{{#Wiki_filter:7 F-
7 F-                                                                                                                             l
~
      ~
~ July 23, 1984 Date ISI FIELD CHANGE AUTHORIZATION RPV Preservice Inspection Program Plan for Perry Document Title Npo/r Document No. 00A44 21 Rev.
                                                                                                                                    , (
1 Field Change No.
                                                                                          ~ July 23, 1984 Date ISI FIELD CHANGE AUTHORIZATION RPV Preservice Inspection Program Plan for Perry Document Title       Npo/r Document No. 00A44 21 Rev.                           1 Field Change No.           FC #1~                         Originator     C. Tedesco Description of Field Change:
FC #1~
Originator C. Tedesco Description of Field Change:
Page 5, Para. 3.4 - Change: "Subarticle T-540 of Article 4 of
Page 5, Para. 3.4 - Change: "Subarticle T-540 of Article 4 of
                                                          'ASME' Section V, 1900 Edition".
'ASME' Section V, 1900 Edition".
To Read: "Subarticle T-434 of Article 4 of ASME Section V,         1977 Edition through Addenda Summer 1978           and                         Subarticle III-3400 of Appendix III of ASME Section Reason f or Change:                           XI, 1977 Edition through Addenda Summer 1978.
To Read: "Subarticle T-434 of Article 4 of ASME Section V, 1977 Edition through Addenda Summer 1978 and Subarticle III-3400 of Appendix III of ASME Section Reason f or Change:
To correct mistaken Code selection in para.                         3.4.
XI, 1977 Edition through Addenda Summer 1978.
APPROVALS:
To correct mistaken Code selection in para.
Title                                   *L;ea j;re
 
                        ~
===3.4. APPROVALS===
Date CEI/NDE OA               '
Title
                                                      ).
*L;e j;re Date a
I/   .:n.       .-                                                  7/ </W ISI Eng. Dept. Mgr.                     ;
CEI/NDE OA
~
I/
)..:n.
7/ </W ISI Eng. Dept. Mgr.
Proj. Mgr.
Proj. Mgr.
g QA Manager                   bhC. AcW h
g QA Manager bhC. AcW h
* 7 Distribute to all Controlled Copy holders ' affected Document.
* 7 7/e'py Distribute to all Controlled Copy holders ' affected Document.
7/e'py l
l NOTE:
NOTE:
A' copy of this authorization shall be attached to the affected document until a subsequent revision incorporates the field change 8409040132 840028 PDR ADOCK 05000440 e
A' copy of this authorization shall be attached to the affected document until a subsequent revision incorporates the field change 8409040132 840028 PDR ADOCK 05000440 e           G                       PDR                                                                                       ,
G PDR J
J


1 80A4421           1 DOCUMENT NO.                 REV.
80A4421 1
NUCLEAR ENERGY SERVICES, INC.                         PAGE   1     nF 145 L]
DOCUMENT NO.
F     COMR0' LED B0PY ;bh l             -
REV.
REACTOR PRESSURE VESSEL PRESERVICE INSPECTION PROGRAM PLAN FOR PERRY NUCLEAR POWER PLANT UNIT 1
NUCLEAR ENERGY SERVICES, INC.
                              ,                  PREPARED FOR CLEVELAND ELECTRIC ILLUMINATING COMPANY Project Applicatio3532               Prepared By Asrar Ahmed       -yEpf)     EE:b         Date g/3,/g3 APPROVALSI TITLE / DEPT.                                 SIG N AT U R E                         DATE Inspection Programs Manager         ggg,p/p                     (       [                   pffg Project Manager
PAGE 1
(((                                             pfp 3 Q.A. Manager                     , y[               j,, g,g4                             h_y_g, u-                                                         ;
nF 145 L]
l l
F COMR0' LED B0PY ;bh l
FORM # NES 2042 80                                                                                           i
REACTOR PRESSURE VESSEL PRESERVICE INSPECTION PROGRAM PLAN FOR PERRY NUCLEAR POWER PLANT UNIT 1 PREPARED FOR CLEVELAND ELECTRIC ILLUMINATING COMPANY Project Applicatio3532 Prepared By Asrar Ahmed
-yEpf)
EE:b Date g/3,/g3 APPROVALSI TITLE / DEPT.
SIG N AT U R E DATE Inspection Programs Manager ggg,p/p
(
[
pffg Project Manager
(((
pfp 3 Q.A. Manager y[
j,, g,g4
: h_y_g, u-l FORM # NES 2042 80 i


80A4421
80A4421 REVISION L0G ggg 2
145 PAGE OF NUCLEAR ENERGY SERVICES. INC.
~~
~~
ggg                                REVISION L0G NUCLEAR ENERGY SERVICES. INC.
DATE
PAGE 2
"#[E DESCRIPTION APPROVAL AE '
OF 145 AE '      DATE                        DESCRIPTION                                                APPROVAL gO                "#[E n
n gO 1
1      6/20/84     All CRA # 4394                                                       ,
6/20/84 All CRA # 4394 V
Incorporate customer comments and                                                     V          ._
Incorporate customer comments and inhouse corrections.
inhouse corrections.
'O
'O
\\, /
\, /
AU FORM # NES 206 2 80
A U
FORM # NES 206 2 80


^
DOCUMENT NO.
DOCUMENT NO.
                                                                                                                                                  ^  '
PAGE OF p
PAGE                                           OF p                       NUCLEAR ENERGY SERVICES. INC.                                                                                                             j G
NUCLEAR ENERGY SERVICES. INC.
TABLE OF CONTENTS PAGE 1.. INTRODUCTION                                                                                                               4 J
j G
: 2. BASES FOR PRESERVICE INSPECTION PROGRAM                                                                                     4
TABLE OF CONTENTS PAGE 1..
: 3.     PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION                                                                             5 3.1 Classification                                                                                                       5 3.2~ Exemptions                                                                                                           5 3.3 Exceptions                                                                                                           5 3.4 Ultrasonic Testing Calibration Standards                                                                             5 3.5 Examination Procedures                                                                                               6 3.6 Figures and Sketches                                                                                                 8
INTRODUCTION 4
: 4.     PROGRAM PLAN AND SCHEDULE                                                                                                 9 WELD MAP FIGURES                                                                                                         10 SCHEDULE SHEETS                                                                                                           26 TABLES 3.4 Reference Calibration Standards                                                                                       6 3.5 Reference NDE Procedures                                                                                             7 3.6 Reactor Pressure Vessel Sketches                                                                                     8 O
J 2.
i FORM #NES 205 2/80
BASES FOR PRESERVICE INSPECTION PROGRAM 4
3.
PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 5
3.1 Classification 5
3.2~
Exemptions 5
3.3 Exceptions 5
3.4 Ultrasonic Testing Calibration Standards 5
3.5 Examination Procedures 6
3.6 Figures and Sketches 8
4.
PROGRAM PLAN AND SCHEDULE 9
WELD MAP FIGURES 10 SCHEDULE SHEETS 26 TABLES 3.4 Reference Calibration Standards 6
3.5 Reference NDE Procedures 7
3.6 Reactor Pressure Vessel Sketches 8
O i
FORM #NES 205 2/80


DOCUMENTfjo.       80A M21 "g                               NUCLEAR ENERGY SERVICES. INC.
80A M21 DOCUMENTfjo.
PAGE        OF
"g PAGE OF NUCLEAR ENERGY SERVICES. INC.
: 1. INTRODUCTION This Program Plan has been prepared to fulfill the Preservice Inspection (PSI) requirements for the Reactor Pressure Vessel (RPV) of the Perry Nuclear Power Plant (PNPP) Unit 1, owned by Cleveland Electric Illuminating Company.
: 1. INTRODUCTION This Program Plan has been prepared to fulfill the Preservice Inspection (PSI) requirements for the Reactor Pressure Vessel (RPV) of the Perry Nuclear Power Plant (PNPP) Unit 1, owned by Cleveland Electric Illuminating Company.
The scope of these examinations, procedures, and acceptance criteria meet the requirements outlined in Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, " Rules for Inservice Inspection of Nuclear Power Plant Components",1977 Edition with Addenda up to and including the Summer 1978 Addenda.
The scope of these examinations, procedures, and acceptance criteria meet the requirements outlined in Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, " Rules for Inservice Inspection of Nuclear Power Plant Components",1977 Edition with Addenda up to and including the Summer 1978 Addenda.
Line 81: Line 111:


80A4421 DOCUMENT NO.
80A4421 DOCUMENT NO.
PAGE       OF Q                         NUCLEAR ENERGY SERVCES. INC.
PAGE OF Q
NUCLEAR ENERGY SERVCES. INC.
v
v
: 3. PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 3.1     CLASSIFICATION All the components covered in this program plan are part of the reactor coolant pressure boundary as defined in 10CFR 50 subsection 50.2(v).
: 3. PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 3.1 CLASSIFICATION All the components covered in this program plan are part of the reactor coolant pressure boundary as defined in 10CFR 50 subsection 50.2(v).
3.2     EXEMPTIONS None of the wolds or components of the RPV are exempted from examination by subparagraph IWB-1220 of ASME Section XI..
3.2 EXEMPTIONS None of the wolds or components of the RPV are exempted from examination by subparagraph IWB-1220 of ASME Section XI..
3.3     EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as allowed by 10CFR 50.55 a(a)(2), provided that design fabrication, installation, testing and inspection performed in compliance with Codes and Section XI requirements would result in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative examination w ~' provide an acceptable level of quality and safety.
3.3 EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as allowed by 10CFR 50.55 a(a)(2), provided that design fabrication, installation, testing and inspection performed in compliance with Codes and Section XI requirements would result in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative examination w ~' provide an acceptable level of quality and safety.
Detailed descriptions and justifications for exceptions taken are itemized in Table 3.3. (Later) 3.4     ULTRASONIC TESTING CALIBRATION STANDARDS The UT Examination Calibration Standard design and material selection is in accordance with subarticle T-540 of Article 4 of 'ASME' Section V,1980 Edition.
Detailed descriptions and justifications for exceptions taken are itemized in Table 3.3. (Later) 3.4 ULTRASONIC TESTING CALIBRATION STANDARDS The UT Examination Calibration Standard design and material selection is in accordance with subarticle T-540 of Article 4 of 'ASME' Section V,1980 Edition.
Table 3.4 lists all the UT Calibration Standards required to perform the Ultrasonic Examinations for the RPV at Perry Nuclear Power Plant.
Table 3.4 lists all the UT Calibration Standards required to perform the Ultrasonic Examinations for the RPV at Perry Nuclear Power Plant.
O V
O V
Line 92: Line 123:


DOCUMENT NO.
DOCUMENT NO.
PAGE           OF
PAGE OF h_
                                - NUCt. EAR ENERGY SERVICES, INC.
- NUCt. EAR ENERGY SERVICES, INC.
h_
- %.)
  - %.)
TABLE 3.4 Reference Calibration Standards Block Wall Title Where Used Thickness Material d
TABLE 3.4 Reference Calibration Standards                                                             --
PY-123-1-RPV Bottom Head Plate 8.15" SA 533 GRB, CLI PY-124-1-RPV No.1 Shell Ring 7.0" SA 533 GR3, CLI No. 2 & No. 3 Shell Ring g
Block Wall Title               Where Used                         Thickness             Material d
No. 4 Shell Ring PY-127-1-RPV Top Head Dollar Plate 3.08" SA 533 GRB, CLI PY-128-1-RPV Top Head Radial Plates 5.0" SA 533 GRB, CLI PY-SE-BI-l Nozzle Safe-end
PY-123-1-RPV Bottom Head Plate                         8.15"                 SA 533 GRB, CLI PY-124-1-RPV No.1 Shell Ring                           7.0"                 SA 533 GR3, CLI No. 2 & No. 3 Shell Ring                                                       g No. 4 Shell Ring PY-127-1-RPV Top Head Dollar Plate                     3.08"                 SA 533 GRB, CLI PY-128-1-RPV Top Head Radial Plates                   5.0"                 SA 533 GRB, CLI PY-SE-BI-l         Nozzle Safe-end                     .745"                 SA 336 CLF8 SA 508 CLII PY-SE-CS-1         Nozzle Safe-end                     .756"               SA 105 O                     ev-SE-CS-2         Nozzie Sefe-end                     1.51"               SA 516 GR70 PY-SE-BI-3         Nozzle Safe-end                     1.15"               SB 166 INCO SA 508 CLII PY-SE-BI-4         Nozzle Safe-end                     1.27"               SA 182 F316L SA 508 CLIA PY-SE-BI-5         Nozzle Safe-end                     1.50"               SA 336 CLF8 SA 508 CL2, PY-SE-BI-6         Nozzle Safe-end                     Later               Later PY-STUD-1-RPVClosure Stud                             61/4"               SA 540 B23, CL3 PY-NUT-1-RPV Closure Nut                               61/4"               SA 540 B23, CL3 3.5     EXAMINATION PROCEDURES Subarticle IWA-1400 of Section XI requires the development and preparation of written examination procedures neces,ary for the conduct of the nondestructive examinations associated with PSI operations. The written procedures for the performance of visual, surface, and volumetric examinations are referenced in O
.745" SA 336 CLF8 SA 508 CLII PY-SE-CS-1 Nozzle Safe-end
  %j Table 3.5.
.756" SA 105 O
FORM # NES 205 2/80
ev-SE-CS-2 Nozzie Sefe-end 1.51" SA 516 GR70 PY-SE-BI-3 Nozzle Safe-end 1.15" SB 166 INCO SA 508 CLII PY-SE-BI-4 Nozzle Safe-end 1.27" SA 182 F316L SA 508 CLIA PY-SE-BI-5 Nozzle Safe-end 1.50" SA 336 CLF8 SA 508 CL2, PY-SE-BI-6 Nozzle Safe-end Later Later PY-STUD-1-RPVClosure Stud 61/4" SA 540 B23, CL3 PY-NUT-1-RPV Closure Nut 61/4" SA 540 B23, CL3 3.5 EXAMINATION PROCEDURES Subarticle IWA-1400 of Section XI requires the development and preparation of written examination procedures neces,ary for the conduct of the nondestructive examinations associated with PSI operations. The written procedures for the performance of visual, surface, and volumetric examinations are referenced in O
Table 3.5.
%j FORM # NES 205 2/80


80A4421 DOCUMENT NO.
80A4421 DOCUMENT NO.
PAGE                       OF NUCLEAR ENERGY SERVICES, INC.
PAGE OF NUCLEAR ENERGY SERVICES, INC.
TABLE 3.5 REFERENCE NDE PROCEDURES Procedure No.         Title 80A0183   -
TABLE 3.5 REFERENCE NDE PROCEDURES Procedure No.
Procedure for Liquid Penetrant Examinations 80A0184   -
Title 80A0183 Procedure for Liquid Penetrant Examinations 80A0184 Procedure for Visual Examinations Procedure for Magnetic Particle Examinations 80A0185 80A0189 Ultrasonic Examination Procedure for Reactor Vessel to Flange and Flange Ligament areas 80A0190 Manual Ultrasonic Examination Procedure for Nozzle Inner Radil 80A0191 Manual Ultrasonic Examination Procedure for Reactor Vessel Nozzle to Shell Welds.
Procedure for Visual Examinations 80A0185    -
b 80A0192 Manual Ultrasonic Examination Procedure for Closure Head and Nozzle Welds 80A0195 Manual Ultrasonic Examination Procedure for Nozzle Safe-end and Transition Welds 80A0196 Ultrasonic Examination Procedure for Studs & Bolts 80A0208 Automated Ultrasonic Examination Procedure for Reactor Vessel Welds 80A0209 Automated Ultrasonic Examination Procedure for Reactor Vessel Nozzle Welds b
Procedure for Magnetic Particle Examinations 80A0189   -    Ultrasonic Examination Procedure for Reactor Vessel to Flange and Flange Ligament areas 80A0190   -
80A0211 Remote Ultrasonic Examination Procedure for Nozzle Safe-end and Transition Welds FORM # NES 205 2/80
Manual Ultrasonic Examination Procedure for Nozzle Inner Radil 80A0191   -
Manual Ultrasonic Examination Procedure for Reactor Vessel Nozzle to Shell Welds.                                                   b 80A0192   -
Manual Ultrasonic Examination Procedure for Closure Head and Nozzle Welds 80A0195   -
Manual Ultrasonic Examination Procedure for Nozzle Safe-end and Transition Welds 80A0196   -
Ultrasonic Examination Procedure for Studs & Bolts 80A0208   -
Automated Ultrasonic Examination Procedure for Reactor Vessel Welds 80A0209   -
Automated Ultrasonic Examination Procedure for Reactor Vessel Nozzle Welds                                                       b 80A0211   -
Remote Ultrasonic Examination Procedure for Nozzle Safe-end and Transition Welds FORM # NES 205 2/80


80A4421 DOCUMENT NO.
80A4421 DOCUMENT NO.
PAGE       OF NUCLEAR ENERGY SERVICES, INC.
PAGE OF NUCLEAR ENERGY SERVICES, INC.
(-]
(-]
3.6     FIGURES AND SKETCHES The figures listed in Table 3.6 delineates the identification and location of areas of the Reactor Pressure Vessel requiring examinations.
3.6 FIGURES AND SKETCHES The figures listed in Table 3.6 delineates the identification and location of areas of the Reactor Pressure Vessel requiring examinations.
TABLE 3.6 REACTOR PRESSURE VESSEL SKETCHES Figure No.     Revision       Description 1-RV-001           0           Reactor Vessel Internals 1-RV-002           0           Vessel Roll-Out, Vertical and Circumferential Welds 1-RV-003           1           Reactor. Recirculation Nozzle Welds                                                                                     g 1-RV-004           1           Feedwater Nozzle Welds                                                                                                 g 1-RV-005           0           Core Spray & RHR Nozzle Welds l-RV-006           0           Closure Head Circumferential & Meridional Weld 1-RV-007           0           Bottom Head Welds
TABLE 3.6 REACTOR PRESSURE VESSEL SKETCHES Figure No.
                                                                                                          ~
Revision Description 1-RV-001 0
1-RV-008           0           Main Steam & Vibration Nozzle Welds 1-RV-009           0           Jet Pump & CRD Return Nozzle Welds 1-RV-010           0           CRD Partial Penetration Welds 1-RV-011           0           CRD Mechanism Housing Welds and Flange Bolting 1-RV-012           i           Bottom Head Incore Partial Penetration Welds                                                                           d 1-RV-013           0           Vessel Flange Ligaments 1-RV-014           0           Closure Head Studs l                       l-RV-015           0           Closure Head Nuts 1-RV-016           0           Closure Head Washers l
Reactor Vessel Internals 1-RV-002 0
Vessel Roll-Out, Vertical and Circumferential Welds 1-RV-003 1
Reactor. Recirculation Nozzle Welds g
1-RV-004 1
Feedwater Nozzle Welds g
1-RV-005 0
Core Spray & RHR Nozzle Welds l-RV-006 0
Closure Head Circumferential & Meridional Weld 1-RV-007 0
Bottom Head Welds
~
1-RV-008 0
Main Steam & Vibration Nozzle Welds 1-RV-009 0
Jet Pump & CRD Return Nozzle Welds 1-RV-010 0
CRD Partial Penetration Welds 1-RV-011 0
CRD Mechanism Housing Welds and Flange Bolting 1-RV-012 i
Bottom Head Incore Partial Penetration Welds d
1-RV-013 0
Vessel Flange Ligaments 1-RV-014 0
Closure Head Studs l
l-RV-015 0
Closure Head Nuts 1-RV-016 0
Closure Head Washers l
l O FORM # NES 205 2/80 l
l O FORM # NES 205 2/80 l


^
DOCUMENT NO.
DOCUMENT NO.
                                                                                                                                                ^
PAGE OF NUCLEAR ENERGY SERVICES, INC.
PAGE                         OF NUCLEAR ENERGY SERVICES, INC.
b,n
b,n
: 4. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables. Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, and any calibration standard number referenced for ultrasonic examination.
: 4. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.
Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, and any calibration standard number referenced for ultrasonic examination.
Examination items are first divided according to the figure that they appear on.
Examination items are first divided according to the figure that they appear on.
Multiple examination requirements of the same component are listed together in the schedule tables.
Multiple examination requirements of the same component are listed together in the schedule tables.
Supplemental surface examination (PT) on the Feedwater Nozzles Inner Radius in accordance with Nuclear Regulatory Commission NUREG-061g "BWR Feedwater                                                             b Nozzle and CRD return line Nozzle Cracking", has been scheduled per CEI request.
Supplemental surface examination (PT) on the Feedwater Nozzles Inner Radius in accordance with Nuclear Regulatory Commission NUREG-061g "BWR Feedwater b Nozzle and CRD return line Nozzle Cracking", has been scheduled per CEI request.
l l
l l
O FORM #NES 205 2/80
O FORM #NES 205 2/80


DOCUMENT NO.                     80A @
80A @
[]                     NUCLEAR ENERGY SERVICES. INC.
DOCUMENT NO.
VENT AND HEAD SPRAY                                                                                                                                                   ._
[]
NUCLEAR ENERGY SERVICES. INC.
VENT AND HEAD SPRAY
_ I_
_ I_
                                              \                                                               ,
\\
TEAM DRYER ASSEMBLY i.
TEAM DRYER ASSEMBLY i.
i                      '[
'[
STEAM OUTLET
STEAM OUTLET i
                                                        ),
),
                                                                          ''.-                                                                  STEAM SEPARATOR
STEAM SEPARATOR ASSEMBLY 3
                                                          !.                                                                                        ASSEMBLY 3     -
FEEDWATER INLET b II
FEEDWATER INLET COR' E SPRAY INLET                   A                                   l       N b II                    ,
..L
v,    ..L                  -hid      .
-hid COR' E SPRAY INLET A
g                         FEEDWATER SPARGER f    ,
l N
LQW PRESSURE COOLANT               .
. g FEEDWATER SPARGER v,
l INJECTION INLET             - dd           -l                                                   !                            CORE SPRAY LINE b
f LQW PRESSURE COOLANT l
CORE SPRAY SPARGER                 I.               j                               _, j O                                           d JET PUMP ASSEMBLY                                                                     1 CORE SHROUD FUEL ASSEMBLIES              %"~                                                                                           CONTROL BLADE
INJECTION INLET
                                                              ,                                          ,[
- dd
                                            '        ~                             '                                ''
-l CORE SPRAY LINE CORE SPRAY SPARGER I.
JET PUMP /RECTRCUL ATI                       W
b j
                                                          ,                                                  /
_, j O
                                                                                                              '                              CORE PLATE l
d JET PUMP ASSEMBLY 1
WATER INLET                                                                                   '
CORE SHROUD
k                                                   '
%"~
                                                                                                              /
CONTROL BLADE FUEL ASSEMBLIES
                                                                                                                  /
,[
ECIRCULATION WATER OUTLET d,                         ,   ,   .- l :
~
VESSEL SUPPORT SKIRT #                                                                                                           SHIELD WALL
/
                                                                                  \
CORE PLATE JET PUMP /RECTRCUL ATI W
                                      /                          }                      'b\l         ;
l WATER INLET k
i,
/ /
                                                                                                                        /
ECIRCULATION WATER OUTLET d,
CONTROL ROD DRIVES #                                   pt           hl"l                   \                     CONTROL ROD DRIVE
,,.- l :
                                            ' /
VESSEL SUPPORT SKIRT #
                                                                                                                          -    HYDRAULIC LINES 11EE ---
SHIELD WALL
IN-CORE FLUX MONITOR                                                                                               ,,,,,,              nra                             -
\\
REACTOR VESSEL B 13                   CUTAWAY
'b\\l i,
                                                                                                                            =0                 **
}
/
CONTROL ROD DRIVES #
pt hl"l
/
\\
CONTROL ROD DRIVE
/
HYDRAULIC LINES 11EE ---
IN-CORE FLUX MONITOR nra REACTOR VESSEL B 13 CUTAWAY
=0
**
* l RV-OOI
* l RV-OOI
                                                                                                                                                      *",*I/#[
*",*I/#[
                                                                                                                                                          ,f CLASSI PERRY UNIT I
CLASSI
                                                                                                                                                        ,,or to seu l         FORM #NES 205 2/80
,f PERRY UNIT I
,,or to seu l
FORM #NES 205 2/80


DOCUMENT NO.
80A421 DOCUMENT NO.
80A421 PAGE II OF 145 NUCLEAR ENERGY SERVICES, INC.
II 145 PAGE OF NUCLEAR ENERGY SERVICES, INC.
d       319'     288*                                           19 9*                 168*                             7s* 48'                 O' I
d 319' 288*
                                                                                                                                                                                                                        ~
19 9*
I                        SHELL FLANG                               E                                                       _ _ _ EL.7pOO _ _
168*
11-843-41 l                                                                       -il-913-BN I 3                 3                           '                                                                                                                                        N
7s*
                                                                                    @                                      3    ')
48' O'
NO.4 SHELL RING                       b   k l
I I
1
SHELL FLANG E
        '$                        6 P
_ _ _ EL.7pOO _ _
O
~
                                                                              **O                  _ {gl[5 y 1                             ,$                                                                    k I_ _ _ _ s 555$ _ _                                    _
11-843-41 l
                                                                                                                                                                                                                  )
-il-913-BN I 3
          '3 G
3 3
                                      @h@                                     886 h                                        O           G5                           NQ 3 SHELL RING O                                                                                                                               :
')
l         -5=                               @                        _ - n @ re m _                                         @                    ,
N NO.4 SHELL RING b
_ _ _ _EL _3,,_ _ ,_ _                              _
k l
o                                       rA6El                     o           o                                                 o                                                                   l I2                                                                 12 12                                                           12                                                                   ;
6 O
h                                        NQ2 iiHELL RING
_ {gl[5 y 1 k
P
**O 1
I_ _ _ _ s 555$ _ _
)
'3 G
@h@ 886 O
G5 h
NQ 3 SHELL RING O
l
-5=
_ - n @ re m _
, _ _ _ _EL _3,,
o rA6El o
o o
l I2 12 12 12 h
NQ2 iiHELL RING
{
{
13.g3 4g1                                  H i-m i
{
{
                                                                  '                                                                                        _ __ _EL_203,69_ _                                 _  ;
13.g3 4g1 H i-m i
O   h@0@ @@                                                                   O * @,@ @ @ d Il-M3- A A l                                           g,                                              ,1 SHELL RING                    l g
_ __ _EL_203,69_ _
BOTTOM HEAD l                    _ _ _EL 8g_ _ _         _                        _f m                                             w                       J                                                                 ~
O h@0@ @@
aso*                                                     Micf             137'               do* d' 257*                                                                             -
O * @,@ @ @ d l
,1 SHELL RING g,
g Il-M3-A A l
_ _ _ L 8g_ _ _ _f l
E BOTTOM HEAD m
w J
~
aso*
Micf 137' do* d' 257*
O sozzte LOcATiOs Os ReACrm vEsSEt ssEtt CBI REE NO.
O sozzte LOcATiOs Os ReACrm vEsSEt ssEtt CBI REE NO.
73- C100 ( 14 oWG,NO, 21 REV 4                                                                                                           gg                             g=
73-C100 ( 14 oWG,NO, 21 REV 4 gg g=
22 REV 5                                                                                         ma                                   w hhk                                                                                               "E" " VESSEL ROU:OUT Bl3                      VERTICAL AND l                                                                                                                                                                     CIRCUMFERENTIAL SEAM
22 REV 5 ma w
                                                                                                                                              =                      m e.o.1-RV-OO2
hhk "E"
                                                                                                                                              % ."[h
" VESSEL ROU:OUT VERTICAL AND Bl3 l
                                                                                                                                              ~
CIRCUMFERENTIAL SEAM m e.o.1-RV-OO2
CLASS I PERRY UNIT I un m sens FORM #NES 205 2/80
=
."[h CLASS I
~
PERRY UNIT I un m sens FORM #NES 205 2/80


DOCUMENT NO. 80A4421 gg gg                                                                                                        12         145 PAGE                 OF NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO. 80A4421 gg 12 145 gg PAGE OF (Q
(Q x_J Il-Bl3 NIB-lR    l l- Bl3-NIB -KAI           I Bl3-N2A-I R I I l-Bl3-N2K K A;                     l 1 - 813- NIB- KB l                 ! l- 813- N2A-KA l
NUCLEAR ENERGY SERVICES, INC.
                                                                                                                                      ~
x_J l l-Bl3-NIB -KAI I Bl3-N2A-I R I Il-Bl3 NIB-lR I l-Bl3-N2K K A; l 1 - 813-NIB-KB l
l l-Bl3-N2K-KB                                                     l-Bl3-N2A-KB l l l-Bl3-N2K-l R                           g     _
! l-813-N2A-KA l l l-Bl3-N2K-KB l-Bl3-N2A-KB l
p                       ll-Bl3-N2B 4R l ll-Bl3-N2J KAl                                               -
~
ll-B13-N28-KA l 11 Bl3-N2J -KB!                                                                         ll- Bl3 -N29-KBI
l l-Bl3-N2K-l R g
[                    j
p ll-Bl3-N2B 4R l ll-Bl3-N2J KAl ll-B13-N28-KA l 11 Bl3-N2J -KB!
                                                                      <R                                             I- Bl3- N2C-IRl ll-Bl3-N2J -lR I                       /\             \
[
ll-Bl3-N2H KA                         f                                                             11-Bl3-N2C- KA l Il-Bl3-N2H -KB .
ll-Bl3 -N29-KBI j
    -                                                                                                          l [-BI3-N2C -KB l
<R I-Bl3-N2C-IRl ll-Bl3-N2J -lR I
                                                                  /                           ;
/\\
\\
ll-Bl3-N2H KA f
11-Bl3-N2C-KA l Il-Bl3-N2H -KB.
l [-BI3-N2C -KB l
/
ll-813 - N2H-IR
ll-813 - N2H-IR
                                                                                              .)
.)
                                                                                              /               q i.g3.N2D IRI ll Bl3-N2G-KA                             '  -
/
l-Bl3-N2D-KAl Il- Bl3-N2G- K
q i.g3.N2D IRI ll Bl3-N2G-KA l-Bl3-N2D-KAl Il-Bl3-N2G-K l l-Bl3-N2D -KBI
  +
+
1
1 I l-813-N26-IR
                                                                                  ,                      l l- Bl3-N2D -KBI I l-813-N26-IR
_c l-Bl3-N2E-IR I l l-Bl3-N2F-KA l l l-Bt3-N2E-KAl ll-Bl3 N2F-KBI 11-Bl3-N2E-KB l Il-BI3 -HI A-KA ll-Bl3-NIA-KB l Il-Bl3-N2F-IR I.Bl3 NIA-IRI CBI REF NO 73-CIOB NI-RECIRC OUTLET NOZZLE DWG NO 165 REV,1 N2-RECIRC lNLET N0ZZLE Si REV.3 KA-NOZZLE TD VESSEL WELD 55 REV,4 KB-tOZZLE 10 SAFE END WELD KC-SAFE END TO SAFE END EXTENTION WELD IR - N0ZZLE INNER RADIUS N E h. = = =. - - =
_c                                     l-Bl3-N2E-IR I l l- Bl3-N2F- KA l l l-Bt3- N2E-KAl ll-Bl3 N2F-KBI                                                     11- Bl3-N2E-KB l Il- BI3 -HI A- KA ll-Bl3-NIA-KB l Il-Bl3-N2F-IR                                             I.Bl3 NIA-IRI CBI REF NO NI- RECIRC OUTLET NOZZLE 73-CIOB DWG NO 165 REV,1 N2-RECIRC lNLET N0ZZLE Si REV.3 KA-NOZZLE TD VESSEL WELD                                                       55 REV,4 KB-tOZZLE 10 SAFE END WELD KC- SAFE END TO SAFE END EXTENTION WELD IR - N0ZZLE INNER RADIUS N E h.
sysras DTLE RECIRC NOZZLE Bl3 mI
sysras
= = l RV-OO3 p
                                                                                                                  = = = . - - =
= //W care s//8/U CLASS I x
DTLE Bl3        RECIRC NOZZLE mI         = = l RV-OO3 p
-y care s/r4 PERRY-UNIT I a m sua FORM #NES 205 2/80
x                                                                                        = //W           care s//8/U CLASS I
                                                                                            -y             care s/r4 PERRY- UNIT I a m sua FORM #NES 205 2/80


DOCUMENT NO.           80A4421.
DOCUMENT NO.
pAGE           13   OF 145 NUCt. EAR ENERGY SERVICES, INC.
80A4421.
pAGE 13 OF 145 NUCt. EAR ENERGY SERVICES, INC.
I-B13-N4F-KB l O'
I-B13-N4F-KB l O'
l 1 -Bl3-N4F- KA                                                   g.gl3.N4A- KB l l l-Bl3-N4F IR                                                       g,g,3,g_g ;
l 1 -Bl3-N4F-KA g.gl3.N4A-KB l l l-Bl3-N4F IR g,g,3,g_g ;
                                                            ' 30             l l-B13-N4A-IR l TYP.
' 30 l l-B13-N4A-IR l TYP.
Il-813 N4E KA                                                                     l-BG-N48-IR l ll-Bl3-N4E - K B         \                           ,
Il-813 N4E KA l-BG-N48-IR l ll-Bl3-N4E - K B
\\
I-Bl3-N48 KBl 9
I-Bl3-N48 KBl 9
l l-Bl3-N4E-IR
^I l l-Bl3-N4E-IR I l B13 N40-IRl 30' 11-Bl3-N40 -KA i I - 813-N4C-IRl
                                                                                                '      ^I I l B13 N40-IRl                                   30' 11- Bl3- N40 -KA i                               -              I - 813- N4C-IRl
: p. 843-N40- K B l I-813-N4C-KA l l-Bl3-N4C-KB l 18 0*
: p. 843- N40- K B l                                           I-813-N4C-KA l l-Bl3-N4C-KB l 18 0*
CBI REE NO, N4-FEEDWATER NOZZLE 73 -C108 KA-NOZZLE TO VESSEL WELD DWG, NO,165 REV. I KB-NOZZLE TO SAFE END WELD 62 REV 4 KC - SAFE END TO SAFE END EXTENSION WELD IR - INNER RA01US TIEL87 ---
CBI REE NO, N4-FEEDWATER NOZZLE                                             73 -C108 KA-NOZZLE TO VESSEL WELD                                 DWG, NO,165 REV. I KB-NOZZLE TO SAFE END WELD                                               62 REV 4 KC - SAFE END TO SAFE END EXTENSION WELD IR - INNER RA01US TIEL87 ---
Y FEEDWATER Bl3 NOZZLE WELD
Y           FEEDWATER Bl3             NOZZLE WELD
= l-
                                                                        = l-   == l RV- OO4 h                                                                     OK wM ura.614Is4 ura: s/ra CLASS I PERRY - UNIT I
 
                                                                                        .or to seu FORM #NES 205 2/80 L
== l RV-OO4 h
OK ura.614Is4 CLASS I wM ura: s/ra PERRY - UNIT I
.or to seu FORM #NES 205 2/80 L


DOCUMENT NO.
80A M DOCUMENT NO.
80A M q                       NUCLEAR ENERGY SERVICES, INC.
q NUCLEAR ENERGY SERVICES, INC.
G l
G Oo
Oo                ! l-913-NGA-I RI                                                                           ;
! l-913-NGA-I RI l-Bl3-N6A - kcl I
l-Bl3-N6A - kcl I                                           ;
l l-Bl3-NGA-KB l 4
                                                          %                                                l l-Bl3-NGA-KB l                                           4 45                                             g.gl3.NGA - KA l l
45 g.gl3.NGA - KA l
                                                                                                                                                                      \
\\
T.                   +                   E                                                                                         i l
T.
31                                   31 ll.Bl3-N58-IRI--                                                                                 di-813 NSA-lRl l1. gl3.N56- KA!   e                     s           #                                                '                    ^
+
45 %<45                                                   i.Bl3- NSA- kcl Il-Bl3 N58-KC                         I' E     ~
E 31 31 ll.Bl3-N58-IRI--
I-g 13- NSA- KB l I 1. Bl3-N58- KB                                                                                             '
di-813 NSA-lRl l1. gl3.N56-KA!
l-80-PEB -MCI
e s
                                        .gi3.N6C-K Al                                              '~           ~
^
g.Bl3 N6C- KB     180'                                     ''ON ~ #
45 %<45 i.Bl3-NSA-kcl Il-Bl3 N58-KC I' E
H i-Bl3-N6C-kcl                             I-Bl3 N6B-IRI NS - CORE SPRAY NOZZLE N6- RHR N0ZZLE KA- NOZZLE TO VESSEL WELD                                                     C B1 REF. NO.
~
KB - NOZZLE TO SAFE END WELD                                                             73-CIOB KC - SAFE END TO SAFE END EXTENSION WELD                                       DWG. NO,165 REV. I                                                       '
I-g 13-NSA-KB l I 1. Bl3-N58-KB l-80-PEB -MCI
IR - INNER RM)lUS                                                                           66 REV. 4                                                 !
.gi3.N6C-KAl
70 REV. 3                                                 l H E.5 ---
'~
~
g.Bl3 N6C-KB 180'
''ON ~ #
H i-Bl3-N6C-kcl I-Bl3 N6B-IRI NS - CORE SPRAY NOZZLE N6-RHR N0ZZLE KA-NOZZLE TO VESSEL WELD C B1 REF. NO.
KB - NOZZLE TO SAFE END WELD 73-CIOB KC - SAFE END TO SAFE END EXTENSION WELD DWG. NO,165 REV. I IR - INNER RM)lUS 66 REV. 4 70 REV. 3 l
H E.5 ---
m" CORE SPRAY (
m" CORE SPRAY (
Bl              RHR N0ZZLE WELDS
RHR N0ZZLE WELDS Bl
                                                                                        =0             m w. I-RV-005 d                                                                                                       un s.ua n dag
=0 m w.
                                                                                        - /g             == g/g3         CLASS I
I-RV-005 d
                                                                                        " PERRf-UNIT l e micas FORM e NES 205 2/80
n dag un s.ua
- /g
 
== g/g3 CLASS I
" PERRf-UNIT l e micas FORM e NES 205 2/80


DOCUMENT NO.
DOCUMENT NO.
80A4421 PAGE         15       op   145
80A4421 PAGE 15 op 145
  )                         NUCLEAR ENERGY SERVICES. INC.
)
O'                 IS' o o 315*
NUCLEAR ENERGY SERVICES. INC.
O' IS' 315*
o o
l-813-OR
l-813-OR
                    \l-Bl3-DP                                                                                                                                             gi.gi3.DJ l 75 270*                               a-               g                                                         g                                         .
\\l-Bl3-DP gi.gi3.DJ l 75 270*
a-g g
255' l-Bl3-DK l Il-BI3-ON
255' l-Bl3-DK l Il-BI3-ON
[]                                                                                       -
[]
Il-Bl3-DM F                                 Q       o   oo o 135                                                       ,
Il-Bl3-DM F Q
195*     180' O                                                                                                   !I-Bl3 #]d-S]
o oo o 135 195*
1-813 N7-KA I ll-Bl3-N8-KA l                                                                                                                                 ,l -Bl3-N7-Bl y
180' O
l-Bl3 DJ THRU DRI e a                            ll-Bl3-AGI
!I-Bl3 #]d-S]
                                                          !                      I                                                                  I FLANGE +                                                                                                                   -
1-813 N7-KA I ll-Bl3-N8-KA l
I N 7- HEAD SPARE N8-HEAD SPRAY RCICl VENT KA- NOZZLE TO VESSEL WELD                                                                                                                                                                       ._
,l -Bl3-N7-Bl y
IR -INNER RADIUS i
l-Bl3 DJ THRU DRI ll-Bl3-AGI e a I
8 - BOLTING                                                                                                                                       Q {                         _,,,,,,,, _
I FLANGE +
j YR         l$$ AND 13               RIDIONAl.WED w COI REE NO,
I N 7-HEAD SPARE N8-HEAD SPRAY RCICl VENT KA-NOZZLE TO VESSEL WELD IR -INNER RADIUS 8 - BOLTING Q {
                                                                                                                                                          ""                '* - '*-ooS 73-c'oe O                                                                   DWG NO.-166 REV I
i YR l$$ AND j
                                                                                                                                                          '" W#'
13 RIDIONAl.WED w COI REE NO,
                                                                                                                                                                                  *** # # '3
'* - '*-ooS 73-c'oe O
                                                                                                                                                                                  "'" 8/F3 CLASS i 73 REV 4                                                             ""
'" W#'
77 REV 3                                                                               PERRY UNIT l l                                                                                                                                                                                   adOf TO SCAta FOM *NES 205 2/80
*** # # '3 CLASS i DWG NO.-166 REV I
"'" 8/F3 73 REV 4 77 REV 3 PERRY UNIT l l
adOf TO SCAta FOM *NES 205 2/80


DOCUMENT NO.                 80A e p, W1                            NUCLEAR ENERGY SERVICES, INC.                                     PAGE            16    op  145 G
80A e DOCUMENT NO.
O g                 N                       1-93-al I                         ~
W1 PAGE 16 op 145 p,
f                 h Il Bl3-DE                                                   '
NUCLEAR ENERGY SERVICES, INC.
i.Bl3-Nil-RBl A                                                               A d                                                               "
G O
                                  .                                              Nil I
g N
270                                               _p                               I O
1-93-al I
M NIS j.gj3.gp l1.Bl3-DG t-Bl3-NI8-KBl W                   J J
~
f h
Il Bl3-DE i.Bl3-Nil-RBl A
A d
Nil I
I 270
_p O
M NIS j.gj3.gp l1.Bl3-DG t-Bl3-NI8-KBl J
W J
18 0*
18 0*
O               -
O E
E                  li-BI3-AAl                 3 s
li-BI3-AAl 3
i.813 -DG                           g                                                       ll-B13-DH I 2 \                                  /        {s ll.Bl3-DE '                       (                               !                        ll Bl3-DF l NI-B13-CG l w
s i.813 -DG g
i                                          :
2
7 CIOB(14 DWG NO,13 REV. G i
\\
W RW. S 93 RW, 2 Il-Bl3 NIS-KA                     .SECTION A-A 11EL%,                 ---
/
s,_     ,,,m i
{
NI1-CORE DIFFERENTIAL PRESSURE NOZZLE                                                   *
ll-B13-DH I s
'                                                                                                              BOTTOM HEA0 NI5-ORAIN N0ZZLE                                                                       Bl3               WELD MAP NI6- LIGUl0 CONTROL KA - VE5SEL TO N0ZZLE WELD                                                             =0     **
ll.Bl3-DE '
* l-RV-OO7 O     *S - " 22'5 '               S^'" "" **'
(
                                                                                                "a"%             a
ll Bl3-DF l NI-B13-CG l w
                                                                                                                "'"'<''!!'    '^55 '
7 CIOB(14 i
DWG NO,13 REV. G i
W RW. S 93 RW, 2 Il-Bl3 NIS-KA
.SECTION A-A 11EL%, ---
s,_
,,,m i
NI1-CORE DIFFERENTIAL PRESSURE NOZZLE BOTTOM HEA0 NI5-ORAIN N0ZZLE Bl3 WELD MAP NI6-LIGUl0 CONTROL KA - VE5SEL TO N0ZZLE WELD
=0 l-RV-OO7 O
*S - " 22'5 '
S^'" "" **'
"a"%
a
'^55 '
PERRY UNIT I
PERRY UNIT I
!                                                                                                                .et to seas FORM #NES 205 2/80
.et to seas FORM #NES 205 2/80


1 l
l DOCUMENT NO.
80A4421 DOCUMENT NO.                             )
80A4421 PAGE 17 OF 145 (O)
PAGE         17     OF   145 NUCLEAR ENERGY SERVICES. INC.
NUCLEAR ENERGY SERVICES. INC.
(O)
W I
W I
l l-Bl3-N30-KA                                                         ; l 813-N3A-IRI Il-B13-N30-KB l-B l3-N3A- KB I l l BG N30 IR,i
l l-Bl3-N30-KA
                                                                                \ l-Bl3*N3A KAl 18'( M )                     id(TYRI           li-sl3-H38-lRI Il-Bl3-N3C-KA
; l 813-N3A-IRI Il-B13-N30-KB l-B l3-N3A-KB I l l BG N30 IR,
\\ l-Bl3*N3A KAl i
18'( M )
id(TYRI li-sl3-H38-lRI Il-Bl3-N3C-KA
(, gl3.r@B.lR ]
(, gl3.r@B.lR ]
o     Il-Bl3-N3C KBi c t-Bl3-N38- KA l li-BB-N3C IR                                   I Il I Bl3 N16-KAl i I Bl3 Nt6 IRI CBI REE NO.
o Il-Bl3-N3C KBi c t-Bl3-N38-KA l li-BB-N3C IR I
73-CLOB DWG, NO, 165 REV. I 58 REV. 2 N3 - MAIN STEAM NTZLE                                                   98 REV,5 N16 - VIBRATION NOZZLE KA - NO22LE TO VESSEL WELD KB - N0ZZLE TO SAFE END WELD IR' - INNER RA01US MEh,---
Il I Bl3 N16-KAl i I Bl3 Nt6 IRI CBI REE NO.
                                                                          'b""
73-CLOB DWG, NO, 165 REV. I 58 REV. 2 N3 - MAIN STEAM NTZLE 98 REV,5 N16 - VIBRATION NOZZLE KA - NO22LE TO VESSEL WELD KB - N0ZZLE TO SAFE END WELD MEh,---
                                                                                '"" MAIN NOZZL VIBRATION        '4EAM (E WELOS                         ,
IR' - INNER RA01US
                                                                        =O **
'"" MAIN '4EAM (E
* l-RV-OOB                       i
'b""
\
VIBRATION NOZZL WELOS
O                                                                      = JRP em8 2 0 Ct. ASS I e Mk urs e]ss
=O
**
* l-RV-OOB i
O
\\
= JRP em8 2 0 Ct. ASS I e Mk urs e]ss
* PERRY - UNIT l l
* PERRY - UNIT l l
ocr to sens FORM 8 NES 205 2/80 1
ocr to sens FORM 8 NES 205 2/80 1


DOCUMENT NO.           80A4421 18     op   145 h                         NUCLEAR ENERGY SERVICES. INC.
80A4421 DOCUMENT NO.
PAGE I 913 N120                                                                                                             '-
PAGE 18 op 145 h
l-813-N12A 1 Bl3 Nf3D l 813 N140                             .
NUCLEAR ENERGY SERVICES. INC.
I-Bl3-N13A O                                           l- 013 -N 64A
I 913 N120 l-813-N12A 1 Bl3 Nf3D l 813 N140 I-Bl3-N13A
                                                        \                 /                                                                           ;
.O l- 013 -N 64A
l l-Bl3-N98 - KA                               \             /
\\
ll-Bl3-N98-K8l                                                                                                                                   --
/
N 15*                                                                                               ;
l l-Bl3-N98 - KA
Il-Bl3-N98 IRl--                             N h
\\
1-Bl3-N8A-KAl k                                                                             l-813 - N'5A-K B I O
/
                                                            /                                                           Il-Bl3-N9A-IRI
ll-Bl3-N98-K8l N
                                                          /
15*
                                                                .I l-Bl3 Nt2B g Bl3-N12C                                                                                   -
Il-Bl3-N98 IRl--
f-Bl3 NI38 l- 813-NI3C                             %      g                                                I-813 NI4B l-013 NI4C                                 in I-Bl3-NIO-KAl l l-813- NIO lR               100 1-Bl3-NE l-Bl3-NIO- KC :
N h
CBI REE NO, 73-C108(14 DWG NO.- 165 REV I                     :
1-Bl3-N8A-KAl k
85 REV 5
l-813 - N'5A-K B I O
                                                                              .                                                    79 REV 4 N9 JET PUMP INSTRUMENTATION N0ZZLE NIO-CRD RETURN N0ZZLE NE%---
/
                                                                                                              *      ,,,,, g               4 NI2N13,N64-INSTUMENTATION N0ZZLE CRD RETURN N0ZZLE KA-N0ZZLE TO VESSEL WELD                                                                   B31               WELDS                       l KB-N0ZZLE TO SAFE END WELD                                                                  .g         ,, .'g.RV-OO9 9           KC-NOZZLE SAFE END TO CAP WELD IR -INNER RADIUS                                                                           "y             Ss/g3         CLASS l PERRY UNIT l
Il-Bl3-N9A-IRI
                                                                                                                            .ce to seas FORM #NES 205 2/80
/
.I l-Bl3 Nt2B g Bl3-N12C f-Bl3 NI38 l-813-NI3C I-813 NI4B g
l-013 NI4C in I-Bl3-NIO-KAl 1-Bl3-NE l l-813-NIO lR 100 l-Bl3-NIO-KC :
CBI REE NO, 73-C108(14 DWG NO.- 165 REV I 85 REV 5 79 REV 4 N9 JET PUMP INSTRUMENTATION N0ZZLE NE%---
NIO-CRD RETURN N0ZZLE
,,,,, g 4
NI2N13,N64-INSTUMENTATION N0ZZLE CRD RETURN N0ZZLE KA-N0ZZLE TO VESSEL WELD B31 WELDS l
.g
,,.'g.RV-OO9 KB-N0ZZLE TO SAFE END WELD 9
KC-NOZZLE SAFE END TO CAP WELD IR -INNER RADIUS "y
Ss/g3 CLASS l PERRY UNIT l
.ce to seas FORM #NES 205 2/80


oocumEurNo. soA442, t
oocumEurNo. soA442, g
g                        NUCLEAR ENERGY SERVICES, INC.
PAGE 19 op 145 NUCLEAR ENERGY SERVICES, INC.
PAGE      19  op 145 O
t O
06       14   22   30     38   46     54                               ..
06 14 22 30 38 46 54 02 iO is as 34 42 so se X CO-OROINATESg MT
02   iO       is   as     34   42   so     se X CO-OROINATESg
^
                                                              ^
s
MT                  s 59
/
                                      /               G@@@l                       g GGGGGGGGG,
G@@@l g
                                  / GGGGGGGGGGG;                                                   ss si GGGDGGGGGGGGbI\\                                               47 OGGGGGGGGG@@@I                                                 e OGGGGGODGGGGe@b\I                                                 m GGGGGGGGGGGGG6G                                                   35 270 ~                   e-e-e-O-e-O e e e @ G e e e e                                     3i - 90
59 GGGGGGGGG, ss
                                @@@@@@@@@@@@GGG                                                   27 O                           966@@@@@@@@@GGG ,l                                                23 GGOO@@GGGGGGG                                                   19 GGGGGGGGG@@@@ j!                                                15
/ GGGGGGGGGGG; si GGGDGGGGGGGGbI\\
                                      @G@@@@@@@@@                                                 'I GGGGGBOGG                                               07 NOM S                                   @@@@@                                          03 DENT                         IST                               CO-ORDINATES p         g X-Y CO-ORDINATE DESIGNATIONS, 18 0 PLAN V EW CRD       CBI RR NO. -
47 OGGGGGGGGG@@@I
PENE HATIONS           73-Cl08 ( 14 DWG NO,
\\
        * " "* V .'..')l - ]
e OGGGGGODGGGGe@b\\
e-                 '      '
m I
i l
GGGGGGGGGGGGG6G 35 270 ~
                                                          \                 na5---
e-e-e-O-e-O e e e @ G e e e e 3i - 90
                                                                              *b**  ''''8 CRO PARTIAL Bl3 N   AION W S j
@@@@@@@@@@@@GGG 27 l
'                                  l w0 m. o. I-RV-OIO 1   4     [ g/g3   CLASS I A-A.                                 "***
O 966@@@@@@@@@GGG 23 GGOO@@GGGGGGG 19 GGGGGGGGG@@@@
SECTION                                                PERRY UNIT l CRO PENETRATION THRU BOTTOM HEAD                                   ,_
15 j
FORM # NES 205 2/80
@G@@@@@@@@@
'I GGGGGBOGG 07 NOM S 03 DENT IST CO-ORDINATES p
g X-Y CO-ORDINATE DESIGNATIONS, 18 0 PLAN V EW CRD CBI RR NO. -
PENE HATIONS 73-Cl08 ( 14
* " "* V.'..')l - ]
DWG NO, e-i
\\
na5---
l
''''8 CRO PARTIAL
*b**
N AION W S l
Bl3 j
w0
: m. o. I-RV-OIO 1 4
[ g/g3 CLASS I SECTION A-A.
PERRY UNIT l CRO PENETRATION THRU BOTTOM HEAD FORM # NES 205 2/80


DOCUMENT NO.             80A4421 O                                       R ENERGY SERycES. INC.
80A4421 DOCUMENT NO.
PAGE 06     14   22     30   38       46       54 02     10   18   26     34     4it     50       58 X CO-ORDINATESg                                                                                           .,
O PAGE R ENERGY SERycES. INC.
MT                 %
06 14 22 30 38 46 54 02 10 18 26 34 4it 50 58 X CO-ORDINATESg MT OGGG@i
OGGG@i                                                   59 g/ [GGGGGGBGG,;gl 55 GGGGGGGGGGG                                                       si GGGGGGGG@@@@bI \                                   I 47 c
[GGGGGGBGG,;gl 59 55 g/ GGGGGGGGGGG si GGGGGGGG@@@@bI 47 I
                                                @@@GGGGGGGGGG O@@GGGGGGGG@@@b\                                                       ' as OGGGGGGGGGGGGGG                                                           H 270*                         O-O-6 0 0 0-O G G G G G O O O                                             31
\\
                                            @@@G@@@@@@@@GGG I                                                         v O@@@@@@@@@@@@@@ /                                                         23 GOGO @@@@@@@@@                                                       is
@@@GGGGGGGGGG c
                                                                                                      /
O@@GGGGGGGG@@@b\\
O   NOTE:                                     eeeeeeeeeeeee                                                         ,5 II DN F       T N OS. CONSIS
' as OGGGGGGGGGGGGGG H
                                                      @@666@@@@ /                               /                    07 OF PREFIX 1-B13 FOLLOWED BY X-Y CO-ORDINATES AND THEN                             G@@6@                                                     03 DESIGNATION B FOR BOLTING AND                                                   YW N TS W FOR HOUSING TO FLANGE WELDS.
270*
180 PLAN V EW CRO CBl REF. NO. 73-C108 & 14 m                                                                        DWG.NO.14 REV. 3 l               4                                                                                 G.E.NO.- 767E957 922D124 HOUSING WEL'DS                           aur zusasnaseesmeven mce.
O-O-6 0 0 0-O G G G G G O O O 31
                      -          _            HOUSING TO               S'"           CRD MECHANISM FLANGE WELD                           HOUSING WELDS AND B13 FLANGE BOLTING g.
@@@G@@@@@@@@GGG v
nev: O     nG. NO. 1-RV-011 q                  f                                  ev:P55         oars.a. 7-as l                   l               l     ' BOLTINGS.                 ^" M           DATE: kSS
I O@@@@@@@@@@@@@@
                                                                            " PERRY.- UNIT 1 VIEW-A-A                                                               Nor to sens FORM # NES 205 2/80
23
/
GOGO @@@@@@@@@
is
/
O NOTE:
eeeeeeeeeeeee
,5 II DN F T N OS. CONSIS
/
OF PREFIX 1-B13 FOLLOWED BY
@@666@@@@
07
/
X-Y CO-ORDINATES AND THEN G@@6@
03 DESIGNATION B FOR BOLTING AND W FOR HOUSING TO FLANGE WELDS.
YW N TS 180 PLAN V EW CRO CBl REF. NO. 73-C108 & 14 DWG.NO.14 REV. 3 m
l 4
G.E.NO.- 767E957 922D124 HOUSING WEL'DS aur zusasnaseesmeven mce.
HOUSING TO S'"
CRD MECHANISM FLANGE WELD HOUSING WELDS AND B13 FLANGE BOLTING g.
nev: O nG. NO.
1-RV-011 ev:P55 oars.a. 7-as q
f l
l l
' BOLTINGS.
^" M DATE: kSS
" PERRY.- UNIT 1 VIEW-A-A Nor to sens FORM # NES 205 2/80


