPING RESISTOR BOX NE OPERABLE SPD CTRLR ELEC 177 E51K615 RCIC PUMP DISCHARGE FLOW CTRLR NE OPERABLE ELECNE OEAL RCIC FLOW CTRL SIGNAL ISOLATOR FOR TURB CTRL NE OPERABLE 179 E51NO03 RCIC PUMP DISCHARGE FLOW TRANSMITTER ELEC NE ENERGIZED 180 ES 1N205 RCIC TURB SPD SENSOR SPD ELEMENT NE OPERABLE 181 E51R608 RCIC TURB STM INLET AND EXHAUST NE OPERABLE PRESS INDICATOR 182 E51R609 RCIC PUMP DISCHARGE & SUCT PRESS INDICATOR NE OPERABLE Fermi 2 Expedited Seismic Evaluation Process Page B20 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 183 E51R613 RCIC PUMP DISCHARGE FLOW NE OPERABLE INDICATOR 184 E51R700 RCIC TURB SPD INDICATOR NE OPERABLE 185 T50N402B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (ATM) DIV2 T/C 186 T50N403B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (ATM) DIV2 T/C 187 T50N404B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (WTR) DIV2 T/C 188 T50N405B PCAM PC TEMP MON TORUS SUPR NE OPERABLE CHAMBER (WTR) DIV2 T/C PCAM PC TORUS WTR LVL MON 189 T50N406B TORUS WTR LVL DIV2 LVL XMTR NE OPERABLE ELEC 190 T50N414B PCAM DIV2 TORUS WR PRESS XMTR NE OPERABLE 191 T50N415B PCAM PC PRESS MTREE WR NE OPERABLE POWERED FROM T50K800B IN H1 1P615 192 T50R800B PCAM PC ATMOSPHERIC MON DIV2 NE ENERGIZED POWERED FROM INVERTER R3 1K005 IN PANEL DW AND TORUS TEMP RECORDER H11P612 193 T50R802B PCAM PRESS MON DIV2 DW & TORUS POWERED FROM INVERTER R31K005 IN PANEL PRESS RECORDER NE ENERGIZED HN1P612 Fermi 2 Expedited Seismic Evaluation Process Page B21 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION POEEDFOMMBETRR3ERO N AE 194 T50R804B PCAM TORUS WTR LVL MON DIV2 PC POWERED FROM INVERTER R31K005 IN PANEL LVL RECORDER NE ENERGIZED HI lP612 195 E5150F059 RCIC TURB INLET TRIP THROTTLE NO OPERABLE MOV LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "A" INBD PC ISO AOV - DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 196 B2103F022A-3 MANIFOLDC D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "B" INBD PC ISO AOV - DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 197 B2103F022B-3 MANIFOLD NE D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "C" INBD PC ISO AOV - DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 198 B2103F022C-3 MANIFOLD NE D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "D" INBD PC ISO AOV - DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 199 B2103F022D-3 MANIFOLDC D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

Fermi 2 Expedited Seismic Evaluation Process R14 12-4899/14 Rev. 0 (December 2, 2014)

Page B22 of B32 7

ESEL EQUIPMENT OPERATING STATE ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NTM NUMBER LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "A" OTBD PC ISO AOV - DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 200 B2103F028A-6 MANIFOLD NED AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "B" OTBD PC ISO AOV - DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 201 B2103F028B-6 MANIFOLDC D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "C" OTBD PC ISO AOV - DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 202 B2103F028C-6 MANIFOLD NE D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

LOSS OF RPS POWER DROPS RPS LOGIC (2 OF 2 NB MSL "D" OTBD PC ISO AOV - DEENERGIZE LOGIC, NO SINGLE FAILURE) WHICH DROPS BOTH 203 B2103F028D-6 MANIFOLD NE D AC OR DC POWER WHICH OPENS AIR BOOST RELAY TO VENT AO. SPRING TO CLOSE OPERATOR.

HPCI REMOTE TURB TRIP SOLENOID REMOTE TRIP SV NOT REQUIRED TO OPERATE 204 E41F200 VLV NC CLOSED THE SYSTEM MUST ENSURE THE SV DOES NOT SPURIOUSLY OPEN LOSS OF 120V AC POWER TO BOP BUS (R3101S003) 205 P50F401 SA ISO VLV P5000F401 SOLENOID VLV NE CLOSED DEENERGIZES SOLENOID IN H21P408 RACK.

VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION Fermi 2 Expedited Seismic Evaluation Process Page B23 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION LOSS OF 120V AC POWER TO BOP BUS (R3101S002)

P50F516A CA DIV1 NIAS ISO VLV P5000F440 CLOSED DEENERGIZES SOLENOID INH21P501A RACK.

206 SOLENOID VLV VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION LOSS OF 120V AC POWER TO BOP BUS (R3101S001)

P50F516B CA DIV2 NIAS ISO VLV P5000F441 CLOSED DEENERGIZES SOLENOID IN H21P501B RACK.

207 SOLENOID VLV VENTING AIR VALVE FAILS CLOSED ON LOSS OF AIR. NO POWER REQUIRED TO FULFILL FUNCTION PC PNEU DIV2 SPLY N2 INERTING POWERED IN H1 1P870 CKT 27 REQUIRED AS SRVS 208 T49F469 SPLY ISO VLV T4901F469 SOV NE ENERGIZED F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE ACCUMULATOR BANK 209 B2100MO 1A NB MSL "D" RELIEF VLV B2104F013A ND OPERABLE 20 (B21CK1A) CTRL PWR RELAY ND OPERABLE 210 B2100M329A NB MSL INBD ISO VLV B2103F022A LATCHED OPERABLE LATCHING RELAY IN HII-P609 AUX DC RELAY 212 B2100M329C NB MSL INBD ISO VLV B2103F022B LATCHED OPERABLE LATCHING RELAY IN H11-P609 AUX DC RELAY LTHD OEAL ACIGRLYI I1P0 212 B2100M329C NB MSL INBD ISO VLV B2103F022C LATCHED OPERABLE LATCHING RELAY IN HI 1-P609 AUX DC RELAY 213 B2100M329D NB MSL INBD ISO VLV B2103F022D LTHD OEAL ACIGRLYI IIP0 213 B2100M329D AUX DC RELAY LTHD OEAL ACIGRLYI i1P0 214 B2100M331A NB MSL OTBD ISO VLV B2103F028A LATCHED OPERABLE LATCHING RELAY IN H 11-P611 AUX DC RELAY Fermi 2 Expedited Seismic Evaluation Process Page B24 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 215 B2100M331B NB MSL OTBD ISO VLV B2103F028B LATCHED OPERABLE LATCHING RELAY IN H11-P611 AUX DC RELAY AUX DC RELAY 217 B2100M331D NB MSL OTBD ISO VLV B2103F028D LATCHED OPERABLE LATCHING RELAY IN H11-P611 218 B2104M084 NB SAFETY AND RELIEF VLV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427C) CAUSE INADVERTANT SRV OPENING 219 B2104M085 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427D ) WOULD CAUSE INADVERTANT SRV OPENING 220 B2104MD86 NB SRV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427F) CAUSE INADVERTANT SRV OPENING 221 B2104M87 NB SRV RELAY ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427G) CAUSE INADVERTANT SRV OPENING 222 B2104M88 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427K) WOULD CAUSE INADVERTANT SRV OPENING 23 (B21CK427K) NBSVRLYN PRBE WOULD CAUSE INADVERTANT SRV OPENING 222 B2104M097 NB SRV RELAY ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK427L) WOULD CAUSE INADVERTANT SRV OPENING 23 B2104MO97 NB SRV REL A NDEPERBL INPS RELAY WHICH IF ACTUATEDL 224 B1498 DEPRESSURIZATI01 VLV FO13M CTRL ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427M) REAYAUSE INADVERTANT SRV OPENING RELAY Fermi 2 Expedited Seismic Evaluation Process Page B25 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NMBER ID B210M099NB SRV DIV2 MAN 225 2104M99 DEPRESSURIZATION VLV F13N CTRL ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK427N) RELAY CAUSE INADVERTANT SRV OPENING E1100MO94A DEENERGIZE LOCA INITIATION LOGIC RELAY CONTACT IN RUN 226 (E 1K94A) RHR K94A RELAY ND D LOGICFOR E5101C003 AND AF180E5101C004 IN THE H 11P617 PANEL NEEDS TO BE DEENERGIZED E1100M094B DEENERGIZE LOCA INITIATION LOGIC RELAY CONTACT IN RUN 227 (E 11K94B) RHR K94B RELAY ND D LOGICFOR E4101C003 AND E4101C004 IN THE HI1 P618 PANEL NEEDS TO BE DEENERGIZED RELAY OPERATES THE E41F200 SV REMOTE TRIP 228 E4100M012 HPCI K12 RELAY ND DEENERGIZE SV NOT REQUIRED TO OPERATE THE SYSTEM (E41AK12) D MUST ENSURE THE SV DOES NOT SPURIOUSLY OPEN LOCATED IN Hi 1-P620 PANEL 229 E4100M015 HPCI K15 RELAY (LOW STM DEENERGIZE (E41K15) PRESSURE TRIP LOGIC) D 230 E4100M028 HPCI K28 RELAY (TURB EXH HIGH DEENERGIZE (E41K28) DIA PRESSURE TRIP LOGIC) D 231 E4100M035 HPCI K35 RELAY (HPCI AUTO DEENERGIZE (E41K35) INITIATION LOGIC) D 232 E4100M036 HPCI K36 RELAY (HPCI AUTO ND DEENERGIZE (E41K36) INITIATION LOGIC) D 233 E4100M043 HPCI K43 RELAY (STEAM LINE HI DP) ND DEENERGIZE (E41K43) D Fermi 2 Expedited Seismic Evaluation Process Page B26 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION E4100M080 HPCI K80 RELAY (LOW STM DEENERGIZE 234 (E41K80) PRESSURE TRIP LOGIC) D 235 E5100MR52 GELRATOR TRIGGER ND OPERABLE ENERGIZES WHEN E5101F045 IS OFF SEAT 236 H 1P622-22 CTRL AND AUX RM PNL INBD VLV NC/NO NC/NO POWERED FROM R31K002 IN H 11P613 (A71BK53) CTRL RELAY CAB DIV1 INST RACK 237 H 1P628- 1 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK06A) DIV1 ADS RELAY CAB 238 HI iP628-12 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK06B) DIV1 ADS RELAY CAB 239 HI IP628-13 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK07A) DIV1 ADS RELAY CAB 240 HI IP628-14 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK07B) DIV1 ADS RELAY CAB 241 H 1IP628-23 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK1IE) DIV1 ADS RELAY CAB 242 HI 1P628-24 CRTL & AUX RM PNL (MR ONLY) SRV (B21CKIIH) DIV1 ADS RELAY CAB ND OPERABLE 243 Hi 1P628-32 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27A) DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 244 HI IP628-33 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27E) DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING Fermi 2 Expedited Seismic Evaluation Process Page B27 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) r

