ENS 44587: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 10/21/2008 19:44 EDT | | event date = 10/21/2008 19:44 EDT | ||
| last update date = 10/21/2008 | | last update date = 10/21/2008 | ||
| title = Failure | | title = Failure of 250V Dc Hpci Injection Valve Undervoltage Relay | ||
| event text = A 250 Volt DC undervoltage relay for HPCI injection valve MO-2301-8 failed. The reason for the failure is still under investigation. The injection valve is a normally closed valve that opens on an initiation signal. The failure of the under voltage relay would prevent the HPCI injection valve (MO-2301-8) from opening and would prevent HPCI from performing its safety function. Pilgrim Station has entered a 14 day LCO due to Technical Specification 3.5.C.2. | | event text = A 250 Volt DC undervoltage relay for HPCI injection valve MO-2301-8 failed. The reason for the failure is still under investigation. The injection valve is a normally closed valve that opens on an initiation signal. The failure of the under voltage relay would prevent the HPCI injection valve (MO-2301-8) from opening and would prevent HPCI from performing its safety function. Pilgrim Station has entered a 14 day LCO due to Technical Specification 3.5.C.2. | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. |
Latest revision as of 21:13, 1 March 2018
Where | |
---|---|
Pilgrim Massachusetts (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
LER: | 05000293/LER-2008-004 |
Time - Person (Reporting Time:+0.02 h8.333333e-4 days <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) | |
Opened: | Bruce Chenard 23:45 Oct 21, 2008 |
NRC Officer: | Donald Norwood |
Last Updated: | Oct 21, 2008 |
44587 - NRC Website
| |