O                                                               O                                                                                                                         O 8         -
O O
6
O 8
    != Eg!Ng                                                                                    03                                                                                                             d o.
6 E
5       *A
g!N 03 d
            !P gg N'y                                           g+      +
g o.
* 7          j, p'                             ,
=
                                                                                  + t t
5
*A
!P N'y gg 7
j, p'
g+ +
t++
t++
                                                                                                +       +   -e +I z
z
b ie      -t-
+I b
                                //       i,'           ,sd                         e          +e+        e                                                                                             8    t t                      t t + O+
iet +
i t
-t- + -e
1ttt >
+ t
:n N'                                          e -e-t+-e-O+t -- e t
//
                                                                            + lt  t      it        -+- t r + -+ 1 +
i,'
e-e-e-e l
,sd
E m
+e e
z m
O+
                                                                        +++
8 t
                                                                            +++++
e 1ttt t
                                                                                  ++
t
t
                                                                                                        +   ++++                                                                                             l3 e +e+-ey+           e-e+-o+
+
                                                                                                                +e+                                                                                       y
t t +
                                                                                                                          +e++
:n N'
g ;z         ++e+     ++ ++             + + + ++ +
i l
                                                                                                                                                                                                      ,  a    n z                                                                                                                                                 g
m
                                                                        +*+e      +          +                                                                +
+ lt t
                                                          !o%5 _z o    +++       +e+  + -+t ' + e
it t
                                                                                                    + +
-+- t r +
t +e+
-+ 1 +
                                                                                                        -+- e++tte e         +e +
z e -e-t+-e-O -- e e-e-e-e E
t +                                                                       J w
*l
                                                                                                                                                                                                          " 9 @
+++++
                                                                                                                                                                                                              -g
+
!                                                          2 8' m
+ ++++
                                                                        +++ ++++               ++ ++++ ++ /
t m
a          +e+ +    e-e-o       +e+ + e-e+-o+                                                                                             8
+++
)                                                                                           +t               +               +e tt +*
++
                                                                                  + + + o+ ++ ++ t+e l
+e+-ey+ e-e+-o+
e'Fe?.*                  +e+ +e+                                                                                          g t
+e+ +e++
                                                                                  + + ++
t 3
t'+ t,t   t                 /
y g ;z
                                                                                                                                                        /                                                             E
++e e
                                              $o !u52>h i              1 11 !            a w
a n
* SF                      +'+ ++                   e                                                                                  $         i i             1 9        -
++
* 8: =d      -
+ + + ++
N                                 /                                                                                                 -
+ ++
o$ng..ow  O \                                 /                                                                                                       4 i
+
m g
g z
* yEs         5En 5mdSi z         jI5E o                           w          -
%5 t
x R
+
                                                                                                                                                                                                                  =
9 @
g a i!-
+*+
8   g~             m a-           2pazaog    g-                                                                                                                              G      ni   .
+ -+t ' + e + e + e e +
62 g
+e+ +e +
4 j ti j jg mRE                                      g                                                                                                                               g
+e+
!          i                        lg ""Y                              gsaa~=a me*asse                                                                                                                 g g
+
g           osz l                             92     a                                                                                                                               m              ~
+
e            5AQ                               gd     D                       ,
e w
m o                             oo
o
!                                                                                                                                                                                                                  vi i
+++
+
-+- + tt t
2 8'
+++
++++
++ ++++
++
/
-g
_z J
o
+e e-e-o
+e e-e+-o++e 8
ma
)
+
+
+t
+ + +
l e'Fe?.* + o+ ++
++
tt
+* +e+ t +e+
g
+e
/
E
+ +
t
+ + ++ t'+ t,t t
/
52>h
+'+ ++
+
$o
!u i
i 1 11 !
* 8:
SF a w e
i 19 N
/
=d o$ng..
O
\\
/
4 5mdSi jI5E i
ow m
x
=
g yEs 5En R
g w
z o
g-G 4 a i!
8 2paz g~
m a-mRE 62 ni i jti j jg lg aog g
g g
gsaa~=a me*asse
""Y g
g l
92 a
osz g
5AQ gd D
m
~
e o
o m
o vi i
e
e


DOCUMENT NO.         80A421 M
80A421 DOCUMENT NO.
(']                           NUCLEAR ENERGY SERVICES. INC.
OF M
OF H-9               A-l         STUD HOLE NUMBERING WITH 72 STUD HOLES                                         CLOCKWISE ROTATION FROM EQUALLY SPACED                             f     i A-1 TO A-9 THRU H-1 TO H-9 ABT CARDINAL $                   eO O         D H-l G-9 N                                         O
(']
NUCLEAR ENERGY SERVICES. INC.
H-9 A-l STUD HOLE NUMBERING WITH 72 STUD HOLES CLOCKWISE ROTATION FROM EQUALLY SPACED f
i A-1 TO A-9 THRU H-1 TO H-9 ABT CARDINAL $
eO O D
H-l O
G-9 N
_g B -1 4
_g B -1 4
A G       4                                                                     B-3 270 4                               C                  go' p,g         _g
A G 4 C
                                                                                        'O           C-l O                                     x                                                         -
B-3 270 4
E   -
go' p,g
D-i OQQ Q                                 .
_g
sig                   '        '
'O C-l O
                        +6 ,-                                D-9         NOTE:
x E
I                             E-l           ALL LIGAMENT EXAMINATION
D-i OQQ Q sig
                      'i    i    ,
+6 D-9 NOTE:
n                                IDENTIFl. CATION NOS. CONSIST
I E-l ALL LIGAMENT EXAMINATION IDENTIFl. CATION NOS. CONSIST
                        ,  8 l                                       OFTHE PREFIX t-813-AND
'i i
                                  '                      180*
n l
l                                                THEN THE STUD HOLE NUMBER.'
OFTHE PREFIX t-813-AND 8
                        !        I N/                                                   CBI REF. NO.- 73C108 & 14 DWG.NO.           38 REV 39 REV VESSEL FLANGE
180*
                                                        .                    TIEL%, ---- ~
THEN THE STUD HOLE NUMBER.'
I                                                                     "E"     ""' VESSEL FLANGE B43           LIGAMENTS O          \l
l I
              - SECTION A-A as* O -
N/
                                                                                    ** *.1-AV-013 TE           c'^SS '
CBI REF. NO.- 73C108 & 14 DWG.NO.
n.cac' PERRY - UNIT 1 e to sm FORM a P4ES 205 2/B0 L                                                                                                                       l
38 REV 39 REV VESSEL FLANGE TIEL%, ---- ~
I "E"
""' VESSEL FLANGE B43 LIGAMENTS as* O - ** *.1-AV-013 O
\\l
"%& TE c'^SS '
- SECTION A-A n.cac' PERRY - UNIT 1 e to sm FORM a P4ES 205 2/B0 L


DOCUMENT NO. 80A4421 PAGE                     2                       OF (j                           WR ENERGY SERWES. n 0*           4 70 73                 23 1     72     1   f I
DOCUMENT NO. 80A4421 PAGE 2
I     l d6 0                                                                                               ~
OF (j
WR ENERGY SERWES. n 0*
4 70 2 3 73 1
72 1
f I
I l
d6 0
~
Oo O
Oo O
5
5
                .56 55 -G                                                                                       O-       -
.56 55 -G O-27f
27f          ,.g                                             7-o O-- 19
,.g
                                                                                                                          % 20 21
, O-- 19 o
                                    \                                                                     m                                                 -
7-
o                                        x 00Q f
% 20 21
90 Q l 37 38                                         NOTE:
\\
* 40 39
m o
                      $        l                                    18f                                 ALL STUD EXAMINATION N              '
x f
j                                                                                        IDENTIFICATION CONSISTS f                                                           OF THE PREFlX 1-B13-38-1 l
90 Q 0 0 Q l 37 38 NOTE:
              *%            i
40 39 l
          $7                         m                                                                   CBI REF. NO. 73C108 & 14
18f N
                            ! '                                                                                                                          38 REV.
ALL STUD EXAMINATION IDENTIFICATION CONSISTS j
DWG. NO.
f OF THE PREFlX 1-B13-38-1 l
l     l                                                                                                                       39 REV.
i
                              $                                                                    ll D Li - - -
$7 m
{"                                                                                   mm.
CBI REF. NO. 73C108 & 14 DWG. NO.
ll             )
38 REV.
* ritt CLOSURE HEAD u                                                                                        B13 l                             ,                                                                                                      STUDS I                                                                 *** O       **
l l
* 1-RV-014 0               - coo''
39 REV.
* DiA.
ll D Li - - -
                                          =                                                     --                - <
{"
men; 8la3 CLASS 1
)
                                                                                                  - k4 SECTION THRU STUD                                                                 "" ' PERRY - UNIT 1
mm.
                                                                                                                      .cr m as FORM #NES 205 2/80
ritt ll CLOSURE HEAD B13 l
u STUDS I
*** O
**
* 1-RV-014 0
- coo'' *
=
> CLASS 1 DiA.
- k4 men; 8la3 SECTION THRU STUD
"" ' PERRY - UNIT 1
.cr m as FORM #NES 205 2/80


DOCUMENT NO.               80A4421 24           145 PAGE                   OF Q                                     NUCLEAR ENERGY SERVICES. INC.
DOCUMENT NO.
O' 70 71 v2 1 2   34
80A4421 24 145 PAGE OF Q
                                                                                  \     \J O dd                                                     -
NUCLEAR ENERGY SERVICES. INC.
o O
O' 70 71 v2 1 2 3 4
5                                                                                                             0 5                                                                                     ,
\\
5 5----.O                                                                       g     .
\\J O dd o
270*                                                                                                     90*
O 0
4     ,
5 5
                                                                                                                ' O--- 19
5 5----.O g
                                                                                                                      ~20 21 22 0                                                 x 0 . 0o 37 3       0 190                   NOTE:
270*
ALL NUTS EXAMINATION NOS. CONSIST OF THE PREFlX 1-B13-39-5 90 b           -_                                        CBI REF NO. 73C.108 & 14 1 otA.
90*
DWG.NO.               38 REV.
4
y                m,    a                                                                39 REV.
' O--- 19
I
~20 21 22 0
                                                      '        di 8k                               h bh s,      ,,,,,
x 0. 0o 0
                                                                                                                          ==a= ===,.===.
37 3
i           i           !                                            D3           CLOSURE HEAD NUTS I                         i                                           =0       ** e.1-RV-015 l
190 NOTE:
h                      ~                               -
0 ALL NUTS EXAMINATION NOS. CONSIST OF THE PREFlX 1-B13-39-5 b
erP55
CBI REF NO. 73C.108 & 14 0
                                                                                                    *4 pt J /6 65 oars:  g/t3     CLASS 1 SWD WT                                                       -n PERRY - UNIT 1
9 1 otA.
                                                                                                                        , to w.as FORM s NES 205 2/80
DWG.NO.
38 REV.
39 REV.
y a
m, 8k h bh==a====,.===.
I di s,
i i
D3 CLOSURE HEAD NUTS I
i
=0
** e.1-RV-015 h
~
erP55 pt J /6 65 g/t3 CLASS 1 l
*4 oars:
SWD WT
-n PERRY - UNIT 1
, to w.as FORM s NES 205 2/80


DOCUMENT NO.         80A4421 NUCLEAR ENERGY SERVICES. INC.
80A4421 DOCUMENT NO.
7 72     2 60 66                                             -
NUCLEAR ENERGY SERVICES. INC.
O O
7 72 2
5                     -
60 66 O
5                                                                               -
O 5
55 -C                                                                       O- -
5 55 -C O-
270,       .g                                                                                 p O._jg N 20 g                                                                             21 Os.         2 O
: 270,
ec co o                                -
.g O._jg p
37 3                                           NOTE:
N 20 g
188                   ALL WASHER EXAMINATION NOS. CONSIST OF THE PREFIX 1-813-39-6 CBI REF. NO. 73C108 & 14 DWG. NO. 38 REV.
21 Os.
2 O
o ec co 37 3
NOTE:
188 ALL WASHER EXAMINATION NOS. CONSIST OF THE PREFIX 1-813-39-6 CBI REF. NO. 73C108 & 14 DWG. NO.
38 REV.
39 REV.
39 REV.
i
i
                - 7 ________.______ 7 _-
- 7 ________.______ 7 _-
ig*N       11E!.E ---
ig*N 11E!.E ---
{                                           p         " , '4" "'" CLOSURE HEAD 1
{
3   42                           e                        013           WASHERS
1 p
    ~
" '4"
9 h: CIA.                                                ,,, o   .. . i.RV-016
"'" CLOSURE HEAD 9 h: CIA.
(                           SPHERICAL WASHER
3 42 013 WASHERS e
* Rso u A4 ameSe
~
                                                                                                      == t/s3 CLASS 1
,,, o
                                                                                        "'**' PERRY - UNIT 1 estoacus FOAM s NES 205 2/80
... i.RV-016
(
SPHERICAL WASHER
* Rso ameSe CLASS 1 u A4


System: Reactor Pressure Vessel                                  PROGRAM PLAN AND SCHEDULE                          By: elf    Date:    3f Document No. 80A4421                                                                                                App: 4J    Date: c/ w Preservice Inspection                                                      5532-PERRY                               Rev:    1 Page: 26 of'145 CAU9 RATION          CODE coupegguy                                            cmNT                  PROCEDURE    ROCK        CCCE    EXAM  ZONE mTinCArm                                              oEscapr a              NUMBER    W= W      CATEGORY WETHOO  NO      RE W
== t/s3
                                                                                                                                                    \_,
"'**' PERRY - UNIT 1 estoacus FOAM s NES 205 2/80
                                                                                                                                                    ,yc VESSEL SIELL WELDS Ref. Dwg. No: 1-RV-002 1-313-AA                              Loiver Head to No. I Shell                  80A0191    PY-123-1-RPV B-A        UT    I Ring Circumferential Seam                                              Bl.11 PY-124-1-RPV                                          -
i                                                                                                                                                N 1-B13-BA                              No. I Shell Ring Longitudinal              80A0208    PY-124-1-RPV B-A      UT    I Seam @ 170 Azimuth                                                      Bl.12 1-B13-BB                              No. I Shell Ring Longitudinal              80A0208    PY-124-1-RPV B-A        UT    I Seam @ 1370 Azimuth                                                      Bl.12 I-B13-BC                            No. I Shell Ring Longitudinal                80A0208    PY-124-1-RPV B-A        UT    I Seam @ 2570 Azimuth                                                      Bl.12 1-B13-AB                            No. I Shell Ring to No. 2 Shell              80A0208    PY-124-1-RPV B-A        UT    I Ring Circumferential Seam                                              Bl.11 1-B13-BD                            No. 2 Shell Ring Longitudinal                80A0208    PY-124-1-RPV B-A        UT    I Seam @ 400 Azimuth                                                        Bl.12 1-813-BE                            No. 2 Shell Ring Longitudinal                80A0208    PY-124-1-RPV B-A        UT    I Seam @ 1600 Azimuth                                                      Bl.12 1-B13-BF                            No. 2 Shell Ring Longitudinal                80A0208    PY-124-1-RPV B-A        UT    I Seam @ 2800 Azimuth                                                      Bl.12 NES 239 682                                                                                                              ;


o System: Reactor Pressure Vessel 11EN                                By: /r#
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: elf Date:
O Date: 6Nf PROGRAM PLAN AND SCHEDULE                     App: 44    Date: _c/Sg Document No. 80A4421 Preservice Inspection                                 5532-PERRY                       Rev:   1 Page: 27 of 145 cAusunon          coac aME                          o EcE                  "eca wuw    m T-      cAEccm Efwoo  E      NW YESSEL StELL WELDS Ret Dwg. No: 1-RV-002 1-813-AC              No. 2 Shell Ring to No. 3            80A0208 PY-124-1-RPV B-A   UT   I Shell Ring Circumferential                                 Bl.11 Seam I-813-BG              No. 3 Shell Ring Longitudinal         80A0208 PY-124-1-RPV B-A   UT   I Seam @ 790 Azimuth                                         Bl.12 1-B13-83              No. 3 Shell Ring Longitudinal .      80A0208 PY-124-1-RPV B-A   UT   I Seam @ 1990 Azimuth                                       Bl.12
3f Document No. 80A4421 App: 4J Date: c/ w Preservice Inspection 5532-PERRY Rev:
  ~
1 Page: 26 of'145 CAU9 RATION CODE coupegguy cmNT PROCEDURE ROCK CCCE EXAM ZONE mTinCArm oEscapr a NUMBER W= W CATEGORY WETHOO NO RE W
1-B13-BK              No. 3 Shell Ring Longitudinal         80A0208 PY-124-1-RPV B-A   UT   I Seam @ 3190 Azimuth                                       Bl.12 i
\\_,
1-B13-AD              No. 3 Shell Ring to No. 4            80A0208 PY-124-1-RPV B-A   UT   I Shell Ring Circumferential                                 B1.11 Seam                                                                                        l l-B13-BN              No. 4 Shell Ring Longitudinal         80A0208 PY-124-1-RPV B-A   UT   I Seam @ 480 Azimuth                                         Bl.12 1-B13-BP              No. 4 Shell Ring Longitudinal         80A0208 PY-124-1-RPV B-A   UT   I                     !
,yc VESSEL SIELL WELDS Ref. Dwg. No: 1-RV-002 1-313-AA Loiver Head to No. I Shell 80A0191 PY-123-1-RPV B-A UT I
Seam @ 1630 Azimuth                                       Bl.12 l  l-B13-BR              No. 4 Shell Ring Longitudinal         80A0208 PY-124-1-RPV B-A   UT   I Seam @ 2880 Azimuth                                       Bl.12 NES :*39 682                                                                               ;
Ring Circumferential Seam Bl.11 PY-124-1-RPV i
N 1-B13-BA No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 170 Azimuth Bl.12 1-B13-BB No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 1370 Azimuth Bl.12 I-B13-BC No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 2570 Azimuth Bl.12 1-B13-AB No. I Shell Ring to No. 2 Shell 80A0208 PY-124-1-RPV B-A UT I
Ring Circumferential Seam Bl.11 1-B13-BD No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 400 Azimuth Bl.12 1-813-BE No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 1600 Azimuth Bl.12 1-B13-BF No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 2800 Azimuth Bl.12 NES 239 682


o                                           11EN                                                               O System: Reactor Pressure Vessel             PROGRAM PLAN AND CCHEDULE                              By: /ht Date: 6/81 Document No,80A4421                                                                               App: gj_ Date: Mt Preservice Inspection                               5532-PERRY                                   Rev:   1 Page: 28 v.145 CAL 18 RAT 10N          CODE COMPONENT            PROCEDURE        BLOCK        CODE    EXAM ZOAE m NT        '
o 11EN O
F4JMBER      Of appbcablet  CATEGORY WTHOO  NO. REMARKS K)ENTC4MK)N                  KSCitPTX)N VESSEL SHELL WELDS Ref. Dwg. No: 1-RY-002 1-B13-AE              No. 4 Shell Ring to Shell           80A0189      PY-124-1-RPV B-A           UT   I Flange Circumferential Seam                                         Bl.ll l
6Nf System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
NES 239 6/82                                                                                          ;
/r# Date:
Document No. 80A4421 App: 44 Date: _c/Sg Preservice Inspection 5532-PERRY Rev:
1 Page: 27 of 145 cAusunon coac aME o EcE "eca m T-cAEccm Efwoo E NW wuw YESSEL StELL WELDS Ret Dwg. No: 1-RV-002 1-813-AC No. 2 Shell Ring to No. 3 80A0208 PY-124-1-RPV B-A UT I
Shell Ring Circumferential Bl.11 Seam I-813-BG No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 790 Azimuth Bl.12 1-B13-83 No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 1990 Azimuth Bl.12
~
1-B13-BK No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 3190 Azimuth Bl.12 i
1-B13-AD No. 3 Shell Ring to No. 4 80A0208 PY-124-1-RPV B-A UT I
Shell Ring Circumferential B1.11 Seam l
l-B13-BN No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 480 Azimuth Bl.12 1-B13-BP No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 1630 Azimuth Bl.12 l
l-B13-BR No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 2880 Azimuth Bl.12 NES :*39 682


o Syst;mi Reactor Pressura Vcssel 11EN                                        By:           o/ei
o 11EN O
                                                                                                      /n< oate: 6 PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                             App: M Dates (/S4 Preservice Inspection                                 5532-PERRY                                 Rev:   1 Page: 29 of 145 CAU8 RATION            CODE COMP 0eENT                    COMPONENT             PROCEDURE     BLOCK       CODE   EXAM ZONE DESCRIPTION            NUMBER    (tf apphe=Nat CATEGORY LETHOO  NO. E MARKS 80ENTIFICATION RECIRCUI ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-                 Recirculation Outlet Nozzle          80A0209    PY-124-1-RPV B-D          UT    I NI A-AA              NIA to Vessel                                                      B3.90 1-B13-                Recirculation Outlet Nozzle          80A0190    PY-124-1-RPV B-D          UT    I NI A-lR              NIA' Inner Radius                                                  B3.100 1-B13-                Recirculation Outlet Nozzle          80A0211    PY-SE-BI-5        B-F    UT   I NIA-KB                NI A to Safe-end                                                  B5.10 80A0183    N/A                      PT l-B13-                Recirculation Outlet Nozzle          80A0209    PY-124-1-RPV B-D          UT    I NIB-KA                NIB to Vessel                                                      B3.90 1-B13-                Recirculation Outlet Nozzle          80A0190    PY-124-1-RPV B-D          UT    I NIB-IR                NIB Inner Radius                                                  B3.100 1-B13-                Recirculation Outlet Nozzle          80A0211    PY-SE-BI-5        B-F    UT    I NIB-KB                NIB to Safe-end                                                  B5.10 80A0183    N/A                      PT l-B13-                Recirculation Inlet Nozzle          80A0209    PY-124-1-RPV B-D          UT    I N2A-KA                N2A to Vessel                                                      B3.90 1-B13-          .      Recirculatica Inlet Nozzle          80A0190    PY-124-1-RPV B-D          UT    I N2A-lR                N2A Inner Radius                                                  B3.100 NES 239 6/82                                                                                         ,
System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
/ht Date: 6/81 Document No,80A4421 App: gj_ Date: Mt Preservice Inspection 5532-PERRY Rev:
1 Page: 28 v.145 CAL 18 RAT 10N CODE m NT COMPONENT PROCEDURE BLOCK CODE EXAM ZOAE K)ENTC4MK)N KSCitPTX)N F4JMBER Of appbcablet CATEGORY WTHOO NO.
REMARKS VESSEL SHELL WELDS Ref. Dwg. No: 1-RY-002 1-B13-AE No. 4 Shell Ring to Shell 80A0189 PY-124-1-RPV B-A UT I
Flange Circumferential Seam Bl.ll l
NES 239 6/82


O Syst;mi Rcactor Pr ssure Vcssel HM PROGRAM PLAN AND SCHEDULE                             By O
o 11EN o/ei 6
                                                                                                                                      /nt Date: C/94 Document No. 80A4421                                                                               App:   #- Date: c/S<,t Preservice Inspection                                 5532-PERRY                                   Rev     1   Page: 30 of 145 CAUBRATO4                CODE COMPONE>si                    COMPONENT             PROCEDURE     BLOCK       CODE     EXAM ZONE MNTIRCATION                    DESCfDFTION            NUMBER   (if appleablel CATEGORY ETHOD  No      REMARKS RECIRCULATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-                 Recirculation Inlet Nozzle           80A0211   PY-SE-BI-4        B-F     UT   I N2A-KB                 N2A to Safe-end                                                   B5.10 80A0183   N/A                         PT l-B13-                 Recirculation Inlet Nozzle           80A0209   PY-124-1-RPV B-D           UT   I N2B-KA                 N2B to Vessel                                                     B3.90 1-B13-                 Recirculation Inlet Nozzle           80A0190   PY-124-1-RPV B-D           UT   I N2B-IR                 N2B Inner Radius                                                   B3.100 1-B13-                 Recirculation Inlet Nozzle           80A0211   PY-SE-BI-4        B-F     UT   I N2B-KB                 N2B to Safe-end                                                   B5.10 80A0183   N/A                         PT l
Syst;mi Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By:
1-B13                 Recirculation Inlet Nozzle           80A0209   PY-124-1-RPV B-D           UT   I N2C-KA                 N2C to Vessel                                                     B3.90 1-B13-                 Recirculation Inlet Nozzle           80A0190   PY-124-1-RPV B-D           UT   I N2C-IR                N2C Inner Radius                                                   B3.100 NES 239 6/82                                                                                           ;
/n< oate:
Document No. 80A4421 App: M Dates (/S4 Preservice Inspection 5532-PERRY Rev:
1 Page: 29 of 145 CAU8 RATION CODE COMP 0eENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 80ENTIFICATION DESCRIPTION NUMBER (tf apphe=Nat CATEGORY LETHOO NO.
E MARKS RECIRCUI ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Outlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
NI A-AA NIA to Vessel B3.90 1-B13-Recirculation Outlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
NI A-lR NIA' Inner Radius B3.100 1-B13-Recirculation Outlet Nozzle 80A0211 PY-SE-BI-5 B-F UT I
NIA-KB NI A to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Outlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
NIB-KA NIB to Vessel B3.90 1-B13-Recirculation Outlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
NIB-IR NIB Inner Radius B3.100 1-B13-Recirculation Outlet Nozzle 80A0211 PY-SE-BI-5 B-F UT I
NIB-KB NIB to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2A-KA N2A to Vessel B3.90 1-B13-Recirculatica Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2A-lR N2A Inner Radius B3.100 NES 239 6/82


o Syst:mi R; actor Pressura Vcssel 11EN                                            By:
O HM O
O Lilg Date: 4[f4 Document No. 80A4421 PROGRAM PLAN AND SCHEDULE App:   # Date c/JV Preservice Inspection                                 5532-PERRY                                   Rev:    1 Page: 31 of 145 CALIBRATION              CODE COMPONENT                     COuPOHENT              PROCEDURE       BLOCK       CODE   EXAM ZONE tDENTIFICATION                  DESCRPTION              NUMBER     (tf appbcablel CATEGORY BETHOO  NO. REMARKS RECIRCU!.ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-                 Recirculation Inlet Nozzle           80A0211     PY-SE-BI-4         B-F     UT   I N2C-KB                 N2C to Safe-end                                                       B5.10 80A0183     N/A                       PT 1-B13-                 Recirculation Inlet Nozzle           80A0209     PY-124-1-RPV B-D           UT   I N2D-KA                 N2D to Vessel                                                         B3.90 1-B13-                 Recirculation Inlet Nozzle           80A0190     PY-124-1-RPV B-D           UT   I N2D-!R                N2D Inner Radius                                                     B3.100 1-B13-                 Recirculation Inlet Nozzle           80A0211     FY-SE-BI-RPV B-F           UT   I N2D-KB                 N2D to Safe-end                                                       B5.10 80A0183     N/A                       PT l-B13-                Recirculation Inlet ~ Nozzle         80A0209     PY-124-1-RPV B-D           UT   I N2E-KA                 N2E to Vessel                                                         B3.90 1-B13-                 Recirculation Inlet Nozzle           80A0190     PY-124-1-RPV B-D           UT   I N2E-lR                N2E Inner Radius                                                     B3.100 NES 239 6/82                                                                                             ;
Syst;mi Rcactor Pr ssure Vcssel PROGRAM PLAN AND SCHEDULE By
/nt Date: C/94 Document No. 80A4421 App:
#- Date: c/S<,t Preservice Inspection 5532-PERRY Rev 1
Page: 30 of 145 CAUBRATO4 CODE COMPONE>si COMPONENT PROCEDURE BLOCK CODE EXAM ZONE MNTIRCATION DESCfDFTION NUMBER (if appleablel CATEGORY ETHOD No REMARKS RECIRCULATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2A-KB N2A to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2B-KA N2B to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2B-IR N2B Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2B-KB N2B to Safe-end B5.10 80A0183 N/A PT l
1-B13 Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2C-KA N2C to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2C-IR N2C Inner Radius B3.100 NES 239 6/82


o                                                   lies                                                                                                                        o Systemi R act r Pr:ssura Vessel                  PROGRAM PLAN AND SCHEDULE                                                       By2          hM Date:                             ( /84 Date: C/ge/
o 11EN O
Document No. 80A4421                                                                                                             App:
Syst:mi R; actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By:
Preservice Inspection                                     5532-PERRY                                                             Rev:                     1                   Page: 32 of 145 CAUBRATION                              CODE COMPONENT                           COMPONENT            PROCEDURE                 BLOCK       CODE                     EXAM ZONE DESCHPTION              NUMBER               Of apphcatM  CATEGORY                 BETHOO       NO.                                 REMARKS IDENTlHCATION RECIRCUI.ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-                     Recirculati .. Inlet Nozzle         80A0211               PY-SE-BI-4       B-F                     UT             I N2E-KB                     N2E to Safe-end                                                             B5.10 80A0183               N/A                                       PT l-B13-                     Recirculation Inlet Nozzle           80A0209               PY-124-1-RPV B-D                         UT             I N2F-KA                     N2F to Vessel                                                               B3.90 1-B13-                     Recirculation Inlet Nozzle           80A0190               PY-124-1-RPV B-D                         UT             I N2F-1R                      N2P Inner Radius                                                             B3.100 -
Lilg Date: 4[f4 Document No. 80A4421 App:
1-B13-                     Recirculation Inlet Nozzle           80A0211               PY-SE-BI-4        B-F                     UT             I N2F-KB                     N2F to Safe-end                                                               B5.10 80A0183               N/A                                       PT l-B13-                     Recirculation Inlet Nozzle           80A0209               PY-124-1-RPV B-D                         UT             I N2G-KA                     N2G to Vessel                                                                 B3.90 1-B13-                     Recirculation Inlet Nozzle           80A0190               PY-124-1-RPV B-D                         UT             I N2G-IR                      N2G Inner Radius                                                             B3.100 NES 239 6/82                                                                                                                                   ;
# Date c/JV Preservice Inspection 5532-PERRY Rev:
1 Page: 31 of 145 CALIBRATION CODE COMPONENT COuPOHENT PROCEDURE BLOCK CODE EXAM ZONE tDENTIFICATION DESCRPTION NUMBER (tf appbcablel CATEGORY BETHOO NO.
REMARKS RECIRCU!.ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2C-KB N2C to Safe-end B5.10 80A0183 N/A PT 1-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2D-KA N2D to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2D-!R N2D Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 FY-SE-BI-RPV B-F UT I
N2D-KB N2D to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet ~ Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2E-KA N2E to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2E-lR N2E Inner Radius B3.100 NES 239 6/82


O System: Reactor Pressure Vessel 1]M PROGRAM PLAN AND SCHEDULE                                             By:
o lies o
O M Date: (, /94 Document No. 80A4421                                                                                                       App: M             Date: c/g4 Preservice Inspection                                           5532-PERRY                                                 Rev:         1     Page: 33 of 145 CAU8 RATION                  CODE COMPONENT                     COMPONENT                             PROCEDURE           BLOCK       CODE       EXAM     ZONE DESCFCPTION                            NUMBER         (if appicabael CATEGORY   METHOO      NO,        N MARKS IDENTIFICATION RECIRCULATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-               Recirculation Inlet Nozzle                             80A0211     PY-SE-BI-4           B-F       UT         I N2G-KB               N2G to Safe-end                                                                           B5.10 l
Systemi R act r Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By2 h Date: ( /84 Document No. 80A4421 App:
80A0183     N/A                             PT l
M Date: C/ge/
l-B13-               Recirculation Inlet Nozzle                             80A0209     PY-124-1-RPV B-D                 UT       I N2H-KA               N2H to Vessel                                                                             B3.90 1-B13-               Recirculation Inlet Nozzle                             80A0190     PY-124-1-RPV B-D                 UT       I                             '
Preservice Inspection 5532-PERRY Rev:
N2H-IR                N2H Inner Radius                                                                           B3.100 l-B13-               Recirculation Inlet Nozzle                             80A0211     PY-SE-BI-4           B-F       UT       I N2H-KB               N2H to Safe-end                                                                           B5.10 80A0183     N/A                             PT l-B13-               Recirculation Inlet Nozzle                             80A0209     PY-124-1-RPV B-D                 UT       I N23-KA               N23 to Vessel                                                                             B3.90 1-B13-               Recirculation Inlet Nozzle                             80A0190     PY-124-1-RPV B-D                 UT       I N23-IR               N23 Inner Radius                                                                           B3.100 NES 239 6/82                                                                                                                       ;
1 Page: 32 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTlHCATION DESCHPTION NUMBER Of apphcatM CATEGORY BETHOO NO.
Y,'  .
REMARKS RECIRCUI.ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculati.. Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2E-KB N2E to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2F-KA N2F to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2F-1R N2P Inner Radius B3.100 -
1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2F-KB N2F to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2G-KA N2G to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2G-IR N2G Inner Radius B3.100 NES 239 6/82


O Syst:mi Reactor Pressura Vessel HM PROGRAM PLAN AND SCHEDULE                         By:
O 1]M O
O
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
                                                                                                                            - h'r Date: 6 /sf-Document No. 80A4421                                                                               App:     # Date: c/W Preservice Inspection                                     5532-PERRY                               Rev:     1- Page: 34 of 145 CAUBRATION             CODE COMPONENT                           COMPONENT           PROCEDURE   BLOCK     CODE     EXAM ZONE DESCRIPTION             NUMBER   (!f applW CATEGORY   METHOD No.     REMARKS.-
M Date: (, /94 Document No. 80A4421 App: M Date: c/g4 Preservice Inspection 5532-PERRY Rev:
E)ENTWICATION RECIRCULATION NOZZLE WELDS Ref. Dwg. Nc: 1-RV-003 1-B31-                     Recirculation Inlet Nozzle           80A0211   PY-SE-BI-4     B-F     UT     I N23-KB                     N23 to Safe-end                                               B5.10 80A0183 - N/A                     PT l-B31-                     Recirculation Inlet Nozzle           80A0209   PY-124-1-RPV B-D         UT     I N2K-KA                   N2K to Vessel                                                   B3.90 -
1 Page: 33 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCFCPTION NUMBER (if appicabael CATEGORY METHOO NO, N MARKS RECIRCULATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
1-B31-                     Recirculation Inlet Nozzle           80A0190   PY-124-1-RPV B-D       'UT     I N2K-1R                     N2K Inner Radius                                               B3.100 1-B13-                     Recirculation Inlet Nozzle         80A0211   PY-SE-BI-4     B-F     UT     I N2K-KB                     N2K to Safe-end                                               B5.10 80A0183   N/A                     PT t
N2G-KB N2G to Safe-end B5.10 80A0183 N/A PT l
NES 239 6/82                                                                                           ;
l l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2H-KA N2H to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2H-IR N2H Inner Radius B3.100 l-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2H-KB N2H to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N23-KA N23 to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N23-IR N23 Inner Radius B3.100 NES 239 6/82 Y,'
 
O HM O
/
6 sf-Syst:mi Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
- h'r Date:
Document No. 80A4421 App:
# Date: c/W Preservice Inspection 5532-PERRY Rev:
1-Page: 34 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E)ENTWICATION DESCRIPTION NUMBER
(!f applW CATEGORY METHOD No.
REMARKS.-
RECIRCULATION NOZZLE WELDS Ref. Dwg. Nc: 1-RV-003 1-B31-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N23-KB N23 to Safe-end B5.10 80A0183 -
N/A PT l-B31-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2K-KA N2K to Vessel B3.90 -
1-B31-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D
'UT I
N2K-1R N2K Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2K-KB N2K to Safe-end B5.10 80A0183 N/A PT t
NES 239 6/82


o                                             HEN                                                                                                             o Syst;m: Reactor Pr:ssure Vessel         PROGRAM PLAN AND SCHEDULE                                                   BD    ht< D^t** /94 Document No. 80A4421                                                                                                 App: A4 Date: c/rst Preservice Inspect!On                             5532-PERRY                                                         Rev:       1                           Page: 35 of 145 CAUBRATION                                   CODE COMPONENT                   COMPONENT           PROCEDURE       BLOCK             CODE                   EXAM   ZONE IDENTIFICATION               DESORPTICH           NUMBER     Of apphcabiel       CATEGORY                 LETHOO   No.                                 REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004                     .
o HEN o
1-B13-                 Feedwater Nozzle N4A to           80A0209     PY-124-1-RPV B-D                                 UT     I N4A-KA                 Vessel                                                                 B3.90 1-B13-                 Feedwater Nozzle N4A Inner       80A0190     PY-124-1-RPV B-D                                 UT     I N4A-lR                 Radius                                                                 B3.100 80A0183     N/A                     N/A                     PT                                     Reg. Guide 06   L9 1-B13-                 Feedwater Nozzle N4A to           80A0211     PY-SE-BI-3               B-F                     UT     I N4A-KB                 Safe-end                                                               B5.10 80A0183     N/A                                             PT l-B13-                 Feedwater Nozzle N4B to           80A0209     PY-124-1-RPV B-D                                 UT     I N4B-KA                 Vessel                                                                 B3.90 1-B13-                 Feedwater Nozzle N4B Inner       80A0190     PY-124-1-RPV B-D                                 UT     I N4B-lR                 Radius                                                                 B3.100 80A0183     N/A                     N/A                     PT                                     Reg. Guide 061 9 l-B13-                 Feedwater Nozzle N4B to           80A0211     PY-SE-BI-3               B-F                     UT     I N4B-KB                 Safe-end                                                               B5.10 80A0183     N/A                                             PT NES 239 6/82                                                                                                               ;
BD ht<
D^t**
/94 Syst;m: Reactor Pr:ssure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: A4 Date: c/rst Preservice Inspect!On 5532-PERRY Rev:
1 Page: 35 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESORPTICH NUMBER Of apphcabiel CATEGORY LETHOO No.
REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4A to 80A0209 PY-124-1-RPV B-D UT I
N4A-KA Vessel B3.90 1-B13-Feedwater Nozzle N4A Inner 80A0190 PY-124-1-RPV B-D UT I
N4A-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 06 L9 1-B13-Feedwater Nozzle N4A to 80A0211 PY-SE-BI-3 B-F UT I
N4A-KB Safe-end B5.10 80A0183 N/A PT l-B13-Feedwater Nozzle N4B to 80A0209 PY-124-1-RPV B-D UT I
N4B-KA Vessel B3.90 1-B13-Feedwater Nozzle N4B Inner 80A0190 PY-124-1-RPV B-D UT I
N4B-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 061 9 l-B13-Feedwater Nozzle N4B to 80A0211 PY-SE-BI-3 B-F UT I
N4B-KB Safe-end B5.10 80A0183 N/A PT
\\
i NES 239 6/82


o System: Reactor Pressure Vessel BEN                                        By:
o BEN O
O
System: Reactor Pressure Vessel By:
[]f Date: d8Y Document No. 80A4421                    PROGRAM PLAN AND SCHEDULE                           . App:
[]f Date: d8Y PROGRAM PLAN AND SCHEDULE
Preservice Inspection                             5532-PERRY                                 Rev:. A Date:
. App:
1 c/fg Page: 36 of 145 CAUBRATION               CODE.
Preservice Inspection 5532-PERRY Rev:. A Date: c/fg Document No. 80A4421 1
NUMBE (if applicablel CA   ORY   THOD NO     REMARKS IDE      TON                DE FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-               Feedwater Nozzle N4C to           80A0209 PY-124-1-RPV B-D           UT   I N4C-KA        -
Page: 36 of 145 CAUBRATION CODE.
Vessel                                                         B3.90
IDE TON DE NUMBE (if applicablel CA ORY THOD NO REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4C to 80A0209 PY-124-1-RPV B-D UT I
,            1-B13-               Feedwater Nozzle N4C Inner         80A0190 PY-125-1-RPV B-D           UT   I N4C-lR               Radius                                                         B3.100 80A0183 N/A                 N/A     PT         Reg. Guide 0615 1-B13-               Feedwater Nozzle N4C to           80A0211 PY-SE-BI-3         B-F     UT   I N4C-KB               Safe-end                                                       B5.10 80A0183 N/A                         PT l-B13-               Feedwater Nozzle N4D to           80A0209 PY-124-1-RPV B-D           UT   I N4D-KA               Vessel                                                         B3.90 1-B13-               Feedwater Nozzle N4D Inner         80A0190 PY-124-1-RPV B-D           UT   I N4D-lR               Radius                                                         B3.100 80A0183 N/A                 N/A     PT         Reg. Guide 061S 1-B13-               Feedwater Nozzle N4D to           80A0211 PY-SE-BI-3         B-F     UT   I N4D-KB               Safe-end                                                       B5.10
Vessel B3.90 N4C-KA 1-B13-Feedwater Nozzle N4C Inner 80A0190 PY-125-1-RPV B-D UT I
                                                                      .80A0183 N/A                         PT NES 239 fv82                                                                                     ;
N4C-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 0615 1-B13-Feedwater Nozzle N4C to 80A0211 PY-SE-BI-3 B-F UT I
1
N4C-KB Safe-end B5.10 80A0183 N/A PT l-B13-Feedwater Nozzle N4D to 80A0209 PY-124-1-RPV B-D UT I
- - - - - mmw                                                                                                                         u
N4D-KA Vessel B3.90 1-B13-Feedwater Nozzle N4D Inner 80A0190 PY-124-1-RPV B-D UT I
N4D-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 061S 1-B13-Feedwater Nozzle N4D to 80A0211 PY-SE-BI-3 B-F UT I
N4D-KB Safe-end B5.10
.80A0183 N/A PT NES 239 fv82 1
- - - - - mmw u


me             -                                                                                -
me o
o                      ure Vessel iIEE                                                             o S    nu Rea to nt o          A442                      PROGRAM PLAN AND SCHEDULE                               . 7',     U*[l Page: 3
iIEE o
                                                                                                                                ' "145 Preservice Inspection                                     5532-PERRY                                     Rev     1 l CALIBRATION               CODE COMPONENT             PROCEDURE         BLOCK         CODE   EXAM ZONE COMPONENT                                                              (If applicable) CATEGORY METHOD NO. REMARKS BOENTIF6 CATION                    DESCEtPTICH            NUMBER FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-                       Feedwater Nozzle N4E to             80A0209     PY-124-1-RPV B-D             UT   I N4E-KA                       Vessel                                                               B3.90 1-B13-                       Feedwater Nozzle N4E Inner         80A0190     PY-124-1-RPV B-D             UT   I
PROGRAM PLAN AND SCHEDULE
  -N4E-IR                       Radius                                                               B3.100 80A0183     N/A                 N/A     PT       Reg. Guide 0615 1-B13-                       Feedwater Nozzle N4E to             80A0211     PY-SE-BI-3           B-F     UT   I N4E-KB                       Safe-end                                                             B5.10 80A0183     N/A                         PT                         i 1-B13-                       Feedwater Nozzle N4F to             80A0209     PY-124-1-RPV B-D             UT   I N4F-KA                       Vessel                                                               B3.90 1-B13-                       Feedwater Nozzle N4F Inner         80A0190     PY-124-1-RPV B-D             UT   I N4F-lR                       Radius                                                               B3.100                             ..
. 7',
80A0183     h/A                 N/A     PT       Reg. Guide 0615 2
U*[l ' "
1-B13-                       Feedwater Nozzle N4F to             80A0211     PY-SE-BI-3           B-F     UT   I N4F-KB                     Safe-end                                                               B5.10 80A0183     N/A                         PT                         i
S nu Rea to ure Vessel nt o A442 Preservice Inspection 5532-PERRY Rev 1
                                                                                                                                            ^
Page: 3 145 l
l t
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE BOENTIF6 CATION DESCEtPTICH NUMBER (If applicable)
NES 239 6/82                                                                                                  ;
CATEGORY METHOD NO.
REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4E to 80A0209 PY-124-1-RPV B-D UT I
N4E-KA Vessel B3.90 1-B13-Feedwater Nozzle N4E Inner 80A0190 PY-124-1-RPV B-D UT I
-N4E-IR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 0615 1-B13-Feedwater Nozzle N4E to 80A0211 PY-SE-BI-3 B-F UT I
N4E-KB Safe-end B5.10 80A0183 N/A PT i
1-B13-Feedwater Nozzle N4F to 80A0209 PY-124-1-RPV B-D UT I
N4F-KA Vessel B3.90 1-B13-Feedwater Nozzle N4F Inner 80A0190 PY-124-1-RPV B-D UT I
N4F-lR Radius B3.100 80A0183 h/A N/A PT Reg. Guide 0615 2
1-B13-Feedwater Nozzle N4F to 80A0211 PY-SE-BI-3 B-F UT I
N4F-KB Safe-end B5.10 80A0183 N/A PT i
l
l
^
t NES 239 6/82 l


O Syst m Reactor Pressura Vcssel HM PROGRAM PLAN AND SCHEDULE                               By2 O
O HM O
hPc Dat;i 6 If4 Document No. 80A4421                                                                               App:   # - Date: W Preservice Inspection                               5532-PERRY                                   Rev:     1 Page: 38 of 145 i
I 6 f4 Syst m Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By2 hPc Dat;i Document No. 80A4421 App:
CAUBRATION                 CODE COMPONENT                   COMPONENT             PROCEDURE     BLOCK         CODE   EXAM ZONE IDENTIFICATION               DESCRIPTION             NUMBER   (if appicabiel   CATEGORY ETHOD   No. REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-               Core Spray Nozzle NSA to             80A0209   PY-124-1-RPV B-D             UT   I NSA-KA                 Vesse!                                                             B3.90 1-B13-               Core Spray Nozzle N5A Inner         80A0190   PY-124-1-RPV B-D             UT   I NSA-IR               Radius                                                               B3.100 1-B 13-             Core Spray Nozzle NSA to             80A0211   PY-SE-BI-3           B-F     UT   I N5A-KB               Safe-end                                                             B5.10 80A0183   N/A                         PT                       -
# - Date: W Preservice Inspection 5532-PERRY Rev:
1-B13-               Core Spray Nozzle N5A Safe-end       80A0211   PY-SE-BI-3           B-3     UT   I NSA-KC               to Safe-end Extension                                               B9.11 80A0183   N/A                         PT l-B13-               Core Spray Nozzle NSB to             80A0209   PY-124-1-RPV B-D             UT   I N5B-KA               Vessel                                                               B3.90 1-B13-               Core Spray Nozzle NSB Inner         80A0190   PY-124-1-RPV B-D             UT   I N5B-lR               Radius                                                               B3.100 1-B13-               Core Spray Nozzle NSB to             80A0211   PY-SE-BI-3           B-F     UT   I NSB-KB               Safe-end                                                             B5.10 80A0183   N/A                         PT l-B13-               Core Spray Nozzle NSB Safe-end       80A0211   PY-SE-BI-3           B-3     UT   I N5B-KC               to Safe-end Extension                                               B9.11 80A0183   N/A                         PT NES 239 6/82 i
1 Page: 38 of 145 i
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicabiel CATEGORY ETHOD No.
REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-Core Spray Nozzle NSA to 80A0209 PY-124-1-RPV B-D UT I
NSA-KA Vesse!
B3.90 1-B13-Core Spray Nozzle N5A Inner 80A0190 PY-124-1-RPV B-D UT I
NSA-IR Radius B3.100 1-B 13-Core Spray Nozzle NSA to 80A0211 PY-SE-BI-3 B-F UT I
N5A-KB Safe-end B5.10 80A0183 N/A PT 1-B13-Core Spray Nozzle N5A Safe-end 80A0211 PY-SE-BI-3 B-3 UT I
NSA-KC to Safe-end Extension B9.11 80A0183 N/A PT l-B13-Core Spray Nozzle NSB to 80A0209 PY-124-1-RPV B-D UT I
N5B-KA Vessel B3.90 1-B13-Core Spray Nozzle NSB Inner 80A0190 PY-124-1-RPV B-D UT I
N5B-lR Radius B3.100 1-B13-Core Spray Nozzle NSB to 80A0211 PY-SE-BI-3 B-F UT I
NSB-KB Safe-end B5.10 80A0183 N/A PT l-B13-Core Spray Nozzle NSB Safe-end 80A0211 PY-SE-BI-3 B-3 UT I
N5B-KC to Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82 i


o Systemi Reactor Pr:ssurs Vcssel na5                                               B3
o na5
* t Dat2: ' /84
. a B3
                                                                                                                            .a PROGRAM PLAN AND SCHEDULE                                   Y Document No. 80A4421                                                                               App:     # Date: c/M Preservice Inspection                             5532-PERRY                                       Rev:           1 Page: 39 of 145 CALIBRATION                   CODE COMPONENT                   COMPONENT           PROCEDURE     BLOCK       CODE         EXAM ZONE IDENTIFICATION               DESCRPTION             NUMBER   (if apphcable) CATEGORY       METHOD No.         REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-               RHR Nozzle N6A to Vessel           80A0209   PY-124-1-RPV B-D                 UT     I N6A-KA                                                                                 B3.90 1-B13-               RHR Nozzle N6A Inner Radius       80A0190   PY-124-1-RPV B-D                 UT     I N6A-IR                                                                                 B3.100 1-B13-               RHR Nozzle N6A to Safe-end         80A0211   PY-SE-BI-3         B-F         UT     I N6A-KB                                                                                 B5.10 80A0183   N/A                             PT l-B13-               RHR Nozzle N6A Safe-end to         80A0211   PY-SE-BI-3         B-3         UT     I N6A-KC               Safe-end Extension                                               B9.ll 80A0183   N/A                             PT l-B13-               RHR Nozzle N6B to Vessel           80A0209   PY-124-1-RPV B-D                 UT     I N6B-KA                                                                                 B3.90 1-B13-               RHR Nozzle N6B Inner Radius       80A0190   PY-124-1-RPV B-D                 UT     I N6B-IR                                                                                 B3.100 1-B13-               RHR Nozzle N6B to Safe-end         80A0211   PY-SE-BI-3         B-F         UT     I N6B-KB                                                                                 B5.10 80A0183   N/A                             PT l-B13-               RHR Nozzle N6B Safe-end to         80A0211   PY-SE-BI-3         B-3         UT     I N6B-KC               Safe-end Extension                                               B9.11 80A0183   N/A                             PT NES 239 6/82                                                                                           ;
* t Dat2: ' /84 Systemi Reactor Pr:ssurs Vcssel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
# Date: c/M Preservice Inspection 5532-PERRY Rev:
1 Page: 39 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRPTION NUMBER (if apphcable)
CATEGORY METHOD No.
REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-RHR Nozzle N6A to Vessel 80A0209 PY-124-1-RPV B-D UT I
N6A-KA B3.90 1-B13-RHR Nozzle N6A Inner Radius 80A0190 PY-124-1-RPV B-D UT I
N6A-IR B3.100 1-B13-RHR Nozzle N6A to Safe-end 80A0211 PY-SE-BI-3 B-F UT I
N6A-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6A Safe-end to 80A0211 PY-SE-BI-3 B-3 UT I
N6A-KC Safe-end Extension B9.ll 80A0183 N/A PT l-B13-RHR Nozzle N6B to Vessel 80A0209 PY-124-1-RPV B-D UT I
N6B-KA B3.90 1-B13-RHR Nozzle N6B Inner Radius 80A0190 PY-124-1-RPV B-D UT I
N6B-IR B3.100 1-B13-RHR Nozzle N6B to Safe-end 80A0211 PY-SE-BI-3 B-F UT I
N6B-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6B Safe-end to 80A0211 PY-SE-BI-3 B-3 UT I
N6B-KC Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82


