ML15197A032: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15197A032
| number = ML15197A032
| issue date = 07/13/2015
| issue date = 07/13/2015
| title = Calvert Cliffs, Units 1 and 2 - Submittal of Emergency Response Data System Revision
| title = Submittal of Emergency Response Data System Revision
| author name = Smith L D
| author name = Smith L
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Exe!.on GenerationLarry D. SmithRegulatory Assurance ManagerCalvert Cliffs Nuclear Power Plant1650 Calvert Cliffs ParkwayLusby, MD 20657410 495 5219 Office410 610 9729 Mobilewww.exeloncorp.comLa rry.Smith2@exeloncorp.com10 CFR 50, Appendix EJuly 13, 2015U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2Renewed Facility Operating License Nos. DPR-53 and DPR-69NRC Docket Nos. 50-317 and 50-318
{{#Wiki_filter:Exe!.on Generation Larry D. Smith Regulatory Assurance Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5219 Office 410 610 9729 Mobile www.exeloncorp.com La rry.Smith2@exeloncorp.com 10 CFR 50, Appendix E July 13, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318


==Subject:==
==Subject:==
Emerqjencv Response Data SystemThe attached revision to the Emergency Response Data System (ERDS) Data Point Library forthe Calvert Cliffs Nuclear Power Plant is provided pursuant to 10 CFR Part 50, Appendix E,Section VI.3.a. The revision is described below.The table below provides a brief summary of the changes:Unit 1DPLPae Point ID Description of Change1) Plant Specific Point Description changed from LOG POWER toWide Range Power.2) Generic/Condition Description changed from NI WIDE RANGELOG REACTOR PWR to Nuclear Instruments, Power Range.1 1 Si 109 3) ENGR Units changed from % POWER to %.4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.5) Unique System Description changed from '...provides a______logarithmic indication...' to '...provides an indication...'1) Number of Sensors changed from 32 to 16.2 1SP2112 2) Unique System Descriptions changed from "...strategically nearthe vicinity..." to ". ..strategically in a vacant CEA shroudassembly near the vicinity..."1) How Processed description changed to AVG EACHQUADRANT'S PTS, SHOW HIGH AVG2) Unique System Description changed to CORE EXITTHERMOCOUPLES ARE LOCATED AT THE TOP OF THE31SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN35 SELECTED FUEL ASSEMBLIES. THESE DETECTORSARE DIVIDED INTO QUADRANTS AND EACH QUADRANTIS AVERAGED. THIS POINT IS THE HIGHEST QUADRANTAVG.
Emerqjencv Response Data System The attached revision to the Emergency Response Data System (ERDS) Data Point Library for the Calvert Cliffs Nuclear Power Plant is provided pursuant to 10 CFR Part 50, Appendix E, Section VI.3.a. The revision is described below.
Document Control DeskJuly 13, 2015Page 2Unit 1DPLPaciePoint IDDescription of Changev 1) Minimum and Maximum Instrument Range fields changed toN/A.2) Number of sensors changed to 37 (35 CETs and 2 pressuresensors)41SP3123 3) Unique System Description changed to: CORE SUBCOOLEDMARGIN IS CALCULATED BY THE SATURATIONTEMPERATURE AS DETERMINED FROM PRESSURIZERPRESSURE (SP3120) MINUS THE CORE EXIT TEMP($P211 3).1) ENGR Units changed from % FLOW to %.51 F131 A 2) Number of sensors changed to 2 (1 per SG)3) Proc or Sens changed to P6 1SP3I17A No changes other than point ID.7 1SP3117B No changes other than point I D.8 1SP3116A No changes other than point ID.9 1SP3116B No changes other than point ID.1) Minimum and Maximum Instrument Range changed to N/A.10 1 Fl111% 2) Number of Sensors changed to 8.3) Unique System Description, first line updated to THIS IS ATEMPERATURE COMPENSATED FEED FLOW.11 1 Fl1121% 1) Minimum and Maximum Instrument Range changed to N/A.2) Number of Sensors changed to 812 1SP3118A Maximum Instrument Range changed to 1250.13 1SP3118B Maximum Instrument Range changed to 1250.14 1SP0106A No changes other than point ID.15 1 SP0106B No changes other than point ID.16 1SP3113A No changes other than point I D.17 1SP3113B No changes other than point ID.18 1 SP3120 No changes other than point ID.19 1 SP2109 No changes other than point ID.1) Proc or Sens changed to S.20 1SP1114 2) Number of Sensors changed to 13) Unique System Descriptions updated.21 1SP2115 No changes other than point ID.22 1SP2116 Proc or Sens changed to S.23 1 SP4112 No changes other than point ID.24 1 R5415! Proc or Sens changed to S.25 1S5P6120 How Processed changed to Inverse Log of Instrument Value.26 1SP6117 How Processed changed to Reference Unique System Description.
The table below provides a brief summary of the changes:
Document Control DeskJuly 13, 2015Page 3Unit 1Point IDDescription of Change27 1SP6121 No changes other than point ID.28 1 R5202! Proc or Sens changed to S.29 1 5421! 1) Proc or Sens changed to S.2) How Processed changed to Inverse Log of Instrument Value.30 1R5422! 1) Proc or Sens changed to S.2) How Processed changed to Inverse Log of Instrument Value.1) Proc or Sens changed to S.31 1R4014! 2) How Processed changed to Inverse Log of Instrument Value.3) Alarm / Trip Setpoints format changed to match other DPLentries.32 1SP4110 Unique System Descriptions updated.33 1SP4111 No changes other than point ID.1) Zero Point Reference changed to TNKBOT34 1SP2RWLVL 2) How Processed changed to WR sensor when outside NRsensor band35 1WS60#15M Engr Units changed to M/S (no spaces).36 1WD60#15M No changes other than point I D.37 1WS10#15M No changes other than point ID.38 1WD10#15M No changes other than point ID.39 1 MMSDTASTB No changes other than point ID.40 1 MMS_S60STB No changes other than point ID.Unit 2DPLPae Point ID Change1) Plant Specific Point Description changed from LOG POWER toWide Range Power.2) Generic/Condition Description changed from NI WIDE RANGE109 LOG REACTOR PWR to Nuclear Instruments, Power Range.1 25P13) ENGR Units changed from % POWER to %.4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.5) Unique System Description changed from '...provides alogarithmic indication...' to '...provides an indication...'1) Number of Sensors changed from 32 to 16.2 2SP2112 2) Unique System Descriptions changed from "...strategically nearthe vicinity..." to "...strategically in a vacant CEA shroud_____ _____________ assembly near the vicinity..."
Unit 1 DPL Pae Point ID Description of Change
Document Control DeskJuly 13, 2015Page 4Unit 2Pae Point ID Change1) How Processed description changed to AVG EACHQUADRANT'S PTS, SHOW HIGH AVG2) Unique System Description changed to CORE EXITTHERMOCOUPLES ARE LOCATED AT THE TOP OF THE3 2SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN35 SELECTED FUEL ASSEMBLIES. THESE DETECTORSARE DIVIDED INTO QUADRANTS AND EACH QUADRANTIS AVERAGED. THIS POINT IS THE HIGHEST QUADRANTAVG.1) Minimum and Maximum Instrument Range fields changed toN/A.2) Number of sensors changed to 37 (35 CETs and 2 pressuresensors)3) Unique System Description changed to: CORE SUBCOOLED4 2SP3123 MARGIN IS CALCULATED BY THE SATURATIONTEMPERATURE AS DETERMINED FROM PRESSURIZERPRESSURE (SP3120) MINUS THE CORE EXIT TEMP(SF2113).4) How Processed changed to RE: USD (REFERENCE UNIQUESYS DESC).1) ENGR Units changed from % FLOW to %.5 2F131A 2) Number of sensors changed to 2 (1 per SG)3) Proc or Sens changedto P6 2SP3117A No changes other than point ID.7 2SP3117B No changes other than point ID.8 2SP31 16A Alarm / Trip Setpoints, X >= changed from 985 to 950.9 2SP311 6B Alarm / Trip Setpoints, X >= changed from 985 to 950.1) Minimum and Maximum Instrument Range changed to N/A.10 2F1 11% 2) Number of Sensors changed to 8.3) Unique System Description, first line updated to THIS IS ATEMPERATURE COMPENSATED FEED FLOW.1) Minimum and Maximum Instrument Range changed to N/A.11 2F1 121% 2) Number of Sensors changed to 83) Unique System Description, first line updated to THIS IS ATEMPERATURE COMPENSATED FEED FLOW.12 2SP3118A Maximum Instrument Range changed to 1250.13 2SP3118B Maximum Instrument Range changed to 1250.14 2SP0106A No changes other than point ID.15 2SP0106B No changes other than point ID.16 2SP3113A Alarm / Trip Setpoints, X <= changed from 504 to 525.17 2SP3113B Alarm I Trip Setpoints, X <= changed from 504 to 525.18 2SP3I20 No changes other than point ID.
: 1) Plant Specific Point Description changed from LOG POWER to Wide Range Power.
Document Control DeskJuly 13, 2015Page 5Unit 2Pae Point ID Change19 2SP2109 Alarm / Trip Setpoints, X >= changed from 300 to 305.1) Proc or Sens changed to S.20 2SPl114 2) Number of Sensors changed to 1_____________3) Unique System Descriptions updated,21 2SP2115 No changes other than point ID.22 2SP2116 Proc or Sens changed to S.23 2SP4112 No changes other than point ID.The "before" and "after" ERDS Data Point Library sheets are attached.There are no regulatory commitments contained in this correspondence.Should you have questions regarding this matter, please contact me at (410) 495-5219.Respectfully,Regulatory Assurance ManagerLDS/PSF/bjm
: 2) Generic/Condition Description changed from NI WIDE RANGE LOG REACTOR PWR to Nuclear Instruments, Power Range.
1 1 Si 109
: 3) ENGR Units changed from % POWER to %.
: 4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.
: 5) Unique System Description changed from  
'...provides a
______logarithmic indication...' to '...provides an indication...'
: 1) Number of Sensors changed from 32 to 16.
2 1SP2112
: 2) Unique System Descriptions changed from "...strategically near the vicinity..." to "...strategically in a vacant CEA shroud assembly near the vicinity..."
: 1) How Processed description changed to AVG EACH QUADRANT'S PTS, SHOW HIGH AVG
: 2) Unique System Description changed to CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE 31SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
 
Document Control Desk July 13, 2015 Page 2 Unit 1 DPL Pacie Point ID Description of Change v
: 1)
Minimum and Maximum Instrument Range fields changed to N/A.
: 2) Number of sensors changed to 37 (35 CETs and 2 pressure sensors) 41SP3123
: 3) Unique System Description changed to: CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120)
MINUS THE CORE EXIT TEMP
($P211 3).
: 1) ENGR Units changed from % FLOW to %.
51 F131 A
: 2) Number of sensors changed to 2 (1 per SG)
: 3) Proc or Sens changed to P 6
1SP3I17A No changes other than point ID.
7 1SP3117B No changes other than point I D.
8 1SP3116A No changes other than point ID.
9 1SP3116B No changes other than point ID.
: 1) Minimum and Maximum Instrument Range changed to N/A.
10 1 Fl111%
: 2) Number of Sensors changed to 8.
: 3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.
11 1 Fl1121%
: 1) Minimum and Maximum Instrument Range changed to N/A.
: 2) Number of Sensors changed to 8 12 1SP3118A Maximum Instrument Range changed to 1250.
13 1SP3118B Maximum Instrument Range changed to 1250.
14 1SP0106A No changes other than point ID.
15 1 SP0106B No changes other than point ID.
16 1SP3113A No changes other than point I D.
17 1SP3113B No changes other than point ID.
18 1 SP3120 No changes other than point ID.
19 1 SP2109 No changes other than point ID.
: 1) Proc or Sens changed to S.
20 1SP1114
: 2) Number of Sensors changed to 1
: 3) Unique System Descriptions updated.
21 1SP2115 No changes other than point ID.
22 1SP2116 Proc or Sens changed to S.
23 1 SP4112 No changes other than point ID.
24 1 R5415!
Proc or Sens changed to S.
25 1S5P6120 How Processed changed to Inverse Log of Instrument Value.
26 1SP6117 How Processed changed to Reference Unique System Description.
 
Document Control Desk July 13, 2015 Page 3 Unit 1 Point IDDescription of Change 27 1SP6121 No changes other than point ID.
28 1 R5202!
Proc or Sens changed to S.
29 1 5421!
: 1) Proc or Sens changed to S.
: 2) How Processed changed to Inverse Log of Instrument Value.
30 1R5422!
: 1) Proc or Sens changed to S.
: 2) How Processed changed to Inverse Log of Instrument Value.
: 1) Proc or Sens changed to S.
31 1R4014!
: 2) How Processed changed to Inverse Log of Instrument Value.
: 3) Alarm / Trip Setpoints format changed to match other DPL entries.
32 1SP4110 Unique System Descriptions updated.
33 1SP4111 No changes other than point ID.
: 1) Zero Point Reference changed to TNKBOT 34 1SP2RWLVL
: 2) How Processed changed to WR sensor when outside NR sensor band 35 1WS60#15M Engr Units changed to M/S (no spaces).
36 1WD60#15M No changes other than point I D.
37 1WS10#15M No changes other than point ID.
38 1WD10#15M No changes other than point ID.
39 1 MMSDTASTB No changes other than point ID.
40 1 MMS_S60STB No changes other than point ID.
Unit 2 DPL Pae Point ID Change
: 1) Plant Specific Point Description changed from LOG POWER to Wide Range Power.
: 2) Generic/Condition Description changed from NI WIDE RANGE 109 LOG REACTOR PWR to Nuclear Instruments, Power Range.
1 25P13)
ENGR Units changed from % POWER to %.
: 4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.
: 5) Unique System Description changed from  
'...provides a
logarithmic indication...' to '...provides an indication...'
: 1) Number of Sensors changed from 32 to 16.
2 2SP2112
: 2) Unique System Descriptions changed from "...strategically near the vicinity..." to "...strategically in a vacant CEA shroud assembly near the vicinity..."
 
Document Control Desk July 13, 2015 Page 4 Unit 2 Pae Point ID Change
: 1) How Processed description changed to AVG EACH QUADRANT'S PTS, SHOW HIGH AVG
: 2) Unique System Description changed to CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE 3
2SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
: 1) Minimum and Maximum Instrument Range fields changed to N/A.
: 2) Number of sensors changed to 37 (35 CETs and 2 pressure sensors)
: 3) Unique System Description changed to: CORE SUBCOOLED 4
2SP3123 MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120)
MINUS THE CORE EXIT TEMP (SF2113).
: 4) How Processed changed to RE: USD (REFERENCE UNIQUE SYS DESC).
: 1) ENGR Units changed from % FLOW to %.
5 2F131A
: 2) Number of sensors changed to 2 (1 per SG)
: 3) Proc or Sens changedto P 6
2SP3117A No changes other than point ID.
7 2SP3117B No changes other than point ID.
8 2SP31 16A Alarm / Trip Setpoints, X >= changed from 985 to 950.
9 2SP311 6B Alarm / Trip Setpoints, X >= changed from 985 to 950.
: 1) Minimum and Maximum Instrument Range changed to N/A.
10 2F1 11%
: 2) Number of Sensors changed to 8.
: 3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.
: 1) Minimum and Maximum Instrument Range changed to N/A.
11 2F1 121%
: 2) Number of Sensors changed to 8
: 3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.
12 2SP3118A Maximum Instrument Range changed to 1250.
13 2SP3118B Maximum Instrument Range changed to 1250.
14 2SP0106A No changes other than point ID.
15 2SP0106B No changes other than point ID.
16 2SP3113A Alarm / Trip Setpoints, X <= changed from 504 to 525.
17 2SP3113B Alarm I Trip Setpoints, X <= changed from 504 to 525.
18 2SP3I20 No changes other than point ID.
 
Document Control Desk July 13, 2015 Page 5 Unit 2 Pae Point ID Change 19 2SP2109 Alarm / Trip Setpoints, X >= changed from 300 to 305.
: 1) Proc or Sens changed to S.
20 2SPl114
: 2) Number of Sensors changed to 1
_____________3)
Unique System Descriptions updated, 21 2SP2115 No changes other than point ID.
22 2SP2116 Proc or Sens changed to S.
23 2SP4112 No changes other than point ID.
The "before" and "after" ERDS Data Point Library sheets are attached.
There are no regulatory commitments contained in this correspondence.
Should you have questions regarding this matter, please contact me at (410) 495-5219.
Respectfully, Regulatory Assurance Manager LDS/PSF/bjm


==Attachment:==
==Attachment:==
Emergency Response Data System Data Point Library (80 pages)cc: NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert CliffsNRC Regional Administrator, Region I S. Gray, MD-DNR ATTACHM ENTEMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY(80 pages)Calvert Cliffs Nuclear Power PlantJuly 13, 2015 PWR Data Point Library Reference FileReport Date :Page :06-24-20151Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
Emergency Response Data System Data Point Library (80 pages) cc:
NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert Cliffs NRC Regional Administrator, Region I S. Gray, MD-DNR
 
ATTACHM ENT EMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY (80 pages)
Calvert Cliffs Nuclear Power Plant July 13, 2015
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 1
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 31: Line 179:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC 1CCllNI POWER RNG1SPll109WIDE RANGE POWERNUCLEAR INSTRUMENTS, POWER RANGEAN/A1E-8200N/AN/AP4AVG OF THE TWO CLOSEST CHANNEL VALUESN/AN/AN/AN/AN/AN/AN/AWIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OFREACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATEREACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTSBETWEEN THE RANGE OF 1 E-4% TO 15% POWER. THESE DETECTORSARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURINGNORMAL POWER OPERATIONS.
5/4/2015 CC 1 CCll NI POWER RNG 1SPll109 WIDE RANGE POWER NUCLEAR INSTRUMENTS, POWER RANGE A
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 2Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
N/A 1E-8 200 N/A N/A P
4 AVG OF THE TWO CLOSEST CHANNEL VALUES N/A N/A N/A N/A N/A N/A N/A WIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OF REACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATE REACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTS BETWEEN THE RANGE OF 1 E-4% TO 15% POWER. THESE DETECTORS ARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURING NORMAL POWER OPERATIONS.
 
