Florida Power June 17, 1975 Mr. Donald v. Knuth, Director
~
h Directorate of Regulatory Operations U. 3. Nuclear Regulatory Commission Washington, DC 20545
Subject:
Docket No. 50-302 Crystal River Unit #3 4
Dear Mr. Knuth:
7e wish to advise you that we have been notified by B&W Co:apany that they have determined that a deficiency exists in the hydraalic performance of the reactor building spray system on a unit similar to Crystal River Unit #3 (ANO f1.).
Neither the hydraulic performance or the overall effects for Crystal River Unit #3 bave yet been assessed. Pursuant to 10CTR50.55(e), this deficiency is being reported as a "possible" significant deficiency.
Florida Power Corporation is assessing what steps are necessary to determini the posture of the Crystal River Unit #3 reactor building spray system as regards to its hydraulic performance.
We will keep you informed of the actions taken by Florida Power Corporation concerning this matter.
I Very truly yours,
(
7 JTR: ldh J.
Rodgers Assistant Vice President
(
cc: Norman C. Moseley I