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION 245 Hi 1P628-34 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27H) DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 246 H 11P628-35 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27J) DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 247 H 1P628-36 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27P) DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 248 H 1P628-37 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE INTERPOSING RELAY WHICH IF ACTUATED (B21CK27R) DIV1 ADS RELAY CAB WOULD CAUSE INADVERTANT SRV OPENING 249 HI lP628-44 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK31) DIV1 ADS RELAY CAB 250 HI IP628-45 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE (B21CK31A) DIV1 ADS RELAY CAB 251 HI iP628-65 CRTL & AUX RM PNL (MR ONLY) SRV ND OPERABLE SEAL IN RELAY WHICH IF ACTUATED WOULD (B21CK27B) DIV1 ADS RELAY CAB CAUSE INADVERTANT SRV OPENING H11P870-34 CRTL & AUX RM PNL (MR ONLY) POWERED IN HI IP870 CKT 27 REQUIRED AS SRVS 252 T41M804 MISC DC RELAY PANEL DIV2 INST NE ENERGIZED F,K,D,M,N &C ARE SUPPLIED BY A SEPARTE RACK ACCUMULATOR BANK LOC PNL/RACK (MR ONLY) LOCAL 253 H21P080-22 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE (E41K202A) UNIT INST RACK D (STEAM LINE HI DP)

Fermi 2 Expedited Seismic Evaluation Process Page B28 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NTM NUMBER _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

LOC PNL/RACK (MR ONLY) LOCAL 254 H21P081-20 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIR FOR E4100M015 (E41K15)

(E41K201B) UNIT INST RACK (LOW STM D PRESSURE TRIP LOGIC)

LOC PNL/RACK (MR ONLY) LOCAL 255 H21P81-21 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M080 (E41K80)

(E41K201D) UNIT INST RACK (LOW STM D PRESSURE TRIP LOGIC)

LOC PNL/RACK (MR ONLY) LOCAL PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE 256 H21P081-22 (E41K202B) UNIT INST RACK D (STEAM LINE HI DP)

LOC PNL/RACK (MR ONLY) LOCAL H21P081-24 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M028 (E41K28)

(E41K204B) UNIT INST RACK (TURB EXH HIGH D DIA PRESSURE TRIP LOGIC)

LOC PNL/RACK (MR ONLY) LOCAL H21P081-25 PNL AND RACKS DIV2 ECCS TRIP DEENERGIZE CIRCUIT FOR E4100M028 (E41K28)

(E41K204D) UNIT INST RACK (TURB EXH HIGH D DIA PRESSURE TRIP LOGIC)

H21P081-28 LOC PNL/RACK (MR ONLY) LOCAL DEENERGIZE 259 (E41K206B) PNL AND RACKS DIV2 ECCS TRIP ND D UNIT INST RACK H21P082-10 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE (B21K203A) UNIT CAB DIV1 INST RACK D Fermi 2 Expedited Seismic Evaluation Process Page B29 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014) ad

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER I ECITO OML DSRDNTSCMET LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE 261 H21P082-11 (B21K203C) UNIT CAB DIV1 INST RACK D H21P082-21 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE 262 (B21K250A) UNIT CAB DIV1 INST RACK D H21P082-22 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE 263 (B21K250C) UNIT CAB DIV1 INST RACK D H21P082-6 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE 264 (B21K201A) UNIT CAB DIV1 INST RACK ND D H21P082-7 LOC PNL/RACK (MR ONLY) ECCS TRIP DEENERGIZE 265 (B21K201C) UNIT CAB DIV1 INST RACK D H21P082-8 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE 266 (B21K202A) UNIT CAB DIV1 INST RACK D H21P082-9 LOC PNL/RACK (MR ONLY) ECCS TRIP ND DEENERGIZE 267 (B21K202C) UNIT CAB DIV1 INST RACK D TRi RELAY: LOC PNL/RACK (MR 268 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS TR2 RELAY: LOC PNL/RACK (MR 269 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS TR3 RELAY: LOC PNL/RACK (MR 270 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS Fermi 2 Expedited Seismic Evaluation Process Page B30 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

Ed

ESEL EQUIPMENT OPERATING STATE NORMAL DESIRED NOTES/COMMENTS NMBER ID DESCRIPTION TR4 RELAY: LOC PNL/RACK (MR 271 N/A ONLY DSD MCC 72C-3A LOCAL CTRL NE ENERGIZED PANEL LOCAL PNL & RACKS B21K609B NBS TRANS ECCS SERVICE DIV2 PWR NE ENERGIZED NON-VALVE ITEMS. NO SEAL IN / LOCKOUT 272 SPLY CONTACTS B21K610A NB TRANS ECCS SERVICE DIV1 PWR NE ENERGIZED NON-VALVE ITEMS. NO SEAL IN / LOCKOUT 273 SPLY CONTACTS 274 E4100B001 HPCI BARO CNDR SUPPORT SUPPORT E4101C003 & E4101C004 OPERATE THIS DEVICE 275 E4100B002 HPCI TURB LUBE OIL COOLER NA NA 276 E4101C001B HPCI BOOSTER PUMP OFF OPERABLE 277 E4101C001C HPCI TURB DRIVEN OIL PUMP OFF OPERABLE 278 E4101C002 HIGH PRESSURE COOLANT INJECTION OFF OPERABLE TURBINE 279 E4101C004 E4101C004, HPCI BAROMETRIC OFF OPERABLE TRIP AFTER 5 MINUTES ON LOCA HI DW PRESSURE CONDENSER CONDENSATE PUMP ACTUATION 280 E4101C005 HPCI AUX OIL PUMP OFF OPERABLE 281 E5100B002 RCIC LUBE OIL COOLER OFF OPERABLE 282 E5101C003 RCIC BAROMETRIC CONDENSER OFF OPERABLE CONDENSATE PUMP 283 E5101C004 RCIC BAROMETRIC CONDENSER OFF OPERABLE VACUUM PUMP Fermi 2 Expedited Seismic Evaluation Process Page B31 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT OPERATING STATE ITEM ID DESCRIPTION NORMAL DESIRED NOTES/COMMENTS NUMBER I ECITO OML DSRDNTSCMET 284 E51K600 RCIC PWR SPLY NE ENERGIZED H11P623 BB-95 & BB-96 ARE THE POWER CONNECTION TO R3200S061A (I-2045-27) 285 R1600SO03D -38 MCC/DIST CAB 480V 72C-F MCC NE ENERGIZED (72C-F) 286 R1600S003D-48 MCC/DIST CAB 480V 72C-F MCC NE ENERGIZED (72C-F) 287 T50K800A PCAM DIV2 PWR SPLY NE ENERGIZED T50K800A TO INVERT FROM R31K002 288 T50K800B PCAM DIV2 PWR SPLY NE ENERGIZED INVERT FROM R31K005 FROM 2PB2-5 289 T49P401 PCP DIV 2 B/U N2 SPLY NITROGEN SUPPORT SUPPORT RACK QUALIFIED BY DC-6342 BOTTLE RACK 290 E41F402 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33X-VLV 3BC; 33X-_3A) 291 E41F403 HPCI PCM - SUPR POOL SOLENOID NE ENERGIZED SOME RELAYS ARE INSIDE VALVE HOUSING. (33 VLV 4B; 33X-4A)