PWR Data Point Library Reference File Report Date :
06-24-2015 Page :
2 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 44: Line 216:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllREC VES LEV1SP2112REACTOR VESSEL LEVELREACTOR VESSEL WATER LEVELAINCHESN/AN/AN/AFAPN/AP16RE:USD (REFERENCE UNIQUE SYS DESC)160,151,112,71,50,29,19, & 10" ABOVE FAPVOID DETECTEDN/AN/AN/AN/AN/A8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACEDSTRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THEVICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVEREDTHE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED ININCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUELALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50"FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOWPROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDEAN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.
5/4/2015 CC1 CCll REC VES LEV 1SP2112 REACTOR VESSEL LEVEL REACTOR VESSEL WATER LEVEL A
PWR Data Point Library Reference FileReport Date :Page :06-24-20153Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
INCHES N/A N/A N/A FAP N/A P
16 RE:USD (REFERENCE UNIQUE SYS DESC) 160,151,112,71,50,29,19, & 10" ABOVE FAP VOID DETECTED N/A N/A N/A N/A N/A 8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACED STRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THE VICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVERED THE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED IN INCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUEL ALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50" FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOW PROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDE AN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 3
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 57: Line 254:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sons:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sons:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CC1 1TEMP CORE EX1SP2113CORE EXIT TEMPHIGHEST TEMP AT THE CORE EXITADEGFN/A402300N/AN/AP35AVG EACH QUADRANT'S PTS:SHOW HIGH AVGN/AX >= 650N/AN/AN/AN/AN/ACORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THEINCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTEDFUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTSAND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHESTQUADRANT AVG.
5/4/2015 CC1 CC1 1 TEMP CORE EX 1SP2113 CORE EXIT TEMP HIGHEST TEMP AT THE CORE EXIT A
PWR Data Point Library Reference Fi~eReport Date :Page :06-24-20154Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 40 2300 N/A N/A P
35 AVG EACH QUADRANT'S PTS:SHOW HIGH AVG N/A X >= 650 N/A N/A N/A N/A N/A CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
 
PWR Data Point Library Reference Fi~e Report Date :
Page :
06-24-2015 4
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 70: Line 292:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSUB MARGIN1SP3123CORE SUBCOOLED MARGINSATURATION TEMPERATURE-HIGH CETADEGFN/AN/AN/AN/AN/AP37RE:USD (REFERENCE UNIQUE SYS DESC)N/AN/AN/AN/AN/AN/AN/ACORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATIONTEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE(SP3120) MINUS THE CORE EXIT TEMP (SP211 3).
5/4/2015 CC1 CCll SUB MARGIN 1SP3123 CORE SUBCOOLED MARGIN SATURATION TEMPERATURE-HIGH CET A
PWR Data Point Library Reference FileReport Date :Page :06-24-20155Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A N/A N/A N/A N/A P
37 RE:USD (REFERENCE UNIQUE SYS DESC)
N/A N/A N/A N/A N/A N/A N/A CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SP211 3).
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 5
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 83: Line 331:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:-Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:-
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCORE FLOW1F131ARCS TOTAL FLOW CH ATOTAL REACTOR COOLANT FLOWA100% RX COOLANT FLOW = 370,000 GPM-53.57151.48N/AN/AP2N/AN/AN/AN/AN/AN/AN/AN/AREACTOR COOLANT FLOW IS DETERMINED BY THE D/P ACROSS THESTEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOPFLOWS.
5/4/2015 CC1 CCll CORE FLOW 1F131A RCS TOTAL FLOW CH A TOTAL REACTOR COOLANT FLOW A
PWR Data Point Library Reference FileReport Date :Page :06-24-20156Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
100% RX COOLANT FLOW = 370,000 GPM
-53.57 151.48 N/A N/A P
2 N/A N/A N/A N/A N/A N/A N/A N/A REACTOR COOLANT FLOW IS DETERMINED BY THE D/P ACROSS THE STEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOP FLOWS.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 6
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 96: Line 370:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1OCil1SG LEVEL 1/A1SP3117ASG LEVEL LOOP 11STEAM GENERATOR 11 WATER LEVELAINCH ESN/A-401.063.5N/A0" = 40" ABOVE THE FEED RINGP2AVG OFN/AX >= 50TWO CHANNELSX <=-170N/AN/AN/AN/AWETA LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROWRANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170' AS READ ONTHE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117A IS A WIDERANGE LVL INDICATOR.
5/4/2015 CC1 OCil1 SG LEVEL 1/A 1SP3117A SG LEVEL LOOP 11 STEAM GENERATOR 11 WATER LEVEL A
PWR Data Point Library Reference FileReport Date :Page :06-24-20157Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
INCH ES N/A
-401.0 63.5 N/A 0" = 40" ABOVE THE FEED RING P
2 AVG OF N/A X >= 50 TWO CHANNELS X <=-170 N/A N/A N/A N/A WET A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170' AS READ ON THE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117A IS A WIDE RANGE LVL INDICATOR.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 7
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 109: Line 409:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSG LEVEL 2/B1SP3117BSG LEVEL LOOP 12STEAM GENERATOR 12 WATER LEVELAINCHESN/A-401.063.5N/A0' = 40" ABOVE THE FEED RINGP2AVG OF TWO CHANNELSN/AX>=50 X<=-170N/AN/AN/AN/AWETA LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROWRANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ONTHE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117B IS A WIDERANGE LVL INDICATOR.
5/4/2015 CC1 CCll SG LEVEL 2/B 1SP3117B SG LEVEL LOOP 12 STEAM GENERATOR 12 WATER LEVEL A
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 8Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
INCHES N/A
-401.0 63.5 N/A 0' = 40" ABOVE THE FEED RING P
2 AVG OF TWO CHANNELS N/A X>=50 X<=-170 N/A N/A N/A N/A WET A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117B IS A WIDE RANGE LVL INDICATOR.
 
PWR Data Point Library Reference File Report Date :
06-24-2015 Page :
8 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 122: Line 447:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSG PRESS 1/A1SP3116ASG PRESSURE LOOP 11STEAM GENERATOR 11 PRESSUREAPSIAN/A01200N/AN/AP2AVG OF TWO CHANNELSN/AX>= 950 X<= 703N/AN/AN/AN/AN/AREACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEATEXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE ORCOMP FAILURE.
5/4/2015 CC1 CCll SG PRESS 1/A 1SP3116A SG PRESSURE LOOP 11 STEAM GENERATOR 11 PRESSURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-20159Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PSIA N/A 0
1200 N/A N/A P
2 AVG OF TWO CHANNELS N/A X>= 950 X<= 703 N/A N/A N/A N/A N/A REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OR COMP FAILURE.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 9
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 135: Line 486:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm /Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSG PRESS 2/B1SP3116BSG PRESSURE LOOP 12STEAM GENERATOR 12 PRESSUREAPSIAN/A01200N/AN/Ap2AVG OF TWO CHANNELSN/AX>=950 X<=703N/AN/AN/AN/AN/AREACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEATEXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LiNE RUPTURE OFCOMP FAILURE.
5/4/2015 CC1 CCll SG PRESS 2/B 1SP3116B SG PRESSURE LOOP 12 STEAM GENERATOR 12 PRESSURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201510Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PSIA N/A 0
1200 N/A N/A p
2 AVG OF TWO CHANNELS N/A X>=950 X<=703 N/A N/A N/A N/A N/A REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LiNE RUPTURE OF COMP FAILURE.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 10 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 148: Line 524:


== Description:==
== Description:==
Analog!/ Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog!/ Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CCllMN FD FL 1/A1F1111%FW FLOW TO STEAM GEN. 11STM GEN 11 MAIN FEEDWATER FLOWAKLB/HRN/AN/AN/AN/AN/AP8COMPLEXN/AN/AN/AN/AN/AN/ATHIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVENMAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATEREXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEEDREG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONEDTO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARERUNNING.
5/4/2015 CCll MN FD FL 1/A 1F1111%
PWR Data Point Library Reference FileReport Date :Page :06-24-201511Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
FW FLOW TO STEAM GEN. 11 STM GEN 11 MAIN FEEDWATER FLOW A
KLB/HR N/A N/A N/A N/A N/A P
8 COMPLEX N/A N/A N/A N/A N/A N/A THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 11 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 161: Line 562:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllMN FD FL 2/B1F1121%FW FLOW TO STEAM GEN. 12STM GEN 12 MAIN FEEDWATER FLOWAKLB/HRN/AN/AN/AN/AN/AP8COMPLEXN/AN/AN/AN/AN/AN/ATHIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVENMAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATEREXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEEDREG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONEDTO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARERUNNING.
5/4/2015 CC1 CCll MN FD FL 2/B 1F1121%
PWR Data Point Library Reference FileReport Date :Page :06-24-201512Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
FW FLOW TO STEAM GEN. 12 STM GEN 12 MAIN FEEDWATER FLOW A
KLB/HR N/A N/A N/A N/A N/A P
8 COMPLEX N/A N/A N/A N/A N/A N/A THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 12 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 174: Line 600:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllAX FD FL 1/A1SP3118AAUX FEED FLOW LOOP 11STM GEN 11 AUXILIARY FW FLOWA.GPMN/A01250N/AN/AP2SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCHN/AN/AN/AN/AN/ANN/ATHERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRICDRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMONHEADER FOR BOTH #11 & #12 STM GENS. THE MOTOR DRIVEN PUMPDISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOREACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP ISNORMALLY ALIGNED TO START.
5/4/2015 CC1 CCll AX FD FL 1/A 1SP3118A AUX FEED FLOW LOOP 11 STM GEN 11 AUXILIARY FW FLOW A.
PWR Data Point Library Reference FileReport Date :Page :06-24-201513Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
1250 N/A N/A P
2 SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH N/A N/A N/A N/A N/A N
N/A THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #11 & #12 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.
BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM
#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 13 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 187: Line 641:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Tem perature Comnpensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Tem perature Comnpensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllAX FD FL 2/B1SP3I18BAUX FEED FLOW LOOP 12STM GEN 12 AUXILIARY FW FLOWAGPMN/A01250N/AN/AP2SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCHN/AN/AN/AN/AN/ANN/ATHERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRICDRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMONHEADER FOR BOTH #11 & #12 STM GENS. THE MOTOR DRIVEN PUMPDISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOREACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP ISNORMALLY ALIGNED TO START.
5/4/2015 CC1 CCll AX FD FL 2/B 1SP3I18B AUX FEED FLOW LOOP 12 STM GEN 12 AUXILIARY FW FLOW A
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 14Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
1250 N/A N/A P
2 SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH N/A N/A N/A N/A N/A N
N/A THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #11 & #12 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.
BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM
#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.
 
PWR Data Point Library Reference File Report Date :
06-24-2015 Page :
14 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 200: Line 682:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllHL TEMP 1/A1SP0106ATHOT LOOP 11STM GEN 11 INLET TEMPERATUREADEGFN/A50700N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THESTEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGINMONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUITFOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTIONSYSTEM.
5/4/2015 CC1 CCll HL TEMP 1/A 1SP0106A THOT LOOP 11 STM GEN 11 INLET TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201515Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 50 700 N/A N/A P
2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 15 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 213: Line 719:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllHL TEMP 2/B1SP0I06BTHOT LOOP 12STM GEN 12 INLET TEMPERATUREADEGFN/A50700N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THESTEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGINMONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUITFOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTIONSYSTEM.
5/4/2015 CC1 CCll HL TEMP 2/B 1SP0I06B THOT LOOP 12 STM GEN 12 INLET TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201516Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 50 700 N/A N/A P
2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 16 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 226: Line 756:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCL TEMP 1/A1 SP3I113ATCOLD LOOP 11STM GEN 11 OUTLET TEMPERATUREADEGFN/A50700N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX>= 560 X<=525N/AN/AN/AN/AN/ATHE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SETPOINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANELINDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLEDMARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTORPROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TOBE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
5/4/2015 CC1 CCll CL TEMP 1/A 1 SP3I113A TCOLD LOOP 11 STM GEN 11 OUTLET TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201517Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 50 700 N/A N/A P
3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
N/A X>= 560 X<=525 N/A N/A N/A N/A N/A THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)
CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 17 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 239: Line 795:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm/ITrip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temnperature Comnpensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm/ITrip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temnperature Comnpensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCL TEMP 2/B1SP3I13BTCOLD LOOP 12STM GEN 12 OUTLET TEMPERATUREADEGFN/A50700N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX>=560 X<=525N/AN/AN/AN/AN/ATHE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SETPOINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANELINDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLEDMARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TMILP)CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTORPROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TOBE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
5/4/2015 CC1 CCll CL TEMP 2/B 1SP3I13B TCOLD LOOP 12 STM GEN 12 OUTLET TEMPERATURE A
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 18Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 50 700 N/A N/A P
3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
N/A X>=560 X<=525 N/A N/A N/A N/A N/A THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TMILP)
CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
 
PWR Data Point Library Reference File Report Date :
06-24-2015 Page :
18 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 252: Line 834:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CC11RCS PRESSURE1 SP3120PRESSURIZER PRESSUREREACTOR COOLANT SYSTEM PRESSUREAPSIAN/A04000N/AN/AP2AVG OF TWO CHANNELSN/AX >= 2400 X <= 1740N/AN/AN/AN/AN/AREACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGEPRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SETTO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION ISINITIATED AT 1 740#.
5/4/2015 CC1 CC11 RCS PRESSURE 1 SP3120 PRESSURIZER PRESSURE REACTOR COOLANT SYSTEM PRESSURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201519Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PSIA N/A 0
4000 N/A N/A P
2 AVG OF TWO CHANNELS N/A X >= 2400 X <= 1740 N/A N/A N/A N/A N/A REACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGE PRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SET TO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.
PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.
SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.
BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION IS INITIATED AT 1 740#.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 19 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 265: Line 875:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Tem perature Comnpensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Tem perature Comnpensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CC11PRZR LEVEL1SP2109PRESSURIZER LEVELPRIMARY SYSTEM PRESSURIZER LEVELAINCHESN/A0360RE: USDN/AP2AVG OF TWO CHANNELSN/AX>=305 X<=50N/AN/AN/AN/AWETPRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN160' TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZERHEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.PRESSURIZER HEATERS WJLL START TO BE UNCOVERED AT APPROX 84"OF INDICATED LEVEL. ZERO POINT  
5/4/2015 CC1 CC11 PRZR LEVEL 1SP2109 PRESSURIZER LEVEL PRIMARY SYSTEM PRESSURIZER LEVEL A
INCHES N/A 0
360 RE: USD N/A P
2 AVG OF TWO CHANNELS N/A X>=305 X<=50 N/A N/A N/A N/A WET PRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN 160' TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZER HEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.
PRESSURIZER HEATERS WJLL START TO BE UNCOVERED AT APPROX 84" OF INDICATED LEVEL. ZERO POINT  


