7 F-
~
~ July 23, 1984 Date ISI FIELD CHANGE AUTHORIZATION RPV Preservice Inspection Program Plan for Perry Document Title Npo/r Document No. 00A44 21 Rev.
1 Field Change No.
FC #1~
Originator C. Tedesco Description of Field Change:
Page 5, Para. 3.4 - Change: "Subarticle T-540 of Article 4 of
'ASME'Section V, 1900 Edition".
To Read: "Subarticle T-434 of Article 4 of ASME Section V, 1977 Edition through Addenda Summer 1978 and Subarticle III-3400 of Appendix III of ASME Section Reason f or Change:
XI, 1977 Edition through Addenda Summer 1978.
To correct mistaken Code selection in para.
3.4. APPROVALS
Title
- L;e j;re Date a
CEI/NDE OA
~
I/
)..:n.
7/ </W ISI Eng. Dept. Mgr.
Proj. Mgr.
g QA Manager bhC. AcW h
- 7 7/e'py Distribute to all Controlled Copy holders ' affected Document.
l NOTE:
A' copy of this authorization shall be attached to the affected document until a subsequent revision incorporates the field change 8409040132 840028 PDR ADOCK 05000440 e
G PDR J
80A4421 1
DOCUMENT NO.
REV.
NUCLEAR ENERGY SERVICES, INC.
PAGE 1
nF 145 L]
F COMR0' LED B0PY ;bh l
REACTOR PRESSURE VESSEL PRESERVICE INSPECTION PROGRAM PLAN FOR PERRY NUCLEAR POWER PLANT UNIT 1 PREPARED FOR CLEVELAND ELECTRIC ILLUMINATING COMPANY Project Applicatio3532 Prepared By Asrar Ahmed
-yEpf)
EE:b Date g/3,/g3 APPROVALSI TITLE / DEPT.
SIG N AT U R E DATE Inspection Programs Manager ggg,p/p
(
[
pffg Project Manager
(((
pfp 3 Q.A. Manager y[
j,, g,g4
- h_y_g, u-l FORM # NES 2042 80 i
80A4421 REVISION L0G ggg 2
145 PAGE OF NUCLEAR ENERGY SERVICES. INC.
~~
DATE
"#[E DESCRIPTION APPROVAL AE '
n gO 1
6/20/84 All CRA # 4394 V
Incorporate customer comments and inhouse corrections.
'O
\\, /
AU FORM # NES 206 2 80
^
DOCUMENT NO.
PAGE OF p
NUCLEAR ENERGY SERVICES. INC.
j G
TABLE OF CONTENTS PAGE 1..
INTRODUCTION 4
J 2.
BASES FOR PRESERVICE INSPECTION PROGRAM 4
3.
PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 5
3.1 Classification 5
3.2~
Exemptions 5
3.3 Exceptions 5
3.4 Ultrasonic Testing Calibration Standards 5
3.5 Examination Procedures 6
3.6 Figures and Sketches 8
4.
PROGRAM PLAN AND SCHEDULE 9
WELD MAP FIGURES 10 SCHEDULE SHEETS 26 TABLES 3.4 Reference Calibration Standards 6
3.5 Reference NDE Procedures 7
3.6 Reactor Pressure Vessel Sketches 8
O i
FORM #NES 205 2/80
80A M21 DOCUMENTfjo.
"g PAGE OF NUCLEAR ENERGY SERVICES. INC.
- 1. INTRODUCTION This Program Plan has been prepared to fulfill the Preservice Inspection (PSI) requirements for the Reactor Pressure Vessel (RPV) of the Perry Nuclear Power Plant (PNPP) Unit 1, owned by Cleveland Electric Illuminating Company.
The scope of these examinations, procedures, and acceptance criteria meet the requirements outlined in Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, " Rules for Inservice Inspection of Nuclear Power Plant Components",1977 Edition with Addenda up to and including the Summer 1978 Addenda.
- 2. BASES FOR PRESERVICE INSPECTION PROGRAM Title 10 of the Code of Federal Regulations, Part 50, Subsection 10CFR 50.55(a) establishes the edition of Section XI of the 'ASME' BPV Code applicable to Preservice Inspection of the Reactor Pressure Vessel. Based upon the construction permit, which was issued on May 3,1977, this unit is required to comply with requirements set forth in ASME Code no earlier than Summer 1972 Addenda of 1971 Edition. However, it is the intent of Cleveland Electric Illuminating Company to comply with the PSI requirements of the 1977 Edition of ASME Section XI with Addenda through Summer 1978.
Consideration will be given to the provisions of Nuclear Regulatory Commission (NRC)
Regulatory Guide 1.150," Ultrasonic Testing of Reactor Vessel welds during Preservice and Inservice Examinations", Regulatory Guide 1.65, " Inspection of Reactor Vessel Studs" and Regulatory Guide 1.58, " Qualification of Inspection Personnel".
O FORM #NES 205 2/80
80A4421 DOCUMENT NO.
PAGE OF Q
NUCLEAR ENERGY SERVCES. INC.
v
- 3. PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 3.1 CLASSIFICATION All the components covered in this program plan are part of the reactor coolant pressure boundary as defined in 10CFR 50 subsection 50.2(v).
3.2 EXEMPTIONS None of the wolds or components of the RPV are exempted from examination by subparagraph IWB-1220 of ASME Section XI..
3.3 EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as allowed by 10CFR 50.55 a(a)(2), provided that design fabrication, installation, testing and inspection performed in compliance with Codes and Section XI requirements would result in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative examination w ~' provide an acceptable level of quality and safety.
Detailed descriptions and justifications for exceptions taken are itemized in Table 3.3. (Later) 3.4 ULTRASONIC TESTING CALIBRATION STANDARDS The UT Examination Calibration Standard design and material selection is in accordance with subarticle T-540 of Article 4 of 'ASME'Section V,1980 Edition.
Table 3.4 lists all the UT Calibration Standards required to perform the Ultrasonic Examinations for the RPV at Perry Nuclear Power Plant.
O V
FORM s NES 205 2/80
DOCUMENT NO.
PAGE OF h_
- NUCt. EAR ENERGY SERVICES, INC.
- %.)
TABLE 3.4 Reference Calibration Standards Block Wall Title Where Used Thickness Material d
PY-123-1-RPV Bottom Head Plate 8.15" SA 533 GRB, CLI PY-124-1-RPV No.1 Shell Ring 7.0" SA 533 GR3, CLI No. 2 & No. 3 Shell Ring g
No. 4 Shell Ring PY-127-1-RPV Top Head Dollar Plate 3.08" SA 533 GRB, CLI PY-128-1-RPV Top Head Radial Plates 5.0" SA 533 GRB, CLI PY-SE-BI-l Nozzle Safe-end
.745" SA 336 CLF8 SA 508 CLII PY-SE-CS-1 Nozzle Safe-end
.756" SA 105 O
ev-SE-CS-2 Nozzie Sefe-end 1.51" SA 516 GR70 PY-SE-BI-3 Nozzle Safe-end 1.15" SB 166 INCO SA 508 CLII PY-SE-BI-4 Nozzle Safe-end 1.27" SA 182 F316L SA 508 CLIA PY-SE-BI-5 Nozzle Safe-end 1.50" SA 336 CLF8 SA 508 CL2, PY-SE-BI-6 Nozzle Safe-end Later Later PY-STUD-1-RPVClosure Stud 61/4" SA 540 B23, CL3 PY-NUT-1-RPV Closure Nut 61/4" SA 540 B23, CL3 3.5 EXAMINATION PROCEDURES Subarticle IWA-1400 of Section XI requires the development and preparation of written examination procedures neces,ary for the conduct of the nondestructive examinations associated with PSI operations. The written procedures for the performance of visual, surface, and volumetric examinations are referenced in O
Table 3.5.
%j FORM # NES 205 2/80
80A4421 DOCUMENT NO.
PAGE OF NUCLEAR ENERGY SERVICES, INC.
TABLE 3.5 REFERENCE NDE PROCEDURES Procedure No.
Title 80A0183 Procedure for Liquid Penetrant Examinations 80A0184 Procedure for Visual Examinations Procedure for Magnetic Particle Examinations 80A0185 80A0189 Ultrasonic Examination Procedure for Reactor Vessel to Flange and Flange Ligament areas 80A0190 Manual Ultrasonic Examination Procedure for Nozzle Inner Radil 80A0191 Manual Ultrasonic Examination Procedure for Reactor Vessel Nozzle to Shell Welds.
b 80A0192 Manual Ultrasonic Examination Procedure for Closure Head and Nozzle Welds 80A0195 Manual Ultrasonic Examination Procedure for Nozzle Safe-end and Transition Welds 80A0196 Ultrasonic Examination Procedure for Studs & Bolts 80A0208 Automated Ultrasonic Examination Procedure for Reactor Vessel Welds 80A0209 Automated Ultrasonic Examination Procedure for Reactor Vessel Nozzle Welds b
80A0211 Remote Ultrasonic Examination Procedure for Nozzle Safe-end and Transition Welds FORM # NES 205 2/80
80A4421 DOCUMENT NO.
PAGE OF NUCLEAR ENERGY SERVICES, INC.
(-]
3.6 FIGURES AND SKETCHES The figures listed in Table 3.6 delineates the identification and location of areas of the Reactor Pressure Vessel requiring examinations.
TABLE 3.6 REACTOR PRESSURE VESSEL SKETCHES Figure No.
Revision Description 1-RV-001 0
Reactor Vessel Internals 1-RV-002 0
Vessel Roll-Out, Vertical and Circumferential Welds 1-RV-003 1
Reactor. Recirculation Nozzle Welds g
1-RV-004 1
1-RV-005 0
Core Spray & RHR Nozzle Welds l-RV-006 0
Closure Head Circumferential & Meridional Weld 1-RV-007 0
Bottom Head Welds
~
1-RV-008 0
Main Steam & Vibration Nozzle Welds 1-RV-009 0
Jet Pump & CRD Return Nozzle Welds 1-RV-010 0
CRD Partial Penetration Welds 1-RV-011 0
CRD Mechanism Housing Welds and Flange Bolting 1-RV-012 i
Bottom Head Incore Partial Penetration Welds d
1-RV-013 0
Vessel Flange Ligaments 1-RV-014 0
Closure Head Studs l
l-RV-015 0
Closure Head Nuts 1-RV-016 0
Closure Head Washers l
l O FORM # NES 205 2/80 l
^
DOCUMENT NO.
PAGE OF NUCLEAR ENERGY SERVICES, INC.
b,n
- 4. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.
Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, and any calibration standard number referenced for ultrasonic examination.
Examination items are first divided according to the figure that they appear on.
Multiple examination requirements of the same component are listed together in the schedule tables.
Supplemental surface examination (PT) on the Feedwater Nozzles Inner Radius in accordance with Nuclear Regulatory Commission NUREG-061g "BWR Feedwater b Nozzle and CRD return line Nozzle Cracking", has been scheduled per CEI request.
l l
O FORM #NES 205 2/80
80A @
DOCUMENT NO.
[]
NUCLEAR ENERGY SERVICES. INC.
VENT AND HEAD SPRAY
_ I_
\\
TEAM DRYER ASSEMBLY i.
'[
STEAM OUTLET i
),
STEAM SEPARATOR ASSEMBLY 3
FEEDWATER INLET b II
..L
-hid COR' E SPRAY INLET A
l N
. g FEEDWATER SPARGER v,
f LQW PRESSURE COOLANT l
INJECTION INLET
- dd
-l CORE SPRAY LINE CORE SPRAY SPARGER I.
b j
_, j O
d JET PUMP ASSEMBLY 1
CORE SHROUD
%"~
CONTROL BLADE FUEL ASSEMBLIES
,[
~
/
CORE PLATE JET PUMP /RECTRCUL ATI W
l WATER INLET k
/ /
ECIRCULATION WATER OUTLET d,
,,.- l :
VESSEL SUPPORT SKIRT #
SHIELD WALL
\\
'b\\l i,
}
/
CONTROL ROD DRIVES #
pt hl"l
/
\\
CONTROL ROD DRIVE
/
HYDRAULIC LINES 11EE ---
IN-CORE FLUX MONITOR nra REACTOR VESSEL B 13 CUTAWAY
=0
- l RV-OOI
- ",*I/#[
CLASSI
,f PERRY UNIT I
,,or to seu l
FORM #NES 205 2/80
80A421 DOCUMENT NO.
II 145 PAGE OF NUCLEAR ENERGY SERVICES, INC.
d 319' 288*
19 9*
168*
7s*
48' O'
I I
SHELL FLANG E
_ _ _ EL.7pOO _ _
~
11-843-41 l
-il-913-BN I 3
3 3
')
N NO.4 SHELL RING b
k l
6 O
_ {gl[5 y 1 k
P
- O 1
I_ _ _ _ s 555$ _ _
)
'3 G
@h@ 886 O
G5 h
NQ 3 SHELL RING O
l
-5=
_ - n @ re m _
, _ _ _ _EL _3,,
o rA6El o
o o
l I2 12 12 12 h
NQ2 iiHELL RING
{
{
13.g3 4g1 H i-m i
_ __ _EL_203,69_ _
O h@0@ @@
O * @,@ @ @ d l
,1 SHELL RING g,
g Il-M3-A A l
_ _ _ L 8g_ _ _ _f l
E BOTTOM HEAD m
w J
~
aso*
Micf 137' do* d' 257*
O sozzte LOcATiOs Os ReACrm vEsSEt ssEtt CBI REE NO.
73-C100 ( 14 oWG,NO, 21 REV 4 gg g=
22 REV 5 ma w
hhk "E"
" VESSEL ROU:OUT VERTICAL AND Bl3 l
CIRCUMFERENTIAL SEAM m e.o.1-RV-OO2
=
."[h CLASS I
~
PERRY UNIT I un m sens FORM #NES 205 2/80
DOCUMENT NO. 80A4421 gg 12 145 gg PAGE OF (Q
NUCLEAR ENERGY SERVICES, INC.
x_J l l-Bl3-NIB -KAI I Bl3-N2A-I R I Il-Bl3 NIB-lR I l-Bl3-N2K K A; l 1 - 813-NIB-KB l
! l-813-N2A-KA l l l-Bl3-N2K-KB l-Bl3-N2A-KB l
~
l l-Bl3-N2K-l R g
p ll-Bl3-N2B 4R l ll-Bl3-N2J KAl ll-B13-N28-KA l 11 Bl3-N2J -KB!