0                                                                                                                                                                         (i By: .AA Dat;r 6Af Systami Ractor Pressure Vessel                            PROGRAM PLAN AND CCHEDULE Document No. 80A4421                                                                                                                                         App: 44 Date: 6//f Preservice Inspection                                                 5532-PERRY                                                                             Rev:     1 Page: 40 of 145 CAUBRATION                                     COOE COMPONENT                                     COMPONENT               PROCEDURE                                         BLOCK               CODE     EXAM ZONE DESCPIPTION                 NUMBER                       (if apphcablel                     CATEGORY. hETHOD NO. REMARKS tOENilHCATON CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-               RHR Nozzle N6C to Vessel                             80A0209               PY-124-1-RPV B-D                                           UT     I N6C-KA                                                                                                                                               B3.90 l
0 (i
l-B13-               RHR Nozzle N6C Inner Radius                           80A0190             PY-124-1-RPV B-D                                             UT     I N6C-IR                                                                                                                                               B3.100 I
Systami Ractor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
1-B13-               RPR Nozzle N6C to Safe-end                           80A0211             PY-SE-BI-3                                           B-F     UT     I N6C-KB                                                                                                                                               B5.10 80A0183             N/A                                                         PT l-B13-               RHR Nozzle N6C Safe-end                               80A0211             PY-SE-BI-3                                           B-3     UT     I                     ,
.AA Dat;r 6Af Document No. 80A4421 App: 44 Date: 6//f Preservice Inspection 5532-PERRY Rev:
N6C-KC               to Safe-end Extension                         '
1 Page: 40 of 145 CAUBRATION COOE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE tOENilHCATON DESCPIPTION NUMBER (if apphcablel CATEGORY.
B9.11 80A0183             N/A                                                         PT NES 239 6/82                                                                                                                                                       ;
hETHOD NO.
__          _ _ _ _  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _                                        ~
REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-RHR Nozzle N6C to Vessel 80A0209 PY-124-1-RPV B-D UT I
N6C-KA B3.90 l
l-B13-RHR Nozzle N6C Inner Radius 80A0190 PY-124-1-RPV B-D UT I
N6C-IR B3.100 I
1-B13-RPR Nozzle N6C to Safe-end 80A0211 PY-SE-BI-3 B-F UT I
N6C-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6C Safe-end 80A0211 PY-SE-BI-3 B-3 UT I
N6C-KC to Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82
~


o Syst mt R actor Pressura Vessel 11EN                                                                    By o
o 11EN o
I" . Dat:: 6/g4 PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                                                                                       App:   M Date: e/JV Preservice Inspection                                                                 3532-PERRY                                                           Rev:     1 Page: 41 of 145 :
Syst mt R actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By I". Dat:: 6/g4 Document No. 80A4421 App:
Co W ONENT                                                   CO W (NT                                         PROCEDURE       BL         CODE         ZONE IDENTIFICATION                                               DESCRIP W)N                                       NUMBER     til apphcable) CATEGORY METHOD NO.     REMARKS CLOSURE HEAD WELDS           '
M Date: e/JV Preservice Inspection 3532-PERRY Rev:
Ref. Dwg. No: 1-RV-006
1 Page: 41 of 145 :
                                                                                    ~
Co W ONENT CO W (NT PROCEDURE BL CODE ZONE IDENTIFICATION DESCRIP W)N NUMBER til apphcable)
. 1-B13-AG                                             Top Head to Top Head Flange                                   80A0192   PY-128-1-RPV B-A           UT   I Bl.40 1-B13-AH                                             Top Head Dollar Plate to                                       80A0192   PY-127-1-RPV B-A           UT   I Side Plates                                                                                   Bl.21 PY-128-1-RPV l-B13-DJ                                             Top Head Meridional Weld                                       80A0192   PY-128-1-RPV B-A           UT   I
CATEGORY METHOD NO.
                                                        @ 75 Azimuth                                                                                 Bl.22 1-B13-DK                                             Top Head Meridional Weld                                       80A0192   PY-128-1-RPV B-A           UT   I
REMARKS CLOSURE HEAD WELDS Ref. Dwg. No: 1-RV-006
                                                        @ 135 Azimuth                                                                                 Bl.22 1-B13-DM                                             Top Head Meridional Weld                                       80A0192   PY-128-1-RPV B-A           UT   I
~
                                                        @ 195 Azimuth                                                                                 Bl.22 1-B13-DN                                             Top Head Meridional Weld                                       80A0192   PY-128-1-RPV B-A           UT   I
1-B13-AG Top Head to Top Head Flange 80A0192 PY-128-1-RPV B-A UT I
                                                        @ 255 Azimuth                                                                                 Bl.22 1-B13-DP                                             Top Head Meridional Weld                                       80A0192   PY-128-1-RPV B-A           UT   I
Bl.40 1-B13-AH Top Head Dollar Plate to 80A0192 PY-127-1-RPV B-A UT I
                                                        @ 315 Azimuth                                                                                 Bl.22 1-B13-DR                                             Top Head Meridional Weld                                       80A0192   PY-128-1-RPV B-A           UT   I
Side Plates Bl.21 PY-128-1-RPV l-B13-DJ Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
                                                        @ 15 Azimuth                                                                                 Bl.22 NES 239 6/82                                                                                                                                                     i
@ 75 Azimuth Bl.22 1-B13-DK Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 135 Azimuth Bl.22 1-B13-DM Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 195 Azimuth Bl.22 1-B13-DN Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 255 Azimuth Bl.22 1-B13-DP Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 315 Azimuth Bl.22 1-B13-DR Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 15 Azimuth Bl.22 NES 239 6/82 i


O.
O.
System: Reactor Pressure Vessel MM PROGRAM PLAN AND CCHEDULE                                                       By: E O.
MM O.
Date:fr/H Document No. 80A4421                                                                                                                   App: & Date: c/ M Preservice Inspection                                           5532-PERRY                                                             Rev:     1 Page: 42 of 145 CAL 18 RATION                                     CODE COMPONENT                       COMPONENT             PROCEDURE       BLOCK       CODE                             EXAM   ZONE IDENTIFICATION                   DESCRIPTION           NUMBER     (if apphcable) CATEGORY                   nETHOO         No.     REMARNS CLOSURE HEAD WELDS Ref. Dwg. No: 1-RV-406 1 B13-                           Top Head to N7 Head Spare           80A0192   PY-127-1-RPV B-D                                     UT   I N7-KA                           Nozzle                                                             B3.90 1-B13-                           N7 Head Spare Nozzle Inner           80A0192   PY-127-1-RPV B-D                                     UT   I N7-IR                           Radius B3.100 1-B13-                           N7 Head Spare Nozzle to             80A0184   N/A                 B-G-2 VT-1 I N7-B                             Flange Bolting (12 Pieces)                                         B7.50 1-B13-                           Top Head to N8 Head Spray           80A0192   PY-127-1-RPV B-D                                     UT   I NS-KA                           Nozzle                                                             B3.90 1-B13-                           N8 Head Spray Nozzle Inner           80A0192   PY-127-1-RPV B-D                                     UT   I N8-lR                           Radius                                                             B3.100 1-B13-                           N3 Head Spray Nozzle to Flange       80A0184   N/A                 B-G-2 VT-1 I NS-B                             Bolting (12 Pieces)                                                 B7.50 NES 239 6/82 ,                                                                                                                     ;
Date:fr/H System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
E Document No. 80A4421 App: & Date: c/ M Preservice Inspection 5532-PERRY Rev:
1 Page: 42 of 145 CAL 18 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)
CATEGORY nETHOO No.
REMARNS CLOSURE HEAD WELDS Ref. Dwg. No: 1-RV-406 1 B13-Top Head to N7 Head Spare 80A0192 PY-127-1-RPV B-D UT I
N7-KA Nozzle B3.90 1-B13-N7 Head Spare Nozzle Inner 80A0192 PY-127-1-RPV B-D UT I
N7-IR Radius B3.100 1-B13-N7 Head Spare Nozzle to 80A0184 N/A B-G-2 VT-1 I N7-B Flange Bolting (12 Pieces)
B7.50 1-B13-Top Head to N8 Head Spray 80A0192 PY-127-1-RPV B-D UT I
NS-KA Nozzle B3.90 1-B13-N8 Head Spray Nozzle Inner 80A0192 PY-127-1-RPV B-D UT I
N8-lR Radius B3.100 1-B13-N3 Head Spray Nozzle to Flange 80A0184 N/A B-G-2 VT-1 I NS-B Bolting (12 Pieces)
B7.50
)
NES 239 6/82,


O Syst mi Reactor Pressura Vcssel gg                                           B"   E   U**2' O
O gg O
Document No. 80A4421                                   PROGRAM PLAN AND SCHEDULE                              App: A Date: 4/S4 Preservice Inspection                                           5532-PERRY                                   Rev     1 Page: 43 of 145 -
B" E
COMPONENT                     COMFOdN T             PROCEDURE         O         CODE           ZONE IDENTIFICATION                       DESCR*PTION           NUMBER   (if apphcabiel CATEGORY METHOD NO. REMARKS BOTTOM HEAD WELDS Ref. Dwg. No: 1-RV-007 1-B13-DE                         Bottom Head Side Plates Weld,       80A0191   PY-123-1-RPV B-A             UT   i 2700 Side                                                         Bl.22 1-B13-DG                         Bottom Center Plate to Side         80A0191   PY-123-1-RPV B-A             UT   I Plates,2700 Side                                                   Bl.22 1-B13-DF                         Bottom Head Side Plates Weld,       80A0191   PY-123-1-RPV B-A             UT   I 900 Side                                                           Bl.22 1-B13-DH                         Bottom Center Plate to Side         80A0191   PY-123-1-RPV B-A             UT   I Plates, 900 Side                                                   Bl.22 1-B13-CG                         Bottom Head to Sidrt Extension       80A0183   N/A'               B-H     PT   I B8.10 l
U**2' Syst mi Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: A Date: 4/S4 Preservice Inspection 5532-PERRY Rev 1
1-B13-N15                         Bottom Head to NIS Drain             80A0191   PY-123-1-RPV B-D             UT   I
Page: 43 of 145 -
  -KA                               Nozzle                                                             B3.90 1-B13-N15                         NIS Drain Nozzle Inner Radius       80A0190   PY-123-1-RPV B-D             UT   I
COMPONENT COMFOdN T PROCEDURE O
  -IR                                                                                                 B3.100 1-B13-Nil                         Nil Differential Pressure           80A0195   PY-SE-BI-6         B-F     UT   I
CODE ZONE IDENTIFICATION DESCR*PTION NUMBER (if apphcabiel CATEGORY METHOD NO.
  -KB                               Nozzle to Safe-end                                                 B5.10 80A0183   N/A                         PT NES 239 6/82 i
REMARKS BOTTOM HEAD WELDS Ref. Dwg. No: 1-RV-007 1-B13-DE Bottom Head Side Plates Weld, 80A0191 PY-123-1-RPV B-A UT i
2700 Side Bl.22 1-B13-DG Bottom Center Plate to Side 80A0191 PY-123-1-RPV B-A UT I
Plates,2700 Side Bl.22 1-B13-DF Bottom Head Side Plates Weld, 80A0191 PY-123-1-RPV B-A UT I
900 Side Bl.22 1-B13-DH Bottom Center Plate to Side 80A0191 PY-123-1-RPV B-A UT I
Plates, 900 Side Bl.22 1-B13-CG Bottom Head to Sidrt Extension 80A0183 N/A' B-H PT I
B8.10 l
1-B13-N15 Bottom Head to NIS Drain 80A0191 PY-123-1-RPV B-D UT I
-KA Nozzle B3.90 1-B13-N15 NIS Drain Nozzle Inner Radius 80A0190 PY-123-1-RPV B-D UT I
-IR B3.100 1-B13-Nil Nil Differential Pressure 80A0195 PY-SE-BI-6 B-F UT I
-KB Nozzle to Safe-end B5.10 80A0183 N/A PT NES 239 6/82 i


o                                                           nog                                                                                                               o.
o nog o.
S    *        *
$, y U"$l h(
* rn n o8$A421 P ure Vessel PROGRAM PLAN AND SCHEDULE                              $, y U"$l h(                                                       _
P ure Vessel S
Preservice Inspection                                               5532-PERRY                                   Rev:                                     1                   Page: 44 of 145 CAUBRATION               CODE COMPONENT                                 CouPONENT             PROCEDURE       BLOCK       CODE     EXAM               ZONE IDENTIFICATION                               DESCT4PTION           NUMBER     Of apphcable) CATEG0RY METHOO                   NO.                                     REMARKS BOTTOM HEAD WELDS Ref. Dwg. No: 1-RV-007 1-B13-N18               N18 Liquid Control Nozzle                       80A0195     PY-SE-BI-6         B-F     UT                           I
o8$A421 PROGRAM PLAN AND SCHEDULE rn n Preservice Inspection 5532-PERRY Rev:
                                          -KB                     to Safe-end                                                                     B5.10 80A0183     N/A                       PT i
1 Page: 44 of 145 CAUBRATION CODE COMPONENT CouPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCT4PTION NUMBER Of apphcable)
NES 239 6/82                                                                                                                                 ,
CATEG0RY METHOO NO.
REMARKS BOTTOM HEAD WELDS Ref. Dwg. No: 1-RV-007 1-B13-N18 N18 Liquid Control Nozzle 80A0195 PY-SE-BI-6 B-F UT I
-KB to Safe-end B5.10 80A0183 N/A PT i
NES 239 6/82


O                                               g3                                                   .
O g3 8O Syst:m: Reactor Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By:
O Syst:m: Reactor Pr:ssura Vessel           PROGRAM PLAN AND SCHEDULE                               By:   md Dates (l84 Document No. 80A4421                                                                             App: A4 Date: ch<,c Preservice Inspection                               5532-PERRY                                   Rev:       1           Page: 45 of 145 CAUBRATK)!               CODE N                             COMPONENT             PROCEDURE     BLOCK         CODE     EXAM ZONE E)ENTFOTK)N                   DESCRPTION             NUMBER   Of applacablel CATEGORY METHOO NO.                                         REMARKS ..
md Dates (l 4 Document No. 80A4421 App: A4 Date: ch<,c Preservice Inspection 5532-PERRY Rev:
MAIN STEAM NOZZLES Ref. Dwg. No: 1-RV-008 1-B13-                 Main Steam Nozzle N3A to           80A0191   PY-124-1-RPV B-D           UT   I N3A-KA                 Vessel                                                           B3.90 1-B13                 Main Steam Nozzle N3A Inner         80A0190   PY-124-1-RPV B-D           UT   I N3A-IR                 Radius                                                           B3.100 1-B13-                 Main Steam Nozzle N3A to           80A0195   PY-SE-CS-2         B-F     UT     I N3A-KB                 Safe-end                                                           B5.10 80A0183   N/A                         PT l-B13-                 Main Steam Nozzle N3B to           80A0191   PY-124-1-RPV B-D           UT     I N3B-KA                 Vessel                                                             B3.90 1-B13-                 Main Steam Nozzle N3B Inner         80A0190   PY-124-1-RPV B-D           UT     I N3B-IR                 Radius                                                             B3.100
1 Page: 45 of 145 CAUBRATK)!
, 1-B13-                 Main Steam Nozzle N3B to           80A0195   PY-SE-CS-2         B-F     UT     I N3B-KB                 Safe-end                                                           B5.10 80A0183   N/A                         PT l-B13-                 Main Steam Nozzle N3C to           80A0191   PY-124-1-RPV B-D             UT   I N3C-KA                 Vessel                                                             B3.90 i
CODE N
I l-B13                 Main Steam Nozzle N3C Inner         80A0190   PY-124-1-RPV B-D             UT   I N3C-lR                 Radius                                                             B3.100 NES 239 6/82                                                                                             -
COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E)ENTFOTK)N DESCRPTION NUMBER Of applacablel CATEGORY METHOO NO.
REMARKS..
MAIN STEAM NOZZLES Ref. Dwg. No: 1-RV-008 1-B13-Main Steam Nozzle N3A to 80A0191 PY-124-1-RPV B-D UT I
N3A-KA Vessel B3.90 1-B13 Main Steam Nozzle N3A Inner 80A0190 PY-124-1-RPV B-D UT I
N3A-IR Radius B3.100 1-B13-Main Steam Nozzle N3A to 80A0195 PY-SE-CS-2 B-F UT I
N3A-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3B to 80A0191 PY-124-1-RPV B-D UT I
N3B-KA Vessel B3.90 1-B13-Main Steam Nozzle N3B Inner 80A0190 PY-124-1-RPV B-D UT I
N3B-IR Radius B3.100 1-B13-Main Steam Nozzle N3B to 80A0195 PY-SE-CS-2 B-F UT I
N3B-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3C to 80A0191 PY-124-1-RPV B-D UT I
N3C-KA Vessel B3.90 i
I l-B13 Main Steam Nozzle N3C Inner 80A0190 PY-124-1-RPV B-D UT I
N3C-lR Radius B3.100 NES 239 6/82


o                                           np5                                           By: /3 c Date:C /M o
o np5 o
System: Reactor Prcssura Vessel           PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                               App: M Date t/r4 Preservice Inspection                                 5532-PERRY                                   Rev:       1 Page: 46 of 145 CAUBRATION                 CCOE COMPONENT                 COVPONENT             PROCEDURE     BLOCK         CODE     EXAM   ZONE IDENTIFICATION             DESCR:PTION             NUMBER   (11 appleablel CATEGORY LETHOO   NO       REMARKS MAIN STEAM A V BRATION NOZZLE Ref. Dwg. No: 1-RV-008 1-B13-               Main Steam Nozzle N3C to           80A0195   PY-SE-CS-2         B-F     UT       I N3C-KB                 Safe-end                                                         B5.10 80A0183   N/A                         PT l-B13-               Main Steam Nozzle N3D to           80A0191   PY-124-1-RPV B-D             UT       I~
System: Reactor Prcssura Vessel PROGRAM PLAN AND SCHEDULE By: /3 c Date:C /M Document No. 80A4421 App:
N3D-KA                 Vesset                                                           B3.90 1-B13-               Main Steam Nozzle N3D Inner         80A0190   PY-124-1-RPV B-D             U1       I N3D-IR                 Radius                                                           B3.100 1-B13-               Main StCam Nozzle N3D to           80A0195   PY-SE-CS-2         B-F     UT       I N3D-KB                 Safe-end                                                         B5.10 80A0183   N/A                         PT 1-B13-               Vibration Nozzle N16 to             80A0191   PY-124-1-RPV B-D             UT       I Vessel                                                             B3.90   -
M Date t/r4 Preservice Inspection 5532-PERRY Rev:
1-B13-               Vibration Nozzle N16 inner         80A0190   PY-124-1-RPV B-D             UT       I-N16-lR                 Radius                                                             B3.100 NES 239 6/82                                                                                         .
1 Page: 46 of 145 CAUBRATION CCOE COMPONENT COVPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCR:PTION NUMBER (11 appleablel CATEGORY LETHOO NO REMARKS MAIN STEAM A V BRATION NOZZLE Ref. Dwg. No: 1-RV-008 1-B13-Main Steam Nozzle N3C to 80A0195 PY-SE-CS-2 B-F UT I
N3C-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3D to 80A0191 PY-124-1-RPV B-D UT I~
N3D-KA Vesset B3.90 1-B13-Main Steam Nozzle N3D Inner 80A0190 PY-124-1-RPV B-D U1 I
N3D-IR Radius B3.100 1-B13-Main StCam Nozzle N3D to 80A0195 PY-SE-CS-2 B-F UT I
N3D-KB Safe-end B5.10 80A0183 N/A PT 1-B13-Vibration Nozzle N16 to 80A0191 PY-124-1-RPV B-D UT I
Vessel B3.90 1-B13-Vibration Nozzle N16 inner 80A0190 PY-124-1-RPV B-D UT I-N16-lR Radius B3.100 NES 239 6/82


o Syst::mi R actor Pr:ssura Vessel 1135                                    By:     Ar Dat:: t/ff o
o 1135 o
PROGRAM PLAN AND SCHEDULE                          App: M Document No. 80A4421                                                                                     Date: 4/fy.                           ~
Syst::mi R actor Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By:
  . Preservice Inspection                                 5532-PERRY                             Rev:     1 Page: 47 of 145 o Ecra                          oesc Ea                 nuus "en           cAEocar ue      #Yo n                   newas JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-LX)9 l-B13-                 3et Pump Nozzle N9A to             80A0191   PY-124-1-RPV B-D     UT     I N9A-KA                 Vessel                                                       B3.90 1-B13-                 3et Pump Nozzle N9A Inner           80A0190   PY-124-1-RPV B-D     UT     I N9A-lR                 Radius                                                       B3.100 1-B13-                 3et Pump Nozzle N9A to             80A0195   PY-SE-BI-I   B-F     UT     I N9A-KB                 Safe-end                                                     B5.10 80A0183   N/A                   PT l-B13-                 3et Pump Nozzle N9B to             80A0191   PY-124-1-RPV B-D     UT     I N9B-KA                 Vessel                                                       B3.90 1-B13-                 3et Pump Nozzle N9B Inner           80A0190   PY-124-1-RPV B-D     UT     I N9B-IR                 Radius                                                       B3.100 1-B13-                 3et Pump Nozzle N9B to             80A0195   PY-SE-BI-l   B-F     UT. I N9B-KB                 Safe-end                                                     B5.10 80A0183   N/A                   PT l-B13-                 CRD Return Nozzle N10 to           80A0191   PY-124-1-RPV B-D     UT     I N10-KA                 Vessel                                                       B3.90 1-B13-                 CRD Return Nozzle NIO Inner         80A0190   PY-124-1-RPV B-D     UT     I N10-lR                 Radius                                                       B3.100 NES 239 6/82                                                                                     ;
Ar Dat:: t/ff Document No. 80A4421 App: M Date: 4/fy.
~
Preservice Inspection 5532-PERRY Rev:
1 Page: 47 of 145 o Ec oesc Ea nuus "en cAEocar
#Yo
*ra ue n
newas JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-LX)9 l-B13-3et Pump Nozzle N9A to 80A0191 PY-124-1-RPV B-D UT I
N9A-KA Vessel B3.90 1-B13-3et Pump Nozzle N9A Inner 80A0190 PY-124-1-RPV B-D UT I
N9A-lR Radius B3.100 1-B13-3et Pump Nozzle N9A to 80A0195 PY-SE-BI-I B-F UT I
N9A-KB Safe-end B5.10 80A0183 N/A PT l-B13-3et Pump Nozzle N9B to 80A0191 PY-124-1-RPV B-D UT I
N9B-KA Vessel B3.90 1-B13-3et Pump Nozzle N9B Inner 80A0190 PY-124-1-RPV B-D UT I
N9B-IR Radius B3.100 1-B13-3et Pump Nozzle N9B to 80A0195 PY-SE-BI-l B-F UT.
I N9B-KB Safe-end B5.10 80A0183 N/A PT l-B13-CRD Return Nozzle N10 to 80A0191 PY-124-1-RPV B-D UT I
N10-KA Vessel B3.90 1-B13-CRD Return Nozzle NIO Inner 80A0190 PY-124-1-RPV B-D UT I
N10-lR Radius B3.100 NES 239 6/82


O Syst:ms Reactor Pressura Vessel MM PROGRAM PLAN AND SCHEDULE                             B2Y  M O
O MM O
Date: 6/si Document No. 80A4421                                                                             App: M Date c/#4-Preservice Inspection                               5532-PERRY                                 Rev:   1 Page: 48 of 145 CAuBRAT m               CooE COMPONENT                   COMPONENT             PROCEDURE     BLOCK       CODE     EXAM ZONE IDENTIFICATO                 DESCFDPTION             NUMBER   Uf apphCablel CATEGORY LETHOO No. REMARKS JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-009 l-B13-                 CRD Return Nozzle NIO to           80A0195   PY-SE-CS-1       B-F     UT   I N10-KB               Safe-end                                                         B5.10' 80A0183   N/A                       PT l-B13-               CRD Return Nozzle NIO Safe-end       80A0195   PY-SE-CS-1       B-F     UT   I N10-KC               to Cap                                                           B5.10 80A0183   N/A                       PT l-B13-               Instrumentation Nozzle N12A         80A0184   N/A               B-E     VT-2 I N12A                                                                                   B4.13 1-B13-               Instrumentation Nozzle Nf 3A         80A0184   N/A               B-E     VT-2 I N13A                                                                                   B4.13 1-B13-               Instrumentation Nozzle N16A         80A0184   N/A               B-E     VT-2 I N14A                                                                                   B4.13 1-B13-               Instrumentation Nozzle N128         80A0184   N/A               B-E     VT-2 I N12B                                                                                   B4.13 1-B13-               Instrumentation Nozzle N13B         80A0184   N/A               B-E     VT-2 I N13B                                                                                   B4.13 1-B13-               Instrumentation Nozzle Ni4B         80A0184   N/A               B-E     VT-2 1 N14B                                                                                   B4.13 NES 239 6/82                                                                                         ;
B2 M
Date: 6/si Syst:ms Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App: M Date c/#4-Preservice Inspection 5532-PERRY Rev:
1 Page: 48 of 145 CAuBRAT m CooE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATO DESCFDPTION NUMBER Uf apphCablel CATEGORY LETHOO No.
REMARKS JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-009 l-B13-CRD Return Nozzle NIO to 80A0195 PY-SE-CS-1 B-F UT I
N10-KB Safe-end B5.10' 80A0183 N/A PT l-B13-CRD Return Nozzle NIO Safe-end 80A0195 PY-SE-CS-1 B-F UT I
N10-KC to Cap B5.10 80A0183 N/A PT l-B13-Instrumentation Nozzle N12A 80A0184 N/A B-E VT-2 I N12A B4.13 1-B13-Instrumentation Nozzle Nf 3A 80A0184 N/A B-E VT-2 I N13A B4.13 1-B13-Instrumentation Nozzle N16A 80A0184 N/A B-E VT-2 I N14A B4.13 1-B13-Instrumentation Nozzle N128 80A0184 N/A B-E VT-2 I N12B B4.13 1-B13-Instrumentation Nozzle N13B 80A0184 N/A B-E VT-2 I N13B B4.13 1-B13-Instrumentation Nozzle Ni4B 80A0184 N/A B-E VT-2 1 N14B B4.13 NES 239 6/82


o                                                                             11E85                                       By:
o 11E85 o
o AA Date: Gd4 Syst:m: R: actor Prcssure Vessel                                       PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                                                         App: 44   Date: t/54     .
Syst:m: R: actor Prcssure Vessel PROGRAM PLAN AND SCHEDULE By:
Preservice Inspection                                                             5532-PERRY                                 Rev:     1 Page: 49 of 145 CAUBRATION             CODE COMPONEen                                       COMPONENT             PROCEDURE     BLOCK       CODE   EXAM ZONE IDENTlHCATK)N                                   MSCRIPTION             NUMBER   Of apphcabeel CATEGORY METHOO !D. REMARKS JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-009 l-B13-                                               Instrumentation Nozzle N12C         80A0184   N/A               B-E     VT-2 I N12C                                                                                                                 B4.13 1-B13-                                               Instrumentation Nozzle N13C         80A0184   N/A               B-E     VT-2 I N13C                                                                                                                 B4.13 1-B13-                                               Instrumentation Nozzle N14C         80A0184   N/A               B-E     VT-2 I N14C                                                                                                                 B4.13 1-B13-                                               Instrumentation Nozzle N12D         80A0184   N/A               B-E     VT-2 I N12D                                                                                                                 B4.13 1-B13-                                               Instrumentation Nozzle N13D         80A0184   N/A               B-E     VT-2 I N13D                                                                                                                 B4.13 1-B13-                                               Instrumentation Nozzle Ni4D         80A0184   N/A               B-E     VT-2 I N14D                                                                                                                 B4.13 l
AA Date: Gd4 Document No. 80A4421 App: 44 Date: t/54 Preservice Inspection 5532-PERRY Rev:
NES 239 6/82                                                                                                                       ;
1 Page: 49 of 145 CAUBRATION CODE COMPONEen COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTlHCATK)N MSCRIPTION NUMBER Of apphcabeel CATEGORY METHOO
!D.
REMARKS JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-009 l-B13-Instrumentation Nozzle N12C 80A0184 N/A B-E VT-2 I N12C B4.13 1-B13-Instrumentation Nozzle N13C 80A0184 N/A B-E VT-2 I N13C B4.13 1-B13-Instrumentation Nozzle N14C 80A0184 N/A B-E VT-2 I N14C B4.13 1-B13-Instrumentation Nozzle N12D 80A0184 N/A B-E VT-2 I N12D B4.13 1-B13-Instrumentation Nozzle N13D 80A0184 N/A B-E VT-2 I N13D B4.13 1-B13-Instrumentation Nozzle Ni4D 80A0184 N/A B-E VT-2 I N14D B4.13 l
NES 239 6/82


o                                         11EE                                                             C System: Reactor Pressure Vessel           PROGRAM PLAN AND SCHEDULE                             By: m< Date: t/H Document No. 80A4421                                                                           App: 44 Date: E/ft/.
o 11EE C
Preservice Inspection                               5532-PERRY                                 Rev:   1 Page: 50 of 145 CAU8 RATION             CODE COMPONENT             PROCEDURE       BLOCK       CODE   EXAM ZONE COMPONENT                                                      (tf apphcablel CATEGORY METHOD NO. REMARKS IDENTIFICATK)N                DESCRIPTM              NUMBER CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-410 1-B13-               CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 58-39                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 58-35                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 1 38-M                                                                                     B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 58-27                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 58-23                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 1 54-15                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 54-19                                                                                   B4.12 1-B13-               CRD Nozzle                 '
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
80A0184   N/A                 B-E   VT-2 I 54-23                                                                                   B4.12 NES 239 6'82                                                                                         i
m<
Date: t/H Document No. 80A4421 App: 44 Date: E/ft/.
Preservice Inspection 5532-PERRY Rev:
1 Page: 50 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATK)N DESCRIPTM NUMBER (tf apphcablel CATEGORY METHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-410 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 58-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-M B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 54-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-23 B4.12 NES 239 6'82 i


O Syst;m: R: actor Pressure Vessel MM PROGRAM PLAN AND CCHEDULE                       By:
O MM O
O w< - Date: 6 /S/
/
Document No. 80A4421                                                                       App: 44-   Date: 974 Preservice Inspection                               $532-PERRY                             Rev:     1 Page: 51 of 145 CAUBRATK)N             CODE DESCRI                   BE   Of appicabiel CA   ORY               REMARKS lOE    T ON CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                 CRD Nozzle                         80A0184 N/A               B-E   VT-2 I 54-27                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A               B-E   VT-2 I 54-31                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A               B-E   VT-2 I 54-35                                                                                 B4.12 1-B13-                 CRD Nozzle                 '
Syst;m: R: actor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
80A0184 N/A               B-E   VT-2 I 54-39                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A               B-E   VT-2 I 54-43                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A               B-E   VT-2 1 54-47                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A               B-E   VT-2 I 50-51                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A               B-E   VT-2 I 50-47                                                                                 B4.12 NES 239 Ov82                                                                                   i
w< - Date: 6 S/
Document No. 80A4421 App: 44-Date: 974 Preservice Inspection
$532-PERRY Rev:
1 Page: 51 of 145 CAUBRATK)N CODE lOE T ON DESCRI BE Of appicabiel CA ORY REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 54-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-47 B4.12 NES 239 Ov82 i


                                                                                      /
/
o                                           np.5                                                         o System: Reactor Pressure Vessel         PROGRAM PLAN AND SCHEDULE                           By:   m Dat:: 4/f#
o np.5 o
Document No. 80A4421                                                                         App: A4 Date: C/94 Preservice Inspection                             5532-PERRY                                 Rev:   1 Page: 52 of 145 CAUBRATON               CODE COMPONENT                   COMPONENT             PROCEDURE     BLOCK       CODE   EXAM ZONE DESCRIPTON             NUMBER     Of apphcable) CATEGORY METHOD NO. REMARKS OENTIFCATON CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV 010 1-B13-               CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 50-43                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 50-39                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 50-35                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184   N/A               B-E   .VT-2 I 50-31                                                                                 B4.12 1-B13-                 CRD Nozzle                       80A0184   N/A               B-E     VT-2 1 50-27                                                                                 B4.12 1-B31-                 CRD Nozzle             .        80A0184   N/A               B-E     VT-2 I 50-23                                                                                 B4.12 1-B31-                 CRD Nozzle                       80A0184   N/A               B-E     VT-2 1 50-19                                                                                 B4.12 1-B13-                 CRD Nozzle                       80A0184   N/A               B-E     VT-2 I 50-15                                                                                 B4.12 NES 239 682                                                                                       ;
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
m Dat:: 4/f#
Document No. 80A4421 App: A4 Date: C/94 Preservice Inspection 5532-PERRY Rev:
1 Page: 52 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFCATON DESCRIPTON NUMBER Of apphcable)
CATEGORY METHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV 010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E
.VT-2 I 50-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 50-27 B4.12 1-B31-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-23 B4.12 1-B31-CRD Nozzle 80A0184 N/A B-E VT-2 1 50-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-15 B4.12 NES 239 682


o                                                           sing                                                         o System: Reactor Pressure Vessel                                           PROGRAM PLAN AND SCHEDULE                           By:   me Date: c41 Document No. 80A4421                                                                                                           App: g Date:     4'5't,I Preservice inspection                                                               5532-PERRY                                 Rev:   1 Page: 53 of 145 CAUBRATON               CODE COMPONENT                 COMPOtENT             PROCEDURE     BLOCK       CODE   EXAM ZONE DESCRPTION             NUMBER   pf apphcable6 CATEGORY METHOD NO. REMARKS OENTIFsCATION CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                                                 CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 50-11                                                                                                                   B4.12 1-B13-                                                 CRD Nozzle                         80A0184   N/A               B-E-   VT-2 I 46-07                                                                                                                   B4.12 1-B13-                                                 CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 46-11                                                                                                                   B4.12 1-B13-                                                 CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 46-15                                                                                                                   B4.12 1-B13-                                                 CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 46-19                                                                                                                   B4.12 1-B13-                                                 CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 46-23                                                                                                                   B4.12 i 1-B13-                                                 CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 46-27                                                                                                                   B4.12 1-B13-                                                 CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 46-31                                                                                                                   B4.12 NES 239 6/82                                                                                                                       ;
o sing o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
me Date: c41 Document No. 80A4421 App: g Date:
4'5't,I Preservice inspection 5532-PERRY Rev:
1 Page: 53 of 145 CAUBRATON CODE COMPONENT COMPOtENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFsCATION DESCRPTION NUMBER pf apphcable6 CATEGORY METHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E-VT-2 I 46-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I i
46-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 46-31 B4.12 NES 239 6/82


o                                           nas                                                                               c System: Reactor Pressure Vessel           PROGRAM PLAN AND SCHEDULE                                             By:     ere Date: e/H Document No. 80A4421                                                                                             App: 44     Date: 694 Preservice Inspection                             5532-PERRY                                                   Rev       1 Page: 54 of 145 CAUBRATION
o nas c
                                                                                                      \           CODE COMPONENT                   COMPONENT           PROCEDURE                     BLOCX       COUE       EXAM   ZONE                   a DESCRIPTION           NUMBER                   cf appincatdel CATEGORY   DETHOD   NO. REMARKS OENTIFICATION CRD PARTIAL PENETRATION WELDS                                                         '
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
Ref. Dwg. No: 1-RV-010                                                                   ,
ere Date: e/H Document No. 80A4421 App: 44 Date: 694 Preservice Inspection 5532-PERRY Rev 1
1 B13-               CRD Nozzle                         80A0184                 N/A                 B-E.       VT-2 I                       ,
Page: 54 of 145
46-35                                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184                 N/A                 B-E       VT-2 I 46-39                                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184                 N/A               B-E         VT-2 i }
\\
46-43                                                                                                 B4.12 1
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCX COUE EXAM ZONE a
1-B31-               CRD Nozzle                         80A0134                 N/A                 B-E       VT-2 I 46-47                                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184                 N/A                 B-E.-     VT-2 I 46-51                                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184                 N/A                 B-E       VT-2 I 46-55                                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184                 N/A                 B-E       VT-2 42-55                                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184                 N/A                 B-E       VT-2 I 42-51                                                                                                 B4.12 NES 239 682                                                                                                           i
OENTIFICATION DESCRIPTION NUMBER cf appincatdel CATEGORY DETHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1 B13-CRD Nozzle 80A0184 N/A B-E.
VT-2 I 46-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 i }
46-43 B4.12 1
1-B31-CRD Nozzle 80A0134 N/A B-E VT-2 I 46-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E.-
VT-2 I 46-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 42-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-51 B4.12 NES 239 682 i


                                                                                                                    ~
~
l o                                                               11 E.85                                                         O System: Reactor Pressure Vessel                             PROGRAM PLAN AND SCHEDULE                               By:   en,t Date: <; 4(
l o
Document No. 80A4421                                                                                               App: ff, Date: I,/M Preservice Inspection                                                 5532-PERRY                                   Rev     1 Page: 55 of 145 COMPONENT             PROCEDURE           OCK     CODE     AM 2ONE COMPONENT                                                                                            RE W IDENTIFICAT80N                     DESCRtPTION           MlMBER       (if enrdenNat CATEGORY RETHOO to CRD PARTIAL PENETRATION WELDS Ret Dwg. No: 1-RV-010 1-B13-                                   CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 42-47                                                                                                       B4.12 1-B13-                                   CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 42-43                                                                                                       B4.12 1-B13-                                   CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 42-39                                                                                                       B4.12 1-B13-                                   CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 42-35                                                                                                       B4.12 1-B13-                                   CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 42-31                                                                                                       B4.12 1-B13-                                   CRD Nozzle                         80AG184     N/A               B-E     VT-2 I 42-27                                                                                                       B4.12 1-B13-                                   CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 42-23                                                                                                       B4.12 l-B13-                                   CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 42-19                                                                                                       B4.12 NES 239 6'82                                                                                                             ;
11 E.85 O
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
en,t Date: <; 4(
Document No. 80A4421 App: ff, Date: I,/M Preservice Inspection 5532-PERRY Rev 1
Page: 55 of 145 COMPONENT COMPONENT PROCEDURE OCK CODE AM 2ONE IDENTIFICAT80N DESCRtPTION MlMBER (if enrdenNat CATEGORY RETHOO to RE W CRD PARTIAL PENETRATION WELDS Ret Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-31 B4.12 1-B13-CRD Nozzle 80AG184 N/A B-E VT-2 I 42-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I i
42-23 B4.12 j
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-19 B4.12 NES 239 6'82


                                'b                                                                                                                 b System: Reactor Pressure Vessel           PROGRAM PLAN AND CCHEDULE.c         ~'
'b b
By:     a< Dates e /u Document No. 80A4tt21                                                                           App:   4+ Dates ffV Preservice Inspection                               5532-PERRY                                   Rev: '   1 Page: 56 of 145 CAU9 RATION               CODE COMPONENT                   COMPONENT           *ROCEDURE       BLOCK       CODE     EXAM   ZONE DESCRPTION             NUMBER   (if apphcable) CATEGCRY hETHOO   NO. FEMARKS IDENTIFICATION
System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE.c By:
                                                                                                                                                                                            ~
a< Dates e /u Document No. 80A4tt21
CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1 B13-               CRD Nozzle                         80A0184   N/A                 B-E     VT-2 1 15                                                                                     B4.12
~'
                                                                                                                                          ~'
App:
1-B13-                 CRD Nozzle                         80A0184   N/A                 B-E     VT-2. I -
4+
42-11                                                                                     B4.12
Dates ffV Preservice Inspection 5532-PERRY Rev: '
                                                                                                                                                                                          /
1 Page: 56 of 145 CAU9 RATION CODE COMPONENT COMPONENT
l-B13-                 CRD Nozzle                         80A0184   N/A                 B.E     VT-2 I 42-07                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184   N/A                 .B-E     VT-2 I 38-03                                                                             '
*ROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRPTION NUMBER (if apphcable)
                                                                                                                    - B4.12 1-B13-                 CRD Nozzle                         80A0184   N/A                 B-E     VT-2 1 38-07                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184   N/A                 B-E     VT-2 I 38-11                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184   N/A                 B-E     VT-2 1 33-15                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184   N/A                 B-E     VT-2 I 38-19                                                                                     B4.12 NES 239 6/82                                                                                           ;
CATEGCRY hETHOO NO.
FEMARKS CRD PARTIAL PENETRATION WELDS
~
Ref. Dwg. No: 1-RV-010 1 B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 15 B4.12
~'
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2. I -
42-11 B4.12
/
l-B13-CRD Nozzle 80A0184 N/A B.E VT-2 I 42-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A
.B-E VT-2 I 38-03
- B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 33-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-19 B4.12 NES 239 6/82


y O
y O
11EE O
System: Reactor Pressure Vessel '
System: Reactor Pressure Vessel '
11EE PROGRAM PLAN AND SC ADULE                             Byt O
PROGRAM PLAN AND SC ADULE Byt
                                                                                                                                                          /=< Date: , /f 4 Document No. 80A4421                                                                                                                           App: M Dater t/ M Preservice Inspection                                                                             5532-PERRY                                 Rev:   1   Page: 57 of 145 CAUBRATION               CODE COMPONENT                                           COMPONENT             PROCEDURE     BLOCK       CODE     EXAM ZONE DESCRIPTION           NUMBER   Of apphcable) CATEGORY METHOD NO     REMARKS IDENTIFICATION CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                                                               CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 38-23                                                                                           -                                    B4.12 1-B13-                                                               CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 38-27                                                                                                                                 B4.12 1-B13-                                                               CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 8
/=< Date:, /f 4 Document No. 80A4421 App: M Dater t/ M Preservice Inspection 5532-PERRY Rev:
38-31                                                                                                                                 B4.12 1-B13-                                                               CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 38-35                                                                                                                                 B4.12 1-B13-                                                               CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 38-39                                                                                                                                 B4.12 1-B13-                                                               CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 38-43                                                                                                                                 B4.12 1-B13-                                                               CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 38-47                                                                                                                                 B4.12 1-B13-                                                               CRD Nozzle ~                       80A0184   N/A               B-E     VT-2 I 38-51                                                                                                                                 B4.12 NES 239 6/82                                                                                                                                       i
1 Page: 57 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of apphcable)
CATEGORY METHOD NO REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I B4.12 38-23 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-31 B4.12 8
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-43 B4.12 i
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I
]
38-47 B4.12 1-B13-CRD Nozzle ~
80A0184 N/A B-E VT-2 I 38-51 B4.12 NES 239 6/82 i


O Syst:m: R: actor Prcssura Vcssel MM PROGRAM PLAN AND CCHEDULE                         By:
O MM O
O
Syst:m: R: actor Prcssura Vcssel PROGRAM PLAN AND CCHEDULE By:
                                                                                                        'n( Date: e /.* 4 .
'n( Date: e /.* 4.
s Document No. 80A4421                                                                         ' App: #4   Date: Y9 %
s Document No. 80A4421
Preservice Inspection                               5532-PERRY                               Rev:     1 Page 58 of 145 CAU8 RATION         CODE IDE I   TON                 CESCRI                 NUMBE     Of         CA GORY   HOO         REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                 CRD Nozzle                         80A0184     N/A             B-E   VT-2 I
' App: #4 Date: Y9 %
. 38-55                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A             B-E   VT-2 I 38-59                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A             B-E   VT-2 I 34-59                                                                                 B412 1-B13-                 CRD Nozzle                         80A0184     N/A             B-E   VT-2 I 34-55                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A             B-E   VT-2 I 34-51                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A             B-E   VT-2 I 34-47                                                                                 B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A             B-E   VT-2 I 34-43                                                                                 B4.12
Preservice Inspection 5532-PERRY Rev:
.1-B13-                 CRD Nozzle                         80A0184     N/A             B-E   VT-2 I 34-39                                                                                  B4.12 NES 239 6/82 i
1 Page 58 of 145 CAU8 RATION CODE IDE I TON CESCRI NUMBE Of CA GORY HOO REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-59 B412 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-39 B4.12 NES 239 6/82 i
 
O HM O
System: Reactor Pressure Vessel PROGRAE PLAN AND SCHEDULE By:
g Date: s4f Document No. 80A4421 App:
M Date: 4/f4 Preservice Inspection 5532-PERRY Rev:
1-Page: 59 of 145 CAU8 RATION CODE DE NUMBE (if CA GORY HOO No REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 34-35 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-27 B4.12 -
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 i 34-07 B4.12 NES 239 6/82 i


O System: Reactor Pressure Vessel HM PROGRAE PLAN AND SCHEDULE                       By:   g Date: s4f O
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
Document No. 80A4421                                                                                                               App:   M Date: 4/f4 Preservice Inspection                                                                       5532-PERRY                             Rev:     1- Page: 59 of 145 CAU8 RATION          CODE DE                    NUMBE  (if        CA GORY    HOO  No      REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                                                         CRD Nozzle                         80A0184 N/A             B-E     VT-2 1 34-35                                                                                                                      B4.12 l-B13-                                                         CRD Nozzle                         80A0184 N/A             B-E     VT-2 I 34-31                                                                                                                      B4.12 1-B13-                                                         CRD Nozzle                         80A0184 N/A             B-E     VT-2 I 34-27                                                                                                                      B4.12 -
a s-. Date: 24#
1-B13-                                                         CRD Nozzle                         80A0184 N/A             B-E     VT-2 I 34-23                                                                                                                      B4.12 1-B13-                                                         CRD Nozzle                         80A0184 N/A             B-E     VT-2 I 34-19                                                                                                                      B4.12 1-B13-                                                         CRD Nozzle                         80A0184 N/A             B-E     VT-2 I 34-15                                                                                                                      B4.12 1-B13-                                                         CRD Nozzle                         80A0184 N/A             B-E     VT-2 I 34-11                                                                                                                      B4.12 1-B13-                                                         CRD Nozzle                         80A0184 N/A             B-E     VT-2 i 34-07                                                                                                                      B4.12 NES 239 6/82                                                                                                                     i
Document No. 80A4421 App:._
M-Date: 4/J4 Preservice Inspection 5532-PERRY Rev:
1 Page: 60 of 145 CAUBRAi m CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE minCATION DESCRIPTm NUMBER Si apphcable)
CATEGORY METHOO NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-11 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-27 B4.12 NES 239 6/82 i


System: Reactor Pressure Vessel              PROGRAM PLAN AND SCHEDULE                            By:        a s- . Date: 24#
11EE System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE sy:
Document No. 80A4421                                                                              App: ._  M-    Date: 4/J4 Preservice Inspection                                  5532-PERRY                                  Rev:      1    Page: 60 of 145 CAUBRAi m                CODE COMPONENT                      COMPONENT            PROCEDURE      BLOCK        CODE    EXAM    ZONE DESCRIPTm              NUMBER    Si apphcable) CATEGORY METHOO    NO.      REMARKS minCATION CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                  CRD Nozzle                          80A0184    N/A                B-E    VT-2 I 34-03                                                                                      B4.12 1-B13-                  CRD Nozzle                          80A0184    N/A                B-E    VT-2 I
.., < Date: 4>
, 30-03                                                                                      B4.12 1-B13-                  CRD Nozzle                          80A0184    N/A                B-E    VT-2 1 30-07                                                                                      B4.12 1-B13-                  CRD Nozzle                          80A0184    N/A                B-E    VT-2 I 30-11                                                                                      B4.12 l-B13-                  CRD Nozzle                          80A0184    N/A                B-E    VT-2 1 30-15                                                                                      B4.12 1-B13-                  CRD Nozzle                          80A0184    N/A                B-E    VT-2 I 30-19                                                                                      B4.12 1-B13-                  CRD Nozzle                          80A0184    N/A                B-E    VT-2 I 30-23                                                                                      B4.12 1-B13-                  CRD Nozzle                          80A0184    N/A                B-E    VT-2 I 30-27                                                                                      B4.12 NES 239 6/82                                                                                              ;
Document No. 80A4421 App: _gt Date:
i
Preservice Inspection 5532-PERRY Rev:
* 11EE
- Page: 61 of 145 -
* System: Reactor Pressure Vessel         PROGRAM PLAN AND SCHEDULE               sy:     . . , < Date: 4>
OSEFYTON DESCR NbMBE CA Y
Document No. 80A4421                                                             App: _gt Date:
ME REWJES CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E V T-2 I 30-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-43 B4.12 1-B13-CRD Nozzle 80A0184
Preservice Inspection                             5532-PERRY                   Rev:         - Page: 61 of 145 -
.N/A B-E VT-2 I 30-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-59 B4.12 NES 239 6/82
NbMBE     CA     Y ME                   REWJES OSEFYTON                    DESCR CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-               CRD Nozzle                         80A0184 N/A   B-E     VT-2 I 30-31                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184 N/A   B-E   V T-2 I 30-35                                                                     B4.12 1-B13-               CRD Nozzle                         80A0184 N/A   B-E   VT-2 I 30-39                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A   B-E   VT-2 I 30-43                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184 .N/A   B-E   VT-2 I 30-47                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A   B-E   VT-2 I 30-51                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A   B-E   VT-2 I 30-55                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A     B-E   VT-2 1 30-59                                                                     B4.12 NES 239 6/82                                                                         ;


o                                           11EN                                                 O                   .
o 11EN O
System: Reactor Pressure Vessel           PROGRAM PLAN AND SCHEDULE                 By: - in d Date: e A4 Document No. 80A4421                                                                 App: & Dates t/F/
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: -
Preservice Inspection                             5532-PERRY                       Rev:     1 Page: 62 of 145 CAuBRATON         COM T                     DE g                   MBE   (if   atM CA GORY THOO         RE M S CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-               CRD Nozzle                         8CA0184 N/A           B-E   VT-2 1 26-59                                                                           B4.12 1-B13-               CRD Nozzle                         80A0184 N/A           B-E   VT-2 I 26-55                                                                           B4.12 1-B13-               CRD Nozzle                         80A0184 N/A           B-E   VT-2 I 26-51                                                                           B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A           B-E   VT-2 I 26-47                                                                           B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A           B-E   VT-2 1 26-43                                                                           B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A           B-E   VT-2 I 26-39                                                                           B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A           B-E   VT-2 I 26-35                                                                           B4.12 1-B13-                 CRD Nozzle                         80A0184 N/A         B-E   VT-2 I 26-31                                                                           B4.12 NES 239 6/82                                                                             i
in d Date: e A4 Document No. 80A4421 App: & Dates t/F/
Preservice Inspection 5532-PERRY Rev:
1 Page: 62 of 145 CAuBRATON COM T
DE g MBE (if atM CA GORY THOO RE M S CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 8CA0184 N/A B-E VT-2 1 26-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 26-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-31 B4.12 NES 239 6/82 i


o                                                                               ging                                                             o System: Reactor Pressure Vessel                                     PROGRAM PLAN AND SCHEDULE                                     By:   p<   Date: s /ff Document No. 80A4421                                                                                                               App:     44 Date: 64 Preservice Inspection                                                                 5532-PERRY                                   Rev:     1 Page: 63 of 145 CAUBRATION               CODE COMPONENT                                               COMPONENT                     PROCEDURE       BLOCK       CODE     EXAM ZONE E NnFO DON                                               DESCRPTION                     NUMOER     (if apphcabeel CATEGORY hEETHOD NO. REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                                           CRD Nozzle                                 80A0184   N/A                 B-E     VT-2 I 26-27                                                                                                                       B4.12 1-B13-                                           CRD Nozzle                                 80A0184   N/A               B-E     . VT-2 1 26-23                                                                                                                       B4.12 1-B13-                                           CRD Nozzle                                 80A0184   N/A               B-E     VT-2 1 26-19                                                                                                                       B4.12 1-B13-                                           CRD Nozzle                                 80A0184   N/A               B-E     VT-2 I 26-15                                                                                                                       B4.12 1-B13-                                           CRD Nozzle                                 80A0184   N/A               B-E     VT-2 I 26-11                                                                                                                       B4.12 1-B13-                                           CRD Nozzle                                 80A0184   N/A               B-E     VT-2 I 26-07                                                                                                                     B4.12 1-B13-                                           CRD Nozzle                                 80A0184   N/A               B-E     VT-2 I 26-03                                                                                                                     B4.12 1-B13-                                           CRD Nozzle                                 80A0184   N/A               B-E     VT-2 I 22-03                                                                                                                     B4.12 NES 239 6/82                                                                                                                             ;
o ging o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
p<
Date: s /ff Document No. 80A4421 App:
44 Date: 64 Preservice Inspection 5532-PERRY Rev:
1 Page: 63 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E NnFO DON DESCRPTION NUMOER (if apphcabeel CATEGORY hEETHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E
. VT-2 1 26-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 26-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-03 B4.12 NES 239 6/82