Fermi 2 Expedited Seismic Evaluation Process Page B32 of B32 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'

ATTACHMENT C ESEP HCLPF VALUES AND FAILURE MODES TABULATION Fermi 2 Expedited Seismic Evaluation Process Page Cl1of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE FGTY COMMENTS NUMBER NB MSL "D" RELIEF EPRI NP-6041, 1 B2104F013A VB2104F03A ScreenedTable 2-4 2 B2104F013B NB MSL "C" RELIEF B2104F013B Screened EPRI NP-6041, VLV Table 2-4 NB MSL "B" RELIEF EPRI NP-6041, 2 B2104F013C VLV B2104F013B Screened Table 2-4 4 B2104F013D NB MSL "B" RELIEF B2104F013D Screened EPRI NP-6041, VLV Table 2-4 5 B2104F013E NB MSL "C" RELIEF B2104F013E Screened EPRI NP-6041, VLV Table 2-4 NB MSL "B" RELIEF EPRI NP-6041, S B2104F013VLV B2104F013 Screened Table 2-4 7 B2104F013G NB MSL "B" RELIEF B2104F013G Screened EPRI NP-6041, VLV Table 2-4 7 21401GVLV B140G ScendTable 2-4 8 B2104F013H NB MSL "C" RELIEF B2104F013H Screened EPRI NP-6041, 9NB B2104F013J MSL "C" RELIEF B2104F013J Screened EPRI NP-6041, VLV Table 2-4 10 B2104F013K NB MSL "B" RELIEF B2104F013K Screened EPRI NP-6041, VLV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C2 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE FGTY COMMENTS NUMBER NB MSL "A" RELIEF EPRI NP-6041, 11 B2104F013L LV B2104F013L Screened Tabl -4 VLV Table 2-4 NB MSL "A" RELIEF EPRI NP-6041, 12 B2104F013M LV B2104F013M Screened Tabl -4 NB MSL "A"RELIEF EPRI NP-6041, 13 B2104F013N VVB2104F013N ScreenedTal2-VLV Table 2-4 NB MSL "D" RELIEF EPRI NP-6041, 14 B2104F013P VLV B2104F013P Screened VLV Tabl Table 2-4

-4 NB MSL "C"RELIEF EPRI NP-6041, 15 B2104F013R VVB2104F013R ScreenedTal2-OVLV (HO)Table 2-4 16 E40F07 HPCI TURB STM E410F6 cendEPRI NP-6041, 16 E1007 SO VLV (H.O.) E40F6 cendTable 2-4 17 E4100F068 HPCI TURB STM E4100F068 Screened EPRI NP-6041, CTRL VLV (H.O.) Table 2-4 RCIC TURB RCICTURBEPRI NP-6041, 18 E5150F044 GOVERNOR CTRL E5150F044 Screened Table 2-4 VLV HPCI BARO CNDR 19 E4100F018 VACUUM TANK E4100F018 Screened EPRI NP-6041, Table 2-4 PRESS RELIEF VLV Fermi 2 Expedited Seismic Evaluation Process Page C3 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT MOUNTED FRAGILITY NOTES/

ITEM IP DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER HPCI OIL CLR/TRIP UNIT OIL SPLY EPRI NP-6041, 20 E4100F122 PRESS E4101C002 Screened Table 2-4 REGULATING VLV HPCI OIL COOLER THERMOSTA TIC EPRI NP-6041, 21 E4100F128 BYPA S T LT E4100B002 Screened Tabl -4 BYPASS/OUTLET Table 2-4 VLV HPCI O/S TRIP EPR N601, 22 E4100F133 AUTOMATIC E4101C002 Screened Table 2-4 RESET CTRL VLV HPCI COOLING WATER TO TURBINE LUBE OIL EPRI NP-6041, 23 E41F035 COOLER E41B002 E41002 02 Screened Table 2-4 PRESSURE CONTROL VLV RCIC BARO CNDR EPRI NP-6041, PRESS RELIEF VLV Table 2-4 RCIC COOLING WATER TO LUBE 25 E51F015 OIL COOLER E5100B002 Screened EPRI NP-6041 E5100B3002 Table 2-4 PRESSURE CONTROL VLV Fermi 2 Expedited Seismic Evaluation Process Page C4 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METY COMMENTS NUMBER ID RCIC TURB BARO 26 E51F200 CNDR VACUUM 5100B001 Screened EPRI NP-6041, TANK VLV V8-4618 Table 2-4 PRESS CTRL VLV PCP DIV 2 B/U N2 SPLY PRV 27 T4901F613 BETWEEN T49P401 Screened EPRI NP-6041, Table 2-4 PRESSURE REGULATORS PCP DIV 2 B/U N2 SPLY 2ND STAGE 28 T49F470 PCV DOWN T49P401 Screened EPRI NP-6041, Table 2-4 STREAM OF RELIEF VLV PCP DIV 2 B/U N2 29 T49F471 SPLY 1ST STAGE T49P401 Screened Table 2-4 PCV SWGR 480V 30 R1400SO22 UNIS BDOOR FLOOR 0.3 Functionality GERS NO. 72B SWGR 480V 31 31 R1405023 R1400SO23 INDOOR UNIT SUBSTATION BUS FLOOR 0.3 Functionality GERS NO. 72C Fermi 2 Expedited Seismic Evaluation Process Page C5 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

IEME EQUIPMENT UEID DESCRIPTION MOUNTED ON HCLPF(G) FAILURE MODE FRAGILITY METHOD

] NOTES/

COMMENTS NUMBER 32 R1600S002A 48MCC/DI 72B-A FLOOR 0.3 Functionality GERS MCC/DIST CAB 33 R1600S002B 480V MCC NO 72B- FLOOR 0.3 Functionality GERS 3A MCC/DIST CAB 34 R1600SO02C 480V MCC NO 72B- FLOOR 0.3 Functionality GERS 3A 35 R1600S003D MCC 72C-F FLOOR 0.3 Functionality GERS MCC/DIST CAB 36 R1600SO04B 480V MCC NO 72E- FLOOR 0.3 Functionality GERS 5A MCC/DIST CAB 37 R1600S005A 480V MCC NO 72F- FLOOR 0.3 Functionality GERS 2A MCC/DIST CAB 38 R1600SO14A 480V MCC NO 72B- FLOOR 0.3 Functionality GERS 4A 39 39 R320S015 R3200S015 DC 260V DC MCC (2PA-1) FLOOR 0.3 Functionality GERS 40 R3200S(16 DC 260PBDC MCC FLOOR 0.3 Functionality GERS Fermi 2 Expedited Seismic Evaluation Process Page C6 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER R1600SO01C MCC/DIST CAB 41 480V MCC NO 72A- FLOOR 0.37 Functionality GERS (72A-4A) 4A DC DIV1 130/260V 42 R3200S003 DUAL BAT T 2PA FLOOR 0.52 Anchorage New Analysis 43 43 R320S004 R3200S004 DC 260/130V DUAL BA TT3(2PB) FLOOR 0.52 Anchorage New Analysis R3200S020A Div 1 Battery Charger FLOOR 0.27 Functionality Qualification 44 2A-1 Data R3200SO20C Div 1 Spare Battery FLOOR 0.27 Functionality Qualification 45 Charger 2A 1-2 Data R3200SO21B Div 2 Battery Charger FLOOR 0.27 Functionality Qualification 46 2B-2 Data R3200S21C 1DC DIAT C GR FLOOR 0.27 Functionality Qualification 47 CRTL & AUX RM PNL (MR ONLY)

