ENS 45279: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 08/20/2009 08:38 CDT
| event date = 08/20/2009 08:38 CDT
| last update date = 08/20/2009
| last update date = 08/20/2009
| title = Both Divisions Of Vital Switchgear Inoperable Because Flood Door Found Closed
| title = Both Divisions of Vital Switchgear Inoperable Because Flood Door Found Closed
| event text = At 08:38 on 08/20/09, a plant operator identified that DOOR-18, which is a normally open fire door, had closed due to a failed fusible link.  With this door closed, the pathway for a potential flood due to a high energy line break (HELB) is blocked therefore closing off a drain path for the water.  This represented an unanalyzed condition where both divisions of essential switchgear could be impacted.  As a result, both divisions of essential switchgear were declared inoperable and Technical Specification LCO 3.0.3 was entered.   
| event text = At 08:38 on 08/20/09, a plant operator identified that DOOR-18, which is a normally open fire door, had closed due to a failed fusible link.  With this door closed, the pathway for a potential flood due to a high energy line break (HELB) is blocked therefore closing off a drain path for the water.  This represented an unanalyzed condition where both divisions of essential switchgear could be impacted.  As a result, both divisions of essential switchgear were declared inoperable and Technical Specification LCO 3.0.3 was entered.   
With both switchgear divisions being inoperable, this condition is also an event that could have prevented fulfillment of a Safely Function and reportable under 50.72(b)(3)(v).  At 0942 on 08/20/09, the closed fire door was restored to the open state.  Both divisions of switchgear were declared Operable and LCO 3.0.3 was exited. No system actuations occurred as a part of this event.
With both switchgear divisions being inoperable, this condition is also an event that could have prevented fulfillment of a Safely Function and reportable under 50.72(b)(3)(v).  At 0942 on 08/20/09, the closed fire door was restored to the open state.  Both divisions of switchgear were declared Operable and LCO 3.0.3 was exited. No system actuations occurred as a part of this event.

Latest revision as of 21:11, 1 March 2018

ENS 45279 +/-
Where
Monticello Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition

10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+1.68 h0.07 days <br />0.01 weeks <br />0.0023 months <br />)
Opened: Leroy Anderson
15:19 Aug 20, 2009
NRC Officer: Pete Snyder
Last Updated: Aug 20, 2009
45279 - NRC Website