{{#Wiki_filter:-             - - ___ _                              __  __
{{#Wiki_filter:-
?
?
i                     ~ ATTADENT L14                     ,
i
r   #'.
~ ATTADENT L14 r
REV. - l'                         REACTOR TRIP C1 SAFETY. INJECTION               1BEP4
REV. - l' REACTOR TRIP C1 SAFETY. INJECTION 1BEP4
                            'WOG-1A                                             UNIT 1                       '
'WOG-1A UNIT 1 3
3-l-
l-1 4
1                                                                   .
4                                   ,
A. PURPOSE)
A. PURPOSE)
This procedure provides actions to verify prope'r response of the automatic protection systems following manual 4r automatic actuation of'a Reactor Trip or Safety. Injection, to assess plant conditions, and to identify the. appropriate recovery procedure.
This procedure provides actions to verify prope'r response of the automatic protection systems following manual 4r automatic actuation of'a Reactor Trip or Safety. Injection, to assess plant conditions, and to identify the. appropriate recovery procedure.
P. S_yptTryo nn. nrMY WITIONS.,                         .
P. S_yptTryo nn. nrMY WITIONS.,
y 3,          ^
3, y
3                                        1) The'following are symptoms that-may require a Reactor Trip, if.one has not occurred:
3
o     Source range high'1evel 1 105 CPS o     Intermediate range high level 1 25% power o ! Power range lo-level 1 25% power o Power range hi-level.1 109% power o' Power range positive rate 1 5% power change in 2 seconds-o Power range negative rate 1 5% power change in 2 seconds
^
: o. Overtemperature Delta T 1 116.4% i penalties o, Overpower Delta T 1 107.2%             -penalties
: 1) The'following are symptoms that-may require a Reactor Trip, if.one has not occurred:
                                              'o High.PZR pressure 1 2385 psig
o Source range high'1evel 1 105 CPS o
                                              'o Low PZR pressure 1 1885 psig 3'                                             o. High PZR level 1 92%
Intermediate range high level 1 25% power o ! Power range lo-level 1 25% power o
                                              .o     Single loop loss of flow I 90% loop flow o     Two loop loss of flow I 90% loop flow in 2/4 loops o     RCP breakers - open o      RCP bus low frequency 1 57.0 Hz o     RCP bus undervoltage <-5268 volts o      Turbine trip emergency trip _ header 1 540 psig oil pressure-or Turbine stop valves shut o     SI manual actuation o      containment high pressure SI > 3.4 psig o     Low PZR pressure SI i 1829 psIg o     Low steamline pressure SI 1 640 psig (rate sensitive) o   Steam Generator water level low-low < 40.8% of narrow range span
Power range hi-level.1 109% power o' Power range positive rate 1 5% power change in 2 seconds-o Power range negative rate 1 5% power change in 2 seconds o.
: 2) The following are symptoms of a reactor trip:                                   ,
Overtemperature Delta T 1 116.4% i penalties o,
o   Any Reactor Trip first out annunciator lit.
Overpower Delta T 1 107.2%
Rapid decrease'in neutron level indicated by nuclear instrumentation.
-penalties
Step continued on next page                                                   APPROVED FEB 011989 8908020242 890727 PDR         ADOCK 05000454                                                     B.O.S.R.
'o High.PZR pressure 1 2385 psig
4                           P                                 PDC                                                 _.
'o Low PZR pressure 1 1885 psig 3'
                    -(0304E/0035E/042088)
o.
W__-__-___---___-_                                       __      _    -
High PZR level 1 92%
.o Single loop loss of flow I 90% loop flow o
Two loop loss of flow I 90% loop flow in 2/4 loops o
RCP breakers - open RCP bus low frequency 1 57.0 Hz o
o RCP bus undervoltage <-5268 volts Turbine trip emergency trip _ header 1 540 psig oil pressure-o or Turbine stop valves shut o
SI manual actuation containment high pressure SI > 3.4 psig o
Low PZR pressure SI i 1829 psIg o
Low steamline pressure SI 1 640 psig (rate sensitive) o o
Steam Generator water level low-low < 40.8% of narrow range span
: 2) The following are symptoms of a reactor trip:
o Any Reactor Trip first out annunciator lit.
Rapid decrease'in neutron level indicated by nuclear o
instrumentation.
Step continued on next page APPROVED FEB 011989 8908020242 890727 PDR ADOCK 05000454 B.O.S.R.