[
ll-Bl3 -N29-KBI j
<R I-Bl3-N2C-IRl ll-Bl3-N2J -lR I
/\\
\\
ll-Bl3-N2H KA f
11-Bl3-N2C-KA l Il-Bl3-N2H -KB.
l [-BI3-N2C -KB l
/
ll-813 - N2H-IR
.)
/
q i.g3.N2D IRI ll Bl3-N2G-KA l-Bl3-N2D-KAl Il-Bl3-N2G-K l l-Bl3-N2D -KBI
+
1 I l-813-N26-IR
_c l-Bl3-N2E-IR I l l-Bl3-N2F-KA l l l-Bt3-N2E-KAl ll-Bl3 N2F-KBI 11-Bl3-N2E-KB l Il-BI3 -HI A-KA ll-Bl3-NIA-KB l Il-Bl3-N2F-IR I.Bl3 NIA-IRI CBI REF NO 73-CIOB NI-RECIRC OUTLET NOZZLE DWG NO 165 REV,1 N2-RECIRC lNLET N0ZZLE Si REV.3 KA-NOZZLE TD VESSEL WELD 55 REV,4 KB-tOZZLE 10 SAFE END WELD KC-SAFE END TO SAFE END EXTENTION WELD IR - N0ZZLE INNER RADIUS N E h. = = =. - - =
sysras DTLE RECIRC NOZZLE Bl3 mI
= = l RV-OO3 p
= //W care s//8/U CLASS I x
-y care s/r4 PERRY-UNIT I a m sua FORM #NES 205 2/80
DOCUMENT NO.
80A4421.
pAGE 13 OF 145 NUCt. EAR ENERGY SERVICES, INC.
I-B13-N4F-KB l O'
l 1 -Bl3-N4F-KA g.gl3.N4A-KB l l l-Bl3-N4F IR g,g,3,g_g ;
' 30 l l-B13-N4A-IR l TYP.
Il-813 N4E KA l-BG-N48-IR l ll-Bl3-N4E - K B
\\
I-Bl3-N48 KBl 9
^I l l-Bl3-N4E-IR I l B13 N40-IRl 30' 11-Bl3-N40 -KA i I - 813-N4C-IRl
- p. 843-N40- K B l I-813-N4C-KA l l-Bl3-N4C-KB l 18 0*
CBI REE NO, N4-FEEDWATER NOZZLE 73 -C108 KA-NOZZLE TO VESSEL WELD DWG, NO,165 REV. I KB-NOZZLE TO SAFE END WELD 62 REV 4 KC - SAFE END TO SAFE END EXTENSION WELD IR - INNER RA01US TIEL87 ---
= l-
== l RV-OO4 h
OK ura.614Is4 CLASS I wM ura: s/ra PERRY - UNIT I
.or to seu FORM #NES 205 2/80 L
80A M DOCUMENT NO.
q NUCLEAR ENERGY SERVICES, INC.
G Oo
! l-913-NGA-I RI l-Bl3-N6A - kcl I
l l-Bl3-NGA-KB l 4
45 g.gl3.NGA - KA l
\\
T.
+
E 31 31 ll.Bl3-N58-IRI--
di-813 NSA-lRl l1. gl3.N56-KA!
e s
^
45 %<45 i.Bl3-NSA-kcl Il-Bl3 N58-KC I' E
~
I-g 13-NSA-KB l I 1. Bl3-N58-KB l-80-PEB -MCI
.gi3.N6C-KAl
'~
~
g.Bl3 N6C-KB 180'
ON ~ #
H i-Bl3-N6C-kcl I-Bl3 N6B-IRI NS - CORE SPRAY NOZZLE N6-RHR N0ZZLE KA-NOZZLE TO VESSEL WELD C B1 REF. NO.
KB - NOZZLE TO SAFE END WELD 73-CIOB KC - SAFE END TO SAFE END EXTENSION WELD DWG. NO,165 REV. I IR - INNER RM)lUS 66 REV. 4 70 REV. 3 l
H E.5 ---
m" CORE SPRAY (
=0 m w.
I-RV-005 d
n dag un s.ua
- /g
== g/g3 CLASS I
" PERRf-UNIT l e micas FORM e NES 205 2/80
DOCUMENT NO.
80A4421 PAGE 15 op 145
)
NUCLEAR ENERGY SERVICES. INC.
O' IS' 315*
o o
l-813-OR
\\l-Bl3-DP gi.gi3.DJ l 75 270*
a-g g
255' l-Bl3-DK l Il-BI3-ON
[]
Il-Bl3-DM F Q
o oo o 135 195*
180' O
!I-Bl3 #]d-S]
1-813 N7-KA I ll-Bl3-N8-KA l
,l -Bl3-N7-Bl y
l-Bl3 DJ THRU DRI ll-Bl3-AGI e a I
I FLANGE +
I N 7-HEAD SPARE N8-HEAD SPRAY RCICl VENT KA-NOZZLE TO VESSEL WELD IR -INNER RADIUS 8 - BOLTING Q {
i YR l$$ AND j
13 RIDIONAl.WED w COI REE NO,
'* - '*-ooS 73-c'oe O
'" W#'
- # # '3 CLASS i DWG NO.-166 REV I
"'" 8/F3 73 REV 4 77 REV 3 PERRY UNIT l l
adOf TO SCAta FOM *NES 205 2/80
80A e DOCUMENT NO.
W1 PAGE 16 op 145 p,
NUCLEAR ENERGY SERVICES, INC.
G O
g N
1-93-al I
~
f h
Il Bl3-DE i.Bl3-Nil-RBl A
A d
Nil I
I 270
_p O
M NIS j.gj3.gp l1.Bl3-DG t-Bl3-NI8-KBl J
W J
18 0*
O E
li-BI3-AAl 3
s i.813 -DG g
2
\\
/
{
ll-B13-DH I s
ll.Bl3-DE '
(
ll Bl3-DF l NI-B13-CG l w
7 CIOB(14 i
DWG NO,13 REV. G i
W RW. S 93 RW, 2 Il-Bl3 NIS-KA
.SECTION A-A 11EL%, ---
s,_
,,,m i
NI1-CORE DIFFERENTIAL PRESSURE NOZZLE BOTTOM HEA0 NI5-ORAIN N0ZZLE Bl3 WELD MAP NI6-LIGUl0 CONTROL KA - VE5SEL TO N0ZZLE WELD
=0 l-RV-OO7 O
- S - " 22'5 '
S^'" "" **'
"a"%
a
'^55 '
PERRY UNIT I
.et to seas FORM #NES 205 2/80
l DOCUMENT NO.
80A4421 PAGE 17 OF 145 (O)
NUCLEAR ENERGY SERVICES. INC.
W I
l l-Bl3-N30-KA
- l 813-N3A-IRI Il-B13-N30-KB l-B l3-N3A-KB I l l BG N30 IR,
\\ l-Bl3*N3A KAl i
18'( M )
id(TYRI li-sl3-H38-lRI Il-Bl3-N3C-KA
(, gl3.r@B.lR ]
o Il-Bl3-N3C KBi c t-Bl3-N38-KA l li-BB-N3C IR I
Il I Bl3 N16-KAl i I Bl3 Nt6 IRI CBI REE NO.
73-CLOB DWG, NO, 165 REV. I 58 REV. 2 N3 - MAIN STEAM NTZLE 98 REV,5 N16 - VIBRATION NOZZLE KA - NO22LE TO VESSEL WELD KB - N0ZZLE TO SAFE END WELD MEh,---
IR' - INNER RA01US
'"" MAIN '4EAM (E
'b""
VIBRATION NOZZL WELOS
=O
- l-RV-OOB i
O
\\
= JRP em8 2 0 Ct. ASS I e Mk urs e]ss
- PERRY - UNIT l l
ocr to sens FORM 8 NES 205 2/80 1
80A4421 DOCUMENT NO.
PAGE 18 op 145 h
NUCLEAR ENERGY SERVICES. INC.
I 913 N120 l-813-N12A 1 Bl3 Nf3D l 813 N140 I-Bl3-N13A
.O l- 013 -N 64A
\\
/
l l-Bl3-N98 - KA
\\
/
ll-Bl3-N98-K8l N
15*
Il-Bl3-N98 IRl--
N h
1-Bl3-N8A-KAl k
l-813 - N'5A-K B I O
/
Il-Bl3-N9A-IRI
/
.I l-Bl3 Nt2B g Bl3-N12C f-Bl3 NI38 l-813-NI3C I-813 NI4B g
l-013 NI4C in I-Bl3-NIO-KAl 1-Bl3-NE l l-813-NIO lR 100 l-Bl3-NIO-KC :
CBI REE NO, 73-C108(14 DWG NO.- 165 REV I 85 REV 5 79 REV 4 N9 JET PUMP INSTRUMENTATION N0ZZLE NE%---
NIO-CRD RETURN N0ZZLE
,,,,, g 4
NI2N13,N64-INSTUMENTATION N0ZZLE CRD RETURN N0ZZLE KA-N0ZZLE TO VESSEL WELD B31 WELDS l
.g
,,.'g.RV-OO9 KB-N0ZZLE TO SAFE END WELD 9
KC-NOZZLE SAFE END TO CAP WELD IR -INNER RADIUS "y
Ss/g3 CLASS l PERRY UNIT l
.ce to seas FORM #NES 205 2/80
oocumEurNo. soA442, g
PAGE 19 op 145 NUCLEAR ENERGY SERVICES, INC.
t O
06 14 22 30 38 46 54 02 iO is as 34 42 so se X CO-OROINATESg MT
^
s
/
G@@@l g
59 GGGGGGGGG, ss
/ GGGGGGGGGGG; si GGGDGGGGGGGGbI\\
47 OGGGGGGGGG@@@I
\\
e OGGGGGODGGGGe@b\\
m I
GGGGGGGGGGGGG6G 35 270 ~
e-e-e-O-e-O e e e @ G e e e e 3i - 90
@@@@@@@@@@@@GGG 27 l
O 966@@@@@@@@@GGG 23 GGOO@@GGGGGGG 19 GGGGGGGGG@@@@
15 j
@G@@@@@@@@@
'I GGGGGBOGG 07 NOM S 03 DENT IST CO-ORDINATES p
g X-Y CO-ORDINATE DESIGNATIONS, 18 0 PLAN V EW CRD CBI RR NO. -
PENE HATIONS 73-Cl08 ( 14
- " "* V.'..')l - ]
DWG NO, e-i
\\
na5---
l
'8 CRO PARTIAL
- b**
N AION W S l
Bl3 j
w0
- m. o. I-RV-OIO 1 4
[ g/g3 CLASS I SECTION A-A.
PERRY UNIT l CRO PENETRATION THRU BOTTOM HEAD FORM # NES 205 2/80
80A4421 DOCUMENT NO.
O PAGE R ENERGY SERycES. INC.
06 14 22 30 38 46 54 02 10 18 26 34 4it 50 58 X CO-ORDINATESg MT OGGG@i
[GGGGGGBGG,;gl 59 55 g/ GGGGGGGGGGG si GGGGGGGG@@@@bI 47 I
\\
@@@GGGGGGGGGG c
O@@GGGGGGGG@@@b\\
' as OGGGGGGGGGGGGGG H
270*
O-O-6 0 0 0-O G G G G G O O O 31
@@@G@@@@@@@@GGG v
I O@@@@@@@@@@@@@@
23
/
GOGO @@@@@@@@@
is
/
O NOTE:
eeeeeeeeeeeee
,5 II DN F T N OS. CONSIS
/
OF PREFIX 1-B13 FOLLOWED BY
@@666@@@@
07
/
X-Y CO-ORDINATES AND THEN G@@6@
03 DESIGNATION B FOR BOLTING AND W FOR HOUSING TO FLANGE WELDS.
YW N TS 180 PLAN V EW CRO CBl REF. NO. 73-C108 & 14 DWG.NO.14 REV. 3 m
l 4
G.E.NO.- 767E957 922D124 HOUSING WEL'DS aur zusasnaseesmeven mce.
HOUSING TO S'"
CRD MECHANISM FLANGE WELD HOUSING WELDS AND B13 FLANGE BOLTING g.
nev: O nG. NO.
1-RV-011 ev:P55 oars.a. 7-as q
f l
l l
' BOLTINGS.
^" M DATE: kSS
" PERRY.- UNIT 1 VIEW-A-A Nor to sens FORM # NES 205 2/80
O O
O 8
6 E
g!N 03 d
g o.
=
5
- A
!P N'y gg 7
j, p'
g+ +
t++
z
+I b
iet +
-t- + -e
+ t
//
i,'
,sd
+e e
O+
8 t
e 1ttt t
t
+
t t +
- n N'
i l
m
+ lt t
it t
-+- t r +
-+ 1 +
z e -e-t+-e-O -- e e-e-e-e E
- l
+++++
+
+ ++++
t m
+++
++
+e+-ey+ e-e+-o+
+e+ +e++
t 3
y g ;z
++e e
a n
++
+ + + ++
+ ++
+
g z
%5 t
+
9 @
+*+
+ -+t ' + e + e + e e +
+e+ +e +
+e+
+
+
e w
o
+++
+
-+- + tt t
2 8'
+++
++++
++ ++++
++
/
-g
_z J
o
+e e-e-o
+e e-e+-o++e 8
ma
)
+
+
+t
+ + +
l e'Fe?.* + o+ ++
++
tt
+* +e+ t +e+
g
+e
/
E
+ +
t
+ + ++ t'+ t,t t
/
52>h
+'+ ++
+
$o
!u i
i 1 11 !
- 8:
SF a w e
i 19 N
/
=d o$ng..
O
\\
/
4 5mdSi jI5E i
ow m
x
=
g yEs 5En R
g w
z o
g-G 4 a i!
8 2paz g~
m a-mRE 62 ni i jti j jg lg aog g
g g
gsaa~=a me*asse
""Y g
g l
92 a
osz g
5AQ gd D
m
~
e o
o m
o vi i
e
80A421 DOCUMENT NO.
OF M
(']
NUCLEAR ENERGY SERVICES. INC.