==REFERENCE:==
==REFERENCE:==
BOTTIOM OFPRESSURIZER.
BOTTIOM OF PRESSURIZER.
PWR Data Point Library Reference FileReport Date :Page :06-24-201520Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 20 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 281: Line 917:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllRCS CHG/MU1SPil114CHG PUMP FLOWPRIMARY SYSTEM CHARGING/MAKEUP FAGPMN/A0150N/AN/AS1RE:USD (REFERENCE UNIQ SYS DESC)N/AN/AN/AN/AN/ANN/ATHERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPMEACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #13CAN BE POWERED FROM ONE OF TWO BUSSES #11 OR #14. WHICH MUSTBE MANUALLY SELECTED BY A "KIRK" KEY INTERLOCK SCHEME.
5/4/2015 CC1 CCll RCS CHG/MU 1SPil114 CHG PUMP FLOW PRIMARY SYSTEM CHARGING/MAKEUP F A
PWR Data Point Library Reference FileReport Date :Page :06-24-201521Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
150 N/A N/A S
1 RE:USD (REFERENCE UNIQ SYS DESC)
N/A N/A N/A N/A N/A N
N/A THERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPM EACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #13 CAN BE POWERED FROM ONE OF TWO BUSSES #11 OR #14. WHICH MUST BE MANUALLY SELECTED BY A "KIRK" KEY INTERLOCK SCHEME.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 21 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 294: Line 957:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllHP SI FLOW1SP2115HPSI FLOWHIGH PRESSURE SAFETY INJECTION FAGPMN/A01600N/AN/AP4SUM OF FLOW LOOPS 11A, 11B, 12A, 12BN/AN/AN/AN/AN/ANN/A3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCYCOOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275PSIA. ONLY TWO PUMPS WILL START. 12 HPSI IS MAINTAINED IN PULL TOLOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THEREFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTERTHE RWTI IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TOPROVIDE SUCTION FROM THE CONTAINMENT SUMP.
5/4/2015 CC1 CCll HP SI FLOW 1SP2115 HPSI FLOW HIGH PRESSURE SAFETY INJECTION F A
PWR Data Point Library Reference FileReport Date :Page :06-24-201522Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
1600 N/A N/A P
4 SUM OF FLOW LOOPS 11A, 11B, 12A, 12B N/A N/A N/A N/A N/A N
N/A 3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCY COOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275 PSIA. ONLY TWO PUMPS WILL START. 12 HPSI IS MAINTAINED IN PULL TO LOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THE REFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTER THE RWTI IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TO PROVIDE SUCTION FROM THE CONTAINMENT SUMP.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 22 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 307: Line 996:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:-Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
-Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllLP SI FLOWlSP2116LPSI FLOWLOW PRESSURE SAFETY INJECTION FLAGPMN/A08000N/AN/AS1INSTRUMENT VALUEN/AN/AN/AN/AN/AN/A2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGHVOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES ASUCTION OFF A SEPARATE HEADER FROM THE RWT. DURINGRECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPSARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THECONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.
5/4/2015 CC1 CCll LP SI FLOW lSP2116 LPSI FLOW LOW PRESSURE SAFETY INJECTION FL A
PWR Data Point Library Reference FileReport Date :Page :06-24-201523Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
8000 N/A N/A S
1 INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A 2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGH VOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES A SUCTION OFF A SEPARATE HEADER FROM THE RWT. DURING RECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPS ARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THE CONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 23 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 320: Line 1,034:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCTMNT SMP WR1SP4112CNTMT LEVELCONTAINMENT SUMP WIDE RNG LEVELAINCHESN/A0120N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TOBOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THERECIRCULATION MODE. "TWO 24" DIAMETER RECIRC LINES SUPPLYWATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRISFROM ENTERING THE SUMP.
5/4/2015 CC1 CCll CTMNT SMP WR 1SP4112 CNTMT LEVEL CONTAINMENT SUMP WIDE RNG LEVEL A
PWR Data Point Library Reference FileReport Date :Page :06-24-201524Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
INCHES N/A 0
120 N/A N/A P
2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TO BOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THE RECIRCULATION MODE. "TWO 24" DIAMETER RECIRC LINES SUPPLY WATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.
THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRIS FROM ENTERING THE SUMP.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 24 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 333: Line 1,073:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllEFF GAS RAD1R5415!WR EFF MONITORRADIOACTIVITY OF RELEASED GASSESAUCI/SECN/A1 El1El13N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACKEFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH AREUSED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THERANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) ISSELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUSFLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVEEFFLUENT GROSS ACTIVITY.
5/4/2015 CC1 CCll EFF GAS RAD 1R5415!
PWR Data Point Library Reference FileReport Date :Page :06-24-201525Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
WR EFF MONITOR RADIOACTIVITY OF RELEASED GASSES A
UCI/SEC N/A 1 El 1El13 N/A N/A S
1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACK EFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH ARE USED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THE RANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) IS SELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUS FLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVE EFFLUENT GROSS ACTIVITY.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 25 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 346: Line 1,111:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllEFF LIQ RAD1SP6120LIQUID WASTE RADRADIOACTIVITY OF RELEASED LIQUIDACPMN/A1E11E6N/AN/AP3INVERSE LOG OF INSTRUMENT VALUEN/AX >= 4.21 E5N/AN/AN/AN/AN/ALIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGEHEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISCWASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2DISCHARGE VALVES 0-CV-2201 & 0-CV-2202 TO ISOLATE FLOW TO THECIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN INALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.
5/4/2015 CC1 CCll EFF LIQ RAD 1SP6120 LIQUID WASTE RAD RADIOACTIVITY OF RELEASED LIQUID A
PWR Data Point Library Reference FileReport Date :Page :06-24-201526Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
CPM N/A 1E1 1E6 N/A N/A P
3 INVERSE LOG OF INSTRUMENT VALUE N/A X >= 4.21 E5 N/A N/A N/A N/A N/A LIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGE HEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISC WASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2 DISCHARGE VALVES 0-CV-2201 & 0-CV-2202 TO ISOLATE FLOW TO THE CIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN IN ALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 26 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 359: Line 1,148:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCOND A/E RAD1SP6117OFF GAS RADCONDENSER AIR EJECTOR RADIOACTIVAGPDN/A0250N/AN/AP4REFERENCE UNIQUE SYSTEM DESCRIPTIONN/AX >= 5N/AN/AN/AN/AN/ATHE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOURRADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDEOF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUTSIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEEREDHIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPD)AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARYLEAK THROUGH THE S/G TUBES.
5/4/2015 CC1 CCll COND A/E RAD 1SP6117 OFF GAS RAD CONDENSER AIR EJECTOR RADIOACTIV A
PWR Data Point Library Reference FileReport Date :Page :06-24-201527Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
GPD N/A 0
250 N/A N/A P
4 REFERENCE UNIQUE SYSTEM DESCRIPTION N/A X >= 5 N/A N/A N/A N/A N/A THE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOUR RADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDE OF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUT SIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEERED HIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPD)
AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARY LEAK THROUGH THE S/G TUBES.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 27 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Paint ID:
Plant Specific Point


== Description:==
== Description:==
Line 372: Line 1,187:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CCllCNTMNT RAD1 SP6121CNTMT RADRADIATION LEVEL IN CONTAINMENTAR/HRN/A11 E8"N/AN/AP2AVG OF TWO CHANNELSN/AX >= 6N/AN/AN/AN/AN/ATHESE CONTAINMENT RADIATION MONITORS MEASURE GAMMARADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND AREPLACED NEAR THE PRESSURIZER AND #11 STEAM GEN.
5/4/2015 CCll CNTMNT RAD 1 SP6121 CNTMT RAD RADIATION LEVEL IN CONTAINMENT A
PWR Data Point Library Reference FileReport Date :Page :06-24-201528Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
R/HR N/A 1
1 E8 "N/A N/A P
2 AVG OF TWO CHANNELS N/A X >= 6 N/A N/A N/A N/A N/A THESE CONTAINMENT RADIATION MONITORS MEASURE GAMMA RADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.
THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND ARE PLACED NEAR THE PRESSURIZER AND #11 STEAM GEN.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 28 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 385: Line 1,226:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllRCS LTDN RAD1 R5202!PROCESS RAD MONITORRAD LEVEL OF RCS LETDOWN LINEACPMN/A1E11 E6N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TOMONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING APOTENTIAL FUEL ELEMENT FAILURE.
5/4/2015 CC1 CCll RCS LTDN RAD 1 R5202!
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 29Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PROCESS RAD MONITOR RAD LEVEL OF RCS LETDOWN LINE A
CPM N/A 1E1 1 E6 N/A N/A S
1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TO MONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING A POTENTIAL FUEL ELEMENT FAILURE.
 
PWR Data Point Library Reference File Report Date :
06-24-2015 Page :
29 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 398: Line 1,264:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCll1MAIN SL I/A1 R5421 !MAIN STM RAD LP 11STM GEN 11 STEAM LINE RAD LEVELAuCi/ccN/AI1E-2I1E5N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FORNOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARELOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIVROOM.
5/4/2015 CC1 CCll1 MAIN SL I/A 1 R5421 !
PWR Data Point Library Reference FileReport Date :Page :06-24-201530Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
MAIN STM RAD LP 11 STM GEN 11 STEAM LINE RAD LEVEL A
uCi/cc N/A I1E-2 I1E5 N/A N/A S
1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 30 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 411: Line 1,302:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllMAIN SL 2/B1 R5422!MAIN STM RAD LP 12STM GEN 12 STEAM LINE RAD LEVELAuCi/ccN/A1 E-21 E5N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FORNOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARELOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIVROOM.
5/4/2015 CC1 CCll MAIN SL 2/B 1 R5422!
PWR Data Point Library Reference FileReport Date :Page :06-24-201531Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
MAIN STM RAD LP 12 STM GEN 12 STEAM LINE RAD LEVEL A
uCi/cc N/A 1 E-2 1 E5 N/A N/A S
1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 31 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 424: Line 1,340:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllSG BD RAD IAiR4014!STM GEN BLOWDOWN ACTIVITYSTM GEN 11 BLOWDOWN RAD LEVELACPMN/A1 El1 E6N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AX >= 5E4N/AN/AN/AN/AN/ATHIS DETECTOR MONITORS A SMALL PORTION OF THE STM GENBLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OFSTM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARMAUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTT-IOMBLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAMGENERATORS THIS MONITOR IS IN THE LINE OF THE BLOWDOWN TANKAND IS COMMON TO BOTH STM GEN.
5/4/2015 CC1 CCll SG BD RAD IA iR4014!
PWR Data Point Library Reference FileReport Date :Page :06-24-201532Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
STM GEN BLOWDOWN ACTIVITY STM GEN 11 BLOWDOWN RAD LEVEL A
CPM N/A 1 El 1 E6 N/A N/A S
1 INVERSE LOG OF INSTRUMENT VALUE N/A X >= 5E4 N/A N/A N/A N/A N/A THIS DETECTOR MONITORS A SMALL PORTION OF THE STM GEN BLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OF STM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARM AUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTT-IOM BLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAM GENERATORS THIS MONITOR IS IN THE LINE OF THE BLOWDOWN TANK AND IS COMMON TO BOTH STM GEN.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 32 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 437: Line 1,378:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/412015CC1CC11CTMNT PRESS1 SP41 10CNTMT PRESSURECONTAINMENT PRESSUREAPSIGN/A-5150N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX >= 2.8N/AN/AN/AN/AN/ATHERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWOPROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS ANARROW RANGE INDICATION -5 TO +5 PSIG WHICH PROVIDESCONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @2.8 PSIG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSIG.
5/412015 CC1 CC11 CTMNT PRESS 1 SP41 10 CNTMT PRESSURE CONTAINMENT PRESSURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201533Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
PSIG N/A
-5 150 N/A N/A P
3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
N/A X >= 2.8 N/A N/A N/A N/A N/A THERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWO PROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150 PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS A NARROW RANGE INDICATION -5 TO +5 PSIG WHICH PROVIDES CONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @
2.8 PSIG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSIG.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 33 Date:
Reactor Unit:
Data Feeder:
NRC EROS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 450: Line 1,418:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for OP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllCTMNT TEMP1SP4I111CNTMT TEMPERATURECONTAINMENT TEMPERATUREADEGFN/A50300N/AN/AP2AVG OF TWO CHANNELSN/AX >= 220N/AN/AN/AN/AN/ATHERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOMETEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OFTHESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.
5/4/2015 CC1 CCll CTMNT TEMP 1SP4I111 CNTMT TEMPERATURE CONTAINMENT TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201534Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 50 300 N/A N/A P
2 AVG OF TWO CHANNELS N/A X >= 220 N/A N/A N/A N/A N/A THERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOME TEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OF THESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 34 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 463: Line 1,455:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCll1BWST LEVEL1 SP2RWLVLREFUELJNG WATER TANK LEVELBORATED WATER STORAGE TANK LEVELAFEETN/A040TNKBOTRE:USD (REFERENCE UNIQ SYS DESC)P2WR SENSOR WHEN OUTSIDE NR SENSOR BANDN/AN/AN/AN/AN/AN/AWETTHE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATEDWATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATERFOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THERECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANKVOLUME.
5/4/2015 CC1 CCll1 BWST LEVEL 1 SP2RWLVL REFUELJNG WATER TANK LEVEL BORATED WATER STORAGE TANK LEVEL A
PWR Data Point Library Reference FileReport Date :Page :06-24-201535Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
FEET N/A 0
40 TNKBOT RE:USD (REFERENCE UNIQ SYS DESC)
P 2
WR SENSOR WHEN OUTSIDE NR SENSOR BAND N/A N/A N/A N/A N/A N/A WET THE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATED WATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATER FOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5 FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THE RECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANK VOLUME.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 35 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 476: Line 1,494:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllWIND SPEED1 WS60#15SMWiND SPEED 60 METER 15 MINUTE AVGWIND SPEED AT REACTOR SITEAM/SN/A050N/AN/AS1N/AN/AX >= 22N/AN/ALOWN/AN/AWIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTERIS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201536Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
5/4/2015 CC1 CCll WIND SPEED 1 WS60#15SM WiND SPEED 60 METER 15 MINUTE AVG WIND SPEED AT REACTOR SITE A
M/S N/A 0
50 N/A N/A S
1 N/A N/A X >= 22 N/A N/A LOW N/A N/A WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 36 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 488: Line 1,532:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllWIND DIR1WD60#15SMWIND DIRECTION 60 METER 15 MINUTE AVGWIND DIRECTION AT REACTOR SITEADEGN/A0360N/AN/AS1N/AN/AN/AN/AN/A0 DEGREES (NORTH)N/AN/AWIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THEPRIMARY MET TOWER ON SITE. 60 METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201537Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Paint
5/4/2015 CC1 CCll WIND DIR 1WD60#15SM WIND DIRECTION 60 METER 15 MINUTE AVG WIND DIRECTION AT REACTOR SITE A
DEG N/A 0
360 N/A N/A S
1 N/A N/A N/A N/A N/A 0 DEGREES (NORTH)
N/A N/A WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 60 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 37 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Paint


== Description:==
== Description:==
Line 500: Line 1,571:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CCICCIlWIND SPEED1WS10#15MWIND SPEED 10 METER 15 MINUTE AVGWIND SPEED AT REACTOR SITEAM/SN/A050N/AN/AS1N/AN/AX >= 22N/AN/ALOWN/AN/AWIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTERIS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201538Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
5/4/2015 CCI CCIl WIND SPEED 1WS10#15M WIND SPEED 10 METER 15 MINUTE AVG WIND SPEED AT REACTOR SITE A
M/S N/A 0
50 N/A N/A S
1 N/A N/A X >= 22 N/A N/A LOW N/A N/A WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 38 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 512: Line 1,609:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CClCCllWIND DIR1WD10#15MWIND DIRECTION 10 METER 15 MINUTE AVGWIND DIRECTION AT REACTOR SITEADEGN/A0360N/AN/AS1N/AN/AN/AN/AN/A0 DEGREES (NORTH)N/AN/AWIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THEPRIMARY MET TOWER ON SITE. 10 METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-20 1539Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
5/4/2015 CCl CCll WIND DIR 1WD10#15M WIND DIRECTION 10 METER 15 MINUTE AVG WIND DIRECTION AT REACTOR SITE A
DEG N/A 0
360 N/A N/A S
1 N/A N/A N/A N/A N/A 0 DEGREES (NORTH)
N/A N/A WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 10 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-20 15 39 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 524: Line 1,648:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Paint NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Paint Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllATMOSPHERIC STABILITY1MMS_DTASTBWIND STABILITY BASED ON DELTA TEMP (A)AIR STABILITY AT REACTOR SITEAN/AN/A0 (A)6 (G)N/AN/AP1COMPLEXN/AN/AN/AN/AN/AN/AN/AATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATUREMINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THEPLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITYCLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A,I=B, 2=C, 3=D, 4=E, 5=F, 6=G PWR Data Point Library Reference FileReport Date :Page :06-24-201540Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
5/4/2015 CC1 CCll ATMOSPHERIC STABILITY 1MMS_DTASTB WIND STABILITY BASED ON DELTA TEMP (A)
AIR STABILITY AT REACTOR SITE A
N/A N/A 0 (A) 6 (G)
N/A N/A P
1 COMPLEX N/A N/A N/A N/A N/A N/A N/A ATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATURE MINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, I=B, 2=C, 3=D, 4=E, 5=F, 6=G
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 40 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 536: Line 1,687:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC1CCllATMOSPHERIC STABILITYI MMSS6OSTB60 METER WIND STABILITY -SIGMA-THETAAIR STABILITY AT REACTOR SITEAN/AN/A0 (A)6 (G)N/AN/AP1COMPLEXN/AN/AN/AN/AN/AN/AN/AATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ONTHE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITYCLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A,1=B, 2=C, 3=D, 4=E, 5=F, 6=G PWR Data Point Library Reference FileReport Date :Page :06-24-20151Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
5/4/2015 CC1 CCll ATMOSPHERIC STABILITY I MMSS6OSTB 60 METER WIND STABILITY - SIGMA-THETA AIR STABILITY AT REACTOR SITE A
N/A N/A 0 (A) 6 (G)
N/A N/A P
1 COMPLEX N/A N/A N/A N/A N/A N/A N/A ATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, 1=B, 2=C, 3=D, 4=E, 5=F, 6=G
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 1
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 548: Line 1,726:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015002CC21NI POWER RNG2SP1 109WIDE RANGE POWERNUCLEAR INSTRUMENTS, POWER RANGEAN/A1 E-82O00N/AN/AP4AVG OF THE TWO CLOSEST CHANNEL VALUESN/AN/AN/AN/AN/AN/AN/AWIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OFREACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATEREACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTSBETWEEN THE RANGE OF 1E-4% TO 15% POWER. THESE DETECTORSARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURINGNORMAL POWER OPERATIONS.
5/4/2015 002 CC21 NI POWER RNG 2SP1 109 WIDE RANGE POWER NUCLEAR INSTRUMENTS, POWER RANGE A
PWR Data Point Library Reference FileReport Date :Page :06-24-20152Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
N/A 1 E-8 2O00 N/A N/A P
4 AVG OF THE TWO CLOSEST CHANNEL VALUES N/A N/A N/A N/A N/A N/A N/A WIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OF REACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATE REACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTS BETWEEN THE RANGE OF 1E-4% TO 15% POWER. THESE DETECTORS ARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURING NORMAL POWER OPERATIONS.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 2
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 561: Line 1,764:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021REC VES LEV2SP2112REACTOR VESSEL LEVELREACTOR VESSEL WATER LEVELAINCHESN/AN/AN/AFAPN/AP16RE:USD (REFERENCE UNIQUE SYS DESC)160,151,112,71,50,29,19, & 10" ABOVE FAPVOID DETECTEDN/AN/AN/AN/AN/A8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACEDSTRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THEVICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVEREDTHE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED ININCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUELALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50"FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOWPROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDEAN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.
5/4/2015 002 0021 REC VES LEV 2SP2112 REACTOR VESSEL LEVEL REACTOR VESSEL WATER LEVEL A
PWR Data Point Library Reference FileReport Date:*Page :06-24-20153Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
INCHES N/A N/A N/A FAP N/A P
16 RE:USD (REFERENCE UNIQUE SYS DESC) 160,151,112,71,50,29,19, & 10" ABOVE FAP VOID DETECTED N/A N/A N/A N/A N/A 8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACED STRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THE VICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVERED THE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED IN INCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUEL ALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50" FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOW PROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDE AN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.
 