4 P
PDC
-(0304E/0035E/042088)
W__-__-___---___-_


i REV. 1                         OPERATOR ACTION  
i REV. 1 OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0' WOG-1A                       FOR 2BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                 RED PATH  
1BEP-F.0' WOG-1A FOR 2BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                       1. Subcriticality - NUCLEAR
o CC water to RCP lost
    .                                  (affected pumps only)                             POWER >5%
: 1. Subcriticality - NUCLEAR (affected pumps only)
                                                  -OR-o   Cnmt Phase B actuated                       2     Core cooling - CORE EXIT
POWER >5%
                                                  -OR-                                   TCs >1200*F o   ALL of the following conditions exist:                                     3. Heat sinh-ALL SGs NR wnn  p mi.=r,yo
-OR-o Cnmt Phase B actuated 2
  ~'~
Core cooling - CORE EXIT
* Luntrolled Rua cooldown,HQ1                   . ADVERSE CNMT) AND TOTAL _
-OR-TCs >1200*F o
in progress                                   FEEDWATER FLOW <500 GPM
ALL of the following conditions exist:
                                                        -AND                             AVAILABLS
: 3. Heat sinh-ALL SGs NR p mi.=r,yo wnn
* RCS pressure - <1370 PSIG
~'~
                                                        -AND-                       4. Integrity - DICEIASI_
Luntrolled Rua cooldown,HQ1
* High head SI pump flow indicator               > 100
. ADVERSE CNMT) AND TOTAL _
in progress FEEDWATER FLOW <500 GPM
-AND AVAILABLS RCS pressure - <1370 PSIG
-AND-4.
Integrity - DICEIASI_
High head SI pump flow indicator
> 100
* F Ui LAST 60 MINUTES __
* F Ui LAST 60 MINUTES __
(lFI-917) >50 GPM flow or       -
(lFI-917) >50 GPM flow or AND RCS COLD LEG <246*I SI pumps >100 GPM SI ACTUATION:
AND RCS COLD LEG <246*I SI pumps >100 GPM SI ACTUATION:                                   5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO.lBEP-0, REACTOR TRIP OR SAFETY INJECTION,                 IF CST LEVE_ <20%, THEN Step 1, if:                                     CONSIDEfL THE FOLLOWING:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO.lBEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST LEVE_ <20%, THEN Step 1, if:
o RCS subcooling - NOT ACCEPTABLE           o Makeup from MUDS or PER ICONIC DISPLAY OR                         radwaste ATTACHMENT A                             o     Prepare to isolate
CONSIDEfL THE FOLLOWING:
                                                      -OR-                               secondary supply side o PZR level - CAUNOT BE MAINTAINED               of 3 SGs
o RCS subcooling - NOT ACCEPTABLE o
                                          > 47. (387. FOR ADVERSE CNMT)           o     Crosstie unit's CST o     Reduce cooldown rate
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
* IF AUX :EED )UiP JA'' TANK .fVEL
Prepare to isolate
                                  < 16% T i EN P ER FOR 1 'HE F0E_0 WING:           I: CST LEVEL <3%, TiEN P ERFORfl TH E FOLLOWI 4G:
-OR-secondary supply side o
* Refill the day tank
PZR level - CAUNOT BE MAINTAINED of 3 SGs
> 47. (387. FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate IF AUX
:EED )UiP JA'' TANK.fVEL
< 16% T i EN P ER FOR 1
'HE F0E_0 WING:
I: CST LEVEL <3%, TiEN P ERFORfl TH E FOLLOWI 4G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
Line 76: Line 105:


f**
f**
REV. 1             REACTOR. TRIP'OR SAFETY I.JECTION                               1BEP-0 lWOG-1A'                                        UNIT l' l-Stop B-2) (continued) o   All shutdown and control rods fully inserted and rod. bottom-g'    ,
REV. 1 lWOG-1A' REACTOR. TRIP'OR SAFETY I.JECTION 1BEP-0 UNIT l' l-Stop B-2) (continued) o All shutdown and control rods fully inserted and rod. bottom-lights lit.
lights lit.
g' Rapid.dtcrease in Unit load to zero power.
Rapid.dtcrease in Unit load to zero power.
o 3 ). m' e i nowin n?" ' - -- nne..c.c M at9xc t r e a %a r.or N i a
3 ). m' e i nowin             n?" ' - -- nne..c.c M at9xc
~
                                                                                    ~  -              t r e a %a r .or N i a -'
Safety Injection, if one bas not occur' red:
Safety Injection, if one bas not occur' red:
o Low PZR pressure 1 1829 psig.
o Low PZR pressure 1 1829 psig.
