ML19319D006: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. _ | {{#Wiki_filter:. _ | ||
l 1 | l 1 | ||
i | i | ||
./I h U. | |||
l | l l' | ||
l' | (,7 vuAsa - | ||
( ,7 vuAsa - | |||
Nobd ' | Nobd ' | ||
Florida Power June 17, 1975 | Florida Power June 17, 1975 Mr. Donald v. Knuth, Director | ||
~ | |||
Mr. Donald v. Knuth, Director h Directorate of Regulatory Operations U. 3. Nuclear Regulatory Commission Washington, DC 20545 | h Directorate of Regulatory Operations U. 3. Nuclear Regulatory Commission Washington, DC 20545 | ||
==Subject:== | ==Subject:== | ||
Docket No. 50-302 Crystal River Unit #3 | Docket No. 50-302 Crystal River Unit #3 4 | ||
==Dear Mr. Knuth:== | ==Dear Mr. Knuth:== | ||
7e wish to advise you that we have been notified by B&W Co:apany that they have determined that a deficiency exists in the hydraalic performance of the reactor building spray system on a unit similar to Crystal River Unit #3 (ANO f1.). | |||
Neither the hydraulic performance or the overall effects for Crystal River Unit #3 bave yet been assessed. Pursuant to 10CTR50.55(e), this deficiency is being reported as a "possible" significant deficiency. | |||
Florida Power Corporation is assessing what steps are necessary to determini the posture of the Crystal River Unit #3 reactor building spray system as regards to its hydraulic performance. | Florida Power Corporation is assessing what steps are necessary to determini the posture of the Crystal River Unit #3 reactor building spray system as regards to its hydraulic performance. | ||
We will keep you informed of the actions taken by Florida Power | We will keep you informed of the actions taken by Florida Power Corporation concerning this matter. | ||
I Very truly yours, | I Very truly yours, | ||
( | ( | ||
( | 7 JTR: ldh J. | ||
Rodgers Assistant Vice President | |||
( | |||
cc: Norman C. Moseley I | |||
Director, Region 11 t | |||
wr W | wr W | ||
l | l 8003040 C) 33 | ||
8003040 C) 33}} | --}} | ||
Latest revision as of 19:30, 1 January 2025
| ML19319D006 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear, Crystal River |
| Issue date: | 06/17/1975 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19319C975 | List: |
| References | |
| NUDOCS 8003040933 | |
| Download: ML19319D006 (1) | |
Text
. _
l 1
i
./I h U.
l l'
(,7 vuAsa -
Nobd '
Florida Power June 17, 1975 Mr. Donald v. Knuth, Director
~
h Directorate of Regulatory Operations U. 3. Nuclear Regulatory Commission Washington, DC 20545
Subject:
Docket No. 50-302 Crystal River Unit #3 4
Dear Mr. Knuth:
7e wish to advise you that we have been notified by B&W Co:apany that they have determined that a deficiency exists in the hydraalic performance of the reactor building spray system on a unit similar to Crystal River Unit #3 (ANO f1.).
Neither the hydraulic performance or the overall effects for Crystal River Unit #3 bave yet been assessed. Pursuant to 10CTR50.55(e), this deficiency is being reported as a "possible" significant deficiency.
Florida Power Corporation is assessing what steps are necessary to determini the posture of the Crystal River Unit #3 reactor building spray system as regards to its hydraulic performance.
We will keep you informed of the actions taken by Florida Power Corporation concerning this matter.
I Very truly yours,
(
7 JTR: ldh J.
Rodgers Assistant Vice President
(
cc: Norman C. Moseley I
Director, Region 11 t
wr W
l 8003040 C) 33
--