P
P 11EE System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:..mr nate:. f /g/ -
* 11EE
Document No. 80A4421 App:
* PROGRAM PLAN AND SCHEDULE                                   By: . .mr nate:. f /g/ -
Date ~ Mrv Preservice Inspection 5532-PERRY Rev:
System: Reactor Pressure Vessel
1 Page: 64 of 145 i~
  <        Document No. 80A4421                                                                                                       App:   #        Date ~ Mrv Preservice Inspection                                                     5532-PERRY                                       Rev:   1       Page: 64 of 145 i~       {                                                                                                                                       l CAllBRATK)N               CODE PROCEDURE         BLOCK         CODE   EXAM   ZONE COMPONENT                           COMPONENT                                                      METHOD  NO.          REMARKS NUMBER       (if apphcablel   CATEGORY IDENTIFICATION                      DESCR1PilON I'                                                     CRD PARTIAL PENETRATION WL DS Ref. Dwg. No: 1-RV-010 l-B13-                                   CRD Nozzle                           80A0184       N/A                   B-E   VT-2 I 22-07                                                                                                               B4.12 a
{
l-B13-                                   CRD Nozzle                           80A0184       N/A                   B-E   VT-2 I 22-11                                                                                                               B4.12 I
l CAllBRATK)N CODE COMPONENT PROCEDURE BLOCK CODE EXAM ZONE COMPONENT IDENTIFICATION DESCR1PilON NUMBER (if apphcablel CATEGORY METHOD NO.
l-B13-                                     CRD Nozzle                           80A0184       N/A                   B-E   VT-2 1 22-13                                                                                                               B4.12 l-B13-                                     CRD Nozzle                           80A0184       N/A                   B-E   VT-2 I c          22-19                                                                                                               B4.12                                   ,
REMARKS I'
1 i                                                                                                                                                                       l 3~
CRD PARTIAL PENETRATION WL DS Ref. Dwg. No: 1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-07 B4.12 a
1-B13-                                     CRD Nozzle                           80A0184       N/A                   B-E   VT-2 I                           l l
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-11 B4.12 I
B4.12
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-13 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-19 B4.12 c
    -      22-23 F
1 i
[           1-B13-                                     CRD Nozzle                           80A0184       N/A                   B-E   VT-2 I 22-27                                                                                                               B4.12 7
l 3~
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I l
l 22-23 B4.12 F
[
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-27 B4.12 7
r i
r i
1-B13-                                     CRD Nozzle                           80A0184       N/A                   B-E   VT-2 1 22-31                                                                                                               B4.12 y
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-31 B4.12 y
;          l-B13-                                     CRD Nozzle                           80A0184       N/A                   B-E   VT-2 I 1
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-35 B4.12 1
22-35                                                                                                               B4.12 I
I


e                                         ting                                                                         o System: Reacter Pressure Vessel         PROGRAM PLAN AND SCHEDULE                                       By:
e ting o
App:
System: Reacter Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
id Dater Af Date:
id Dater
                                                                                                                                /d Document No. 80A4421 Preservice Inspection                             5532-PERRY                                             Rev:         1 Page: 63 o 145 CAUBRATION               Co0E
/d Document No. 80A4421 App:
                                                            'MBE                 ttf       CA GORY       HOO     No     IEuARKS n       i                   DE CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-               CRD Nozzle                       80A0184           N/A                 B-E     VT-2 1 22-39                                                                                           B4.12 1-B13-               CRD Nozzle                       80A0134           N/A                 B-E     VT-2 I 22-43                                                                                           B4.12 1-B13-               CRD Nozzle                       80A0184           N/A                 B-E     VT-2 I 22-47                                                                                           B4.12 1-B13-               CRD Nozzle                       80A0184           N/A                 B-E     VT-2 1 22-51                                                                                           B4.12 1-B13-               CRD Nozzle                       80A0184           N/A                 B-E     VT-2 1 22-55                                                                                           B4.12 1-B13-               CRD Nozzle                       80A0184           N/A                 B-E     VT-2 1 22-59                                                                                           B4.12 1-B13-               CRD Nozzle                       80A0184           N/A                 B-E     VT-2 I 18-55                                         ,
Af Date:
B4.12 1-B13-               CRD Nozzle                       80A0184           N/A                 B-E     VT-2 1 18-51                                                                                           B4.12 NES 239 6/82                                                                                                     ;
Preservice Inspection 5532-PERRY Rev:
1 Page: 63 o 145 CAUBRATION Co0E
'MBE ttf CA GORY HOO No IEuARKS n
i DE CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-39 B4.12 1-B13-CRD Nozzle 80A0134 N/A B-E VT-2 I 22-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I B4.12 18-55 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-51 B4.12 NES 239 6/82


o                                                     BEE                                                         o System: Reactor Pressure Vessel                     PROGRAM PLAN AND SCHEDULE                           By:   m Date: G/Sf ~
o BEE o
Document No. 80A4421                                                                                   App: A Date: '/ M Preservice Inspection                                       5532-PERRY                                 Rev:     1 Page: 66 of 145 CALtBRATION             CODE COMFONENT                   COMPONENT           PROCEDURE     BLOCK       CODE   EXAM ZONE NUMBER     Of apphcabiel CATEGORY METHOD PC     E MARKS IDENTIFK:ATION                DESCRIPTION CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                         CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 18-47                                                                                           B4.12 1-B13-                         CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 18-43                                                                                           B4.12 1-B13-                         CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 18-39                                                                                           B4.12 1-B13-                         CRD Nozzle                         80A0184   N/A               B-E     VT-2 I 18-35                                                                                           B4.12 1-B13-                           CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 18-31                                                                                           B4.12 1-B13-                           CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 18-27                                                                                           B4.12 1-B13-                           CRD Nozzle                         80A0184   N/A               B-E     VT-2 1 18-23                                                                                           B4.12 1-B13-                           CRD Nozzle                         80A0184   N/A               B-E   VT-2 I 18-19                                                                                             B4.12 NES 239 6/82                                                                                               ;
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
m Date: G/Sf ~
Document No. 80A4421 App: A Date: '/ M Preservice Inspection 5532-PERRY Rev:
1 Page: 66 of 145 CALtBRATION CODE COMFONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFK:ATION DESCRIPTION NUMBER Of apphcabiel CATEGORY METHOD PC E MARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-19 B4.12 NES 239 6/82


O System: Reactor Pressure Vessel MM PROGRAM PLAN AND SCHEDULE                             sy:
O MM O
O A < Date: a /t/
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE sy:
Document No. 80A4421                                                                           App:   4 Date: v54e Preservice Inspection                             5532-PERRY                                   Rev:     1 Page: 67 of 145 COMPONENT                   COuPONENT             PROCEDURE                   CODE   E     ZONE DESCRPTK)N             NUMBER     (if appbcattel CATEGORY WTHOO   No. REMARKS IDENTIFICATION CRD PARTIAL PENETRATION WELDS                                                                       x' Ref. Dwg. No:.1-RV-010 l-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 18-15                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 18-11                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 18-07                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 ' I 14-07                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 14-11                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 14-15                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 14-19                                                                                   B4.12 1-B13-               CRD Nozzle                         80A0184   N/A                 B-E   VT-2 I 14-23                                                                                   B4.12 NES 239 6/82                                                                                       ;
A < Date: a /t/
Document No. 80A4421 App:
4 Date: v54e Preservice Inspection 5532-PERRY Rev:
1 Page: 67 of 145 COMPONENT COuPONENT PROCEDURE CODE E
ZONE IDENTIFICATION DESCRPTK)N NUMBER (if appbcattel CATEGORY WTHOO No.
REMARKS CRD PARTIAL PENETRATION WELDS x
Ref. Dwg. No:.1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 ' I 14-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-23 B4.12 NES 239 6/82


                                                                                                                              ~
~
HEN i
i HEN System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
System: Reactor Pressure Vessel             PROGRAM PLAN AND SCHEDULE                           By:   A< oate: t /$4 Document No. 80A4421                                                ,
A<
App:   +f Date: c/f4/
oate: t /$4 Preservice Inspection 5532-PERRY App:
Preservice Inspection                                5532-PERRY                                Rev:     1 Page: 68 of 145 CAtl8 RATION           CODE NUMBER     Of   4 cablet CA GORY THOD NO. REMARKS E        T                    DE CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 l
+f Date: c/f4/
l   l-B13-                 CRD Nozzle                         80A0184     N/A               B-E   VT-2 I 14-27                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A               B-E   VT-2 I 14-31                                                                                     B4.12 l   l-B13-                 CRD Nozzle                         80A0184     N/A               B-E   VT-2 I 14-35                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A               B-E   VT-2 I 14-39                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A               B-E   VT-2 I 14-43                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A               B-E   VT-2 I 14-47                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A               B-E   VT-2 1 14-51                                                                                     B4.12 1-B13-                 CRD Nozzle                         80A0184     N/A               B-E   VT-2 I 14-55                                                                                     B4.12 NES 239 6/82                                                                                       ;
Document No. 80A4421 Rev:
1 Page: 68 of 145 CAtl8 RATION CODE E
T DE NUMBER Of 4 cablet CA GORY THOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 l
l l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-31 B4.12 l
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 14-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-55 B4.12 NES 239 6/82


o                                         n33                                           o System: Reactor Pressure Vessel                       PROGRAM PLAN AND SCHEDULE         By: 4. e Date: 5 /?4 Document No. 80A4421                                                   .                App:   W Date: c/r4 Preservice Inspection                                           5532-PERRY               Rev:   1   Page: 69 of 145 OE       TK:N               DE                   NUMBE     CA GCm               REW CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                         CRD Nozzle                       80A0184 N/A B-E   VT-2 I 10-51                                                                         B4.12 1-B13-                         CRD Nozzle                       80A0184 N/A B-E   VT-2 I 10-47                                                                         B4.12 1-B13-                         CRD Nozzle                       80A0184 N/A B-E   VT-2 I 10-43                                                                         B4.12 1-B13-                         CRD Nozzle                       80A0184 N/A B-E   VT-2 I 10-39                                                                         B4.12 1-B13-                         CRD Nozzle                       80A0184 N/A   B-E   VT-2 1 10-35                                                                         B4.12 1-B13-                         CRD Nozzle                       80A0184 N/A   B-E   VT-2 I 10-31                                                                         B4.12 1-B13-                         CRD Nozzle                       80A0184 N/A   B-E   VT-2 I 10-27                                                                         B4.12 1-B13-                       CRD Nozzle                       80A0184 N/A   B-E   VT-2 I 10-23                                                                         B4.12 NES 239 6/82                                                                   ;
o n33 o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
: 4. e Date: 5 /?4 Document No. 80A4421 App:
W Date: c/r4 Preservice Inspection 5532-PERRY Rev:
1 Page: 69 of 145 OE TK:N DE NUMBE CA GCm REW CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 10-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-23 B4.12 NES 239 6/82


m o                                           11EN                                                           o System: Rcactor Pressure Vessel           PROGRAM PLAN AND SCHEDULE                           By:   m Date:(. f Document No. 80A4421                                                                           App: #     Date: t/r#
m o
Preservice Inspection                             5532-PERRY                                 Rev:     1 Page: 70 of 145 COMPONENT             PROCEDURE     BLOCK       CODE       M   ZONE COMPONENT                                                      Of apokcablel          nETHOO          REM /.RKs IDENTFK;ATION                 DESCRtPTION           PA.luBER                 CATEGORY         NOL CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-               CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 10-19                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184     N/A               B-E     VT-2 1 10-15                                                                                 B4.12
11EN o
. I-B13-               CRD Nozzle                         80A0184     N/A               B-E     VT-2 I
System: Rcactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
10-11                                                                                 B4.12 l-B13-               CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 06-15                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184     N/A               B-E     VT-2 1 06-19                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184     N/A               B-E     VT-2 1 06-23                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184     N/A               B-E     VT-2 I 06-27                                                                                 B4.12 1-B13-               CRD Nozzle                         80A0184     N/A               B-E     VT-2 1 06-31                                                                                 B4.12 NES 239 682                                                                                         i
m Date:(. f Document No. 80A4421 App: #
Date: t/r#
Preservice Inspection 5532-PERRY Rev:
1 Page: 70 of 145 COMPONENT COMPONENT PROCEDURE BLOCK CODE M
ZONE IDENTFK;ATION DESCRtPTION PA.luBER Of apokcablel CATEGORY nETHOO NOL REM /.RKs CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 10-15 B4.12 I-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-11 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-27 B4.12 1
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-31 B4.12 NES 239 682 i


o                                                 1135 PROGRAM PLAN AND SCHEDULE o
o 1135 o
System: Reactor Pressure Vessel                                                                               By:     dir Date:S/r4 Document No. 80A4421                                                                                           App: M       Dater c/S4 Preservice Inspection                                         5532-PERRY                                     Rev:     1   Page: 71 of 145 i
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
CALIBRATION               COOE COMPONENT               COMPONENT             PROCEDURE         BLOCK       CODE   EXAM ZONE DESCRIPTION           NUMBER       til applacablel CATEGORY BETHOO NO       REMAFMS IDENTIFICATION CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-                           CRD Nozzle                         80A0184     N/A                 B-E   VT-2 1 06-35                                                                                                 B4.12 1-B13-                           CRD Nozzle                         80A0184     N/A                 B-E   VT-2 1 06-39                                                                                                 B4.12 1-B13-                           CRD Nozzle                         80A0184     N/A                 B-E   VT-2 1 06-43                                                                                                 B4.12 1-B13-                           CRD Nozzle                         80A0184     N/A                 B-E     VT-2 I 06-47                                                                                                 B4.12 1-B13-                           CRD Nozzle                         80A0184     N/A                 B-E     VT-2 I 02-39                                                                                                 B4.12 1-B13-                           CRD Nozzle                         80A0184     N/A                 B-E     VT-2 1 02-35                                                                                                 B4.12 1-B13-                           CRD Nozzle                         80A0184   .
dir Date:S/r4 Document No. 80A4421 App: M Dater c/S4 Preservice Inspection 5532-PERRY Rev:
N/A                 B-E     VT-2 I 02-31                                                                                                 B4.12 1-B13-                           CRD Nozzle                         80A0184     N/A                 B-E     VT-2 I 02-27                                                                                                 B4.12 NES 239 fv82                                                                                                       ;
1 Page: 71 of 145 i
CALIBRATION COOE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER til applacablel CATEGORY BETHOO NO REMAFMS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 02-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-27 B4.12 NES 239 fv82


O System: Rcactor Pressure Vessel HM PROGRAM PLAN AND SCHEDULE                         cy:
O HM O
O
System: Rcactor Pressure Vessel PROGRAM PLAN AND SCHEDULE cy:
                                                                                                      /E Date: (, /S 4 Document No. 80A4421                                                                             App: & ' Date: (/fg Preservice Inspection                                 5532-PERRY                               Rev:     1 Page: 72 of 145 -
/E Date: (, /S 4 Document No. 80A4421 App: & ' Date: (/fg Preservice Inspection 5532-PERRY Rev:
CALIBRATION           CODE COMPONENT                       COMPONENT           PROCEDURE     BLOCK       CODE   EXAM ZONE IDENTFICATON                     DESCRIPTON           NUMBER     pfapphCabeel CATEGORY METHOO NO. RE W CRD PARTIAL PENETRATION WELDS Ret Dwg. No: 1-RV-010 l-B13-                     CRD Nozzle                       80A0184   N/A             B-E     VT-2 I 02-23                                                                                   B4.12 NES 239 682                                                                                         ,
1 Page: 72 of 145 -
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTFICATON DESCRIPTON NUMBER pfapphCabeel CATEGORY METHOO NO.
RE W CRD PARTIAL PENETRATION WELDS Ret Dwg. No: 1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-23 B4.12 NES 239 682


i System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE
i J' ' U****
* J' ' U****
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:
Document No. 80A4421                                                           App:   # Date: _[/ff_
# Date: _[/ff_
Preservice Inspection                           5532-PERRY                   Rev:   1 Page: 73 of 145 oc  new                  o YcS               nuusYE     cAEGCm   METtOO       REMMMS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-               CRDH Flange Bolting             80A0184 N/A     B-G-2 VT-1 1 58-39-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A     B-G-2 VT-1 I 58-35-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A'   B-G-2 VT-1 I 58-31-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A     B-G-2 VT-1 I 58-27-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A     B-G-2 VT-1 1 58-23-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A     B-G-2 VT-1 I 54-15-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A     B-G-2 VT-1 I 54-19-B                                                               B7.10 1-B13-               CRDH Flange Botting             80A0184 N/A     B-G-2 VT-1 I 54-23-B                                                               B7.10 NES 239 682                                                                       ;
Preservice Inspection 5532-PERRY Rev:
1 Page: 73 of 145 o YcS nuusYE cAEGCm METtOO REMMMS oc new CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 58-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 58-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A' B-G-2 VT-1 I 58-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 58-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 58-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-19-B B7.10 1-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 54-23-B B7.10 NES 239 682


7
7
(
(
System: Reactor Pressura Vessel         PROGRAM PLAN AND SCHEDULE                           [y:     !* 4 Date: 4 M4 Document No. 80A4421                                                                         App:   44 Date: r/rg Preservice Inspection                             5532-PERRY                                 Rev:     1 Page: 74 of 145 CAUBRATION           CODE COMPONENT                 COMPONENT           PROCEDURE     BLOCK     CODE     EXAM   ZOPE OENDFICADON               CESCRIPDON           NUWlER     Ofa * =Nel CATEGORY METHOD   NCL     REuARKs CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-               CRDH Flange Bolting               80A0184     N/A             B-G-2 VT-1 1 54-27-B                                                                             B7.10 1-B13-               CRDH Flange Bolting               80A0184     N/A             B-G-2 VT-1 I 54-31-B                                                                             B7.10 1-B13-               CRDH Flange Botting               80A0184     N/A             B-G-2 VT-1 I 54-35-B                                                                             B7.10 1-B13-               CRDH Flange Bolting               80A0184     N/A             B-G-2 VT-1 I 54-39-B                                                                             B7.10 1-B 13-               CRDH Flange Bolting               80A0184     N/A             B-G-2 VT-1 I 54-43-B                                                                             B7.10 i
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE
1-B13-               CRDH Flange Bolting               80A0184     N/A             B-G-2 VT-1 I 54-47-B                                                                             B7.10 1-B13-               CRDH Flange Bolting               80A0184     N/A             B-G-2 VT-1 I 50-51-B                                                                             B7.10 1-B13-               CRDH Flange Bolting               80A0184     N/A             B-G-2 VT-1 I 50-47-B                                                                             B7.10 NES 239 6/82                                                                                       ;
[y:
!* 4 Date: 4 M4 Document No. 80A4421 App:
44 Date: r/rg Preservice Inspection 5532-PERRY Rev:
1 Page: 74 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOPE OENDFICADON CESCRIPDON NUWlER Ofa * =Nel CATEGORY METHOD NCL REuARKs CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 54-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-31-B B7.10 1-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 54-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-39-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-43-B B7.10 i
1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-47-B B7.10 NES 239 6/82


7 o                                         tip.g                                       Ey:                V System: Reactor Pressure Vessel         PROGRAM PLAN AND SCHEDULE                               de Date:
7 o
Document No. 30A4421                                                                     App: A Date: r/sq Preservice Inspection                             5532-PERRY                             Rev:     1 Page: 75 of 145 COMPONDR                     COWONENT           PROCEDURE       OC     CODE     FXM  ZCPE ooanCAnCN                   DESCRPnON             NUMBER   Of am*cabW CATEGORY ME NOO m     Ruww,S CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-                 CRDH Flange Bolting             80A0184   N/A             B-G-2 VT-1 I 50-43-B                                                                           B7.10 1-B13-                 CRDH Flange Bolting             80A0184   N/A             B-G-2 VT-1 I 50-39-B                                                                           B7.10 1-B13-                 CRDH Flange Bolting             80A0184   N/A             B-G-2 VT-1 I 50-35-B                                                                           B7.10 1-B13-                 CRDH Flange Bolting             80A0184   N/A             B-G-2 VT-1 I 50-31-B                                                                           B7.10 1-B13-                 CRDH Flange Bolting             80A0184   N/A             B-G-2 VT-1 I 50-27-B                                                                           B7.10 1-B13-                 CRDH Flange Bolting             80A0184   N/A             B-G-2 VT-1 I 50-23-B                                                                           B7.10 1-B13-                 CRDH Flange Bolting             80A0184   N/A             B-G-2 VT-l' I 50-19-B                                                                           B7.10 1-B13-                 CRDH Flange Bolting             80A0184   N/A             B-G-2 VT-1 I 50-15-B                                                                           B7.10 NES 239 6/82                                                                                   ,
tip.g System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Ey:
de Date:
V Document No. 30A4421 App: A Date: r/sq Preservice Inspection 5532-PERRY Rev:
1 Page: 75 of 145 FXM COMPONDR COWONENT PROCEDURE OC CODE ZCPE ooanCAnCN DESCRPnON NUMBER Of am*cabW CATEGORY ME NOO m
Ruww,S CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-l' I 50-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-15-B B7.10 NES 239 6/82


O System: Reactor Pressure Vessel gg                             B:
O gg
                                                                                              ^
^
/
Lf#
B:
i*
i*
* Date: Lf#/
* Date:
PROGRAM PLAN AND SCHEDULE             Y App: & Date: E/f4 Document No. 80A4421 Preservice Inspection                           5532-PERRY                 Rev:   1 Page: 76 of 145 coar Toe                    uscM                             cAEcom i.enUo E       muums CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-               CRDH Flange Bolting             80A0184 N/A   B-G-2 VT-1 I 50-II-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A   B-G-2 VT-1 I 46-07-B                                                               B7.10 1-B 13-               CRDH Flange Bolting             80A0184 N/A   B-G-2 VT-1 I 46-ll-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A   B-G-2 VT-1 I '
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y
46-15-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A   B-G-2 VT-1 1 46-19-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A   B-G-2 VT-1 I 46-23-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A   B-G-2 VT-1 I 46-27-B                                                               B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A   B-G-2 VT-1 I 46-31-B                                                               B7.10 NES 239 632
Document No. 80A4421 App: & Date: E/f4 Preservice Inspection 5532-PERRY Rev:
1 Page: 76 of 145 uscM cAEcom i.enUo E muums coar Toe CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-II-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-07-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-31-B B7.10 NES 239 632


i O
i O
System: Reactor Pressura V;ssel gg PROGRAM PLAN AND SCHEDULE                     EY:     I"I Date: [ff Document No. 80A4421                                                                 App:   A4 Date: c/ M Preservice Inspection                             5532-PERRY                         Rev:     1 Page: 77 of 145 COMPONENT                   COwCEM               PROCEDURE     OCK   CODE     XAM ZCr4 comncancm                   oEscaienon           muueca   or += cartocav merwoo not     neuAans CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-               CRDH Flange Bolting               80A0184   N/A         B-G-2 VT-1 I 46-35-B                                                                       B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A         B-G-2 VT-1 I 46-39-B                                                                       B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A         B-G-2 VT-1 I 46-43-B                                                                       B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A         B-G-2 VT-1 1 46-47-B                                                                       B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A         B-G-2 VT-1 1 46-51-B                                                                       B7.10 1-B13-                 CRDH Flange Bolting               80A0184   N/A         B-G-2 VT-1 I 46-55-B                                                                       B7.10 1-B13-                 CRDH Flange Bolting               80A0184   N/A         B-G-2 VT-1 1 42-55-B                                                                       B7.10 1-B13-                 CRDH Flange Bolting               80A0184   N/A         B-G-2 VT-1 I
gg System: Reactor Pressura V;ssel PROGRAM PLAN AND SCHEDULE EY:
  '42-51-B                                                                       B7.10 NES 239 682                                                                                 e
I"I Date: [ff Document No. 80A4421 App:
A4 Date: c/ M Preservice Inspection 5532-PERRY Rev:
1 Page: 77 of 145 COMPONENT COwCEM PROCEDURE OCK CODE XAM ZCr4 comncancm oEscaienon muueca or +=
cartocav merwoo not neuAans CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 42-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I
'42-51-B B7.10 NES 239 682 e


                                                                                                                                                ~
1 0
1 0
System: Reactor Pressure Vessel       PROGRAM PLAN AND SCHEDULE                     EY:     ### Date: f#
~
Document No. 80A4421                                                                 App: 4 Date: aN Preservice Inspection                           5532-PERRY                           Rev:                 1                             Page: 78 of 145 CauSRADON           CODE ENT   DON                   DE   TION           NUMBE   W=   m   CA GORY   THOD NO                                             REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 I 42-47-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 I 42-43-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 I 42-39-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 I 42-35-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 I 42-31-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 I 42-27-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 I 42-23-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 I 42-19-B                                           .                          B7.10 NES 239 632                                                                                 ;
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE EY:
### Date:
f#
Document No. 80A4421 App: 4 Date: aN Preservice Inspection 5532-PERRY Rev:
1 Page: 78 of 145 CauSRADON CODE ENT DON DE TION NUMBE W=
m CA GORY THOD NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-19-B B7.10 NES 239 632


System: Reactor Pressuro Vessel         PROGRAM PLAN AND SCHEDULE                         [Y:     l'M D**** # A#
System: Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE
Document No. 80A4421                                                                       App:   M Date: (/rq Preservice Inspection                             3532-PERRY                             Rev:     1 Page: 79 of 145 cauenanON           CooE COMPOPENT                   COMPONENT             PROCEDURE   BLOCK     CODE     EXAM   ZONE IDENTIFICADON               DESCR6PTION           P&WR     Of meew   CATEGORY LETHOD   NO     REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-               CRDH Flange Bolting               80A0184   N/A           B-G-2 VT-1 I 42-15-B                                                                           B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A           B-G-2 VT-1 1 42-Il-B                                                                           B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A           B-G-2 VT-1 I 42-07-B                                                                           B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A           B-G-2 VT-1 I 38-03-B                                                                           B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A           B-G-2 VT-1 1 38-07-B                                                                           B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A           B-G-2 VT-1 I 38-ll-B                                                                           B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A           B-G-2 VT-1 I 38-15-B                                                                           B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A           B-G-2 VT-1 1 38-19-B                                                                           B7.10 NES 239 682                                                                                     ,
[Y:
l'M D**** # A#
Document No. 80A4421 App:
M Date: (/rq Preservice Inspection 3532-PERRY Rev:
1 Page: 79 of 145 cauenanON CooE COMPOPENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICADON DESCR6PTION P&WR Of meew CATEGORY LETHOD NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 42-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-19-B B7.10 NES 239 682


m o                                         ngg                                                   <  .
m o
System: Reactor Pressure Vessel       PROGRAM PLAN AND SCHEDULE                       EY: BC D***: # #
ngg System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE EY:
Document No. 80A4421                                                                   App: A Date: u!rf Preservice Inspection                           5532-PERRY                           Rev:   1 Page: 80 of 145 CAU9 RATION           CODE OEN                         DE                   NUMBER pt=P m     CA GCRY   THOO       REMARKS CRDH BOLTING Reg. Dwg. No: 1-RV-011 1-B13-               CRDH Flange Bolting             80A0184 N/A             B-G-2 VT-1 I 38-23-B                                                                         B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A             B-G-2 VT-1 1 38-27-B                                                                         B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A             B-G-2 VT-1 I 38-31-B                                                                         B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A             B-G-2 VT-1 I 38-35-B                                                                         B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A             B-G-2 VT-1 I 38-39-B                                                                         B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A             B-G-2 VT-1 I 38-43-B                                                                         B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A             B-G-2 VT-1 I 38-47-B                                                                         B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A             B-G-2 VT-1 I 38-51-B                                                                         B7.10 NES 239 682                                                                               ,
BC D***: # #
Document No. 80A4421 App: A Date: u!rf Preservice Inspection 5532-PERRY Rev:
1 Page: 80 of 145 CAU9 RATION CODE OEN DE NUMBER pt=P m CA GCRY THOO REMARKS CRDH BOLTING Reg. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-51-B B7.10 NES 239 682


O                                                           g3                                                                     .
O g3 System: Reactor Pressure Vessel B ''
System: Reactor Pressure Vessel                                                                           BY'' '"    D****
D****
Document No. 80A4421                                     PROGRAM PLAN AND SCHEDULE                        App:   M Date: uru Preservice Inspection                                               5532-PERRY                             Rev   _1_   Page: 81 of 145 caunRAnCu           croe COMPCPENT                     COMPONENT           PROCEDURE   BLOCX     CODE     EXAM ZONE OENTFICADON                   DESCRPDON             NUMBER   pta
Y PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:
* M   CATEGORY N       NO     REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-0!!
M Date: uru Preservice Inspection 5532-PERRY Rev
l-B13-                                   CRDH Flange Bolting             80A0134   N/A           B-G-2 VT-1 I 33-55-B                                                                                           B7.10 1-B13-                                   CRDH Flange Bolting             80A0184   N/A           B-G-2 VT-1 I 38-59-B                                                                                           B7.10 1-B13-                                   CRDH Flange Bolting             80A0184   N/A           B-G-2 VT 1 1 34-59-B                                                                                           B7.10 1-B13-                                   CRDH Flange Bolting             80A0184   N/A           B-G-2 VT-1 I 34-55-B                                                                                           B7.10 1-B13-                                   CRDH Flange Bolting             80A0184   N/A           B-G-2. VT-1 1 34-51-B                                                                                           B7.10 1-B13-                                   CRDH Flange Bolting             80A0184   N/A           B-G-2 VT-1 I 34-47-B                                                                                           B7.10 1-B13-                                   CRDH Flange Bolting             80A0184   N/A           B-G-2 VT-1 I 34-43-B                                                                                           B7.10 1-B13-                                   CRDH Flange Bolting             80A0184   N/A           B-G-2 VT-1 I 34-39-B                                                                                           B7.10 NES 239 632                                                                                                     ,
_1_
Page: 81 of 145 caunRAnCu croe COMPCPENT COMPONENT PROCEDURE BLOCX CODE EXAM ZONE OENTFICADON DESCRPDON NUMBER pta
* M CATEGORY N
NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-0!!
l-B13-CRDH Flange Bolting 80A0134 N/A B-G-2 VT-1 I 33-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT 1 1 34-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2. VT-1 1 34-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-39-B B7.10 NES 239 632


O System: Reactor Pressure Vessel HER PROGRAM PLAN AND SCHEDULE                                         B:Y App:
O HER 0
* 0
B:
                                                                                                                                            ''< Date: c /94 Date: uty Document No. 80A4421 Preservice Inspection                                           5532-PERRY                                     Rev:       1 Page: 82 of 145 I-Cumuncu                   CoCe     .
''< Date: c /94 System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y
COMPONENT                     PROCEDURE     SLOCK       CODE     FXM     ZCDE CCwCPsNT                                                                                            ne.THOO    70        REMARKS OENTFICA'XD4                     DESCRPTION                       PAJMBER Of -         CATER.C9Y CRDH BOLTING               ;s Ref. Dwg. Noe 1-RV-011 1-B13-                   CRDH Flange Bolting                           80A0184   N/A               B-G-2 VT-1 I 34-35-B                                                                                             B7.10 7
Document No. 80A4421 App:
s I-B13-                   CRDH Flange Bolting                           80A0184   N/A               B-G-2 VT-1         I-h-31-B _                                                                                            B7.10 1-B13 ,                 CRDH Flange Bolting                           30A0184   N/AT               B-G-2 VT-1 I 34-27-6                                                                                             B7.10 1-B13-                   CRDH Flange Bolting                           80A0184   N/A               B-G-2 VT-1 I 34-23-B .                            .
* Date: uty Preservice Inspection 5532-PERRY Rev:
B7.10 80A0184   N/A               B-G-2 VT-1 I
1 Page: 82 of 145 I-Cumuncu CoCe CCwCPsNT COMPONENT PROCEDURE SLOCK CODE FXM ZCDE OENTFICA'XD4 DESCRPTION PAJMBER Of -
          ~
CATER.C9Y ne.THOO 70 REMARKS CRDH BOLTING
t 1-3 13-                  CRDH Flange Bolting l                   34-19-B                                                                                             B7.10 1-B13-                   CRDH Flange Bo!&g                             80A0184   N/A               B-G-2 VT-1 I 34-15-B                                                                                             B7.10 1-B13-                   CRDH Flange Bolting                           80A0184   N/A               B-G-2 VT-1 I 34-11-B                                                                                             B7.10 1-B13-                   CRDH Flange Bolting                           80A0184   N/A               B-G-2 VT-1 I 34-07-B                                                                                             B7.10 NES 239 632
;s Ref. Dwg. Noe 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-35-B B7.10 7
_ ~. E _ - .* - -4 ,s ay-.y s;_ A. j_ A g.w . N. @ _ .g.:qmyj_.% p/ ',
s h-31-B _
                                                                            . . J .# 7 g ys.;g7-
CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I-I-B13-B7.10 1-B13,
_q 7..*'        , .<-g_,            -
CRDH Flange Bolting 30A0184 N/AT B-G-2 VT-1 I B7.10 34-27-6 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-23-B.
y, . .    . .. mz . . _ - . , - - . . u. ; _
B7.10
~
1-3 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I t
l 34-19-B B7.10 1-B13-CRDH Flange Bo!&g 80A0184 N/A B-G-2 VT-1 I 34-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-11-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-07-B B7.10 NES 239 632
_q 7..*'
ys.;g7-
.<-g_,
y,..
... mz.. _ -., - -.
: u. ; _
_ ~. E _ -.* - -4 ay-.y s;_
A. j_ A g.w. N. @ _.g.:qmyj_.% p/ ',
.. J.#
7 g
,s


                                                                                                                                  ~
l 0
l 0                                                                                                                        (       ,
~
System: Reactor Pressure Vessel        PROGRAM PLAN AND SCHEDULE                    B:
(
'"C D****6d*#
B:
Document No. 80A4421                                                                 App: # Date: (/ra Preservice Inspection                           5532-PERRY                         Rev:   1 Page: 83 of 145 cAuenArou           com c Ton rou                  o Ycr[u               unecn  or."8-     cAEcony E     E             ReuAmS CRDH BOLTING Ref. Dwg. No: 1-RV-O!!
'"C D****6d*#
l-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 1 34-03-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 1 30-03-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 1 30-07-B                                                                       B7.10 1-B13-               CRDH Flange Bolting     '
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y
80A0184 N/A           B-G-2 VT-1 1 30-Il-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 1 30-15-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 1 30-19-B                                                                       B7.10 1-B13-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 1 30-23-B                                                                       B7.10 1-813-               CRDH Flange Bolting             80A0184 N/A           B-G-2 VT-1 1 30-27-B                                                                       B7.10 NES 239 632                                                                             ;
Document No. 80A4421 App:
# Date: (/ra Preservice Inspection 5532-PERRY Rev:
1 Page: 83 of 145 cAuenArou com c Ton o Ycr[u or."8-cAEcony E E
rou unecn ReuAmS CRDH BOLTING Ref. Dwg. No: 1-RV-O!!
l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 34-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-23-B B7.10 1-813-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-27-B B7.10 NES 239 632


o                                               TIEE                                                             o Syst;mt R:: actor Prrssura Vcssel         PROGRAM PLAN AND SCHEDULE                             B5 Y   /d Datei /id4 Document No. 80A4421                                                                             App:     M Date: c/re/
o TIEE o
Preservice Inspection                               5532-PERRY                                   Rev:     1 Page: 84 of 145     ,
B5
CAUBRATION               CODE COMPONENT                     COMPONENT             PROCEDURE     BLOCK       CODE     EXAM   ZONE lOENTsRCAilON                 DESCRIPTION           NUMBER     Of apphcabiel CATEGORY hETHOO   NO. REMARKS CRDH BOLTING                                                               ^
/d Datei /id4 Syst;mt R:: actor Prrssura Vcssel PROGRAM PLAN AND SCHEDULE Y
Ref. Dwg. No: 1-RV-011 l-B13-                 CRDH Flange Botting               80A0184   N/A               B-G-2 VT-1 I 30-31-B                                                                                 B7.10
Document No. 80A4421 App:
                                                                                                                                        ~
M Date: c/re/
1-B13-                 CRDH Flange Bolting               80A0184   ~N/A               B-G-2 VT-1 I 30-3$-B                                                                                 B7.10 1-B13-                 CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 I 30-39-B                                                                                 B7.10 1-B13-                 CRDH Flange Bolting'               80A0184   N/A               B-G-2 VT-1 I 30-43-B                                                                                 B7.10 1-B13-                 CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 I 30-47-B                                                                                 B7.10
Preservice Inspection 5532-PERRY Rev:
                                                                                                                          ~
1 Page: 84 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTsRCAilON DESCRIPTION NUMBER Of apphcabiel CATEGORY hETHOO NO.
1-B13-                 CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 1 30-51-B                                                                                 B7.10 1-B13-                 CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 I 30-55-B                                                         ,                        B7.10 1-B13-                 CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 I 30-59-B                                                                                 B7.10 NES 239 6/82                                                                                         ;
REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011
^
l-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 30-31-B B7.10
~
1-B13-CRDH Flange Bolting 80A0184
~N/A B-G-2 VT-1 I 30-3$-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-39-B B7.10 1-B13-CRDH Flange Bolting' 80A0184 N/A B-G-2 VT-1 I 30-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1
~
30-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-59-B B7.10 NES 239 6/82


O Syst:m: Rcactor Pr:ssurs Vessel MM PROGRAM PLAN AND SCHEDULE                           B2 Y   '~" <' D***:
O MM O
O 4 /f'#
/
Document No. 80A4421                                                                                                     App:           4 Date: pyL Preservice Inspection                                                           5532-PERRY                                 Rev:               1           Page: 85 of 145 cAueRenoN                 caos IDE     DON                                           DESCR                 NUMBE   Of         CA GORY         HOO                               REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oll 1-B13-                                           CRDH Flange Bolting               80A0184 N/A             B-G-2 VT-1 I 26-59-B                                                                                                       B7.10 1-B13-                                           CRDH Flange Bolting               80A0184 N/A             B-G-2 VT-1 I 26-55-B                                                                                                       B7.10 1-B13-                                           CRDH Flange Bolting               80A0184 N/A             B-G-2 VT-1 1 26-51-B                                                                                                       B7.10
4 f'#
!        l-B13-                                           CRDH Flange Bolting               80A0184 N/A             B-G.-2     VT-1 1 26-47-B                                                                                                       B7.10 1-B13-                                           CRDH Flange Bolting               80A0184 N/A             B-G-2, VT-1 I 26-43-B                                                                                                       B7.10 4
B2
1-B13-                                           CRDH Flange Bolting               80A0184 N/A             B-G-2 VT-1 I 26-39-B                                                                                                       B7.10 1-B13-                                           CRDH Flange Bolting               80A0184 N/A             B-G-2 VT-1 1 26-35-B                                                                                                       B7.10 1-B13-                                           CRDH Flange Bolting               80A0184 N/A             B-G-2 VT-1 I 26-31-B                                                                                                       B7.10 NES 239 &82                                                                                                                     .
'~" <' D***:
Syst:m: Rcactor Pr:ssurs Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
4 Date: pyL Preservice Inspection 5532-PERRY Rev:
1 Page: 85 of 145 cAueRenoN caos IDE DON DESCR NUMBE Of CA GORY HOO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oll 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-51-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G.-2 VT-1 1 26-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2, VT-1 I 26-43-B B7.10 4
1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-31-B B7.10 NES 239 &82


n o
n o
System: Reactor Pressure Vessel Document No. 80A4421 nm PROGRAM PLAN AND SCHEDULE                           By:
nm o
App:
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
                                                                                                                    +4 o
/t<' Date: ad/
                                                                                                                    /t<' Date: ad/
Document No. 80A4421 App:
Date: 4/fc Preservice Inspection                                   5532-PERRY                                 Rev:       1 Page: 86 of 145 CALIBRAT!ON             CODE COMPONENT               COMPONENT             PROCEDURE     BLOCK       CODE     EXAM   ZONE IDENTIFICATION             DESCRIPTION           NUMBER   Of aprhcable) CATEGORY hETH00   NO. REMARKS CRDH BOLTING Reg. Dwg. No: 1-RV-011 1-B13-                       CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 I 26-27-B                                                                                     B7.10 1-B13-                       CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 1 26-23-B                                                                                     B7.10 1-B13-                       CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 1 26-19-B                                                                                     B7.10 1-B13-                       CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 1 26-15-B                                                                                     B7.10 1-B13-                       CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 1 26-il-B                                                                                     B7.10 1-B13-                       CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 1 26-07-B                                                                                     B7.10 1-B13-                       CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 I 26-03-B                                                                                     B7.10 1-B13-                       CRDH Flange Bolting               80A0184   N/A               B-G-2 VT-1 1 22-03-B                                                                                     B7.10 NES 239 6/82                                                                                             i
+4 Date: 4/fc Preservice Inspection 5532-PERRY Rev:
1 Page: 86 of 145 CALIBRAT!ON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of aprhcable)
CATEGORY hETH00 NO.
REMARKS CRDH BOLTING Reg. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-03-B B7.10 NES 239 6/82 i


o Syst:m2 Reactor Pressura Vessel 11  3.3                                          By: -
o 11 3.3 o
o
Syst:m2 Reactor Pressura Vessel PROGRAM PLAN AND CCHEDULE By: -
                                                                                                              /*( Date:gM PROGRAM PLAN AND CCHEDULE                                                                .
/*( Date:gM Document No. 80A4421 App:
Document No. 80A4421                                                                               App:       M Dates (/JS Preservice Inspection                               5532-PERRY                                     Rev:     1   Page: 87 of 145 CAU8 RATION             . CODE COMPONENT                   COMPONENT               PROCEDURE       BLOCK       CODE     EXAM   ZONE IDENTIFICATION               DESCRIPTION             NUMBER     (if apphcabiel CATEGORY METHOD     NO.     REMARKS CRDH BOLTING Drawing No: 1-RV-011 1-B13-               CRDH Flange Bolting                 80A0184     N/A                 B-G-2 VT-1 I 22-07-B                                                                                   B7.10 1-B13-               CRDH Flange Bolting                 80A0184     N/A                 B-G-2 VT-1 I 22-11-B                                                                                   B7.10 1-B13-               CRDH Flange Bolting                 80A0184     N/A                 B-G-2 VT-1 I 22-15-B                                                                                   B7.10 1-B13-               CRDH Flange Bolting                 80A0184     N/A                 B-G-2 VT-1 I 22-19-B                                                                                   B7.10 1-B13-               CRDH Flange Bolting                 80A0184     N/A                 B-G-2 VT-1 I 22-23-B                                                                                   B7.10 1-B13-               CRDH Flange Bolting                 80A0184     N/A                 B-G-2 VT-1 1 22-27-B                                                                                   B7.10 1-B13-               CRDH Flange Bolting                 80A0184     N/A                 B-G-2 VT-1 I 22-31-B                                                                                   B7.10 1-B13-               CRDH Flange Bolting                 80A0184     N/A                 B-G-2 VT-1 I 22-35-B                                                                                   B7.10 NES 239 6/82                                 -
M Dates (/JS Preservice Inspection 5532-PERRY Rev:
1 Page: 87 of 145 CAU8 RATION
. CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcabiel CATEGORY METHOD NO.
REMARKS CRDH BOLTING Drawing No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-11-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-35-B B7.10 NES 239 6/82


o                                                     HEE                                                     O Syst::ms Rccctor Pressure Vessel                   PROGRAM PLAN AND SCHEDULE                       By: /?/ Data 4//#
o HEE O
Document No. 80A4421                                                                               App: 4+ Date: (/.ry Preservice Inspection                                         5532-PERRY                           Rev:   1 Page: 88 of 145 I
Syst::ms Rccctor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
CAUBRATION           CODE IDE I ICA ON                           DESCR                         Of   cablel CA GORY     HOO No     REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-                 CRDH Flange Bolting                         80A0184 N/A             B-G-2 VT-1 I 22-39-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting                         80A0184 N/A             B-G-2 VT-1 I 22-43-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting                         80A0184 N/A             B-G-2 VT-1 1 22-47-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting                         80A0184 N/A             B-G-2 VT-1 I 22-51-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting                         80A0184 N/A             B-G-2 VT-1 I 22-55-b                                                                                     B7.10 1-B13-                 CRDH Flange Bolting                         80A0184 N/A             B-G-2 VT-1 I 1
/?/ Data 4//#
22-59-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting                         80A0184 N/A             B-G-2 VT-1 I 18-55-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting                         80A0184 N/A             B-G-2 VT-1 I 18-51-B                                                                                     B7.10 NES 239 6/82
Document No. 80A4421 App:
4+
Date: (/.ry Preservice Inspection 5532-PERRY Rev:
1 Page: 88 of 145 I
CAUBRATION CODE IDE I ICA ON DESCR Of cablel CA GORY HOO No REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-55-b B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 1
22-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-51-B B7.10 i
NES 239 6/82


o                                           HEE                                                           O Systrm: Reactor Pressure Vess:1         PROGRAM PLAN AND SCHEDULE                           By: /M' Date:6MY Document No. 80A4421                                                                         App:   # Date: IM Preservice Inspection                             5532-PERRY                               Rev:   1 Page: 89 of 145 CAUBRATK)N               CODE K)E F TON                   DESCFu ON               MBE   (if appicable) CA GORY   THOO NO     F(MARKS CRDH BOLTING Ref. Dwg. No.1-RV-Oli 1-B13-                 CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 1 18-47-B                                                                             B7.10 1-B13-                 CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 I 18-43-B                                                                             B7.10 1-B13-                 CRDH Flange Bolting               80A0184 N/A             r   B-G-2 VT-1 I 18-39-B                                                                             B7.10 1-B13-                 CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 I 18-35-B                                                                             B7.10
o HEE O
;                              l-B13-                 CRDil Flange Bolting             80A0184 M/A                 B-G-2 VT-1 I 18-31-B                                                                             B7.10
Systrm: Reactor Pressure Vess:1 PROGRAM PLAN AND SCHEDULE By:
;                                l-B13-                 CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 I 18-27-B B7.10 1-B13-                 CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 I 18-23-B                                                                             B7.10 1-B13-                 CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 I 18-19-B                                                                             B7.10 NES 239 6/82                                                                                     ;
/M' Date:6MY Document No. 80A4421 App:
# Date: IM Preservice Inspection 5532-PERRY Rev:
1 Page: 89 of 145 CAUBRATK)N CODE K)E F TON DESCFu ON MBE (if appicable)
CA GORY THOO NO F(MARKS CRDH BOLTING Ref. Dwg. No.1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 18-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A r
B-G-2 VT-1 I 18-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-35-B B7.10 l-B13-CRDil Flange Bolting 80A0184 M/A B-G-2 VT-1 I 18-31-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-19-B B7.10 NES 239 6/82


o                                           TIEN                                                                 C System: Reactor Pre:sure Vessel           PROGRAM PLAN AND SCHEDULE                               BY:   d' Date: C/88 Document No. 80A4421                                                                               App: M Dates (/M Preservice Inspection                                 5532-PERRY                                   Rev:     1 Page: 90 of 145 CALIBRATION               CODE COMPONENT                 COMPONENT               PROCEDURE     BLOCK       CODE     EXAM   ZONE 10ENTIFICATION             DESCRIPTION             NUMBER   (if appleable) CATEGORY hETHOD   No,     ffMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-                 CRDH Flange Bolting                 80A0184   N/A                 B-G-2 VT-1 I 18-15-B                                                                                   B7.10 1-B13-                 CRDH Flange Bolting                 80A0184   N/A                 B-G-2 VT-1 I 18-ll-B                                                                                   B7.10 1-B13-                 CRDH Flange Bolting                 80A0184   N/A                 B-G-2 VT-1 I 18-07-B                                                                                   B7.10 1-B13-                 CRDH Flange Bolting                 80A0184   N/A                 B-G-2 VT-1 I         ,
o TIEN C
14-07-B                                                                                   B7.10 1-B13-                 CRDH Flange Bolting                 80A0184   N/A                 B-G-2 VT-1 I 4                14-ll-B                                                                                   B7.10 1-B13-                 CRDH Flange Bolting                 80A0184   N/A                 B-G-2 VT-1 I
System: Reactor Pre:sure Vessel PROGRAM PLAN AND SCHEDULE BY:
.                14-15-B                                                                                   B7.10 1-B13-                 CRDH Flange Bolting                 80A0184   N/A                 B-G-2 VT-1 I
d' Date: C/88 Document No. 80A4421 App: M Dates (/M Preservice Inspection 5532-PERRY Rev:
.                14-19-B                                                                                   B7.10 1-B13-               CRDH Flange Bolting                 80A0184   N/A                 B-G-2 VT-1 1 14-23-B                                                                                   B7.10 NES 239 6/82                                                                                             ;
1 Page: 90 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 10ENTIFICATION DESCRIPTION NUMBER (if appleable)
CATEGORY hETHOD No, ffMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-ll-B B7.10 4
1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 14-23-B B7.10 NES 239 6/82


q Syst:mi Rc::.ctor Prcssure Vcssel         PROGRAM PLAN AND SCHEDULE                                 By:   B/4' Datei/,4(
q Syst:mi Rc::.ctor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By:
Document No. 80A4421                                                                                 App:   4+ Dates w4 Preservice Inspection                               5532-PERRY                                     Rev:     1 Page: 91 of 145 i
B/4' Datei/,4(
CAUBRATION                 CODE COMPONENT                   COMPONENT             PROCEDURE       BLOCK         CODE     EXAM ZONE IDENTIFICATION                 DESCRIPTION           NUMBER     (if applicable) CATEGORY   METHOD NO.       REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 l-B13-                 CRDH Flange Bolting               80A0184     N/A                 B-G-2 VT-1 I 14-27-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting               80A0184     N/A                 B-G-2 VT-1 I 14-31-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting               80A0184     N/A                 B-G-2 VT-1 I 14-35-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting               80A0184     N/A                 B-G-2 VT-1 I 14-39-B                                                                                     B-7.10 1-B13-                 CRDH Flange Bolting               80A0184     N/A                 B-G-2 VT-1 I 14-43-B                                                                                     B7.10 1-B13-                 CRDH Flange Bolting               80A0184     N/A                 B-G-2 VT-1 I 14-47-B                                                                                     B7.10 i
Document No. 80A4421 App:
1-B13-                 CRDH Flange Bolting               80A0184     N/A                 B-G-2 VT-1 I
4+
-l 14-51-B                                                                                     B7.10 l-B13-                 CRDH Flange Bolting               80A0184     N/A                 B-G-2 VT-1 I 14-55-B                                                                                     B7.10 NES 239 6/82                                                                                               ;
Dates w4 Preservice Inspection 5532-PERRY Rev:
1 Page: 91 of 145 i
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if applicable)
CATEGORY METHOD NO.
REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-39-B B-7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-47-B B7.10 i
1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I
-l 14-51-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-55-B B7.10 NES 239 6/82


O System: R: actor Prcssure Vcssel MM PROGRAM PLAN AND SCHEDULE                                                     By: /> # DataC;/f4 I
O MM C;/f4 System: R: actor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By:
Document No. 80A4421                                                                                                 App: _4t- Date: 63 4 Preservice Inspection                             5532-PERRY                                                         Rev:   1   Page: 92 of 145
/> # Data I Document No. 80A4421 App: _4t-Date: 63 4 Preservice Inspection 5532-PERRY Rev:
                                                                                                                        ^
1 Page: 92 of 145 oYcrEnE ocs"cE MEm"OO
oYcrEnE                       ocs"cE               NUMBE                                             CA   Y MEm"OO        REWJES -
^
CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-                 CRDH Flange Bolting             80A0184                                     N/A     B-G-2 VT-1 I 10-51-B                                                                                                       B7.10 1-B13-                 CRDH Flange Bolting             80A0184                                       N/A     B-G-2 VT-1 I 10-47-B                                                                                                       B7.10 1-B13-                 CRDH Flange Bolting             80A0184                                       N/A     B-G-2 VT-1 I 10-43-B                                                                                                       B7.10 1-B13-                 CRDH Flange Bolting             80A0184                                       N/A     B-G-2 VT-1 I           .
NUMBE CA Y
10-39-B                                                                                                       B7.10 1-B13-                 CRDH Flange Bolting             80A0184                                       N/A   B-G-2 VT-1 I 10-35-B                                                                                                       B7.10 1-B13-                 CRDH Flange Bolting             80A0184                                       N/A   B-G-2 VT-1 I
REWJES -
! 10-31-B                                                                                                       B7.10 1-B 13-               CRDH Flange Bolting             80A0184                                       N/A   B-G-2 VT-1 I 10-27-B                                                                                                       B7.10 1-B13-                 CRDH Flange Bolting             80A0184                                       N/A   B-G-2 VT-1 I 10-23-B                                                                                                       B7.10 NES 239 6/82 e
CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-31-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-23-B B7.10 NES 239 6/82 e


O System: Reactor Pressure Vessel MM PROGRAM PLAN AND SCHEDULE                             B2 Y
O MM O
O A Date:/M App: 44 Dates r/r4 Document No. 80A4421 Pa eservice Inspection                                                         5532-PERRY                                 Rev: - 1   Page: 93 of 145 CouPONENT                                               COMPONENT           PROCEDURE       OCK       CODE           2ONE 80ENTIFICATION                                           DESCRIPTION           NUMBER   (18 apphcable) CATEGORY WTHOO   Ho. REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-                                             CRDH Flange Bolting             80A0184   N/A                 B-G-2 VT-1 I 10-19-B                                                                                                           B7.10 1-B13-                                             CRDH Flange Bolting             80A0184   N/A                 B-G-2 VT-1 I 10-15-B                                                                                                           B7.10 1-B13-                                             CRDH Flange Bolting             80A0184   N/A                 B-G-2 VT-1 I 10-Il-B                                                                                                           B7.10 1-B13-                                             CRDH Flange Bolting             80A0184   N/A                 B-G-2 VT-1 I 06-15-B                                                                                                           B7.10 l-B13-                                             CRDH Flange Bolting             80A0184   N/A                 B-G-2 VT-1 1 06-19-B                                                                                                           B7.10 1-B13-                                             CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 I 06-23-B                                                                                                           B7.10 1-B13-                                             CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 I 06-27-B                                                                                                           B7.10 1-B13-                                           CRDH Flange Bolting               80A0184 N/A                 B-G-2 VT-1 I 06-31-B                                                                                                           B7.10 NES 239 6/82                                                                                                                   ;
B2 A Date:/M System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App: 44 Dates r/r4 Pa eservice Inspection 5532-PERRY Rev: -
1 Page: 93 of 145 CouPONENT COMPONENT PROCEDURE OCK CODE 2ONE 80ENTIFICATION DESCRIPTION NUMBER (18 apphcable)
CATEGORY WTHOO Ho.
REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-15-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 06-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-31-B B7.10 NES 239 6/82