                                            ~o Low steamline pressure 1 640 psig (ra e sensitive) Containment high pressure 1 3.4 psig
~ o Low steamline pressure 1 640 psig (ra e sensitive)
Containment high pressure 1 3.4 psig o
: 4) The following may be symptoms of a Reactor Trip and Safety Injection:
: 4) The following may be symptoms of a Reactor Trip and Safety Injection:
o Any SI first'out annunciator lit.                 ,
o Any SI first'out annunciator lit.
All Group 2 cold leg injection monitor lights lit.
All Group 2 cold leg injection monitor lights lit.
o   ESF equipment actuated.
o o
o   SI actuated BYPASS-PERMISSIVE light lit.
ESF equipment actuated.
o SI actuated BYPASS-PERMISSIVE light lit.
: 5) This procedure may also be entered from:
: 5) This procedure may also be entered from:
o   1BEP ES-0.1, REACTOR TRIP RESPONSE, Step 7, when PZR pressure 1 1829 psig.
o 1BEP ES-0.1, REACTOR TRIP RESPONSE, Step 7, when PZR pressure 1 1829 psig.
APPROVED FCB011989 B. o. s. R.
APPROVED FCB011989 B. o. s. R.
_ _ _ . - -                                                                                            =
=
(0304E/0035E/042088)
(0304E/0035E/042088)


i REV               1                       OPERA'0R ACTION  
i REV 1
OPERA'0R ACTION  


==SUMMARY==
==SUMMARY==
:1BEP-F.0 -
:1BEP-F.0 WOGI1A FOR 1BEP-0 SER?ES PROCEDURES i
WOGI1A                                   FOR 1BEP-0 SER?ES PROCEDURES i
TRIP RCPS WHEN:
TRIP RCPS WHEN:                       [                   RED PATH  
[
RED PATH  


==SUMMARY==
==SUMMARY==
o               CC water to RCP lost-                     1. Suberiticality - NUCf. EAR (affected pumps only)                           POWER >5%
o CC water to RCP lost-
                                        -OR-o               Cnmt Phase B actuated                     2. Core cooling - CORE EXIT                 1
: 1. Suberiticality - NUCf. EAR (affected pumps only)
                                        -OR-                                 TCs >1200*F o               ALL of the following conditions exic.:                                     3. Heat sink-ATL SGs NR                       !
POWER >5%
                                        %                                    LT.YEL <4% (34% FOR
-OR-1 o
* Concrol' leo.Aca couauvwa E                 /eVEuE C.....   ! .u'D     L -
Cnmt Phase B actuated
in progress                             ,
: 2. Core cooling - CORE EXIT
FRRnWATER FLOW <500 GPM               j
-OR-TCs >1200*F o
                                            -AND                             AVAILABLE                             q
ALL of the following conditions exic.:
* RCS pressure - <1370 PSin
: 3. Heat sink-ATL SGs NR LT.YEL <4% (34% FOR Concrol' leo.Aca couauvwa E
                                            -AND-                     4. Integrity - DECREASE
/eVEuE C..... !.u'D L -
* High head SI pump flow indicator             >100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or                   AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                               5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                           IF' CST   _ EVE _ <20%,   'iEN Step 1               if:                                   CONSIDE   R'"iE FOLL0tG Q:
in progress FRRnWATER FLOW <500 GPM j
o   RCS subcooling - NOT ACCEPTAlSLE       o   Makeup from MUDS or PER ICONIC DISPLAY OR                         radwaste                 -
-AND AVAILABLE q
ATTACHMENT A                           o   Prepare to isolate
RCS pressure - <1370 PSin
                                          -OR-                                 secondary supply side o   PZR level - CANNOT BE MAINTAINED             of 3 SGs
-AND-
                                > 4% (38% FOR ADVERSE CNMT)             o     Crosstie unit's CST o     Reduce cooldown rate
: 4. Integrity - DECREASE High head SI pump flow indicator
* IF AUX :E ED jug _ )A" TA4K _ EVE             _
>100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
            < 16% T i E 4P err 6R 4 IHE FOL _0WI 4G:                     I: CST LEVEL <3%, TJ       EN P ERFORM TH E FOLLOWI     G:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF' CST
* Refill the day tank
_ EVE _ <20%,
'iEN Step 1 if:
CONSIDE R'"iE FOLL0tG Q:
o RCS subcooling - NOT ACCEPTAlSLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate IF AUX
:E ED jug _ )A" TA4K
_ EVE
< 16% T i E 4P err 6R 4 IHE FOL _0WI 4G:
I: CST LEVEL <3%, TJ EN P ERFORM TH E FOLLOWI G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                               APPROVED JM 311989 B. O. S. R.
