100 +
At 08:38 on 08/20/09, a plant operator ide … At 08:38 on 08/20/09, a plant operator identified that DOOR-18, which is a normally open fire door, had closed due to a failed fusible link. With this door closed, the pathway for a potential flood due to a high energy line break (HELB) is blocked therefore closing off a drain path for the water. This represented an unanalyzed condition where both divisions of essential switchgear could be impacted. As a result, both divisions of essential switchgear were declared inoperable and Technical Specification LCO 3.0.3 was entered. </br>With both switchgear divisions being inoperable, this condition is also an event that could have prevented fulfillment of a Safely Function and reportable under 50.72(b)(3)(v). At 0942 on 08/20/09, the closed fire door was restored to the open state. Both divisions of switchgear were declared Operable and LCO 3.0.3 was exited. No system actuations occurred as a part of this event.</br>A continuous fire watch was posted as a compensatory measure while the fire door is being repaired.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
13:38:00, 20 August 2009 +
45,279 +
15:19:00, 20 August 2009 +
13:38:00, 20 August 2009 +
At 08:38 on 08/20/09, a plant operator ide … At 08:38 on 08/20/09, a plant operator identified that DOOR-18, which is a normally open fire door, had closed due to a failed fusible link. With this door closed, the pathway for a potential flood due to a high energy line break (HELB) is blocked therefore closing off a drain path for the water. This represented an unanalyzed condition where both divisions of essential switchgear could be impacted. As a result, both divisions of essential switchgear were declared inoperable and Technical Specification LCO 3.0.3 was entered. </br>With both switchgear divisions being inoperable, this condition is also an event that could have prevented fulfillment of a Safely Function and reportable under 50.72(b)(3)(v). At 0942 on 08/20/09, the closed fire door was restored to the open state. Both divisions of switchgear were declared Operable and LCO 3.0.3 was exited. No system actuations occurred as a part of this event.</br>A continuous fire watch was posted as a compensatory measure while the fire door is being repaired.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 20 August 2009 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:11:29, 2 March 2018 +
15:19:00, 20 August 2009 +
true +
false +
0.07 d (1.68 hours, 0.01 weeks, 0.0023 months) +
13:38:00, 20 August 2009 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.