O System: Reactor Pressure Vessel gg PROGRAM PLAN AND SCHEDULE                                By:
O gg Q
Q Datest/94 '
By:
Document No. 80A4421                                                                            App: 4+  /;( Dates (/Sa Preservice Inspection                             5532-PERRY                                     Rev:     1 Page: 94 of 145 -
Datest/94 '
CALIBRATION               CODE COMPONENT                 COMPONENT             PROCEDURE       BLOCK       CODE     EXAM   ZONE 10ENTIFICAT60N             DESCRIPTION           NUMBER     (ll applicable) CATEGORY METHOD   No.     REMARKS CRDH BOLTING         ,
App: /;(
Ref. Dwg. No: 1-RV-Oli 1-B13-               CRDH Flange Bolting               80A0184   'N/A                 B-G-2 VT-1 I 06-35-B                                                                                 B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A                 B-G-2 VT-1 I 06-39-B                                                                                 B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A                 B-G-2 VT-1 I 06-43-B                                                                                 B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A                 B-G-2 VT-1 I 06-47-B                                                                                 B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A                 B-G-2 VT-1 I 02-39-B                                                                                 B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A                 B-G-2 VT-1 I 02-35-B                                                                                 B7.10 1-B13-               CRDH Flange Bolting               80A0184   N/A                 B-G-2 VT-1 1 02-31-B                                                                                 B7.10
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE 4+
; l-B13-               CRDH Flange Bolting               80A0184   N/A                 B-G-2 VT-1 I 02-27-B                                                                                 B7.10 NES 239 6/82                                                                                           i
Dates (/Sa Document No. 80A4421 Preservice Inspection 5532-PERRY Rev:
1 Page: 94 of 145 -
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 10ENTIFICAT60N DESCRIPTION NUMBER (ll applicable)
CATEGORY METHOD No.
REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184
'N/A B-G-2 VT-1 I 06-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 02-31-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-27-B B7.10 i
NES 239 6/82 i


o                                         11EN                                                           O System: Reactor Przssure Vessel         PROGRAM PLAN AND SCHEDULE                           B:
o 11EN O
Y    d' Dat 4 d'I Document No. 80A4421                                                                         App:   A Date:   c/R/
B:
Preservice Inspection                             5532-PERRY                                 Rev:     1 Page: 95 of 145 CALIBRATION             CODE COMPONENT                 COMPONENT             PROCEDURE   BLOCK       CODE   . EXAM   ZONE IDENTIFICATION             DESCRIPTION           NUMBER   Of applW   CATEGORY nETHOO   NO. REMAMKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-               CRDH Flange Bolting               80A0184   N/A             B-G-2 VT-1 I 06-23-B                                                                           B7.10 NES 239 6/82                                                                                       ;
d' Dat 4 d'I System: Reactor Przssure Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
A Date:
c/R/
Preservice Inspection 5532-PERRY Rev:
1 Page: 95 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE
. EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of applW CATEGORY nETHOO NO.
REMAMKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-23-B B7.10 NES 239 6/82


o                                               ny.5                                                                                                                               By:
o ny.5 o
o lM Dat : 8 Ir#
System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
System: Reactor Pressure Vessel             PROGRAM PLAN AND CCHEDULE                                                                                                                   App: # Date:       vsq Document No. 80A4421 Preservice Inspection                                 5532-PERRY                                                                                                                       Rev:   1   Page: 96 of'145 i
lM Dat : 8 Ir#
CAUBRATION                                                                                               CODE IDE F TON                       DE I                     IBE       Of   cabl4                                           CA                                   ORY                   No. REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-               CRD Housing #02-39 to Flange           80A0183     N/A                                                                   B-0                                   PT   I 02-39-W                                                                                                                                           B14.10 1-B13-               CRD Housing #02-35 to Flange           80A0183     N/A                                                                     B-0                                   PT   I 02-35-4r                                                                                                                                         B14.10 1-B13-               CRD Housing #02-31 to Flange           80A0183     N/A                                                                     B-0                                   PT   I 02-31-W                                                                                                                                           B14.10 1-B13-                 CRD Housing #02-27 to Flange         80A0183     N/A                                                                     B-0                                 PT   I 02-27-W                                                                                                                                           B14.10 1-B13-                 CRD Housing #02-23 to Flange ,      80A0183     N/A                                                                       B-0                                 PT   I 02-23-W                                                                                                                                             B14.10 1-B13-                CRD Housing #06-15 to Flange         80A0183     N/A                                                                       B-0                                 PT   I B14.10
Document No. 80A4421 App:
:                                                                  06-15-W l-B13-                 CRD Housing #10-11 to Flange         80A0183     N/A                                                                       B-0                                 PT   I 10-11-17                                                                                                                                           B14.10 1-B13-                 CRD Housing #14-07 to Flange         80A0183     N/A                                                                       B-0                               PT   I 14-07-W                                                                                                                                             B14.10
# Date:
.                                                                      NES 239 6/82
vsq Preservice Inspection 5532-PERRY Rev:
1 Page: 96 of'145 i
CAUBRATION CODE IDE F TON DE I
IBE Of cabl4 CA ORY No.
REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #02-39 to Flange 80A0183 N/A B-0 PT I
02-39-W B14.10 1-B13-CRD Housing #02-35 to Flange 80A0183 N/A B-0 PT I
02-35-4r B14.10 1-B13-CRD Housing #02-31 to Flange 80A0183 N/A B-0 PT I
02-31-W B14.10 1-B13-CRD Housing #02-27 to Flange 80A0183 N/A B-0 PT I
02-27-W B14.10 1-B13-CRD Housing #02-23 to Flange 80A0183 N/A B-0 PT I
02-23-W B14.10 CRD Housing #06-15 to Flange 80A0183 N/A B-0 PT I
1-B13-06-15-W B14.10 l-B13-CRD Housing #10-11 to Flange 80A0183 N/A B-0 PT I
10-11-17 B14.10 1-B13-CRD Housing #14-07 to Flange 80A0183 N/A B-0 PT I
14-07-W B14.10 NES 239 6/82


o Syst;mi R: actor Pressura Vcssel 11EN                                            By: /M Date: 4df O
o 11EN O
PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                                                 App:   A4. Date: 9M_
Syst;mi R: actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By: /M Date: 4df Document No. 80A4421 App:
Preservice Inspection                                                 5532-PERRY                                   Rev:     1   Page: 97 of 145 COMPONENT                                       COWONENT             PROCEDURE       BLOCK         CODE           ZONE lOENTIFICATION                                   DESCRIPTION           NUMBER     (if applicablel CATEGORY METHOO   NO. REWARKs CRD IiOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-                     CRD Housing #22-03 to Flange             .      80A0183     N/A                 B-0     PT     I 22-03-W                                                                                                     B14.10 1-B13-                     CRD i5 sing #26-03 to Flange                     80A0183     N/A                 B-0     PT     I 26-03-W                                                                                                     B14.10 1-B13-                     CRD Housing #30-03 to Flange                     80A0183     N/A                 B-0     PT     I 30-03-W                                                                                                     B14.10 1-B13-                     CRD Housing #34-03 to Flange                     80A0183     N/A                 B-0     PT     I 34-03-W                                                                                                     B14.10 j 1-B13-                     CRD Housing #38-03 to Flange                     80A0183     N/A                 B-0     PT     I 38-03-W                                                                                                     B14.10 l
A4. Date: 9M_
i 1-B13-                     CRD Housing #46-07 to Flange                     80A0183     N/A                 B-0     PT     I 46-07-W                                                                                                     B14.10 1-B13-                     CRD Housing #50-11 to Flange                     80A0183     N/A                 B-0     PT     I 50-11-W                                                                                                     B14.10 1-B13-                     CRD Housing #54-15 to Flange                     80A0183     N/A                 B-0     PT   .I 54-15-W                                                                                                     B14.10 NES 239 6/82                                                                                                               ;
Preservice Inspection 5532-PERRY Rev:
1 Page: 97 of 145 COMPONENT COWONENT PROCEDURE BLOCK CODE ZONE lOENTIFICATION DESCRIPTION NUMBER (if applicablel CATEGORY METHOO NO.
REWARKs CRD IiOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #22-03 to Flange 80A0183 N/A B-0 PT I
22-03-W B14.10 1-B13-CRD i5 sing #26-03 to Flange 80A0183 N/A B-0 PT I
26-03-W B14.10 1-B13-CRD Housing #30-03 to Flange 80A0183 N/A B-0 PT I
30-03-W B14.10 1-B13-CRD Housing #34-03 to Flange 80A0183 N/A B-0 PT I
34-03-W B14.10 j
1-B13-CRD Housing #38-03 to Flange 80A0183 N/A B-0 PT I
38-03-W B14.10 l
i 1-B13-CRD Housing #46-07 to Flange 80A0183 N/A B-0 PT I
46-07-W B14.10 1-B13-CRD Housing #50-11 to Flange 80A0183 N/A B-0 PT I
50-11-W B14.10 1-B13-CRD Housing #54-15 to Flange 80A0183 N/A B-0 PT
.I 54-15-W B14.10 NES 239 6/82


o Syst::mi R actor Pressura Vcssel ting                                           B'     Y  6 E D****
o ting a
a '
B' 6 E D****
PROGRAM PLAN AND SCHEDULE-                               App:         4 Date: C/s4 Document No. 80A4421 Preservice Inspection                                 5532-PERRY                                     Rev:         1                               Page: 98 of 145 CAUBRATION                     CODE COMPONENT                   COMPONENT               PROCEOURE       BLOCK         CODE         EXAM   ZONE DESCRIPTION             NUMBER     Of apphcablel   CATEGORY. hETHOD       NO.                                                           REMARKS IDENTIFICATION l
Syst::mi R actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE-Y Document No. 80A4421 App:
CRD HOUSING WELDS Ref. Dwg. No: 1-RV-Oll 1-B13-                 CRO Housing #58-23 to Flange         80A0183     N/A                 B-0     PT         I 58-23-W                                                                                     B14.10 1-B13-                 CRD Housing #58-27 to Flange         80A0183     N/A                 B-0     PT         I 58-27-W                                                                                     B14.10 1-B13-                 CRD Housing #58-31 to Flange-       80A0183     N/A                 B-0     PT         I 58-31-47                                                                                     B14.10 1-B13-                 CRD Housing #58-35 to Flange         80A0183     N/A                 B-0     PT         I 58-35-TV                                                                                     B14.10 1-B13-                 CRD Housing #58-39 to Flange         80A0183     N/A                 B-0     PT         I 58-39-W                                                                                     B14.10
4 Date: C/s4 Preservice Inspection 5532-PERRY Rev:
; l-B13-                 CRD Housing #54-47 to Flange         80A0183     N/A                 B-0     PT         I 54-47-W                                                                                     B14.10 1-B13-                 CRD Housing #50-51 to Flange         80A0183     N/A                 B-0     PT         I 50-51-W                                                                                     B14.10 1-B13-                 CRD Housing #46-55 to Flange         80A0183     N/A                 B-0     PT         I 46-55-W                                                                                     B14.10 NES 239 6/82                                                                                                         ;
1 Page: 98 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEOURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of apphcablel CATEGORY.
hETHOD NO.
REMARKS l
CRD HOUSING WELDS Ref. Dwg. No: 1-RV-Oll 1-B13-CRO Housing #58-23 to Flange 80A0183 N/A B-0 PT I
58-23-W B14.10 1-B13-CRD Housing #58-27 to Flange 80A0183 N/A B-0 PT I
58-27-W B14.10 1-B13-CRD Housing #58-31 to Flange-80A0183 N/A B-0 PT I
58-31-47 B14.10 1-B13-CRD Housing #58-35 to Flange 80A0183 N/A B-0 PT I
58-35-TV B14.10 1-B13-CRD Housing #58-39 to Flange 80A0183 N/A B-0 PT I
58-39-W B14.10 l-B13-CRD Housing #54-47 to Flange 80A0183 N/A B-0 PT I
54-47-W B14.10 1-B13-CRD Housing #50-51 to Flange 80A0183 N/A B-0 PT I
50-51-W B14.10 1-B13-CRD Housing #46-55 to Flange 80A0183 N/A B-0 PT I
46-55-W B14.10 NES 239 6/82


c o
c o
Syst;mi Rcactor Pressuro Vessel nEN                                            By:   /nf Dat:: #4 f o
nEN o
PROGRAM PLAN AND CCHEDULE                                App: A Date: (M Document No. 80A4421 Preservice Inspection                               5532-PERRY                                   Rev:       1   Page: 99 of 145 COMPONENT                   COMPONENT               PROCEDURE       BLOC         CODE             ZONE IDENTIFICATION               DESCRIPTION             NUMBER     (If applicabiel CATEGORY METHOD     NO. REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-               CRD Housing #38-59 to Flange         80A0183     N/A                 B-0     PT     I 38-59-ur                                                                                   B14.10 1-B13-               CRD Housing #34-59 to Flange         80A0183     N/A                 B-0     PT     I 34-59-W                                                                                     B14.10 1-B13-               CRD Housing #30-55' to Flange       80A0183     N/A                 B-0     PT     I 30-59-W                                                                                     B14.10 1-B13-                 CRD Housing #26-59 to Flange         80A0183     N/A                 B-0     PT     I 26-59-4f                                                                                   B14.10 1-B13-                 CRD Housing #22-59 to Flange         80A0183     N/A                 B-0     PT     I 22-59-W                                                                                     B14.10 1-B13-                 CRD Housing #14-55 to Flange         80A0183     N/A                 B-0     PT     I 14-55-W                                                                                     B14.10 1-B13-                 CRD Housing #10-51 to Flange         80A0183     N/A                 B-0     PT     I 10-51-47                                                                                   B14.10 1-B13-                 CRD Housing #06-47 to Flange         80A0183     N/A                 B-0     PT     I 06-47-W                                                                                     B14.10 NES 239 6/82                                                                                               i
Syst;mi Rcactor Pressuro Vessel PROGRAM PLAN AND CCHEDULE By:
/nf Dat:: #4 f Document No. 80A4421 App: A Date: (M Preservice Inspection 5532-PERRY Rev:
1 Page: 99 of 145 COMPONENT COMPONENT PROCEDURE BLOC CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (If applicabiel CATEGORY METHOD NO.
REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #38-59 to Flange 80A0183 N/A B-0 PT I
38-59-ur B14.10 1-B13-CRD Housing #34-59 to Flange 80A0183 N/A B-0 PT I
34-59-W B14.10 1-B13-CRD Housing #30-55' to Flange 80A0183 N/A B-0 PT I
30-59-W B14.10 1-B13-CRD Housing #26-59 to Flange 80A0183 N/A B-0 PT I
26-59-4f B14.10 1-B13-CRD Housing #22-59 to Flange 80A0183 N/A B-0 PT I
22-59-W B14.10 1-B13-CRD Housing #14-55 to Flange 80A0183 N/A B-0 PT I
14-55-W B14.10 1-B13-CRD Housing #10-51 to Flange 80A0183 N/A B-0 PT I
10-51-47 B14.10 1-B13-CRD Housing #06-47 to Flange 80A0183 N/A B-0 PT I
06-47-W B14.10 NES 239 6/82 i


System: Reactor Pressure Vessel                                 PROGRAM PLAN AND SCHEDULE                                       By: /?F D:ta App: # Dater chy
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: /?F D:ta /f(
                                                                                                                                                      /f(
Document No. 80A4421 App: #
Document No. 80A4421 Preservice Inspection                                                         5532-PERRY                                         Rev:     1 Page: 100 of 145 CAU0 RATION                     CODE N NT                                       COMPONENT                 PROCEDURE       BLOCK               CODE EXAM ZONE DESCRIPTION                   NUMBER   (if apphcable)       CATEGORY. AETHOD No. REMARKS IDENTIFICATION CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 NOTE: According to General Electric Dwg. #767E957, there are altogether 4 full penetration welds on the CRD housings. Only the CRD housing to Flange weld has been scheduled for examination. The remaining welds are not scheduled at this time, as their exact location and accessibility has not been determined. These welds will included later.
Dater chy Preservice Inspection 5532-PERRY Rev:
1 Page: 100 of 145 CAU0 RATION CODE N NT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)
CATEGORY.
AETHOD No.
REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 NOTE: According to General Electric Dwg. #767E957, there are altogether 4 full penetration welds on the CRD housings. Only the CRD housing to Flange weld has been scheduled for examination. The remaining welds are not scheduled at this time, as their exact location and accessibility has not been determined. These welds will included later.
l l
l l
l l
l l
l l
l l
NES 239 6/82                                                                                                                         ;
NES 239 6/82


o Syst:m: Reactor Pressura Vessel 11EN PROGRAM PLAN AND SCHEDULE                            B3' Y    d(( Date:6((*f O
o 11EN O
Document No. 80A4421                                                                         APP: y Date:                                                           GM Preservice Inspection                             5532-PERRY                                 Rev:     1 Page: 101 of 145 CAUBRATION               LCDE COMPONENT                 COMPONENT           PROCEDURE       BLOCK       CODE   EXAM   ZONE IDENTIFICATION               DESCRIPTION           NUMBER     (if appicabiel CATEGORY METHOD   No.                                   REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-               Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 56-41                                                                                 B4.13 1-B13-               Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 56-33                                                                                 B4.13 1-B13-               Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 56-25                                                                                 B4.13 1-B13-               Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 48-09                                                                                 B4.13 1-B13-               Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 48-13                                                                                 B4.13 1-313-               Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 48-17                                                                                 B4.13 1-B13-               Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 48-25                                                                                 B4.13 1-B13-               Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 48-33                                                                                 B4.13 NES 239 6/82                                                                                       i
B3' d(( Date:6((*f Syst:m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 APP: y Date:
GM Preservice Inspection 5532-PERRY Rev:
1 Page: 101 of 145 CAUBRATION LCDE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicabiel CATEGORY METHOD No.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-13 B4.13 1-313-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-33 B4.13 NES 239 6/82 i


O Syst;mi Rcactor Pressura Vessel MM PROGRAM PLAN AND CCHEDULE B'
O MM O
Y App:
B'
                                                                                                        ' ' ' , U**2*N 4 Date:
' ' ', U**2*N Y
O t/ty Document No. 80A4421 Preservice Inspection                               5532-PERRY                                   Rev:     1   Page: 102 of 145 cAusRAnON               CODE COMPONENT                     COMPONENT             PROCEDURE       BLOCK       OODE   EXAM   ZONE BOENTIFICATION               DESCRIPTION             NUMBER     (If appheablel CATEGORY DETHOD   NO.     REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-                 Instrument Nozzle         ,      80A0184     N/A               B-E     VT-2 I 48-41                                                                                   B4.13 1-B13-               Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 48-49                                                                                   B4.13 1-B13-               Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 48-53                                                                                   B4.13 1-B13-               Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 40-57                                                                                   B4.13 1-B13-               Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 40-49                                                                                   B4.13 1-B13-               Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 40-45                                                                                   B4.13 l 1-B13-               Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 40-41                                                                                   B4.13 i
Syst;mi Rcactor Pressura Vessel PROGRAM PLAN AND CCHEDULE Document No. 80A4421 App:
1-B13-               Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 40-33                                                                                   B4.13 NES 239 6/82                                                                                           i
4 Date:
t/ty Preservice Inspection 5532-PERRY Rev:
1 Page: 102 of 145 cAusRAnON CODE COMPONENT COMPONENT PROCEDURE BLOCK OODE EXAM ZONE BOENTIFICATION DESCRIPTION NUMBER (If appheablel CATEGORY DETHOD NO.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-53 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-57 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-45 B4.13 l
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-41 B4.13 i
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-33 B4.13 NES 239 6/82 i


g Syst:ms Reactor Pressura Vessel g                                                 B' Y    #'M *""*z*
g g
g                                        '
g B'
Document No. 80A4421 PROGRAM PLAN AND SCHEDULE                              App:   A4 Date: ~c /M Preservice Inspection                                   5532-PERRY                                     Rev:     1 Page: 103 of 145 CAUBRATION               CODE COMPONENT                   COMPONENT             PROCEDURE         BLOCK       CODE   EXAM   ZONE IDENTIFICATION               DESCRIPTION             NUMBER       (if appicable) CATEGORY METHOD   NO. REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-                   Instrument Nozzle                 80A0184       N/A               B-E     VT-2 I 40-25                                                                                         B4.13 1-B13-                   Instrument Nozzle                 80A0184       N/A               B-E     VT-2 I 40-21                                                                                         B4.13 1-B13-                   Instrument Nozzle                   80A0184       N/A               B-E     VT-2 I 40-17                                                                                         B4.13 1-B13-                   Instrument Nozzle                   80A0184       N/A               B-E     VT-2 I 40-09                                                                                         B4.13 1-B13-                   Instrument Nozzle                   80A0184       N/A               B-E     VT-2 I 32-09                                                                                         B4.13 1-B13-                   Instrument Nozzle                   80A0184       N/A               B-E     VT-2 I 32-17                                                                                         B4.13 j I-B13-                   Instrument Nozzle                   80A0184       N/A               B-E     VT-2 I 32-25                                                                                         B4.13 1-B13-                   Instrument Nozzle                   80A0184       N/A               B-E     VT-2 I 32-29                                                                                         B4.13 l
#'M
NES 239 6/82                                                                                             ;
*""*z*
Syst:ms Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
~ /M Document No. 80A4421 App:
A4 Date:
c Preservice Inspection 5532-PERRY Rev:
1 Page: 103 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicable)
CATEGORY METHOD NO.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-21 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-17 B4.13 j
I-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-29 B4.13 l
NES 239 6/82


l                                                                           o Syst;mi Reactor Pressura Vessel 1133                                        By: ' g Date: M o
l o
l                                                                                                                    PROGRAM PLAN AND ' SCHEDULE                            App: & Dates c/M l                                                                      Docurr.ent No. 80A4421 Preservice Inspection                                   5532-PERRY                                 Rev:     1 Page: 104 of 145
1133 o
                                                                                                                              -                    CAUBRATON               CODE COMPONENT                     COMPONENT               PROCEDURE       BLOCK     CODE     EXAM ZONE DESCRIPTION             NUMBER     (if apphcatM CATEGORY. METHOO No. FIEMARKS IDENTIFICATION FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-                 Instrument Nozzle                       80A0184   N/A             B-E     VT-2 I 32-33                                                                                       B4.13 1-B13-                 Instrument Nozzle                       80A0184   N/A             B-E     VT-2 I 32-37                                                                                     B4.13 1-B13-                 Instrument Nozzle                       80A0184   N/A             B-E     VT-2 I 32-41                                                                                     B4.13 1-B13-                 Instrument Nozzle                       80A0184   N/A             B-E     VT-2 1 32-49                                                                                       B4.13 i
l Syst;mi Reactor Pressura Vessel PROGRAM PLAN AND ' SCHEDULE By: ' g Date: M l
1-B13-                 Instrument Nozzle                       80A0184   N/A             B-E     VT-2 I
Docurr.ent No. 80A4421 App: & Dates c/M Preservice Inspection 5532-PERRY Rev:
;                                                                      32-57                                                                                       B4.13 1-B13-         '
1 Page: 104 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcatM CATEGORY.
Instrument Nozzle                       80A0184   N/A               B-E       T-2 I 24-57                                                                                       B4.13 i
METHOO No.
1-B13-                 Instrument Nozzle           -
FIEMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-37 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 1 32-49 B4.13 i
80A0184   N/A               B-E     VT-2 I 24-49                                                                                       B4.13 1-B13-                 Instrument Nozzle                       80A0184   N/A             B-E     VT-2 I 24-41                                                                                     B4.13 NES 239 6/82                                                                                             ;
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-57 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E T-2 I 24-57 B4.13 i
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-41 B4.13 NES 239 6/82


o                                               11EN                                         By: /?(
o 11EN o
o Date:/d System: Reactor Pressure Vessel              PROGRAM PLAN AN3 SCHEDULE                            App: A Date: c/f4 Document No. 80A4421 Preservice Inspection                                 5532-PERRY                                 Rev:     1 Page: 105 of 145 COMPONENT                     COMPONENT           PROCEDURE     BLO         CODE           ZONE IDENTIFICATION                 DESCRIPTION           NLtWBER   Uf apphcable) CATEGORY. nETHOD   No. EMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-                   Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 24-37                                                                                     B4.13 -
System: Reactor Pressure Vessel PROGRAM PLAN AN3 SCHEDULE By: /?(
1-B13-                   Instrument Nezzle                 80A0184   N/A               B-E     VT-2 I 24-33                                                                                     B4.13 1-B13-                   Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 24-29                                                                                     B4.13 1-B13-                   Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 24-25                                                                                     B4.13 1-B13-                   Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 24-17                                                                                     B4.13
Date:/d Document No. 80A4421 App: A Date: c/f4 Preservice Inspection 5532-PERRY Rev:
!                                1-B13-                   Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 24-09                                                                                     B4.13
1 Page: 105 of 145 COMPONENT COMPONENT PROCEDURE BLO CODE ZONE IDENTIFICATION DESCRIPTION NLtWBER Uf apphcable)
                                .1-B 13-                   Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 16-09                                                                                     B4.13 1-B13-                   Instrument Nozzle                 80A0184   N/A               B-E     VT-2 I 16-13                                                                                     B4.13 l
CATEGORY.
NES 239 &82                                                                                             ;
nETHOD No.
EMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-37 B4.13 -
1-B13-Instrument Nezzle 80A0184 N/A B-E VT-2 I 24-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-29 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-09 B4.13
.1-B 13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-13 B4.13 l
NES 239 &82


()
()
System: Reactor Pressure Vessel             PROGRAM PLAN AND SCHEDULE                           By: MV Date: /M4 Document No. 80A4421                                                                             App:   M- Date: c/f4 Preservice Inspection                               5532-PERRY                                 Rev:   1   Page: 106 of 145 CAueRATm                 CooE COMPONENT                   COldPONENT             PROCEDURE       OLOCK       CODE   EXAM ZONE IDENTIFICATION               DESCRIPTION             NUWBER     Of apphcatdel CATEGORY SETHOD No. REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-                 Instrument Nozzle                   80A0184     N/A               B-E   VT-2 I 16-17                                                                                     B4.13 1-B13-                 Instrument Nozzle                   80A0184     N/A               B-E   VT-2 I 16-21                                                                                     B4.13 1-B13-                 Instrument Nozzle                   80A0184     N/A               B-E   VT-2 I 16-25                                                                                     B4.13 1-B13-                 Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I l 16-33                                                                                     B4.13 1-B13-                 Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 16-41                                                                                     B4.13 1-B13-                 Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 16-45                                                                                     B4.13
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: MV Date: /M4 Document No. 80A4421 App:
. 1-B13-                 Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 16-49                                                                                     B4.13 4
M-Date: c/f4 Preservice Inspection 5532-PERRY Rev:
1-B13-                 Instrument Nozzle                   80A0184     N/A               B-E     VT-2 I 16-53                                                                                     B4.13 4
1 Page: 106 of 145 CAueRATm CooE COMPONENT COldPONENT PROCEDURE OLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUWBER Of apphcatdel CATEGORY SETHOD No.
NES 239 6/82                                                                                         i
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-21 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I l
16-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-45 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-49 B4.13 4
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-53 B4.13 4
NES 239 6/82 i
]


o                                           HEN                                           B3 o
o HEN o
Syst;m R actor Pressuro Vessel           PROGRAM PLAN AND SCHEDULE                               Y   df Date: 4M/
B3 df Date: 4M/
Document No. 80A4421                                                                           APP: & Date: c/Se/
Syst;m R actor Pressuro Vessel PROGRAM PLAN AND SCHEDULE Y
Preservice Inspection                             5532-PERRY                                   Rev:   1   Page: 107 of 145 CAUBRATION               CODE C N NT                     COMPONENT             PROCEDURE       BLOCK       CODE   EXAM ZONE IDINTlRCATION               DESCRIPTION           NUMBER     (if apphcable) CATEGORY WTHOD   NO. REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-               Instrument Nozzle                 80A0184     N/A               B-E     VT-2 I 08-49                                                                                   B4.13 1-B13-               Instrument Nozzle                 30A0184     N/A               B-E     VT-2 I 08-41                                                                                   B4.13 1-B13-               Instrument Nozzle                 80A018'     N/A               B-E     VT-2 1 08-33                                                                                   B4.13 1-B13-               Instrument Nozzle                 80A0184     N/A               B-E     VT-2 I 08-25                                                                                   B4.13 1-B13-               Instrument Nozzle                 80A0184     N/A               B-E     VT-2 I 08-17                                                                                   B4.13 i
Document No. 80A4421 APP: & Date: c/Se/
NES 239 6/82                                                                                         -
Preservice Inspection 5532-PERRY Rev:
1 Page: 107 of 145 CAUBRATION CODE C N NT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDINTlRCATION DESCRIPTION NUMBER (if apphcable)
CATEGORY WTHOD NO.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-49 B4.13 1-B13-Instrument Nozzle 30A0184 N/A B-E VT-2 I 08-41 B4.13 1-B13-Instrument Nozzle 80A018' N/A B-E VT-2 1 08-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-17 B4.13 i
NES 239 6/82


o Systemi Rcactor Prc,ssura Vcssel lies PROGRAM PLAN AND SCHEDULE                           By:   W Date:   o/#
o lies o/#
A Document No. 80A4421                                                                           App:   44- Date: . s/f4 Preservice Inspection                               5532-PERRY                                 Rev:     1 Page: 108 of 145 CAUBRATON               CODE-COMPONENT                   COMPONENT             PROCEDURE     BLOCK       COOE   EXAM ZONE IDENTIFICATION               DESCRIPTION           NUMBER     pf appicabiel CATEGORY nETHOO   NO. HEMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-                 Ligament Between Stud Hole         80A1089   PY-NUT-1-RPV B-G-1       UT   I A-1                                                                                   B6.40 1-B13-                 Ligament Between Stud Hole         80A1089   PY-NUT-1-RPV B-G-1       UT   I A-2                                                                                   B6.40 1-B13-                 Ligament Between Stud Hole         80A1089   PY-NUT-1-RPV B-G-1 UT           I A-3                                                                                   B6.40 1-B13-                 Ligament Between Stud Hole         80A1089   PY-NUT-1-RPV B-G-1 UT           I A-4                                                                                   B6.40 1-B13-                 Ligament Between Stud Hole         80A1089   PY-NUT-1-RPV B-G-1 UT           I A-5                                                                                   B6.40 1-B13-                 Ligament Between Stud Hole         80AIO89   PY-NUT-1-RPV B-G-1 UT-         I A-6                                                                                   B6.40 1-B13-                 Ligament Between Stud Hole         30A1089   PY-NUT-1-RPV B-G-1 UT           I A-7                                                                                   B6.40 1-B13-                 Ligament Between Stud Hole         80A1089   PY-NUT-1-RPV B-G-1 UT           I A-8                                                                                   B6.40 NES 239 6/82                                                                                         i
Systemi Rcactor Prc,ssura Vcssel PROGRAM PLAN AND SCHEDULE By:
W Date: A Document No. 80A4421 App:
44-Date:. s/f4 Preservice Inspection 5532-PERRY Rev:
1 Page: 108 of 145 CAUBRATON CODE-COMPONENT COMPONENT PROCEDURE BLOCK COOE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER pf appicabiel CATEGORY nETHOO NO.
HEMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-1 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-2 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-3 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-4 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-5 B6.40 1-B13-Ligament Between Stud Hole 80AIO89 PY-NUT-1-RPV B-G-1 UT-I A-6 B6.40 1-B13-Ligament Between Stud Hole 30A1089 PY-NUT-1-RPV B-G-1 UT I
A-7 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-8 B6.40 NES 239 6/82 i


MM
O MM
                                                                                                                    ~
O                                                                                          By
(
(
~
M Date: #M4'-
M Date: #M4'-
System: Rcactor Pressura Vessel         PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                             App:   # Date: cm Preservice Inspection                             5532-PERRY                                   Rev:   1 Page: 109 of 145 CAUBRATION               CODE COMPONENT                   COMPONENT               PROCEDURE       BLOCK       CODE   EXAM ZONE IDENTIFICATION               DESCRIPTION             NUMBER     (if appicablel CATEGORY ETHOD   NO. REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-               Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I A-9                                                                                     B6.40 1-B13-               Ligament Between Stud Hole         80A0189     F Y-NUT-1-RPV B-G-1 UT         I B-1                                                                                     B6.40 1-B13-               Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I B-2                                                                                     B6.40 l-B13-               Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I B-3                                                                                     B6.40 1-B13-               Ligament Between Stud Hole         80A0189     PY-NUT-1-RPVB-G-1 UT           I B-4                                             .                                      B6.40 1-B13-               Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1         UT   I B-5                                                                                     B6.40 1-B13-               Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I B-6                                                                                     B6.40 1-B13-               Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I B-7                                                     .                                B6.40 NES 239 6/82                                                                                         i
System: Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By Document No. 80A4421 App:
# Date: cm Preservice Inspection 5532-PERRY Rev:
1 Page: 109 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicablel CATEGORY ETHOD NO.
REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
A-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 F Y-NUT-1-RPV B-G-1 UT I
B-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-2 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPVB-G-1 UT I
B-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-7 B6.40 NES 239 6/82 i


O System: Reactor Pressure Vessel HM PROGRAM PLAN AND SCHEDULE                             By:     /W Date: t/f#
O HM C
C Document No. 80A4421                                                                                   App:     4- Date: r/ff               T Preservice Inspection                                     5532-PERRY                                   Rev:       1     Paget 110 ch145 CAUBRATION             CODE COMPONr4                       COMPONENT             PROCEDURE       BLOCK     CODE     EXAM     ZONE 4 DEN 11F,CATtON                 DESCRIPTION             NUMBER       (ll aM     CATEGORY   METHOO     NO.     . REMARKS I
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
FLANGE LIGAMENT                   <_
/W Date: t/f#
kef. Dwg.~ No: 1-RV-013                                                               ,
Document No. 80A4421 App:
                                    ~                 ~
4-Date:
1-B13-                     Ligament Between Stud Hole         80A0189       PY-NUT-I-RPV B-G-1     UT       I B-8                                                                                           B6.40                                                 ;
r/ff T
1-B13-                       Ligament Between Stud Hole         80A0189       PY-NUT-i-RPV B-G-1 UT - I     ~
Preservice Inspection 5532-PERRY Rev:
B-9                                                                                 -
1 Paget 110 ch145 CAUBRATION CODE COMPONr4 COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 4 DEN 11F,CATtON DESCRIPTION NUMBER (ll aM CATEGORY METHOO NO.
B6.40 l-B13-                     Liganient Between Stud Hole       80A0189       PY-NUT-1-RPV B-G-1 UT           I             .
REMARKS I
                      ~. C                                                                                         B6.40 ,
FLANGE LIGAMENT kef. Dwg.~ No: 1-RV-013
l-B13-                       Ligament Between Stud Hole         80A0189       PY-NUT-1-RPV B-G- 1 UT           I B6.40
~
                                                                                                                                                      ~
~
                          ~C-2 1-B13-                       Ligament Betw&n Stud Hole         80A0189       PY-NUT-1-RPV B-G-1 UT           I                       .
1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-I-RPV B-G-1 UT I
1 C-3                                                                                           B6.40                                         ,l 1-B13-                       Ligament Between Stud Hole         80A0189       PY-NUT-1-RPV B-G-1 UT           I C-4                                                                                           B6.40 1-B13-                       Ligament Between Stud Hole         80A0189       PY-NUT-1-RPV B-G-1 UT           I C-5                                                                                           B6.40 1-B13-                       Ligament Between Stud Hole         80A0189       PY-NUT-1-RPV B-G-1 UT           I C-6                                                                                           B6.40 NES 239 6/82                                                                                                   ;
B-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-i-RPV B-G-1 UT - I B-9 B6.40
~
l-B13-Liganient Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C B6.40,
~.
l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
~C-2 B6.40
~
1-B13-Ligament Betw&n Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
1 C-3 B6.40
,l 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-6 B6.40 NES 239 6/82


Syst;m:r Rcactor Pressura Vessel         PROGRAM PLAN AND SCHEDULE                       By: /W. Date:FN.
Syst;m:r Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By: /W. Date:FN.
Document No. 80A4421                                                                     App: & Dates e/M -
Document No. 80A4421 App: & Dates e/M -
Preservice Inspection                             5532-PERRY                             Rev:       1 Page: 111 of 145 CAUBRATION     .      CODE IDE     T ON                 DE                           Of   icablel CA ORY. THOD     NO     REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-                 Ligament Between Stud Hole       80A0189 PY-NUT-1-RPV B-G-1 UT-         I C-7                                                                               B6.40 1-B13-                 Ligament Between Stud Hole       80A0189 PY-NUT-1-RPV B-G-1 UT           I C-8                                                                               B6.40 1-B13-                 Ligament Between Stud Hole       80A0189 PY-NUT-1-RPV B-G-1 UT           I C-9                                                                               B6.40 '
Preservice Inspection 5532-PERRY Rev:
l-B13-                 Ligament Between Stud Hole       80A0189 PY-NUT-1-RPV B-G-1 UT           I D-1                                                                               B6.40 1-B13-                 Ligament Between Stud Hole       80A0189 PY-NUT-1-RPV B-G-1 UT           I D-2                                                                               B6.40 1-B13-                 Ligament Between Stud Hole       80A0189 PY-NUT-1-RPV B-G-1 UT           I D-3                                                                               B6.40 1-B13-                 Ligament Between Stud Hole       80A0189 PY-NUT-1-RPV B-G-1       UT     I D-4                                                                               B6.40 1-B13-                 Ligament Between Stud Hole       80A0189 PY-NUT-1-RPV B-G-1 UT           I D-5                                                                               B6.40 NES 239 6/82                                                                                   i
1 Page: 111 of 145 CAUBRATION CODE IDE T ON DE Of icablel CA ORY.
THOD NO REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT-I C-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-9 B6.40 '
l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-5 B6.40 NES 239 6/82 i


            ~.J -
~.J
                                .s   .
.s r,.;
                                                                                                                            ,          r, .;
B3 M dst *:t/N Syst::mt Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Syst::mt Rcactor Pressura Vessel                     PROGRAM PLAN AND SCHEDULE B3 Y App:
Document No. 80A4421 App:
MA+dst          *:t/N
A+ ' Dates? WM -
                                                                                                                                                ' Dates? WM -
7
Document No. 80A4421
-Preservice Inspection 5532 -PERRY Rev:
      -Preservice Inspection                                             5532 -PERRY                                         Rev:         1     .Pages 112 of 145 7
1
CAUBRATION                     CODE COMPONENT                         COMPONENT               PROCEDURE.       BLOCK             CODE   . EXAM     ZONE             -
.Pages 112 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE.
                                                                                    - 6 y/       (Il apphcablel     CATEGORY DETHOO       NO.         RE     S
BLOCK CODE
                    - IDENTIFICATION                      DESCRIPTION FLANGE LIGAMENT.
. EXAM ZONE
Ref. Dwg. No: 1-RV-013                                                                                                                   5-1-B13-                           Ligament Between Stud Hole           80A0189     PY-NU T-1-RPV B-G-1 UT                 .I D-6                                                                                                         B6.40 l-B13-                           Ligament Between Stud Hole           80A0189     PY-NUT-1-RPV B-G-1 UT                     I D-7                                                                                                    _
- IDENTIFICATION DESCRIPTION
B6.40 1-B13-                           Ligament Between Stud Hole           80A0189     PY-NUT-1-RPV B-G-1 UT ~ I D-8                                                                                                         B6.40 1-B13-                           Ligament Between Stud Hole           80A0189'     Py-NUT-1-RPV B-G-1 UT;                   I N
- 6 y/
D-9                                                                                                           B5.40 l'-B 13-                         L.igament Between Stud Hole           80A0189     PY-NUT-1-RPV B-G-1 UT                     I                   -
(Il apphcablel CATEGORY DETHOO NO.
E-1                                                                                                           B6.40 1-B13-                           Ligament Between Stud Hole           80A0189     PY-NUT-1-RPV B-G-1             UT       I                                           -
RE S
E-2                                                                                                           B6.40 l         1-B13-                           Ligament Between Stud Hole           80A0189     PY-NUT-1-RPV B-G-1 UT                     I
FLANGE LIGAMENT.
:        E-3                                                                                                           B6.40 l
Ref. Dwg. No: 1-RV-013 5-1-B13-Ligament Between Stud Hole 80A0189 PY-NU T-1-RPV B-G-1 UT
l 1-B13-                           Ligament Between Stud Hole           80A0189     PY-NUT-1-RPV B-G-1             UT       I E-4                                                                                                           B6.40 NES 239 6/82                                                                                                               ;
.I D-6 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B6.40 D-7 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT ~ I D-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189' Py-NUT-1-RPV B-G-1 UT; I
N D-9 B5.40 l'-B 13-L.igament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-2 B6.40 l
1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-3 B6.40 l
l 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-4 B6.40 NES 239 6/82


a Syst:mt Rerctor Prcssure Vcssel nm5                                            By: /N[ Date: Ch o
a nm5 o
l Document No. 80A4421 PROGRAM PLAN AND SCHEDULE                              App: pf_ Date: c/f4t Preservice Inspection                                     5532-PERRY       -                            Rev:     1 Page 113 of 145 CALIBRATION             CODE COMPONENT                         COMPONENT           PROCEDURE         BLOCK     CODE     EXAM ZONE lOENTIACATION                       DESCRIPTION           NUMBER       (if apphCatW4 CATEGORY, hETHOD   NO. REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 I-B13-                         Ligament Between Stud Holc       80A0189     PY-NUT-1-RPV B-G-1 UT           I E-3                                                                                             B6.40 1-B13-                         Ligament Between Stud Hole       80A0189     PY-NUT-1-RPV B-G-l' UT           I E-6                                                                                             B6.40 1-B13-                         Ligament Between Stud Hole       80A0189     PY-NUT-1-RPV B-G-1 UT           I E-7                                                                                             B6.40 1-B13-                       Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I E-8                                                                                             B6.40 1-B13-                       Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I E-9                                                                                             B6.40 1-B13-                       Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I F-1                                                                                             B6.40 l-B13-                       Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I F-2                                                                                             B6.40 1-B13-                       Ligament Between Stud Hole         80A0189     PY-NUT-1-RPV B-G-1 UT           I F-3                                                                                             B6.40 NES 239 6/82                                                                                                 ;
Syst:mt Rerctor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By: /N[ Date: Ch l
Document No. 80A4421 App: pf_ Date: c/f4t Preservice Inspection 5532-PERRY Rev:
1 Page 113 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTIACATION DESCRIPTION NUMBER (if apphCatW4
: CATEGORY, hETHOD NO.
REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 I-B13-Ligament Between Stud Holc 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-l' UT I
E-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-1 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-3 B6.40 NES 239 6/82


O Syst;mt Rractor Pressura Vessel gM                                          By:   /M . Date:
O gM c;N Syst;mt Rractor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
c;N>
/M. Date:
PROGRAM PLAN AND SCHEDULE                            App:   W. Date:       @,t Document No. 80A4421 Preservice Inspection                                       5532-PERRY                                 Rev:     1- ' Page: 114 of 145 CAUBRATK)N               CODE COMPONENT                   COMPONENT           PROCEDURE       block       CODE   EXAM   ZONE DESCRIPTION           NUMBER     (if appicablel CATEGORY METHOO   No.     REMARKS IDENTIFICATION FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-                           Ligament Between Stud Holc       80A0189   PY-NUT-1-RPV B-G-1 UT             I F-4                                                                                             B6.40 1-B13-                           Ligament Between Stud Hole       80A0189   PY-NUT-1-RPV B-G-1 UT             I F-5                                                                                             B6.40 1-B13-                           Ligament Between Stud Hole       80A0189   PY-NUT-1-RPV B-G-1 UT             I F-6                                                                                             B6.40 1-B13-                           Ligament Between Stud Hole       80A0189   PY-NUT-1-RPV B-G-1 UT             I.
Document No. 80A4421 App:
F-7                                                                                             B6.40 1-B13-                           Ligament Between Stud Hole       80A0189   PY-NUT-1-RPV B-G-1 UT             I F-8                                                                                             B6.40 1-B13-                           Ligament Between Stud Hole       80A0189   PY-NUT-1-RPV B-G-1 UT             I F-9                                                                                             B6.40 1-B13-                           Ligament Between Stud Hole       80A0189   PY-NUT-1-RPV B-G-1 UT             I G-1                                                                                             B6.40 1-B13-                           Ligament Between Stud Hole       80A0189   PY-NUT-1-RPV B-G-1         UT     I G-2                                                                                             B6.40 NES 239 6/82                                                                                                   ;
W.
Date:
@,t Preservice Inspection 5532-PERRY Rev:
1-
' Page: 114 of 145 CAUBRATK)N CODE COMPONENT COMPONENT PROCEDURE block CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicablel CATEGORY METHOO No.
REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Holc 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I.
F-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-2 B6.40 NES 239 6/82


O     .
O MM G
SYSt:mt Reactor Pressuro Vessel Document No. 80A4421 MM PROGRAM PLAN AND CCHEDULE                                 By:
/
App: 44 Date: c/fg G
SYSt:mt Reactor Pressuro Vessel PROGRAM PLAN AND CCHEDULE By:
                                                                                                              //rf Dater 6/ ff Preservice Inspection                                   5532-PERRY                                   Rev:     1   Page: 115 of 145 '
//rf Dater 6 ff Document No. 80A4421 App: 44 Date: c/fg Preservice Inspection 5532-PERRY Rev:
CAUBRATION               CODE COMPONENT                   COMPONENT                 PROCEDURE       BLOCK       CODE   EXAM     ZONE NUMBER     (If apphcablel CATEGORY hETHOD     NO,     REMARKS IDENTIFICATION                DESCRIPTION FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-                 Ligament Between Stud Hole             80A0189     PY-NUT-1-RPV B-G-1 UT             I G-3                                                                                         B6.40 1-B13-                 Ligament Between Stud Hole             80A0189     PY-NUT-1-RPV B-G-1 UT             I G-4                                                   ,
1 Page: 115 of 145 '
B6.40 1-B13-                 Ligament Between Stud Hole             80A0189     PY-NUT-1-RPV B-G-1 UT             I
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcablel CATEGORY hETHOD NO, REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
  . G-5                                                                                         B6.40
G-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
1-B13-                 Ligament Between Stud Hole             80A0189     PY-NUT-1-RPV B-G-1 UT             I G-6                                                                                         B6.40 1-B13-                 Ligament Between Stud Hole             80A0189     PY-NUT-1-RPV B-G-1 UT             I G-7                                                                                         B6.40 1-B13-                 Ligament Between Stud Hole             80A0189     PY-NUT-1-RPV B-G-1 UT             I G-8                                                                                         B6.40 1-B13-                 Ligament Between Stud Hole             80A0189     PY-NUT-1-RPV B-G-1 UT             I G-9                                                                                         B6.40 1-B13-                 Ligament Between Stud Hole             80A0189     PY-NUT-1-RPV B-G-1         UT     I H-1                                                                                         B6.40 NES 239 6/82                                                                                                 i i
G-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-1 B6.40 NES 239 6/82 i
i


O System: Reactor Pressure Vessel HM PROGRAM PLAN AND SCHEDULE                               By:   /f/ f Date:
O HM c)
M- Date: c,/se/
/f f Date:
c) fd Document No. 80A4421                                                                                                          APP:
fd
Preservice Inspection                                                         5532-PERRY                                     Rev       1     Page: 116 of 145 CALIBRATION               CODE COMPONEt:T                                             COMPONENT             PROCEDURE         BLOCK       CODE   EXAM     ZONE DESCRIPTION           NUMBER       (if apphcable) CATEGORY hETHOD     No,       REMARKS IDENTIFICATION FLANGE LIGAMENT Ref. Dwg. ' No: 1-RV-013 1-B13-                                 Ligament Between Stud Hole                   80A0189       PY-NUT-1-RPV B-G-1 UT             I H-2                                                                                                                   B6.40 1-B13-                                 Ligament Between Stud Hole                   80A0189       PY-NUT-1-RPV B-G-1 UT             I H-3                                                                                                                   B6.40 1-B13-                                 Ligament Between Stud Hole                   80A0189       PY-NUT-1-RPV B-G-1 UT             I H-4                                                                                                                   B6.40 1-B13-                                 Ligament Between Stud Hole                   80A0189       PY-NUT-1-RPV B-G-1         UT     I H-5                                                                                                                   B6.40 1-B13-                                 Ligament Between Stud Hole                   80A0189       PY-NUT-1-RPV B-G-1         UT     I H-6                                                                                                                   B6.40 S
/
1-B13-                                 Ligament Between Stud Hole                   80A0189       PY-NUT-1-RPV B-G-1 UT             I     -
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
H-7                                                                                                                   B6.40 1-B13-                                 Ligament Between Stud Hole                   80A0189       PY-NUT-1-RPV B-G-1 UT             I H-8                                                                                                                   B6.40 1-B13-                                 Ligament Between Stud Hole                   80A0189       PY-NUT-1-RPV B-G-1 UT             I H-9                                                                                                                   B6.40 NES 239 6/82                                                                                                                         ;
Document No. 80A4421 APP:
M-Date: c,/se/
Preservice Inspection 5532-PERRY Rev 1
Page: 116 of 145 CALIBRATION CODE COMPONEt:T COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)
CATEGORY hETHOD No, REMARKS FLANGE LIGAMENT Ref. Dwg. ' No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-6 B6.40 S
1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-9 B6.40 NES 239 6/82


Syst mt Recctor Pressura Vcssel                                                                                                                              By:   A /( ' ~ Date:
By:
Document No. 80A4421                                                                                  PROGRAM PLAN AND CCHEDULE                             App: # Date:           ~ y Preservice Inspection                                                                                           5532-PERRY                                   Rev:   1     Page: 117 of 145 CAU8 RATION             CODE COMPONENT                                                                     COMPONENT             PROCEDURE       BLOCK       CODE   EXAM   ZONE DESCRIPTION           NUMBER     (If apphcablel CATEGORY nETHOO   NO         REMARKS IDENTIFICATION CLOSURE HEAD BOLTING     .
A /( ' ~ Date:
Ret Dwg. No: 1-RV-014 1-B13-                                                                             Closure Stud                     80A0196     PY-STUD-           B-G-1 UT     I 38-1-1                                                                                                                           1-RPV               B6.30 80A0185     N/A                         MT -
Syst mt Recctor Pressura Vcssel PROGRAM PLAN AND CCHEDULE App: # Date:
1-B13-                                                                             Closure Stud                     80A0196     PY-STUD-           B-G-1   UT   I 38-1-2                                                                                                                             1-RPV               B6.30 80A0185     N/A                         M T-l-B13-                                                                             Closure Stud                     80A0196     PY-STUD-           B-G-1 UT     I 38-1-3                                                                                                                           1-RPV               B6.30 80A0185     N/A                         MT l-B13-                                                                             Closure Stud                     80A0196     PY-STUD-           B-G-1 UT     I 38-1-4                                                                                                                             1-RPV               B6.30 80A0185     N/A                         MT l-B13-                                                                             Closure Stud                     80A0196     PY-STUD-           B-G-1 UT     I 38-1-5                                                                                                                             1-RPV               B6.30 80A0185     N/A                         MT l-B13-                                                                             Closure Stud                     80A0196     PY-STUD-           B-G-1 UT     I 38-1-6                                                                                                                             1-RPV               B6.30 80A0185     N/A                         MT l-B13-                                                                             Closure Stud                     80A0196     PY-STUD-           B-G-1 UT     I 38-1-7                                                                                                                             1-RPV               B6.30 80A0185     N/A                         MT l-B13-                                                                             Closure Stud                     80A0196     PY-STUD-           B-G-1 UT     I 38-1-8                                                                                                                             1-RPV               B6.30 80A0185     N/A                         MT NES 239 6/82                                                                                                                                             ;
~ y Document No. 80A4421 Preservice Inspection 5532-PERRY Rev:
1 Page: 117 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcablel CATEGORY nETHOO NO REMARKS CLOSURE HEAD BOLTING Ret Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-1 1-RPV B6.30 80A0185 N/A MT -
1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-2 1-RPV B6.30 80A0185 N/A M T-l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-3 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-4 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-5 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-6 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-7 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-8 1-RPV B6.30 80A0185 N/A MT NES 239 6/82


o Syst:m: R; actor Prcssure Vessel 11EN                                            By                   o/r#
o 11EN o/r# -
                                                                                                            / M ' Dat:: s         -
Syst:m: R; actor Prcssure Vessel PROGRAM PLAN AND SCHEDULE By
PROGRAM PLAN AND SCHEDULE                            App: A Date:           c/ M Document No. 80A4421 Preservice Inspection                               3532-PERRY                                   Rev:         1 Pages 118 of 145 CALIBRATION             CODE COMPONENT                     COMPONENT             PROCEDURE       BLOCK       CODE     EXAM     ZONE IDENTIFICATION                 DESCRIPTION           NUMBER     Of appkcable) CATEGORY, BETHOO     No. REP %RKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-                 Closure Stud                       80A0196   PY-STUD-           B-G-1 UT         I 38-1-9                                                               l-RPV             B6.30 80A0185   N/A                         MT 1-B13-                 Closure Stud                       80A0196   PY-STUD-           B-G-1 UT         I 38-1-10                                                               1-RPV             B6.30 80A0185   N/A                         MT l-B13-                 Closure Stud                       80A0196   PY-STUD-           B-G-1   UT       I 38-1-11                                                               1-RPV             "6.30 80A0185   N/A                         MT                               .
/ M ' Dat:: s Document No. 80A4421 App: A Date:
1-B13-                 Closure Stud                       80A0196   PY-STUD-           B-G-1 UT         I 38-1-12                                                               1-RPV               B6.30 80A0185   N/A                         MT 1-B13-                 Closure Stud                       80A0196   PY-STUD-           B-G-1 UT         I
c/ M Preservice Inspection 3532-PERRY Rev:
, 38-1-13                                                               1-RPV               B6.30 80A0185   N/A                         MT l-B13-                 Closure Stud                       80A0196   PY-STUD-           B-G-1 UT         I 38-1-14                                                               1-RPV               B6.30 80A0185   N/A                         MT l-B13-                 Closure Stud                       80A0196   PY-STUD-           B-G-1 UT         I 38-1-15                                                               1-RPV               B6.30 80A0185   N/A                         MT.
1 Pages 118 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of appkcable)
1-B13-                 Closure Stud                       80A0196   PY-STUD-           B-G-1 UT         I 38-1-16                                                               1-RPV               B6.30 80A0185   N/A                         MT I   NES 239 6/82                                                                                               i
: CATEGORY, BETHOO No.
REP %RKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-9 l-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-10 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-11 1-RPV "6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-12 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-13 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-14 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-15 1-RPV B6.30 80A0185 N/A MT.
1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-16 1-RPV B6.30 80A0185 N/A MT I
NES 239 6/82 i