HI1P601 ECCS DIV1 FLOOR 0.34 Functionality Experience 48 COMBINATION Data Method OPERATING PANEL Fermi 2 Expedited Seismic Evaluation Process Page C7 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAIIYNTS ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE RAGILITY COMENTS NUMBER CRTL & AUX RM PNL (MR ONLY)

ECCS DIV2 FLOOR 0.34 Functionality Experience 49 H 1P602 Data Method COMBINATION OPERATING PANEL CRTL & AUX RM PNL (MR ONLY) 50 HI1P612 NSSS PROCESS FLOOR 0.69 Functionality Qualification INST CAB DIV2 INST RACK CRTL & AUX RM PNL (MR ONLY) 51 HI 1P613 NSSS PROCESS FLOOR 0.69 Functionality Qualification INST CAB DIV1 INST RACK CRTL & AUX RM H11P621 PNL (MR ONLY) FLOOR 0.69 Functionality Qualification 52 RCIC DIV1 INST Data RACK 53 H 1P620 HPCI Relays/lights FLOOR 0.32 Functionality Data Method CRTL & AUX RM 54 H 1P628 PNL (MR ONLY) FLOOR 0.32 Functionality Experience SRV DIVi1 ADS Data Method RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C8 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUPNTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER CTRL AND AUX RM PNL INBD VLV . Experience 55 H 11P622 CTRL RELAY CAB FLOOR 0.47 Functionality Data Method DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY)

MISC DC RELAY FLOOR 0.47 Functionality Experience 56 HI1P870 Data Method PANEL DIV2 INST RACK CRTL & AUX RM PNL (MR ONLY)

H 1P914 PCAM EQUIP AND FLOOR 0.47 Functionality Experience 57 Data Method MISC RELAY DIV1 INST RACK CRTL & AUX RM PNL (MR ONLY) PC HI1P915 MON EQUIP & MISC FLOOR 0.47 Functionality Experience 58 RELAY DIV2 INST RACK LOC PNL/RACK 59 59 H2P080 H21P080 (MR TRIPONLY)

UNIT ECCS CAB FLOOR 0.28 Anchorage New Analysis DIV1 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C9 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUPNTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL 60 H21P081 PNL AND RACKS FLOOR 0.28 Anchorage New Analysis DIV2 ECCS TRIP UNIT INST RACK LOC PNL/RACK 61 61 H2P082 H21P082 (MR TRIPONLY)

UNIT ECCS CAB FLOOR 0.28 Anchorage New Analysis DIVI INST RACK CRTL & AUX RM 62 HI 1P609 RPS TRP CA D FLOOR 0.32 Functionality DExpelthod INST RACK CRTL & AUX RM 63 H 1P611 RPS R CN DV2 FLOOR 0.32 Functionality DExpelthod INST RACK CRTL & AUX RM 64 H11P617 PNL(MR FLOOR 0.32 Functionality Experience DIVI RHR RELAY FLO .2 Fntoaiy Data Method CAB INST RACK CRTL & AUX RM 65 H11P618 PNL(MR FLOOR 0.32 Functionality Experience DIV2 RHR RELAY FLO .2 Fntoaiy Data Method CAB INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C 10 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER 66 B21P400 RELB SRV DINT WALL 0.32 Functionality DExpelthod 67 B21P401 NB SRV DINET WALL 0.32 Functionality DExpethod LOC PNL/RACK (MR ONLY) RX 68 H21P004 VESSEL LVL & FLOOR 0.59 Functionality GERS PRESS DIV1 INST RACK LOC PNL/RACK 69 69 H~PS9SB(MR H21P595B ONLY)

RWELL MON WALL 1.12 Functionality GERS DIV2 INST RACK LOC PNL/RACK 70 H21P408 (MR ONLY) AIR FLOOR 0.38 Functionality GERS COMPS INST RACK LOC PNL/RACK 71 71 H 1P1 4B H2MP614B (MR MON SYS TORUS ONLY) INST FLOOR 1.36 Functionality GERS RACK Fermi 2 Expedited Seismic Evaluation Process Page C1I of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER LOCAL PNL AND RACKS DIV2 72 H21P631B TORUS PRESS WALL 0.53 Functionality GERS INSTRUMENTATIO N RACK LOC PNL/RACK 73 1121P014 (MR ONLY) HPCI ESS DIV2 INST FLOOR 0.89 Anchorage New Analysis RACK LOC PNL/RACK 74 H21P017 (MR ONLY) RCIC FLOOR 0.89 Anchorage New Analysis DIV1 INST RACK 75 T49P400B3 PC PNEU DIV2 FLO .9 Fntoaiy Experience SPLY INST RACK FLOOR 1.29 Functionality Data Method LOC PNL/RACK (MR ONLY) PILOTScaling from 76 H21P501A VLVDIV1 INST FLOOR 0.43 Anchorage Existing RACK Analysis LOC PNL/RACK (MR ONLY) CA Scaling from 77 H21P501B ( DIV2 PILOT FLOOR 0.43 Anchorage Existing VLVINST RACK Analysis Fermi 2 Expedited Seismic Evaluation Process Page C12 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 78 HIIP923 PNL (MR ONLY)

RCIC TURB CTRL WALL 0.22 Functionality GERS PANEL INST RACK CRTL & AUX RM PNL (MR ONLY) 79 H 1P929 HPCI RELAY RM WALL 0.22 Functionality GERS GOVERNOR CTRL INST RACK DC BATT SPB MAIN 80 R3200SO26 DIST CABINET 2PA- FLOOR 0.39 Functionality GERS 2

DC BATT 2PB MAIN 81 R3200SO27 DIST CABINET 2PB- FLOOR 0.39 Functionality GERS 2

DC SWGR ROOM 82 R3200S062 130V DIST CABINET FLOOR 0.22 Functionality GERS 2PA2-14 RCIC REACTOR 83 E5101C002 CORE ISOLATION E5101C002 1.24 Functionality Qualification COOLING TURBINE Data 84 E4101C00IA HPCI MAIN PUMP E410100I1A 0.58 Functionality Experience Data Method Fermi 2 Expedited Seismic Evaluation Process Page C13 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER E4101C003 HPCI BAROMETRIC Experience 85 E4101C003 CONDENSER E4100B001 0.57 Functionality Data Method VACUUM PUMP RCIC REACTOR CORE ISOLATION E5101C001 0.54 Functionality Experience 86 E5101C001 Data Method COOLING PUMP HPCI TEST LINE 87 E41F011 ISO / PRESS CTRL E41F011 1.87 Functionality Qualification AOV AOV Data PC PNEU DIV2 N2 88 T4901F469 SPLY ISO AOV T4901F469 0.64 Functionality New Analysis PCAM PC PRESS MON T50L406B PT 89 T5000F420B OTBD SAMPLE T5000F420B 0.64 Functionality New Analysis AOV PCAM PC TORUS 90 90 T000F21B T5000F421B WTR LVL MON DIV2 TORUS LVL T5000F421B 0.64 Functionality New Analysis INST LINE ISO AOV NB MSL "A" INBD Scaling from 91 B2103F022A PC ISO AOV B2103F022A 0.33 Functionality Existing Analysis Fermi 2 Expedited Seismic Evaluation Process Page C14 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

EQUIPMENT MOUNTED FRAGILITY NOTES/

ITEM EME ID DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER ______ ________ __________ _____ __

