ENS 47237
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
21:00 Sep 2, 2011 | |
Title | Intake Structure Fire Suppression System Failed Surveillance Test |
Event Description | During intake structure fire suppression sprinkler system surveillance testing, Operations identified that a portion of the sprinkler system was not able to pass flow. A 14-day fire protection system impairment was entered and a continuous compensatory fire watch with backup suppression was stationed prior to removing the system from service for testing. Upon failure of the surveillance test, the impairment remained in effect and the continuous fire watch remained stationed pending investigation/repair by Maintenance. On 9/2/2011 at approximately 1600 [CDT], Mechanical Maintenance personnel informed Operations that the sprinkler suppression piping was found to be fouled and not capable of passing flow. The intake sprinkler system is relied upon in part to satisfy an exemption for the station to 10CFR50 Appendix R, Section III.G.2.B concerning separation of components in the intake structure. Based upon the intake sprinkler system being non-functional, this condition is being reported under 10CFR50.72(b)(3)(ii)(B) as an unanalyzed condition affecting plant safety systems.
The licensee informed the NRC Resident Inspector. |
Where | |
---|---|
Monticello Minnesota (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+1.25 h0.0521 days <br />0.00744 weeks <br />0.00171 months <br />) | |
Opened: | Mark Roelike 22:15 Sep 2, 2011 |
NRC Officer: | Steve Sandin |
Last Updated: | Sep 2, 2011 |
47237 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47237\u003C/a\u003E - \u003Ca href=\"/Monticello\" title=\"Monticello\"\u003EMonticello\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EIntake Structure Fire Suppression System Failed Surveillance Test\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47237 - Monticello\n","link":"","lat":45.333647222222226,"lon":-93.8490361111111,"icon":"/w/images/6/6c/Xcel_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_47237&oldid=87256"