Syst:mt Rc. actor Pressura Vessel                                     PROGRAM PLAN AND SCHEDULE                                       By: . A < oate: h Document No. 80A4421                                                                                                                 APP: _dt Dates       o'f 4 Preservice Inspection                                                               5532-PERRY                                       Rev:     1   Page: 119 of 145 CAU8 RATION               CODE COMPONENT                                     COMPONENT                     PROCEDURE       BLOCK       CODE     EXAM   ZONE IDENTIFICATION                                   DESCRIPTION                   NUMBER     (if appleable) CATEGORY   METHOD   Not     REMARKS l
Syst:mt Rc. actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:. A < oate: h Document No. 80A4421 APP: _dt Dates o' 4 f
CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-                                       Closure Stud                               80A0196     PY-STUD-           B-G-1 UT       I 38-1-17                                                                                               1-RPV               B6.30 80A0185     N/A                           MT l-B13-                                       Closure Stud                               80A0196     PY-STUD-           B-G-1 UT       I 38-1-18                                                                                               1-RPV               B6.30 80A0185     N/A                           MT l-B13-                                       Closure Stud                               50A0196     PY-STUD-           B-G-1 UT       I 38-1-19                                                                                               l-RPV               B6.30 80A0185     N/A                           MT l-B13-                                       Closure Stud                               80A0196     PY-STUD-           B-G-1 UT       I 38-1-20                                                                                               1-RPV               B6.30 80A0185     N/A                           MT l-B13-                                       Closure Stud                               80A0196     PY-STUD-           B-G-1 UT       I 38-1-21                                                                                               1-RPV               B6.30 80A0185     N/A                           MT l-B13-                                       Closure Stud                               80A0196     PY-STUD-           B-G-1 UT       I 38-1-22                                                                                             1-RPV               B6.30 80A0185     N/A                           MT l-B13-                                       Closure Stud                               80A0196     PY-STUD-           B-G-1 UT       I 38-1-23                                                                                             1-RPV               B6.30 SOA0185     N/A                           MT l                   l-B13-                                     Closure Stud                               80A0196     PY-STUD-           B-G-1 UT       I 38-1-24                                                                                             1-RPV               B6.30 80A0185     N/A                           MT NES 239 6/82                                                                                                                       i
Preservice Inspection 5532-PERRY Rev:
1 Page: 119 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appleable)
CATEGORY METHOD Not REMARKS l
CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-17 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-18 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 50A0196 PY-STUD-B-G-1 UT I
38-1-19 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-20 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-21 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-22 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-23 1-RPV B6.30 SOA0185 N/A MT l
l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-24 1-RPV B6.30 80A0185 N/A MT NES 239 6/82 i


o                                           11EN                                             By       l'f( Dat:: //f/
o 11EN O
O System: Reactor Pressure Vcssel            PROGRAM PLAN AND CCHEDULE Document No. 80A4421                                                                               App: . E Date: E/fty Preservice Inspection                               5532-PERRY                                     Rev:     1       Page: 120 of 145 Cauer.non                   CooE COMPONENT                   COMPONENT             PROCEDURE         BLOCK       CODE       EXAM   ZONE DESCRIPTION           NUMBER     (If apphcatded CATEGORY ETHOO     No.         REMARKS
System: Reactor Pressure Vcssel PROGRAM PLAN AND CCHEDULE By l'f( Dat:: //f/
        .DENTIFICATION CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-25                                                               1-RPV             B6.30 80A0185     N/A                         MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-26                                                               1-RPV             B6.30 80A0185     N/A                         MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-27                                                               1-RPV             B6.30 80A0185     N/A                         MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-28                                                               I-RPV             B6.30 80A0185     N/A                         MT 1-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1     UT     I 38-1-29                                                               l-RPV             B6.30 80A0185     N/A                         MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1     UT     I 38-1-30                                                               1-RPV             B6.30 80A0185     N/A                       'MT 1-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-31                                                               1-RPV             B6.30 80A0185     N/A                         MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-32                                                               1-RPV             B6.30 80A0185     N/A                         ur NES 239 6/82                                                                                               ;
Document No. 80A4421 App:. E Date: E/fty Preservice Inspection 5532-PERRY Rev:
1 Page: 120 of 145 Cauer.non CooE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE
.DENTIFICATION DESCRIPTION NUMBER (If apphcatded CATEGORY ETHOO No.
REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-25 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-26 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-27 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-28 I-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-29 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-30 1-RPV B6.30 80A0185 N/A
'MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-31 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-32 1-RPV B6.30 80A0185 N/A ur NES 239 6/82


O Syst;m: Reactor Pressura Vessel HM PROGRAM PLAN AND SCHEDULE                             B8Y    l'W Date h/9/
O HM r0 l'W Date h/9/
r0 Document No. 80A4421                                                                             App: & Date:. E/f#
B8 Syst;m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Preservice Inspection                               5532-PERRY                                   Rev:       1   Page: 121 of 145 CoupoNENT                     CoupoNENT             PROCEDURE         oCK       CoOE             ZONE IDEd flFICATioN               DESCRieTK)N           NUMEIER     (11 apphcablet CATEGORY hEETHOO     No. REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-33                                                               1-RPV             B6.30 80A0185     N/A                       MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-34                                                               1-RPV             B6.30 80A0185     N/A                       MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-35                                                               1-RPV             B6.30 80A0185     N/A                       MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-36                                                               1-RPV             B6.30 i                                                             80A0185     N/A                       MT 1-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-37                                                               1-RPV             B6.30 80A0185     N/A                       MT 1-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1 UT         I 38-1-38                                                               1-RPV             B6.30 80A0185     N/A                       MT l-B13-                 Closure Stud                       80A0196     PY-STUD-           B-G-1   UT       I 38-1-39                                                               l-RPV             B6.30 80A0185     N/A                       MT 1-B13-                 Clo'.are Stud                     80A0196     PY-STUD-           B-G-1   UT       I 38-1-40                                                               1-RPV             B6.30 80A0185     N/A                       MT NES 239 6/82                                                                                               ;
Document No. 80A4421 App: & Date:. E/f#
Preservice Inspection 5532-PERRY Rev:
1 Page: 121 of 145 CoupoNENT CoupoNENT PROCEDURE oCK CoOE ZONE IDEd flFICATioN DESCRieTK)N NUMEIER (11 apphcablet CATEGORY hEETHOO No.
REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-33 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-34 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-35 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-36 1-RPV B6.30 i
80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-37 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-38 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-39 l-RPV B6.30 80A0185 N/A MT 1-B13-Clo'.are Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-40 1-RPV B6.30 80A0185 N/A MT NES 239 6/82


Systemi Reactor Pressura Vessel         PROGRAM PLAN AND SCHEDULE               8F  M App: 4+
M Dated W 8F Systemi Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:
Dated W Date: W39 Document No. 80A4421 Preservice Inspection                             5532-PERRY                     Rev:   1   Page: 122 of 145 o EEEoM                     DE     N             NUMBE         CA GORY ME     No"    REuUES CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-               Closure Stud                     80A0196 PY-STUD- B-G-1 UT   1 38-1-41                                                         1-RPV     B6.30 80A0185 N/A             MT l-B13-               Closure Stud                     80A0196 PY-STUD- B-G-1 UT   I 38-1-42                                                         1-RPV     B6.30 80A0185 N/A             MT l-B13-               Closure Stud                     -80A0196 PY-STUD- B-G-1 UT   I 38-1-43                                                         1-RPV     B6.30 80A0185 N/A             MT l-B13-               Closure Stud                     80A0196 PY-STUD- B-G-1 UT   1 38-1-44                                                         1-RPV     B6.30 80A0185 N/A             MT l-B13-               Closure Stud                     80A0196 PY-STUD- B-G-1 UT   I 38-1-45                                                         1-RPV     B6.30 80A0185 N/A             MT l-B13-               Closure Stud                     80A0196 PY-STUD- B-G-1 UT   1 38-1-46                                                         1-RPV     B6.30 80A0185 N/A             MT 1-B13-               Closure Stud                     80A0196 PY-STUD- B-G-1 UT   I 38-1-47                                                         1-RPV     B6.30 80A0185 N/A             MT l-B13-               Closure Stud                     80A0196 PY-STUD- B-G-1 UT   i 38-1-48                                                         1-RPV     B6.30 I
4+
80A0185 N/A             MT NES 239 &'82                                                                         i
Date: W39 Preservice Inspection 5532-PERRY Rev:
1 Page: 122 of 145 o EEEoM No" DE N
NUMBE CA GORY ME REuUES CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-41 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-42 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud
-80A0196 PY-STUD-B-G-1 UT I
38-1-43 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-44 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-45 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-46 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-47 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT i
38-1-48 1-RPV B6.30 I
80A0185 N/A MT NES 239 &'82 i
j


ll 9                     o                                                     11EE                                                   Bv:     NN Date:o/8'I 6
ll 9
System: Reactor Pressure Vessel                   PROGRAM PLAN AND SCHEDULE                                     App: . 44- Date:- @/
o 11EE o/8'I Bv:
r Document No. 80A4421 Preservice Inspection                                      5532-PERRY                                            Rev        1    Page: 123 of 145
NN Date: 6 System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:. 44-Date:- @/
r
{
{
cAUBRADON                   CODE
Preservice Inspection 5532-PERRY Rev 1
- ..                        COMPONENT                         COMPONENT                 PROCEDURE         BLOCK         CODE     EXAM     ZCNE DESCRIPTION               NUMBER       (if apphcablel   CATEGORY   METHOO     No.       REMARKS IDENTFICATION
Page: 123 of 145 cAUBRADON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZCNE IDENTFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY METHOO No.
    .                                        CLOSURE HEAD BOLTING
REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014
;                                            Ref. Dwg. No: 1-RV-014
" =
"=               l-B13-                     Closure Stud                         80A0196         PY-STUD-             B-G-1 UT         I 38-1-49                                                                           l-RPV               B6.30 80A0185         N/A                           MT 1-B13-                     Closure Stud                         80A0196         PY-STUD-             B-G-1 UT         I
l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
_                38-1-50                                                                           1-RPV               B6.30
38-1-49 l-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
    .                                                                              80A0185         N/A                           MT 1-B13-                     Closure Stud                         80A0196         PY-STUD-             B-G-1 UT         I 38-1-51                                                                           1-RPV               B6.30 80A0185         N/A                           MT i                 1-B13-                     Closure Stud                         80A0196         PY-STUD-             B-G-1 UT         I
38-1-50 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-51 1-RPV B6.30 80A0185 N/A MT i
1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-52 1-RPV B6.30
=-
=-
38-1-52                                                                            1-RPV                B6.30 t                                                                                 80A0185         N/A                           MT l-B13-                     Closure Stud                         80A0196         PY-STUD-             B-G-1 UT         I
t 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
;-              38-1-53                                                                           1-RPV               B6.30
38-1-53 1-RPV B6.30 80A0185 N/A MT l
;                                                                                  80A0185         N/A                           MT                                   l 8                                                                                                                                                                       l l-B13-                     Closure Stud                         80A0196         PY-STUD-             B-G-1 UT         I                             '
8 l
?               38-1-54                                                                           1-RPV               B6.30 g                                                                                  80A0185         N/A                           MT l-B13-                     Closure Stud               -
l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
80A0196         PY-STUD-             B-G-1 UT         I 38-1-55                                                                           1-RPV               B6.30 80A0185          N/A                            MT
?
38-1-54 1-RPV B6.30 80A0185 N/A MT g
l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-55 1-RPV B6.30
[
[
:                1-B13-                     Closure Stud                         80A0196         PY-STUD-             B-G-1     UT     I 38-1-56                                                                           1-RPV               B6.30 80A0185         N/A                           ur ll             NES 239 &82                                                                                                             ;
80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
i
38-1-56 1-RPV B6.30 80A0185 N/A ur ll NES 239 &82 i


(
(
System: Reactor Pressure Vessel           PROGRAM PLAN AND SCHEDULE                           By   /*/ Dat :6h[
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By
Document No. 80A4421                                                                           App: M Date: cN4' Preservice Inspection                               5532-PERRY                                 Rev:   1                                 Page: 124 of 145 CALIBRATION             CODE 40ENT   TlON                 DESCRt                 NUMBE   (11 appicablel CA   ORY. T     No                                               REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-               Closure Stud                       80A0196 PY-STUD-           B-G-1   UT   1 38-1-57                                                           1-RPV               B6.30 80A0185 N/A                         MT 1-B13-               Closure Stud                       80A0196 PY-STUD-           B-G-1 UT     1 38-1-58                                                           1-RPV               B6.30 80A0185 N/A                         MT l-B13-                 Closure Stud                       80A0196 PY-STUD-           B-G-1 UT     1
/*/ Dat :6h[
, 38-1-59                                                           l-RPV               B6.30 80A0185 N/A                         MT l-B13-               Closure Stud                       80A0196 PY-STUD-           B-G-1 UT     1 38-1-60                                                           1-RPV               B6.30 80A0185 N/A                         MT l-B13-               Closure Stud                       80A0196 PY-STUD-           B-G-1 UT     1 38-1-61                                                           1-RPV               B6.30 80A0185 N/A                         MT l-B13-               Closure Stud                       80A0196 PY-STUD-           B-G-1   UT   1 38-1-62                                                           1-RPV               B6.30 80A0185 N/A                         MT l-B13-                 Closure Stud                       80A014   PY-STUD-             B-G-1 UT   1 38-1-63                                                           1-RPV               B6.30 80A0185 N/A                         MT 1-B13-                 Closure Stud                       80A0196 PY-STUD-             B-G-1 UT   I 38-1-64                                                           1-RPV               B6.30 80A0185 N/A                         ur NES 239 6/82                                                                                       i
Document No. 80A4421 App:
M Date: cN4' Preservice Inspection 5532-PERRY Rev:
1 Page: 124 of 145 CALIBRATION CODE 40ENT TlON DESCRt NUMBE (11 appicablel CA ORY.
T No REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-57 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-58 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-59 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-60 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-61 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-62 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A014 PY-STUD-B-G-1 UT 1
38-1-63 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-64 1-RPV B6.30 80A0185 N/A ur NES 239 6/82 i


a Syst;ms R actor Pressura Vessel           PROGRAM PLAN AND SCHEDULE               B2Y    br Date: 6/94 Document No. 80A4421                                                             App:   44- Date: ch, Preservice Inspection                             5532-PERRY                     Rev: . 1 Page: 125 of 145 KEEE                         D YES                 NUMBE     P   CA GmY ME JD         REM /MS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-                 Closure Stud                     80A0196 PY-STUD- B-G-1 UT     I 38-1-65                                                           1-RPV     B6.30 80A0185 N/A             MT I-B13-                 Closure Stud                     80A0196 PY-STUD- B-G-1 UT     I 38-1-66                                                           1-RPV     B6.30 80A0185 N/A             MT l-B13-                 Closure Stud                     80A0196 PY-STUD- B-G-1 UT     I 38-1-67                                                           1-RPV-   B6.30 80A0185 N/A             MT 1-B13-                 Closure Stud                     80A0196 PY-STUD- B-G-1 UT     I 38-1-68                                                           1-RPV     B6.30 80A0185 N/A             MT l-B13-                 Closure Stud                     80A0196 PY-STUD- B-G-1 UT     I 38-1-69                                                           l-RPV     B6.30 80A0185 N/A             MT l-B13-                 Closure Stud                     80A0196 PY-STUD- B-G-1 UT     I 38-1-70                                                           1-RPV     B6.30 80A0185 N/A             MT l-B13-                 Closure Stud                     80A0196 PY-STUD- B-G-1 UT     I 38-1-71                                                           1-RPVs   B6.30 80A0185 N/A             MT 1-B13-                 Closure Stud                     80A0196 PY-STUD- B-G-1 UT     I 38-1-72                                                           1-RPV     B6.30 80A0185 N/A             MT NES 239 6/82                                                                             i
a B2 br Date: 6/94 Syst;ms R actor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
44-Date: ch, Preservice Inspection 5532-PERRY Rev:.
1 Page: 125 of 145 KEEE D YES NUMBE P
CA GmY ME JD REM /MS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-65 1-RPV B6.30 80A0185 N/A MT I-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-66 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-67 1-RPV-B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-68 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-69 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-70 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-71 1-RPVs B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-72 1-RPV B6.30 80A0185 N/A MT NES 239 6/82 i


O System: Rcactor Pressura Vessel
O
                                                    - MM PROGRAM PLAN AND SCHEDULE                               By:   44 Date: t/# .
- MM C)
C)        ~
System: Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
Document No. 80A4421                                                                               App: 44- Date: r/Sy .
44 Date: t/#.
Preservice Inspection                               5532-PERRY                                     Rev:     l~   Page: 126 of 145 CALIBRATION               CODE COMPONENT                   COMPONENT             PROCEDURE       BLOCK         CODE     EXAM   ZONE IDENTIFICATION               DESCFDPTION             NUMBER     (if applicable) CATEGORY. nETHOO     NO. fEMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-                 Closure Nut                         80A0185     N/A                 B-G-1   MT     I 39-5-1                                                                                     B6.10 l-B13-                 Closure Nut                         80A0185     N/A                 B-G-1 MT       I 39-5-2                                                                                     B6.10 1-B13-                 Closure Nut                         80A0185     N/A                 B-G-1 MT       I 39-5-3                                                                                     B6.10 1-B13-                 Closure Nut                         80A0185     W/A                 B-G-1 MT       I 39-5-4                                                                                     B6.10 1-B13-                 Closure Nut                         80A0185     N/A                 B-G-1 MT       I l
~
39-5-5                                                                                     B6.10 1-B13-                 Closure Nut                         80A0185     N/A                 B-G-1 MT       I 39-5-6                                                                                     B6.10 1-B13-                 Closure Nut                         80A0185     N/A                 B-G-1   MT     I 39-5-7                                                                                     B6.10 4
Document No. 80A4421 App: 44-Date:
1-B13-                 Closure Nut                         80A0185     N/A                 B-G-1 MT       I 39-5-8                                                                                     B6.10 1
r/Sy.
NES 239 6/82                                                                                               ;
Preservice Inspection 5532-PERRY Rev:
l~
Page: 126 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCFDPTION NUMBER (if applicable)
CATEGORY.
nETHOO NO.
fEMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-1 B6.10 l-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-2 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-3 B6.10 1-B13-Closure Nut 80A0185 W/A B-G-1 MT I
39-5-4 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
l 39-5-5 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-6 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-7 B6.10 4
1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-8 B6.10 1
NES 239 6/82


Syst;mi Reactor Pressure Vessel           PROGRAM PLAN AND SCHEDULE                                                               B' Y    #''# D**** E N Document No. 80A4421                                                                                                               App: 4f Date: car =/
B' D**** E N Y
Preservice Inspection                             5532-PERRY                                                                     Rev:     1 Page: 127 of 145 CAU8 RATION                                                   CODE TON                   DE                   NUMBE   Of am hw   CA GORY                                             HOD   NO     REMARKS IDE CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-                 Closure Nut                       80A0185 N/A             B-G-1                                           MT     I 39-5-9                                                                           B6.10 1-B13-                 Closure Nut                       80A0185 N/A             B-G-1 MT                                                 I 39-5-10                                                                           B6.10 1-B13-                 Closure Nut                       80A0185 N/A             B-G-1 MT                                                 I 39-5-11                                                                           B6.10 1-B13-                 Closure Nut                       80A0185 N/A             B-G-1                                           MT     I 39-5-12                                                                           B6.10 1-B13-                 Closure Nut                       80A0185 N/A             B-G-1                                           MT     I 39-5-13                                                                           B6.10 1-B13-                 Closure Nut                       80A0185 N/A             B-G-1 MT                                                 I
Syst;mi Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: 4f Date: car =/
; 39-5-14                                                                           B6.10 1-B13-                 Closure Nut                       80A0185 N/A             B-G-1                                           MT     I 39-5-15                                                                           B6.10 1-B13-                 Closure Nut                       80A0185 N/A             B-G-1                                           MT     I 39-5-16                                                                           B6.10 NES 239 6'82                                                                                                                             i
Preservice Inspection 5532-PERRY Rev:
1 Page: 127 of 145 CAU8 RATION CODE IDE TON DE NUMBE Of am hw CA GORY HOD NO REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-9 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-10 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-11 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-12 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-13 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-14 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-15 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-16 B6.10 NES 239 6'82 i


O Sy;; tem: Reactor Pressuro Vessel MM PROGRAM PLAN AND SCHEDULE                     By       !s <
O MM O
O Date: 6/v/
Sy;; tem: Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE By
Document No. 80A4421                                                                     APP: 4+                                                   Date: 64 Preservice Inspection                               5532-PERRY                           Rev:                     1                               Page: 128 of 145 CAUBRATION         CODE DE                   NUMBER   Of         CA GORY   HOD                   NO                                 REMARKS IDE CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-                 Closure Nut                       80A0185   N/A           B-G-1 MT           I 39-5-17                                                                           B6.10 1-B13-                 Closure Nut                       80A0185   N/A           B-G-1 MT           I 39-5-18                                                                           B6.10 1-B13-                 Closure Nut                       80A0185   N/A           B-G-1 MT           I 39-5-19                                                                           B6.10 1-B13-                 Closure Nut                       80A0185   N/A           B-G-1 MT           I 39-5-20                                                                           B6.10 1-B13-                 Closure Nut                       80A0185   N/A           B-G-1 MT           I 39-5-21                                                                           B6.10 1-B13-                 Closure Nut                       80A0185   N/A           B-G-1 MT           I 39-5-22                                                                           B6.10 1-B13-                 Closure Nut                       80A0185   N/A           B-G-1 MT           I 39-5-23                                                                           B6.10 1-B13-                 Closure Nut                       80A0185   N/A           B-G-1 MT           I 39-5-24                                                                           B6.10 NES 239 6B2                                                                                                       i
!s <
Date: 6/v/
Document No. 80A4421 APP:
4+
Date: 64 Preservice Inspection 5532-PERRY Rev:
1 Page: 128 of 145 CAUBRATION CODE IDE DE NUMBER Of CA GORY HOD NO REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-17 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-18 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-19 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-20 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-21 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-22 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-23 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-24 B6.10 NES 239 6B2 i


o                                           NEE                                               By:    6    Date:
o NEE o
o C //
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
System: Reactor Pressura Vessel           PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                               App.   ,M     bates (/y4 Preservice Inspection                               5532-PERRY                                     Rev:     1   Page: 129 of 145 -
6 Date: C //
CALIBRATION               CODE COMPONENT                   COMPONENT             PROCEDURE         BLOCK         CODE     EXAM   ZONE sDENTIFICATION               DESCRIPTION           NUMBER       (11 appicablel CATEGORY, hETVJO   NO. REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-                 Closure Nut                       80A0185       N/A               B-G-1 MT       I 39-5-25                                                                                   B6.10 1-B13-                 Closure Nut                       80A0185       N/A               B-G-1 MT       I 39-5-26                                                                                   B6.10 1-B13-                 Closure Nut                       80A0185       N/A               B-G-1 MT       I 39-5-27                                                                                   B6.10 1-B13-                 Closure Nut                       80A0185       N/A               B-G-1 MT       I 39-5-28                                                                                     B6.10 1-B13-                 Closure Nut                       80A0185       N/A                 B-G-1 MT       I 39-5-29                                                                                     B6.10 1-B13-                 Closure Nut                       80A0185       N/A                 B-G-1 MT       I 39-5-30                                                                                     B6.10 1-B13-                 Closure Nut                       80A0185       N/A                 B-G-1   MT     I 39-5-31                                                                                     B6.10 1-B13-                 Closure Nut                       80A0185       N/A                 B-G-1 MT       I 39-5-32                                                                                     B6.10 NES 239 6/82                                                                                               ;
Document No. 80A4421 App.
,M bates (/y4 Preservice Inspection 5532-PERRY Rev:
1 Page: 129 of 145 -
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE sDENTIFICATION DESCRIPTION NUMBER (11 appicablel
: CATEGORY, hETVJO NO.
REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-25 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-26 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-27 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-28 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-29 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-30 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-31 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-32 B6.10 NES 239 6/82


o System: Reactor Pressure Vessel HEE                                            By:   g Date:6N O
o HEE O
PROGRAM PLAN AND SCHEDULE                              App: A Dater       r/w Document No. 80A4421 Preservice Inspection                             5532-PERRY                                     Rev:     1 Page: 130 of 145 1
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: g Date:6N Document No. 80A4421 App: A Dater r/w Preservice Inspection 5532-PERRY Rev:
CAU8 RATION               CODE COMPONENT                   COMPONENT             PROCEDURE       BLOCK       CODE     EXAM   ZONE OENTWICATnON                 DESCRIPTON             NUMBER     (if appleab!el CATEGORY   LETHCO   No. REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT       I 39-5-33                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT       I 39-5-34                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1     MT   I 39-5-35                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G .1   MT   I 39-5-36                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT       I 39-5-37                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT       I 39-5-38                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1     MT   I 39-5-39                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1     MT   I 39-5-40                                                                                 B6.10 NES 239 6/82                                                                                           ;
1 Page: 130 of 145 1
CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTWICATnON DESCRIPTON NUMBER (if appleab!el CATEGORY LETHCO No.
REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-33 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-34 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-35 B6.10 1-B13-Closure Nut 80A0185 N/A B-G.1 MT I
39-5-36 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-37 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-38 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-39 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-40 B6.10 NES 239 6/82


                                                                                                                                                            %,,/
%,,/
Syst;m: Reactor Pressura Vessel                                                                                                   B:
/'+t Date: (_/.f__/_
Document No. 80A4421                     PROGRAM PLAN AND SCHEDULE                                                                  Y App: /'+t
Syst;m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE B:
                                                                                                                                            /       Date:
Y Document No. 80A4421 App:
Date: WM   (_/.f__/_
/
Preservice Inspection                                   5532-PERRY                                                               Rev:       1     Page: 131 of 145 CADORATION               CODE COMPONENT                   COMPONENT                   PROCEDURE                                       BLOCK   CODE   EXAM   ZONE ENTFICATION                 DESCRIPTION                   NUMBER                                 (if apphcable) CATEGORY hETHOO   No.       REMARKS l
Date: WM Preservice Inspection 5532-PERRY Rev:
CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-               Closure Nut                             80A0185                       N/A                         B-G-1   MT     I 39-541                                                                                                                     B6.10 1-B13-               Closure Nut                             80A0185                       N/A                         B-G-1   MT     I 39-542                                                                                                                     B6.10 1-B13-               Closure Nut                             80A0185                       N/A                         B-G-1   MT     I 39-5-43                                                                                                                   B6.10
1 Page: 131 of 145 CADORATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE ENTFICATION DESCRIPTION NUMBER (if apphcable)
; l-B13-                 Closure Nut                             80A0185                     N/A                           3-G-1 MT -     I 39-544                                                                                                                     B6.10 1-B13-                 Closure Nut                             80A0185                       N/A                         B-G-1 MT       I 39-5-45                                                                                                                   B6.10 1-B13-                 Closure Nut                             80A0185                     N/A                           B-G-1 MT       I 39-546                                                                                                                     B6.10 1-B13-                 Closure Nut                             80A0185                     N/A                           B-G-1 MT       I 39-5-47                                                                                                                   B6.10 1-B13-                 Closure Nut                             80A0185                     N/A                           B-G-1 MT       I 39-5-48 B6.10 NES 239 6/82                                                                                                                             ;
CATEGORY hETHOO No.
_____i
REMARKS l
CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-541 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-542 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-43 B6.10 l-B13-Closure Nut 80A0185 N/A 3-G-1 MT -
I 39-544 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-45 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-546 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-47 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-48 B6.10 NES 239 6/82 i


e 0
e 0
Systems Reactor Pressuro Vessel 11EN PROGRAM PLAN AND SCHEDULE                            B2 Y
11EN e
App: H Date: cast e
B2 D***:###
D***:###
Systems Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE Y
Do ument No. 80A4421 Preservice Inspection                             5532-PERRY                                 Rev:     1 Page: 132 of 145 CAUBRATON               CODE COMPONENT                   COMPONENT             PROCEDURE     BLOCK       CODE   EXAM   ZONE IDENTIFICATON                 DESCRIPTION           NUMBER     Of apphcabiel CATEGORY METHOO   No. REMARKS ,
Do ument No. 80A4421 App: H Date: cast Preservice Inspection 5532-PERRY Rev:
CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT     I 39-5-49                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1   MT   I 39-5-50                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1   MT   I 39-5-51                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1   MT   I 39-5-52                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT     I 39-5-53                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT     I 39-5-54                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1   MT   I 39-5-55                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT     I 39-5-56                                                                               B6.10 NES 239 6/82                                                                                         ;
1 Page: 132 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATON DESCRIPTION NUMBER Of apphcabiel CATEGORY METHOO No.
REMARKS,
CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-49 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-50 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-51 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-52 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-53 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-54 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-55 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-56 B6.10 NES 239 6/82


O System: Reactor Pressure Vessel MM PROGRAM PLAN AND SCHEDULE                           By:     At Date: 4///
O MM
                                                                                                                    <D Document No. 80A4421                                                                           . App: A Date:         c/sq Preservice Inspection                             5532-PERRY                                 Rev:       1   Page: 133 o'f 145 CAueRATm                 CODE COMPONENT                   COMPONENT             PROCEDURE       BLOCK       COCE   EXAM     ZONE IDENTWICATION               DESCR1PTION           NUMBER     Of apphcabiel CATEGORY h4ETHCO   No. REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT       I 39-5-57                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1   MT     I 39-5-58                                                                               B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1   MT     I 39-5-59                                                                                 B6.10 1-B13-               Closure Nut                       30A0185     N/A               B-G-1 MT       I 39-5-60                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT       I 39-5-61                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1 MT       I 39-5-62                                                                                 B6.10 1-B13-               Closure Nut                       80A0185     N/A               B-G-1   MT     I 39-5-63                                                                                 B6.10 1-B13-                 Closure Nut                       80A0185     N/A               B-G-1 MT       I 39-5-64                                                                                 B6.10 NES 239 6/82                                                                                           .
<D PROGRAM PLAN AND SCHEDULE By:
At Date: 4///
System: Reactor Pressure Vessel Document No. 80A4421
. App: A Date:
c/sq Preservice Inspection 5532-PERRY Rev:
1 Page: 133 o'f 145 CAueRATm CODE COMPONENT COMPONENT PROCEDURE BLOCK COCE EXAM ZONE IDENTWICATION DESCR1PTION NUMBER Of apphcabiel CATEGORY h4ETHCO No.
REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-57 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-58 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-59 B6.10 1-B13-Closure Nut 30A0185 N/A B-G-1 MT I
39-5-60 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-61 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-62 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-63 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-64 B6.10 NES 239 6/82 J


y                                                     _.          . - _
y o
o                                            MEN                                                                   0 System: Reactor Pressura Vessel             PROGRAM PLAN AND SCHEDULE                               By:   ezrr Date: . /f/
MEN 0
Document No. 80A4421                                                                               APP: g Date:                           a-Preservice Inspection                               5532-PERRY                                     Rev:     1   Page: 134 of 145 cAuBRATON                 coOE COMPONENT                 COMPONENT             PROCEDURE         BLOCK       COOE     EXAM   ZONE OENTIFICATON               DESCRIPTON             NUMBER     (If apphcatded C .TEGORY. METHOO   NO     NW CLOSURE HEAD NUT Ret Dwg. No: 1-RV-015 1-BI3-                 Closure Nut                       80A0185     N/A               B-G-1     MT     I 39-5-65                                                                                   B6.10 1-B13-                 Closure Nut                       80A0185     N/A               B-G-1 MT         I 39-5-66                                                                                   B6.10 1-B13-                 Closure Nut                       80A0185     N/A               B-G-1 MT         I 39-5-67                                                                                   B6.10 1-B13-                   Closure Nut                       80A0185     N/A               B-G-1 MT         I 39-5-68                                                                                   B6.10 1-B13-                   Closure Nut                       80A0185     N/A               B-G-1 MT         I 39-5-69                                                                                   B6.10 1-B13-                   Closure Nut                       80A0185     N/A               B-G-1 MT         I 39-5-70                                                                                   B6.10 1-B13-                   Closure Nut                       80A0185     N/A               B-G-1 MT         I 39-5-71                                                                                   B6.10 1-B13-                   Closure Nut                       80A0185     N/A               B-G-1     MT     I 39-5-72                                                                                   B6.10 NES 239 6/82                                                                                               ;
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
ezrr Date:. /f/
Document No. 80A4421 APP: g Date:
a-Preservice Inspection 5532-PERRY Rev:
1 Page: 134 of 145 cAuBRATON coOE COMPONENT COMPONENT PROCEDURE BLOCK COOE EXAM ZONE OENTIFICATON DESCRIPTON NUMBER (If apphcatded C.TEGORY.
METHOO NO NW CLOSURE HEAD NUT Ret Dwg. No: 1-RV-015 1-BI3-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-65 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-66 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-67 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-68 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-69 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-70 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-71 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-72 B6.10 NES 239 6/82


(']                                                                                                       <
(']
                                                                                                                    )
)
System: Reactor Pressura Vessel           PROGRAM PLAN AND SCHEDULE                       B8Y    d_*g Date def Document No. 80A4421                                                                     App:   4+     Date: Q4 Preservice Inspection                             5532-PERRY                             Rev:     1   Page: 135 of 145 CAUBRATON           CODE N;ir                       COMPOhENT             PROCEDURE     BLOCK     CODE   EXAM   ZONE DESCRPTION             NUMBER     (ifWeam   CATEGORY METHOO   NO. REMARKS OENTWOATON CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 1-B13-               Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-1                                                                             B6.50 1-B13-               Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-2                                                                             B6.50 1-B13-               Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-3                                                                             B6.50 1-B13-               Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-4                                                                             B6.50 1-B13-               Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-5                                                                             B6.50 1-B13-               Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-6                                                                             B6.50 1-B13-               Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-7                                                                             B6.50 1-B13-                Closure Washer            -
d_*g Date def B8 System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
80A0184     N/A           B-G-1 VT-1 I 39-6-8                                                                             B6.50 NES 239 682                                                                                     ;
Document No. 80A4421 App:
4+
Date: Q4 Preservice Inspection 5532-PERRY Rev:
1 Page: 135 of 145 CAUBRATON CODE N;ir COMPOhENT PROCEDURE BLOCK CODE EXAM ZONE OENTWOATON DESCRPTION NUMBER (ifWeam CATEGORY METHOO NO.
REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-1 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-2 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-3 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-4 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-5 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-6 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-7 B6.50 80A0184 N/A B-G-1 VT-1 I 1-B13-Closure Washer 39-6-8 B6.50 NES 239 682


T O
T O
System: Reactor Pressure Vessel MM PROGRAM PLAN AND SCHEDULE                             By:             4               Date: 4            D[N Document No. 80A4421                                                                             App:                             Date: (/r4 Preservice Inspection                             5532-PERRY                                   Rev:               1             Page: 136 of 145 CAU8 RATION               CODE COMPONENT                   COMPONENT             PROCEDURE       BLOCK         CODE   EXAM             ZOPE OENTIF. CATION               DESCRIPTION           NUMBER     (If apphcablet t'ATEGORY METHOD             No.                         REM / RKs CLOSURE HEAD WASHERS                       '
MM D[N 4
Ref. Dwg. No: 1-RV-Ol6 1-B13-               Closure Washer                     80A0184     N/A                 B-G-1 VT-1 I 39-6-9                                                                                     B6.50 1-B13-               Closure Washer                     80A0184     N/A                 B-G-1 VT-1 I 39-6-10                                                                                   B6.50 1-B13-                 Closure Washer                     80A0184     N/A                 B-G-1 VT-1 I 39-6-11                                                                                   B6.50 1-B13-                 Closure Washer                     80A0184     N/A                 B-G-1 VT-1 I 39-6-12                                                                                   B6.50 1-B13-                 Closure Washer                     80A0184     N/A                 B-G-1 VT-1 I 39-6-13                                                                                   B6.50 1-B13-                 Closure Washer                     80A0184     N/A                 B-G-1 VT-1 I 39-6-14                                                                                   B6.50 1-B13-                 Closure Washer                     80A0184     N/A                 B-G-1 VT-1 I 39-6-15                                                                                   B6.50 1-813-                 Closure Washer                     80A0184     N/A                 B-G-1 VT-1 I 39-6-16                                                                                   B6.50
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
'l NES 239 6/82                                                                                                       ;
4 Date:
Document No. 80A4421 App:
Date: (/r4 Preservice Inspection 5532-PERRY Rev:
1 Page: 136 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOPE OENTIF. CATION DESCRIPTION NUMBER (If apphcablet t'ATEGORY METHOD No.
REM / RKs CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-9 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-10 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-11 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-12 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-13 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-14 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-15 B6.50 1-813-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-16 B6.50
'l NES 239 6/82


o System: Reactor Pressura Vessel 11EE PROGRAM PLAN AND SCHEDULE                     By:   M Date:th e
o 11EE e
Document No. 80A4421                                                                   App:' g Date: OM Preservice Inspection                             5532-PERRY                           Rev:   1 Page: 137 of 145 cAuenanos           com axEE                         MYS                   NUMBE   M=         CA GORY MENOO NO     RE W CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 s
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
1-B13-               Closure Washer                   80A0184 N/A             B-G-1 VT-1 I 39-6-17                                                                           B6.50 1-B13-               Closure Washer                   80A0184 N/A             B-G-1 VT-1 I 39-6-18                                                                           B6.50 1-B13-                 Closure Washer                   80A0184 N/A             B-G-1 VT-1 I 39-6-19                                                                           B6.50 1-B13-                 Closure Washer                   80A0184 N/A             B-G-1 VT-1 I 39-6-20                                                                           B6.50 1-B13-                 Closure Washer                   80A0184 N/A             B-G-1 VT-1 I 39-6-21                                                                           B6.50 1-B13-                 Closure Washer                   80A0184 N/A             B-G-1 VT-1 I 39-6-22                                                                           B6.50 1-B13-                 Closure Washer                   80A0184 N/A             B-G-1 VT-1 I 39-6-23                                                                           B6.50 1-B13-                 Closure Washer                   80A0184 N/A             B-G-1 VT-1 I 39-6-24                                                                           B6.50 NES 239 632                                                                               i
M Date:th Document No. 80A4421 App:' g Date:
OM Preservice Inspection 5532-PERRY Rev:
1 Page: 137 of 145 cAuenanos com axEE MYS NUMBE M=
CA GORY MENOO NO RE W CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 s
1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-17 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-18 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-19 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-20 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-21 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-22 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-23 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-24 B6.50 NES 239 632 i


(O                                                                                                                         (b System: Reactor Pressure Vessel                                                        PROGRAM PLAN AND SCHEDULE                          By:
( b (O
                                                                                                                                            - App:
4 g'e'' Date:
4N/
4N/
Document No. 80A4421                                                                                                                                     Dates _ _W4 Preservice Inspection                                                                           5532-PERRY                                 Rev       1     Page: 138 of 145         .
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
                                                                                                                                                                                  .I' s                                                                                            CacmaroN               COc4 COMPCNENT                   COMPOPENT _           PROCEDURE     t.LCCK     CODE     EXAM   ZONE DESCRaPTOs             NUMBER     #fmar*c= W CATEGORY   nETHOO     NC1     REMARKS CENTIFsCATtON CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016
g'e' Date:
                                                              ~
4
1-B13-                                                           Closure Washer                     30A0184     N/A           B-G-1 VT-1 I                                     '
' Dates _ _W4 Document No. 80A4421
39-6-25                                                                                                                     ,
- App:
B6.50                       f   ._
Preservice Inspection 5532-PERRY Rev 1
I-813-                                                             Closure Washer                     30A0184     N[A           B-G-1 VT-1 I d'
Page: 138 of 145
39-6-26                                                                                                                           B6.50                 ._
.I' CacmaroN COc4 s
                                                                                                                                                                          .              c
COMPCNENT COMPOPENT _
                                                                                                                                  'B-GI l VT-1 I
PROCEDURE t.LCCK CODE EXAM ZONE CENTIFsCATtON DESCRaPTOs NUMBER
                                                                                                                                                                                          ~
#fmar*c= W CATEGORY nETHOO NC1 REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016
1-B13-                                                             C!csure Washer                     80A0184     N/A 39-6-27                                                                                                                           B6.50 1-313-                                                             Closure Washer                     30A0184     N/A           B-G-1 VT-1 l' '
~
39-6-28                                                                                                                           B6.50
1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-25 B6.50 f
                                                                                                                                          ~
I-813-Closure Washer 30A0184 N[A B-G-1 VT-1 I d
1-B13-                                                             Closure Washer                     80A0184     N/A           B-G-1     VT-1 I 39-6-29                                                                                                                             B6.50 1-B13-                                                             Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-30                                                                                                                             B6.50 1-B13-                                                             Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-31                                                                                                                             B6.50 1-B13-                                                               Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39632                                                                                                                               B6.50 NES 239 6/82                                                                                                                 ,
39-6-26 B6.50 c
I 1-B13-C!csure Washer 80A0184 N/A
'B-G l VT-1 I
~
39-6-27 B6.50 1-313-Closure Washer 30A0184 N/A B-G-1 VT-1 l' '
39-6-28 B6.50
~
1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-29 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-30 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-31 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39632 B6.50 NES 239 6/82


eD                                         1135                                       Sy:
eD 1135 o
o ng Date: 4 /N '
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Sy:
System: Reactor Pressure Vessel            PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                         App: & Date: @$r/.
ng Date: 4 /N '
Preservice Inspection                               5532-PERRY                               Rev:   1   Page: 139 of 145 CAttBRATON           CODE COMPONENT                 COMPONENT             PROCEDURE     BLOCK     CODE   EXAM ZOME NUMBER     Ofarw*e m CATEGORY nETHOO   NO. REMARKS ICENTIFICATON                DEsCRPTON CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016                         ,
Document No. 80A4421 App: & Date: @$r/.
1-B13-                 Closure Washer                     30A0184     N/A           B-G-1 VT-1 I 39-6-33                                                                             B6.50 1-B13-                 Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-34                                                                             B6.50 1-B13-                 Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-35                                                                             B6.50 1-B13-                 Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-36                                                                             B6.50 1-B13-                 Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-37                                                                             B6.50 1-B13-                 Closure Washer                     80A0184     N/A           B-G-1 VT-1 I 39-6-38                                                                             B6.50 1-B13-                 Closure Washer                     30A0184     N/A           B-G-1 VT-1 I 39-6-39                                                                             B6.50 1-B13-                 Closure Washer                     30A0184     N/A           B-G-1 VT-1 I l
Preservice Inspection 5532-PERRY Rev:
39-6-40                                                                             B6.50 NES 239 6B2                                                                                       .
1 Page: 139 of 145 CAttBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOME ICENTIFICATON DEsCRPTON NUMBER Ofarw*e m CATEGORY nETHOO NO.
REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-33 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-34 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-35 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-36 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-37 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-38 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-39 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I l
39-6-40 B6.50 NES 239 6B2


o 113g                                           .
o 113g q.
q.
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
System: Reactor Pressure Vessel           PROGRAM PLAN AND SCHEDULE                     By:     M Date: Off App: 4 _ Date: ON Document No. 80A4421 Preservice Inspection                             5532-PERRY                           _ Rev:   1 - Page 140 of 145 cAuBRmON           COOr 30E IF TON                     DE                   NUMBE . (11 a     CA GORY ME       No       REMARKS CLOSURE HEAD WASHERS                 -
M Date: Off Document No. 80A4421 App: 4 _ Date: ON Preservice Inspection 5532-PERRY
Ref. Dwg. No: 1-RV-016 1-B13-               Closure Washer                     80A01114 N/A           B-G-1 VT-1 . I 39-6-41                                                                         B6.50 1-B13-               Closure Washer                     80A0184   N/A           B-G-1 VT-1 I 39-6-42                                                                         B6.50 1-B13-               Closure Washer                     80A0184   N/A           B-G-1 VT-1 I             -
_ Rev:
39-6-43                                                                         B6.50 1-B13-               Closure Washer                     80A0184   N/A           B-G-1 VT-1 I 39-6-44                                                                         B6.50 1-B13-               Closure Washer                     80A0184   N/A           B-G-1 VT-1 I 39-6-45                                                                         B6.50 1-B13-               Closure Wr. sher                 ~80A0184   N/A           B-G-1 VT-1 I 39-6-46                                                                         B6.50 1-B13-               Closure Washer 80A0184   N/A           B-G-1 VT-1 I 39-6-47                                                                         B6.50 1-B13-               Closure Washer                     80A0184   N/A           B-G-1 VT-1 I 39-6-48                                                                         B6.50 NES 239 6/82                                                                                 ;
1 - Page 140 of 145 cAuBRmON COOr 30E IF TON DE NUMBE
. (11 a CA GORY ME No REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A01114 N/A B-G-1 VT-1. I 39-6-41 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-42 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-43 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-44 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-45 B6.50 1-B13-Closure Wr. sher
~80A0184 N/A B-G-1 VT-1 I 39-6-46 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-47 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-48 B6.50 NES 239 6/82


o                                         1185                                   By:
o 1185 o
o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
                                                                                              /?i( Dat:24 4 (
/?i( Dat:24 4 (
System: Reactor Pressure Vessel          PROGRAM PLAN AND SCHEDULE Document No. 80A4421                                                                 App: g Date: cArg Preservice Inspection                             5532-PERRY                         Rev:     1   Page: 141 of 145 CAUDRATKW         CODE DE                     440E   Uf       CA GORY   D100   No     ' IEMARKS IDE    T ON CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-               Closure Washer                   80A0184 N/A           B-G-1 VT-1 I 39-6-49                                                                       B6.50 1-B13-               Closure Washer                   80A0184 N/A           B-G-1 VT-1 I 39-6-50                                                                       B6.50 1-B13-               Closure Washer                   30A0184 N/A           B-G-1 VT-1 I 39-6-51                                                                       B6.50 1-B13-               Closure Washer                   80A0184 N/A           B-G-1 VT-1 1 39-6-52                                                                       B6.50 1-B13-               Closure Washer           .      80A0184 N/A           B-G-1 VT-1 I 39-6-53                                                                       B6.50 l-B13-               Closure Washer                   80A0184 N/A           B-G-1 VT-1 I 39-6-54                                                                       B6.50 1-B13-               Closure Washer                   80A0184 N/A           B-G-1 VT-1 I 39-6-55                                                                       B6.50 1-B13-               Closure Washer                   80A0184 N/A           B-G-1 VT-1 I 39-6-56                                                                       B6.50 NES 239 6/82                                                                               ;
Document No. 80A4421 App: g Date: cArg Preservice Inspection 5532-PERRY Rev:
1 Page: 141 of 145 CAUDRATKW CODE IDE T ON DE 440E Uf CA GORY D100 No
' IEMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-49 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-50 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-51 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 1 39-6-52 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-53 B6.50 l-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-54 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-55 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-56 B6.50 NES 239 6/82


O Syst;m2 R: actor Pressura Vessel MM PROGRAM PLAN AND SCHEDULE                                                             By: /sN Date: M-C App: 44 Date: Vfte. -
O MM C
Document No. 80A4421                                                                                                                                  ~
Syst;m2 R: actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
Preservice Inspection                               5532-PERRY                                                                   Rev:   1   Page: 142 of 145 CAUBRATIOF                 CODE COMPONENT                   COMPONENT                                             PROCEDURE         BLOCK       CODE     EXAM ZONE IDENTIFICATION               DESCRIPTION                                           NUMBER     (if apphcablel CATEGORY. METHOO No     E MARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-                 Closure Washer             ,
/sN Date: M-Document No. 80A4421 App: 44 Date: Vfte. -
80A0184     N/A                 B-G-1 VT-1 I 39-6-57                                                                                                                   B6.50 1-B13-                 Closure Washer                                                     80A0184     N/A                 B-G-1 VT-1 1 39-6-58                                                                                                                   B6.50 1-B13-                 Closure Washer                                                     80A0184     N/A                 B-G-1 VT-1 I 39-6-59                                                                                                                   96.50 1-B13-                 Closure Washer                                                     80A0184     N/A                 B-G-1 VT-1 I 39-6-60                                                                                                                   B6.50 1-B13-                 Closure Washer                                                     80A0184     N/A                 B-G-1 VT-1 I 39-6-61                                                                                                                   B6.50 1-B13-                 Closure Washer                                                     80A0184     N/A                 B-G-1 VT-1 I 39-6-62                                                                                                                   B6.50 1-B13-                 Closure Washer                                                     80A0184     N/A                 B-G-1. VT-1 I 39-6-63                                                                                                                   B6.50 1-B13-                 Closure Washer                                                     80A0184     N/A                 B-G-1 VT-1 I 39-6                                                                                                                           B6.50 NES 239 6/82 i
~
Preservice Inspection 5532-PERRY Rev:
1 Page: 142 of 145 CAUBRATIOF CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY.
METHOO No E MARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-57 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 1 39-6-58 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-59 96.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-60 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-61 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-62 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1. VT-1 I 39-6-63 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6 B6.50 NES 239 6/82 i


System: Reactor Pressure Vessel                             PROGRAM PLAN AND SCHEDULE                           By:     ri   Date: / r Document No. 80A4421                                                                                             App:         Date Preservice Inspection                                               5532-PERRY                                 Rev:     1   Page: 143 of 145 l
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
CAueRAnON               COoE COMPONENT                                 COMPONENT             PROCEDURE       BLOCK       CODE   EXAM   ZONE DESCRIPTION             NUMBER     Uf apphcablel CATEGORY METHOO   No.     REMARKS IDENTFICADON
ri Date: / r Document No. 80A4421 App:
                                                                    ,is CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-                               Closure Washer                       80A0184     N/A               B-G-1 VT-1 I 39-6-65                                                                                                 B6.50
Date Preservice Inspection 5532-PERRY Rev:
1 Page: 143 of 145 l
CAueRAnON COoE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTFICADON DESCRIPTION NUMBER Uf apphcablel CATEGORY METHOO No.
REMARKS
,is CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-65 B6.50
=
=
1-B13-                             Closure Washer                         80A0184     N/A               B-G-1 VT-1 I 39-6-66                                                                                                 B6.50 1-B13-                             Closure Washer                         80A0184     N/A               B-G-1 VT-1 I 39-6-67                                                                                                 B6.50 1-B13-                             Closure Washer                         80A0184     N/A               B-G-1 VT-1 I 39-6-68                                                                                                 B6.50 1-B13-                             Closure Washer                         80A0184     N/A               B-G-1 VT-1 I 39-6-69                                                                                                 B6.50 '
1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-66 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-67 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-68 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-69 B6.50 '
1-B13-                             Closure Washer                         80A0184     N/A               B-G-1 VT-1 I 39-6-70                                                                                                 B6.50 1-B13-                             Closure Washer                         80A018%     N/A               B-G-1 VT-1 I 39-6-71                                                                                                 B6.50 1-B13-                             Closure Washer                         80A0184     N/A               B-G-1 VT-1 I 39-6-72                                                                                                 B6.50
1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-70 B6.50 1-B13-Closure Washer 80A018%
        ,            NES 239 6/82                                                                                                           ;
N/A B-G-1 VT-1 I 39-6-71 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-72 B6.50 NES 239 6/82


o                                             HEN                                           By:    /V Date:([84 o          =
o HEN o
S stem: Reactor Pressure Vessel             PROGRAM PLAN AND SCHEDULE d>cument No. 80A4421                                                                             App: $ Dater y Preservice Inspection                               5532-PERRY                                   Rev:     1   Page: 144 of 145 CAU8 RATION             CODE COMPONENT                     COMPONENT             PROCEDURE       BLOCK       CODE   EXAM   ZONE DESCRIPTION           Nut /3ER   (If apphcat*$ CATEGORY h4ETHOO   NCE     REMARKS IDENTIFICATION SYSTEM LEAKAGE TEST Ref. Dwg, No: 1-RV-001 1-B13-                 Reactor Vessel Pressure             80A0184     N/N               B-P     VT-2 I Leakage               Retalning Boundary                                               B15.10 2
=
/V Date:([84 S stem: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
d>cument No. 80A4421 App: $ Dater y Preservice Inspection 5532-PERRY Rev:
1 Page: 144 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION Nut /3ER (If apphcat*$
CATEGORY h4ETHOO NCE REMARKS SYSTEM LEAKAGE TEST Ref. Dwg, No: 1-RV-001 1-B13-Reactor Vessel Pressure 80A0184 N/N B-P VT-2 I Leakage Retalning Boundary B15.10 2
[
[
NES 233 6/82                                                                                           ;
NES 233 6/82


o                                                                 11p.5                                                                                                                             o By: - 41 ( Date: 8/II System: Reactor Pressure Vessel                                  PROGRAM PLAN AND CCHEDULE Document No. 80A4421                                                                                                                                                                     App: V Date:       eV/#
o 11p.5 o
Preservice Inspection                                                     5532-PERRY                                                                                                   Rev:   1   Page: 143 of 145 9
System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By: - 41 ( Date: 8/II Document No. 80A4421 App: V Date:
CAUBRATION                                                   CODE COMPONENT                                               PROCEDURE       BLX,K                                 CODE               EXAM ZONE COMPONENT                                                                                                                                                                                    REMARKS DESCRIPTION                                               NUMBER     (if apphcabiel                     CATEGORY                 METHOD NO.
eV/#
IDENTIFICATION l
Preservice Inspection 5532-PERRY Rev:
1 Page: 143 of 145 9
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLX,K CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcabiel CATEGORY METHOD NO.
REMARKS l
l I
l I
REACTOR VESSEL INTERIOR Ref. Dwg. No: 1-RV-001 1-B13-                     Retete- Vessel Interior                                                     80A0184         N/A                                         B-N-2 VT-1 I                                 '
REACTOR VESSEL INTERIOR Ref. Dwg. No: 1-RV-001 1-B13-Retete-Vessel Interior 80A0184 N/A B-N-2 VT-1 I Attachment Attachinants B13.20 l-B13-Reactor Vessel Core Support 80A0184 N/A B-N-2 VT-1 I Core Support Structure B13.21 1-B13-Reactor Vessel Interior 80A0184 N/A B-N-1 VT-3 I Interior B13.10 l
Attachment                 Attachinants                                                                                                                             B13.20 l-B13-                     Reactor Vessel Core Support                                               80A0184           N/A                                         B-N-2 VT-1 I Core Support             Structure                                                                                                                                 B13.21 1-B13-                     Reactor Vessel Interior                                                   80A0184           N/A                                         B-N-1 VT-3 I Interior                                                                                                                                                             B13.10 l
l l
l l
J i
J i
NES 239 6/82
NES 239 6/82
                                                                                                                                                                                                                            -}}
-}}

Latest revision as of 08:10, 13 December 2024

Rev 1 to Procedure 80A4421, Reactor Pressure Vessel Preservice Insp Program Plan for Perry Nuclear Power Plant Unit 1
ML20096B394
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/23/1984
From: Tedesco C
NUCLEAR ENERGY SERVICES, INC.
To:
Shared Package
ML20096B369 List:
References
80A4421, NUDOCS 8409040132
Download: ML20096B394 (146)


Text

7 F-

~

~ July 23, 1984 Date ISI FIELD CHANGE AUTHORIZATION RPV Preservice Inspection Program Plan for Perry Document Title Npo/r Document No. 00A44 21 Rev.

1 Field Change No.

FC #1~

Originator C. Tedesco Description of Field Change:

Page 5, Para. 3.4 - Change: "Subarticle T-540 of Article 4 of

'ASME'Section V, 1900 Edition".

To Read: "Subarticle T-434 of Article 4 of ASME Section V, 1977 Edition through Addenda Summer 1978 and Subarticle III-3400 of Appendix III of ASME Section Reason f or Change:

XI, 1977 Edition through Addenda Summer 1978.