Scaling from NB MSL "B" INBD 92 B2103F022B PC ISO AOV B2103F022B 0.33 Functionality Existing Analysis NB MSL "C" INBD Scaling from 93 B2103F022C PC ISO AOV B2103F022C 0.33 Functionality Existing Analysis Scaling from NB MSL "D" INBD 94 B2103F022D PC ISO AOV B2103F022D 0.33 Functionality Existing Analysis NB MSL "A" OTBD Scaling from 95 B2103F028A PC ISO AOV B2103F028A 0.33 Functionality Existing Analysis NB MSL "B" OTBD Scaling from 96 B2103F028B PC ISO AOV B2103F028B 0.33 Functionality Existing Analysis Scaling from NB MSL "C" OTBD 97 B2103F028C PC ISO AOV B2103F028C 0.33 Functionality Existing Analysis NB MSL "D" OTBD Scaling from 98 B2103F028D PC ISO AOV B2103F028D 0.33 Functionality Existing Analysis Fermi 2 Expedited Seismic Evaluation Process Page C 15 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER NIAS STATION AIR 99 P5000F440 TO CONTROL AIR P5000F440 Screened EPRI NP-6041, Table 2-4 ISO AOV NIAS STATION AIR 100 P5000F441 TO CONTROL AIR P5000F441 Screened EPRI NP-6041, ISO AOV Table 2-4 SA TURBINE SA TUBINEEPRI NP-604 101 P5000F401 BUILDING HEADER P5000F401 Screened Table 2-4 1, ISO AOV RCIC WARM-UP 102 E5150F095 BYPASS INLET E5150F095 Screened EPRI NP-6041, Table 2-4 MOV Closure of Reactor 103 B3105F023A Recirc Pump A seal B3105F023A Screened EPRI NP-6041, leakage source, RRA Table 2-4 Suction Valve Closure of Reactor 104 B3105F023B Recirc Pump B seal B3105F023B Screened EPRI NP-6041, leakage source, RRB Table 2-4 Suction Valve Closure of Reactor 105 B3105F031A cre o Asal B3105F031A Screened EPRI NP-6041, leakage source, RRA Table 2-4 Discharge Valve Fermi 2 Expedited Seismic Evaluation Process Page C16 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER Closure of Reactor 106 B3105F031B Recirc Pump B seal B3105F031B Screened EPRI NP-6041, leakage source, RRB Table 2-4 Discharge Valve 107 E1150F015A RHR DIV1 LPCI E1150F015A Screened EPRI NP-6041, INBD ISO MOV Table 2-4 E1150F015B, RHR EPRI NP-6041, 108 E1150F015B DIV2 LPCI INBD ISO E1150F015B Screened EPRI N-4 MOV Table 2-4 109 E1150F017A RHR DIV1 LPCI E1150F017A Screened EPRI NP-6041, MOV Table 2-4 110 E1150F017B E1150FOI7B, RHR E1150F017B Screened EPRI NP-6041, DIV2 LPCI MOV Table 2-4 RHR DIV1 CNTM 111 E1150F024A COOLING/TEST ISO E1150F024A Screened EPRI 1, Table 2-4 MOV E1150F024B, RHR 112 E1150F024B DIV2 CNTM El150F024B Screened EPRI NP-6041, COOLING! Test ISO El1004 cendTable 2-4 MOV, Div. 2 Fermi 2 Expedited Seismic Evaluation Process Page C17 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER RHR DIV1 SUPR POOL CNTM SPRAY EPRI NP-6041, 113 E1150F028A TEST ISOM Div. E1150F028A Screened Tabl -4 TEST ISO MOV, Div. Table 2-4 1

El 150F028B, RHR 114 E1150F028B DIV2 SUPR POOL E1150F028B Screened EPRI NP-6041, CNTM SPRAY/TEST Table 2-4 ISO MOV HPCI STEAM 115 E4150F001 SUPPLY TO TURB E4150F001 Screened EPRI NP-6041, DRIVEN PUMP Table 2-4 116 E4150F002 RPV Injection E4150F002 Screened EPRI NP-6041, Table 2-4 117 E4150F003 RPV Injection E4150F003 Screened EPRI NP-6041, Table 2-4 118 E4150F004 RPV Injection E4150F004 Screened EPRI NP-6041, Table 2-4 HPCI TURB 119 E4150F021 EXHAUST STOP E4150F021 Screened EPRI NP-6041, GLOBE MOV Table 2-4 HPCI LUBE OIL 120 E4150F059 COOLING WATER E4100B002 Screened EPRI NP-6041, SPLY ISO MOV Table 2-4 Fermi 2 Expedited Seismic Evaluation Process Page C18 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER HPCI MAIN PUMP Scaling based 121 E4150F008 TEST LINE ISO E4150F008 0.47 Functionality on Existing MOV Analysis HPCI TURB EXH CONDENSATE 122 E4150F022 DRAIN TO SUPR E4150F022 Screened EPRI NP-6041, Table 2-4 POOL STOP CHECK MOV RCIC TURB 123 E5150F001 EXHAUST LINE ISO E5150F001 Screened EPRI NP-6041, Table 2-4 MOV HPCI BOOSTER 124 E4150F041 PUMP SUCT FROM E4150F041 Screened EPRI NP-6041, SUPR POOL ISO Table 2-4 MOV HPCI BOOSTER 125 E4150F042 PUMP SUCT FROM E4150F042 Screened EPRI NP-6041, SUPR POOL ISO Table 2-4 MOV RCIC BARO CNDR 126 ES150F002 VACUUM PUMP E5100B001 Screened EPRI NP-6041, DISCHARGE STOP Table 2-4 CHECK MOV Fermi 2 Expedited Seismic Evaluation Process Page C19 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQIMN MOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER RCICI TURB STM 127 E5150F007 SPLY INBO CNTM E5150F007 Screened Table 2-4 ISO MOV RCICI TURB STM 128 E5150F008 SPLY ONBO CNTM E5150F008 Screened EPRI N-4 ISO MOV ISO MOVTable 2-4 RCIC PUMP RCICPUMPEPRI NP-6041, 129 E5150F012 DISCHARGE ISO E5150F012 Screened EPRI N-4 MOV Table 2-4 MOV RCIC PUMP SPLY EPRI N-01, ,

130 E5150F013 TO FEEDWATER E5150F013 Screened Table 2-4 HEADER ISO MOV COMPR AIR PC 131 T490IF602 PNEU DIV2 INST N2 T4901F602 Screened EPRI NP-6041, INERTING SPY Table 2-4 INBRD PC ISO MOV RCIC PUMP MIN 132 E5150F019 FLOW RECIRC E5150F019 Screened EPRI NP-6041, BYPASS MOV Table 2-4 RCIC PUMP SPLY 133 E5150F029 FROM TORUS ISO E5150F029 Screened EPRI NP-6041, Table 2-4 MOV Fermi 2 Expedited Seismic Evaluation Process Page C20 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER RCIC PUMP SPLY EPRI NP-6041 134 E5150F031 FROM TORUS ISO E5150F031 Screened MOV MOV Table 2-4 135 E5150F045 RCIC TURB STM E5150F045 Screened EPRI NP-6041, INLET ISO MOV Table 2-4 RCIC LUBE OIL 136 E5150F046 COOLER COOLING E5150F046 Screened EPRI NP-6041, WATER SPLY ISO Table 2-4 MOV HPCI PCM - SUPR 137 E41F400 POOL SOLENOID E41F400 Screened EPRI NP-6041, Table 2-4 VLV HPCI PCM - SUPR 138 E41F401 POOL SOLENOID E41F401 Screened EPRI NP-6041, Table 2-4 VLV PCAM PC TORUS 139 T50F412A LVL MON DIV1 T50F412A Screened EPRI NP-6041, Table 2-4 SOV SOV PCAM PC TORUS 140 T50F412B LVL MON DIV2 T50F412B Screened EPRI NP-6041, Table 2-4 SOV SOV 141 E5100B001 RCIC BARO CNDR E5100B001 4.47 Anchorage New Analysis Fermi 2 Expedited Seismic Evaluation Process Page C21 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE F GTY COMMENTS NUMBER HPCI DC TO AC 142 E41K603 INVERTER P Hi1P612 0.29 Functionality GERS SPLY VITAL PWR DIST 143 R31KO01 120 VAC DIV1 H11P613 0.32 Functionality Qualification 2KVA INVERTER VITAL PWR DIST 144 R31K002 120 VAC DIV1 H11P613 0.32 Functionality Qualification 2KVA INVERTER VITAL PWR DIST 145 R31K004 120 VAC DIV1 H11P612 0.32 Functionality Qualification 2KVA INVERTER Data VITAL PWR DIST 146 R31K005 120 VAC DIV1 HI1P612 0.32 Functionality Qualification 2KVA INVERTER Data LOC PNL/RACK (MR ONLY) DSD 147 H21P625 MCC 7 -A LCAL FLOOR 0.59 Functionality DExpe ethod LOCAL PNL &

