ML20133E870: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . . _ _ _ _ _ | {{#Wiki_filter:. . . _ _ _ _ _ | ||
l | |||
CMcicti | |||
JUL12 085 | |||
-ATTN: Mr. H. B. Tucker, | Duke Power Company | ||
-ATTN: | |||
Mr. H. B. Tucker, Vice President | |||
Nuclear Production Department | |||
422 South Church Street | |||
Charlotte, NC 28242 | |||
Gentlemen: | |||
SUBJECT: | |||
REPORT NOS. 50-413/85-20 AND 50-414/85-16 | |||
On April 26, 1985 - May 25, 1985, NRC inspected activities authorized by NRC | |||
Operating License No. NPF-35 and Construction Permit No. CPPR-17 for your Catawoa | |||
facility. At the conclusion of the inspection, the findings were discussed with | |||
those members of your staff identified in the enclosed inspection report. | |||
The inspection findings indicate that certain activities violated NRC require- | |||
ments and.other activities appeared to deviate from a commitment to the NRC. The | |||
violations and deviations, with pertinent references and elements to be included | |||
in your response, are presented in the enclosed Notices. | |||
Your attention is invited to unresolved items identified in the inspection | |||
report. | |||
These matters will be pursued during future inspections. | |||
' The responses directed by this letter and the enclosures are not subject to the | ' The responses directed by this letter and the enclosures are not subject to the | ||
clearance procedures of the Office of Management and Budget issued under the | |||
Paperwork Reduction Act of 1980, PL 96-511. | |||
Should you have any questions concerning this letter, please contact us. | |||
Sincerely, | |||
Original Signed by | |||
Roger D. Walker | |||
Roger D. Walker, Director | |||
Division of Reactor Projects | |||
Enclosures: | |||
1. | |||
Notice of Violation | |||
2. | |||
Notice of Deviation | |||
3. | |||
Inspection Report Nos. 50-413/85-20 | |||
and 50-414/85-16 | |||
cc w/encis: | |||
-R. | |||
L. Dick, Vice President - Construction | |||
L'U. W. Hampton, Station Manager | L'U. W. Hampton, Station Manager | ||
bec w/encls: | |||
u-G Johnson, ELD | u-G Johnson, ELD | ||
K: N. Jabbour, NRR | |||
Document Control Desk | |||
State of South Carolina | |||
NRC Resident Inspector | |||
RII | |||
RII | |||
RI: | |||
g0 | |||
e | |||
E[V/ wnlee | |||
CBurger:cdg | |||
HDance | |||
7///)/85 | |||
7/g /85 | |||
7/;l/85 | |||
8508080048 850712 | |||
}I( | |||
Efd)f | |||
PDR | |||
ADOCK 05000413 | |||
G | |||
PDR | |||
}} | }} | ||
Latest revision as of 08:35, 12 December 2024
| ML20133E870 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/12/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20133E873 | List: |
| References | |
| NUDOCS 8508080048 | |
| Download: ML20133E870 (1) | |
See also: IR 05000413/1985020
Text
. . . _ _ _ _ _
l
CMcicti
JUL12 085
Duke Power Company
-ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NOS. 50-413/85-20 AND 50-414/85-16
On April 26, 1985 - May 25, 1985, NRC inspected activities authorized by NRC
Operating License No. NPF-35 and Construction Permit No. CPPR-17 for your Catawoa
facility. At the conclusion of the inspection, the findings were discussed with
those members of your staff identified in the enclosed inspection report.
The inspection findings indicate that certain activities violated NRC require-
ments and.other activities appeared to deviate from a commitment to the NRC. The
violations and deviations, with pertinent references and elements to be included
in your response, are presented in the enclosed Notices.
Your attention is invited to unresolved items identified in the inspection
report.
These matters will be pursued during future inspections.
' The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Roger D. Walker
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
Notice of Deviation
3.
Inspection Report Nos. 50-413/85-20
and 50-414/85-16
cc w/encis:
-R.
L. Dick, Vice President - Construction
L'U. W. Hampton, Station Manager
bec w/encls:
u-G Johnson, ELD
K: N. Jabbour, NRR
Document Control Desk
State of South Carolina
NRC Resident Inspector
RII
RII
RI:
g0
e
E[V/ wnlee
CBurger:cdg
HDance
7///)/85
7/g /85
7/;l/85
8508080048 850712
}I(
Efd)f
ADOCK 05000413
G