PWR Data Point Library Reference File Report Date:*
Page :
06-24-2015 3
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Paint ID:
Plant Specific Point


== Description:==
== Description:==
Line 574: Line 1,802:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21TEMP CORE EX2SP2113CORE EXIT TEMPHIGHEST TEMP AT THE CORE EXITADEG FN/A402300N/AN/AP35AVG EACH QUADRANT'S PTS:SHOW HIGH AVGN/AX >= 650N/AN/AN/AN/AN/ACORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THEINCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTEDFUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTSAND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHESTQUADRANT AVG.
5/4/2015 CC2 CC21 TEMP CORE EX 2SP2113 CORE EXIT TEMP HIGHEST TEMP AT THE CORE EXIT A
PWR Data Point Library Reference FileReport Date :Page :06-24-20154Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEG F N/A 40 2300 N/A N/A P
35 AVG EACH QUADRANT'S PTS:SHOW HIGH AVG N/A X >= 650 N/A N/A N/A N/A N/A CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 4
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 587: Line 1,840:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC20021SUB MARGIN2SP3123CORE SUBCOOLED MARGINSATURATION TEMPERATURE-HIGH CETADEGFN/AN/AN/AN/AN/AP37RE: USD (REFERENCE UNIQUE SYS DESC)N/AN/AN/AN/AN/AN/AN/ACORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATIONTEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE(SP3120) MINUS THE CORE EXIT TEMP (SP2113).
5/4/2015 CC2 0021 SUB MARGIN 2SP3123 CORE SUBCOOLED MARGIN SATURATION TEMPERATURE-HIGH CET A
PWR Data Point Library Reference FileReport Date :Page :06-24-20155Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A N/A N/A N/A N/A P
37 RE: USD (REFERENCE UNIQUE SYS DESC)
N/A N/A N/A N/A N/A N/A N/A CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SP2113).
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 5
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 600: Line 1,879:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015002CC21CORE FLOW2F131ARCS TOTAL FLOW OH ATOTAL REACTOR COOLANT FLOWA100% RX COOLANT FLOW = 370,000 GPM-54.35153.68N/AN/AP2N/AN/AN/AN/AN/AN/AN/AN/AREACTOR COOLANT FLOW IS DETERMINED BY THE 0/P ACROSS THESTEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOPFLOWS.
5/4/2015 002 CC21 CORE FLOW 2F131A RCS TOTAL FLOW OH A TOTAL REACTOR COOLANT FLOW A
PWR Data Point Library Reference FileReport Date :Page :06-24-20156Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
100% RX COOLANT FLOW = 370,000 GPM
-54.35 153.68 N/A N/A P
2 N/A N/A N/A N/A N/A N/A N/A N/A REACTOR COOLANT FLOW IS DETERMINED BY THE 0/P ACROSS THE STEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOP FLOWS.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 6
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 613: Line 1,918:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21SG LEVEL 1/A2SP3I17ASG LEVEL LOOP 21STEAM GENERATOR 21 WATER LEVELAINCHESN/A-401.063.5N/A0" = 40' ABOVE THE FEED RINGP2AVG OF TWO CHANNELSN/AX>=50 X<=-170N/AN/AN/AN/AWETA LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROWRANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ONTHE WIDE RANGE S/G LVL DETECTOR. POINT ID SP3117A IS A WIDERANGE LVL INDICATOR.
5/4/2015 CC2 CC21 SG LEVEL 1/A 2SP3I17A SG LEVEL LOOP 21 STEAM GENERATOR 21 WATER LEVEL A
PWR Data Point Library Reference FileReport Date :Page :06-24-20157Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
INCHES N/A
-401.0 63.5 N/A 0" = 40' ABOVE THE FEED RING P
2 AVG OF TWO CHANNELS N/A X>=50 X<=-170 N/A N/A N/A N/A WET A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE S/G LVL DETECTOR. POINT ID SP3117A IS A WIDE RANGE LVL INDICATOR.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 7
Date:
Reactor Unit:
Data Feeder:
NRC EROS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 626: Line 1,957:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21SG LEVEL 2/B2SP3117BSG LEVEL LOOP 22STEAM GENERATOR 22 WATER LEVELAINCHESN/A-401.063.5N/A0" = 40' ABOVE THE FEED RINGP2AVG OF TWO CHANNELSN/AX>=50 X<z=-170N/AN/AN/AN/AWETA LOW LEVEL REACTOR TRIP OCCURS AT -50' AS READ ON THE NARROWRANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ONTHE WIDE RANGE S/G LVL DETECTOR. POINT ID 5P3117B IS A WIDERANGE LVL INDICATOR.
5/4/2015 CC2 CC21 SG LEVEL 2/B 2SP3117B SG LEVEL LOOP 22 STEAM GENERATOR 22 WATER LEVEL A
PWR Data Point Library Reference FileReport Date :Page :06-24-20158Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
INCHES N/A
-401.0 63.5 N/A 0" = 40' ABOVE THE FEED RING P
2 AVG OF TWO CHANNELS N/A X>=50 X<z=-170 N/A N/A N/A N/A WET A LOW LEVEL REACTOR TRIP OCCURS AT -50' AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE S/G LVL DETECTOR. POINT ID 5P3117B IS A WIDE RANGE LVL INDICATOR.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 8
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 639: Line 1,996:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:Ni Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Tem perature Comnpensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
Ni Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Tem perature Comnpensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21SG PRESS 1/A2SP3116ASG PRESSURE LOOP 21STEAM GENERATOR 21 PRESSUREAPSIAN/A01200N/AN/AP2AVG OF TWO CHANNELSN/AX>=950 X<=703N/AN/AN/AN/AN/AREACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEATEXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE ORCOMP FAILURE.
5/4/2015 CC2 CC21 SG PRESS 1/A 2SP3116A SG PRESSURE LOOP 21 STEAM GENERATOR 21 PRESSURE A
PWR Data Point Library Reference FimeReport Date :Page :06-24-20159Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PSIA N/A 0
1200 N/A N/A P
2 AVG OF TWO CHANNELS N/A X>=950 X<=703 N/A N/A N/A N/A N/A REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OR COMP FAILURE.
 
PWR Data Point Library Reference Fime Report Date :
Page :
06-24-2015 9
Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 652: Line 2,035:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015C020021SG PRESS 2/B2SP3116BSG PRESSURE LOOP 22STEAM GENERATOR 22 PRESSUREAPSIAN/A01200N/AN/AP2AVG OF TWO CHANNELSN/AX>=950 X<=703N/AN/AN/AN/AN/AREACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEATEXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OFCOMP FAILURE.
5/4/2015 C02 0021 SG PRESS 2/B 2SP3116B SG PRESSURE LOOP 22 STEAM GENERATOR 22 PRESSURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201510Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PSIA N/A 0
1200 N/A N/A P
2 AVG OF TWO CHANNELS N/A X>=950 X<=703 N/A N/A N/A N/A N/A REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OF COMP FAILURE.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 10 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 665: Line 2,073:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC20021MN ED FL 1/A2F1111%FW FLOW TO STEAM GEN. 21STM GEN 21 MAIN FEEDWATER FLOWAKLB/HRN/AN/AN/AN/AN/AP8COMPLEXN/AN/AN/AN/AN/AYN/ATHIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVENMAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATEREXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEEDREG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONEDTO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARERUNNING.
5/4/2015 CC2 0021 MN ED FL 1/A 2F1111%
PWR Data Point Library Reference FileReport Date :Page :06-24-201511Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
FW FLOW TO STEAM GEN. 21 STM GEN 21 MAIN FEEDWATER FLOW A
KLB/HR N/A N/A N/A N/A N/A P
8 COMPLEX N/A N/A N/A N/A N/A Y
N/A THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 11 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 678: Line 2,112:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
instrument Failure Mode:
Temperature Compensation for OP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021MN FD FL 2/B2F1121%FW FLOW TO STEAM GEN. 22STM GEN 22 MAIN FEEDWATER FLOWAKLB/HRN/AN/AN/AN/AN/AP8COMPLEXN/AN/AN/AN/AN/AYN/ATHIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVENMAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATEREXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEEDREG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONEDTO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARERUNNING.
5/4/2015 002 0021 MN FD FL 2/B 2F1121%
PWR Data Point Library Reference FileReport Date :Page :06-24-201512Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
FW FLOW TO STEAM GEN. 22 STM GEN 22 MAIN FEEDWATER FLOW A
KLB/HR N/A N/A N/A N/A N/A P
8 COMPLEX N/A N/A N/A N/A N/A Y
N/A THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 12 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 691: Line 2,151:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021AX FD FL 1/A2SP311 8AAUX FEED FLOW LOOP 21STM GEN 21 AUXILIARY FW FLOWAGPMN/A01250N/AN/AP2SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCHN/AN/AN/AN/AN/ANN/ATHERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRICDRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMONHEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMPDISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOREACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP ISNORMALLY ALIGNED TO START.
5/4/2015 002 0021 AX FD FL 1/A 2SP311 8A AUX FEED FLOW LOOP 21 STM GEN 21 AUXILIARY FW FLOW A
PWR Data Point Library Reference FileReport Date :Page :06-24-201513Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
1250 N/A N/A P
2 SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH N/A N/A N/A N/A N/A N
N/A THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.
BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM
#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 13 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 704: Line 2,192:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21AX FD FL 2/B2SP3118BAUX FEED FLOW LOOP 22STM GEN 22 AUXILIARY FW FLOWAGPMN/A01250N/AN/AP2SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCHN/AN/AN/AN/AN/ANN/ATHERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRICDRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMONHEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMPDISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOREACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP ISNORMALLY ALIGNED TO START.
5/4/2015 CC2 CC21 AX FD FL 2/B 2SP3118B AUX FEED FLOW LOOP 22 STM GEN 22 AUXILIARY FW FLOW A
PWR Data Point Library Reference FileReport Date :Page :06-24-201514Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
1250 N/A N/A P
2 SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH N/A N/A N/A N/A N/A N
N/A THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.
BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM
#12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 14 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 717: Line 2,233:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum instrument Range:
Maximum instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm /Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21HL TEMP 1/A2SP0106ATHOT LOOP 21STM GEN 21 INLET TEMPERATUREA0DEG FN/A50700N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THESTEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGINMONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUITFOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTIONSYSTEM.
5/4/2015 CC2 CC21 HL TEMP 1/A 2SP0106A THOT LOOP 21 STM GEN 21 INLET TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201515Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
0DEG F N/A 50 700 N/A N/A P
2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 15 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 730: Line 2,270:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015002CC21HL TEMP 2/B2SP0106BTHOT LOOP 22STM GEN 22 INLET TEMPERATUREADEGFN/A50700N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THESTEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGINMONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUITFOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTIONSYSTEM.
5/4/2015 002 CC21 HL TEMP 2/B 2SP0106B THOT LOOP 22 STM GEN 22 INLET TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201516Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 50 700 N/A N/A P
2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 16 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 743: Line 2,307:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC20021CL TEMP 1/A2SP3113ATCOLD LOOP 21STM GEN 21 OUTLET TEMPERATUREADEGFN/A50700N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX>=560 X<=525N/AN/AN/AN/AN/ATHE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SETPOINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANELINDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLEDMARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTORPROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TOBE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
5/4/2015 CC2 0021 CL TEMP 1/A 2SP3113A TCOLD LOOP 21 STM GEN 21 OUTLET TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201517Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 50 700 N/A N/A P
3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
N/A X>=560 X<=525 N/A N/A N/A N/A N/A THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)
CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 17 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 756: Line 2,346:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021CL TEMP 2/B2SP311 3BTCOLD LOOP 22STM GEN 22 OUTLET TEMPERATUREADEGFN/A50700N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX>=560 X<=525N/AN/AN/AN/AN/ATHE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SETPOINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANELINDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLEDMARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTORPROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TOBE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
5/4/2015 002 0021 CL TEMP 2/B 2SP311 3B TCOLD LOOP 22 STM GEN 22 OUTLET TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201518Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
DEGF N/A 50 700 N/A N/A P
3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
N/A X>=560 X<=525 N/A N/A N/A N/A N/A THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)
CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 18 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 769: Line 2,385:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015002CC21RCS PRESSURE2SP3120PRESSURIZER PRESSUREREACTOR COOLANT SYSTEM PRESSUREAPSIAN/A04000N/AN/AP2AVG OF TWO CHANNELSN/AX >= 2400 X.<= 1740N/AN/AN/AN/AN/AREACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGEPRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SETTO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION ISINITIATED AT 1740#.
5/4/2015 002 CC21 RCS PRESSURE 2SP3120 PRESSURIZER PRESSURE REACTOR COOLANT SYSTEM PRESSURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201519Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PSIA N/A 0
4000 N/A N/A P
2 AVG OF TWO CHANNELS N/A X >= 2400 X.<= 1740 N/A N/A N/A N/A N/A REACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGE PRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SET TO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.
PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.
SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.
BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION IS INITIATED AT 1740#.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 19 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 782: Line 2,426:


== Description:==
== Description:==
Analog / Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015002CC21PRZR LEVEL2SP2109PRESSURIZER LEVELPRIMARY SYSTEM PRESSURIZER LEVELAINCHESN/A0360RE: USDN/AP2AVG OF TWO CHANNELSN/AX>=305 X<=50N/AN/AN/AN/AWETPRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN160" TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZERHEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.PRESSURIZER HEATERS WILL START TO BE UNCOVERED AT APPROX 84'OF INDICATED LEVEL. ZERO REFERENCE POINT: BOTTOM OFPRESSURIZER.
5/4/2015 002 CC21 PRZR LEVEL 2SP2109 PRESSURIZER LEVEL PRIMARY SYSTEM PRESSURIZER LEVEL A
PWR Data Point Library Reference FileReport Date :Page :06-24-201520Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
INCHES N/A 0
360 RE: USD N/A P
2 AVG OF TWO CHANNELS N/A X>=305 X<=50 N/A N/A N/A N/A WET PRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN 160" TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZER HEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.
PRESSURIZER HEATERS WILL START TO BE UNCOVERED AT APPROX 84' OF INDICATED LEVEL. ZERO REFERENCE POINT: BOTTOM OF PRESSURIZER.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 20 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 795: Line 2,465:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21RCS CHG/MU2SPl114CHG PUMP FLOWPRIMARY SYSTEM CHARGING/MAKEUP FAGPMN/A0150N/AN/AS1RE:USD (REFERENCE UNIQ SYS DESC)N/AN/AN/AN/AN/ANN/ATHERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPMEACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #23CAN BE POWERED FROM ONE OF TWO BUSSES #21 OR #24. WHICH MUSTBE MANUALLY SELECTED BY A 'KIRK" KEY INTERLOCK SCHEME.
5/4/2015 CC2 CC21 RCS CHG/MU 2SPl114 CHG PUMP FLOW PRIMARY SYSTEM CHARGING/MAKEUP F A
PWR Data Point Library Reference FileReport Date :Page :06-24-201521Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
150 N/A N/A S
1 RE:USD (REFERENCE UNIQ SYS DESC)
N/A N/A N/A N/A N/A N
N/A THERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPM EACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #23 CAN BE POWERED FROM ONE OF TWO BUSSES #21 OR #24. WHICH MUST BE MANUALLY SELECTED BY A 'KIRK" KEY INTERLOCK SCHEME.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 21 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 808: Line 2,505:


== Description:==
== Description:==
Analog / Digital:ENGR Units /Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units /Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021HP SI FLOW2SP2115HPSI FLOWHIGH PRESSURE SAFETY INJECTION FAGPMN/A01600N/AN/AP4SUM OF FLOW LOOPS 21A, 21B, 22A, 22BN/AN/AN/AN/AN/ANN/A3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCYCOOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275PSIA. ONLY TWO PUMPS WILL START. 22 HPSI IS MAINTAINED IN PULL TOLOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THEREFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTERTHE RWT IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TOPROVIDE SUCTION FROM THE CONTAINMENT SUMP.
5/4/2015 002 0021 HP SI FLOW 2SP2115 HPSI FLOW HIGH PRESSURE SAFETY INJECTION F A
PWR Data Point Library Reference FileReport Date :Page :06-24-201522Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
GPM N/A 0
1600 N/A N/A P
4 SUM OF FLOW LOOPS 21A, 21B, 22A, 22B N/A N/A N/A N/A N/A N
N/A 3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCY COOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275 PSIA. ONLY TWO PUMPS WILL START. 22 HPSI IS MAINTAINED IN PULL TO LOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THE REFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTER THE RWT IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TO PROVIDE SUCTION FROM THE CONTAINMENT SUMP.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 22 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 821: Line 2,544:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC20021LP SI FLOW2SP2116LPSI FLOWLOW PRESSURE SAFETY INJECTION FLAGPMN/A08000N/AN/AS1INSTRUMENT VALUEN/AN/AN/AN/AN/AN/A2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGHVOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES ASUCTION OFF A SEPARATE HEADER FROM THE RWT. DURINGRECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPSARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THECONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.
5/4/2015 CC2 0021 LP SI FLOW 2SP2116 LPSI FLOW LOW PRESSURE SAFETY INJECTION FL A
PWR Data Point Library Reference FileReport Date :Page :06-24-201523Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Paint
GPM N/A 0
8000 N/A N/A S
1 INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A 2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGH VOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES A SUCTION OFF A SEPARATE HEADER FROM THE RWT. DURING RECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPS ARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THE CONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 23 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Paint


== Description:==
== Description:==
Line 834: Line 2,582:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor VP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for VP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21CTMNT SMP WR2SP4112CNTMT LEVELCONTAINMENT SUMP WIDE RNG LEVELAINCHESN/A0120N/AN/AP2AVG OF TWO CHANNELSN/AN/AN/AN/AN/AN/AN/ATHE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TOBOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THERECIRCULATION MODE. TWO 24" DIAMETER RECIRC LINES SUPPLYWATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRISFROM ENTERING THE SUMP.
5/4/2015 CC2 CC21 CTMNT SMP WR 2SP4112 CNTMT LEVEL CONTAINMENT SUMP WIDE RNG LEVEL A
Data Point Library Reference FileReport Date :Page :06-24-201524Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
INCHES N/A 0
120 N/A N/A P
2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TO BOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THE RECIRCULATION MODE. TWO 24" DIAMETER RECIRC LINES SUPPLY WATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.
THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRIS FROM ENTERING THE SUMP.
 