RACKS Fermi 2 Expedited Seismic Evaluation Process Page C22 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER PCAM PC TEMP 148P402 MON DIV2 SUPR T50P402 Screened 148 T50P402 CHAMBER N403BT, Light weight, (H21P584L) N402B, N404B & (H21P584L) Rugged N405B TERM PNL 149 R3200S061A DCRRI 23VDIST FLOOR 0.22 Functionality GERS CABINET 2PA2-5 150 R3200S061B DRR10DIT FLOOR 0.22 Functionality GERS DC RR 130V DIST 151 R3200S064A CABINET 2PA2-6 FLOOR 0.22 Functionality GERS 12 R20O4 DCABINET02PB2-T FLOOR 0.22 Functionality GERS 152R320S04B DC RR 130VDIST CABINET 2PB2-6 FLOOR 0.22 Functionality GERS 153 153 B21N051A 21N51A NB RPV PXE REACTOR DIV 1 VESSEL H21P004 0.59 Functionality GERS Rule of Box 154 154 E41N019 E41N19 HPCI Suction!aH21P014 Disch H21P4 0.89 Anchorage New Analysis Rule of Box Pressure Gauge NB RX L VL 1 TRIP 155 B21NO91A (WIDE RNG) DIVI H21P004 0.59 Functionality GERS Rule of Box LVL XMTR 156 B21NO91C Reactor water level - H21P004 0.59 Functionality GERS Rule of Box wide range Fermi 2 Expedited Seismic Evaluation Process Page C23 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

IEME EQUIPMENT DSRPIN MOUNTED FRAGILITY NOTES/

M ID DESCRIPTION MON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER NB RX LVL (1) TRIP 157 B21N691A UNIT DIV1 LVL IND H21P082 0.28 Anchorage New Analysis Rule of Box SW NB RX LVL (1) TRIP 158 B21N691C UNIT DIV1 LVL IND H21P082 0.28 Anchorage New Analysis Rule of Box SW NB RPV LVL &

PRESS RECORDER 159 B21R623A POST ACCIDENT H 11P601 0.34 Functionality Experience Rule of Box Data Method MONITORING RECORDER HPCI HI LVL 160 E41N062B SIGNAL TO SUPR WALL Screened Light weight, POOL SUCT VLV Rugged LVL TRANSMITTER RCIC PUMP 161 E51RO01 DISCHARGE PRESS H21P017 0.89 Anchorage New Analysis Rule of Box INDICATOR 162 162 E1R002 E51R002 RCIC PUMP PRESS SUCT INDICATOR H21P017 0.89 Anchorage New Analysis Rule of Box HPCI TURB 163 E41K200 GOVERNOR (EG-M) H 1P929 0.22 Functionality GERS Rule of Box SPD CTRLR Fermi 2 Expedited Seismic Evaluation Process Page C24 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESL EUPETMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER HPCI TURB SPD 164 164 E1K201 E41K201 MILLIVOLT CURRENT TO H 11P929 0.22 Functionality GERS Rule of Box CONVERTER HPCI TURB SPD ELEC TO 165 E41K203 HYDRAULIC E4101C002 0.58 Functionality Experience Rule of Box Data Method CONVERTER SPD SIG CND (EG-R)

HPCI TURB 166 166E1K204GOVERNOR E41K204 H1P929 RESISTOR HI1P929 0.22 Functionality GERS Rule of Box BOX HPCI PUMP FLOW 167 E41K615 RATE FLOW IND Hi1P602 0.34 Functionality Experience Rule of Box CTRLR Data Method HPCI FLOW CTRL 168 E41K826 (TURB CTRL) H11P620 0.32 Functionality Experience Rule of Box SIGNAL Data Method HPCI PUMP DISCHARGE FLOW 169 E41N008 SIGNAL TO TURB H21P014 0.89 Anchorage New Analysis Rule of Box CTRL FLOW TRANSMITTER Fermi 2 Expedited Seismic Evaluation Process Page C25 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT FMOUNTED FRAGILITY NOTES/

NEM ID DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER HPCI TURB 170 E41N212 MAGNETIC PICK- E4101C002 0.58 Functionality Experience Rule of Box Data Method UP SPD ELEMENT HPCI AUX OIL 171 E41NA01 PUMP S RTT IN E4101C002 0.58 Functionality DExpe ethod Rule of Box PRESS SW HPCI MAIN PUMP 172 E41R613 SE4101001E Hi1P602 0.34 Functionality Experience Rule of Box DISCHARGE ELEC Data Method FLOW INDICATOR RCIC TURB EGM 173 E51K200 CTRL BOX SPD H11P923 0.22 Functionality GERS Rule of Box CTRLR ELEC RCIC TURB CTRL 174 E51K201 SPD CURRENT TO HI 1P923 0.22 Functionality GERS Rule of Box VOLTAGE CONVERTER RCIC SPD SIG CND 175 E51 K203 EGR HYDRAULIC E5101 C002 1.24 Functionality Qualification Rule of Box ACTUATOR Data Fermi 2 Expedited Seismic Evaluation Process Page C26 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER RCIC TURB EG-M CTRL BOX PWR 176 E51K204 SOURCE DROPPING H 11P923 0.22 Functionality GERS Rule of Box RESISTOR BOX SPD CTRLR ELEC RCIC PUMP 177 E51K615 DISCHARGE FLOW H 11P601 0.34 Functionality Experience Rule of Box Data Method CTRLR ELEC RCIC FLOW CTRL 178 E51K820 SIGNAL ISOLATOR H11P621 0.69 Functionality Qualification Rule of Box FOR TURB CTRL Data RCIC PUMP 179 E51N003 DISCHARGE FLOW H21P017 0.89 Anchorage New Analysis Rule of Box TRANSMITTER ELEC RCIC TURB SPD 180 E51N205 SENSOR SPD E5101C002 1.24 Functionality Qualification Rule of Box ELEMENT Data RCIC TURB STM 181 E51R608 INLET AND Experience EXHAUST PRESS H11P601 0.34 Functionality Data Method Rule of Box INDICATOR Fermi 2 Expedited Seismic Evaluation Process Page C27 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER RCIC PUMP 182 E51R609 DSCT PRE S H 11P601 0.34 Functionality Data Method Rule of Box INDICATOR RCIC PUMP 183 E51R613 DISCHARGE FLOW H 11P601 0.34 Functionality Experienc Rule of Box Data Method INDICATOR 184 E51R700 RCIC TURB SPD H 11P601 0.34 Functionality Experience Rule of Box INDICATOR Data Method PCAM PC TEMP MON TORUS SUPR 185 T50N402B M BR (ATM T50P402 Screened Rule of Box CHAMBER (ATM)

DIV2 T/C PCAM PC TEMP 186 T50N403B3 MON TORUS SUPR Rule of Box CHAMBER (ATM) T50P402 Screened DIV2 T/C PCAM PC TEMP MON TORUS SUPR 187 T50N404B M BR (WTR T50P402 Screened Rule of Box CHAMBER (WTR)

DIV2 T/C Fermi 2 Expedited Seismic Evaluation Process Page C28 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'

