o DUKE POWER GOMPANY P.O. BOX 33180 CHARLOTTE. N.O. 28242 HALB. TUCKER rztzensown vaca rarernsww (704) 3NMt wuoteam reopt m on July 15, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
DUKE POWER GOMPANY P.O. BOX 33180 CHARLOTTE. N.O. 28242 HALB. TUCKER                                                               rztzensown vaca rarernsww                                                         (704) 3NMt wuoteam reopt m on July 15, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATIFNTION: Mr. B.J. Youngblood, Project Director PWR Project Directorate No. 4 i
20555 ATIFNTION: Mr. B.J. Youngblood, Project Director PWR Project Directorate No. 4 i
Re:         Catawba Nuclear Station, Unit 2 Docket No. 50-414
Re:
Catawba Nuclear Station, Unit 2 Docket No. 50-414


==Dear Sir:==
==Dear Sir:==
 
On September 10, 1985, the NRC transmitted the results of the Staff's audit of the i
On September 10, 1985, the NRC transmitted the results of the Staff's audit of the           i Catawba Unit 2 Safety Parameter Display System (SPDS). Section 4.6 of the audit results requested that Duke submit the Verification and Validation (V&V) Summary Documents describing both the V&V process followed and the results. As noted in our November 27, 1985 response, the V&V summary documents were scheduled for
Catawba Unit 2 Safety Parameter Display System (SPDS). Section 4.6 of the audit results requested that Duke submit the Verification and Validation (V&V) Summary Documents describing both the V&V process followed and the results. As noted in our November 27, 1985 response, the V&V summary documents were scheduled for
    -completion on July 1, 1986. The following summary packages are attached:
-completion on July 1, 1986. The following summary packages are attached:
1 - SPDS Design Basis 2 - SPDS Critical Safety Function Selection 3 - SPDS Status Trees Development 4 - SPDS Logic Generation 5 - SPDS Logic Verification 6 - SPDS Human Factors Program 7 - SPDS Software Verification and Validation 8 - SPDS Maintenance Very truly yours,
1 - SPDS Design Basis 2 - SPDS Critical Safety Function Selection 3 - SPDS Status Trees Development 4 - SPDS Logic Generation 5 - SPDS Logic Verification 6 - SPDS Human Factors Program 7 - SPDS Software Verification and Validation 8 - SPDS Maintenance Very truly yours,
        '[
'[
e Hal B. Tucker ROS/06/j gm xc: w/ attachment Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta St., NW, Suite 2900 Washington, D.C. 20555 NRC Resident Inspector Catawba Nuclear Station          72 g { %           4                   00 P                                           /
e Hal B. Tucker ROS/06/j gm xc: w/ attachment Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta St., NW, Suite 2900 Washington, D.C.
                                                                    .}}
20555 NRC Resident Inspector 72 g { %
4 00 Catawba Nuclear Station P
/
.-}}

Latest revision as of 21:08, 6 December 2024

Forwards Summary Packages for SPDS Design Basis, SPDS Critical Safety Function Selection, SPDS Status Trees Development, SPDS Logic Generation, SPDS Logic Verification & SPDS Human Factors Program
ML20207H863
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/15/1986
From: Tucker H
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20207H868 List:
References
NUDOCS 8607250123
Download: ML20207H863 (1)


Text

,

(-

)

o DUKE POWER GOMPANY P.O. BOX 33180 CHARLOTTE. N.O. 28242 HALB. TUCKER rztzensown vaca rarernsww (704) 3NMt wuoteam reopt m on July 15, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 ATIFNTION: Mr. B.J. Youngblood, Project Director PWR Project Directorate No. 4 i

Re:

Catawba Nuclear Station, Unit 2 Docket No. 50-414

Dear Sir:

On September 10, 1985, the NRC transmitted the results of the Staff's audit of the i

Catawba Unit 2 Safety Parameter Display System (SPDS). Section 4.6 of the audit results requested that Duke submit the Verification and Validation (V&V) Summary Documents describing both the V&V process followed and the results. As noted in our November 27, 1985 response, the V&V summary documents were scheduled for

-completion on July 1, 1986. The following summary packages are attached:

1 - SPDS Design Basis 2 - SPDS Critical Safety Function Selection 3 - SPDS Status Trees Development 4 - SPDS Logic Generation 5 - SPDS Logic Verification 6 - SPDS Human Factors Program 7 - SPDS Software Verification and Validation 8 - SPDS Maintenance Very truly yours,

'[

e Hal B. Tucker ROS/06/j gm xc: w/ attachment Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta St., NW, Suite 2900 Washington, D.C.

20555 NRC Resident Inspector 72 g { %

4 00 Catawba Nuclear Station P

/

.-