| event date = 05/06/2014 08:30 CDT
| event date = 05/06/2014 08:30 CDT
| last update date = 05/09/2014
| last update date = 05/09/2014
| title = Automatic Reactor Scram Due To Low Reactor Water Level During Instrument Testing
| title = Automatic Reactor Scram Due to Low Reactor Water Level During Instrument Testing
| event text = At 0830 [CDT] on 05/06/2014, the Unit 3 reactor automatically scrammed due to low reactor water level as a result of a trip of both recirculation pumps.  Main Steam Isolation Valves remained open with main turbine bypass valves controlling reactor pressure. Reactor feedwater pumps are in service to control reactor water level.
| event text = At 0830 [CDT] on 05/06/2014, the Unit 3 reactor automatically scrammed due to low reactor water level as a result of a trip of both recirculation pumps.  Main Steam Isolation Valves remained open with main turbine bypass valves controlling reactor pressure. Reactor feedwater pumps are in service to control reactor water level.
Primary Containment Isolation System Groups 2, 3, 6, and 8 containment isolation and initiation signals were received. Upon receipt of these signals all required components actuated as required. The Reactor Feedwater System controlled and maintained water level above the level 2 initiation setpoint.
Primary Containment Isolation System Groups 2, 3, 6, and 8 containment isolation and initiation signals were received. Upon receipt of these signals all required components actuated as required. The Reactor Feedwater System controlled and maintained water level above the level 2 initiation setpoint.

Latest revision as of 20:50, 1 March 2018

ENS 50090 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.05 h-0.00208 days <br />-2.97619e-4 weeks <br />-6.849e-5 months <br />)
Opened: Mark Moebes
13:27 May 6, 2014
NRC Officer: Pete Snyder
Last Updated: May 9, 2014