ESL EUPETMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER PCAM PC TEMP MON TORUS SUPR 188 T50N405B3 CHAMBER (WTR) T50P402 Screened Rule of Box DIV2 T/C PCAM PC TORUS WTR LVL MON 189 T50N406B TORUS WTR LVL H21P614B 1.36 Functionality GERS Rule of Box DIV2 LVL XMTR ELEC 190 T5N414B PCAM DIV2 TORUS 190 T50N414B WR PRESS XMTR H21P631B 0.53 Functionality GERS Rule of Box PCAM PC PRESS 191 191 T5N415B T50N415B MON DW PRESS WR DIV2 PRESS H21P595B 1.12 Functionality GERS Rule of Box XMTR ELEC PCAM PC ATMOSPHERIC 192 T50R800B MON DIV2 DW AND HI 1P602 0.34 Functionality Experience Rule of Box TORUS TEMP Data Method RECORDER PCAM PRESS MON 193 T50R802B DIV2 DW & TORUS H 11P602 0.34 Functionality Experience Rule of Box PRESS RECORDER Data Method Fermi 2 Expedited Seismic Evaluation Process Page C29 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESL EUPETMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER PCAM TORUS WTR 194 T50R804B LVL MON DIV2 PC H 1P602 0.34 Functionality Experience Rule of Box Data Method LVL RECORDER RCIC TURB INLET 195 E5150F059 TRIP THROTTLE E5150F059 1.24 Functionality Qualification Rule of Box Data MOV NB MSL "A" INBD Scaling from 196 B2103F022A-3 PC ISO AOV - B2103F022A 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "B" INBD Scaling from 197 B2103F022B-3 PC ISO AOV - B2103F022B 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "C" INBD Scaling from 198 B2103F022C-3 PC ISO AOV - B2103F022C 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "D" INBD Scaling from 199 B2103F022D-3 PC ISO AOV - B2103F022D 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "A" OTBD Scaling from 200 B2103F028A-6 PC ISO AOV - B2103F028A 0.33 Functionality Existing Rule of Box Manifold Analysis Fermi 2 Expedited Seismic Evaluation Process Page C30 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESL EUPETMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER I NB MSL "B" OTBD Scaling from 201 B2103F028B-6 PC ISO AOV - B2103F028B 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "C" OTBD Scaling from 202 B2103F028C-6 PC ISO AOV - B2103F028C 0.33 Functionality Existing Rule of Box Manifold Analysis NB MSL "D" OTBD Scaling from 203 B2103F028D-6 PC ISO AOV - B2103F028D 0.33 Functionality Existing Rule of Box Manifold Analysis HPCI REMOTE 204 E41F200 TURB TRIP E4101C002 0.58 Functionality Experience Rule of Box SOLENOID VLV Data Method SA ISO VLV 205 P50F401 P5000F401 H21P408 0.38 Functionality GERS Rule of Box SOLENOID VLV CA DIV1 NIAS ISO Scaling from 206 P50F516A VLV P5000F440 H21P501A 0.43 Anchorage Existing Rule of Box SOLENOID VLV Analysis CA DIV2 NIAS ISO Scaling from 207 P50F516B VLV P5000F441 H21P501B 0.43 Anchorage Existing Rule of Box SOLENOID VLV Analysis Fermi 2 Expedited Seismic Evaluation Process Page C31 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER PC PNEU DIV2 208 T49F469 SPLYN2 INERTING T49P400B 1.29 Functionality DExpe ethod Rule of Box T4901F469 SOV NB MSL "D" RELIEF 209 B2100M01A VLV B2104F013A H11P628 0.32 Relay Chatter Qualification (B21CK11A) CData CTRL PWR RELAY NB MSL INBD ISO 210 B2100M329A VLV B2103F022A H 11P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 211 B2100M329B VLV B2103F022B HI 1P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 212 B2100M329C VLV B2103F022C HI 1P609 Screened IPEEE AUX DC RELAY NB MSL INBD ISO 213 B2100M329D VLV B2103F022D H11P609 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 214 B2100M331A VLV B2103FO28A H11P611 Screened IPEEE AUX DC RELAY Fermi 2 Expedited Seismic Evaluation Process Page C32 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER NB MSL OTBD ISO 215 B2100M331B VLV B2103FO28B H11P611 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 216 B2100M331C VLV B2103FO28C H11P611 Screened IPEEE AUX DC RELAY NB MSL OTBD ISO 217 B2100M331D VLV B2103FO28D HI1P611 Screened IPEEE AUX DC RELAY B2104M084 NB SAFETY AND 218 (B21C427C ) RLFVEY B21P401 Screened IPEEE (B21CK427C) RELIEF VLV RELAY 219 B2104M285 NB SRV RELAY B21P401 Screened IPEEE (B21 CK427D )

22 B2104M086IEE 220 (B21CK427F) NB SRV RELAY B21P401 Screened IPEEE (B210C407F 221 B2104M287 NB SRV RELAY B21P401 Screened IPEEE (B2 1CK427G) 22 B2104M088IPE 222 (B21CK427K) NB SRV RELAY B21P401 Screened IPEEE B2104M097 223 B21C427 NB SRV RELAY B21P400 Screened IPEEE (B21CK427L )

Fermi 2 Expedited Seismic Evaluation Process Page C33 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER NB SRV DIV2 MAN B2104M098 DEPRESSURIZATIO (B21CK427M) N VLV F013M CTRL B21P400 Screened RELAY NB SRV DIV2 MAN 225 B2104M099 DEPRESSURIZATIO 121P400 Screened IPEE (B21CK427N) N VLV F013N CTRL RELAY El1100M094A 226 E11K94A RHR K94A RELAY H 11P617 Screened IPEEE (El1 K94A)

El1100M094B 227 E11K94B RHR K94B RELAY H11P617 Screened IPEEE (El 1K94B)

HPCI K12 RELAY H11P620 0.32 Functionality Experience 228 E4100M012 (E41AK12) Data Method E4100MO15 2290M15Experience HPCI K15 RELAY 229 (E41K15) (Low stm pressure trip H 11P620 0.32 Functionality Data Method logic) 2302 HPCI K28 RELAY 230 (E41K28) (Turb exh high dia H 1P620 0.32 Functionality Data Method pressure trip logic)

E4100M035 HPCI K35 RELAY Experience 231 (E41K35) (HPCI AUTO H 11P620 0.32 Functionality Data Method INITIATION LOGIC)

Fermi 2 Expedited Seismic Evaluation Process Page C34 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

IEME EQUIPMENT UEID DESCRIPTION MOUNTED ON IFRAGILITY HCLPF(G) FAILURE MODE METHOD NOTES/

COMMENTS NUMBER E4100M036 HPCI K36 RELAY 232 (E41K36) (HPCI AUTO HI 1P617 Screened IPEEE INITIATION LOGIC)

E4100M043 HPCI K43 RELAY (E41K43) (Steam line Hi dP)

HPCI K80 RELAY E4100M0 K8Experience 234 (E41K80) (Low stm pressure trip HI lP620 0.32 Functionality Data Method logic)

E5100M052 RCIC K52 RELAY 235 (E51K52) (RCIC Ramp H 11P621 Screened IPEEE Generator Trigger)

CTRL AND AUX RM Hi11P622-22 PNL INBD VLV 236 I6-2 PNINDVV HIl H P622 Screened IPEEE (A71BK53) CTRL RELAY CAB DIV1 INST RACK CRTL & AUX RM HI iP628-11 PNL (MR ONLY)

SRV DIV1 ADS H11P628 Screened IPEEE 237 (B21CK06A)

RELAY CAB CRTL & AUX RM 238 H11P628-12 PNL (MR ONLY) HI1P628 Screened IPEEE (B21CK06B) SRV DIV1 ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C35 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES!

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 239 H 11P628-13 PNL (MR ONLY) H 11P628 Screened IPEEE (B21CK07A) SRV DIVI ADS RELAY CAB CRTL & AUX RM 240 H 1P628-14 PNL (MR ONLY) H 1P628 Screened IPEEE (B21CK07B) SRV DIVI ADS RELAY CAB CRTL & AUX RM 241 H 1P628-23 PNL (MR ONLY) HI1P628 Screened IPEEE (B21CK11E) SRV DIVI ADS RELAY CAB CRTL & AUX RM 242 H11P628-24 PNL (MR ONLY) HI IP628 Screened IPEE (B21CK11H) SRV DIV1 ADS RELAY CAB CRTL & AUX RM 243 HI IP628-32 PNL (MR ONLY) HI IP628 Screened IPEEE (B21CK27A) SRV DIVI ADS RELAY CAB CRTL & AUX RM 244 H 11P628-33 PNL (MR ONLY) H 1P628 Screened IPEE (B21CK27E) SRV DIVI ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C36 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 245 HI 1P628-34 PNL (MR ONLY) HI 1P628 Screened IPEEE (B21CK27H) SRV DIV1 ADS RELAY CAB CRTL & AUX RM 246 HI 1P628-35 PNL (MR ONLY) HI 1P628 Screened IPEE (B21CK27J) SRV DIV1 ADS RELAY CAB CRTL & AUX RM 247 HI 1P628-36 PNL (MR ONLY) HI 1P628 Screened IPEEE (B21CK27P) SRV DIV1 ADS RELAY CAB CRTL & AUX RM 248 HI 1P628-37 PNL (MR ONLY) HI 1P628 Screened IPEEE (B21CK27R) SRV DIV1 ADS RELAY CAB CRTL & AUX RM H11 P628-44 PNL (MR ONLY) 249 (B21CK31) SRV DIV1 ADS H lP628 Screened IPEEE RELAY CAB CRTL & AUX RM 250 HI1P628-45 PNL (MR ONLY) HI 1P628 Screened IPEE (B21CK31A) SRV DIV1 ADS RELAY CAB Fermi 2 Expedited Seismic Evaluation Process Page C37 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER CRTL & AUX RM 251 HI 1P628-65 PNL (MR ONLY) HI 1P628 Screened IPEE (B21CK27B) SRV DIV1 ADS RELAY CAB CRTL & AUX RM H 1P870-34 PNL (MR ONLY) 252 T41M804 MISC DC RELAY H 11P870 Screened IPEEE PANEL DIV2 INST RACK LOC PNL/RACK (MR ONLY) LOCAL 253 H21P080-22 PNL AND RACKS H21PO80 Screened IPEE (E41K202A) DIV2 ECCS TRIP UNIT INST RACK (Steam line Hi dP)