To correct mistaken Code selection in para.

3.4. APPROVALS

Title

  • L;e j;re Date a

CEI/NDE OA

~

I/

)..:n.

7/ </W ISI Eng. Dept. Mgr.

Proj. Mgr.

g QA Manager bhC. AcW h

  • 7 7/e'py Distribute to all Controlled Copy holders ' affected Document.

l NOTE:

A' copy of this authorization shall be attached to the affected document until a subsequent revision incorporates the field change 8409040132 840028 PDR ADOCK 05000440 e

G PDR J

80A4421 1

DOCUMENT NO.

REV.

NUCLEAR ENERGY SERVICES, INC.

PAGE 1

nF 145 L]

F COMR0' LED B0PY ;bh l

REACTOR PRESSURE VESSEL PRESERVICE INSPECTION PROGRAM PLAN FOR PERRY NUCLEAR POWER PLANT UNIT 1 PREPARED FOR CLEVELAND ELECTRIC ILLUMINATING COMPANY Project Applicatio3532 Prepared By Asrar Ahmed

-yEpf)

EE:b Date g/3,/g3 APPROVALSI TITLE / DEPT.

SIG N AT U R E DATE Inspection Programs Manager ggg,p/p

(

[

pffg Project Manager

(((

pfp 3 Q.A. Manager y[

j,, g,g4

h_y_g, u-l FORM # NES 2042 80 i

80A4421 REVISION L0G ggg 2

145 PAGE OF NUCLEAR ENERGY SERVICES. INC.

~~

DATE

"#[E DESCRIPTION APPROVAL AE '

n gO 1

6/20/84 All CRA # 4394 V

Incorporate customer comments and inhouse corrections.

'O

\\, /

AU FORM # NES 206 2 80

^

DOCUMENT NO.

PAGE OF p

NUCLEAR ENERGY SERVICES. INC.

j G

TABLE OF CONTENTS PAGE 1..

INTRODUCTION 4

J 2.

BASES FOR PRESERVICE INSPECTION PROGRAM 4

3.

PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 5

3.1 Classification 5

3.2~

Exemptions 5

3.3 Exceptions 5

3.4 Ultrasonic Testing Calibration Standards 5

3.5 Examination Procedures 6

3.6 Figures and Sketches 8

4.

PROGRAM PLAN AND SCHEDULE 9

WELD MAP FIGURES 10 SCHEDULE SHEETS 26 TABLES 3.4 Reference Calibration Standards 6

3.5 Reference NDE Procedures 7

3.6 Reactor Pressure Vessel Sketches 8

O i

FORM #NES 205 2/80

80A M21 DOCUMENTfjo.

"g PAGE OF NUCLEAR ENERGY SERVICES. INC.

1. INTRODUCTION This Program Plan has been prepared to fulfill the Preservice Inspection (PSI) requirements for the Reactor Pressure Vessel (RPV) of the Perry Nuclear Power Plant (PNPP) Unit 1, owned by Cleveland Electric Illuminating Company.

The scope of these examinations, procedures, and acceptance criteria meet the requirements outlined in Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, " Rules for Inservice Inspection of Nuclear Power Plant Components",1977 Edition with Addenda up to and including the Summer 1978 Addenda.

2. BASES FOR PRESERVICE INSPECTION PROGRAM Title 10 of the Code of Federal Regulations, Part 50, Subsection 10CFR 50.55(a) establishes the edition of Section XI of the 'ASME' BPV Code applicable to Preservice Inspection of the Reactor Pressure Vessel. Based upon the construction permit, which was issued on May 3,1977, this unit is required to comply with requirements set forth in ASME Code no earlier than Summer 1972 Addenda of 1971 Edition. However, it is the intent of Cleveland Electric Illuminating Company to comply with the PSI requirements of the 1977 Edition of ASME Section XI with Addenda through Summer 1978.

Consideration will be given to the provisions of Nuclear Regulatory Commission (NRC)

Regulatory Guide 1.150," Ultrasonic Testing of Reactor Vessel welds during Preservice and Inservice Examinations", Regulatory Guide 1.65, " Inspection of Reactor Vessel Studs" and Regulatory Guide 1.58, " Qualification of Inspection Personnel".

O FORM #NES 205 2/80

80A4421 DOCUMENT NO.

PAGE OF Q

NUCLEAR ENERGY SERVCES. INC.

v

3. PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 3.1 CLASSIFICATION All the components covered in this program plan are part of the reactor coolant pressure boundary as defined in 10CFR 50 subsection 50.2(v).

3.2 EXEMPTIONS None of the wolds or components of the RPV are exempted from examination by subparagraph IWB-1220 of ASME Section XI..

3.3 EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as allowed by 10CFR 50.55 a(a)(2), provided that design fabrication, installation, testing and inspection performed in compliance with Codes and Section XI requirements would result in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative examination w ~' provide an acceptable level of quality and safety.

Detailed descriptions and justifications for exceptions taken are itemized in Table 3.3. (Later) 3.4 ULTRASONIC TESTING CALIBRATION STANDARDS The UT Examination Calibration Standard design and material selection is in accordance with subarticle T-540 of Article 4 of 'ASME'Section V,1980 Edition.

Table 3.4 lists all the UT Calibration Standards required to perform the Ultrasonic Examinations for the RPV at Perry Nuclear Power Plant.

O V

FORM s NES 205 2/80

DOCUMENT NO.

PAGE OF h_

- NUCt. EAR ENERGY SERVICES, INC.

- %.)

TABLE 3.4 Reference Calibration Standards Block Wall Title Where Used Thickness Material d

PY-123-1-RPV Bottom Head Plate 8.15" SA 533 GRB, CLI PY-124-1-RPV No.1 Shell Ring 7.0" SA 533 GR3, CLI No. 2 & No. 3 Shell Ring g

No. 4 Shell Ring PY-127-1-RPV Top Head Dollar Plate 3.08" SA 533 GRB, CLI PY-128-1-RPV Top Head Radial Plates 5.0" SA 533 GRB, CLI PY-SE-BI-l Nozzle Safe-end

.745" SA 336 CLF8 SA 508 CLII PY-SE-CS-1 Nozzle Safe-end

.756" SA 105 O

ev-SE-CS-2 Nozzie Sefe-end 1.51" SA 516 GR70 PY-SE-BI-3 Nozzle Safe-end 1.15" SB 166 INCO SA 508 CLII PY-SE-BI-4 Nozzle Safe-end 1.27" SA 182 F316L SA 508 CLIA PY-SE-BI-5 Nozzle Safe-end 1.50" SA 336 CLF8 SA 508 CL2, PY-SE-BI-6 Nozzle Safe-end Later Later PY-STUD-1-RPVClosure Stud 61/4" SA 540 B23, CL3 PY-NUT-1-RPV Closure Nut 61/4" SA 540 B23, CL3 3.5 EXAMINATION PROCEDURES Subarticle IWA-1400 of Section XI requires the development and preparation of written examination procedures neces,ary for the conduct of the nondestructive examinations associated with PSI operations. The written procedures for the performance of visual, surface, and volumetric examinations are referenced in O

Table 3.5.

%j FORM # NES 205 2/80

80A4421 DOCUMENT NO.

PAGE OF NUCLEAR ENERGY SERVICES, INC.

TABLE 3.5 REFERENCE NDE PROCEDURES Procedure No.

Title 80A0183 Procedure for Liquid Penetrant Examinations 80A0184 Procedure for Visual Examinations Procedure for Magnetic Particle Examinations 80A0185 80A0189 Ultrasonic Examination Procedure for Reactor Vessel to Flange and Flange Ligament areas 80A0190 Manual Ultrasonic Examination Procedure for Nozzle Inner Radil 80A0191 Manual Ultrasonic Examination Procedure for Reactor Vessel Nozzle to Shell Welds.

b 80A0192 Manual Ultrasonic Examination Procedure for Closure Head and Nozzle Welds 80A0195 Manual Ultrasonic Examination Procedure for Nozzle Safe-end and Transition Welds 80A0196 Ultrasonic Examination Procedure for Studs & Bolts 80A0208 Automated Ultrasonic Examination Procedure for Reactor Vessel Welds 80A0209 Automated Ultrasonic Examination Procedure for Reactor Vessel Nozzle Welds b

80A0211 Remote Ultrasonic Examination Procedure for Nozzle Safe-end and Transition Welds FORM # NES 205 2/80

80A4421 DOCUMENT NO.

PAGE OF NUCLEAR ENERGY SERVICES, INC.

(-]

3.6 FIGURES AND SKETCHES The figures listed in Table 3.6 delineates the identification and location of areas of the Reactor Pressure Vessel requiring examinations.

TABLE 3.6 REACTOR PRESSURE VESSEL SKETCHES Figure No.

Revision Description 1-RV-001 0

Reactor Vessel Internals 1-RV-002 0

Vessel Roll-Out, Vertical and Circumferential Welds 1-RV-003 1

Reactor. Recirculation Nozzle Welds g

1-RV-004 1

Feedwater Nozzle Welds g

1-RV-005 0

Core Spray & RHR Nozzle Welds l-RV-006 0

Closure Head Circumferential & Meridional Weld 1-RV-007 0

Bottom Head Welds

~

1-RV-008 0

Main Steam & Vibration Nozzle Welds 1-RV-009 0

Jet Pump & CRD Return Nozzle Welds 1-RV-010 0

CRD Partial Penetration Welds 1-RV-011 0

CRD Mechanism Housing Welds and Flange Bolting 1-RV-012 i

Bottom Head Incore Partial Penetration Welds d

1-RV-013 0

Vessel Flange Ligaments 1-RV-014 0

Closure Head Studs l

l-RV-015 0

Closure Head Nuts 1-RV-016 0

Closure Head Washers l

l O FORM # NES 205 2/80 l

^

DOCUMENT NO.

PAGE OF NUCLEAR ENERGY SERVICES, INC.

b,n

4. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.

Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, and any calibration standard number referenced for ultrasonic examination.

Examination items are first divided according to the figure that they appear on.

Multiple examination requirements of the same component are listed together in the schedule tables.

Supplemental surface examination (PT) on the Feedwater Nozzles Inner Radius in accordance with Nuclear Regulatory Commission NUREG-061g "BWR Feedwater b Nozzle and CRD return line Nozzle Cracking", has been scheduled per CEI request.

l l

O FORM #NES 205 2/80

80A @

DOCUMENT NO.

[]

NUCLEAR ENERGY SERVICES. INC.

VENT AND HEAD SPRAY

_ I_

\\

TEAM DRYER ASSEMBLY i.

'[

STEAM OUTLET i

),

STEAM SEPARATOR ASSEMBLY 3

FEEDWATER INLET b II

..L

-hid COR' E SPRAY INLET A

l N

. g FEEDWATER SPARGER v,

f LQW PRESSURE COOLANT l

INJECTION INLET

- dd

-l CORE SPRAY LINE CORE SPRAY SPARGER I.

b j

_, j O

d JET PUMP ASSEMBLY 1

CORE SHROUD

%"~

CONTROL BLADE FUEL ASSEMBLIES

,[

~

/

CORE PLATE JET PUMP /RECTRCUL ATI W

l WATER INLET k

/ /

ECIRCULATION WATER OUTLET d,

,,.- l :

VESSEL SUPPORT SKIRT #

SHIELD WALL

\\

'b\\l i,

}

/

CONTROL ROD DRIVES #

pt hl"l

/

\\

CONTROL ROD DRIVE

/

HYDRAULIC LINES 11EE ---

IN-CORE FLUX MONITOR nra REACTOR VESSEL B 13 CUTAWAY

=0

  • l RV-OOI
  • ",*I/#[

CLASSI

,f PERRY UNIT I

,,or to seu l

FORM #NES 205 2/80

80A421 DOCUMENT NO.

II 145 PAGE OF NUCLEAR ENERGY SERVICES, INC.

d 319' 288*

19 9*

168*

7s*

48' O'

I I

SHELL FLANG E

_ _ _ EL.7pOO _ _

~

11-843-41 l

-il-913-BN I 3

3 3

')

N NO.4 SHELL RING b

k l

6 O

_ {gl[5 y 1 k

P

    • O 1

I_ _ _ _ s 555$ _ _

)

'3 G

@h@ 886 O

G5 h

NQ 3 SHELL RING O

l

-5=

_ - n @ re m _

, _ _ _ _EL _3,,

o rA6El o

o o

l I2 12 12 12 h

NQ2 iiHELL RING

{

{

13.g3 4g1 H i-m i

_ __ _EL_203,69_ _

O h@0@ @@

O * @,@ @ @ d l

,1 SHELL RING g,

g Il-M3-A A l

_ _ _ L 8g_ _ _ _f l

E BOTTOM HEAD m

w J

~

aso*

Micf 137' do* d' 257*

O sozzte LOcATiOs Os ReACrm vEsSEt ssEtt CBI REE NO.

73-C100 ( 14 oWG,NO, 21 REV 4 gg g=

22 REV 5 ma w

hhk "E"

" VESSEL ROU:OUT VERTICAL AND Bl3 l

CIRCUMFERENTIAL SEAM m e.o.1-RV-OO2

=

."[h CLASS I

~

PERRY UNIT I un m sens FORM #NES 205 2/80

DOCUMENT NO. 80A4421 gg 12 145 gg PAGE OF (Q

NUCLEAR ENERGY SERVICES, INC.

x_J l l-Bl3-NIB -KAI I Bl3-N2A-I R I Il-Bl3 NIB-lR I l-Bl3-N2K K A; l 1 - 813-NIB-KB l

! l-813-N2A-KA l l l-Bl3-N2K-KB l-Bl3-N2A-KB l

~

l l-Bl3-N2K-l R g

p ll-Bl3-N2B 4R l ll-Bl3-N2J KAl ll-B13-N28-KA l 11 Bl3-N2J -KB!

[

ll-Bl3 -N29-KBI j

<R I-Bl3-N2C-IRl ll-Bl3-N2J -lR I

/\\

\\

ll-Bl3-N2H KA f

11-Bl3-N2C-KA l Il-Bl3-N2H -KB.

l [-BI3-N2C -KB l

/

ll-813 - N2H-IR

.)

/

q i.g3.N2D IRI ll Bl3-N2G-KA l-Bl3-N2D-KAl Il-Bl3-N2G-K l l-Bl3-N2D -KBI

+

1 I l-813-N26-IR

_c l-Bl3-N2E-IR I l l-Bl3-N2F-KA l l l-Bt3-N2E-KAl ll-Bl3 N2F-KBI 11-Bl3-N2E-KB l Il-BI3 -HI A-KA ll-Bl3-NIA-KB l Il-Bl3-N2F-IR I.Bl3 NIA-IRI CBI REF NO 73-CIOB NI-RECIRC OUTLET NOZZLE DWG NO 165 REV,1 N2-RECIRC lNLET N0ZZLE Si REV.3 KA-NOZZLE TD VESSEL WELD 55 REV,4 KB-tOZZLE 10 SAFE END WELD KC-SAFE END TO SAFE END EXTENTION WELD IR - N0ZZLE INNER RADIUS N E h. = = =. - - =

sysras DTLE RECIRC NOZZLE Bl3 mI

= = l RV-OO3 p

= //W care s//8/U CLASS I x

-y care s/r4 PERRY-UNIT I a m sua FORM #NES 205 2/80

DOCUMENT NO.

80A4421.

pAGE 13 OF 145 NUCt. EAR ENERGY SERVICES, INC.

I-B13-N4F-KB l O'

l 1 -Bl3-N4F-KA g.gl3.N4A-KB l l l-Bl3-N4F IR g,g,3,g_g ;

' 30 l l-B13-N4A-IR l TYP.

Il-813 N4E KA l-BG-N48-IR l ll-Bl3-N4E - K B

\\

I-Bl3-N48 KBl 9

^I l l-Bl3-N4E-IR I l B13 N40-IRl 30' 11-Bl3-N40 -KA i I - 813-N4C-IRl

p. 843-N40- K B l I-813-N4C-KA l l-Bl3-N4C-KB l 18 0*

CBI REE NO, N4-FEEDWATER NOZZLE 73 -C108 KA-NOZZLE TO VESSEL WELD DWG, NO,165 REV. I KB-NOZZLE TO SAFE END WELD 62 REV 4 KC - SAFE END TO SAFE END EXTENSION WELD IR - INNER RA01US TIEL87 ---

Y FEEDWATER Bl3 NOZZLE WELD

= l-

== l RV-OO4 h

OK ura.614Is4 CLASS I wM ura: s/ra PERRY - UNIT I

.or to seu FORM #NES 205 2/80 L

80A M DOCUMENT NO.

q NUCLEAR ENERGY SERVICES, INC.

G Oo

! l-913-NGA-I RI l-Bl3-N6A - kcl I

l l-Bl3-NGA-KB l 4

45 g.gl3.NGA - KA l

\\

T.

+

E 31 31 ll.Bl3-N58-IRI--

di-813 NSA-lRl l1. gl3.N56-KA!

e s

^

45 %<45 i.Bl3-NSA-kcl Il-Bl3 N58-KC I' E

~

I-g 13-NSA-KB l I 1. Bl3-N58-KB l-80-PEB -MCI

.gi3.N6C-KAl

'~

~

g.Bl3 N6C-KB 180'

ON ~ #

H i-Bl3-N6C-kcl I-Bl3 N6B-IRI NS - CORE SPRAY NOZZLE N6-RHR N0ZZLE KA-NOZZLE TO VESSEL WELD C B1 REF. NO.

KB - NOZZLE TO SAFE END WELD 73-CIOB KC - SAFE END TO SAFE END EXTENSION WELD DWG. NO,165 REV. I IR - INNER RM)lUS 66 REV. 4 70 REV. 3 l

H E.5 ---

m" CORE SPRAY (

RHR N0ZZLE WELDS Bl

=0 m w.

I-RV-005 d

n dag un s.ua

- /g

== g/g3 CLASS I

" PERRf-UNIT l e micas FORM e NES 205 2/80

DOCUMENT NO.

80A4421 PAGE 15 op 145

)

NUCLEAR ENERGY SERVICES. INC.

O' IS' 315*

o o

l-813-OR

\\l-Bl3-DP gi.gi3.DJ l 75 270*

a-g g

255' l-Bl3-DK l Il-BI3-ON

[]

Il-Bl3-DM F Q

o oo o 135 195*

180' O

!I-Bl3 #]d-S]

1-813 N7-KA I ll-Bl3-N8-KA l

,l -Bl3-N7-Bl y

l-Bl3 DJ THRU DRI ll-Bl3-AGI e a I

I FLANGE +

I N 7-HEAD SPARE N8-HEAD SPRAY RCICl VENT KA-NOZZLE TO VESSEL WELD IR -INNER RADIUS 8 - BOLTING Q {

i YR l$$ AND j

13 RIDIONAl.WED w COI REE NO,

'* - '*-ooS 73-c'oe O

'" W#'

      • # # '3 CLASS i DWG NO.-166 REV I

"'" 8/F3 73 REV 4 77 REV 3 PERRY UNIT l l

adOf TO SCAta FOM *NES 205 2/80

80A e DOCUMENT NO.

W1 PAGE 16 op 145 p,

NUCLEAR ENERGY SERVICES, INC.

G O

g N

1-93-al I

~

f h

Il Bl3-DE i.Bl3-Nil-RBl A

A d

Nil I

I 270

_p O

M NIS j.gj3.gp l1.Bl3-DG t-Bl3-NI8-KBl J

W J

18 0*

O E

li-BI3-AAl 3

s i.813 -DG g

2

\\

/

{

ll-B13-DH I s

ll.Bl3-DE '

(

ll Bl3-DF l NI-B13-CG l w

7 CIOB(14 i

DWG NO,13 REV. G i

W RW. S 93 RW, 2 Il-Bl3 NIS-KA

.SECTION A-A 11EL%, ---

s,_

,,,m i

NI1-CORE DIFFERENTIAL PRESSURE NOZZLE BOTTOM HEA0 NI5-ORAIN N0ZZLE Bl3 WELD MAP NI6-LIGUl0 CONTROL KA - VE5SEL TO N0ZZLE WELD

=0 l-RV-OO7 O

  • S - " 22'5 '

S^'" "" **'

"a"%

a

'^55 '

PERRY UNIT I

.et to seas FORM #NES 205 2/80

l DOCUMENT NO.

80A4421 PAGE 17 OF 145 (O)

NUCLEAR ENERGY SERVICES. INC.

W I

l l-Bl3-N30-KA

l 813-N3A-IRI Il-B13-N30-KB l-B l3-N3A-KB I l l BG N30 IR,

\\ l-Bl3*N3A KAl i

18'( M )

id(TYRI li-sl3-H38-lRI Il-Bl3-N3C-KA

(, gl3.r@B.lR ]

o Il-Bl3-N3C KBi c t-Bl3-N38-KA l li-BB-N3C IR I

Il I Bl3 N16-KAl i I Bl3 Nt6 IRI CBI REE NO.

73-CLOB DWG, NO, 165 REV. I 58 REV. 2 N3 - MAIN STEAM NTZLE 98 REV,5 N16 - VIBRATION NOZZLE KA - NO22LE TO VESSEL WELD KB - N0ZZLE TO SAFE END WELD MEh,---

IR' - INNER RA01US

'"" MAIN '4EAM (E

'b""

VIBRATION NOZZL WELOS

=O

  • l-RV-OOB i

O

\\

= JRP em8 2 0 Ct. ASS I e Mk urs e]ss

  • PERRY - UNIT l l

ocr to sens FORM 8 NES 205 2/80 1

80A4421 DOCUMENT NO.

PAGE 18 op 145 h

NUCLEAR ENERGY SERVICES. INC.

I 913 N120 l-813-N12A 1 Bl3 Nf3D l 813 N140 I-Bl3-N13A

.O l- 013 -N 64A

\\

/

l l-Bl3-N98 - KA

\\

/

ll-Bl3-N98-K8l N

15*

Il-Bl3-N98 IRl--

N h

1-Bl3-N8A-KAl k

l-813 - N'5A-K B I O

/

Il-Bl3-N9A-IRI

/

.I l-Bl3 Nt2B g Bl3-N12C f-Bl3 NI38 l-813-NI3C I-813 NI4B g

l-013 NI4C in I-Bl3-NIO-KAl 1-Bl3-NE l l-813-NIO lR 100 l-Bl3-NIO-KC :

CBI REE NO, 73-C108(14 DWG NO.- 165 REV I 85 REV 5 79 REV 4 N9 JET PUMP INSTRUMENTATION N0ZZLE NE%---

NIO-CRD RETURN N0ZZLE

,,,,, g 4

NI2N13,N64-INSTUMENTATION N0ZZLE CRD RETURN N0ZZLE KA-N0ZZLE TO VESSEL WELD B31 WELDS l

.g

,,.'g.RV-OO9 KB-N0ZZLE TO SAFE END WELD 9

KC-NOZZLE SAFE END TO CAP WELD IR -INNER RADIUS "y

Ss/g3 CLASS l PERRY UNIT l

.ce to seas FORM #NES 205 2/80

oocumEurNo. soA442, g

PAGE 19 op 145 NUCLEAR ENERGY SERVICES, INC.

t O

06 14 22 30 38 46 54 02 iO is as 34 42 so se X CO-OROINATESg MT

^

s

/

G@@@l g

59 GGGGGGGGG, ss

/ GGGGGGGGGGG; si GGGDGGGGGGGGbI\\

47 OGGGGGGGGG@@@I

\\

e OGGGGGODGGGGe@b\\

m I

GGGGGGGGGGGGG6G 35 270 ~

e-e-e-O-e-O e e e @ G e e e e 3i - 90

@@@@@@@@@@@@GGG 27 l

O 966@@@@@@@@@GGG 23 GGOO@@GGGGGGG 19 GGGGGGGGG@@@@

15 j

@G@@@@@@@@@

'I GGGGGBOGG 07 NOM S 03 DENT IST CO-ORDINATES p

g X-Y CO-ORDINATE DESIGNATIONS, 18 0 PLAN V EW CRD CBI RR NO. -

PENE HATIONS 73-Cl08 ( 14

  • " "* V.'..')l - ]

DWG NO, e-i

\\

na5---

l

'8 CRO PARTIAL

  • b**

N AION W S l

Bl3 j

w0

m. o. I-RV-OIO 1 4

[ g/g3 CLASS I SECTION A-A.

PERRY UNIT l CRO PENETRATION THRU BOTTOM HEAD FORM # NES 205 2/80

80A4421 DOCUMENT NO.

O PAGE R ENERGY SERycES. INC.

06 14 22 30 38 46 54 02 10 18 26 34 4it 50 58 X CO-ORDINATESg MT OGGG@i

[GGGGGGBGG,;gl 59 55 g/ GGGGGGGGGGG si GGGGGGGG@@@@bI 47 I

\\

@@@GGGGGGGGGG c

O@@GGGGGGGG@@@b\\

' as OGGGGGGGGGGGGGG H

270*

O-O-6 0 0 0-O G G G G G O O O 31

@@@G@@@@@@@@GGG v

I O@@@@@@@@@@@@@@

23

/

GOGO @@@@@@@@@

is

/

O NOTE:

eeeeeeeeeeeee

,5 II DN F T N OS. CONSIS

/

OF PREFIX 1-B13 FOLLOWED BY

@@666@@@@

07

/

X-Y CO-ORDINATES AND THEN G@@6@

03 DESIGNATION B FOR BOLTING AND W FOR HOUSING TO FLANGE WELDS.

YW N TS 180 PLAN V EW CRO CBl REF. NO. 73-C108 & 14 DWG.NO.14 REV. 3 m

l 4

G.E.NO.- 767E957 922D124 HOUSING WEL'DS aur zusasnaseesmeven mce.

HOUSING TO S'"

CRD MECHANISM FLANGE WELD HOUSING WELDS AND B13 FLANGE BOLTING g.

nev: O nG. NO.

1-RV-011 ev:P55 oars.a. 7-as q

f l

l l

' BOLTINGS.

^" M DATE: kSS

" PERRY.- UNIT 1 VIEW-A-A Nor to sens FORM # NES 205 2/80

O O

O 8

6 E

g!N 03 d

g o.

=

5

  • A

!P N'y gg 7

j, p'

g+ +

t++

z

+I b

iet +

-t- + -e

+ t

//

i,'

,sd

+e e

O+

8 t

e 1ttt t

t

+

t t +

n N'

i l

m

+ lt t

it t

-+- t r +

-+ 1 +

z e -e-t+-e-O -- e e-e-e-e E

  • l

+++++

+

+ ++++

t m

+++

++

+e+-ey+ e-e+-o+

+e+ +e++

t 3

y g ;z

++e e

a n

++

+ + + ++

+ ++

+

g z

%5 t

+

9 @

+*+

+ -+t ' + e + e + e e +

+e+ +e +

+e+

+

+

e w

o

+++

+

-+- + tt t

2 8'

+++

++++

++ ++++

++

/

-g

_z J

o

+e e-e-o

+e e-e+-o++e 8

ma

)

+

+

+t

+ + +

l e'Fe?.* + o+ ++

++

tt

+* +e+ t +e+

g

+e

/

E

+ +

t

+ + ++ t'+ t,t t

/

52>h

+'+ ++

+

$o

!u i

i 1 11 !

  • 8:

SF a w e

i 19 N

/

=d o$ng..

O

\\

/

4 5mdSi jI5E i

ow m

x

=

g yEs 5En R

g w

z o

g-G 4 a i!

8 2paz g~

m a-mRE 62 ni i jti j jg lg aog g

g g

gsaa~=a me*asse

""Y g

g l

92 a

osz g

5AQ gd D

m

~

e o

o m

o vi i

e

80A421 DOCUMENT NO.

OF M

(']

NUCLEAR ENERGY SERVICES. INC.

H-9 A-l STUD HOLE NUMBERING WITH 72 STUD HOLES CLOCKWISE ROTATION FROM EQUALLY SPACED f

i A-1 TO A-9 THRU H-1 TO H-9 ABT CARDINAL $

eO O D

H-l O

G-9 N

_g B -1 4

A G 4 C

B-3 270 4

go' p,g

_g

'O C-l O

x E

D-i OQQ Q sig

+6 D-9 NOTE:

I E-l ALL LIGAMENT EXAMINATION IDENTIFl. CATION NOS. CONSIST

'i i

n l

OFTHE PREFIX t-813-AND 8

180*

THEN THE STUD HOLE NUMBER.'

l I

N/

CBI REF. NO.- 73C108 & 14 DWG.NO.

38 REV 39 REV VESSEL FLANGE TIEL%, ---- ~

I "E"

""' VESSEL FLANGE B43 LIGAMENTS as* O - ** *.1-AV-013 O

\\l

"%& TE c'^SS '

- SECTION A-A n.cac' PERRY - UNIT 1 e to sm FORM a P4ES 205 2/B0 L

DOCUMENT NO. 80A4421 PAGE 2

OF (j

WR ENERGY SERWES. n 0*

4 70 2 3 73 1

72 1

f I

I l

d6 0

~

Oo O

5

.56 55 -G O-27f

,.g

, O-- 19 o

7-

% 20 21

\\

m o

x f

90 Q 0 0 Q l 37 38 NOTE:

40 39 l

18f N

ALL STUD EXAMINATION IDENTIFICATION CONSISTS j

f OF THE PREFlX 1-B13-38-1 l

i

$7 m

CBI REF. NO. 73C108 & 14 DWG. NO.

38 REV.

l l

39 REV.

ll D Li - - -

{"

)

mm.

ritt ll CLOSURE HEAD B13 l

u STUDS I

      • O
  • 1-RV-014 0

- coo *

=

> CLASS 1 DiA.

- k4 men; 8la3 SECTION THRU STUD

"" ' PERRY - UNIT 1

.cr m as FORM #NES 205 2/80

DOCUMENT NO.

80A4421 24 145 PAGE OF Q

NUCLEAR ENERGY SERVICES. INC.

O' 70 71 v2 1 2 3 4

\\

\\J O dd o

O 0

5 5

5 5----.O g

270*

90*

4

' O--- 19

~20 21 22 0

x 0. 0o 0

37 3

190 NOTE:

0 ALL NUTS EXAMINATION NOS. CONSIST OF THE PREFlX 1-B13-39-5 b

CBI REF NO. 73C.108 & 14 0

9 1 otA.

DWG.NO.

38 REV.

39 REV.

y a

m, 8k h bh==a====,.===.

I di s,

i i

D3 CLOSURE HEAD NUTS I

i

=0

    • e.1-RV-015 h

~

erP55 pt J /6 65 g/t3 CLASS 1 l

  • 4 oars:

SWD WT

-n PERRY - UNIT 1

, to w.as FORM s NES 205 2/80

80A4421 DOCUMENT NO.

NUCLEAR ENERGY SERVICES. INC.

7 72 2

60 66 O

O 5

5 55 -C O-

270,

.g O._jg p

N 20 g

21 Os.

2 O

o ec co 37 3

NOTE:

188 ALL WASHER EXAMINATION NOS. CONSIST OF THE PREFIX 1-813-39-6 CBI REF. NO. 73C108 & 14 DWG. NO.

38 REV.

39 REV.

i

- 7 ________.______ 7 _-

ig*N 11E!.E ---

{

1 p

" '4"

"'" CLOSURE HEAD 9 h: CIA.

3 42 013 WASHERS e

~

,,, o

... i.RV-016

(

SPHERICAL WASHER

  • Rso ameSe CLASS 1 u A4

== t/s3

"'**' PERRY - UNIT 1 estoacus FOAM s NES 205 2/80

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: elf Date:

3f Document No. 80A4421 App: 4J Date: c/ w Preservice Inspection 5532-PERRY Rev:

1 Page: 26 of'145 CAU9 RATION CODE coupegguy cmNT PROCEDURE ROCK CCCE EXAM ZONE mTinCArm oEscapr a NUMBER W= W CATEGORY WETHOO NO RE W

\\_,

,yc VESSEL SIELL WELDS Ref. Dwg. No: 1-RV-002 1-313-AA Loiver Head to No. I Shell 80A0191 PY-123-1-RPV B-A UT I

Ring Circumferential Seam Bl.11 PY-124-1-RPV i

N 1-B13-BA No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 170 Azimuth Bl.12 1-B13-BB No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 1370 Azimuth Bl.12 I-B13-BC No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 2570 Azimuth Bl.12 1-B13-AB No. I Shell Ring to No. 2 Shell 80A0208 PY-124-1-RPV B-A UT I

Ring Circumferential Seam Bl.11 1-B13-BD No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 400 Azimuth Bl.12 1-813-BE No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 1600 Azimuth Bl.12 1-B13-BF No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 2800 Azimuth Bl.12 NES 239 682

o 11EN O

6Nf System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

/r# Date:

Document No. 80A4421 App: 44 Date: _c/Sg Preservice Inspection 5532-PERRY Rev:

1 Page: 27 of 145 cAusunon coac aME o EcE "eca m T-cAEccm Efwoo E NW wuw YESSEL StELL WELDS Ret Dwg. No: 1-RV-002 1-813-AC No. 2 Shell Ring to No. 3 80A0208 PY-124-1-RPV B-A UT I

Shell Ring Circumferential Bl.11 Seam I-813-BG No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 790 Azimuth Bl.12 1-B13-83 No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 1990 Azimuth Bl.12

~

1-B13-BK No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 3190 Azimuth Bl.12 i

1-B13-AD No. 3 Shell Ring to No. 4 80A0208 PY-124-1-RPV B-A UT I

Shell Ring Circumferential B1.11 Seam l

l-B13-BN No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 480 Azimuth Bl.12 1-B13-BP No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 1630 Azimuth Bl.12 l

l-B13-BR No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I

Seam @ 2880 Azimuth Bl.12 NES :*39 682

o 11EN O

System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:

/ht Date: 6/81 Document No,80A4421 App: gj_ Date: Mt Preservice Inspection 5532-PERRY Rev:

1 Page: 28 v.145 CAL 18 RAT 10N CODE m NT COMPONENT PROCEDURE BLOCK CODE EXAM ZOAE K)ENTC4MK)N KSCitPTX)N F4JMBER Of appbcablet CATEGORY WTHOO NO.

REMARKS VESSEL SHELL WELDS Ref. Dwg. No: 1-RY-002 1-B13-AE No. 4 Shell Ring to Shell 80A0189 PY-124-1-RPV B-A UT I

Flange Circumferential Seam Bl.ll l

NES 239 6/82

o 11EN o/ei 6

Syst;mi Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By:

/n< oate:

Document No. 80A4421 App: M Dates (/S4 Preservice Inspection 5532-PERRY Rev:

1 Page: 29 of 145 CAU8 RATION CODE COMP 0eENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 80ENTIFICATION DESCRIPTION NUMBER (tf apphe=Nat CATEGORY LETHOO NO.

E MARKS RECIRCUI ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Outlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

NI A-AA NIA to Vessel B3.90 1-B13-Recirculation Outlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

NI A-lR NIA' Inner Radius B3.100 1-B13-Recirculation Outlet Nozzle 80A0211 PY-SE-BI-5 B-F UT I

NIA-KB NI A to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Outlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

NIB-KA NIB to Vessel B3.90 1-B13-Recirculation Outlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

NIB-IR NIB Inner Radius B3.100 1-B13-Recirculation Outlet Nozzle 80A0211 PY-SE-BI-5 B-F UT I

NIB-KB NIB to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2A-KA N2A to Vessel B3.90 1-B13-Recirculatica Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N2A-lR N2A Inner Radius B3.100 NES 239 6/82

O HM O

Syst;mi Rcactor Pr ssure Vcssel PROGRAM PLAN AND SCHEDULE By

/nt Date: C/94 Document No. 80A4421 App:

  1. - Date: c/S<,t Preservice Inspection 5532-PERRY Rev 1

Page: 30 of 145 CAUBRATO4 CODE COMPONE>si COMPONENT PROCEDURE BLOCK CODE EXAM ZONE MNTIRCATION DESCfDFTION NUMBER (if appleablel CATEGORY ETHOD No REMARKS RECIRCULATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N2A-KB N2A to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2B-KA N2B to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N2B-IR N2B Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N2B-KB N2B to Safe-end B5.10 80A0183 N/A PT l

1-B13 Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2C-KA N2C to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N2C-IR N2C Inner Radius B3.100 NES 239 6/82

o 11EN O

Syst:mi R; actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By:

Lilg Date: 4[f4 Document No. 80A4421 App:

  1. Date c/JV Preservice Inspection 5532-PERRY Rev:

1 Page: 31 of 145 CALIBRATION CODE COMPONENT COuPOHENT PROCEDURE BLOCK CODE EXAM ZONE tDENTIFICATION DESCRPTION NUMBER (tf appbcablel CATEGORY BETHOO NO.

REMARKS RECIRCU!.ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N2C-KB N2C to Safe-end B5.10 80A0183 N/A PT 1-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2D-KA N2D to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N2D-!R N2D Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 FY-SE-BI-RPV B-F UT I

N2D-KB N2D to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet ~ Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2E-KA N2E to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N2E-lR N2E Inner Radius B3.100 NES 239 6/82

o lies o

Systemi R act r Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By2 h Date: ( /84 Document No. 80A4421 App:

M Date: C/ge/

Preservice Inspection 5532-PERRY Rev:

1 Page: 32 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTlHCATION DESCHPTION NUMBER Of apphcatM CATEGORY BETHOO NO.

REMARKS RECIRCUI.ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculati.. Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N2E-KB N2E to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2F-KA N2F to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N2F-1R N2P Inner Radius B3.100 -

1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N2F-KB N2F to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2G-KA N2G to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N2G-IR N2G Inner Radius B3.100 NES 239 6/82

O 1]M O

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

M Date: (, /94 Document No. 80A4421 App: M Date: c/g4 Preservice Inspection 5532-PERRY Rev:

1 Page: 33 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCFCPTION NUMBER (if appicabael CATEGORY METHOO NO, N MARKS RECIRCULATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N2G-KB N2G to Safe-end B5.10 80A0183 N/A PT l

l l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2H-KA N2H to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N2H-IR N2H Inner Radius B3.100 l-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N2H-KB N2H to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N23-KA N23 to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I

N23-IR N23 Inner Radius B3.100 NES 239 6/82 Y,'

O HM O

/

6 sf-Syst:mi Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:

- h'r Date:

Document No. 80A4421 App:

  1. Date: c/W Preservice Inspection 5532-PERRY Rev:

1-Page: 34 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E)ENTWICATION DESCRIPTION NUMBER

(!f applW CATEGORY METHOD No.

REMARKS.-

RECIRCULATION NOZZLE WELDS Ref. Dwg. Nc: 1-RV-003 1-B31-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N23-KB N23 to Safe-end B5.10 80A0183 -

N/A PT l-B31-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I

N2K-KA N2K to Vessel B3.90 -

1-B31-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D

'UT I

N2K-1R N2K Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I

N2K-KB N2K to Safe-end B5.10 80A0183 N/A PT t

NES 239 6/82

o HEN o

BD ht<

D^t**

/94 Syst;m: Reactor Pr:ssure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: A4 Date: c/rst Preservice Inspect!On 5532-PERRY Rev:

1 Page: 35 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESORPTICH NUMBER Of apphcabiel CATEGORY LETHOO No.

REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4A to 80A0209 PY-124-1-RPV B-D UT I

N4A-KA Vessel B3.90 1-B13-Feedwater Nozzle N4A Inner 80A0190 PY-124-1-RPV B-D UT I

N4A-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 06 L9 1-B13-Feedwater Nozzle N4A to 80A0211 PY-SE-BI-3 B-F UT I

N4A-KB Safe-end B5.10 80A0183 N/A PT l-B13-Feedwater Nozzle N4B to 80A0209 PY-124-1-RPV B-D UT I

N4B-KA Vessel B3.90 1-B13-Feedwater Nozzle N4B Inner 80A0190 PY-124-1-RPV B-D UT I

N4B-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 061 9 l-B13-Feedwater Nozzle N4B to 80A0211 PY-SE-BI-3 B-F UT I

N4B-KB Safe-end B5.10 80A0183 N/A PT

\\

i NES 239 6/82

o BEN O

System: Reactor Pressure Vessel By:

[]f Date: d8Y PROGRAM PLAN AND SCHEDULE

. App:

Preservice Inspection 5532-PERRY Rev:. A Date: c/fg Document No. 80A4421 1

Page: 36 of 145 CAUBRATION CODE.

IDE TON DE NUMBE (if applicablel CA ORY THOD NO REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4C to 80A0209 PY-124-1-RPV B-D UT I

Vessel B3.90 N4C-KA 1-B13-Feedwater Nozzle N4C Inner 80A0190 PY-125-1-RPV B-D UT I

N4C-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 0615 1-B13-Feedwater Nozzle N4C to 80A0211 PY-SE-BI-3 B-F UT I

N4C-KB Safe-end B5.10 80A0183 N/A PT l-B13-Feedwater Nozzle N4D to 80A0209 PY-124-1-RPV B-D UT I

N4D-KA Vessel B3.90 1-B13-Feedwater Nozzle N4D Inner 80A0190 PY-124-1-RPV B-D UT I

N4D-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 061S 1-B13-Feedwater Nozzle N4D to 80A0211 PY-SE-BI-3 B-F UT I

N4D-KB Safe-end B5.10

.80A0183 N/A PT NES 239 fv82 1

- - - - - mmw u

me o

iIEE o

PROGRAM PLAN AND SCHEDULE

. 7',

U*[l ' "

S nu Rea to ure Vessel nt o A442 Preservice Inspection 5532-PERRY Rev 1

Page: 3 145 l

CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE BOENTIF6 CATION DESCEtPTICH NUMBER (If applicable)

CATEGORY METHOD NO.

REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4E to 80A0209 PY-124-1-RPV B-D UT I

N4E-KA Vessel B3.90 1-B13-Feedwater Nozzle N4E Inner 80A0190 PY-124-1-RPV B-D UT I

-N4E-IR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 0615 1-B13-Feedwater Nozzle N4E to 80A0211 PY-SE-BI-3 B-F UT I

N4E-KB Safe-end B5.10 80A0183 N/A PT i

1-B13-Feedwater Nozzle N4F to 80A0209 PY-124-1-RPV B-D UT I

N4F-KA Vessel B3.90 1-B13-Feedwater Nozzle N4F Inner 80A0190 PY-124-1-RPV B-D UT I

N4F-lR Radius B3.100 80A0183 h/A N/A PT Reg. Guide 0615 2

1-B13-Feedwater Nozzle N4F to 80A0211 PY-SE-BI-3 B-F UT I

N4F-KB Safe-end B5.10 80A0183 N/A PT i

l

^

t NES 239 6/82 l

O HM O

I 6 f4 Syst m Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By2 hPc Dat;i Document No. 80A4421 App:

  1. - Date: W Preservice Inspection 5532-PERRY Rev:

1 Page: 38 of 145 i

CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicabiel CATEGORY ETHOD No.

REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-Core Spray Nozzle NSA to 80A0209 PY-124-1-RPV B-D UT I

NSA-KA Vesse!

B3.90 1-B13-Core Spray Nozzle N5A Inner 80A0190 PY-124-1-RPV B-D UT I

NSA-IR Radius B3.100 1-B 13-Core Spray Nozzle NSA to 80A0211 PY-SE-BI-3 B-F UT I

N5A-KB Safe-end B5.10 80A0183 N/A PT 1-B13-Core Spray Nozzle N5A Safe-end 80A0211 PY-SE-BI-3 B-3 UT I

NSA-KC to Safe-end Extension B9.11 80A0183 N/A PT l-B13-Core Spray Nozzle NSB to 80A0209 PY-124-1-RPV B-D UT I

N5B-KA Vessel B3.90 1-B13-Core Spray Nozzle NSB Inner 80A0190 PY-124-1-RPV B-D UT I

N5B-lR Radius B3.100 1-B13-Core Spray Nozzle NSB to 80A0211 PY-SE-BI-3 B-F UT I

NSB-KB Safe-end B5.10 80A0183 N/A PT l-B13-Core Spray Nozzle NSB Safe-end 80A0211 PY-SE-BI-3 B-3 UT I

N5B-KC to Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82 i

o na5

. a B3

  • t Dat2: ' /84 Systemi Reactor Pr:ssurs Vcssel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

  1. Date: c/M Preservice Inspection 5532-PERRY Rev:

1 Page: 39 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRPTION NUMBER (if apphcable)

CATEGORY METHOD No.

REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-RHR Nozzle N6A to Vessel 80A0209 PY-124-1-RPV B-D UT I

N6A-KA B3.90 1-B13-RHR Nozzle N6A Inner Radius 80A0190 PY-124-1-RPV B-D UT I

N6A-IR B3.100 1-B13-RHR Nozzle N6A to Safe-end 80A0211 PY-SE-BI-3 B-F UT I

N6A-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6A Safe-end to 80A0211 PY-SE-BI-3 B-3 UT I

N6A-KC Safe-end Extension B9.ll 80A0183 N/A PT l-B13-RHR Nozzle N6B to Vessel 80A0209 PY-124-1-RPV B-D UT I

N6B-KA B3.90 1-B13-RHR Nozzle N6B Inner Radius 80A0190 PY-124-1-RPV B-D UT I

N6B-IR B3.100 1-B13-RHR Nozzle N6B to Safe-end 80A0211 PY-SE-BI-3 B-F UT I

N6B-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6B Safe-end to 80A0211 PY-SE-BI-3 B-3 UT I

N6B-KC Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82

0 (i

Systami Ractor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:

.AA Dat;r 6Af Document No. 80A4421 App: 44 Date: 6//f Preservice Inspection 5532-PERRY Rev:

1 Page: 40 of 145 CAUBRATION COOE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE tOENilHCATON DESCPIPTION NUMBER (if apphcablel CATEGORY.

hETHOD NO.

REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-RHR Nozzle N6C to Vessel 80A0209 PY-124-1-RPV B-D UT I

N6C-KA B3.90 l

l-B13-RHR Nozzle N6C Inner Radius 80A0190 PY-124-1-RPV B-D UT I

N6C-IR B3.100 I

1-B13-RPR Nozzle N6C to Safe-end 80A0211 PY-SE-BI-3 B-F UT I

N6C-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6C Safe-end 80A0211 PY-SE-BI-3 B-3 UT I

N6C-KC to Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82

~

o 11EN o

Syst mt R actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By I". Dat:: 6/g4 Document No. 80A4421 App:

M Date: e/JV Preservice Inspection 3532-PERRY Rev:

1 Page: 41 of 145 :

Co W ONENT CO W (NT PROCEDURE BL CODE ZONE IDENTIFICATION DESCRIP W)N NUMBER til apphcable)

CATEGORY METHOD NO.

REMARKS CLOSURE HEAD WELDS Ref. Dwg. No: 1-RV-006

~

1-B13-AG Top Head to Top Head Flange 80A0192 PY-128-1-RPV B-A UT I

Bl.40 1-B13-AH Top Head Dollar Plate to 80A0192 PY-127-1-RPV B-A UT I

Side Plates Bl.21 PY-128-1-RPV l-B13-DJ Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I

@ 75 Azimuth Bl.22 1-B13-DK Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I

@ 135 Azimuth Bl.22 1-B13-DM Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I

@ 195 Azimuth Bl.22 1-B13-DN Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I

@ 255 Azimuth Bl.22 1-B13-DP Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I

@ 315 Azimuth Bl.22 1-B13-DR Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I

@ 15 Azimuth Bl.22 NES 239 6/82 i

O.

MM O.

Date:fr/H System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:

E Document No. 80A4421 App: & Date: c/ M Preservice Inspection 5532-PERRY Rev:

1 Page: 42 of 145 CAL 18 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY nETHOO No.

REMARNS CLOSURE HEAD WELDS Ref. Dwg. No: 1-RV-406 1 B13-Top Head to N7 Head Spare 80A0192 PY-127-1-RPV B-D UT I

N7-KA Nozzle B3.90 1-B13-N7 Head Spare Nozzle Inner 80A0192 PY-127-1-RPV B-D UT I

N7-IR Radius B3.100 1-B13-N7 Head Spare Nozzle to 80A0184 N/A B-G-2 VT-1 I N7-B Flange Bolting (12 Pieces)

B7.50 1-B13-Top Head to N8 Head Spray 80A0192 PY-127-1-RPV B-D UT I

NS-KA Nozzle B3.90 1-B13-N8 Head Spray Nozzle Inner 80A0192 PY-127-1-RPV B-D UT I

N8-lR Radius B3.100 1-B13-N3 Head Spray Nozzle to Flange 80A0184 N/A B-G-2 VT-1 I NS-B Bolting (12 Pieces)

B7.50

)

NES 239 6/82,

O gg O

B" E

U**2' Syst mi Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: A Date: 4/S4 Preservice Inspection 5532-PERRY Rev 1

Page: 43 of 145 -

COMPONENT COMFOdN T PROCEDURE O

CODE ZONE IDENTIFICATION DESCR*PTION NUMBER (if apphcabiel CATEGORY METHOD NO.

REMARKS BOTTOM HEAD WELDS Ref. Dwg. No: 1-RV-007 1-B13-DE Bottom Head Side Plates Weld, 80A0191 PY-123-1-RPV B-A UT i

2700 Side Bl.22 1-B13-DG Bottom Center Plate to Side 80A0191 PY-123-1-RPV B-A UT I

Plates,2700 Side Bl.22 1-B13-DF Bottom Head Side Plates Weld, 80A0191 PY-123-1-RPV B-A UT I

900 Side Bl.22 1-B13-DH Bottom Center Plate to Side 80A0191 PY-123-1-RPV B-A UT I

Plates, 900 Side Bl.22 1-B13-CG Bottom Head to Sidrt Extension 80A0183 N/A' B-H PT I

B8.10 l

1-B13-N15 Bottom Head to NIS Drain 80A0191 PY-123-1-RPV B-D UT I

-KA Nozzle B3.90 1-B13-N15 NIS Drain Nozzle Inner Radius 80A0190 PY-123-1-RPV B-D UT I

-IR B3.100 1-B13-Nil Nil Differential Pressure 80A0195 PY-SE-BI-6 B-F UT I

-KB Nozzle to Safe-end B5.10 80A0183 N/A PT NES 239 6/82 i

o nog o.

$, y U"$l h(

P ure Vessel S

o8$A421 PROGRAM PLAN AND SCHEDULE rn n Preservice Inspection 5532-PERRY Rev:

1 Page: 44 of 145 CAUBRATION CODE COMPONENT CouPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCT4PTION NUMBER Of apphcable)

CATEG0RY METHOO NO.

REMARKS BOTTOM HEAD WELDS Ref. Dwg. No: 1-RV-007 1-B13-N18 N18 Liquid Control Nozzle 80A0195 PY-SE-BI-6 B-F UT I

-KB to Safe-end B5.10 80A0183 N/A PT i

NES 239 6/82

O g3 8O Syst:m: Reactor Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By:

md Dates (l 4 Document No. 80A4421 App: A4 Date: ch<,c Preservice Inspection 5532-PERRY Rev:

1 Page: 45 of 145 CAUBRATK)!

CODE N

COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E)ENTFOTK)N DESCRPTION NUMBER Of applacablel CATEGORY METHOO NO.

REMARKS..

MAIN STEAM NOZZLES Ref. Dwg. No: 1-RV-008 1-B13-Main Steam Nozzle N3A to 80A0191 PY-124-1-RPV B-D UT I

N3A-KA Vessel B3.90 1-B13 Main Steam Nozzle N3A Inner 80A0190 PY-124-1-RPV B-D UT I

N3A-IR Radius B3.100 1-B13-Main Steam Nozzle N3A to 80A0195 PY-SE-CS-2 B-F UT I

N3A-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3B to 80A0191 PY-124-1-RPV B-D UT I

N3B-KA Vessel B3.90 1-B13-Main Steam Nozzle N3B Inner 80A0190 PY-124-1-RPV B-D UT I

N3B-IR Radius B3.100 1-B13-Main Steam Nozzle N3B to 80A0195 PY-SE-CS-2 B-F UT I

N3B-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3C to 80A0191 PY-124-1-RPV B-D UT I

N3C-KA Vessel B3.90 i

I l-B13 Main Steam Nozzle N3C Inner 80A0190 PY-124-1-RPV B-D UT I

N3C-lR Radius B3.100 NES 239 6/82

o np5 o

System: Reactor Prcssura Vessel PROGRAM PLAN AND SCHEDULE By: /3 c Date:C /M Document No. 80A4421 App:

M Date t/r4 Preservice Inspection 5532-PERRY Rev:

1 Page: 46 of 145 CAUBRATION CCOE COMPONENT COVPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCR:PTION NUMBER (11 appleablel CATEGORY LETHOO NO REMARKS MAIN STEAM A V BRATION NOZZLE Ref. Dwg. No: 1-RV-008 1-B13-Main Steam Nozzle N3C to 80A0195 PY-SE-CS-2 B-F UT I

N3C-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3D to 80A0191 PY-124-1-RPV B-D UT I~

N3D-KA Vesset B3.90 1-B13-Main Steam Nozzle N3D Inner 80A0190 PY-124-1-RPV B-D U1 I

N3D-IR Radius B3.100 1-B13-Main StCam Nozzle N3D to 80A0195 PY-SE-CS-2 B-F UT I

N3D-KB Safe-end B5.10 80A0183 N/A PT 1-B13-Vibration Nozzle N16 to 80A0191 PY-124-1-RPV B-D UT I

Vessel B3.90 1-B13-Vibration Nozzle N16 inner 80A0190 PY-124-1-RPV B-D UT I-N16-lR Radius B3.100 NES 239 6/82

o 1135 o

Syst::mi R actor Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By:

Ar Dat:: t/ff Document No. 80A4421 App: M Date: 4/fy.

~

Preservice Inspection 5532-PERRY Rev:

1 Page: 47 of 145 o Ec oesc Ea nuus "en cAEocar

  1. Yo
  • ra ue n

newas JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-LX)9 l-B13-3et Pump Nozzle N9A to 80A0191 PY-124-1-RPV B-D UT I

N9A-KA Vessel B3.90 1-B13-3et Pump Nozzle N9A Inner 80A0190 PY-124-1-RPV B-D UT I

N9A-lR Radius B3.100 1-B13-3et Pump Nozzle N9A to 80A0195 PY-SE-BI-I B-F UT I

N9A-KB Safe-end B5.10 80A0183 N/A PT l-B13-3et Pump Nozzle N9B to 80A0191 PY-124-1-RPV B-D UT I

N9B-KA Vessel B3.90 1-B13-3et Pump Nozzle N9B Inner 80A0190 PY-124-1-RPV B-D UT I

N9B-IR Radius B3.100 1-B13-3et Pump Nozzle N9B to 80A0195 PY-SE-BI-l B-F UT.