H-9 A-l STUD HOLE NUMBERING WITH 72 STUD HOLES CLOCKWISE ROTATION FROM EQUALLY SPACED f
i A-1 TO A-9 THRU H-1 TO H-9 ABT CARDINAL $
eO O D
H-l O
G-9 N
_g B -1 4
A G 4 C
B-3 270 4
go' p,g
_g
'O C-l O
x E
D-i OQQ Q sig
+6 D-9 NOTE:
I E-l ALL LIGAMENT EXAMINATION IDENTIFl. CATION NOS. CONSIST
'i i
n l
OFTHE PREFIX t-813-AND 8
180*
THEN THE STUD HOLE NUMBER.'
l I
N/
CBI REF. NO.- 73C108 & 14 DWG.NO.
38 REV 39 REV VESSEL FLANGE TIEL%, ---- ~
I "E"
""' VESSEL FLANGE B43 LIGAMENTS as* O - ** *.1-AV-013 O
\\l
"%& TE c'^SS '
- SECTION A-A n.cac' PERRY - UNIT 1 e to sm FORM a P4ES 205 2/B0 L
DOCUMENT NO. 80A4421 PAGE 2
OF (j
WR ENERGY SERWES. n 0*
4 70 2 3 73 1
72 1
f I
I l
d6 0
~
Oo O
5
.56 55 -G O-27f
,.g
, O-- 19 o
7-
% 20 21
\\
m o
x f
90 Q 0 0 Q l 37 38 NOTE:
40 39 l
18f N
ALL STUD EXAMINATION IDENTIFICATION CONSISTS j
f OF THE PREFlX 1-B13-38-1 l
i
$7 m
CBI REF. NO. 73C108 & 14 DWG. NO.
38 REV.
l l
39 REV.
ll D Li - - -
{"
)
mm.
ritt ll CLOSURE HEAD B13 l
u STUDS I
- O
- 1-RV-014 0
- coo *
=
> CLASS 1 DiA.
- k4 men; 8la3 SECTION THRU STUD
"" ' PERRY - UNIT 1
.cr m as FORM #NES 205 2/80
DOCUMENT NO.
80A4421 24 145 PAGE OF Q
NUCLEAR ENERGY SERVICES. INC.
O' 70 71 v2 1 2 3 4
\\
\\J O dd o
O 0
5 5
5 5----.O g
270*
90*
4
' O--- 19
~20 21 22 0
x 0. 0o 0
37 3
190 NOTE:
0 ALL NUTS EXAMINATION NOS. CONSIST OF THE PREFlX 1-B13-39-5 b
CBI REF NO. 73C.108 & 14 0
9 1 otA.
DWG.NO.
38 REV.
39 REV.
y a
m, 8k h bh==a====,.===.
I di s,
i i
D3 CLOSURE HEAD NUTS I
i
=0
- e.1-RV-015 h
~
erP55 pt J /6 65 g/t3 CLASS 1 l
- 4 oars:
SWD WT
-n PERRY - UNIT 1
, to w.as FORM s NES 205 2/80
80A4421 DOCUMENT NO.
NUCLEAR ENERGY SERVICES. INC.
7 72 2
60 66 O
O 5
5 55 -C O-
- 270,
.g O._jg p
N 20 g
21 Os.
2 O
o ec co 37 3
NOTE:
188 ALL WASHER EXAMINATION NOS. CONSIST OF THE PREFIX 1-813-39-6 CBI REF. NO. 73C108 & 14 DWG. NO.
38 REV.
39 REV.
i
- 7 ________.______ 7 _-
ig*N 11E!.E ---
{
1 p
" '4"
"'" CLOSURE HEAD 9 h: CIA.
3 42 013 WASHERS e
~
,,, o
... i.RV-016
(
SPHERICAL WASHER
- Rso ameSe CLASS 1 u A4
== t/s3
"'**' PERRY - UNIT 1 estoacus FOAM s NES 205 2/80
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: elf Date:
3f Document No. 80A4421 App: 4J Date: c/ w Preservice Inspection 5532-PERRY Rev:
1 Page: 26 of'145 CAU9 RATION CODE coupegguy cmNT PROCEDURE ROCK CCCE EXAM ZONE mTinCArm oEscapr a NUMBER W= W CATEGORY WETHOO NO RE W
\\_,
,yc VESSEL SIELL WELDS Ref. Dwg. No: 1-RV-002 1-313-AA Loiver Head to No. I Shell 80A0191 PY-123-1-RPV B-A UT I
Ring Circumferential Seam Bl.11 PY-124-1-RPV i
N 1-B13-BA No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 170 Azimuth Bl.12 1-B13-BB No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 1370 Azimuth Bl.12 I-B13-BC No. I Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 2570 Azimuth Bl.12 1-B13-AB No. I Shell Ring to No. 2 Shell 80A0208 PY-124-1-RPV B-A UT I
Ring Circumferential Seam Bl.11 1-B13-BD No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 400 Azimuth Bl.12 1-813-BE No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 1600 Azimuth Bl.12 1-B13-BF No. 2 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 2800 Azimuth Bl.12 NES 239 682
o 11EN O
6Nf System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
/r# Date:
Document No. 80A4421 App: 44 Date: _c/Sg Preservice Inspection 5532-PERRY Rev:
1 Page: 27 of 145 cAusunon coac aME o EcE "eca m T-cAEccm Efwoo E NW wuw YESSEL StELL WELDS Ret Dwg. No: 1-RV-002 1-813-AC No. 2 Shell Ring to No. 3 80A0208 PY-124-1-RPV B-A UT I
Shell Ring Circumferential Bl.11 Seam I-813-BG No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 790 Azimuth Bl.12 1-B13-83 No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 1990 Azimuth Bl.12
~
1-B13-BK No. 3 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 3190 Azimuth Bl.12 i
1-B13-AD No. 3 Shell Ring to No. 4 80A0208 PY-124-1-RPV B-A UT I
Shell Ring Circumferential B1.11 Seam l
l-B13-BN No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 480 Azimuth Bl.12 1-B13-BP No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 1630 Azimuth Bl.12 l
l-B13-BR No. 4 Shell Ring Longitudinal 80A0208 PY-124-1-RPV B-A UT I
Seam @ 2880 Azimuth Bl.12 NES :*39 682
o 11EN O
System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
/ht Date: 6/81 Document No,80A4421 App: gj_ Date: Mt Preservice Inspection 5532-PERRY Rev:
1 Page: 28 v.145 CAL 18 RAT 10N CODE m NT COMPONENT PROCEDURE BLOCK CODE EXAM ZOAE K)ENTC4MK)N KSCitPTX)N F4JMBER Of appbcablet CATEGORY WTHOO NO.
REMARKS VESSEL SHELL WELDS Ref. Dwg. No: 1-RY-002 1-B13-AE No. 4 Shell Ring to Shell 80A0189 PY-124-1-RPV B-A UT I
Flange Circumferential Seam Bl.ll l
NES 239 6/82
o 11EN o/ei 6
Syst;mi Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By:
/n< oate:
Document No. 80A4421 App: M Dates (/S4 Preservice Inspection 5532-PERRY Rev:
1 Page: 29 of 145 CAU8 RATION CODE COMP 0eENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 80ENTIFICATION DESCRIPTION NUMBER (tf apphe=Nat CATEGORY LETHOO NO.
E MARKS RECIRCUI ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Outlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
NI A-AA NIA to Vessel B3.90 1-B13-Recirculation Outlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
NI A-lR NIA' Inner Radius B3.100 1-B13-Recirculation Outlet Nozzle 80A0211 PY-SE-BI-5 B-F UT I
NIA-KB NI A to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Outlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
NIB-KA NIB to Vessel B3.90 1-B13-Recirculation Outlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
NIB-IR NIB Inner Radius B3.100 1-B13-Recirculation Outlet Nozzle 80A0211 PY-SE-BI-5 B-F UT I
NIB-KB NIB to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2A-KA N2A to Vessel B3.90 1-B13-Recirculatica Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2A-lR N2A Inner Radius B3.100 NES 239 6/82
O HM O
Syst;mi Rcactor Pr ssure Vcssel PROGRAM PLAN AND SCHEDULE By
/nt Date: C/94 Document No. 80A4421 App:
- - Date: c/S<,t Preservice Inspection 5532-PERRY Rev 1
Page: 30 of 145 CAUBRATO4 CODE COMPONE>si COMPONENT PROCEDURE BLOCK CODE EXAM ZONE MNTIRCATION DESCfDFTION NUMBER (if appleablel CATEGORY ETHOD No REMARKS RECIRCULATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2A-KB N2A to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2B-KA N2B to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2B-IR N2B Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2B-KB N2B to Safe-end B5.10 80A0183 N/A PT l
1-B13 Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2C-KA N2C to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2C-IR N2C Inner Radius B3.100 NES 239 6/82
o 11EN O
Syst:mi R; actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By:
Lilg Date: 4[f4 Document No. 80A4421 App:
- Date c/JV Preservice Inspection 5532-PERRY Rev:
1 Page: 31 of 145 CALIBRATION CODE COMPONENT COuPOHENT PROCEDURE BLOCK CODE EXAM ZONE tDENTIFICATION DESCRPTION NUMBER (tf appbcablel CATEGORY BETHOO NO.
REMARKS RECIRCU!.ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2C-KB N2C to Safe-end B5.10 80A0183 N/A PT 1-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2D-KA N2D to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2D-!R N2D Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 FY-SE-BI-RPV B-F UT I
N2D-KB N2D to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet ~ Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2E-KA N2E to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2E-lR N2E Inner Radius B3.100 NES 239 6/82
o lies o
Systemi R act r Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By2 h Date: ( /84 Document No. 80A4421 App:
M Date: C/ge/
Preservice Inspection 5532-PERRY Rev:
1 Page: 32 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTlHCATION DESCHPTION NUMBER Of apphcatM CATEGORY BETHOO NO.
REMARKS RECIRCUI.ATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculati.. Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2E-KB N2E to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2F-KA N2F to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2F-1R N2P Inner Radius B3.100 -
1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2F-KB N2F to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2G-KA N2G to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2G-IR N2G Inner Radius B3.100 NES 239 6/82
O 1]M O
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
M Date: (, /94 Document No. 80A4421 App: M Date: c/g4 Preservice Inspection 5532-PERRY Rev:
1 Page: 33 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCFCPTION NUMBER (if appicabael CATEGORY METHOO NO, N MARKS RECIRCULATION NOZZLE WELDS Ref. Dwg. No: 1-RV-003 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2G-KB N2G to Safe-end B5.10 80A0183 N/A PT l
l l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2H-KA N2H to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N2H-IR N2H Inner Radius B3.100 l-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2H-KB N2H to Safe-end B5.10 80A0183 N/A PT l-B13-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N23-KA N23 to Vessel B3.90 1-B13-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D UT I
N23-IR N23 Inner Radius B3.100 NES 239 6/82 Y,'
O HM O
/
6 sf-Syst:mi Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
- h'r Date:
Document No. 80A4421 App:
- Date: c/W Preservice Inspection 5532-PERRY Rev:
1-Page: 34 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E)ENTWICATION DESCRIPTION NUMBER
(!f applW CATEGORY METHOD No.
REMARKS.-
RECIRCULATION NOZZLE WELDS Ref. Dwg. Nc: 1-RV-003 1-B31-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N23-KB N23 to Safe-end B5.10 80A0183 -
N/A PT l-B31-Recirculation Inlet Nozzle 80A0209 PY-124-1-RPV B-D UT I
N2K-KA N2K to Vessel B3.90 -
1-B31-Recirculation Inlet Nozzle 80A0190 PY-124-1-RPV B-D
'UT I
N2K-1R N2K Inner Radius B3.100 1-B13-Recirculation Inlet Nozzle 80A0211 PY-SE-BI-4 B-F UT I
N2K-KB N2K to Safe-end B5.10 80A0183 N/A PT t
NES 239 6/82
o HEN o
BD ht<
D^t**
/94 Syst;m: Reactor Pr:ssure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: A4 Date: c/rst Preservice Inspect!On 5532-PERRY Rev:
1 Page: 35 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESORPTICH NUMBER Of apphcabiel CATEGORY LETHOO No.
REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4A to 80A0209 PY-124-1-RPV B-D UT I
N4A-KA Vessel B3.90 1-B13-Feedwater Nozzle N4A Inner 80A0190 PY-124-1-RPV B-D UT I
N4A-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 06 L9 1-B13-Feedwater Nozzle N4A to 80A0211 PY-SE-BI-3 B-F UT I
N4A-KB Safe-end B5.10 80A0183 N/A PT l-B13-Feedwater Nozzle N4B to 80A0209 PY-124-1-RPV B-D UT I
N4B-KA Vessel B3.90 1-B13-Feedwater Nozzle N4B Inner 80A0190 PY-124-1-RPV B-D UT I
N4B-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 061 9 l-B13-Feedwater Nozzle N4B to 80A0211 PY-SE-BI-3 B-F UT I
N4B-KB Safe-end B5.10 80A0183 N/A PT
\\
i NES 239 6/82
o BEN O
System: Reactor Pressure Vessel By:
[]f Date: d8Y PROGRAM PLAN AND SCHEDULE
. App:
Preservice Inspection 5532-PERRY Rev:. A Date: c/fg Document No. 80A4421 1
Page: 36 of 145 CAUBRATION CODE.
IDE TON DE NUMBE (if applicablel CA ORY THOD NO REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4C to 80A0209 PY-124-1-RPV B-D UT I
Vessel B3.90 N4C-KA 1-B13-Feedwater Nozzle N4C Inner 80A0190 PY-125-1-RPV B-D UT I
N4C-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 0615 1-B13-Feedwater Nozzle N4C to 80A0211 PY-SE-BI-3 B-F UT I
N4C-KB Safe-end B5.10 80A0183 N/A PT l-B13-Feedwater Nozzle N4D to 80A0209 PY-124-1-RPV B-D UT I
N4D-KA Vessel B3.90 1-B13-Feedwater Nozzle N4D Inner 80A0190 PY-124-1-RPV B-D UT I
N4D-lR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 061S 1-B13-Feedwater Nozzle N4D to 80A0211 PY-SE-BI-3 B-F UT I
N4D-KB Safe-end B5.10
.80A0183 N/A PT NES 239 fv82 1
- - - - - mmw u
me o
iIEE o
PROGRAM PLAN AND SCHEDULE
. 7',
U*[l ' "
S nu Rea to ure Vessel nt o A442 Preservice Inspection 5532-PERRY Rev 1
Page: 3 145 l
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE BOENTIF6 CATION DESCEtPTICH NUMBER (If applicable)
CATEGORY METHOD NO.