PWR* Data Point Library Reference File Report Date :
Page :
06-24-2015 24 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 847: Line 2,621:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21EFF GAS RAD2R54151WR EFF MONITORRADIOACTIVITY OF RELEASED GASSESAUCI/SECN/A1E11E13N/AN/ASINVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACKEFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH AREUSED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THERANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) ISSELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUSFLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVEEFFLUENT GROSS ACTIVITY.
5/4/2015 CC2 CC21 EFF GAS RAD 2R54151 WR EFF MONITOR RADIOACTIVITY OF RELEASED GASSES A
PWR Data Point Library Reference FileReport Date :Page :06-24-201525Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
UCI/SEC N/A 1E1 1E13 N/A N/A S
INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACK EFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH ARE USED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THE RANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) IS SELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUS FLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVE EFFLUENT GROSS ACTIVITY.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 25 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 860: Line 2,658:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum instrument Range:Maximum instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum instrument Range:
Maximum instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:N umber of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
N umber of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021EFF LIQ RAD2SP6120LIQUID WASTE RADRADIOACTIVITY OF RELEASED LIQUIDACPMN/A1E11E6N/AN/AP3INVERSE LOG OF INSTRUMENT VALUEN/AX >= 4.21 E5N/AN/AN/AN/AN/ALIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGEHEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISCWASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2DISCHARGE VALVES 0-CV-2201 & 0-CV-2202 TO ISOLATE FLOW TO THECIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN INALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.
5/4/2015 002 0021 EFF LIQ RAD 2SP6120 LIQUID WASTE RAD RADIOACTIVITY OF RELEASED LIQUID A
PWR Data Point Library Reference FileReport Date :Page :06-24-201526Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Paint
CPM N/A 1E1 1E6 N/A N/A P
3 INVERSE LOG OF INSTRUMENT VALUE N/A X >= 4.21 E5 N/A N/A N/A N/A N/A LIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGE HEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISC WASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2 DISCHARGE VALVES 0-CV-2201 & 0-CV-2202 TO ISOLATE FLOW TO THE CIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN IN ALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 26 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Paint


== Description:==
== Description:==
Line 873: Line 2,695:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020C21COND A/E RAD2SP6117OFF GAS RADCONDENSER AIR EJECTOR RADIOACTIVAGPDN/A0250N/AN/AP4REFERENCE UNIQUE SYSTEM DESCRIPTIONN/AX >= 5N/AN/AN/AN/AN/ATHE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOURRADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDEOF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUTSIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEEREDHIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPO)AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARYLEAK THROUGH THE S/G TUBES.
5/4/2015 002 0C21 COND A/E RAD 2SP6117 OFF GAS RAD CONDENSER AIR EJECTOR RADIOACTIV A
PWR Data Point Library Reference FileReport Date :Page :06-24-201527Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
GPD N/A 0
250 N/A N/A P
4 REFERENCE UNIQUE SYSTEM DESCRIPTION N/A X >= 5 N/A N/A N/A N/A N/A THE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOUR RADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDE OF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUT SIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEERED HIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPO)
AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARY LEAK THROUGH THE S/G TUBES.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 27 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Paint ID:
Plant Specific Point


== Description:==
== Description:==
Line 886: Line 2,734:


== Description:==
== Description:==
Analog I Digital:ENGR Units /Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units /Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21CNTMNT RAD2SP6121CNTMT RADRADIATION LEVEL IN CONTAINMENTAR/H RN/A1E8N/AN/AP2AVG OF TWO CHANNELSN/AX >=6N/AN/AN/AN/AN/ATHESE CONTAINMENT RADIATION MONITORS MEASURE GAMMARADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND AREPLACED NEAR THE PRESSURIZER AND #21 STEAM GEN.
5/4/2015 CC2 CC21 CNTMNT RAD 2SP6121 CNTMT RAD RADIATION LEVEL IN CONTAINMENT A
PWR Data Point Library Reference FileReport Date :Page :06-24-20 1528Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
R/H R N/A 1E8 N/A N/A P
2 AVG OF TWO CHANNELS N/A X >=6 N/A N/A N/A N/A N/A THESE CONTAINMENT RADIATION MONITORS MEASURE GAMMA RADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.
THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND ARE PLACED NEAR THE PRESSURIZER AND #21 STEAM GEN.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-20 15 28 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 899: Line 2,772:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm /Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021RCS LTDN RAD2R5202!PROCESS RAD MONITORRAD LEVEL OF RCS LETDOWN LINEAKCPMN/A1 E-21E3N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TOMONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING APOTENTIAL FUEL ELEMENT FAILURE.
5/4/2015 002 0021 RCS LTDN RAD 2R5202!
PWR Data Point Library Reference FileReport Date :Page :06-24-201529Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PROCESS RAD MONITOR RAD LEVEL OF RCS LETDOWN LINE A
KCPM N/A 1 E-2 1E3 N/A N/A S
1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TO MONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING A POTENTIAL FUEL ELEMENT FAILURE.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 29 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 912: Line 2,810:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021MAIN SL 1/A2R5421 !MAIN STM RAD LP 21STM GEN 21 STEAM LINE RAD LEVELAuCi/ccN/A1 E-21 E5N/AN/AS1INVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FORNOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARELOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIVROOM.
5/4/2015 002 0021 MAIN SL 1/A 2R5421 !
PWR Data Point Library Reference FileReport Date :Page :06-24-201530Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
MAIN STM RAD LP 21 STM GEN 21 STEAM LINE RAD LEVEL A
uCi/cc N/A 1 E-2 1 E5 N/A N/A S
1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 30 Date:
Reactor Unit:
Data Feeder:
NRC EROS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 925: Line 2,848:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for OP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015002CC21MAIN SL 2/B2R5422!MAIN STM RAD LP 22STM GEN 22 STEAM LINE RAD LEVELAuCi/ccN/A1 E-21 E5N/AN/ASINVERSE LOG OF INSTRUMENT VALUEN/AN/AN/AN/AN/AN/AN/ATHE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FORNOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARELOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIVROOM.
5/4/2015 002 CC21 MAIN SL 2/B 2R5422!
PWR Data Point Library Reference FileReport Date : 06-24-2015Page : 31Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
MAIN STM RAD LP 22 STM GEN 22 STEAM LINE RAD LEVEL A
uCi/cc N/A 1 E-2 1 E5 N/A N/A S
INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.
 
PWR Data Point Library Reference File Report Date :
06-24-2015 Page :
31 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 938: Line 2,886:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC20021SG BD RAD 1A2R401 4!STM GEN BLOWDOWN ACTIVITYSTM GEN 21 BLOWDOWN RAD LEVELACPMN/A1E11E6N/AN/ASINVERSE LOG OF INSTRUMENT VALUEN/AX >= 5E4N/AN/AN/AN/AN/ATHIS DETECTOR MONITORS A SMALL PORTION OF THE STM GENBLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OFSTM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARMAUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTTIOMBLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAMGENERATORS THIS MONITOR IS IN THE LINE OF THE BLOWDOWN TANKAND IS COMMON TO BOTH STM GEN.
5/4/2015 CC2 0021 SG BD RAD 1A 2R401 4!
PWR Data Point Library Reference FileReport Date :Page :06-24-201532Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
STM GEN BLOWDOWN ACTIVITY STM GEN 21 BLOWDOWN RAD LEVEL A
CPM N/A 1E1 1E6 N/A N/A S
INVERSE LOG OF INSTRUMENT VALUE N/A X >= 5E4 N/A N/A N/A N/A N/A THIS DETECTOR MONITORS A SMALL PORTION OF THE STM GEN BLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OF STM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARM AUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTTIOM BLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAM GENERATORS THIS MONITOR IS IN THE LINE OF THE BLOWDOWN TANK AND IS COMMON TO BOTH STM GEN.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 32 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Paint ID:
Plant Specific Point


== Description:==
== Description:==
Line 951: Line 2,924:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21CTMNT PRESS2SP411 0CNTMT PRESSURECONTAINMENT PRESSUREAPSIGN/A-5150N/AN/AP3AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)N/AX >= 2.8N/AN/AN/AN/AN/ATHERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWOPROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS ANARROW RANGE IND1CATION -5 TO +5 PSIG WHICH PROVIDESCONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @2.8 PSlG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSlG.
5/4/2015 CC2 CC21 CTMNT PRESS 2SP411 0 CNTMT PRESSURE CONTAINMENT PRESSURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201533Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
PSIG N/A
-5 150 N/A N/A P
3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)
N/A X >= 2.8 N/A N/A N/A N/A N/A THERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWO PROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150 PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS A NARROW RANGE IND1CATION -5 TO +5 PSIG WHICH PROVIDES CONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @
2.8 PSlG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSlG.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 33 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 964: Line 2,964:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21CTMNT TEMP2SP4tl 1CNTMT TEMPERATURECONTAINMENT TEMPERATUREAD EGFN/A50300N/AN/AP2AVG OF TWO CHANNELSN/AX >= 220N/AN/AN/AN/AN/ATHERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOMETEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OFTHESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.
5/4/2015 CC2 CC21 CTMNT TEMP 2SP4tl 1 CNTMT TEMPERATURE CONTAINMENT TEMPERATURE A
PWR Data Point Library Reference FileReport Date :Page :06-24-201534Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
D EGF N/A 50 300 N/A N/A P
2 AVG OF TWO CHANNELS N/A X >= 220 N/A N/A N/A N/A N/A THERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOME TEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OF THESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 34 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 977: Line 3,001:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm / Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm / Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021BWST LEVEL2SP2RWLVLREFUELING WATER TANK LEVELBORATED WATER STORAGE TANK LEVELAFEETN/A040TNKBOTRE:USD (REFERENCE UNIQ SYS DESC)P2WR SENSOR WHEN OUTSIDE NR SENSOR BANDN/AN/AN/AN/AN/AN/AWETTHE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATEDWATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATERFOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THERECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANKVOLUME.
5/4/2015 002 0021 BWST LEVEL 2SP2RWLVL REFUELING WATER TANK LEVEL BORATED WATER STORAGE TANK LEVEL A
PWR Data Point Library Reference FileReport Date :Page :06-24-201535Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Paint ID:Plant Specific Point
FEET N/A 0
40 TNKBOT RE:USD (REFERENCE UNIQ SYS DESC)
P 2
WR SENSOR WHEN OUTSIDE NR SENSOR BAND N/A N/A N/A N/A N/A N/A WET THE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATED WATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATER FOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5 FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THE RECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANK VOLUME.
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 35 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Paint ID:
Plant Specific Point


== Description:==
== Description:==
Line 990: Line 3,040:


== Description:==
== Description:==
Analog I Digital:ENGR Units / Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units / Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm /Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021WIND SPEED2WS60#15SMWIND SPEED 60 METER 15 MINUTE AVGWIND SPEED AT REACTOR SITEAM/SN/A050N/AN/ASN/N/AX >= 22N/AN/ALOWN/AN/AWIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTERIS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201536Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
5/4/2015 002 0021 WIND SPEED 2WS60#15SM WIND SPEED 60 METER 15 MINUTE AVG WIND SPEED AT REACTOR SITE A
M/S N/A 0
50 N/A N/A S
N/
N/A X >= 22 N/A N/A LOW N/A N/A WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 36 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 1,002: Line 3,079:


== Description:==
== Description:==
Analog I Digital:ENGR Units!/ Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units!/ Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Paint NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Paint Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21WIND DIR2WD60#15MWIND DIRECTION 60 METER 15 MINUTE AVGWIND DIRECTION AT REACTOR SITEADEGN/A0360N/AN/ASN/N/AN/AN/AN/A0 DEGREES (NORTH)N/AN/AWIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THEPRIMARY MET TOWER ON SITE. 60 METER ELEVATION  
5/4/2015 CC2 CC21 WIND DIR 2WD60#15M WIND DIRECTION 60 METER 15 MINUTE AVG WIND DIRECTION AT REACTOR SITE A
-w1PWR Data Point Library Reference FileReport Date :Page :06-24-201537Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
DEG N/A 0
360 N/A N/A S
N/
N/A N/A N/A N/A 0 DEGREES (NORTH)
N/A N/A WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 60 METER ELEVATION
 
-w1 PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 37 Date:
Reactor Unit:
Data Feeder:
NRC EROS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 1,015: Line 3,119:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC20021WIND SPEED2WS10#15MWIND SPEED 10 METER 15 MINUTE AVGWIND SPEED AT REACTOR SITEAM/SN/A050N/AN/AS1N/AN/AX >= 22N/AN/ALOWN/AN/AWIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTERIS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201538Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
5/4/2015 CC2 0021 WIND SPEED 2WS10#15M WIND SPEED 10 METER 15 MINUTE AVG WIND SPEED AT REACTOR SITE A
M/S N/A 0
50 N/A N/A S
1 N/A N/A X >= 22 N/A N/A LOW N/A N/A WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 38 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 1,027: Line 3,157:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for OP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015CC2CC21WIND DIR2WD1 0#15MWIND DIRECTION 10 METER 15 MINUTE AVGWIND DIRECTION AT REACTOR SITEADEGN/A0360N/AN/AS1N/AN/AN/AN/AN/A0 DEGREES (NORTH)N/AN/AWIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THEPRIMARY MET TOWER ON SITE. 10 METER ELEVATION PWR Data Point Library Reference FileReport Date :Page :06-24-201539Date:Reactor Unit:Data Feeder:NRC EROS Parameter:Point ID:Plant Specific Point
5/4/2015 CC2 CC21 WIND DIR 2WD1 0#15M WIND DIRECTION 10 METER 15 MINUTE AVG WIND DIRECTION AT REACTOR SITE A
DEG N/A 0
360 N/A N/A S
1 N/A N/A N/A N/A N/A 0 DEGREES (NORTH)
N/A N/A WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 10 METER ELEVATION
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 39 Date:
Reactor Unit:
Data Feeder:
NRC EROS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 1,039: Line 3,196:


== Description:==
== Description:==
Analog / Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog / Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm /Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor OP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm /Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for OP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/2015002CC2 1ATMOSPHERIC STABILITY2MMS_DTASTBWIND STABILITY BASED ON DELTA TEMP (A)AIR STABILITY AT REACTOR SITEAN/AN/A0 (A)6 (G)N/AN/APCOMPLEXN/AN/AN/AN/AN/AN/AN/AATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATUREMINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THEPLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITYCLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A,I=B, 2=C, 3=D, 4=E, 5=F, 6=G PWR Data Point Library Reference FileReport Date :Page :06-24-201540Date:Reactor Unit:Data Feeder:NRC ERDS Parameter:Point ID:Plant Specific Point
5/4/2015 002 CC2 1 ATMOSPHERIC STABILITY 2MMS_DTASTB WIND STABILITY BASED ON DELTA TEMP (A)
AIR STABILITY AT REACTOR SITE A
N/A N/A 0 (A) 6 (G)
N/A N/A P
COMPLEX N/A N/A N/A N/A N/A N/A N/A ATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATURE MINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, I=B, 2=C, 3=D, 4=E, 5=F, 6=G
 
PWR Data Point Library Reference File Report Date :
Page :
06-24-2015 40 Date:
Reactor Unit:
Data Feeder:
NRC ERDS Parameter:
Point ID:
Plant Specific Point


== Description:==
== Description:==
Line 1,051: Line 3,235:


== Description:==
== Description:==
Analog I Digital:ENGR Units I Digital States:ENGR Units Conversion:Minimum Instrument Range:Maximum Instrument Range:Zero Point  
Analog I Digital:
ENGR Units I Digital States:
ENGR Units Conversion:
Minimum Instrument Range:
Maximum Instrument Range:
Zero Point  


==Reference:==
==Reference:==
Reference Point NotesProc or Sens:Number of Sensors:How Processed:Sensor LocationsAlarm I Trip Setpoints:NI Detector PowerSupply Cut-Off Power Level:NI Detector PowerSupply Turn-on Power Level:Instrument Failure Mode:Temperature Compensationfor DP Transmitters:Level Reference Leg:Unique System
Reference Point Notes Proc or Sens:
Number of Sensors:
How Processed:
Sensor Locations Alarm I Trip Setpoints:
NI Detector Power Supply Cut-Off Power Level:
NI Detector Power Supply Turn-on Power Level:
Instrument Failure Mode:
Temperature Compensation for DP Transmitters:
Level Reference Leg:
Unique System


== Description:==
== Description:==
5/4/20150020021ATMOSPHERIC STABILITY2MMS_S60STB60 METER WIND STABILITY -SIGMA-THETAAIR STABILITY AT REACTOR SITEAN/AN/A0 (A)6 (G)N/AN/APCOMPLEXN/AN/AN/AN/AN/AN/AN/AATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ONTHE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITYCLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A,1=B, 2=C, 3=D, 4=E, 5=F, 6=G}}
5/4/2015 002 0021 ATMOSPHERIC STABILITY 2MMS_S60STB 60 METER WIND STABILITY - SIGMA-THETA AIR STABILITY AT REACTOR SITE A
N/A N/A 0 (A) 6 (G)
N/A N/A P
COMPLEX N/A N/A N/A N/A N/A N/A N/A ATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, 1=B, 2=C, 3=D, 4=E, 5=F, 6=G}}

Latest revision as of 10:27, 10 January 2025

Submittal of Emergency Response Data System Revision
ML15197A032
Person / Time
Site: Calvert Cliffs  
Issue date: 07/13/2015
From: Laura Smith
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15197A032 (86)


Text

Exe!.on Generation Larry D. Smith Regulatory Assurance Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5219 Office 410 610 9729 Mobile www.exeloncorp.com La rry.Smith2@exeloncorp.com 10 CFR 50, Appendix E July 13, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

Subject:

Emerqjencv Response Data System The attached revision to the Emergency Response Data System (ERDS) Data Point Library for the Calvert Cliffs Nuclear Power Plant is provided pursuant to 10 CFR Part 50, Appendix E, Section VI.3.a. The revision is described below.

