ML19208D295: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML19208D295 | | number = ML19208D295 | ||
| issue date = 08/10/1979 | | issue date = 08/10/1979 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in IE Insp Repts 50-269/79-14,50-270/79-14 & 50-287/79-15.Corrective Actions:Valve 3LP-59 Closed During Refueling to Prevent Radioactive Liquid Spill | ||
| author name = Parker W | | author name = Parker W | ||
| author affiliation = DUKE POWER CO. | | author affiliation = DUKE POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 7909280206 | | document report number = NUDOCS 7909280206 | ||
| title reference date = 07-17-1979 | |||
| package number = ML19208D285 | | package number = ML19208D285 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 19: | Line 20: | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
s* | s* | ||
1 Dunr@pWER COMPANY | |||
' ' Mda Bamswo 422 Socin Cacacn Stazzi, CnAnwitz, N. C. as24a | |||
1 | '9 /UC I6 A 9 928 August 10, T97 w w aw o maaaza.sa. | ||
Tg.g o.o % g an t a 7 4 ViC F Petticce, | |||
2734:e? | |||
Stra= Peoosesio= | Stra= Peoosesio= | ||
Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission F.egion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 RE: RII:FJ 50-269/79-14 50-270/79-14 50-287/79-15 | Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission F.egion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 RE: RII:FJ 50-269/79-14 50-270/79-14 50-287/79-15 | ||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
With regard to Mr. R. C. Lewis' letter of July 17, 1979, which transmitted IE Inspection Report 50-269/79-14, 50-270/79-14, and 50-287/79-15, Duke Power Company does not consi'er the information to be proprietary. | With regard to Mr. R. C. Lewis' letter of July 17, 1979, which transmitted IE Inspection Report 50-269/79-14, 50-270/79-14, and 50-287/79-15, Duke Power Company does not consi'er the information to be proprietary. | ||
As Please find attached our response to the Notice of Violation, Item B. | As Please find attached our response to the Notice of Violation, Item B. | ||
stated in your letter, a response to Item A is not requested. | stated in your letter, a response to Item A is not requested. | ||
/ | |||
l Very truly yours j | |||
w $. Parker,Jr.l William 0 RLG:scs Attachment 1052 035 7909280 1 | / | ||
w $. Parker,Jr.l William 0 RLG:scs Attachment 1052 035 7909280 1 qmr | |||
DUKE POWER COMPANY OCONEE NUCLEAR STATION Response to IE Inspection Report 50-269/79-14, 50-270/79-14, 50-287/79-14 Item A No response requested. | DUKE POWER COMPANY OCONEE NUCLEAR STATION Response to IE Inspection Report 50-269/79-14, 50-270/79-14, 50-287/79-14 Item A No response requested. | ||
Itemj! | Itemj! | ||
| Line 49: | Line 45: | ||
This valve and similar valves on Units 1, 2 were closed or verified closed as required by the system procedure. | This valve and similar valves on Units 1, 2 were closed or verified closed as required by the system procedure. | ||
In order to prevent recurrence of this event, several actions were 1::'tiated. | In order to prevent recurrence of this event, several actions were 1::'tiated. | ||
Operators have been instructed to im=ediately secure any non-emergency | Operators have been instructed to im=ediately secure any non-emergency trans-A modification fer of water when vaste inventories show a rapid increase. | ||
request has been initiated which, when installed, will alleviate design defi-Full design ciencies which contributed to the occurrence of this event. | |||
details and schedule for completion are not available. | details and schedule for completion are not available. | ||
1052 036}} | 1052 036}} | ||
Latest revision as of 23:22, 4 January 2025
| ML19208D295 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/10/1979 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19208D285 | List: |
| References | |
| NUDOCS 7909280206 | |
| Download: ML19208D295 (2) | |
Text
.
s*
1 Dunr@pWER COMPANY
' ' Mda Bamswo 422 Socin Cacacn Stazzi, CnAnwitz, N. C. as24a
'9 /UC I6 A 9 928 August 10, T97 w w aw o maaaza.sa.
Tg.g o.o % g an t a 7 4 ViC F Petticce,
2734:e?
Stra= Peoosesio=
Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission F.egion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 RE: RII:FJ 50-269/79-14 50-270/79-14 50-287/79-15
Dear Mr. O'Reilly:
With regard to Mr. R. C. Lewis' letter of July 17, 1979, which transmitted IE Inspection Report 50-269/79-14, 50-270/79-14, and 50-287/79-15, Duke Power Company does not consi'er the information to be proprietary.
As Please find attached our response to the Notice of Violation, Item B.
stated in your letter, a response to Item A is not requested.
/
l Very truly yours j
/
w $. Parker,Jr.l William 0 RLG:scs Attachment 1052 035 7909280 1 qmr
DUKE POWER COMPANY OCONEE NUCLEAR STATION Response to IE Inspection Report 50-269/79-14, 50-270/79-14, 50-287/79-14 Item A No response requested.
Itemj!
As required by Technical Specification 6.4.1.b, procedures shall be followed during refueling operations.
Contrary to the above, on or before May 24, 1979, valve 3LP-59 was opened without an approved procedure or an out of n.,rmal authorization and f ailure te properly control this valve contributed te a radioactive liquid spill.
Response
This valve and similar valves on Units 1, 2 were closed or verified closed as required by the system procedure.
In order to prevent recurrence of this event, several actions were 1::'tiated.
Operators have been instructed to im=ediately secure any non-emergency trans-A modification fer of water when vaste inventories show a rapid increase.
request has been initiated which, when installed, will alleviate design defi-Full design ciencies which contributed to the occurrence of this event.
details and schedule for completion are not available.
1052 036