ML20207H863
| ML20207H863 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/15/1986 |
| From: | Tucker H DUKE POWER CO. |
| To: | Harold Denton, Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20207H868 | List: |
| References | |
| NUDOCS 8607250123 | |
| Download: ML20207H863 (1) | |
Text
,
(-
)
o DUKE POWER GOMPANY P.O. BOX 33180 CHARLOTTE. N.O. 28242 HALB. TUCKER rztzensown vaca rarernsww (704) 3NMt wuoteam reopt m on July 15, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ATIFNTION: Mr. B.J. Youngblood, Project Director PWR Project Directorate No. 4 i
Re:
Catawba Nuclear Station, Unit 2 Docket No. 50-414
Dear Sir:
On September 10, 1985, the NRC transmitted the results of the Staff's audit of the i
Catawba Unit 2 Safety Parameter Display System (SPDS). Section 4.6 of the audit results requested that Duke submit the Verification and Validation (V&V) Summary Documents describing both the V&V process followed and the results. As noted in our November 27, 1985 response, the V&V summary documents were scheduled for
-completion on July 1, 1986. The following summary packages are attached:
1 - SPDS Design Basis 2 - SPDS Critical Safety Function Selection 3 - SPDS Status Trees Development 4 - SPDS Logic Generation 5 - SPDS Logic Verification 6 - SPDS Human Factors Program 7 - SPDS Software Verification and Validation 8 - SPDS Maintenance Very truly yours,
'[
e Hal B. Tucker ROS/06/j gm xc: w/ attachment Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta St., NW, Suite 2900 Washington, D.C.
20555 NRC Resident Inspector 72 g { %
4 00 Catawba Nuclear Station P
/
.-