ML20207S103: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:,. | ||
l REVISED COPY OPERATING DATA REPORT DOCKET NO | l REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERAT.ING STATUS | ||
: 1. UNIT NAME: ST. LUCIE | : 1. UNIT NAME: | ||
ST. LUCIE UNIT 1 | |||
: 2. REPORTING PERIOD: DECEMBER 1986 | : 2. REPORTING PERIOD: DECEMBER 1986 | ||
: 3. LICENSED THERMAL' POWER (MWT): ______________ 2700 | : 3. LICENSED THERMAL' POWER (MWT): ______________ 2700 | ||
: 4. NAMEPLATE RATING (GROSS MWE): | : 4. NAMEPLATE RATING (GROSS MWE): | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE): | 850 | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | : 5. DESIGN ELECTRICAL RATING (NET MWE): | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | 830 | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | |||
872 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | |||
839 | |||
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | : 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | ||
SINCE LAST REPORT, GIVE REASONS: | SINCE LAST REPORT, GIVE REASONS: | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________ | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
MONTHLY | MONTHLY | ||
: 11. HOURS IN REPORT PERIOD: | -YTD-CUMULATIVE | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ | : 11. HOURS IN REPORT PERIOD: | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS __________ | 744 8760 87912.0 | ||
: 14. HOURS GENERATOR ON-LINE _________________ | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ | ||
: 15. UNIT RESERVE SHUTDOWN HOURS _____________ | 744.0 8424.0l 64572.7 | ||
: 14. GROSS THERMAL ENERGY GENERATED (MWH) | : 13. REACTOR RESERVE SHUTDOWN HOURS __________ | ||
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) | 0.0 0.0 205.3 | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 14. HOURS GENERATOR ON-LINE _________________ | ||
: 19. UNIT SERVICE FACTOR _____________________ | 744.0 8353 6 64155.7 | ||
: 20. UNIT AVAILABILITY FACTOR ________________ | : 15. UNIT RESERVE SHUTDOWN HOURS _____________ | ||
: 21. CAPACITY FACTOR (USING MDC NET) | 0 0 | ||
: 22. CAPACITY FACTOR (USING DER NET) | 39.3 | ||
: 23. UNIT FORCED OUTAGE RATE _________________ | : 14. GROSS THERMAL ENERGY GENERATED (MWH) 1993847 22326924 163219191 | ||
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 461700 7428640 53485145 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 628425 7052031 50485823 | |||
: 19. UNIT SERVICE FACTOR _____________________ | |||
100.0 95.4 73.0 73.0 l | |||
: 20. UNIT AVAILABILITY FACTOR ________________ | |||
100.0 95.4 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 100.7 96.9 l 71.8 | |||
: 22. CAPACITY FACTOR (USING DER NET) 101.8 97.0 70.4 | |||
: 23. UNIT FORCED OUTAGE RATE _________________ | |||
0 1.1 4.0 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS : | : 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS : | ||
REFUELING 2/7/87, 63 DAYS _____________________________________________ | REFUELING 2/7/87, 63 DAYS _____________________________________________ | ||
: 25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP: | ||
8703180531 B70316 PDR | 8703180531 B70316 PDR ADOCK 05000250 R | ||
PDR | |||
o. | |||
REVISED COPY OPERATING DATA REPORT DOCKET NO | REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS | ||
: 1. UNIT NAME! ST. LUCIE | : 1. UNIT NAME! | ||
ST. LUCIE UNIT 2 | |||
: 2. REPORTING PERIODtDECEMBER 1986 | : 2. REPORTING PERIODtDECEMBER 1986 | ||
: 3. LICENSED THERMAL POWER (MWT)! ______________ 2700 | : 3. LICENSED THERMAL POWER (MWT)! ______________ 2700 | ||
: 4. NAMEPLATE RATING (GROSS MWE)! ______________ 850 | : 4. NAMEPLATE RATING (GROSS MWE)! ______________ | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE)! ________ 830 | 850 | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! | : 5. DESIGN ELECTRICAL RATING (NET MWE)! ________ | ||
: 7. MAXIMUM DEPENOABLE CAPACITY (NET MWE)* | 830 | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! | |||
882 | |||
: 7. MAXIMUM DEPENOABLE CAPACITY (NET MWE)* | |||
839 | |||
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | : 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | ||
SINCE LAST REPORTe GIVE REASONS! | SINCE LAST REPORTe GIVE REASONS! | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________ | |||
: 10. REASONS FOR RESTRICTIONSe IF ANY | 4 | ||
: 10. REASONS FOR RESTRICTIONSe IF ANY l | |||
MONTHLY | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ | -YTD-CUMULATIVE i | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS __________ | : 11. HOURS IN REPORT PERIOO! _________________ | ||