(0386E/0042E/042488)
APPROVED JM 311989 B. O. S. R.


p :.
p :.
I-1 REV. 1               . REACTOR TRIP OR-SAFETY INJECTION                                                 1BEP-0 WOG-1A                               UNIT 1                                                                             i L
I -
                                                                                                                                                  )
1 REV. 1
1 STEP         ACTION / EXPECTED RESPONSE                       RE?FONSE NOT 0 iTAiNED                                   I
. REACTOR TRIP OR-SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 i
                                  .                                                                                                            f CAUTION During a loss of offsite power,                                                               I operator action will be necessary to actuate PZR PORVs.
L
__s
)
                                              ****eenen**ene**eenemen**enenemmenen                                       e.. .                 I e                                                                             *
1 STEP ACTION / EXPECTED RESPONSE RE?FONSE NOT 0 iTAiNED I
* NOTE                                                      =
f CAUTION During a loss of offsite power, I
With this procedure in effect,
operator action will be necessary to actuate PZR PORVs.
* notify the Station Director who will*
__s I
* evaluate for GSEP conditions per                                           *
****eenen**ene**eenemen**enenemmenen e...
* BZP-200-A1, BYRON EMERGENCY ACTION ' *
e NOTE
=
With this procedure in effect, notify the Station Director who will*
evaluate for GSEP conditions per BZP-200-A1, BYRON EMERGENCY ACTION '
* LEVELS.
* LEVELS.
* emene**eneesee     ******enene**ene*********
emene**eneesee
******enene**ene*********
emmeenen*menneesene** nene**eneseen ****
emmeenen*menneesene** nene**eneseen ****
e                                                                             e
e e
* NOTE                                                       *
NOTE Steps 1 through 15 are IMMEDIATE ACTION steps.
* Steps 1 through 15 are IMMEDIATE                                           *
**enene
* ACTION steps.                                                            .
***meneme****ene****mene********
                                              **enene ***meneme****ene****mene********
**********senene*******
                                              **********senene*******         e**ene*eammenene e
e**ene*eammenene e
* NOTE
NOTE
                                              *  " Adverse Containment" as used in                                           *
" Adverse Containment" as used in Byron Emergency Procedures is defined as:
* Byron Emergency Procedures is
o Containment pressure GREATER THAN 5 PSIG
* defined as:
-OR-APPROVED o
* o   Containment pressure GREATER                                           *
Contaiment radiation level GREATER THAN 105 R/HR.
* THAN 5 PSIG                                                             *
FEB 011969 e
                                              *                    -OR-
n e
* APPROVED
IRT-AR020 Grid 4 4AS120 B.O.S.R.
* o  Contaiment radiation level
e e
* GREATER THAN 105 R/HR.
IRT-AR021 Grid 4 4AS121 enemmenene***menennename***eemene*****me lil VERIFY REACTOR TRIP '
n FEB 011969         e
Manually trip the Reactor, Rod bottom lights - LIT IF the Reactor will NOT trip, o
* e IRT-AR020 Grid 4 4AS120
Reactor trip and bypass TiiEN GO TO 1BFR-S.1, breakers - OPEN RESPONSE TO NUCLEAR POWER e
* B.O.S.R.           e     e IRT-AR021 Grid 4 4AS121
Neutron flux - DECREASING GENERATION /ATWS, Step'1.
* enemmenene***menennename***eemene*****me lil VERIFY REACTOR TRIP '                                 Manually trip the Reactor, Rod bottom lights - LIT                       IF the Reactor will NOT trip,
* Reactor trip and bypass                       TiiEN GO TO 1BFR-S.1, breakers - OPEN                               RESPONSE TO NUCLEAR POWER e   Neutron flux - DECREASING                     GENERATION /ATWS, Step'1.
