ENS 43884: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
| event date = 01/06/2008 11:00 EST | | event date = 01/06/2008 11:00 EST | ||
| last update date = 03/04/2008 | | last update date = 03/04/2008 | ||
| title = Hpci Declared Inoperable Due | | title = Hpci Declared Inoperable Due to Failed Surveillance Test | ||
| event text = During HPCI pump operability surveillance in preparation for a system outage, the system failed to achieve rated flow and pressure in the time required by procedure and Tech Specs. The procedural requirement is <49 seconds and the Tech Spec requirement is < 50 seconds. The system achieved rated flow and pressure in 54 seconds. The system outage has been delayed until troubleshooting plans can be developed and implemented. | | event text = During HPCI pump operability surveillance in preparation for a system outage, the system failed to achieve rated flow and pressure in the time required by procedure and Tech Specs. The procedural requirement is <49 seconds and the Tech Spec requirement is < 50 seconds. The system achieved rated flow and pressure in 54 seconds. The system outage has been delayed until troubleshooting plans can be developed and implemented. | ||
The licensee notified the NRC Resident Inspector. | The licensee notified the NRC Resident Inspector. |
Latest revision as of 22:14, 1 March 2018
Where | |
---|---|
Hatch Georgia (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+-0.63 h-0.0263 days <br />-0.00375 weeks <br />-8.62974e-4 months <br />) | |
Opened: | Tony Spring 15:22 Jan 6, 2008 |
NRC Officer: | Jeff Rotton |
Last Updated: | Mar 4, 2008 |
43884 - NRC Website
| |