REMARKS FEEDWATER NOZZLE WELDS Ref. Dwg. No: 1-RV-004 1-B13-Feedwater Nozzle N4E to 80A0209 PY-124-1-RPV B-D UT I
N4E-KA Vessel B3.90 1-B13-Feedwater Nozzle N4E Inner 80A0190 PY-124-1-RPV B-D UT I
-N4E-IR Radius B3.100 80A0183 N/A N/A PT Reg. Guide 0615 1-B13-Feedwater Nozzle N4E to 80A0211 PY-SE-BI-3 B-F UT I
N4E-KB Safe-end B5.10 80A0183 N/A PT i
1-B13-Feedwater Nozzle N4F to 80A0209 PY-124-1-RPV B-D UT I
N4F-KA Vessel B3.90 1-B13-Feedwater Nozzle N4F Inner 80A0190 PY-124-1-RPV B-D UT I
N4F-lR Radius B3.100 80A0183 h/A N/A PT Reg. Guide 0615 2
1-B13-Feedwater Nozzle N4F to 80A0211 PY-SE-BI-3 B-F UT I
N4F-KB Safe-end B5.10 80A0183 N/A PT i
l
^
t NES 239 6/82 l
O HM O
I 6 f4 Syst m Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By2 hPc Dat;i Document No. 80A4421 App:
- - Date: W Preservice Inspection 5532-PERRY Rev:
1 Page: 38 of 145 i
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicabiel CATEGORY ETHOD No.
REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-Core Spray Nozzle NSA to 80A0209 PY-124-1-RPV B-D UT I
NSA-KA Vesse!
B3.90 1-B13-Core Spray Nozzle N5A Inner 80A0190 PY-124-1-RPV B-D UT I
NSA-IR Radius B3.100 1-B 13-Core Spray Nozzle NSA to 80A0211 PY-SE-BI-3 B-F UT I
N5A-KB Safe-end B5.10 80A0183 N/A PT 1-B13-Core Spray Nozzle N5A Safe-end 80A0211 PY-SE-BI-3 B-3 UT I
NSA-KC to Safe-end Extension B9.11 80A0183 N/A PT l-B13-Core Spray Nozzle NSB to 80A0209 PY-124-1-RPV B-D UT I
N5B-KA Vessel B3.90 1-B13-Core Spray Nozzle NSB Inner 80A0190 PY-124-1-RPV B-D UT I
N5B-lR Radius B3.100 1-B13-Core Spray Nozzle NSB to 80A0211 PY-SE-BI-3 B-F UT I
NSB-KB Safe-end B5.10 80A0183 N/A PT l-B13-Core Spray Nozzle NSB Safe-end 80A0211 PY-SE-BI-3 B-3 UT I
N5B-KC to Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82 i
o na5
. a B3
- t Dat2: ' /84 Systemi Reactor Pr:ssurs Vcssel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
- Date: c/M Preservice Inspection 5532-PERRY Rev:
1 Page: 39 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRPTION NUMBER (if apphcable)
CATEGORY METHOD No.
REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-RHR Nozzle N6A to Vessel 80A0209 PY-124-1-RPV B-D UT I
N6A-KA B3.90 1-B13-RHR Nozzle N6A Inner Radius 80A0190 PY-124-1-RPV B-D UT I
N6A-IR B3.100 1-B13-RHR Nozzle N6A to Safe-end 80A0211 PY-SE-BI-3 B-F UT I
N6A-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6A Safe-end to 80A0211 PY-SE-BI-3 B-3 UT I
N6A-KC Safe-end Extension B9.ll 80A0183 N/A PT l-B13-RHR Nozzle N6B to Vessel 80A0209 PY-124-1-RPV B-D UT I
N6B-KA B3.90 1-B13-RHR Nozzle N6B Inner Radius 80A0190 PY-124-1-RPV B-D UT I
N6B-IR B3.100 1-B13-RHR Nozzle N6B to Safe-end 80A0211 PY-SE-BI-3 B-F UT I
N6B-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6B Safe-end to 80A0211 PY-SE-BI-3 B-3 UT I
N6B-KC Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82
0 (i
Systami Ractor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
.AA Dat;r 6Af Document No. 80A4421 App: 44 Date: 6//f Preservice Inspection 5532-PERRY Rev:
1 Page: 40 of 145 CAUBRATION COOE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE tOENilHCATON DESCPIPTION NUMBER (if apphcablel CATEGORY.
hETHOD NO.
REMARKS CORE SPRAY /RHR NOZZLE Ref. Dwg. No: 1-RV-005 1-B13-RHR Nozzle N6C to Vessel 80A0209 PY-124-1-RPV B-D UT I
N6C-KA B3.90 l
l-B13-RHR Nozzle N6C Inner Radius 80A0190 PY-124-1-RPV B-D UT I
N6C-IR B3.100 I
1-B13-RPR Nozzle N6C to Safe-end 80A0211 PY-SE-BI-3 B-F UT I
N6C-KB B5.10 80A0183 N/A PT l-B13-RHR Nozzle N6C Safe-end 80A0211 PY-SE-BI-3 B-3 UT I
N6C-KC to Safe-end Extension B9.11 80A0183 N/A PT NES 239 6/82
~
o 11EN o
Syst mt R actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By I". Dat:: 6/g4 Document No. 80A4421 App:
M Date: e/JV Preservice Inspection 3532-PERRY Rev:
1 Page: 41 of 145 :
Co W ONENT CO W (NT PROCEDURE BL CODE ZONE IDENTIFICATION DESCRIP W)N NUMBER til apphcable)
CATEGORY METHOD NO.
REMARKS CLOSURE HEAD WELDS Ref. Dwg. No: 1-RV-006
~
1-B13-AG Top Head to Top Head Flange 80A0192 PY-128-1-RPV B-A UT I
Bl.40 1-B13-AH Top Head Dollar Plate to 80A0192 PY-127-1-RPV B-A UT I
Side Plates Bl.21 PY-128-1-RPV l-B13-DJ Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 75 Azimuth Bl.22 1-B13-DK Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 135 Azimuth Bl.22 1-B13-DM Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 195 Azimuth Bl.22 1-B13-DN Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 255 Azimuth Bl.22 1-B13-DP Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 315 Azimuth Bl.22 1-B13-DR Top Head Meridional Weld 80A0192 PY-128-1-RPV B-A UT I
@ 15 Azimuth Bl.22 NES 239 6/82 i
O.
MM O.
Date:fr/H System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
E Document No. 80A4421 App: & Date: c/ M Preservice Inspection 5532-PERRY Rev:
1 Page: 42 of 145 CAL 18 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)
CATEGORY nETHOO No.
REMARNS CLOSURE HEAD WELDS Ref. Dwg. No: 1-RV-406 1 B13-Top Head to N7 Head Spare 80A0192 PY-127-1-RPV B-D UT I
N7-KA Nozzle B3.90 1-B13-N7 Head Spare Nozzle Inner 80A0192 PY-127-1-RPV B-D UT I
N7-IR Radius B3.100 1-B13-N7 Head Spare Nozzle to 80A0184 N/A B-G-2 VT-1 I N7-B Flange Bolting (12 Pieces)
B7.50 1-B13-Top Head to N8 Head Spray 80A0192 PY-127-1-RPV B-D UT I
NS-KA Nozzle B3.90 1-B13-N8 Head Spray Nozzle Inner 80A0192 PY-127-1-RPV B-D UT I
N8-lR Radius B3.100 1-B13-N3 Head Spray Nozzle to Flange 80A0184 N/A B-G-2 VT-1 I NS-B Bolting (12 Pieces)
B7.50
)
NES 239 6/82,
O gg O
B" E
U**2' Syst mi Reactor Pressura Vcssel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: A Date: 4/S4 Preservice Inspection 5532-PERRY Rev 1
Page: 43 of 145 -
COMPONENT COMFOdN T PROCEDURE O
CODE ZONE IDENTIFICATION DESCR*PTION NUMBER (if apphcabiel CATEGORY METHOD NO.
REMARKS BOTTOM HEAD WELDS Ref. Dwg. No: 1-RV-007 1-B13-DE Bottom Head Side Plates Weld, 80A0191 PY-123-1-RPV B-A UT i
2700 Side Bl.22 1-B13-DG Bottom Center Plate to Side 80A0191 PY-123-1-RPV B-A UT I
Plates,2700 Side Bl.22 1-B13-DF Bottom Head Side Plates Weld, 80A0191 PY-123-1-RPV B-A UT I
900 Side Bl.22 1-B13-DH Bottom Center Plate to Side 80A0191 PY-123-1-RPV B-A UT I
Plates, 900 Side Bl.22 1-B13-CG Bottom Head to Sidrt Extension 80A0183 N/A' B-H PT I
B8.10 l
1-B13-N15 Bottom Head to NIS Drain 80A0191 PY-123-1-RPV B-D UT I
-KA Nozzle B3.90 1-B13-N15 NIS Drain Nozzle Inner Radius 80A0190 PY-123-1-RPV B-D UT I
-IR B3.100 1-B13-Nil Nil Differential Pressure 80A0195 PY-SE-BI-6 B-F UT I
-KB Nozzle to Safe-end B5.10 80A0183 N/A PT NES 239 6/82 i
o nog o.
$, y U"$l h(
P ure Vessel S
o8$A421 PROGRAM PLAN AND SCHEDULE rn n Preservice Inspection 5532-PERRY Rev:
1 Page: 44 of 145 CAUBRATION CODE COMPONENT CouPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCT4PTION NUMBER Of apphcable)
CATEG0RY METHOO NO.
REMARKS BOTTOM HEAD WELDS Ref. Dwg. No: 1-RV-007 1-B13-N18 N18 Liquid Control Nozzle 80A0195 PY-SE-BI-6 B-F UT I
-KB to Safe-end B5.10 80A0183 N/A PT i
NES 239 6/82
O g3 8O Syst:m: Reactor Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By:
md Dates (l 4 Document No. 80A4421 App: A4 Date: ch<,c Preservice Inspection 5532-PERRY Rev:
1 Page: 45 of 145 CAUBRATK)!
CODE N
COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E)ENTFOTK)N DESCRPTION NUMBER Of applacablel CATEGORY METHOO NO.
REMARKS..
MAIN STEAM NOZZLES Ref. Dwg. No: 1-RV-008 1-B13-Main Steam Nozzle N3A to 80A0191 PY-124-1-RPV B-D UT I
N3A-KA Vessel B3.90 1-B13 Main Steam Nozzle N3A Inner 80A0190 PY-124-1-RPV B-D UT I
N3A-IR Radius B3.100 1-B13-Main Steam Nozzle N3A to 80A0195 PY-SE-CS-2 B-F UT I
N3A-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3B to 80A0191 PY-124-1-RPV B-D UT I
N3B-KA Vessel B3.90 1-B13-Main Steam Nozzle N3B Inner 80A0190 PY-124-1-RPV B-D UT I
N3B-IR Radius B3.100 1-B13-Main Steam Nozzle N3B to 80A0195 PY-SE-CS-2 B-F UT I
N3B-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3C to 80A0191 PY-124-1-RPV B-D UT I
N3C-KA Vessel B3.90 i
I l-B13 Main Steam Nozzle N3C Inner 80A0190 PY-124-1-RPV B-D UT I
N3C-lR Radius B3.100 NES 239 6/82
o np5 o
System: Reactor Prcssura Vessel PROGRAM PLAN AND SCHEDULE By: /3 c Date:C /M Document No. 80A4421 App:
M Date t/r4 Preservice Inspection 5532-PERRY Rev:
1 Page: 46 of 145 CAUBRATION CCOE COMPONENT COVPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCR:PTION NUMBER (11 appleablel CATEGORY LETHOO NO REMARKS MAIN STEAM A V BRATION NOZZLE Ref. Dwg. No: 1-RV-008 1-B13-Main Steam Nozzle N3C to 80A0195 PY-SE-CS-2 B-F UT I
N3C-KB Safe-end B5.10 80A0183 N/A PT l-B13-Main Steam Nozzle N3D to 80A0191 PY-124-1-RPV B-D UT I~
N3D-KA Vesset B3.90 1-B13-Main Steam Nozzle N3D Inner 80A0190 PY-124-1-RPV B-D U1 I
N3D-IR Radius B3.100 1-B13-Main StCam Nozzle N3D to 80A0195 PY-SE-CS-2 B-F UT I
N3D-KB Safe-end B5.10 80A0183 N/A PT 1-B13-Vibration Nozzle N16 to 80A0191 PY-124-1-RPV B-D UT I
Vessel B3.90 1-B13-Vibration Nozzle N16 inner 80A0190 PY-124-1-RPV B-D UT I-N16-lR Radius B3.100 NES 239 6/82
o 1135 o
Syst::mi R actor Pr:ssura Vessel PROGRAM PLAN AND SCHEDULE By:
Ar Dat:: t/ff Document No. 80A4421 App: M Date: 4/fy.
~
Preservice Inspection 5532-PERRY Rev:
1 Page: 47 of 145 o Ec oesc Ea nuus "en cAEocar
- Yo
- ra ue n
newas JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-LX)9 l-B13-3et Pump Nozzle N9A to 80A0191 PY-124-1-RPV B-D UT I
N9A-KA Vessel B3.90 1-B13-3et Pump Nozzle N9A Inner 80A0190 PY-124-1-RPV B-D UT I
N9A-lR Radius B3.100 1-B13-3et Pump Nozzle N9A to 80A0195 PY-SE-BI-I B-F UT I
N9A-KB Safe-end B5.10 80A0183 N/A PT l-B13-3et Pump Nozzle N9B to 80A0191 PY-124-1-RPV B-D UT I
N9B-KA Vessel B3.90 1-B13-3et Pump Nozzle N9B Inner 80A0190 PY-124-1-RPV B-D UT I
N9B-IR Radius B3.100 1-B13-3et Pump Nozzle N9B to 80A0195 PY-SE-BI-l B-F UT.