: 14. HOURS GENERATOR ON-LINE _________________ | 744 8760 29809.0 | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | 744.0 7326.7 25375.6 | ||
: 17. GROSS ELEC.TRICAL ENERGY GERERATED (MWH) | : 13. REACTOR RESERVE SHUTDOWN HOURS __________ | ||
0.0 0.0 0.0 | |||
: 19. UNIT SERVICE FACTOR _____________________ | : 14. HOURS GENERATOR ON-LINE _________________ | ||
: 20. UNIT AVAILABILITY FACTOR ________________ | 744.0 7255.5 24827.8 | ||
: 21. CAPACITY FACTOR (USING MDC NET) | : 15. UNIT RESERVE SHUTDOWN HOURS _____________ | ||
: 22. CAPACITY FACTOR (USING DER NET) | 0 0 | ||
: 23. UNIT FORCED OUTAGE RATE _________________ | 0 | ||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 2004055 19391368 64037901 | |||
: 17. GROSS ELEC.TRICAL ENERGY GERERATED (MWH) 673270 6487470 21394150 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 639445 4146561 20217604 | |||
: 19. UNIT SERVICE FACTOR _____________________ | |||
100.0 82.8 83.3 | |||
: 20. UNIT AVAILABILITY FACTOR ________________ | |||
100.0 82.8 83.3 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 102.4 83.8 l | |||
83.5 | |||
: 22. CAPACITY FACTOR (USING DER NET) 103.6 84.5 83 0 | |||
: 23. UNIT FORCED OUTAGE RATE _________________ | |||
0 1.0 8.1 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS | : 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS | ||
: 25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP: | ||
i i | i i | ||
-}} | |||
Latest revision as of 19:38, 6 December 2024
| ML20207S103 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 12/31/1986 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20207S076 | List: |
| References | |
| NUDOCS 8703180531 | |
| Download: ML20207S103 (2) | |
Text
,.
l REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERAT.ING STATUS
- 1. UNIT NAME:
ST. LUCIE UNIT 1
- 2. REPORTING PERIOD: DECEMBER 1986
- 3. LICENSED THERMAL' POWER (MWT): ______________ 2700
- 4. NAMEPLATE RATING (GROSS MWE):
850
- 5. DESIGN ELECTRICAL RATING (NET MWE):
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
872
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
839
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 8760 87912.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
744.0 8424.0l 64572.7
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 205.3
- 14. HOURS GENERATOR ON-LINE _________________
744.0 8353 6 64155.7
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3
- 14. GROSS THERMAL ENERGY GENERATED (MWH) 1993847 22326924 163219191
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 461700 7428640 53485145
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 628425 7052031 50485823
- 19. UNIT SERVICE FACTOR _____________________
100.0 95.4 73.0 73.0 l
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 95.4
- 21. CAPACITY FACTOR (USING MDC NET) 100.7 96.9 l 71.8
- 22. CAPACITY FACTOR (USING DER NET) 101.8 97.0 70.4
- 23. UNIT FORCED OUTAGE RATE _________________
0 1.1 4.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS :
REFUELING 2/7/87, 63 DAYS _____________________________________________
- 25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP:
8703180531 B70316 PDR ADOCK 05000250 R
o.
REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAME!
ST. LUCIE UNIT 2
- 2. REPORTING PERIODtDECEMBER 1986
- 3. LICENSED THERMAL POWER (MWT)! ______________ 2700
- 4. NAMEPLATE RATING (GROSS MWE)! ______________
850
- 5. DESIGN ELECTRICAL RATING (NET MWE)! ________
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!
882
- 7. MAXIMUM DEPENOABLE CAPACITY (NET MWE)*
839
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORTe GIVE REASONS!
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
4
- 10. REASONS FOR RESTRICTIONSe IF ANY l
MONTHLY
-YTD-CUMULATIVE i
- 11. HOURS IN REPORT PERIOO! _________________
744 8760 29809.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
744.0 7326.7 25375.6
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE _________________
744.0 7255.5 24827.8
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2004055 19391368 64037901
- 17. GROSS ELEC.TRICAL ENERGY GERERATED (MWH) 673270 6487470 21394150
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 639445 4146561 20217604
- 19. UNIT SERVICE FACTOR _____________________
100.0 82.8 83.3
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 82.8 83.3
- 21. CAPACITY FACTOR (USING MDC NET) 102.4 83.8 l
83.5
- 22. CAPACITY FACTOR (USING DER NET) 103.6 84.5 83 0
- 23. UNIT FORCED OUTAGE RATE _________________
0 1.0 8.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP:
i i
-