1 1
1 1
-                                                          Page 3 of 33 (0304E/0035E/042088)                                                                                                         4
Page 3 of 33 (0304E/0035E/042088) 4
- _ _ _ = _ - _ _ _ -                  -  _                  .-
- _ _ _ = _ - _ _ _ -


i REV       1                         OPERATOR ACTION SU' dARY                                                     1BEP-F.0 -
i REV 1
i WOG11A                           FOR 1BEP-0 SERIES PROCEDURES                                                                 j 1
OPERATOR ACTION SU' dARY 1BEP-F.0 i
j TRIP RCPS WHEN:                                     RED PATH ' UMMARY:-
WOG11A FOR 1BEP-0 SERIES PROCEDURES j
o     CC water to RCP lost                         1. Subcriticality - NUCLTAR
1 j
                    '(affected pumps only)                             POWER >57.
TRIP RCPS WHEN:
                                  -OR-o     Cnat Phase B actuated                         2. Core cooling - CORE EXII
RED PATH ' UMMARY:-
                                  -OR-                 .
o CC water to RCP lost
TCs >1200'F o     ALL of the follotdng conditions exist:                                       3. Heat sink-ALL SGs NR
: 1. Subcriticality - NUCLTAR
                                                                    ~
'(affected pumps only)
                                                                        ' 3 VEL . (4% (la_7 F.QB
POWER >57.
* Controlled RCS cooldotm nul                 IL Eh CET) AND iuT%
-OR-o Cnat Phase B actuated
in progress                                 FTFDWATER FLOW <500 GPM                                                 ,
: 2. Core cooling - CORE EXII
                                      -AND                             AVAILABLE                                                             l
-OR-TCs >1200'F o
* RCS pressure - <1370 PSIG                                                                                         ;
ALL of the follotdng conditions exist:
                                      -AND-                       4. Integrity - DECREASE
: 3. Heat sink-ALL SGs NR
* High head SI pump flow indicator             >100'r IN LAST 60 MINUTES (1FI-917) >50 GP2 flow or                   AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                       5. Containment - CHMI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                   IF CST                         _ EVE _ <20%,             JEN Step 1, if:                                         CONSIDE                         RT i E F0 _ LOW:: sG:
' 3 VEL. (4% (la_7 F.QB Controlled RCS cooldotm nul
o RCS subcooling - NOT ACCEPTABLE             o Makeup from MUDS or radwaste PER ICONIC DISPLAY OR ATTACHMENT A                             o   Prepare to isolate
~
                                    -OR-                                 secondary supply side o   PZR level - CANNOT BE MAINTAINED             of 3 SGs
IL Eh CET) AND iuT%
                          > 4% (38% FOR ADVERSE CNMT4's           o   Crosstie unit's CST
in progress FTFDWATER FLOW <500 GPM
                                                          ,, V     o   Reduce cooldown rate
-AND AVAILABLE l
* IF AUX :E ED )UiP :)A" TA4K _ EVE _P#
RCS pressure - <1370 PSIG
              < 16% T i E 9P ER:0R i 'HE :0L _0WI1G:'
-AND-
: 4. Integrity - DECREASE High head SI pump flow indicator
>100'r IN LAST 60 MINUTES (1FI-917) >50 GP2 flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
: 5. Containment - CHMI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_ EVE _ <20%,
JEN Step 1, if:
CONSIDE RT i E F0 _ LOW:: sG:
o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT4's o
Crosstie unit's CST
,, V o
Reduce cooldown rate IF AUX
:E ED )UiP :)A" TA4K
_ EVE _P#
< 16% T i E 9P ER:0R i
'HE :0L _0WI1G:
I: CST LEVEL <3%, "iEN P ERFORM TH E FOLLOW:: 4G:
I: CST LEVEL <3%, "iEN P ERFORM TH E FOLLOW:: 4G:
* Refill the day tank
Refill the day tank
                                                ,                  a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final) l           (0386E/0042E/042488)                                       APPROVED JM 311989 B. O. S. R.
: b. Switch AF suction to SX supply (Final) l (0386E/0042E/042488)
APPROVED JM 311989 B. O. S. R.


l l         ..
l l
REV.-1                             REACTOR TRIP OR SAFETY INJECTION                 1.,EP-0 WOG-1A                                             UNIT 1 l
REV.-1 REACTOR TRIP OR SAFETY INJECTION 1.,EP-0 WOG-1A UNIT 1 l
STEP                       ACTION / EXPECTED RESPON5E             RESPONSE NOT OBT AINED l2l VERIFY. TURBINE TRIP:                                     Perfor.n the following:
STEP ACTION / EXPECTED RESPON5E RESPONSE NOT OBT AINED l2l VERIFY. TURBINE TRIP:
* All Turbine throttle stop             1) Manually trip the turbine valves:- CLOSED                       2)_IF turbine will NOT trip,           j
Perfor.n the following:
* All Turbine governor valves -           THEN manually run back             {
All Turbine throttle stop
CLOSED
: 1) Manually trip the turbine valves:- CLOSED 2)_IF turbine will NOT trip, j
                                                                              ~~~
All Turbine governor valves -
the turbine at maximum             {
THEN manually run back
{
CLOSED the turbine at maximum
{
~~~
rate by the follmsic, method:
rate by the follmsic, method:
1 a) Press TURB MAN..