I N9B-KB Safe-end B5.10 80A0183 N/A PT l-B13-CRD Return Nozzle N10 to 80A0191 PY-124-1-RPV B-D UT I
N10-KA Vessel B3.90 1-B13-CRD Return Nozzle NIO Inner 80A0190 PY-124-1-RPV B-D UT I
N10-lR Radius B3.100 NES 239 6/82
O MM O
B2 M
Date: 6/si Syst:ms Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App: M Date c/#4-Preservice Inspection 5532-PERRY Rev:
1 Page: 48 of 145 CAuBRAT m CooE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATO DESCFDPTION NUMBER Uf apphCablel CATEGORY LETHOO No.
REMARKS JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-009 l-B13-CRD Return Nozzle NIO to 80A0195 PY-SE-CS-1 B-F UT I
N10-KB Safe-end B5.10' 80A0183 N/A PT l-B13-CRD Return Nozzle NIO Safe-end 80A0195 PY-SE-CS-1 B-F UT I
N10-KC to Cap B5.10 80A0183 N/A PT l-B13-Instrumentation Nozzle N12A 80A0184 N/A B-E VT-2 I N12A B4.13 1-B13-Instrumentation Nozzle Nf 3A 80A0184 N/A B-E VT-2 I N13A B4.13 1-B13-Instrumentation Nozzle N16A 80A0184 N/A B-E VT-2 I N14A B4.13 1-B13-Instrumentation Nozzle N128 80A0184 N/A B-E VT-2 I N12B B4.13 1-B13-Instrumentation Nozzle N13B 80A0184 N/A B-E VT-2 I N13B B4.13 1-B13-Instrumentation Nozzle Ni4B 80A0184 N/A B-E VT-2 1 N14B B4.13 NES 239 6/82
o 11E85 o
Syst:m: R: actor Prcssure Vessel PROGRAM PLAN AND SCHEDULE By:
AA Date: Gd4 Document No. 80A4421 App: 44 Date: t/54 Preservice Inspection 5532-PERRY Rev:
1 Page: 49 of 145 CAUBRATION CODE COMPONEen COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTlHCATK)N MSCRIPTION NUMBER Of apphcabeel CATEGORY METHOO
!D.
REMARKS JET PUMP & CRD RETURN NOZZLE Ref. Dwg. No: 1-RV-009 l-B13-Instrumentation Nozzle N12C 80A0184 N/A B-E VT-2 I N12C B4.13 1-B13-Instrumentation Nozzle N13C 80A0184 N/A B-E VT-2 I N13C B4.13 1-B13-Instrumentation Nozzle N14C 80A0184 N/A B-E VT-2 I N14C B4.13 1-B13-Instrumentation Nozzle N12D 80A0184 N/A B-E VT-2 I N12D B4.13 1-B13-Instrumentation Nozzle N13D 80A0184 N/A B-E VT-2 I N13D B4.13 1-B13-Instrumentation Nozzle Ni4D 80A0184 N/A B-E VT-2 I N14D B4.13 l
NES 239 6/82
o 11EE C
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
m<
Date: t/H Document No. 80A4421 App: 44 Date: E/ft/.
Preservice Inspection 5532-PERRY Rev:
1 Page: 50 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATK)N DESCRIPTM NUMBER (tf apphcablel CATEGORY METHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-410 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 58-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-M B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 58-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 54-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-23 B4.12 NES 239 6'82 i
O MM O
/
Syst;m: R: actor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
w< - Date: 6 S/
Document No. 80A4421 App: 44-Date: 974 Preservice Inspection
$532-PERRY Rev:
1 Page: 51 of 145 CAUBRATK)N CODE lOE T ON DESCRI BE Of appicabiel CA ORY REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 54-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 54-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-47 B4.12 NES 239 Ov82 i
/
o np.5 o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
m Dat:: 4/f#
Document No. 80A4421 App: A4 Date: C/94 Preservice Inspection 5532-PERRY Rev:
1 Page: 52 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFCATON DESCRIPTON NUMBER Of apphcable)
CATEGORY METHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV 010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E
.VT-2 I 50-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 50-27 B4.12 1-B31-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-23 B4.12 1-B31-CRD Nozzle 80A0184 N/A B-E VT-2 1 50-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-15 B4.12 NES 239 682
o sing o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
me Date: c41 Document No. 80A4421 App: g Date:
4'5't,I Preservice inspection 5532-PERRY Rev:
1 Page: 53 of 145 CAUBRATON CODE COMPONENT COMPOtENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFsCATION DESCRPTION NUMBER pf apphcable6 CATEGORY METHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 50-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E-VT-2 I 46-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I i
46-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 46-31 B4.12 NES 239 6/82
o nas c
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
ere Date: e/H Document No. 80A4421 App: 44 Date: 694 Preservice Inspection 5532-PERRY Rev 1
Page: 54 of 145
\\
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCX COUE EXAM ZONE a
OENTIFICATION DESCRIPTION NUMBER cf appincatdel CATEGORY DETHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1 B13-CRD Nozzle 80A0184 N/A B-E.
VT-2 I 46-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 i }
46-43 B4.12 1
1-B31-CRD Nozzle 80A0134 N/A B-E VT-2 I 46-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E.-
VT-2 I 46-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 46-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 42-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-51 B4.12 NES 239 682 i
~
l o
11 E.85 O
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
en,t Date: <; 4(
Document No. 80A4421 App: ff, Date: I,/M Preservice Inspection 5532-PERRY Rev 1
Page: 55 of 145 COMPONENT COMPONENT PROCEDURE OCK CODE AM 2ONE IDENTIFICAT80N DESCRtPTION MlMBER (if enrdenNat CATEGORY RETHOO to RE W CRD PARTIAL PENETRATION WELDS Ret Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-31 B4.12 1-B13-CRD Nozzle 80AG184 N/A B-E VT-2 I 42-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I i
42-23 B4.12 j
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 42-19 B4.12 NES 239 6'82
'b b
System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE.c By:
a< Dates e /u Document No. 80A4tt21
~'
App:
4+
Dates ffV Preservice Inspection 5532-PERRY Rev: '
1 Page: 56 of 145 CAU9 RATION CODE COMPONENT COMPONENT
- ROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRPTION NUMBER (if apphcable)
CATEGCRY hETHOO NO.
FEMARKS CRD PARTIAL PENETRATION WELDS
~
Ref. Dwg. No: 1-RV-010 1 B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 15 B4.12
~'
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2. I -
42-11 B4.12
/
l-B13-CRD Nozzle 80A0184 N/A B.E VT-2 I 42-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A
.B-E VT-2 I 38-03
- B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 33-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-19 B4.12 NES 239 6/82
y O
11EE O
System: Reactor Pressure Vessel '
PROGRAM PLAN AND SC ADULE Byt
/=< Date:, /f 4 Document No. 80A4421 App: M Dater t/ M Preservice Inspection 5532-PERRY Rev:
1 Page: 57 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of apphcable)
CATEGORY METHOD NO REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I B4.12 38-23 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-31 B4.12 8
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 38-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-43 B4.12 i
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I
]
38-47 B4.12 1-B13-CRD Nozzle ~
80A0184 N/A B-E VT-2 I 38-51 B4.12 NES 239 6/82 i
O MM O
Syst:m: R: actor Prcssura Vcssel PROGRAM PLAN AND CCHEDULE By:
'n( Date: e /.* 4.
s Document No. 80A4421
' App: #4 Date: Y9 %
Preservice Inspection 5532-PERRY Rev:
1 Page 58 of 145 CAU8 RATION CODE IDE I TON CESCRI NUMBE Of CA GORY HOO REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 38-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-59 B412 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-39 B4.12 NES 239 6/82 i
O HM O
System: Reactor Pressure Vessel PROGRAE PLAN AND SCHEDULE By:
g Date: s4f Document No. 80A4421 App:
M Date: 4/f4 Preservice Inspection 5532-PERRY Rev:
1-Page: 59 of 145 CAU8 RATION CODE DE NUMBE (if CA GORY HOO No REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 34-35 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-27 B4.12 -
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 i 34-07 B4.12 NES 239 6/82 i
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
a s-. Date: 24#
Document No. 80A4421 App:._
M-Date: 4/J4 Preservice Inspection 5532-PERRY Rev:
1 Page: 60 of 145 CAUBRAi m CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE minCATION DESCRIPTm NUMBER Si apphcable)
CATEGORY METHOO NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 34-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-11 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-27 B4.12 NES 239 6/82 i
11EE System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE sy:
.., < Date: 4>
Document No. 80A4421 App: _gt Date:
Preservice Inspection 5532-PERRY Rev:
- Page: 61 of 145 -
OSEFYTON DESCR NbMBE CA Y
ME REWJES CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E V T-2 I 30-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-43 B4.12 1-B13-CRD Nozzle 80A0184
.N/A B-E VT-2 I 30-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 30-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 30-59 B4.12 NES 239 6/82
o 11EN O
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: -
in d Date: e A4 Document No. 80A4421 App: & Dates t/F/
Preservice Inspection 5532-PERRY Rev:
1 Page: 62 of 145 CAuBRATON COM T
DE g MBE (if atM CA GORY THOO RE M S CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 8CA0184 N/A B-E VT-2 1 26-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 26-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-31 B4.12 NES 239 6/82 i
o ging o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
p<
Date: s /ff Document No. 80A4421 App:
44 Date: 64 Preservice Inspection 5532-PERRY Rev:
1 Page: 63 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E NnFO DON DESCRPTION NUMOER (if apphcabeel CATEGORY hEETHOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E
. VT-2 1 26-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 26-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 26-03 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-03 B4.12 NES 239 6/82
P 11EE System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:..mr nate:. f /g/ -
Document No. 80A4421 App:
Date ~ Mrv Preservice Inspection 5532-PERRY Rev:
1 Page: 64 of 145 i~
{
l CAllBRATK)N CODE COMPONENT PROCEDURE BLOCK CODE EXAM ZONE COMPONENT IDENTIFICATION DESCR1PilON NUMBER (if apphcablel CATEGORY METHOD NO.
REMARKS I'
CRD PARTIAL PENETRATION WL DS Ref. Dwg. No: 1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-07 B4.12 a
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-11 B4.12 I
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-13 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-19 B4.12 c
1 i
l 3~
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I l
l 22-23 B4.12 F
[
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-27 B4.12 7
r i
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-31 B4.12 y
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-35 B4.12 1
I
e ting o
System: Reacter Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
id Dater
/d Document No. 80A4421 App:
Af Date:
Preservice Inspection 5532-PERRY Rev:
1 Page: 63 o 145 CAUBRATION Co0E
'MBE ttf CA GORY HOO No IEuARKS n
i DE CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-39 B4.12 1-B13-CRD Nozzle 80A0134 N/A B-E VT-2 I 22-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 22-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-55 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 22-59 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I B4.12 18-55 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-51 B4.12 NES 239 6/82
o BEE o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
m Date: G/Sf ~
Document No. 80A4421 App: A Date: '/ M Preservice Inspection 5532-PERRY Rev:
1 Page: 66 of 145 CALtBRATION CODE COMFONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFK:ATION DESCRIPTION NUMBER Of apphcabiel CATEGORY METHOD PC E MARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 18-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-19 B4.12 NES 239 6/82
O MM O
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE sy:
A < Date: a /t/
Document No. 80A4421 App:
4 Date: v54e Preservice Inspection 5532-PERRY Rev:
1 Page: 67 of 145 COMPONENT COuPONENT PROCEDURE CODE E
ZONE IDENTIFICATION DESCRPTK)N NUMBER (if appbcattel CATEGORY WTHOO No.
REMARKS CRD PARTIAL PENETRATION WELDS x
Ref. Dwg. No:.1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 18-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 ' I 14-07 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-11 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-23 B4.12 NES 239 6/82
~
i HEN System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
A<
oate: t /$4 Preservice Inspection 5532-PERRY App:
+f Date: c/f4/
Document No. 80A4421 Rev:
1 Page: 68 of 145 CAtl8 RATION CODE E
T DE NUMBER Of 4 cablet CA GORY THOD NO.
REMARKS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 l
l l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-31 B4.12 l
l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 14-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 14-55 B4.12 NES 239 6/82
o n33 o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
- 4. e Date: 5 /?4 Document No. 80A4421 App:
W Date: c/r4 Preservice Inspection 5532-PERRY Rev:
1 Page: 69 of 145 OE TK:N DE NUMBE CA GCm REW CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-51 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 10-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-27 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-23 B4.12 NES 239 6/82
m o
11EN o
System: Rcactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
m Date:(. f Document No. 80A4421 App: #
Date: t/r#
Preservice Inspection 5532-PERRY Rev:
1 Page: 70 of 145 COMPONENT COMPONENT PROCEDURE BLOCK CODE M
ZONE IDENTFK;ATION DESCRtPTION PA.luBER Of apokcablel CATEGORY nETHOO NOL REM /.RKs CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 10-15 B4.12 I-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 10-11 B4.12 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-15 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-19 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-23 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-27 B4.12 1
1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-31 B4.12 NES 239 682 i
o 1135 o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
dir Date:S/r4 Document No. 80A4421 App: M Dater c/S4 Preservice Inspection 5532-PERRY Rev:
1 Page: 71 of 145 i
CALIBRATION COOE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER til applacablel CATEGORY BETHOO NO REMAFMS CRD PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-010 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 06-43 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 06-47 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-39 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 1 02-35 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-31 B4.12 1-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-27 B4.12 NES 239 fv82
O HM O
System: Rcactor Pressure Vessel PROGRAM PLAN AND SCHEDULE cy:
/E Date: (, /S 4 Document No. 80A4421 App: & ' Date: (/fg Preservice Inspection 5532-PERRY Rev:
1 Page: 72 of 145 -
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTFICATON DESCRIPTON NUMBER pfapphCabeel CATEGORY METHOO NO.