LOC PNL/RACK (MR ONLY) LOCAL H21P081-20 PNL AND RACKS 254 (E41K201B) DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Low stm pressure trip logic)

Fermi 2 Expedited Seismic Evaluation Process Page C38 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

M ID DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL H21P081-21 PNL AND RACKS 255 (E41K201D) DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Low stm pressure trip logic)

LOC PNL/RACK (MR ONLY) LOCAL 256 H21P081-22 PNL AND RACKS H21P081 0.28 Anchorage New Analysis Rule ofBox (E41K202B) DIV2 ECCS TRIP UNIT INST RACK (Steam line Hi dP)

LOC PNL/RACK (MR ONLY) LOCAL H21P081-24 PNL AND RACKS 257 (E41K204B) DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Turb exh high dia pressure trip logic)

Fermi 2 Expedited Seismic Evaluation Process Page C39 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT MOUNTED FRAGILITY NOTES!

ITEM IP DESCRIPTION ON HCLPF(G) FAILURE MODE METHOD COMMENTS NUMBER LOC PNL/RACK (MR ONLY) LOCAL H21P081-25 PNL AND RACKS 258 (E41K204D) DIV2 ECCS TRIP H21P081 0.28 Anchorage New Analysis Rule of Box UNIT INST RACK (Turb exh high dia pressure trip logic)

LOC PNL/RACK H21P081-28 (MR ONLY) LOCAL 259 (E41K206B) PNL AND RACKS H21P081 0.28 Anchorage New Analysis Rule of Box DIV2 ECCS TRIP UNIT INST RACK LOC PNL/RACK 260 H21P082-10 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K203A) TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 261 H21PK82-11 (MR ONLY) EGGS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K203G) TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 262 H21P082-21 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K250A) TRIP UNIT CAB DIVI INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C40 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

EQSUIEPLMEENT M OU N TED F A I I YN T S E EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE FRAGILITY COMENTS NUMBER LOC PNL/RACK 263 H21P082-22 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K250C) TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 264 H21P082-6 (MR ONLY) ECCS H21P082 0.28 Anchorage New Analysis Rule of Box (B21K201A) TRIP UNIT CAB DIVI INST RACK LOC PNL/RACK 265 H21P082-7 (MR ONLY) ECCS H21PO82 0.28 Anchorage New Analysis Rule of Box (B21K201C) TRIP UNIT CAB DIV1 INST RACK LOC PNL/RACK 266 H21P082-8 (MR ONLY) ECCS H21PO82 0.28 Anchorage New Analysis Rule of Box (B21K202A) TRIP UNIT CAB DIV1 INST RACK LOC PNL/RACK H21P082-9 (MR ONLY) ECCS 267 (B21K202C) TRIP UNIT CAB H21P082 0.28 Anchorage New Analysis Rule of Box DIV1 INST RACK Fermi 2 Expedited Seismic Evaluation Process Page C41 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUPNTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE FGTY COMMENTS NUMBER TR1 RELAY: LOC PNL/RACK (MR ONLY DSD MCC N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification 268 CTRL PANEL Data LOCAL PNL &

RACKS TR2 RELAY: LOC PNL/RACK (MR ONLY DSD MCC N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification 269 Data CTRL PANEL LOCAL PNL &

RACKS TR3 RELAY: LOC PNL/RACK (MR ONLY DSD MCC N/A 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification 270 Data CTRL PANEL LOCAL PNL &

RACKS Fermi 2 Expedited Seismic Evaluation Process Page C42 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE F GTY COMMENTS NUMBER TR4 RELAY: LOC PNL/RACK (MR ONLY DSD MCC 72C-3A LOCAL H21P625 0.32 Relay Chatter Qualification 271 N/A Data CTRL PANEL LOCAL PNL &

RACKS NBS TRANS ECCS 272 B21K609B SERVICE DIV2 PWR H21P081 0.28 Anchorage New Analysis Rule of Box SPLY NB TRANS ECCS 273 B21K610A SERVICE DIV1 PWR H21P082 0.28 Anchorage New Analysis Rule of Box SPLY 274 E4100B001 HPCI BARO CNDR E4100B001 0.57 Functionality Experience Rule of Box Data Method 275 E4100B002 OILTCO LUBE E4100B002 0.58 Functionality Data Method Rule of Box HPCI BOOSTER Expenc 276 E4101C001B PP E4101C001B 0.58 Functionality Experience Rule of Box PUMP Data Method 277 E4101C001C HPCIOIURB DIVEN E4101C001C 0.58 Functionality Data Method Rule of Box Fermi 2 Expedited Seismic Evaluation Process Page C43 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EUP NTMOUNTED FRAGILITY NOTES/

ITEM EQUIPMENT DESCRIPTION ON HCLPF(G) FAILURE MODE F GTY COMMENTS NUMBER HIGH PRESSURE 278 E4101C002 INCON E4101C002 0.58 Functionality Data ethod Rule of Box TURBINE E4101C004, HPCI BAROMETRIC 279 E4101C004 CONDENSER E4100B001 0.57 Functionality Experienc Rule of Box Data Method CONDENSATE PUMP 280 E4101C005 HPCI AUX OIL E4101C002 0.58 Functionality Experience Rule of Box PUMP Data Method 281 E5100B002 RCIC LUBE OIL E5100B002 0.54 Functionality Experience Rule of Box COOLER Data Method RCIC BAROMETRIC 282 282E5101C003 5101003 CONDENSER CONDENSATE E5100B001 4.47 Anchorage New Analysis Rule of Box PUMP RCIC BAROMETRIC 283 E5101C004 CONDENSER E5100B001 4.47 Anchorage New Analysis Rule of Box VACUUM PUMP 284 E51K600 RCIC PWR SPLY HI1P613 0.69 Functionality Qualification Rule of Box Data Fermi 2 Expedited Seismic Evaluation Process Page C44 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

ESEL EQUIPMENT DESCRIPTION MOUNTED HCLPF(G) FAILUR MODE FRAGILITY NOTES!

NUME ID DSRPINON HLFG FAURMOE METHOD COMMENTS NUMBER 285 R1600S03D - 480CV C-F CC FLOOR 0.3 Functionality GERS Rule of Box 286 R1600S003D- MCC/DIST CAB FLOOR 0.3 Functionality GERS Rule of Box 48 (72C-F) 480V 72C-F MCC 287 T50K800A PCAM DIV1 PWR H 1P914 0.47 Functionality Experience Rule of Box SPLY Data Method 288 T50K800B PCAMS P HI lP915 0.47 Functionality Data ethod Rule of Box PCP DIV 2 B/U N2 Scaling from 289 T49P401 SPLY NITROGEN FLOOR 0.21 Anchorage Existing BOTTLE RACK Analysis HPCI PCM - SUPR 290 E41F402 POOL SOLENOID E41F402 Screened E 1, Table 2-4 VLV HPCI PCM - SUPR EPRI N-011, 291 E41F403 POOL SOLENOID E41F403 Screened Table 2-4 VLV Fermi 2 Expedited Seismic Evaluation Process Page C45 of C45 R14 12-4899/14 Rev. 0 (December 2, 2014)

I'