1 a) Press TURB MAN..
b) Press FAST ACTION and GOV LWR. simultaneously.       1 IF turbine can NOT be run back, THEN place EH pumps in PULL OUT position.
b) Press FAST ACTION and GOV LWR. simultaneously.
IF Turbine still will NOT trip, THEN manually initiate Main Steamline Isolation and manually close MSIV bypass valves.
1 IF turbine can NOT be run
l31 VERIFY POWER TO 4KV ESF BUSSES:
: back, THEN place EH pumps in PULL OUT position.
y a.ESFbusses-ATLEASTOlb                     "
IF Turbine still will NOT
: a. Try to restore power to at ENERGIZED:           y                  least one ESF bus, o Bus 141 alive light -                 IF power can NOT be LIT                                 restored to at least one
: trip, THEN manually initiate Main Steamline Isolation and manually close MSIV bypass valves.
                                                                                    -OR-                         ESF bus, o   Bus 142 alive light -               THEN GO TO 1BCA-0.0, LIT                                 LOSS OF ALL AC POWER, Step 1.
l31 VERIFY POWER TO 4KV ESF BUSSES:y a.ESFbusses-ATLEASTOlb
: b. ESF busses - ALL ENERGIZED:                         b. Try to restore power to deenergized ESF bus while
: a. Try to restore power to at ENERGIZED:
* Bus 141 alive light - LIT           continuing with this
least one ESF bus, y
                                                                                        -AND-                     procedure.
o Bus 141 alive light -
* Bus 142 alive light - LIT APPROVED FEB 011989 s.o.S.R.
IF power can NOT be LIT restored to at least one
-OR-ESF bus, o
Bus 142 alive light -
THEN GO TO 1BCA-0.0, LIT LOSS OF ALL AC POWER, Step 1.
: b. ESF busses - ALL ENERGIZED:
: b. Try to restore power to deenergized ESF bus while Bus 141 alive light - LIT continuing with this
-AND-procedure.
Bus 142 alive light - LIT APPROVED FEB 011989 s.o.S.R.
(0304E/0035E/042088)
(0304E/0035E/042088)


i REV :1                                         OPERATOR ACTION  
i REV :1 OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOG '-1A                                     FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS-WHEN:                                                 RED PATH  
1BEP-F.0 WOG '-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS-WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o           CC water to RCP lost                                 1. Subcriticality - JiUCT. EAR (affected pumps only)                                 POWER > 57.
o CC water to RCP lost
                                                              -OR-o           Cnat Phase B actuated                               2. Core cooling - CORE EXIT-
: 1. Subcriticality - JiUCT. EAR (affected pumps only)
                                                              -OR-                               TCs >1200*F 0           ALL of the following conditions exist:                                             3. Heat sink-AT.T. SGs NR I.EVEL <4'l M47. FOR       ..,
POWER > 57.
* Controttea RC5 anouwn lid                       J'Ju Cf*MT- m ... 10.       n ' -
-OR-o Cnat Phase B actuated
in progress                                     FREDWATER FLOW (500 GPM
: 2. Core cooling - CORE EXIT-
                                                                  -AND                         AVAILABLE
-OR-TCs >1200*F 0
* RCS pressure - <1370 PSIG
ALL of the following conditions exist:
                                                                  -AND-                     4. Integrity - DECREASE
: 3. Heat sink-AT.T. SGs NR I.EVEL <4'l M47. FOR Controttea RC5 anouwn lid J'Ju Cf*MT-m...