The table below provides a brief summary of the changes:

Unit 1 DPL Pae Point ID Description of Change

1) Plant Specific Point Description changed from LOG POWER to Wide Range Power.
2) Generic/Condition Description changed from NI WIDE RANGE LOG REACTOR PWR to Nuclear Instruments, Power Range.

1 1 Si 109

3) ENGR Units changed from % POWER to %.
4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.
5) Unique System Description changed from

'...provides a

______logarithmic indication...' to '...provides an indication...'

1) Number of Sensors changed from 32 to 16.

2 1SP2112

2) Unique System Descriptions changed from "...strategically near the vicinity..." to "...strategically in a vacant CEA shroud assembly near the vicinity..."
1) How Processed description changed to AVG EACH QUADRANT'S PTS, SHOW HIGH AVG
2) Unique System Description changed to CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE 31SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.

Document Control Desk July 13, 2015 Page 2 Unit 1 DPL Pacie Point ID Description of Change v

1)

Minimum and Maximum Instrument Range fields changed to N/A.

2) Number of sensors changed to 37 (35 CETs and 2 pressure sensors) 41SP3123
3) Unique System Description changed to: CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120)

MINUS THE CORE EXIT TEMP

($P211 3).

1) ENGR Units changed from % FLOW to %.

51 F131 A

2) Number of sensors changed to 2 (1 per SG)
3) Proc or Sens changed to P 6

1SP3I17A No changes other than point ID.

7 1SP3117B No changes other than point I D.

8 1SP3116A No changes other than point ID.

9 1SP3116B No changes other than point ID.

1) Minimum and Maximum Instrument Range changed to N/A.

10 1 Fl111%

2) Number of Sensors changed to 8.
3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.

11 1 Fl1121%

1) Minimum and Maximum Instrument Range changed to N/A.
2) Number of Sensors changed to 8 12 1SP3118A Maximum Instrument Range changed to 1250.

13 1SP3118B Maximum Instrument Range changed to 1250.

14 1SP0106A No changes other than point ID.

15 1 SP0106B No changes other than point ID.

16 1SP3113A No changes other than point I D.

17 1SP3113B No changes other than point ID.

18 1 SP3120 No changes other than point ID.

19 1 SP2109 No changes other than point ID.

1) Proc or Sens changed to S.

20 1SP1114

2) Number of Sensors changed to 1
3) Unique System Descriptions updated.

21 1SP2115 No changes other than point ID.

22 1SP2116 Proc or Sens changed to S.

23 1 SP4112 No changes other than point ID.

24 1 R5415!

Proc or Sens changed to S.

25 1S5P6120 How Processed changed to Inverse Log of Instrument Value.

26 1SP6117 How Processed changed to Reference Unique System Description.

Document Control Desk July 13, 2015 Page 3 Unit 1 Point IDDescription of Change 27 1SP6121 No changes other than point ID.

28 1 R5202!

Proc or Sens changed to S.

29 1 5421!

1) Proc or Sens changed to S.
2) How Processed changed to Inverse Log of Instrument Value.

30 1R5422!

1) Proc or Sens changed to S.
2) How Processed changed to Inverse Log of Instrument Value.
1) Proc or Sens changed to S.

31 1R4014!

2) How Processed changed to Inverse Log of Instrument Value.
3) Alarm / Trip Setpoints format changed to match other DPL entries.

32 1SP4110 Unique System Descriptions updated.

33 1SP4111 No changes other than point ID.

1) Zero Point Reference changed to TNKBOT 34 1SP2RWLVL
2) How Processed changed to WR sensor when outside NR sensor band 35 1WS60#15M Engr Units changed to M/S (no spaces).

36 1WD60#15M No changes other than point I D.

37 1WS10#15M No changes other than point ID.

38 1WD10#15M No changes other than point ID.

39 1 MMSDTASTB No changes other than point ID.

40 1 MMS_S60STB No changes other than point ID.

Unit 2 DPL Pae Point ID Change

1) Plant Specific Point Description changed from LOG POWER to Wide Range Power.
2) Generic/Condition Description changed from NI WIDE RANGE 109 LOG REACTOR PWR to Nuclear Instruments, Power Range.

1 25P13)

ENGR Units changed from % POWER to %.

4) Minimum Instrument Range changed from 1 E-7 to 1 E-8.
5) Unique System Description changed from

'...provides a

logarithmic indication...' to '...provides an indication...'

1) Number of Sensors changed from 32 to 16.

2 2SP2112

2) Unique System Descriptions changed from "...strategically near the vicinity..." to "...strategically in a vacant CEA shroud assembly near the vicinity..."

Document Control Desk July 13, 2015 Page 4 Unit 2 Pae Point ID Change

1) How Processed description changed to AVG EACH QUADRANT'S PTS, SHOW HIGH AVG
2) Unique System Description changed to CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE 3

2SP2113 INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.

1) Minimum and Maximum Instrument Range fields changed to N/A.
2) Number of sensors changed to 37 (35 CETs and 2 pressure sensors)
3) Unique System Description changed to: CORE SUBCOOLED 4

2SP3123 MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120)

MINUS THE CORE EXIT TEMP (SF2113).

4) How Processed changed to RE: USD (REFERENCE UNIQUE SYS DESC).
1) ENGR Units changed from % FLOW to %.

5 2F131A

2) Number of sensors changed to 2 (1 per SG)
3) Proc or Sens changedto P 6

2SP3117A No changes other than point ID.

7 2SP3117B No changes other than point ID.

8 2SP31 16A Alarm / Trip Setpoints, X >= changed from 985 to 950.

9 2SP311 6B Alarm / Trip Setpoints, X >= changed from 985 to 950.

1) Minimum and Maximum Instrument Range changed to N/A.

10 2F1 11%

2) Number of Sensors changed to 8.
3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.
1) Minimum and Maximum Instrument Range changed to N/A.

11 2F1 121%

2) Number of Sensors changed to 8
3) Unique System Description, first line updated to THIS IS A TEMPERATURE COMPENSATED FEED FLOW.

12 2SP3118A Maximum Instrument Range changed to 1250.

13 2SP3118B Maximum Instrument Range changed to 1250.

14 2SP0106A No changes other than point ID.

15 2SP0106B No changes other than point ID.

16 2SP3113A Alarm / Trip Setpoints, X <= changed from 504 to 525.

17 2SP3113B Alarm I Trip Setpoints, X <= changed from 504 to 525.

18 2SP3I20 No changes other than point ID.

Document Control Desk July 13, 2015 Page 5 Unit 2 Pae Point ID Change 19 2SP2109 Alarm / Trip Setpoints, X >= changed from 300 to 305.

1) Proc or Sens changed to S.

20 2SPl114

2) Number of Sensors changed to 1

_____________3)

Unique System Descriptions updated, 21 2SP2115 No changes other than point ID.

22 2SP2116 Proc or Sens changed to S.

23 2SP4112 No changes other than point ID.

The "before" and "after" ERDS Data Point Library sheets are attached.

There are no regulatory commitments contained in this correspondence.

Should you have questions regarding this matter, please contact me at (410) 495-5219.

Respectfully, Regulatory Assurance Manager LDS/PSF/bjm

Attachment:

Emergency Response Data System Data Point Library (80 pages) cc:

NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert Cliffs NRC Regional Administrator, Region I S. Gray, MD-DNR

ATTACHM ENT EMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY (80 pages)

Calvert Cliffs Nuclear Power Plant July 13, 2015

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 1

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC 1 CCll NI POWER RNG 1SPll109 WIDE RANGE POWER NUCLEAR INSTRUMENTS, POWER RANGE A

N/A 1E-8 200 N/A N/A P

4 AVG OF THE TWO CLOSEST CHANNEL VALUES N/A N/A N/A N/A N/A N/A N/A WIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OF REACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATE REACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTS BETWEEN THE RANGE OF 1 E-4% TO 15% POWER. THESE DETECTORS ARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURING NORMAL POWER OPERATIONS.

PWR Data Point Library Reference File Report Date :

06-24-2015 Page :

2 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll REC VES LEV 1SP2112 REACTOR VESSEL LEVEL REACTOR VESSEL WATER LEVEL A

INCHES N/A N/A N/A FAP N/A P

16 RE:USD (REFERENCE UNIQUE SYS DESC) 160,151,112,71,50,29,19, & 10" ABOVE FAP VOID DETECTED N/A N/A N/A N/A N/A 8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACED STRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THE VICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVERED THE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED IN INCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUEL ALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50" FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOW PROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDE AN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 3

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sons:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CC1 1 TEMP CORE EX 1SP2113 CORE EXIT TEMP HIGHEST TEMP AT THE CORE EXIT A

DEGF N/A 40 2300 N/A N/A P

35 AVG EACH QUADRANT'S PTS:SHOW HIGH AVG N/A X >= 650 N/A N/A N/A N/A N/A CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.

PWR Data Point Library Reference Fi~e Report Date :

Page :

06-24-2015 4

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll SUB MARGIN 1SP3123 CORE SUBCOOLED MARGIN SATURATION TEMPERATURE-HIGH CET A

DEGF N/A N/A N/A N/A N/A P

37 RE:USD (REFERENCE UNIQUE SYS DESC)

N/A N/A N/A N/A N/A N/A N/A CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SP211 3).

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 5

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:-

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll CORE FLOW 1F131A RCS TOTAL FLOW CH A TOTAL REACTOR COOLANT FLOW A

100% RX COOLANT FLOW = 370,000 GPM

-53.57 151.48 N/A N/A P

2 N/A N/A N/A N/A N/A N/A N/A N/A REACTOR COOLANT FLOW IS DETERMINED BY THE D/P ACROSS THE STEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOP FLOWS.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 6

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 OCil1 SG LEVEL 1/A 1SP3117A SG LEVEL LOOP 11 STEAM GENERATOR 11 WATER LEVEL A

INCH ES N/A

-401.0 63.5 N/A 0" = 40" ABOVE THE FEED RING P

2 AVG OF N/A X >= 50 TWO CHANNELS X <=-170 N/A N/A N/A N/A WET A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170' AS READ ON THE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117A IS A WIDE RANGE LVL INDICATOR.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 7

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll SG LEVEL 2/B 1SP3117B SG LEVEL LOOP 12 STEAM GENERATOR 12 WATER LEVEL A

INCHES N/A

-401.0 63.5 N/A 0' = 40" ABOVE THE FEED RING P

2 AVG OF TWO CHANNELS N/A X>=50 X<=-170 N/A N/A N/A N/A WET A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE SIG LVL DETECTOR. POINT ID SP3117B IS A WIDE RANGE LVL INDICATOR.

PWR Data Point Library Reference File Report Date :

06-24-2015 Page :

8 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll SG PRESS 1/A 1SP3116A SG PRESSURE LOOP 11 STEAM GENERATOR 11 PRESSURE A

PSIA N/A 0

1200 N/A N/A P

2 AVG OF TWO CHANNELS N/A X>= 950 X<= 703 N/A N/A N/A N/A N/A REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OR COMP FAILURE.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 9

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm /Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll SG PRESS 2/B 1SP3116B SG PRESSURE LOOP 12 STEAM GENERATOR 12 PRESSURE A

PSIA N/A 0

1200 N/A N/A p

2 AVG OF TWO CHANNELS N/A X>=950 X<=703 N/A N/A N/A N/A N/A REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LiNE RUPTURE OF COMP FAILURE.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 10 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog!/ Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CCll MN FD FL 1/A 1F1111%

FW FLOW TO STEAM GEN. 11 STM GEN 11 MAIN FEEDWATER FLOW A

KLB/HR N/A N/A N/A N/A N/A P

8 COMPLEX N/A N/A N/A N/A N/A N/A THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 11 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll MN FD FL 2/B 1F1121%

FW FLOW TO STEAM GEN. 12 STM GEN 12 MAIN FEEDWATER FLOW A

KLB/HR N/A N/A N/A N/A N/A P

8 COMPLEX N/A N/A N/A N/A N/A N/A THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 12 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll AX FD FL 1/A 1SP3118A AUX FEED FLOW LOOP 11 STM GEN 11 AUXILIARY FW FLOW A.

GPM N/A 0

1250 N/A N/A P

2 SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH N/A N/A N/A N/A N/A N

N/A THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #11 & #12 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.

BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM

  1. 12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 13 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Tem perature Comnpensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll AX FD FL 2/B 1SP3I18B AUX FEED FLOW LOOP 12 STM GEN 12 AUXILIARY FW FLOW A

GPM N/A 0

1250 N/A N/A P

2 SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH N/A N/A N/A N/A N/A N

N/A THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #11 & #12 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #11 & #12 STM GENS.

BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM

  1. 12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.

PWR Data Point Library Reference File Report Date :

06-24-2015 Page :

14 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll HL TEMP 1/A 1SP0106A THOT LOOP 11 STM GEN 11 INLET TEMPERATURE A

DEGF N/A 50 700 N/A N/A P

2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 15 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll HL TEMP 2/B 1SP0I06B THOT LOOP 12 STM GEN 12 INLET TEMPERATURE A

DEGF N/A 50 700 N/A N/A P

2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 16 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll CL TEMP 1/A 1 SP3I113A TCOLD LOOP 11 STM GEN 11 OUTLET TEMPERATURE A

DEGF N/A 50 700 N/A N/A P

3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

N/A X>= 560 X<=525 N/A N/A N/A N/A N/A THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)

CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 17 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm/ITrip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temnperature Comnpensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll CL TEMP 2/B 1SP3I13B TCOLD LOOP 12 STM GEN 12 OUTLET TEMPERATURE A

DEGF N/A 50 700 N/A N/A P

3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

N/A X>=560 X<=525 N/A N/A N/A N/A N/A THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TMILP)

CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.

PWR Data Point Library Reference File Report Date :

06-24-2015 Page :

18 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CC11 RCS PRESSURE 1 SP3120 PRESSURIZER PRESSURE REACTOR COOLANT SYSTEM PRESSURE A

PSIA N/A 0

4000 N/A N/A P

2 AVG OF TWO CHANNELS N/A X >= 2400 X <= 1740 N/A N/A N/A N/A N/A REACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGE PRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SET TO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.

PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.

SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.

BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION IS INITIATED AT 1 740#.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 19 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Tem perature Comnpensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CC11 PRZR LEVEL 1SP2109 PRESSURIZER LEVEL PRIMARY SYSTEM PRESSURIZER LEVEL A

INCHES N/A 0

360 RE: USD N/A P

2 AVG OF TWO CHANNELS N/A X>=305 X<=50 N/A N/A N/A N/A WET PRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN 160' TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZER HEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.

PRESSURIZER HEATERS WJLL START TO BE UNCOVERED AT APPROX 84" OF INDICATED LEVEL. ZERO POINT

REFERENCE:

BOTTIOM OF PRESSURIZER.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 20 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll RCS CHG/MU 1SPil114 CHG PUMP FLOW PRIMARY SYSTEM CHARGING/MAKEUP F A

GPM N/A 0

150 N/A N/A S

1 RE:USD (REFERENCE UNIQ SYS DESC)

N/A N/A N/A N/A N/A N

N/A THERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPM EACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #13 CAN BE POWERED FROM ONE OF TWO BUSSES #11 OR #14. WHICH MUST BE MANUALLY SELECTED BY A "KIRK" KEY INTERLOCK SCHEME.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 21 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll HP SI FLOW 1SP2115 HPSI FLOW HIGH PRESSURE SAFETY INJECTION F A

GPM N/A 0

1600 N/A N/A P

4 SUM OF FLOW LOOPS 11A, 11B, 12A, 12B N/A N/A N/A N/A N/A N

N/A 3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCY COOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275 PSIA. ONLY TWO PUMPS WILL START. 12 HPSI IS MAINTAINED IN PULL TO LOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THE REFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTER THE RWTI IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TO PROVIDE SUCTION FROM THE CONTAINMENT SUMP.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 22 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic 1 Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

-Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll LP SI FLOW lSP2116 LPSI FLOW LOW PRESSURE SAFETY INJECTION FL A

GPM N/A 0

8000 N/A N/A S

1 INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A 2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGH VOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES A SUCTION OFF A SEPARATE HEADER FROM THE RWT. DURING RECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPS ARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THE CONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 23 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll CTMNT SMP WR 1SP4112 CNTMT LEVEL CONTAINMENT SUMP WIDE RNG LEVEL A

INCHES N/A 0

120 N/A N/A P

2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TO BOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THE RECIRCULATION MODE. "TWO 24" DIAMETER RECIRC LINES SUPPLY WATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.

THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRIS FROM ENTERING THE SUMP.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 24 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll EFF GAS RAD 1R5415!

WR EFF MONITOR RADIOACTIVITY OF RELEASED GASSES A

UCI/SEC N/A 1 El 1El13 N/A N/A S

1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACK EFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH ARE USED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THE RANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) IS SELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUS FLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVE EFFLUENT GROSS ACTIVITY.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 25 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll EFF LIQ RAD 1SP6120 LIQUID WASTE RAD RADIOACTIVITY OF RELEASED LIQUID A

CPM N/A 1E1 1E6 N/A N/A P

3 INVERSE LOG OF INSTRUMENT VALUE N/A X >= 4.21 E5 N/A N/A N/A N/A N/A LIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGE HEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISC WASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2 DISCHARGE VALVES 0-CV-2201 & 0-CV-2202 TO ISOLATE FLOW TO THE CIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN IN ALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 26 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll COND A/E RAD 1SP6117 OFF GAS RAD CONDENSER AIR EJECTOR RADIOACTIV A

GPD N/A 0

250 N/A N/A P

4 REFERENCE UNIQUE SYSTEM DESCRIPTION N/A X >= 5 N/A N/A N/A N/A N/A THE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOUR RADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDE OF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUT SIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEERED HIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPD)

AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARY LEAK THROUGH THE S/G TUBES.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 27 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Paint ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CCll CNTMNT RAD 1 SP6121 CNTMT RAD RADIATION LEVEL IN CONTAINMENT A

R/HR N/A 1

1 E8 "N/A N/A P

2 AVG OF TWO CHANNELS N/A X >= 6 N/A N/A N/A N/A N/A THESE CONTAINMENT RADIATION MONITORS MEASURE GAMMA RADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.

THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND ARE PLACED NEAR THE PRESSURIZER AND #11 STEAM GEN.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 28 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll RCS LTDN RAD 1 R5202!

PROCESS RAD MONITOR RAD LEVEL OF RCS LETDOWN LINE A

CPM N/A 1E1 1 E6 N/A N/A S

1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TO MONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING A POTENTIAL FUEL ELEMENT FAILURE.

PWR Data Point Library Reference File Report Date :

06-24-2015 Page :

29 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll1 MAIN SL I/A 1 R5421 !

MAIN STM RAD LP 11 STM GEN 11 STEAM LINE RAD LEVEL A

uCi/cc N/A I1E-2 I1E5 N/A N/A S

1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 30 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll MAIN SL 2/B 1 R5422!

MAIN STM RAD LP 12 STM GEN 12 STEAM LINE RAD LEVEL A

uCi/cc N/A 1 E-2 1 E5 N/A N/A S

1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 31 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll SG BD RAD IA iR4014!

STM GEN BLOWDOWN ACTIVITY STM GEN 11 BLOWDOWN RAD LEVEL A

CPM N/A 1 El 1 E6 N/A N/A S

1 INVERSE LOG OF INSTRUMENT VALUE N/A X >= 5E4 N/A N/A N/A N/A N/A THIS DETECTOR MONITORS A SMALL PORTION OF THE STM GEN BLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OF STM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARM AUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTT-IOM BLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAM GENERATORS THIS MONITOR IS IN THE LINE OF THE BLOWDOWN TANK AND IS COMMON TO BOTH STM GEN.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 32 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/412015 CC1 CC11 CTMNT PRESS 1 SP41 10 CNTMT PRESSURE CONTAINMENT PRESSURE A

PSIG N/A

-5 150 N/A N/A P

3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

N/A X >= 2.8 N/A N/A N/A N/A N/A THERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWO PROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150 PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS A NARROW RANGE INDICATION -5 TO +5 PSIG WHICH PROVIDES CONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @

2.8 PSIG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSIG.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 33 Date:

Reactor Unit:

Data Feeder:

NRC EROS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for OP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll CTMNT TEMP 1SP4I111 CNTMT TEMPERATURE CONTAINMENT TEMPERATURE A

DEGF N/A 50 300 N/A N/A P

2 AVG OF TWO CHANNELS N/A X >= 220 N/A N/A N/A N/A N/A THERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOME TEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OF THESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 34 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll1 BWST LEVEL 1 SP2RWLVL REFUELJNG WATER TANK LEVEL BORATED WATER STORAGE TANK LEVEL A

FEET N/A 0

40 TNKBOT RE:USD (REFERENCE UNIQ SYS DESC)

P 2

WR SENSOR WHEN OUTSIDE NR SENSOR BAND N/A N/A N/A N/A N/A N/A WET THE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATED WATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATER FOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5 FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THE RECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANK VOLUME.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 35 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll WIND SPEED 1 WS60#15SM WiND SPEED 60 METER 15 MINUTE AVG WIND SPEED AT REACTOR SITE A

M/S N/A 0

50 N/A N/A S

1 N/A N/A X >= 22 N/A N/A LOW N/A N/A WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60 METER ELEVATION

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 36 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll WIND DIR 1WD60#15SM WIND DIRECTION 60 METER 15 MINUTE AVG WIND DIRECTION AT REACTOR SITE A

DEG N/A 0

360 N/A N/A S

1 N/A N/A N/A N/A N/A 0 DEGREES (NORTH)

N/A N/A WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 60 METER ELEVATION

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 37 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Paint

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CCI CCIl WIND SPEED 1WS10#15M WIND SPEED 10 METER 15 MINUTE AVG WIND SPEED AT REACTOR SITE A

M/S N/A 0

50 N/A N/A S

1 N/A N/A X >= 22 N/A N/A LOW N/A N/A WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10 METER ELEVATION

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 38 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CCl CCll WIND DIR 1WD10#15M WIND DIRECTION 10 METER 15 MINUTE AVG WIND DIRECTION AT REACTOR SITE A

DEG N/A 0

360 N/A N/A S

1 N/A N/A N/A N/A N/A 0 DEGREES (NORTH)

N/A N/A WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 10 METER ELEVATION

PWR Data Point Library Reference File Report Date :

Page :

06-24-20 15 39 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Paint Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll ATMOSPHERIC STABILITY 1MMS_DTASTB WIND STABILITY BASED ON DELTA TEMP (A)

AIR STABILITY AT REACTOR SITE A

N/A N/A 0 (A) 6 (G)

N/A N/A P

1 COMPLEX N/A N/A N/A N/A N/A N/A N/A ATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATURE MINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, I=B, 2=C, 3=D, 4=E, 5=F, 6=G

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 40 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC1 CCll ATMOSPHERIC STABILITY I MMSS6OSTB 60 METER WIND STABILITY - SIGMA-THETA AIR STABILITY AT REACTOR SITE A

N/A N/A 0 (A) 6 (G)

N/A N/A P

1 COMPLEX N/A N/A N/A N/A N/A N/A N/A ATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, 1=B, 2=C, 3=D, 4=E, 5=F, 6=G

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 1

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 CC21 NI POWER RNG 2SP1 109 WIDE RANGE POWER NUCLEAR INSTRUMENTS, POWER RANGE A

N/A 1 E-8 2O00 N/A N/A P

4 AVG OF THE TWO CLOSEST CHANNEL VALUES N/A N/A N/A N/A N/A N/A N/A WIDE RANGE NUCLEAR INSTRUMENTATION PROVIDES AN INDICATION OF REACTOR POWER AS A PERCENT OF REACTOR POWER. START UP RATE REACTOR TRIP IS GIVEN FROM WIDE RANGE NUCLEAR INSTRUMENTS BETWEEN THE RANGE OF 1E-4% TO 15% POWER. THESE DETECTORS ARE FISSION CHAMBERS WHICH DO NOT GET DEENERGIZED DURING NORMAL POWER OPERATIONS.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 2

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 REC VES LEV 2SP2112 REACTOR VESSEL LEVEL REACTOR VESSEL WATER LEVEL A

INCHES N/A N/A N/A FAP N/A P

16 RE:USD (REFERENCE UNIQUE SYS DESC) 160,151,112,71,50,29,19, & 10" ABOVE FAP VOID DETECTED N/A N/A N/A N/A N/A 8 HEATED JUNCTION THERMOCOUPLES (HJTC) ARE SPACED STRATEGICALLY IN A VACANT CEA SHROUD ASSEMBLY NEAR THE VICINITY OF ONE HOT LEG OUTLET NOZZLE. AS HJTC IS UNCOVERED THE LVL THAT THE REACTOR HEAD IS UNCOVERED IS INDICATED IN INCREMENTAL STEPS. THE 1ST HJTC IS 160" FROM TOP OF FUEL ALIGNMENT PLATE(FAP); 8TH HJTC IS 10" FROM FAP; 5TH HJTC IS 50" FROM FAP WHICH IS THE CENTER LINE OF THE HOT LEGS. HOW PROCESSED: WHEN LVL DECREASES A VOID IN THE HJTC WILL PROVIDE AN OUTPUT SIGNAL FOR THAT SPECIFIC HJTC POSITION.

PWR Data Point Library Reference File Report Date:*

Page :

06-24-2015 3

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Paint ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 TEMP CORE EX 2SP2113 CORE EXIT TEMP HIGHEST TEMP AT THE CORE EXIT A

DEG F N/A 40 2300 N/A N/A P

35 AVG EACH QUADRANT'S PTS:SHOW HIGH AVG N/A X >= 650 N/A N/A N/A N/A N/A CORE EXIT THERMOCOUPLES ARE LOCATED AT THE TOP OF THE INCORE INSTRUMENT DETECTOR ASSEMBLIES WITHIN 35 SELECTED FUEL ASSEMBLIES. THESE DETECTORS ARE DIVIDED INTO QUADRANTS AND EACH QUADRANT IS AVERAGED. THIS POINT IS THE HIGHEST QUADRANT AVG.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 4

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 0021 SUB MARGIN 2SP3123 CORE SUBCOOLED MARGIN SATURATION TEMPERATURE-HIGH CET A

DEGF N/A N/A N/A N/A N/A P

37 RE: USD (REFERENCE UNIQUE SYS DESC)

N/A N/A N/A N/A N/A N/A N/A CORE SUBCOOLED MARGIN IS CALCULATED BY THE SATURATION TEMPERATURE AS DETERMINED FROM PRESSURIZER PRESSURE (SP3120) MINUS THE CORE EXIT TEMP (SP2113).

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 5

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 CC21 CORE FLOW 2F131A RCS TOTAL FLOW OH A TOTAL REACTOR COOLANT FLOW A

100% RX COOLANT FLOW = 370,000 GPM

-54.35 153.68 N/A N/A P

2 N/A N/A N/A N/A N/A N/A N/A N/A REACTOR COOLANT FLOW IS DETERMINED BY THE 0/P ACROSS THE STEAM GENERATORS. WHERE TOTAL FLOW IS THE SUM OF BOTH LOOP FLOWS.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 6

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 SG LEVEL 1/A 2SP3I17A SG LEVEL LOOP 21 STEAM GENERATOR 21 WATER LEVEL A

INCHES N/A

-401.0 63.5 N/A 0" = 40' ABOVE THE FEED RING P

2 AVG OF TWO CHANNELS N/A X>=50 X<=-170 N/A N/A N/A N/A WET A LOW LEVEL REACTOR TRIP OCCURS AT -50" AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE S/G LVL DETECTOR. POINT ID SP3117A IS A WIDE RANGE LVL INDICATOR.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 7

Date:

Reactor Unit:

Data Feeder:

NRC EROS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 SG LEVEL 2/B 2SP3117B SG LEVEL LOOP 22 STEAM GENERATOR 22 WATER LEVEL A

INCHES N/A

-401.0 63.5 N/A 0" = 40' ABOVE THE FEED RING P

2 AVG OF TWO CHANNELS N/A X>=50 X<z=-170 N/A N/A N/A N/A WET A LOW LEVEL REACTOR TRIP OCCURS AT -50' AS READ ON THE NARROW RANGE LEVEL DETECTOR. AFAS WILL ACTUATE AT -170" AS READ ON THE WIDE RANGE S/G LVL DETECTOR. POINT ID 5P3117B IS A WIDE RANGE LVL INDICATOR.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 8

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

Ni Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Tem perature Comnpensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 SG PRESS 1/A 2SP3116A SG PRESSURE LOOP 21 STEAM GENERATOR 21 PRESSURE A

PSIA N/A 0

1200 N/A N/A P

2 AVG OF TWO CHANNELS N/A X>=950 X<=703 N/A N/A N/A N/A N/A REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OR COMP FAILURE.

PWR Data Point Library Reference Fime Report Date :

Page :

06-24-2015 9

Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 C02 0021 SG PRESS 2/B 2SP3116B SG PRESSURE LOOP 22 STEAM GENERATOR 22 PRESSURE A

PSIA N/A 0

1200 N/A N/A P

2 AVG OF TWO CHANNELS N/A X>=950 X<=703 N/A N/A N/A N/A N/A REACTOR TRIP OCCURS AT 703# TO PREVENT EXCESSIVE HEAT EXTRACTIONS FROM HIGH STEAM FLOW DUE TO STM LINE RUPTURE OF COMP FAILURE.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 10 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 0021 MN ED FL 1/A 2F1111%

FW FLOW TO STEAM GEN. 21 STM GEN 21 MAIN FEEDWATER FLOW A

KLB/HR N/A N/A N/A N/A N/A P

8 COMPLEX N/A N/A N/A N/A N/A Y

N/A THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 11 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

instrument Failure Mode:

Temperature Compensation for OP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 MN FD FL 2/B 2F1121%

FW FLOW TO STEAM GEN. 22 STM GEN 22 MAIN FEEDWATER FLOW A

KLB/HR N/A N/A N/A N/A N/A P

8 COMPLEX N/A N/A N/A N/A N/A Y

N/A THIS IS A TEMPERATURE COMPENSATED FEED FLOW. 2 STEAM DRIVEN MAIN FEED PUMPS EACH CAPABLE OF SUPPLYING FEED WATER EXCEEDING 50% FEED FLOW DEMAND. UPON A MAIN TURBINE TRIP FEED REG VALVES CLOSE AND FEED REG BYPASS VALVES ARE POSITIONED TO MAINTAIN 5% OF MAIN FEED WATER FLOW WHEN FEED PUMPS ARE RUNNING.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 12 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 AX FD FL 1/A 2SP311 8A AUX FEED FLOW LOOP 21 STM GEN 21 AUXILIARY FW FLOW A

GPM N/A 0

1250 N/A N/A P

2 SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH N/A N/A N/A N/A N/A N

N/A THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.

BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM

  1. 12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 13 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 AX FD FL 2/B 2SP3118B AUX FEED FLOW LOOP 22 STM GEN 22 AUXILIARY FW FLOW A

GPM N/A 0

1250 N/A N/A P

2 SUM:MTR DRIVEN & TURB DRIVEN PMPS DISCH N/A N/A N/A N/A N/A N

N/A THERE ARE 2 STEAM TURBINE DRIVEN PUMPS AND ONE ELECTRIC DRIVEN PUMP. THE TURBINE DRIVEN PUMPS DISCHARGE TO A COMMON HEADER FOR BOTH #21 & #22 STM GENS. THE MOTOR DRIVEN PUMP DISCHARGES TO A SEPARATE HEADER FOR BOTH #21 & #22 STM GENS.

BOTH FLOW HEADERS COMBINE TO SUPPLY THE AUX FEED NOZZLE FOR EACH STM GEN. THE NORMAL SUPPLY TO AFW PUMP SUCTION IS FROM

  1. 12 CONDENSATE STORAGE TANK. ONLY 1 STEAM DRIVEN PUMP IS NORMALLY ALIGNED TO START.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 14 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum instrument Range:

Maximum instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm /Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 HL TEMP 1/A 2SP0106A THOT LOOP 21 STM GEN 21 INLET TEMPERATURE A

0DEG F N/A 50 700 N/A N/A P

2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 15 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 CC21 HL TEMP 2/B 2SP0106B THOT LOOP 22 STM GEN 22 INLET TEMPERATURE A

DEGF N/A 50 700 N/A N/A P

2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THOT IS THE COOLANT TEMPERATURE MEASURED AT THE INLET TO THE STEAM GEN. THOT PROVIDES INPUT TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP) CIRCUIT FOR A TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 16 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 0021 CL TEMP 1/A 2SP3113A TCOLD LOOP 21 STM GEN 21 OUTLET TEMPERATURE A

DEGF N/A 50 700 N/A N/A P

3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

N/A X>=560 X<=525 N/A N/A N/A N/A N/A THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)

CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 17 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 CL TEMP 2/B 2SP311 3B TCOLD LOOP 22 STM GEN 22 OUTLET TEMPERATURE A

DEGF N/A 50 700 N/A N/A P

3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

N/A X>=560 X<=525 N/A N/A N/A N/A N/A THE ALARM/TRIP SET POINTS SUPPLIED ABOVE ARE SPDS ALARM SET POINTS. TCOLD PROVIDES CONTROL ROOM AND AUX SHUTDOWN PANEL INDICATION. TCOLD ALSO SUPPLIES SIGNALS TO THE SUBCOOLED MARGIN MONITOR AND THE THERMAL MARGIN/LOW PRESSURE (TM/LP)

CIRCUIT FOR TOTAL POWER CALCULATION IN THE REACTOR PROTECTION SYSTEM. AS A DNB PARAMETER TCOLD IS REQUIRED TO BE LESS THAN 548 DEG WITH 4 REACTOR COOLANT PUMPS RUNNING.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 18 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 CC21 RCS PRESSURE 2SP3120 PRESSURIZER PRESSURE REACTOR COOLANT SYSTEM PRESSURE A

PSIA N/A 0

4000 N/A N/A P

2 AVG OF TWO CHANNELS N/A X >= 2400 X.<= 1740 N/A N/A N/A N/A N/A REACTOR COOLANT PRESSURE IS THE AVERAGE OF 2 WIDE RANGE PRESSURIZER PRESSURE DETECTORS. THE SAFETY VALVES ARE SET TO OPEN AT 2500#. HIGH PRESSURE REACTOR TRIP OCCURS AT 2400#.