RE W CRD PARTIAL PENETRATION WELDS Ret Dwg. No: 1-RV-010 l-B13-CRD Nozzle 80A0184 N/A B-E VT-2 I 02-23 B4.12 NES 239 682
i J' ' U****
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:
- Date: _[/ff_
Preservice Inspection 5532-PERRY Rev:
1 Page: 73 of 145 o YcS nuusYE cAEGCm METtOO REMMMS oc new CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 58-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 58-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A' B-G-2 VT-1 I 58-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 58-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 58-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-19-B B7.10 1-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 54-23-B B7.10 NES 239 682
7
(
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE
[y:
!* 4 Date: 4 M4 Document No. 80A4421 App:
44 Date: r/rg Preservice Inspection 5532-PERRY Rev:
1 Page: 74 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOPE OENDFICADON CESCRIPDON NUWlER Ofa * =Nel CATEGORY METHOD NCL REuARKs CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 54-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-31-B B7.10 1-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 54-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-39-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-43-B B7.10 i
1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 54-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-47-B B7.10 NES 239 6/82
7 o
tip.g System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Ey:
de Date:
V Document No. 30A4421 App: A Date: r/sq Preservice Inspection 5532-PERRY Rev:
1 Page: 75 of 145 FXM COMPONDR COWONENT PROCEDURE OC CODE ZCPE ooanCAnCN DESCRPnON NUMBER Of am*cabW CATEGORY ME NOO m
Ruww,S CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-l' I 50-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-15-B B7.10 NES 239 6/82
O gg
^
/
Lf#
B:
i*
- Date:
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App: & Date: E/f4 Preservice Inspection 5532-PERRY Rev:
1 Page: 76 of 145 uscM cAEcom i.enUo E muums coar Toe CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 50-II-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-07-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-31-B B7.10 NES 239 632
i O
gg System: Reactor Pressura V;ssel PROGRAM PLAN AND SCHEDULE EY:
I"I Date: [ff Document No. 80A4421 App:
A4 Date: c/ M Preservice Inspection 5532-PERRY Rev:
1 Page: 77 of 145 COMPONENT COwCEM PROCEDURE OCK CODE XAM ZCr4 comncancm oEscaienon muueca or +=
cartocav merwoo not neuAans CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 46-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 46-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 42-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I
'42-51-B B7.10 NES 239 682 e
1 0
~
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE EY:
- Date:
f#
Document No. 80A4421 App: 4 Date: aN Preservice Inspection 5532-PERRY Rev:
1 Page: 78 of 145 CauSRADON CODE ENT DON DE TION NUMBE W=
m CA GORY THOD NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-19-B B7.10 NES 239 632
System: Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE
[Y:
l'M D**** # A#
Document No. 80A4421 App:
M Date: (/rq Preservice Inspection 3532-PERRY Rev:
1 Page: 79 of 145 cauenanON CooE COMPOPENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICADON DESCR6PTION P&WR Of meew CATEGORY LETHOD NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 42-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 42-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-19-B B7.10 NES 239 682
m o
ngg System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE EY:
BC D***: # #
Document No. 80A4421 App: A Date: u!rf Preservice Inspection 5532-PERRY Rev:
1 Page: 80 of 145 CAU9 RATION CODE OEN DE NUMBER pt=P m CA GCRY THOO REMARKS CRDH BOLTING Reg. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 38-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-51-B B7.10 NES 239 682
O g3 System: Reactor Pressure Vessel B
D****
Y PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:
M Date: uru Preservice Inspection 5532-PERRY Rev
_1_
Page: 81 of 145 caunRAnCu croe COMPCPENT COMPONENT PROCEDURE BLOCX CODE EXAM ZONE OENTFICADON DESCRPDON NUMBER pta
- M CATEGORY N
NO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-0!!
l-B13-CRDH Flange Bolting 80A0134 N/A B-G-2 VT-1 I 33-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 38-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT 1 1 34-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2. VT-1 1 34-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-39-B B7.10 NES 239 632
O HER 0
B:
< Date: c /94 System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
- Date: uty Preservice Inspection 5532-PERRY Rev:
1 Page: 82 of 145 I-Cumuncu CoCe CCwCPsNT COMPONENT PROCEDURE SLOCK CODE FXM ZCDE OENTFICA'XD4 DESCRPTION PAJMBER Of -
CATER.C9Y ne.THOO 70 REMARKS CRDH BOLTING
- s Ref. Dwg. Noe 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-35-B B7.10 7
s h-31-B _
CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I-I-B13-B7.10 1-B13,
CRDH Flange Bolting 30A0184 N/AT B-G-2 VT-1 I B7.10 34-27-6 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-23-B.
B7.10
~
1-3 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I t
l 34-19-B B7.10 1-B13-CRDH Flange Bo!&g 80A0184 N/A B-G-2 VT-1 I 34-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-11-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 34-07-B B7.10 NES 239 632
_q 7..*'
ys.;g7-
.<-g_,
y,..
... mz.. _ -., - -.
- u. ; _
_ ~. E _ -.* - -4 ay-.y s;_
A. j_ A g.w. N. @ _.g.:qmyj_.% p/ ',
.. J.#
7 g
,s
l 0
~
(
B:
'"C D****6d*#
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
- Date: (/ra Preservice Inspection 5532-PERRY Rev:
1 Page: 83 of 145 cAuenArou com c Ton o Ycr[u or."8-cAEcony E E
rou unecn ReuAmS CRDH BOLTING Ref. Dwg. No: 1-RV-O!!
l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 34-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-23-B B7.10 1-813-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 30-27-B B7.10 NES 239 632
o TIEE o
B5
/d Datei /id4 Syst;mt R:: actor Prrssura Vcssel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
M Date: c/re/
Preservice Inspection 5532-PERRY Rev:
1 Page: 84 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTsRCAilON DESCRIPTION NUMBER Of apphcabiel CATEGORY hETHOO NO.
REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011
^
l-B13-CRDH Flange Botting 80A0184 N/A B-G-2 VT-1 I 30-31-B B7.10
~
1-B13-CRDH Flange Bolting 80A0184
~N/A B-G-2 VT-1 I 30-3$-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-39-B B7.10 1-B13-CRDH Flange Bolting' 80A0184 N/A B-G-2 VT-1 I 30-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1
~
30-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 30-59-B B7.10 NES 239 6/82
O MM O
/
4 f'#
B2
'~" <' D***:
Syst:m: Rcactor Pr:ssurs Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
4 Date: pyL Preservice Inspection 5532-PERRY Rev:
1 Page: 85 of 145 cAueRenoN caos IDE DON DESCR NUMBE Of CA GORY HOO REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oll 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-51-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G.-2 VT-1 1 26-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2, VT-1 I 26-43-B B7.10 4
1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-31-B B7.10 NES 239 &82
n o
nm o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
/t<' Date: ad/
Document No. 80A4421 App:
+4 Date: 4/fc Preservice Inspection 5532-PERRY Rev:
1 Page: 86 of 145 CALIBRAT!ON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of aprhcable)
CATEGORY hETH00 NO.
REMARKS CRDH BOLTING Reg. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 26-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 26-03-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-03-B B7.10 NES 239 6/82 i
o 11 3.3 o
Syst:m2 Reactor Pressura Vessel PROGRAM PLAN AND CCHEDULE By: -
/*( Date:gM Document No. 80A4421 App:
M Dates (/JS Preservice Inspection 5532-PERRY Rev:
1 Page: 87 of 145 CAU8 RATION
. CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcabiel CATEGORY METHOD NO.
REMARKS CRDH BOLTING Drawing No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-11-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-35-B B7.10 NES 239 6/82
o HEE O
Syst::ms Rccctor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
/?/ Data 4//#
Document No. 80A4421 App:
4+
Date: (/.ry Preservice Inspection 5532-PERRY Rev:
1 Page: 88 of 145 I
CAUBRATION CODE IDE I ICA ON DESCR Of cablel CA GORY HOO No REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 22-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 22-55-b B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 1
22-59-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-55-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-51-B B7.10 i
NES 239 6/82
o HEE O
Systrm: Reactor Pressure Vess:1 PROGRAM PLAN AND SCHEDULE By:
/M' Date:6MY Document No. 80A4421 App:
- Date: IM Preservice Inspection 5532-PERRY Rev:
1 Page: 89 of 145 CAUBRATK)N CODE K)E F TON DESCFu ON MBE (if appicable)
CA GORY THOO NO F(MARKS CRDH BOLTING Ref. Dwg. No.1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 18-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A r
B-G-2 VT-1 I 18-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-35-B B7.10 l-B13-CRDil Flange Bolting 80A0184 M/A B-G-2 VT-1 I 18-31-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-19-B B7.10 NES 239 6/82
o TIEN C
System: Reactor Pre:sure Vessel PROGRAM PLAN AND SCHEDULE BY:
d' Date: C/88 Document No. 80A4421 App: M Dates (/M Preservice Inspection 5532-PERRY Rev:
1 Page: 90 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 10ENTIFICATION DESCRIPTION NUMBER (if appleable)
CATEGORY hETHOD No, ffMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-ll-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 18-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-07-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-ll-B B7.10 4
1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 14-23-B B7.10 NES 239 6/82
q Syst:mi Rc::.ctor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By:
B/4' Datei/,4(
Document No. 80A4421 App:
4+
Dates w4 Preservice Inspection 5532-PERRY Rev:
1 Page: 91 of 145 i
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if applicable)
CATEGORY METHOD NO.
REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-011 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-31-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-39-B B-7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-47-B B7.10 i
1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I
-l 14-51-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 14-55-B B7.10 NES 239 6/82
O MM C;/f4 System: R: actor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By:
/> # Data I Document No. 80A4421 App: _4t-Date: 63 4 Preservice Inspection 5532-PERRY Rev:
1 Page: 92 of 145 oYcrEnE ocs"cE MEm"OO
^
NUMBE CA Y
REWJES -
CRDH BOLTING Ref. Dwg. No: 1-RV-011 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-51-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-31-B B7.10 1-B 13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-23-B B7.10 NES 239 6/82 e
O MM O
B2 A Date:/M System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App: 44 Dates r/r4 Pa eservice Inspection 5532-PERRY Rev: -
1 Page: 93 of 145 CouPONENT COMPONENT PROCEDURE OCK CODE 2ONE 80ENTIFICATION DESCRIPTION NUMBER (18 apphcable)
CATEGORY WTHOO Ho.
REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-15-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 10-Il-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-15-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 06-19-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-23-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-27-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-31-B B7.10 NES 239 6/82
O gg Q
By:
Datest/94 '
App: /;(
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE 4+
Dates (/Sa Document No. 80A4421 Preservice Inspection 5532-PERRY Rev:
1 Page: 94 of 145 -
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 10ENTIFICAT60N DESCRIPTION NUMBER (ll applicable)
CATEGORY METHOD No.
REMARKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184
'N/A B-G-2 VT-1 I 06-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-43-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-47-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-39-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-35-B B7.10 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 1 02-31-B B7.10 l-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 02-27-B B7.10 i
NES 239 6/82 i
o 11EN O
B:
d' Dat 4 d'I System: Reactor Przssure Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
A Date:
c/R/
Preservice Inspection 5532-PERRY Rev:
1 Page: 95 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE
. EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of applW CATEGORY nETHOO NO.
REMAMKS CRDH BOLTING Ref. Dwg. No: 1-RV-Oli 1-B13-CRDH Flange Bolting 80A0184 N/A B-G-2 VT-1 I 06-23-B B7.10 NES 239 6/82
o ny.5 o
System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By:
lM Dat : 8 Ir#
Document No. 80A4421 App:
- Date:
vsq Preservice Inspection 5532-PERRY Rev:
1 Page: 96 of'145 i
CAUBRATION CODE IDE F TON DE I
IBE Of cabl4 CA ORY No.
REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #02-39 to Flange 80A0183 N/A B-0 PT I
02-39-W B14.10 1-B13-CRD Housing #02-35 to Flange 80A0183 N/A B-0 PT I
02-35-4r B14.10 1-B13-CRD Housing #02-31 to Flange 80A0183 N/A B-0 PT I
02-31-W B14.10 1-B13-CRD Housing #02-27 to Flange 80A0183 N/A B-0 PT I
02-27-W B14.10 1-B13-CRD Housing #02-23 to Flange 80A0183 N/A B-0 PT I
02-23-W B14.10 CRD Housing #06-15 to Flange 80A0183 N/A B-0 PT I
1-B13-06-15-W B14.10 l-B13-CRD Housing #10-11 to Flange 80A0183 N/A B-0 PT I
10-11-17 B14.10 1-B13-CRD Housing #14-07 to Flange 80A0183 N/A B-0 PT I
14-07-W B14.10 NES 239 6/82
o 11EN O
Syst;mi R: actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE By: /M Date: 4df Document No. 80A4421 App:
A4. Date: 9M_
Preservice Inspection 5532-PERRY Rev:
1 Page: 97 of 145 COMPONENT COWONENT PROCEDURE BLOCK CODE ZONE lOENTIFICATION DESCRIPTION NUMBER (if applicablel CATEGORY METHOO NO.
REWARKs CRD IiOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #22-03 to Flange 80A0183 N/A B-0 PT I
22-03-W B14.10 1-B13-CRD i5 sing #26-03 to Flange 80A0183 N/A B-0 PT I
26-03-W B14.10 1-B13-CRD Housing #30-03 to Flange 80A0183 N/A B-0 PT I
30-03-W B14.10 1-B13-CRD Housing #34-03 to Flange 80A0183 N/A B-0 PT I
34-03-W B14.10 j
1-B13-CRD Housing #38-03 to Flange 80A0183 N/A B-0 PT I
38-03-W B14.10 l
i 1-B13-CRD Housing #46-07 to Flange 80A0183 N/A B-0 PT I
46-07-W B14.10 1-B13-CRD Housing #50-11 to Flange 80A0183 N/A B-0 PT I
50-11-W B14.10 1-B13-CRD Housing #54-15 to Flange 80A0183 N/A B-0 PT
.I 54-15-W B14.10 NES 239 6/82
o ting a
B' 6 E D****
Syst::mi R actor Pressura Vcssel PROGRAM PLAN AND SCHEDULE-Y Document No. 80A4421 App:
4 Date: C/s4 Preservice Inspection 5532-PERRY Rev:
1 Page: 98 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEOURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of apphcablel CATEGORY.
hETHOD NO.