* High head SI pump flow indicator                 >100*F IN LAST 'O MINUTES (lFI-917) >50 GPM flow or                       AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                                   5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO T0 1BEP-0, REACTOR TRIP OR SAFETY INJECTION.,                             IF CST   _ EVE _ <20%,   -EN Step 1, if:                                                     CONSIDE RT i E F0 _LOWL VG:
: 10. n ' -
o   RCS subcooling - NOT ACCEPTABLE             o Makeup from MUDS or PER ICONIC DISPLAY OR                             radwaste ATTACHMENT A                                 o   Prepare to isolate
in progress FREDWATER FLOW (500 GPM
                                                                -OR-                             secondary supply side o   PZR level - C_ANNOT BE MAINTAINED                 of 3 SGs
-AND AVAILABLE RCS pressure - <1370 PSIG
                                                > 47. (387. FOR ADVERSE CNMT)               o   Crosstie unit's CST o   Reduce cooldown rate
-AND-
* IF AUX :E ED )UiP ")A" TANK _ EVE                   _
: 4. Integrity - DECREASE High head SI pump flow indicator
                            < 16% T i E 4P ER:0R1 IHE FOL _0W I .4G:                         I: CST LEVEL <3%, '-EN P ERFORM-TH   E FOLLOWL s 3:
>100*F IN LAST 'O MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
* Refill the day tank
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO T0 1BEP-0, REACTOR TRIP OR SAFETY INJECTION.,
IF CST
_ EVE _ <20%,
-EN Step 1, if:
CONSIDE RT i E F0 _LOWL VG:
o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - C_ANNOT BE MAINTAINED of 3 SGs
> 47. (387. FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:E ED )UiP ")A" TANK
_ EVE I: CST LEVEL <3%, '-EN
< 16% T i E 4P ER:0R1 IHE FOL _0W I.4G:
P ERFORM-TH E FOLLOWL s3:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply l
: b. Switch AF suction to SX supply l
l (Final)
l (Final)
(0386E/0042E/042488)                                                   APPROVED
(0386E/0042E/042488)
                                                                                                  #N 311989 s.o.s.R.
APPROVED
_ _ _ _ - - _ - - _ _ _                        _ - - _ - .                                                                          )
#N 311989 s.o.s.R.
)


l REV. 1                   REACTOR TRIP OR SAFETY INJECTION                                                                                 1BEP-0 WOG-1A                                   UNIT 1 STEP     ACTION / EXPECTED RESPON5E                                                 RESPONSE NOT OBTAINED I
l REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED RESPON5E RESPONSE NOT OBTAINED l51 CHECK IF SI ACTUATED:
l51 CHECK IF SI ACTUATED:                                   Check if SI required:
Check if SI required:
* Any SI first out                                     o       PZR pressure less than annunciator - LIT                                             1829 PSIG.
I Any SI first out o
e Group 2 Cold Leg                                                                 -OR-Injection monitor lights                             o       Steamline pressure less
PZR pressure less than annunciator - LIT 1829 PSIG.
                                        - LIT                                                         than 640 ?SIG.
e Group 2 Cold Leg
                                                                                                                        -OR-o       Containment pressure greater than 3.4 PSIG.
-OR-Injection monitor lights o
Steamline pressure less
- LIT than 640 ?SIG.
-OR-o Containment pressure greater than 3.4 PSIG.
IF SI required, THEN manually actuate.
IF SI required, THEN manually actuate.
IF SI NOT required, THEN GO To IBEP ES-0.1, REACTOR TRIP RESPONSE, Step 1.
IF SI NOT required, THEN GO To IBEP ES-0.1, REACTOR TRIP RESPONSE, Step 1.
Line 253: Line 353:
Page 5 of 33 (0304E/0035E/042088)
Page 5 of 33 (0304E/0035E/042088)


REV 1                          OPERATOR ACTION  
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1F P-F.0 '
1F P-F.0 REV 1 WOG'1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
                    ,                                    WOG'1A                       FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                 RED PATH  
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                         1. Suberiticality - NUCf. TAR (affected pumps only)                           POWER >5%                 .