PORVS OPEN AT 2400 PSIA ON A REACTOR TRIP FROM HIGH PRESSURE.

SPRAY VALVE SETPOINT IS DEPENDENT ON CONTROLLER SETPOINT.

BOTH SPRAY VALVES CLOSE AT 2300 PSIA. ESFAS ACTUATION IS INITIATED AT 1740#.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 19 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 CC21 PRZR LEVEL 2SP2109 PRESSURIZER LEVEL PRIMARY SYSTEM PRESSURIZER LEVEL A

INCHES N/A 0

360 RE: USD N/A P

2 AVG OF TWO CHANNELS N/A X>=305 X<=50 N/A N/A N/A N/A WET PRESSURIZER LEVEL IS NORMALLY CONTROLLED IN A BAND BETWEEN 160" TO 216" DURING NORMAL POWER OPERATIONS. PRESSURIZER HEATERS CUTOUT AT A LEVEL OF 101" IN THE PRESSURIZER.

PRESSURIZER HEATERS WILL START TO BE UNCOVERED AT APPROX 84' OF INDICATED LEVEL. ZERO REFERENCE POINT: BOTTOM OF PRESSURIZER.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 20 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 RCS CHG/MU 2SPl114 CHG PUMP FLOW PRIMARY SYSTEM CHARGING/MAKEUP F A

GPM N/A 0

150 N/A N/A S

1 RE:USD (REFERENCE UNIQ SYS DESC)

N/A N/A N/A N/A N/A N

N/A THERE ARE 3 CHARGING PUMPS THAT ARE RATED TO SUPPLY 44 GPM EACH TO THE RCS (REACTOR COOLANT SYSTEM). CHARGING PUMP #23 CAN BE POWERED FROM ONE OF TWO BUSSES #21 OR #24. WHICH MUST BE MANUALLY SELECTED BY A 'KIRK" KEY INTERLOCK SCHEME.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 21 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units /Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 HP SI FLOW 2SP2115 HPSI FLOW HIGH PRESSURE SAFETY INJECTION F A

GPM N/A 0

1600 N/A N/A P

4 SUM OF FLOW LOOPS 21A, 21B, 22A, 22B N/A N/A N/A N/A N/A N

N/A 3 HIGH PRESSURE SAFETY INJECTION PUMPS DELIVER EMERGENCY COOLANT TO ALL FOUR COLD LEGS. SHUTOFF HEAD PRESSURE IS 1275 PSIA. ONLY TWO PUMPS WILL START. 22 HPSI IS MAINTAINED IN PULL TO LOCK. 2 INDEPENDENT SUCTION HEADERS SUPPLY WATER FROM THE REFUELING WATER TANK UNTIL THE TANK IS DOWN TO 10% FULL. AFTER THE RWT IS DOWN TO 10% FULL THE HPSI LINE IS CHANGED TO PROVIDE SUCTION FROM THE CONTAINMENT SUMP.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 22 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 0021 LP SI FLOW 2SP2116 LPSI FLOW LOW PRESSURE SAFETY INJECTION FL A

GPM N/A 0

8000 N/A N/A S

1 INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A 2 LOW PRESSURE SAFETY INJECTION PUMPS SUPPLY LOW HEAD/HIGH VOLUME COOLANT TO THE COLD LEGS. EACH LPSI PUMP TAKES A SUCTION OFF A SEPARATE HEADER FROM THE RWT. DURING RECIRCULATION MODE (APPROX 36 MIN AFTER A D.B.A.) THE LPSI PUMPS ARE SHUT DOWN AND THE HPSI PUMPS TAKE SUCTION FROM THE CONTAIMENT SUMP TO RECIRCULATE WATER THROUGH THE SYSTEM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 23 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Paint

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for VP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 CTMNT SMP WR 2SP4112 CNTMT LEVEL CONTAINMENT SUMP WIDE RNG LEVEL A

INCHES N/A 0

120 N/A N/A P

2 AVG OF TWO CHANNELS N/A N/A N/A N/A N/A N/A N/A THE CONTAINMENT EMERGENCY SUMP PROVIDES ADEQUATE NPSH TO BOTH HPSI AND CONTAINMENT SPRAY PUMPS WHEN IN THE RECIRCULATION MODE. TWO 24" DIAMETER RECIRC LINES SUPPLY WATER TO THE CONTAINMENT SPRAY AND SAFETY INJECTION SYSTEM.

THE SUMP IS COVERED WITH A METAL GRATING TO PREVENT DEBRIS FROM ENTERING THE SUMP.

PWR* Data Point Library Reference File Report Date :

Page :

06-24-2015 24 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 EFF GAS RAD 2R54151 WR EFF MONITOR RADIOACTIVITY OF RELEASED GASSES A

UCI/SEC N/A 1E1 1E13 N/A N/A S

INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE EFFLUENT GAS RADIATION MONITOR MEASURES MAIN VENT STACK EFFLUENT GROSS ACTIVITY. 3 CHANNELS: LOW, MEDIUM, & HIGH ARE USED TO PROVIDE AN OUTPUT TO A FOURTH PSEUDO CHANNEL. THE RANGE OF ACTIVITY DETECTED DETERMINES WHICH CHANNEL (L,M,H) IS SELECTED. THE OUTPUT OF THE FOURTH CHANNEL COMBINES GASIOUS FLOW WITH THE MEASURED ACTIVITY TO PROVIDE THE EFFECTIVE EFFLUENT GROSS ACTIVITY.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 25 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum instrument Range:

Maximum instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

N umber of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 EFF LIQ RAD 2SP6120 LIQUID WASTE RAD RADIOACTIVITY OF RELEASED LIQUID A

CPM N/A 1E1 1E6 N/A N/A P

3 INVERSE LOG OF INSTRUMENT VALUE N/A X >= 4.21 E5 N/A N/A N/A N/A N/A LIQUID WASTE PROCESSING MONITORS THE COMMON DISCHARGE HEADER FROM REACTOR COOLANT WASTE PROCESSING AND MISC WASTE PROCESS. 50000 CPM WILL AUTOMATICALLY CLOSE 2 DISCHARGE VALVES 0-CV-2201 & 0-CV-2202 TO ISOLATE FLOW TO THE CIRCULATION WATER DISCHARGE CONDUITS. ALARM LIMIT GIVEN IN ALARM/TRIP SET POINT IS THE SPDS ALARM LIMIT.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 26 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Paint

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0C21 COND A/E RAD 2SP6117 OFF GAS RAD CONDENSER AIR EJECTOR RADIOACTIV A

GPD N/A 0

250 N/A N/A P

4 REFERENCE UNIQUE SYSTEM DESCRIPTION N/A X >= 5 N/A N/A N/A N/A N/A THE CONDENSER AIR EJECTOR DISCHARGE MONITOR INCLUDES FOUR RADIATION SENSORS. ONE SENSOR IS INSTALLED IN THE SUCTION SIDE OF EACH OF THE FOUR CONDENSER AIR REMOVAL PUMPS. OUTPUT SIGNALS ARE DISPLAYED IN THE CONTROL ROOM. THE AUCTIONEERED HIGH SIGNAL IS CONVERTED FROM CPM TO GALLONS PER DAY (GPO)

AND IS USED AS AN EARLY INDICATION OF A PRIMARY TO SECONDARY LEAK THROUGH THE S/G TUBES.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 27 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Paint ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units /Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 CNTMNT RAD 2SP6121 CNTMT RAD RADIATION LEVEL IN CONTAINMENT A

R/H R N/A 1E8 N/A N/A P

2 AVG OF TWO CHANNELS N/A X >=6 N/A N/A N/A N/A N/A THESE CONTAINMENT RADIATION MONITORS MEASURE GAMMA RADIATION LEVELS IN CONTAINMENT UNDER ACCIDENT CONDITIONS.

THE DETECTORS ARE LOCATED AT THE 73-FOOT LEVEL AND ARE PLACED NEAR THE PRESSURIZER AND #21 STEAM GEN.

PWR Data Point Library Reference File Report Date :

Page :

06-24-20 15 28 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm /Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 RCS LTDN RAD 2R5202!

PROCESS RAD MONITOR RAD LEVEL OF RCS LETDOWN LINE A

KCPM N/A 1 E-2 1E3 N/A N/A S

1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE CVCS LTDN RAD MONITOR IS INSTALLED IN THE LET DOWN LINE TO MONITOR GROSS REACTOR COOLANT ACTIVITY INDICATING A POTENTIAL FUEL ELEMENT FAILURE.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 29 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 MAIN SL 1/A 2R5421 !

MAIN STM RAD LP 21 STM GEN 21 STEAM LINE RAD LEVEL A

uCi/cc N/A 1 E-2 1 E5 N/A N/A S

1 INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 30 Date:

Reactor Unit:

Data Feeder:

NRC EROS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for OP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 CC21 MAIN SL 2/B 2R5422!

MAIN STM RAD LP 22 STM GEN 22 STEAM LINE RAD LEVEL A

uCi/cc N/A 1 E-2 1 E5 N/A N/A S

INVERSE LOG OF INSTRUMENT VALUE N/A N/A N/A N/A N/A N/A N/A THE MAIN STEAM EFFLUENT RADIATION DETECTORS MONITOR FOR NOBLE GASSES WITHIN THE MAIN STEAM LINE. THE MONITORS ARE LOCATED ON THE 27-FOOT LEVEL OF THE AUX BUILDING IN THE MSIV ROOM.

PWR Data Point Library Reference File Report Date :

06-24-2015 Page :

31 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 0021 SG BD RAD 1A 2R401 4!

STM GEN BLOWDOWN ACTIVITY STM GEN 21 BLOWDOWN RAD LEVEL A

CPM N/A 1E1 1E6 N/A N/A S

INVERSE LOG OF INSTRUMENT VALUE N/A X >= 5E4 N/A N/A N/A N/A N/A THIS DETECTOR MONITORS A SMALL PORTION OF THE STM GEN BLOWDOWN TO PROVIDE OPERATORS WITH AN EARLY INDICATION OF STM GEN U-TUBE LEAKAGE. ACTUATION OF THE HIGH ALARM AUTOMATICALLY SHUT THE SURFACE BLOWDOWN AND THE BOTTIOM BLOWDOWN ISOLATION VALVES. OF BOTH #11 & #12 STEAM GENERATORS THIS MONITOR IS IN THE LINE OF THE BLOWDOWN TANK AND IS COMMON TO BOTH STM GEN.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 32 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Paint ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 CTMNT PRESS 2SP411 0 CNTMT PRESSURE CONTAINMENT PRESSURE A

PSIG N/A

-5 150 N/A N/A P

3 AVG OF TWO CHNLS (AUCTIONEERED:WR OR NR)

N/A X >= 2.8 N/A N/A N/A N/A N/A THERE ARE A TOTAL OF 3 CONTAINMENT PRESSURE INDICATORS. TWO PROVIDE WIDE RANGE PRESSURE INDICATION, -5 TO +150 AND 0 TO 150 PSIG, FOR POST ACCIDENT MONITORING. THE THIRD INDICATOR IS A NARROW RANGE IND1CATION -5 TO +5 PSIG WHICH PROVIDES CONTAINMENT DIFFERENTIAL PRESSURE. ACTUATIONS OCCUR: CIS @

2.8 PSlG; CSAS @ 4.25 PSIG; SIAS @ 2.8 PSIG; RPS @ 2.4 PSlG.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 33 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 CTMNT TEMP 2SP4tl 1 CNTMT TEMPERATURE CONTAINMENT TEMPERATURE A

D EGF N/A 50 300 N/A N/A P

2 AVG OF TWO CHANNELS N/A X >= 220 N/A N/A N/A N/A N/A THERE ARE 2 CONTAINMENT TEMP DETECTORS. ONE MEASURES DOME TEMP, ANOTHER MEASURES THE REACTOR CAVITY TEMP. BOTH OF THESE PROVIDE INDICATION TO THE CONTROL ROOM OPERATORS.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 34 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm / Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 BWST LEVEL 2SP2RWLVL REFUELING WATER TANK LEVEL BORATED WATER STORAGE TANK LEVEL A

FEET N/A 0

40 TNKBOT RE:USD (REFERENCE UNIQ SYS DESC)

P 2

WR SENSOR WHEN OUTSIDE NR SENSOR BAND N/A N/A N/A N/A N/A N/A WET THE REFUELING WATER TANK SUPPLIES 2300-2700 PPM BORATED WATER TO THE SAFETY INJECTION SYSTEM AND ALSO SUPPLIES WATER FOR USE DURING REFUELING. TANK CAPACITY IS 420,000 GALS. AT 2.5 FEET THE SAFETY INJECTION LINE-UP IS SWITCHED TO THE RECIRCULATION MODE. THIS LEVEL IS EQUAL TO APPROX 10% OF TANK VOLUME.

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 35 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Paint ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units / Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm /Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 WIND SPEED 2WS60#15SM WIND SPEED 60 METER 15 MINUTE AVG WIND SPEED AT REACTOR SITE A

M/S N/A 0

50 N/A N/A S

N/

N/A X >= 22 N/A N/A LOW N/A N/A WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 60 METER ELEVATION

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 36 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units!/ Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Paint Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 WIND DIR 2WD60#15M WIND DIRECTION 60 METER 15 MINUTE AVG WIND DIRECTION AT REACTOR SITE A

DEG N/A 0

360 N/A N/A S

N/

N/A N/A N/A N/A 0 DEGREES (NORTH)

N/A N/A WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 60 METER ELEVATION

-w1 PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 37 Date:

Reactor Unit:

Data Feeder:

NRC EROS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 0021 WIND SPEED 2WS10#15M WIND SPEED 10 METER 15 MINUTE AVG WIND SPEED AT REACTOR SITE A

M/S N/A 0

50 N/A N/A S

1 N/A N/A X >= 22 N/A N/A LOW N/A N/A WIND SPEED INDICATION IN METERS PER SECOND TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER LOCATED ON SITE. 10 METER ELEVATION

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 38 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic / Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for OP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 CC2 CC21 WIND DIR 2WD1 0#15M WIND DIRECTION 10 METER 15 MINUTE AVG WIND DIRECTION AT REACTOR SITE A

DEG N/A 0

360 N/A N/A S

1 N/A N/A N/A N/A N/A 0 DEGREES (NORTH)

N/A N/A WIND DIRECTION TO PLANT COMPUTER IS SUPPLIED FROM THE PRIMARY MET TOWER ON SITE. 10 METER ELEVATION

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 39 Date:

Reactor Unit:

Data Feeder:

NRC EROS Parameter:

Point ID:

Plant Specific Point

Description:

Generic 1 Condition

Description:

Analog / Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm /Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for OP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 CC2 1 ATMOSPHERIC STABILITY 2MMS_DTASTB WIND STABILITY BASED ON DELTA TEMP (A)

AIR STABILITY AT REACTOR SITE A

N/A N/A 0 (A) 6 (G)

N/A N/A P

COMPLEX N/A N/A N/A N/A N/A N/A N/A ATMOSPHERIC STABILITY BASED ON DELTA T (60 METER TEMPERATURE MINUS 10 METER TEMPERATURE, CHANNEL A). CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, I=B, 2=C, 3=D, 4=E, 5=F, 6=G

PWR Data Point Library Reference File Report Date :

Page :

06-24-2015 40 Date:

Reactor Unit:

Data Feeder:

NRC ERDS Parameter:

Point ID:

Plant Specific Point

Description:

Generic I Condition

Description:

Analog I Digital:

ENGR Units I Digital States:

ENGR Units Conversion:

Minimum Instrument Range:

Maximum Instrument Range:

Zero Point

Reference:

Reference Point Notes Proc or Sens:

Number of Sensors:

How Processed:

Sensor Locations Alarm I Trip Setpoints:

NI Detector Power Supply Cut-Off Power Level:

NI Detector Power Supply Turn-on Power Level:

Instrument Failure Mode:

Temperature Compensation for DP Transmitters:

Level Reference Leg:

Unique System

Description:

5/4/2015 002 0021 ATMOSPHERIC STABILITY 2MMS_S60STB 60 METER WIND STABILITY - SIGMA-THETA AIR STABILITY AT REACTOR SITE A

N/A N/A 0 (A) 6 (G)

N/A N/A P

COMPLEX N/A N/A N/A N/A N/A N/A N/A ATMOSPHERIC STABILITY BASED ON SIGMA-THETA. CALCULATED ON THE PLANT COMPUTER. VALUES 0 TO 6 CORRESPOND TO STABILITY CLASSES A (EXTREMELY UNSTABLE) TO G (EXTREMELY STABLE). 0=A, 1=B, 2=C, 3=D, 4=E, 5=F, 6=G