REMARKS l
CRD HOUSING WELDS Ref. Dwg. No: 1-RV-Oll 1-B13-CRO Housing #58-23 to Flange 80A0183 N/A B-0 PT I
58-23-W B14.10 1-B13-CRD Housing #58-27 to Flange 80A0183 N/A B-0 PT I
58-27-W B14.10 1-B13-CRD Housing #58-31 to Flange-80A0183 N/A B-0 PT I
58-31-47 B14.10 1-B13-CRD Housing #58-35 to Flange 80A0183 N/A B-0 PT I
58-35-TV B14.10 1-B13-CRD Housing #58-39 to Flange 80A0183 N/A B-0 PT I
58-39-W B14.10 l-B13-CRD Housing #54-47 to Flange 80A0183 N/A B-0 PT I
54-47-W B14.10 1-B13-CRD Housing #50-51 to Flange 80A0183 N/A B-0 PT I
50-51-W B14.10 1-B13-CRD Housing #46-55 to Flange 80A0183 N/A B-0 PT I
46-55-W B14.10 NES 239 6/82
c o
nEN o
Syst;mi Rcactor Pressuro Vessel PROGRAM PLAN AND CCHEDULE By:
/nf Dat:: #4 f Document No. 80A4421 App: A Date: (M Preservice Inspection 5532-PERRY Rev:
1 Page: 99 of 145 COMPONENT COMPONENT PROCEDURE BLOC CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (If applicabiel CATEGORY METHOD NO.
REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 1-B13-CRD Housing #38-59 to Flange 80A0183 N/A B-0 PT I
38-59-ur B14.10 1-B13-CRD Housing #34-59 to Flange 80A0183 N/A B-0 PT I
34-59-W B14.10 1-B13-CRD Housing #30-55' to Flange 80A0183 N/A B-0 PT I
30-59-W B14.10 1-B13-CRD Housing #26-59 to Flange 80A0183 N/A B-0 PT I
26-59-4f B14.10 1-B13-CRD Housing #22-59 to Flange 80A0183 N/A B-0 PT I
22-59-W B14.10 1-B13-CRD Housing #14-55 to Flange 80A0183 N/A B-0 PT I
14-55-W B14.10 1-B13-CRD Housing #10-51 to Flange 80A0183 N/A B-0 PT I
10-51-47 B14.10 1-B13-CRD Housing #06-47 to Flange 80A0183 N/A B-0 PT I
06-47-W B14.10 NES 239 6/82 i
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: /?F D:ta /f(
Document No. 80A4421 App: #
Dater chy Preservice Inspection 5532-PERRY Rev:
1 Page: 100 of 145 CAU0 RATION CODE N NT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)
CATEGORY.
AETHOD No.
REMARKS CRD HOUSING WELDS Ref. Dwg. No: 1-RV-011 NOTE: According to General Electric Dwg. #767E957, there are altogether 4 full penetration welds on the CRD housings. Only the CRD housing to Flange weld has been scheduled for examination. The remaining welds are not scheduled at this time, as their exact location and accessibility has not been determined. These welds will included later.
l l
l l
l l
NES 239 6/82
o 11EN O
B3' d(( Date:6((*f Syst:m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 APP: y Date:
GM Preservice Inspection 5532-PERRY Rev:
1 Page: 101 of 145 CAUBRATION LCDE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicabiel CATEGORY METHOD No.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 56-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-13 B4.13 1-313-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-33 B4.13 NES 239 6/82 i
O MM O
B'
' ' ', U**2*N Y
Syst;mi Rcactor Pressura Vessel PROGRAM PLAN AND CCHEDULE Document No. 80A4421 App:
4 Date:
t/ty Preservice Inspection 5532-PERRY Rev:
1 Page: 102 of 145 cAusRAnON CODE COMPONENT COMPONENT PROCEDURE BLOCK OODE EXAM ZONE BOENTIFICATION DESCRIPTION NUMBER (If appheablel CATEGORY DETHOD NO.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 48-53 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-57 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-45 B4.13 l
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-41 B4.13 i
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-33 B4.13 NES 239 6/82 i
g g
g B'
- 'M
- ""*z*
Syst:ms Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
~ /M Document No. 80A4421 App:
A4 Date:
c Preservice Inspection 5532-PERRY Rev:
1 Page: 103 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicable)
CATEGORY METHOD NO.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-21 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 40-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-17 B4.13 j
I-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-29 B4.13 l
NES 239 6/82
l o
1133 o
l Syst;mi Reactor Pressura Vessel PROGRAM PLAN AND ' SCHEDULE By: ' g Date: M l
Docurr.ent No. 80A4421 App: & Dates c/M Preservice Inspection 5532-PERRY Rev:
1 Page: 104 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcatM CATEGORY.
METHOO No.
FIEMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-37 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 1 32-49 B4.13 i
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 32-57 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E T-2 I 24-57 B4.13 i
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-49 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-41 B4.13 NES 239 6/82
o 11EN o
System: Reactor Pressure Vessel PROGRAM PLAN AN3 SCHEDULE By: /?(
Date:/d Document No. 80A4421 App: A Date: c/f4 Preservice Inspection 5532-PERRY Rev:
1 Page: 105 of 145 COMPONENT COMPONENT PROCEDURE BLO CODE ZONE IDENTIFICATION DESCRIPTION NLtWBER Uf apphcable)
CATEGORY.
nETHOD No.
EMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-37 B4.13 -
1-B13-Instrument Nezzle 80A0184 N/A B-E VT-2 I 24-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-29 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 24-09 B4.13
.1-B 13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-09 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-13 B4.13 l
NES 239 &82
()
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: MV Date: /M4 Document No. 80A4421 App:
M-Date: c/f4 Preservice Inspection 5532-PERRY Rev:
1 Page: 106 of 145 CAueRATm CooE COMPONENT COldPONENT PROCEDURE OLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUWBER Of apphcatdel CATEGORY SETHOD No.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-17 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-21 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I l
16-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-41 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-45 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-49 B4.13 4
1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 16-53 B4.13 4
NES 239 6/82 i
]
o HEN o
B3 df Date: 4M/
Syst;m R actor Pressuro Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 APP: & Date: c/Se/
Preservice Inspection 5532-PERRY Rev:
1 Page: 107 of 145 CAUBRATION CODE C N NT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDINTlRCATION DESCRIPTION NUMBER (if apphcable)
CATEGORY WTHOD NO.
REMARKS FLUX MONITOR PARTIAL PENETRATION WELDS Ref. Dwg. No: 1-RV-012 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-49 B4.13 1-B13-Instrument Nozzle 30A0184 N/A B-E VT-2 I 08-41 B4.13 1-B13-Instrument Nozzle 80A018' N/A B-E VT-2 1 08-33 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-25 B4.13 1-B13-Instrument Nozzle 80A0184 N/A B-E VT-2 I 08-17 B4.13 i
NES 239 6/82
o lies o/#
Systemi Rcactor Prc,ssura Vcssel PROGRAM PLAN AND SCHEDULE By:
W Date: A Document No. 80A4421 App:
44-Date:. s/f4 Preservice Inspection 5532-PERRY Rev:
1 Page: 108 of 145 CAUBRATON CODE-COMPONENT COMPONENT PROCEDURE BLOCK COOE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER pf appicabiel CATEGORY nETHOO NO.
HEMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-1 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-2 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-3 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-4 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-5 B6.40 1-B13-Ligament Between Stud Hole 80AIO89 PY-NUT-1-RPV B-G-1 UT-I A-6 B6.40 1-B13-Ligament Between Stud Hole 30A1089 PY-NUT-1-RPV B-G-1 UT I
A-7 B6.40 1-B13-Ligament Between Stud Hole 80A1089 PY-NUT-1-RPV B-G-1 UT I
A-8 B6.40 NES 239 6/82 i
O MM
(
~
M Date: #M4'-
System: Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By Document No. 80A4421 App:
- Date: cm Preservice Inspection 5532-PERRY Rev:
1 Page: 109 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicablel CATEGORY ETHOD NO.
REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
A-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 F Y-NUT-1-RPV B-G-1 UT I
B-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-2 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPVB-G-1 UT I
B-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B-7 B6.40 NES 239 6/82 i
O HM C
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
/W Date: t/f#
Document No. 80A4421 App:
4-Date:
r/ff T
Preservice Inspection 5532-PERRY Rev:
1 Paget 110 ch145 CAUBRATION CODE COMPONr4 COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 4 DEN 11F,CATtON DESCRIPTION NUMBER (ll aM CATEGORY METHOO NO.
REMARKS I
FLANGE LIGAMENT kef. Dwg.~ No: 1-RV-013
~
~
1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-I-RPV B-G-1 UT I
B-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-i-RPV B-G-1 UT - I B-9 B6.40
~
l-B13-Liganient Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C B6.40,
~.
l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
~C-2 B6.40
~
1-B13-Ligament Betw&n Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
1 C-3 B6.40
,l 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-6 B6.40 NES 239 6/82
Syst;m:r Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By: /W. Date:FN.
Document No. 80A4421 App: & Dates e/M -
Preservice Inspection 5532-PERRY Rev:
1 Page: 111 of 145 CAUBRATION CODE IDE T ON DE Of icablel CA ORY.
THOD NO REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT-I C-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
C-9 B6.40 '
l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
D-5 B6.40 NES 239 6/82 i
~.J
.s r,.;
B3 M dst *:t/N Syst::mt Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
A+ ' Dates? WM -
7
-Preservice Inspection 5532 -PERRY Rev:
1
.Pages 112 of 145 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE.
BLOCK CODE
. EXAM ZONE
- IDENTIFICATION DESCRIPTION
- 6 y/
(Il apphcablel CATEGORY DETHOO NO.
RE S
FLANGE LIGAMENT.
Ref. Dwg. No: 1-RV-013 5-1-B13-Ligament Between Stud Hole 80A0189 PY-NU T-1-RPV B-G-1 UT
.I D-6 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
B6.40 D-7 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT ~ I D-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189' Py-NUT-1-RPV B-G-1 UT; I
N D-9 B5.40 l'-B 13-L.igament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-2 B6.40 l
1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-3 B6.40 l
l 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-4 B6.40 NES 239 6/82
a nm5 o
Syst:mt Rerctor Prcssure Vcssel PROGRAM PLAN AND SCHEDULE By: /N[ Date: Ch l
Document No. 80A4421 App: pf_ Date: c/f4t Preservice Inspection 5532-PERRY Rev:
1 Page 113 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTIACATION DESCRIPTION NUMBER (if apphCatW4
- CATEGORY, hETHOD NO.
REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 I-B13-Ligament Between Stud Holc 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-l' UT I
E-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
E-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-1 B6.40 l-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-3 B6.40 NES 239 6/82
O gM c;N Syst;mt Rractor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
/M. Date:
Document No. 80A4421 App:
W.
Date:
@,t Preservice Inspection 5532-PERRY Rev:
1-
' Page: 114 of 145 CAUBRATK)N CODE COMPONENT COMPONENT PROCEDURE block CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicablel CATEGORY METHOO No.
REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Holc 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I.
F-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
F-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-1 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-2 B6.40 NES 239 6/82
O MM G
/
SYSt:mt Reactor Pressuro Vessel PROGRAM PLAN AND CCHEDULE By:
//rf Dater 6 ff Document No. 80A4421 App: 44 Date: c/fg Preservice Inspection 5532-PERRY Rev:
1 Page: 115 of 145 '
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcablel CATEGORY hETHOD NO, REMARKS FLANGE LIGAMENT Ref. Dwg. No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-6 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
G-9 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-1 B6.40 NES 239 6/82 i
i
O HM c)
/f f Date:
fd
/
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
Document No. 80A4421 APP:
M-Date: c,/se/
Preservice Inspection 5532-PERRY Rev 1
Page: 116 of 145 CALIBRATION CODE COMPONEt:T COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)
CATEGORY hETHOD No, REMARKS FLANGE LIGAMENT Ref. Dwg. ' No: 1-RV-013 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-2 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-3 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-4 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-5 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-6 B6.40 S
1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-7 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-8 B6.40 1-B13-Ligament Between Stud Hole 80A0189 PY-NUT-1-RPV B-G-1 UT I
H-9 B6.40 NES 239 6/82
By:
A /( ' ~ Date:
Syst mt Recctor Pressura Vcssel PROGRAM PLAN AND CCHEDULE App: # Date:
~ y Document No. 80A4421 Preservice Inspection 5532-PERRY Rev:
1 Page: 117 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcablel CATEGORY nETHOO NO REMARKS CLOSURE HEAD BOLTING Ret Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-1 1-RPV B6.30 80A0185 N/A MT -
1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-2 1-RPV B6.30 80A0185 N/A M T-l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-3 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-4 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-5 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-6 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-7 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-8 1-RPV B6.30 80A0185 N/A MT NES 239 6/82
o 11EN o/r# -
Syst:m: R; actor Prcssure Vessel PROGRAM PLAN AND SCHEDULE By
/ M ' Dat:: s Document No. 80A4421 App: A Date:
c/ M Preservice Inspection 3532-PERRY Rev:
1 Pages 118 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of appkcable)
- CATEGORY, BETHOO No.
REP %RKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-9 l-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-10 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-11 1-RPV "6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-12 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-13 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-14 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-15 1-RPV B6.30 80A0185 N/A MT.
1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-16 1-RPV B6.30 80A0185 N/A MT I
NES 239 6/82 i
Syst:mt Rc. actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:. A < oate: h Document No. 80A4421 APP: _dt Dates o' 4 f
Preservice Inspection 5532-PERRY Rev:
1 Page: 119 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appleable)
CATEGORY METHOD Not REMARKS l
CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-17 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-18 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 50A0196 PY-STUD-B-G-1 UT I
38-1-19 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-20 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-21 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-22 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-23 1-RPV B6.30 SOA0185 N/A MT l
l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-24 1-RPV B6.30 80A0185 N/A MT NES 239 6/82 i
o 11EN O
System: Reactor Pressure Vcssel PROGRAM PLAN AND CCHEDULE By l'f( Dat:: //f/
Document No. 80A4421 App:. E Date: E/fty Preservice Inspection 5532-PERRY Rev:
1 Page: 120 of 145 Cauer.non CooE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE
.DENTIFICATION DESCRIPTION NUMBER (If apphcatded CATEGORY ETHOO No.
REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-25 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-26 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-27 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-28 I-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-29 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-30 1-RPV B6.30 80A0185 N/A
'MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-31 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-32 1-RPV B6.30 80A0185 N/A ur NES 239 6/82
O HM r0 l'W Date h/9/
B8 Syst;m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App: & Date:. E/f#
Preservice Inspection 5532-PERRY Rev:
1 Page: 121 of 145 CoupoNENT CoupoNENT PROCEDURE oCK CoOE ZONE IDEd flFICATioN DESCRieTK)N NUMEIER (11 apphcablet CATEGORY hEETHOO No.
REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-33 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-34 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-35 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-36 1-RPV B6.30 i
80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-37 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-38 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-39 l-RPV B6.30 80A0185 N/A MT 1-B13-Clo'.are Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-40 1-RPV B6.30 80A0185 N/A MT NES 239 6/82
M Dated W 8F Systemi Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:
4+
Date: W39 Preservice Inspection 5532-PERRY Rev:
1 Page: 122 of 145 o EEEoM No" DE N
NUMBE CA GORY ME REuUES CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-41 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-42 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud
-80A0196 PY-STUD-B-G-1 UT I
38-1-43 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-44 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-45 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-46 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-47 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT i
38-1-48 1-RPV B6.30 I
80A0185 N/A MT NES 239 &'82 i
j
ll 9
o 11EE o/8'I Bv:
NN Date: 6 System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App:. 44-Date:- @/
r
{
Preservice Inspection 5532-PERRY Rev 1
Page: 123 of 145 cAUBRADON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZCNE IDENTFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY METHOO No.
REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014
" =
l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-49 l-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-50 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-51 1-RPV B6.30 80A0185 N/A MT i
1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-52 1-RPV B6.30
=-
t 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-53 1-RPV B6.30 80A0185 N/A MT l
8 l
l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
?
38-1-54 1-RPV B6.30 80A0185 N/A MT g
l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-55 1-RPV B6.30
[
80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-56 1-RPV B6.30 80A0185 N/A ur ll NES 239 &82 i
(
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By
/*/ Dat :6h[
Document No. 80A4421 App:
M Date: cN4' Preservice Inspection 5532-PERRY Rev:
1 Page: 124 of 145 CALIBRATION CODE 40ENT TlON DESCRt NUMBE (11 appicablel CA ORY.
T No REMARKS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-57 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-58 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-59 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-60 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-61 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT 1
38-1-62 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A014 PY-STUD-B-G-1 UT 1
38-1-63 1-RPV B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-64 1-RPV B6.30 80A0185 N/A ur NES 239 6/82 i
a B2 br Date: 6/94 Syst;ms R actor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
44-Date: ch, Preservice Inspection 5532-PERRY Rev:.
1 Page: 125 of 145 KEEE D YES NUMBE P
CA GmY ME JD REM /MS CLOSURE HEAD BOLTING Ref. Dwg. No: 1-RV-014 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-65 1-RPV B6.30 80A0185 N/A MT I-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-66 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-67 1-RPV-B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-68 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-69 l-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-70 1-RPV B6.30 80A0185 N/A MT l-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-71 1-RPVs B6.30 80A0185 N/A MT 1-B13-Closure Stud 80A0196 PY-STUD-B-G-1 UT I
38-1-72 1-RPV B6.30 80A0185 N/A MT NES 239 6/82 i
O
- MM C)
System: Rcactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
44 Date: t/#.
~
Document No. 80A4421 App: 44-Date:
r/Sy.
Preservice Inspection 5532-PERRY Rev:
l~
Page: 126 of 145 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCFDPTION NUMBER (if applicable)
CATEGORY.
nETHOO NO.
fEMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-1 B6.10 l-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-2 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-3 B6.10 1-B13-Closure Nut 80A0185 W/A B-G-1 MT I
39-5-4 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
l 39-5-5 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-6 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-7 B6.10 4
1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-8 B6.10 1
NES 239 6/82
B' D**** E N Y
Syst;mi Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Document No. 80A4421 App: 4f Date: car =/
Preservice Inspection 5532-PERRY Rev:
1 Page: 127 of 145 CAU8 RATION CODE IDE TON DE NUMBE Of am hw CA GORY HOD NO REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-9 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-10 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-11 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-12 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-13 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-14 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-15 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-16 B6.10 NES 239 6'82 i
O MM O
Sy;; tem: Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE By
!s <
Date: 6/v/
Document No. 80A4421 APP:
4+
Date: 64 Preservice Inspection 5532-PERRY Rev:
1 Page: 128 of 145 CAUBRATION CODE IDE DE NUMBER Of CA GORY HOD NO REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-17 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-18 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-19 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-20 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-21 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-22 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-23 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-24 B6.10 NES 239 6B2 i
o NEE o
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
6 Date: C //
Document No. 80A4421 App.
,M bates (/y4 Preservice Inspection 5532-PERRY Rev:
1 Page: 129 of 145 -
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE sDENTIFICATION DESCRIPTION NUMBER (11 appicablel
- CATEGORY, hETVJO NO.
REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-25 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-26 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-27 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-28 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-29 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-30 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-31 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-32 B6.10 NES 239 6/82
o HEE O
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By: g Date:6N Document No. 80A4421 App: A Dater r/w Preservice Inspection 5532-PERRY Rev:
1 Page: 130 of 145 1
CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTWICATnON DESCRIPTON NUMBER (if appleab!el CATEGORY LETHCO No.
REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-33 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-34 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-35 B6.10 1-B13-Closure Nut 80A0185 N/A B-G.1 MT I
39-5-36 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-37 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-38 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-39 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-40 B6.10 NES 239 6/82
%,,/
/'+t Date: (_/.f__/_
Syst;m: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE B:
Y Document No. 80A4421 App:
/
Date: WM Preservice Inspection 5532-PERRY Rev:
1 Page: 131 of 145 CADORATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE ENTFICATION DESCRIPTION NUMBER (if apphcable)
CATEGORY hETHOO No.
REMARKS l
CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-541 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-542 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-43 B6.10 l-B13-Closure Nut 80A0185 N/A 3-G-1 MT -
I 39-544 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-45 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-546 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-47 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-48 B6.10 NES 239 6/82 i
e 0
11EN e
B2 D***:###
Systems Reactor Pressuro Vessel PROGRAM PLAN AND SCHEDULE Y
Do ument No. 80A4421 App: H Date: cast Preservice Inspection 5532-PERRY Rev:
1 Page: 132 of 145 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATON DESCRIPTION NUMBER Of apphcabiel CATEGORY METHOO No.
REMARKS,
CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-49 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-50 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-51 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-52 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-53 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-54 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-55 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-56 B6.10 NES 239 6/82
O MM
<D PROGRAM PLAN AND SCHEDULE By:
At Date: 4///
System: Reactor Pressure Vessel Document No. 80A4421
. App: A Date:
c/sq Preservice Inspection 5532-PERRY Rev:
1 Page: 133 o'f 145 CAueRATm CODE COMPONENT COMPONENT PROCEDURE BLOCK COCE EXAM ZONE IDENTWICATION DESCR1PTION NUMBER Of apphcabiel CATEGORY h4ETHCO No.
REMARKS CLOSURE HEAD NUT Ref. Dwg. No: 1-RV-015 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-57 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-58 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-59 B6.10 1-B13-Closure Nut 30A0185 N/A B-G-1 MT I
39-5-60 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-61 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-62 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-63 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-64 B6.10 NES 239 6/82 J
y o
MEN 0
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
ezrr Date:. /f/
Document No. 80A4421 APP: g Date:
a-Preservice Inspection 5532-PERRY Rev:
1 Page: 134 of 145 cAuBRATON coOE COMPONENT COMPONENT PROCEDURE BLOCK COOE EXAM ZONE OENTIFICATON DESCRIPTON NUMBER (If apphcatded C.TEGORY.
METHOO NO NW CLOSURE HEAD NUT Ret Dwg. No: 1-RV-015 1-BI3-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-65 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-66 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-67 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-68 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-69 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-70 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-71 B6.10 1-B13-Closure Nut 80A0185 N/A B-G-1 MT I
39-5-72 B6.10 NES 239 6/82
(']
)
d_*g Date def B8 System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4421 App:
4+
Date: Q4 Preservice Inspection 5532-PERRY Rev:
1 Page: 135 of 145 CAUBRATON CODE N;ir COMPOhENT PROCEDURE BLOCK CODE EXAM ZONE OENTWOATON DESCRPTION NUMBER (ifWeam CATEGORY METHOO NO.
REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-1 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-2 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-3 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-4 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-5 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-6 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-7 B6.50 80A0184 N/A B-G-1 VT-1 I 1-B13-Closure Washer 39-6-8 B6.50 NES 239 682
T O
MM D[N 4
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
4 Date:
Document No. 80A4421 App:
Date: (/r4 Preservice Inspection 5532-PERRY Rev:
1 Page: 136 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOPE OENTIF. CATION DESCRIPTION NUMBER (If apphcablet t'ATEGORY METHOD No.
REM / RKs CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-9 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-10 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-11 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-12 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-13 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-14 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-15 B6.50 1-813-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-16 B6.50
'l NES 239 6/82
o 11EE e
System: Reactor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
M Date:th Document No. 80A4421 App:' g Date:
OM Preservice Inspection 5532-PERRY Rev:
1 Page: 137 of 145 cAuenanos com axEE MYS NUMBE M=
CA GORY MENOO NO RE W CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-Ol6 s
1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-17 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-18 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-19 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-20 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-21 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-22 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-23 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-24 B6.50 NES 239 632 i
( b (O
4N/
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
g'e' Date:
4
' Dates _ _W4 Document No. 80A4421
- App:
Preservice Inspection 5532-PERRY Rev 1
Page: 138 of 145
.I' CacmaroN COc4 s
COMPCNENT COMPOPENT _
PROCEDURE t.LCCK CODE EXAM ZONE CENTIFsCATtON DESCRaPTOs NUMBER
- fmar*c= W CATEGORY nETHOO NC1 REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016
~
1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-25 B6.50 f
I-813-Closure Washer 30A0184 N[A B-G-1 VT-1 I d
39-6-26 B6.50 c
I 1-B13-C!csure Washer 80A0184 N/A
'B-G l VT-1 I
~
39-6-27 B6.50 1-313-Closure Washer 30A0184 N/A B-G-1 VT-1 l' '
39-6-28 B6.50
~
1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-29 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-30 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-31 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39632 B6.50 NES 239 6/82
eD 1135 o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE Sy:
ng Date: 4 /N '
Document No. 80A4421 App: & Date: @$r/.
Preservice Inspection 5532-PERRY Rev:
1 Page: 139 of 145 CAttBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZOME ICENTIFICATON DEsCRPTON NUMBER Ofarw*e m CATEGORY nETHOO NO.
REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-33 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-34 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-35 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-36 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-37 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-38 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-39 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I l
39-6-40 B6.50 NES 239 6B2
o 113g q.
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
M Date: Off Document No. 80A4421 App: 4 _ Date: ON Preservice Inspection 5532-PERRY
_ Rev:
1 - Page 140 of 145 cAuBRmON COOr 30E IF TON DE NUMBE
. (11 a CA GORY ME No REMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A01114 N/A B-G-1 VT-1. I 39-6-41 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-42 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-43 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-44 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-45 B6.50 1-B13-Closure Wr. sher
~80A0184 N/A B-G-1 VT-1 I 39-6-46 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-47 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-48 B6.50 NES 239 6/82
o 1185 o
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
/?i( Dat:24 4 (
Document No. 80A4421 App: g Date: cArg Preservice Inspection 5532-PERRY Rev:
1 Page: 141 of 145 CAUDRATKW CODE IDE T ON DE 440E Uf CA GORY D100 No
' IEMARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-49 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-50 B6.50 1-B13-Closure Washer 30A0184 N/A B-G-1 VT-1 I 39-6-51 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 1 39-6-52 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-53 B6.50 l-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-54 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-55 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-56 B6.50 NES 239 6/82
O MM C
Syst;m2 R: actor Pressura Vessel PROGRAM PLAN AND SCHEDULE By:
/sN Date: M-Document No. 80A4421 App: 44 Date: Vfte. -
~
Preservice Inspection 5532-PERRY Rev:
1 Page: 142 of 145 CAUBRATIOF CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY.
METHOO No E MARKS CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-57 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 1 39-6-58 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-59 96.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-60 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-61 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-62 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1. VT-1 I 39-6-63 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6 B6.50 NES 239 6/82 i
System: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
ri Date: / r Document No. 80A4421 App:
Date Preservice Inspection 5532-PERRY Rev:
1 Page: 143 of 145 l
CAueRAnON COoE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTFICADON DESCRIPTION NUMBER Uf apphcablel CATEGORY METHOO No.
REMARKS
,is CLOSURE HEAD WASHERS Ref. Dwg. No: 1-RV-016 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-65 B6.50
=
1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-66 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-67 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-68 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-69 B6.50 '
1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-70 B6.50 1-B13-Closure Washer 80A018%
N/A B-G-1 VT-1 I 39-6-71 B6.50 1-B13-Closure Washer 80A0184 N/A B-G-1 VT-1 I 39-6-72 B6.50 NES 239 6/82
o HEN o
=
/V Date:([84 S stem: Reactor Pressure Vessel PROGRAM PLAN AND SCHEDULE By:
d>cument No. 80A4421 App: $ Dater y Preservice Inspection 5532-PERRY Rev:
1 Page: 144 of 145 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION Nut /3ER (If apphcat*$
CATEGORY h4ETHOO NCE REMARKS SYSTEM LEAKAGE TEST Ref. Dwg, No: 1-RV-001 1-B13-Reactor Vessel Pressure 80A0184 N/N B-P VT-2 I Leakage Retalning Boundary B15.10 2
[
NES 233 6/82
o 11p.5 o
System: Reactor Pressure Vessel PROGRAM PLAN AND CCHEDULE By: - 41 ( Date: 8/II Document No. 80A4421 App: V Date:
eV/#
Preservice Inspection 5532-PERRY Rev:
1 Page: 143 of 145 9
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLX,K CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcabiel CATEGORY METHOD NO.
REMARKS l
l I
REACTOR VESSEL INTERIOR Ref. Dwg. No: 1-RV-001 1-B13-Retete-Vessel Interior 80A0184 N/A B-N-2 VT-1 I Attachment Attachinants B13.20 l-B13-Reactor Vessel Core Support 80A0184 N/A B-N-2 VT-1 I Core Support Structure B13.21 1-B13-Reactor Vessel Interior 80A0184 N/A B-N-1 VT-3 I Interior B13.10 l
l l
J i
NES 239 6/82
-