I N9B-KB Safe-end B5.10 80A0183 N/A PT l-B13-CRD Return Nozzle N10 to 80A0191 PY-124-1-RPV B-D UT I

N10-KA Vessel B3.90 1-B13-CRD Return Nozzle NIO Inner 80A0190 PY-124-1-RPV B-D UT I

N10-lR Radius B3.100 NES 239 6/82

O MM O

B2 M

Date: 6/si Syst:ms Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App: M Date c/#4-Preservice Inspection 5532-PERRY Rev:

1 Page: 48 of 145 CAuBRAT m CooE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATO DESCFDPTION NUMBER Uf apphCablel CATEGORY LETHOO No.

REMARKS JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-009 l-B13-CRD Return Nozzle NIO to 80A0195 PY-SE-CS-1 B-F UT I

N10-KB Safe-end B5.10' 80A0183 N/A PT l-B13-CRD Return Nozzle NIO Safe-end 80A0195 PY-SE-CS-1 B-F UT I

N10-KC to Cap B5.10 80A0183 N/A PT l-B13-Instrumentation Nozzle N12A 80A0184 N/A B-E VT-2 I N12A B4.13 1-B13-Instrumentation Nozzle Nf 3A 80A0184 N/A B-E VT-2 I N13A B4.13 1-B13-Instrumentation Nozzle N16A 80A0184 N/A B-E VT-2 I N14A B4.13 1-B13-Instrumentation Nozzle N128 80A0184 N/A B-E VT-2 I N12B B4.13 1-B13-Instrumentation Nozzle N13B 80A0184 N/A B-E VT-2 I N13B B4.13 1-B13-Instrumentation Nozzle Ni4B 80A0184 N/A B-E VT-2 1 N14B B4.13 NES 239 6/82

o 11E85 o

Syst:m: R: actor Prcssure Vessel PROGRAM PLAN AND SCHEDULE By:

AA Date: Gd4 Document No. 80A4421 App: 44 Date: t/54 Preservice Inspection 5532-PERRY Rev:

1 Page: 49 of 145 CAUBRATION CODE COMPONEen COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTlHCATK)N MSCRIPTION NUMBER Of apphcabeel CATEGORY METHOO

!D.

REMARKS JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-009 l-B13-Instrumentation Nozzle N12C 80A0184 N/A B-E VT-2 I N12C B4.13 1-B13-Instrumentation Nozzle N13C 80A0184 N/A B-E VT-2 I N13C B4.13 1-B13-Instrumentation Nozzle N14C 80A0184 N/A B-E VT-2 I N14C B4.13 1-B13-Instrumentation Nozzle N12D 80A0184 N/A B-E VT-2 I N12D B4.13 1-B13-Instrumentation Nozzle N13D 80A0184 N/A B-E VT-2 I N13D B4.13 1-B13-Instrumentation Nozzle Ni4D 80A0184 N/A B-E VT-2 I N14D B4.13 l

NES 239 6/82

o 11EE C

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

m<

Date: t/H Document No. 80A4421 App: 44 Date: E/ft/.

Preservice Inspection 5532-PERRY Rev:

1 Page: 50 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATK)N DESCRIPTM NUMBER (tf apphcablel CATEGORY METHOD NO.

REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-410 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 58-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-M B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 54-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-23 B4.12 NES 239 6'82 i

O MM O

/

Syst;m: R: actor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:

w< - Date: 6 S/

Document No. 80A4421 App: 44-Date: 974 Preservice Inspection

$532-PERRY Rev:

1 Page: 51 of 145 CAUBRATK)N CODE lOE T ON DESCRI BE Of appicabiel CA ORY REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 54-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-47 B4.12 NES 239 Ov82 i

/

o np.5 o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

m Dat:: 4/f#

Document No. 80A4421 App: A4 Date: C/94 Preservice Inspection 5532-PERRY Rev:

1 Page: 52 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFCATON DESCRIPTON NUMBER Of apphcable)

CATEGORY METHOD NO.

REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV 010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E

.VT-2 I 50-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 50-27 B4.12 1-B31-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-23 B4.12 1-B31-CRD Nozzle 80A0184 N/A B-E VT-2 1 50-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-15 B4.12 NES 239 682

o sing o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

me Date: c41 Document No. 80A4421 App: g Date:

4'5't,I Preservice inspection 5532-PERRY Rev:

1 Page: 53 of 145 CAUBRATON CODE COMPONENT COMPOtENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFsCATION DESCRPTION NUMBER pf apphcable6 CATEGORY METHOD NO.

REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E-VT-2 I 46-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I i

46-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 46-31 B4.12 NES 239 6/82

o nas c

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

ere Date: e/H Document No. 80A4421 App: 44 Date: 694 Preservice Inspection 5532-PERRY Rev 1

Page: 54 of 145

\\

CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCX COUE EXAM ZONE a

OENTIFICATION DESCRIPTION NUMBER cf appincatdel CATEGORY DETHOD NO.

REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1 B13-CRD Nozzle 80A0184 N/A B-E.

VT-2 I 46-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 i }

46-43 B4.12 1

1-B31-CRD Nozzle 80A0134 N/A B-E VT-2 I 46-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E.-

VT-2 I 46-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 42-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-51 B4.12 NES 239 682 i

~

l o

11 E.85 O

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

en,t Date: <; 4(

Document No. 80A4421 App: ff, Date: I,/M Preservice Inspection 5532-PERRY Rev 1

Page: 55 of 145 COMPONENT COMPONENT PROCEDURE OCK CODE AM 2ONE IDENTIFICAT80N DESCRtPTION MlMBER (if enrdenNat CATEGORY RETHOO to RE W CRD PARTIAL PENETRATION WELDS Ret Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-31 B4.12 1-B13-CRD Nozzle 80AG184 N/A B-E VT-2 I 42-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I i

42-23 B4.12 j

l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-19 B4.12 NES 239 6'82

'b b

System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE.c By:

a< Dates e /u Document No. 80A4tt21

~'

App:

4+

Dates ffV Preservice Inspection 5532-PERRY Rev: '

1 Page: 56 of 145 CAU9 RATION CODE COMPONENT COMPONENT

  • ROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRPTION NUMBER (if apphcable)

CATEGCRY hETHOO NO.

FEMARKS CRD PARTIAL PENETRATION WELDS

~

Ref. Dwg. No: 1-RV-010 1 B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 15 B4.12

~'

1-B13-CRD Nozzle 80A0184 N/A B-E VT-2. I -

42-11 B4.12

/

l-B13-CRD Nozzle 80A0184 N/A B.E VT-2 I 42-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A

.B-E VT-2 I 38-03

- B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 33-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-19 B4.12 NES 239 6/82

y O

11EE O

System: Reactor Pressure Vessel '

PROGRAM PLAN AND SC ADULE Byt

/=< Date:, /f 4 Document No. 80A4421 App: M Dater t/ M Preservice Inspection 5532-PERRY Rev:

1 Page: 57 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of apphcable)

CATEGORY METHOD NO REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I B4.12 38-23 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-31 B4.12 8

1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-43 B4.12 i

1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I

]

38-47 B4.12 1-B13-CRD Nozzle ~

80A0184 N/A B-E VT-2 I 38-51 B4.12 NES 239 6/82 i

O MM O

Syst:m: R: actor Prcssura Vcssel PROGRAM PLAN AND CCHEDULE By:

'n( Date: e /.* 4.

s Document No. 80A4421

' App: #4 Date: Y9 %

Preservice Inspection 5532-PERRY Rev:

1 Page 58 of 145 CAU8 RATION CODE IDE I TON CESCRI NUMBE Of CA GORY HOO REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-59 B412 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-39 B4.12 NES 239 6/82 i

O HM O

System: Reactor Pressure Vessel PROGRAE PLAN AND SCHEDULE By:

g Date: s4f Document No. 80A4421 App:

M Date: 4/f4 Preservice Inspection 5532-PERRY Rev:

1-Page: 59 of 145 CAU8 RATION CODE DE NUMBE (if CA GORY HOO No REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 34-35 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-27 B4.12 -

1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 i 34-07 B4.12 NES 239 6/82 i

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

a s-. Date: 24#

Document No. 80A4421 App:._

M-Date: 4/J4 Preservice Inspection 5532-PERRY Rev:

1 Page: 60 of 145 CAUBRAi m CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE minCATION DESCRIPTm NUMBER Si apphcable)

CATEGORY METHOO NO.

REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-11 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-27 B4.12 NES 239 6/82 i

11EE System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE sy:

.., < Date: 4>

Document No. 80A4421 App: _gt Date:

Preservice Inspection 5532-PERRY Rev:

- Page: 61 of 145 -

OSEFYTON DESCR NbMBE CA Y

ME REWJES CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E V T-2 I 30-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-43 B4.12 1-B13-CRD Nozzle 80A0184

.N/A B-E VT-2 I 30-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-59 B4.12 NES 239 6/82

o 11EN O

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: -

in d Date: e A4 Document No. 80A4421 App: & Dates t/F/

Preservice Inspection 5532-PERRY Rev:

1 Page: 62 of 145 CAuBRATON COM T

DE g MBE (if atM CA GORY THOO RE M S CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 8CA0184 N/A B-E VT-2 1 26-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 26-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-31 B4.12 NES 239 6/82 i

o ging o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

p<

Date: s /ff Document No. 80A4421 App:

44 Date: 64 Preservice Inspection 5532-PERRY Rev:

1 Page: 63 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E NnFO DON DESCRPTION NUMOER (if apphcabeel CATEGORY hEETHOD NO.

REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E

. VT-2 1 26-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 26-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-03 B4.12 NES 239 6/82

P 11EE System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:..mr nate:. f /g/ -

Document No. 80A4421 App:

Date ~ Mrv Preservice Inspection 5532-PERRY Rev:

1 Page: 64 of 145 i~

{

l CAllBRATK)N CODE COMPONENT PROCEDURE BLOCK CODE EXAM ZONE COMPONENT IDENTIFICATION DESCR1PilON NUMBER (if apphcablel CATEGORY METHOD NO.

REMARKS I'

CRD PARTIAL PENETRATION WL DS Ref. Dwg. No: 1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-07 B4.12 a

l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-11 B4.12 I

l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-13 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-19 B4.12 c

1 i

l 3~

1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I l

l 22-23 B4.12 F

[

1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-27 B4.12 7

r i

1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-31 B4.12 y

l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-35 B4.12 1

I

e ting o

System: Reacter Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

id Dater

/d Document No. 80A4421 App:

Af Date:

Preservice Inspection 5532-PERRY Rev:

1 Page: 63 o 145 CAUBRATION Co0E

'MBE ttf CA GORY HOO No IEuARKS n

i DE CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-39 B4.12 1-B13-CRD Nozzle 80A0134 N/A B-E VT-2 I 22-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I B4.12 18-55 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-51 B4.12 NES 239 6/82

o BEE o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

m Date: G/Sf ~

Document No. 80A4421 App: A Date: '/ M Preservice Inspection 5532-PERRY Rev:

1 Page: 66 of 145 CALtBRATION CODE COMFONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFK:ATION DESCRIPTION NUMBER Of apphcabiel CATEGORY METHOD PC E MARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-19 B4.12 NES 239 6/82

O MM O

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE sy:

A < Date: a /t/

Document No. 80A4421 App:

4 Date: v54e Preservice Inspection 5532-PERRY Rev:

1 Page: 67 of 145 COMPONENT COuPONENT PROCEDURE CODE E

ZONE IDENTIFICATION DESCRPTK)N NUMBER (if appbcattel CATEGORY WTHOO No.

REMARKS CRD PARTIAL PENETRATION WELDS x

Ref. Dwg. No:.1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 ' I 14-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-23 B4.12 NES 239 6/82

~

i HEN System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

A<

oate: t /$4 Preservice Inspection 5532-PERRY App:

+f Date: c/f4/

Document No. 80A4421 Rev:

1 Page: 68 of 145 CAtl8 RATION CODE E

T DE NUMBER Of 4 cablet CA GORY THOD NO.

REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 l

l l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-31 B4.12 l

l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 14-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-55 B4.12 NES 239 6/82

o n33 o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

4. e Date: 5 /?4 Document No. 80A4421 App:

W Date: c/r4 Preservice Inspection 5532-PERRY Rev:

1 Page: 69 of 145 OE TK:N DE NUMBE CA GCm REW CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 10-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-23 B4.12 NES 239 6/82

m o

11EN o

System: Rcactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

m Date:(. f Document No. 80A4421 App: #

Date: t/r#

Preservice Inspection 5532-PERRY Rev:

1 Page: 70 of 145 COMPONENT COMPONENT PROCEDURE BLOCK CODE M

ZONE IDENTFK;ATION DESCRtPTION PA.luBER Of apokcablel CATEGORY nETHOO NOL REM /.RKs CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 10-15 B4.12 I-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-11 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-27 B4.12 1

1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-31 B4.12 NES 239 682 i

o 1135 o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

dir Date:S/r4 Document No. 80A4421 App: M Dater c/S4 Preservice Inspection 5532-PERRY Rev:

1 Page: 71 of 145 i

CALIBRATION COOE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER til applacablel CATEGORY BETHOO NO REMAFMS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 02-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-27 B4.12 NES 239 fv82

O HM O

System: Rcactor Pressure Vessel PROGRAM PLAN AND SCHEDULE cy:

/E Date: (, /S 4 Document No. 80A4421 App: & ' Date: (/fg Preservice Inspection 5532-PERRY Rev:

1 Page: 72 of 145 -

CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTFICATON DESCRIPTON NUMBER pfapphCabeel CATEGORY METHOO NO.

RE W CRD PARTIAL PENETRATION WELDS Ret Dwg. No: 1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-23 B4.12 NES 239 682

i J' ' U****

System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:

  1. Date: _[/ff_

Preservice Inspection 5532-PERRY Rev:

1 Page: 73 of 145 o YcS nuusYE cAEGCm METtOO REMMMS oc new CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 58-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 58-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A' B-G-2 VT-1 I 58-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 58-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 58-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-19-B B7.10 1-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 54-23-B B7.10 NES 239 682

7

(

System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE

[y:

!* 4 Date: 4 M4 Document No. 80A4421 App:

44 Date: r/rg Preservice Inspection 5532-PERRY Rev:

1 Page: 74 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOPE OENDFICADON CESCRIPDON NUWlER Ofa * =Nel CATEGORY METHOD NCL REuARKs CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 54-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-31-B B7.10 1-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 54-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-39-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-43-B B7.10 i

1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-47-B B7.10 NES 239 6/82

7 o

tip.g System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Ey:

de Date:

V Document No. 30A4421 App: A Date: r/sq Preservice Inspection 5532-PERRY Rev:

1 Page: 75 of 145 FXM COMPONDR COWONENT PROCEDURE OC CODE ZCPE ooanCAnCN DESCRPnON NUMBER Of am*cabW CATEGORY ME NOO m

Ruww,S CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-l' I 50-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-15-B B7.10 NES 239 6/82

O gg

^

/

Lf#

B:

i*

  • Date:

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App: & Date: E/f4 Preservice Inspection 5532-PERRY Rev:

1 Page: 76 of 145 uscM cAEcom i.enUo E muums coar Toe CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-II-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-07-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-31-B B7.10 NES 239 632

i O

gg System: Reactor Pressura V;ssel PROGRAM PLAN AND SCHEDULE EY:

I"I Date: [ff Document No. 80A4421 App:

A4 Date: c/ M Preservice Inspection 5532-PERRY Rev:

1 Page: 77 of 145 COMPONENT COwCEM PROCEDURE OCK CODE XAM ZCr4 comncancm oEscaienon muueca or +=

cartocav merwoo not neuAans CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 42-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I

'42-51-B B7.10 NES 239 682 e

1 0

~

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE EY:

      1. Date:

f#

Document No. 80A4421 App: 4 Date: aN Preservice Inspection 5532-PERRY Rev:

1 Page: 78 of 145 CauSRADON CODE ENT DON DE TION NUMBE W=

m CA GORY THOD NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-19-B B7.10 NES 239 632

System: Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE

[Y:

l'M D**** # A#

Document No. 80A4421 App:

M Date: (/rq Preservice Inspection 3532-PERRY Rev:

1 Page: 79 of 145 cauenanON CooE COMPOPENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICADON DESCR6PTION P&WR Of meew CATEGORY LETHOD NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 42-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-19-B B7.10 NES 239 682

m o

ngg System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE EY:

BC D***: # #

Document No. 80A4421 App: A Date: u!rf Preservice Inspection 5532-PERRY Rev:

1 Page: 80 of 145 CAU9 RATION CODE OEN DE NUMBER pt=P m CA GCRY THOO REMARKS CRDH BOLTING Reg. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-51-B B7.10 NES 239 682

O g3 System: Reactor Pressure Vessel B

D****

Y PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:

M Date: uru Preservice Inspection 5532-PERRY Rev

_1_

Page: 81 of 145 caunRAnCu croe COMPCPENT COMPONENT PROCEDURE BLOCX CODE EXAM ZONE OENTFICADON DESCRPDON NUMBER pta

  • M CATEGORY N

NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-0!!

l-B13-CRDH Flange Bolting 80A0134 N/A B-G-2 VT-1 I 33-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT 1 1 34-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2. VT-1 1 34-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-39-B B7.10 NES 239 632

O HER 0

B:

< Date: c /94 System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

  • Date: uty Preservice Inspection 5532-PERRY Rev:

1 Page: 82 of 145 I-Cumuncu CoCe CCwCPsNT COMPONENT PROCEDURE SLOCK CODE FXM ZCDE OENTFICA'XD4 DESCRPTION PAJMBER Of -

CATER.C9Y ne.THOO 70 REMARKS CRDH BOLTING

s Ref. Dwg. Noe 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-35-B B7.10 7

s h-31-B _

CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I-I-B13-B7.10 1-B13,

CRDH Flange Bolting 30A0184 N/AT B-G-2 VT-1 I B7.10 34-27-6 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-23-B.

B7.10

~

1-3 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I t

l 34-19-B B7.10 1-B13-CRDH Flange Bo!&g 80A0184 N/A B-G-2 VT-1 I 34-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-11-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-07-B B7.10 NES 239 632

_q 7..*'

ys.;g7-

.<-g_,

y,..

... mz.. _ -., - -.

u. ; _

_ ~. E _ -.* - -4 ay-.y s;_

A. j_ A g.w. N. @ _.g.:qmyj_.% p/ ',

.. J.#

7 g

,s

l 0

~

(

B:

'"C D****6d*#

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

  1. Date: (/ra Preservice Inspection 5532-PERRY Rev:

1 Page: 83 of 145 cAuenArou com c Ton o Ycr[u or."8-cAEcony E E

rou unecn ReuAmS CRDH BOLTING Ref. Dwg. No: 1-RV-O!!

l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 34-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-23-B B7.10 1-813-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-27-B B7.10 NES 239 632

o TIEE o

B5

/d Datei /id4 Syst;mt R:: actor Prrssura Vcssel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

M Date: c/re/

Preservice Inspection 5532-PERRY Rev:

1 Page: 84 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTsRCAilON DESCRIPTION NUMBER Of apphcabiel CATEGORY hETHOO NO.

REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011

^

l-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 30-31-B B7.10

~

1-B13-CRDH Flange Bolting 80A0184

~N/A B-G-2 VT-1 I 30-3$-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-39-B B7.10 1-B13-CRDH Flange Bolting' 80A0184 N/A B-G-2 VT-1 I 30-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1

~

30-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-59-B B7.10 NES 239 6/82

O MM O

/

4 f'#

B2

'~" <' D***:

Syst:m: Rcactor Pr:ssurs Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

4 Date: pyL Preservice Inspection 5532-PERRY Rev:

1 Page: 85 of 145 cAueRenoN caos IDE DON DESCR NUMBE Of CA GORY HOO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oll 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-51-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G.-2 VT-1 1 26-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2, VT-1 I 26-43-B B7.10 4

1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-31-B B7.10 NES 239 &82

n o

nm o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

/t<' Date: ad/

Document No. 80A4421 App:

+4 Date: 4/fc Preservice Inspection 5532-PERRY Rev:

1 Page: 86 of 145 CALIBRAT!ON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of aprhcable)

CATEGORY hETH00 NO.

REMARKS CRDH BOLTING Reg. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-03-B B7.10 NES 239 6/82 i

o 11 3.3 o

Syst:m2 Reactor Pressura Vessel PROGRAM PLAN AND CCHEDULE By: -

/*( Date:gM Document No. 80A4421 App:

M Dates (/JS Preservice Inspection 5532-PERRY Rev:

1 Page: 87 of 145 CAU8 RATION

. CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcabiel CATEGORY METHOD NO.

REMARKS CRDH BOLTING Drawing No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-11-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-35-B B7.10 NES 239 6/82

o HEE O

Syst::ms Rccctor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

/?/ Data 4//#

Document No. 80A4421 App:

4+

Date: (/.ry Preservice Inspection 5532-PERRY Rev:

1 Page: 88 of 145 I

CAUBRATION CODE IDE I ICA ON DESCR Of cablel CA GORY HOO No REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-55-b B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 1

22-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-51-B B7.10 i

NES 239 6/82

o HEE O

Systrm: Reactor Pressure Vess:1 PROGRAM PLAN AND SCHEDULE By:

/M' Date:6MY Document No. 80A4421 App:

  1. Date: IM Preservice Inspection 5532-PERRY Rev:

1 Page: 89 of 145 CAUBRATK)N CODE K)E F TON DESCFu ON MBE (if appicable)

CA GORY THOO NO F(MARKS CRDH BOLTING Ref. Dwg. No.1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 18-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A r

B-G-2 VT-1 I 18-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-35-B B7.10 l-B13-CRDil Flange Bolting 80A0184 M/A B-G-2 VT-1 I 18-31-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-19-B B7.10 NES 239 6/82

o TIEN C

System: Reactor Pre:sure Vessel PROGRAM PLAN AND SCHEDULE BY:

d' Date: C/88 Document No. 80A4421 App: M Dates (/M Preservice Inspection 5532-PERRY Rev:

1 Page: 90 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 10ENTIFICATION DESCRIPTION NUMBER (if appleable)

CATEGORY hETHOD No, ffMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-ll-B B7.10 4

1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 14-23-B B7.10 NES 239 6/82

q Syst:mi Rc::.ctor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By:

B/4' Datei/,4(

Document No. 80A4421 App:

4+

Dates w4 Preservice Inspection 5532-PERRY Rev:

1 Page: 91 of 145 i

CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if applicable)

CATEGORY METHOD NO.

REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-39-B B-7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-47-B B7.10 i

1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I

-l 14-51-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-55-B B7.10 NES 239 6/82

O MM C;/f4 System: R: actor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By:

/> # Data I Document No. 80A4421 App: _4t-Date: 63 4 Preservice Inspection 5532-PERRY Rev:

1 Page: 92 of 145 oYcrEnE ocs"cE MEm"OO

^

NUMBE CA Y

REWJES -

CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-31-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-23-B B7.10 NES 239 6/82 e

O MM O

B2 A Date:/M System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App: 44 Dates r/r4 Pa eservice Inspection 5532-PERRY Rev: -

1 Page: 93 of 145 CouPONENT COMPONENT PROCEDURE OCK CODE 2ONE 80ENTIFICATION DESCRIPTION NUMBER (18 apphcable)

CATEGORY WTHOO Ho.

REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-15-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 06-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-31-B B7.10 NES 239 6/82

O gg Q

By:

Datest/94 '

App: /;(

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE 4+

Dates (/Sa Document No. 80A4421 Preservice Inspection 5532-PERRY Rev:

1 Page: 94 of 145 -

CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 10ENTIFICAT60N DESCRIPTION NUMBER (ll applicable)

CATEGORY METHOD No.

REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184

'N/A B-G-2 VT-1 I 06-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 02-31-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-27-B B7.10 i

NES 239 6/82 i

o 11EN O

B:

d' Dat 4 d'I System: Reactor Przssure Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

A Date:

c/R/

Preservice Inspection 5532-PERRY Rev:

1 Page: 95 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE

. EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of applW CATEGORY nETHOO NO.

REMAMKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-23-B B7.10 NES 239 6/82

o ny.5 o

System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:

lM Dat : 8 Ir#

Document No. 80A4421 App:

  1. Date:

vsq Preservice Inspection 5532-PERRY Rev:

1 Page: 96 of'145 i

CAUBRATION CODE IDE F TON DE I

IBE Of cabl4 CA ORY No.

REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #02-39 to Flange 80A0183 N/A B-0 PT I

02-39-W B14.10 1-B13-CRD Housing #02-35 to Flange 80A0183 N/A B-0 PT I

02-35-4r B14.10 1-B13-CRD Housing #02-31 to Flange 80A0183 N/A B-0 PT I

02-31-W B14.10 1-B13-CRD Housing #02-27 to Flange 80A0183 N/A B-0 PT I

02-27-W B14.10 1-B13-CRD Housing #02-23 to Flange 80A0183 N/A B-0 PT I

02-23-W B14.10 CRD Housing #06-15 to Flange 80A0183 N/A B-0 PT I

1-B13-06-15-W B14.10 l-B13-CRD Housing #10-11 to Flange 80A0183 N/A B-0 PT I

10-11-17 B14.10 1-B13-CRD Housing #14-07 to Flange 80A0183 N/A B-0 PT I

14-07-W B14.10 NES 239 6/82

o 11EN O

Syst;mi R: actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By: /M Date: 4df Document No. 80A4421 App:

A4. Date: 9M_

Preservice Inspection 5532-PERRY Rev:

1 Page: 97 of 145 COMPONENT COWONENT PROCEDURE BLOCK CODE ZONE lOENTIFICATION DESCRIPTION NUMBER (if applicablel CATEGORY METHOO NO.

REWARKs CRD IiOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #22-03 to Flange 80A0183 N/A B-0 PT I

22-03-W B14.10 1-B13-CRD i5 sing #26-03 to Flange 80A0183 N/A B-0 PT I

26-03-W B14.10 1-B13-CRD Housing #30-03 to Flange 80A0183 N/A B-0 PT I

30-03-W B14.10 1-B13-CRD Housing #34-03 to Flange 80A0183 N/A B-0 PT I

34-03-W B14.10 j

1-B13-CRD Housing #38-03 to Flange 80A0183 N/A B-0 PT I

38-03-W B14.10 l

i 1-B13-CRD Housing #46-07 to Flange 80A0183 N/A B-0 PT I

46-07-W B14.10 1-B13-CRD Housing #50-11 to Flange 80A0183 N/A B-0 PT I

50-11-W B14.10 1-B13-CRD Housing #54-15 to Flange 80A0183 N/A B-0 PT

.I 54-15-W B14.10 NES 239 6/82

o ting a

B' 6 E D****

Syst::mi R actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE-Y Document No. 80A4421 App:

4 Date: C/s4 Preservice Inspection 5532-PERRY Rev:

1 Page: 98 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEOURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of apphcablel CATEGORY.

hETHOD NO.

REMARKS l

CRD HOUSING WELDS Ref. Dwg. No: 1-RV-Oll 1-B13-CRO Housing #58-23 to Flange 80A0183 N/A B-0 PT I

58-23-W B14.10 1-B13-CRD Housing #58-27 to Flange 80A0183 N/A B-0 PT I

58-27-W B14.10 1-B13-CRD Housing #58-31 to Flange-80A0183 N/A B-0 PT I

58-31-47 B14.10 1-B13-CRD Housing #58-35 to Flange 80A0183 N/A B-0 PT I

58-35-TV B14.10 1-B13-CRD Housing #58-39 to Flange 80A0183 N/A B-0 PT I

58-39-W B14.10 l-B13-CRD Housing #54-47 to Flange 80A0183 N/A B-0 PT I

54-47-W B14.10 1-B13-CRD Housing #50-51 to Flange 80A0183 N/A B-0 PT I

50-51-W B14.10 1-B13-CRD Housing #46-55 to Flange 80A0183 N/A B-0 PT I

46-55-W B14.10 NES 239 6/82

c o

nEN o

Syst;mi Rcactor Pressuro Vessel PROGRAM PLAN AND CCHEDULE By:

/nf Dat:: #4 f Document No. 80A4421 App: A Date: (M Preservice Inspection 5532-PERRY Rev:

1 Page: 99 of 145 COMPONENT COMPONENT PROCEDURE BLOC CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (If applicabiel CATEGORY METHOD NO.

REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #38-59 to Flange 80A0183 N/A B-0 PT I

38-59-ur B14.10 1-B13-CRD Housing #34-59 to Flange 80A0183 N/A B-0 PT I

34-59-W B14.10 1-B13-CRD Housing #30-55' to Flange 80A0183 N/A B-0 PT I

30-59-W B14.10 1-B13-CRD Housing #26-59 to Flange 80A0183 N/A B-0 PT I

26-59-4f B14.10 1-B13-CRD Housing #22-59 to Flange 80A0183 N/A B-0 PT I

22-59-W B14.10 1-B13-CRD Housing #14-55 to Flange 80A0183 N/A B-0 PT I

14-55-W B14.10 1-B13-CRD Housing #10-51 to Flange 80A0183 N/A B-0 PT I

10-51-47 B14.10 1-B13-CRD Housing #06-47 to Flange 80A0183 N/A B-0 PT I

06-47-W B14.10 NES 239 6/82 i

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: /?F D:ta /f(

Document No. 80A4421 App: #

Dater chy Preservice Inspection 5532-PERRY Rev:

1 Page: 100 of 145 CAU0 RATION CODE N NT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY.

AETHOD No.

REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 NOTE: According to General Electric Dwg. #767E957, there are altogether 4 full penetration welds on the CRD housings. Only the CRD housing to Flange weld has been scheduled for examination. The remaining welds are not scheduled at this time, as their exact location and accessibility has not been determined. These welds will included later.

l l

l l

l l

NES 239 6/82

o 11EN O

B3' d(( Date:6((*f Syst:m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 APP: y Date:

GM Preservice Inspection 5532-PERRY Rev:

1 Page: 101 of 145 CAUBRATION LCDE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicabiel CATEGORY METHOD No.

REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-13 B4.13 1-313-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-33 B4.13 NES 239 6/82 i

O MM O

B'

' ' ', U**2*N Y

Syst;mi Rcactor Pressura Vessel PROGRAM PLAN AND CCHEDULE Document No. 80A4421 App:

4 Date:

t/ty Preservice Inspection 5532-PERRY Rev:

1 Page: 102 of 145 cAusRAnON CODE COMPONENT COMPONENT PROCEDURE BLOCK OODE EXAM ZONE BOENTIFICATION DESCRIPTION NUMBER (If appheablel CATEGORY DETHOD NO.

REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-53 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-57 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-45 B4.13 l

1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-41 B4.13 i

1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-33 B4.13 NES 239 6/82 i

g g

g B'

  1. 'M
  • ""*z*

Syst:ms Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y

~ /M Document No. 80A4421 App:

A4 Date:

c Preservice Inspection 5532-PERRY Rev:

1 Page: 103 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicable)

CATEGORY METHOD NO.

REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-21 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-17 B4.13 j

I-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-29 B4.13 l

NES 239 6/82

l o

1133 o

l Syst;mi Reactor Pressura Vessel PROGRAM PLAN AND ' SCHEDULE By: ' g Date: M l

Docurr.ent No. 80A4421 App: & Dates c/M Preservice Inspection 5532-PERRY Rev:

1 Page: 104 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcatM CATEGORY.

METHOO No.

FIEMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-37 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 1 32-49 B4.13 i

1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-57 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E T-2 I 24-57 B4.13 i

1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-41 B4.13 NES 239 6/82

o 11EN o

System: Reactor Pressure Vessel PROGRAM PLAN AN3 SCHEDULE By: /?(

Date:/d Document No. 80A4421 App: A Date: c/f4 Preservice Inspection 5532-PERRY Rev:

1 Page: 105 of 145 COMPONENT COMPONENT PROCEDURE BLO CODE ZONE IDENTIFICATION DESCRIPTION NLtWBER Uf apphcable)

CATEGORY.

nETHOD No.

EMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-37 B4.13 -

1-B13-Instrument Nezzle 80A0184 N/A B-E VT-2 I 24-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-29 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-09 B4.13

.1-B 13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-13 B4.13 l

NES 239 &82

()

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: MV Date: /M4 Document No. 80A4421 App:

M-Date: c/f4 Preservice Inspection 5532-PERRY Rev:

1 Page: 106 of 145 CAueRATm CooE COMPONENT COldPONENT PROCEDURE OLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUWBER Of apphcatdel CATEGORY SETHOD No.

REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-21 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I l

16-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-45 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-49 B4.13 4

1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-53 B4.13 4

NES 239 6/82 i

]

o HEN o

B3 df Date: 4M/

Syst;m R actor Pressuro Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 APP: & Date: c/Se/

Preservice Inspection 5532-PERRY Rev:

1 Page: 107 of 145 CAUBRATION CODE C N NT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDINTlRCATION DESCRIPTION NUMBER (if apphcable)

CATEGORY WTHOD NO.

REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-49 B4.13 1-B13-Instrument Nozzle 30A0184 N/A B-E VT-2 I 08-41 B4.13 1-B13-Instrument Nozzle 80A018' N/A B-E VT-2 1 08-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-17 B4.13 i

NES 239 6/82

o lies o/#

Systemi Rcactor Prc,ssura Vcssel PROGRAM PLAN AND SCHEDULE By:

W Date: A Document No. 80A4421 App:

44-Date:. s/f4 Preservice Inspection 5532-PERRY Rev:

1 Page: 108 of 145 CAUBRATON CODE-COMPONENT COMPONENT PROCEDURE BLOCK COOE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER pf appicabiel CATEGORY nETHOO NO.

HEMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I

A-1 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I

A-2 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I

A-3 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I

A-4 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I

A-5 B6.40 1-B13-Ligament Between Stud Hole 80AIO89 PY-NUT-1-RPV B-G-1 UT-I A-6 B6.40 1-B13-Ligament Between Stud Hole 30A1089 PY-NUT-1-RPV B-G-1 UT I

A-7 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I

A-8 B6.40 NES 239 6/82 i

O MM

(

~

M Date: #M4'-

System: Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By Document No. 80A4421 App:

  1. Date: cm Preservice Inspection 5532-PERRY Rev:

1 Page: 109 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicablel CATEGORY ETHOD NO.

REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

A-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 F Y-NUT-1-RPV B-G-1 UT I

B-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

B-2 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

B-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPVB-G-1 UT I

B-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

B-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

B-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

B-7 B6.40 NES 239 6/82 i

O HM C

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

/W Date: t/f#

Document No. 80A4421 App:

4-Date:

r/ff T

Preservice Inspection 5532-PERRY Rev:

1 Paget 110 ch145 CAUBRATION CODE COMPONr4 COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 4 DEN 11F,CATtON DESCRIPTION NUMBER (ll aM CATEGORY METHOO NO.

REMARKS I

FLANGE LIGAMENT kef. Dwg.~ No: 1-RV-013

~

~

1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-I-RPV B-G-1 UT I

B-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-i-RPV B-G-1 UT - I B-9 B6.40

~

l-B13-Liganient Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

C B6.40,

~.

l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

~C-2 B6.40

~

1-B13-Ligament Betw&n Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

1 C-3 B6.40

,l 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

C-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

C-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

C-6 B6.40 NES 239 6/82

Syst;m:r Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By: /W. Date:FN.

Document No. 80A4421 App: & Dates e/M -

Preservice Inspection 5532-PERRY Rev:

1 Page: 111 of 145 CAUBRATION CODE IDE T ON DE Of icablel CA ORY.

THOD NO REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT-I C-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

C-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

C-9 B6.40 '

l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

D-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

D-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

D-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

D-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

D-5 B6.40 NES 239 6/82 i

~.J

.s r,.;

B3 M dst *:t/N Syst::mt Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

A+ ' Dates? WM -

7

-Preservice Inspection 5532 -PERRY Rev:

1

.Pages 112 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE.

BLOCK CODE

. EXAM ZONE

- IDENTIFICATION DESCRIPTION

- 6 y/

(Il apphcablel CATEGORY DETHOO NO.

RE S

FLANGE LIGAMENT.

Ref. Dwg. No: 1-RV-013 5-1-B13-Ligament Between Stud Hole 80A0189 PY-NU T-1-RPV B-G-1 UT

.I D-6 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

B6.40 D-7 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT ~ I D-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189' Py-NUT-1-RPV B-G-1 UT; I

N D-9 B5.40 l'-B 13-L.igament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

E-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

E-2 B6.40 l

1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

E-3 B6.40 l

l 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

E-4 B6.40 NES 239 6/82

a nm5 o

Syst:mt Rerctor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By: /N[ Date: Ch l

Document No. 80A4421 App: pf_ Date: c/f4t Preservice Inspection 5532-PERRY Rev:

1 Page 113 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTIACATION DESCRIPTION NUMBER (if apphCatW4

CATEGORY, hETHOD NO.

REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 I-B13-Ligament Between Stud Holc 80A0189 PY-NUT-1-RPV B-G-1 UT I

E-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-l' UT I

E-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

E-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

E-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

E-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

F-1 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

F-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

F-3 B6.40 NES 239 6/82

O gM c;N Syst;mt Rractor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:

/M. Date:

Document No. 80A4421 App:

W.

Date:

@,t Preservice Inspection 5532-PERRY Rev:

1-

' Page: 114 of 145 CAUBRATK)N CODE COMPONENT COMPONENT PROCEDURE block CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicablel CATEGORY METHOO No.

REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Holc 80A0189 PY-NUT-1-RPV B-G-1 UT I

F-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

F-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

F-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I.

F-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

F-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

F-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-2 B6.40 NES 239 6/82

O MM G

/

SYSt:mt Reactor Pressuro Vessel PROGRAM PLAN AND CCHEDULE By:

//rf Dater 6 ff Document No. 80A4421 App: 44 Date: c/fg Preservice Inspection 5532-PERRY Rev:

1 Page: 115 of 145 '

CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcablel CATEGORY hETHOD NO, REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

G-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-1 B6.40 NES 239 6/82 i

i

O HM c)

/f f Date:

fd

/

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

Document No. 80A4421 APP:

M-Date: c,/se/

Preservice Inspection 5532-PERRY Rev 1

Page: 116 of 145 CALIBRATION CODE COMPONEt:T COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY hETHOD No, REMARKS FLANGE LIGAMENT Ref. Dwg. ' No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-6 B6.40 S

1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I

H-9 B6.40 NES 239 6/82

By:

A /( ' ~ Date:

Syst mt Recctor Pressura Vcssel PROGRAM PLAN AND CCHEDULE App: # Date:

~ y Document No. 80A4421 Preservice Inspection 5532-PERRY Rev:

1 Page: 117 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcablel CATEGORY nETHOO NO REMARKS CLOSURE HEAD BOLTING Ret Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-1 1-RPV B6.30 80A0185 N/A MT -

1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-2 1-RPV B6.30 80A0185 N/A M T-l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-3 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-4 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-5 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-6 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-7 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-8 1-RPV B6.30 80A0185 N/A MT NES 239 6/82

o 11EN o/r# -

Syst:m: R; actor Prcssure Vessel PROGRAM PLAN AND SCHEDULE By

/ M ' Dat:: s Document No. 80A4421 App: A Date:

c/ M Preservice Inspection 3532-PERRY Rev:

1 Pages 118 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of appkcable)

CATEGORY, BETHOO No.

REP %RKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-9 l-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-10 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-11 1-RPV "6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-12 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-13 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-14 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-15 1-RPV B6.30 80A0185 N/A MT.

1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-16 1-RPV B6.30 80A0185 N/A MT I

NES 239 6/82 i

Syst:mt Rc. actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:. A < oate: h Document No. 80A4421 APP: _dt Dates o' 4 f

Preservice Inspection 5532-PERRY Rev:

1 Page: 119 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appleable)

CATEGORY METHOD Not REMARKS l

CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-17 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-18 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 50A0196 PY-STUD-B-G-1 UT I

38-1-19 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-20 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-21 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-22 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-23 1-RPV B6.30 SOA0185 N/A MT l

l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-24 1-RPV B6.30 80A0185 N/A MT NES 239 6/82 i

o 11EN O

System: Reactor Pressure Vcssel PROGRAM PLAN AND CCHEDULE By l'f( Dat:: //f/

Document No. 80A4421 App:. E Date: E/fty Preservice Inspection 5532-PERRY Rev:

1 Page: 120 of 145 Cauer.non CooE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE

.DENTIFICATION DESCRIPTION NUMBER (If apphcatded CATEGORY ETHOO No.

REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-25 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-26 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-27 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-28 I-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-29 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-30 1-RPV B6.30 80A0185 N/A

'MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-31 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-32 1-RPV B6.30 80A0185 N/A ur NES 239 6/82

O HM r0 l'W Date h/9/

B8 Syst;m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App: & Date:. E/f#

Preservice Inspection 5532-PERRY Rev:

1 Page: 121 of 145 CoupoNENT CoupoNENT PROCEDURE oCK CoOE ZONE IDEd flFICATioN DESCRieTK)N NUMEIER (11 apphcablet CATEGORY hEETHOO No.

REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-33 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-34 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-35 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-36 1-RPV B6.30 i

80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-37 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-38 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-39 l-RPV B6.30 80A0185 N/A MT 1-B13-Clo'.are Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-40 1-RPV B6.30 80A0185 N/A MT NES 239 6/82

M Dated W 8F Systemi Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:

4+

Date: W39 Preservice Inspection 5532-PERRY Rev:

1 Page: 122 of 145 o EEEoM No" DE N

NUMBE CA GORY ME REuUES CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-41 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-42 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud

-80A0196 PY-STUD-B-G-1 UT I

38-1-43 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-44 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-45 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-46 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-47 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT i

38-1-48 1-RPV B6.30 I

80A0185 N/A MT NES 239 &'82 i

j

ll 9

o 11EE o/8'I Bv:

NN Date: 6 System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:. 44-Date:- @/

r

{

Preservice Inspection 5532-PERRY Rev 1

Page: 123 of 145 cAUBRADON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZCNE IDENTFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY METHOO No.

REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014

" =

l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-49 l-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-50 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-51 1-RPV B6.30 80A0185 N/A MT i

1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-52 1-RPV B6.30

=-

t 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-53 1-RPV B6.30 80A0185 N/A MT l

8 l

l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

?

38-1-54 1-RPV B6.30 80A0185 N/A MT g

l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-55 1-RPV B6.30

[

80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-56 1-RPV B6.30 80A0185 N/A ur ll NES 239 &82 i

(

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By

/*/ Dat :6h[

Document No. 80A4421 App:

M Date: cN4' Preservice Inspection 5532-PERRY Rev:

1 Page: 124 of 145 CALIBRATION CODE 40ENT TlON DESCRt NUMBE (11 appicablel CA ORY.

T No REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-57 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-58 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-59 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-60 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-61 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1

38-1-62 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A014 PY-STUD-B-G-1 UT 1

38-1-63 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-64 1-RPV B6.30 80A0185 N/A ur NES 239 6/82 i

a B2 br Date: 6/94 Syst;ms R actor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

44-Date: ch, Preservice Inspection 5532-PERRY Rev:.

1 Page: 125 of 145 KEEE D YES NUMBE P

CA GmY ME JD REM /MS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-65 1-RPV B6.30 80A0185 N/A MT I-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-66 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-67 1-RPV-B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-68 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-69 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-70 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-71 1-RPVs B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I

38-1-72 1-RPV B6.30 80A0185 N/A MT NES 239 6/82 i

O

- MM C)

System: Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:

44 Date: t/#.

~

Document No. 80A4421 App: 44-Date:

r/Sy.

Preservice Inspection 5532-PERRY Rev:

l~

Page: 126 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCFDPTION NUMBER (if applicable)

CATEGORY.

nETHOO NO.

fEMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-1 B6.10 l-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-2 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-3 B6.10 1-B13-Closure Nut 80A0185 W/A B-G-1 MT I

39-5-4 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

l 39-5-5 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-6 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-7 B6.10 4

1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-8 B6.10 1

NES 239 6/82

B' D**** E N Y

Syst;mi Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: 4f Date: car =/

Preservice Inspection 5532-PERRY Rev:

1 Page: 127 of 145 CAU8 RATION CODE IDE TON DE NUMBE Of am hw CA GORY HOD NO REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-9 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-10 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-11 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-12 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-13 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-14 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-15 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-16 B6.10 NES 239 6'82 i

O MM O

Sy;; tem: Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE By

!s <

Date: 6/v/

Document No. 80A4421 APP:

4+

Date: 64 Preservice Inspection 5532-PERRY Rev:

1 Page: 128 of 145 CAUBRATION CODE IDE DE NUMBER Of CA GORY HOD NO REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-17 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-18 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-19 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-20 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-21 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-22 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-23 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-24 B6.10 NES 239 6B2 i

o NEE o

System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:

6 Date: C //

Document No. 80A4421 App.

,M bates (/y4 Preservice Inspection 5532-PERRY Rev:

1 Page: 129 of 145 -

CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE sDENTIFICATION DESCRIPTION NUMBER (11 appicablel

CATEGORY, hETVJO NO.

REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-25 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-26 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-27 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-28 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-29 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-30 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-31 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-32 B6.10 NES 239 6/82

o HEE O

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: g Date:6N Document No. 80A4421 App: A Dater r/w Preservice Inspection 5532-PERRY Rev:

1 Page: 130 of 145 1

CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTWICATnON DESCRIPTON NUMBER (if appleab!el CATEGORY LETHCO No.

REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-33 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-34 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-35 B6.10 1-B13-Closure Nut 80A0185 N/A B-G.1 MT I

39-5-36 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-37 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-38 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-39 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-40 B6.10 NES 239 6/82

%,,/

/'+t Date: (_/.f__/_

Syst;m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE B:

Y Document No. 80A4421 App:

/

Date: WM Preservice Inspection 5532-PERRY Rev:

1 Page: 131 of 145 CADORATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE ENTFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY hETHOO No.

REMARKS l

CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-541 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-542 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-43 B6.10 l-B13-Closure Nut 80A0185 N/A 3-G-1 MT -

I 39-544 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-45 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-546 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-47 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-48 B6.10 NES 239 6/82 i

e 0

11EN e

B2 D***:###

Systems Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE Y

Do ument No. 80A4421 App: H Date: cast Preservice Inspection 5532-PERRY Rev:

1 Page: 132 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATON DESCRIPTION NUMBER Of apphcabiel CATEGORY METHOO No.

REMARKS,

CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-49 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-50 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-51 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-52 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-53 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-54 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-55 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-56 B6.10 NES 239 6/82

O MM

<D PROGRAM PLAN AND SCHEDULE By:

At Date: 4///

System: Reactor Pressure Vessel Document No. 80A4421

. App: A Date:

c/sq Preservice Inspection 5532-PERRY Rev:

1 Page: 133 o'f 145 CAueRATm CODE COMPONENT COMPONENT PROCEDURE BLOCK COCE EXAM ZONE IDENTWICATION DESCR1PTION NUMBER Of apphcabiel CATEGORY h4ETHCO No.

REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-57 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-58 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-59 B6.10 1-B13-Closure Nut 30A0185 N/A B-G-1 MT I

39-5-60 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-61 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-62 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-63 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-64 B6.10 NES 239 6/82 J

y o

MEN 0

System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:

ezrr Date:. /f/

Document No. 80A4421 APP: g Date:

a-Preservice Inspection 5532-PERRY Rev:

1 Page: 134 of 145 cAuBRATON coOE COMPONENT COMPONENT PROCEDURE BLOCK COOE EXAM ZONE OENTIFICATON DESCRIPTON NUMBER (If apphcatded C.TEGORY.

METHOO NO NW CLOSURE HEAD NUT Ret Dwg. No: 1-RV-015 1-BI3-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-65 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-66 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-67 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-68 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-69 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-70 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-71 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I

39-5-72 B6.10 NES 239 6/82

(']

)

d_*g Date def B8 System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4421 App:

4+

Date: Q4 Preservice Inspection 5532-PERRY Rev:

1 Page: 135 of 145 CAUBRATON CODE N;ir COMPOhENT PROCEDURE BLOCK CODE EXAM ZONE OENTWOATON DESCRPTION NUMBER (ifWeam CATEGORY METHOO NO.

REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-1 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-2 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-3 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-4 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-5 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-6 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-7 B6.50 80A0184 N/A B-G-1 VT-1 I 1-B13-Closure Washer 39-6-8 B6.50 NES 239 682

T O

MM D[N 4

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

4 Date:

Document No. 80A4421 App:

Date: (/r4 Preservice Inspection 5532-PERRY Rev:

1 Page: 136 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOPE OENTIF. CATION DESCRIPTION NUMBER (If apphcablet t'ATEGORY METHOD No.

REM / RKs CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-9 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-10 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-11 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-12 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-13 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-14 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-15 B6.50 1-813-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-16 B6.50

'l NES 239 6/82

o 11EE e

System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:

M Date:th Document No. 80A4421 App:' g Date:

OM Preservice Inspection 5532-PERRY Rev:

1 Page: 137 of 145 cAuenanos com axEE MYS NUMBE M=

CA GORY MENOO NO RE W CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 s

1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-17 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-18 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-19 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-20 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-21 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-22 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-23 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-24 B6.50 NES 239 632 i

( b (O

4N/

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

g'e' Date:

4

' Dates _ _W4 Document No. 80A4421

- App:

Preservice Inspection 5532-PERRY Rev 1

Page: 138 of 145

.I' CacmaroN COc4 s

COMPCNENT COMPOPENT _

PROCEDURE t.LCCK CODE EXAM ZONE CENTIFsCATtON DESCRaPTOs NUMBER

  1. fmar*c= W CATEGORY nETHOO NC1 REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016

~

1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-25 B6.50 f

I-813-Closure Washer 30A0184 N[A B-G-1 VT-1 I d

39-6-26 B6.50 c

I 1-B13-C!csure Washer 80A0184 N/A

'B-G l VT-1 I

~

39-6-27 B6.50 1-313-Closure Washer 30A0184 N/A B-G-1 VT-1 l' '

39-6-28 B6.50

~

1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-29 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-30 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-31 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39632 B6.50 NES 239 6/82

eD 1135 o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Sy:

ng Date: 4 /N '

Document No. 80A4421 App: & Date: @$r/.

Preservice Inspection 5532-PERRY Rev:

1 Page: 139 of 145 CAttBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOME ICENTIFICATON DEsCRPTON NUMBER Ofarw*e m CATEGORY nETHOO NO.

REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-33 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-34 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-35 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-36 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-37 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-38 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-39 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I l

39-6-40 B6.50 NES 239 6B2

o 113g q.

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

M Date: Off Document No. 80A4421 App: 4 _ Date: ON Preservice Inspection 5532-PERRY

_ Rev:

1 - Page 140 of 145 cAuBRmON COOr 30E IF TON DE NUMBE

. (11 a CA GORY ME No REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A01114 N/A B-G-1 VT-1. I 39-6-41 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-42 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-43 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-44 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-45 B6.50 1-B13-Closure Wr. sher

~80A0184 N/A B-G-1 VT-1 I 39-6-46 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-47 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-48 B6.50 NES 239 6/82

o 1185 o

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

/?i( Dat:24 4 (

Document No. 80A4421 App: g Date: cArg Preservice Inspection 5532-PERRY Rev:

1 Page: 141 of 145 CAUDRATKW CODE IDE T ON DE 440E Uf CA GORY D100 No

' IEMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-49 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-50 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-51 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 1 39-6-52 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-53 B6.50 l-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-54 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-55 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-56 B6.50 NES 239 6/82

O MM C

Syst;m2 R: actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:

/sN Date: M-Document No. 80A4421 App: 44 Date: Vfte. -

~

Preservice Inspection 5532-PERRY Rev:

1 Page: 142 of 145 CAUBRATIOF CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY.

METHOO No E MARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-57 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 1 39-6-58 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-59 96.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-60 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-61 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-62 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1. VT-1 I 39-6-63 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6 B6.50 NES 239 6/82 i

System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

ri Date: / r Document No. 80A4421 App:

Date Preservice Inspection 5532-PERRY Rev:

1 Page: 143 of 145 l

CAueRAnON COoE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTFICADON DESCRIPTION NUMBER Uf apphcablel CATEGORY METHOO No.

REMARKS

,is CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-65 B6.50

=

1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-66 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-67 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-68 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-69 B6.50 '

1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-70 B6.50 1-B13-Closure Washer 80A018%

N/A B-G-1 VT-1 I 39-6-71 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-72 B6.50 NES 239 6/82

o HEN o

=

/V Date:([84 S stem: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:

d>cument No. 80A4421 App: $ Dater y Preservice Inspection 5532-PERRY Rev:

1 Page: 144 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION Nut /3ER (If apphcat*$

CATEGORY h4ETHOO NCE REMARKS SYSTEM LEAKAGE TEST Ref. Dwg, No: 1-RV-001 1-B13-Reactor Vessel Pressure 80A0184 N/N B-P VT-2 I Leakage Retalning Boundary B15.10 2

[

NES 233 6/82

o 11p.5 o

System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By: - 41 ( Date: 8/II Document No. 80A4421 App: V Date:

eV/#

Preservice Inspection 5532-PERRY Rev:

1 Page: 143 of 145 9

CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLX,K CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcabiel CATEGORY METHOD NO.

REMARKS l

l I

REACTOR VESSEL INTERIOR Ref. Dwg. No: 1-RV-001 1-B13-Retete-Vessel Interior 80A0184 N/A B-N-2 VT-1 I Attachment Attachinants B13.20 l-B13-Reactor Vessel Core Support 80A0184 N/A B-N-2 VT-1 I Core Support Structure B13.21 1-B13-Reactor Vessel Interior 80A0184 N/A B-N-1 VT-3 I Interior B13.10 l

l l

J i

NES 239 6/82

-