o CC water to RCP lost
                                                                              -OR-o   Cnmt Phase B actuated                       2. Core cooling - CORE EXIT
: 1. Suberiticality - NUCf. TAR (affected pumps only)
                                                                              -OR-                               TCs >1200'F o   ALL of the following conditions exist:                                         . Heat sink-ATT.SGs NR LEVJk < 41 04LEQB_ . _
POWER >5%
Controlled RCS cooloOer. mlI*                 ADVElil mGMT"; dGJTOTAL in progress                                   FTEDWATER FLOW <500 GPM
-OR-o Cnmt Phase B actuated
                                                                                  -AND                         AVAILABLE
: 2. Core cooling - CORE EXIT
* RCS pressure - (1370 PSIG
-OR-TCs >1200'F o
                                                                                  -AND-                     4. Integrity - DECREASE
ALL of the following conditions exist:
* High head SI pump flow indicator               >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                     AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                     5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                 IF CST   _ EVE _ <20%, " FEN Step 1, if:                                       CONSIDE RT i E FOLLOW 1 3:         ,
. Heat sink-ATT.SGs NR LEVJk < 41 04LEQB_. _
o RCS subcooling - NOT ACCEPTABLE           o Makeup from MUDS or PER ICONIC DISPLAY OR                         radwaste ATTACHMENT A                             o   Prepare to isolate
Controlled RCS cooloOer. mlI*
                                                                                -OR-                             secondary supply side o PZR level - CANNOT BE MAINTAINED               of 3 SGs
ADVElil mGMT"; dGJTOTAL 6
                                                                    > 4% (38% FOR ADVERSE CNMT)             o   Crosstie unit's CST o   Reduce cooldown rate
in progress FTEDWATER FLOW <500 GPM
* IF AUX :E ED 'UiP JA" TA 4K _ EVE   _
-AND AVAILABLE RCS pressure - (1370 PSIG
                                                            < 16% T i E 4P ER :0R i 'HE :0L _0WI 4G:         I: CST LEVEL <3%, "iEN P ERFORM TH E FOLLOWL 4G:
-AND-
* Refill the day tank
: 4. Integrity - DECREASE High head SI pump flow indicator
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_ EVE _ <20%, " FEN Step 1, if:
CONSIDE RT i E FOLLOW 1 3:
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate IF AUX
:E ED 'UiP JA" TA 4K
_ EVE
< 16% T i E 4P ER :0R i
'HE
:0L _0WI 4G:
I: CST LEVEL <3%, "iEN P ERFORM TH E FOLLOWL 4G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                           APPROVED JAN 311989 B.O.S.R.
(0386E/0042E/042488)
APPROVED JAN 311989 B.O.S.R.


REY. 1                       REACTOR TRIP OR SAFETY INJECTION                             1BEP-0 WOG-1A                                         UNIT 1 STEP                     ACT!ON/ EXPECTED RE5 C;N5E RESPONSE NOT OST AINED 4
REY. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACT!ON/ EXPECTED RE5 C;N5E RESPONSE NOT OST AINED 4
l$l VERIFY FW ISOLATION:
l$l VERIFY FW ISOLATION:
: a. FW purops-TRIPPED:                       a. Manually trip pumps.
: a. FW purops-TRIPPED:
* W PUMPS TRIP alarms - LIT b     FW numpe <94echaran v=1vec               b. Manu 11y clos?             alvec..
: a. Manually trip pumps.
                                            - CLOSED:
W PUMPS TRIP alarms - LIT b
* 1FWOO2A
FW numpe <94echaran v=1vec
* 1FWOO2B e   1FWOO2C
: b. Manu 11y clos?
: c. FW reg valves - CLOSED:                     c. Manually close FW reg valves.
alvec..
* 1FW510
- CLOSED:
* IFW520                                 IF any valve vill NOT
1FWOO2A 1FWOO2B e
* IFW530                                  close,
1FWOO2C
* 1FW540                                 THEN close its associated FW shutoff valve:
: c. FW reg valves - CLOSED:
o IFWOO6A                       -
: c. Manually close FW reg valves.
IFWOO6B o IFWOO6C o 1FWOO6D
1FW510 IFW520 IF any valve vill NOT IFW530
: d. FW reg byp valves - CLOSED:                 d. Manually close valves.
: close, 1FW540 THEN close its associated FW shutoff valve:
* IFW510A
o IFWOO6A o
* 1FW520A
IFWOO6B o
* IFW530A
IFWOO6C o
: e. 1FW540A
1FWOO6D
: e. FW isol valves - CLOSED:                   e. Manually close valves.
: d. FW reg byp valves - CLOSED:
* IFWOO9A
: d. Manually close valves.
* IFWOO9B e   1FW009C
IFW510A 1FW520A IFW530A e.
* 1FWOO9D Step continued on next page APPROVED FEB 011989 B.O.S.R.
1FW540A
Page 6 of 33 O __   __ _(0304E/0035E/042088) ---
: e. FW isol valves - CLOSED:
: e. Manually close valves.
IFWOO9A IFWOO9B e
1FW009C 1FWOO9D Step continued on next page APPROVED FEB 011989 B.O.S.R.
Page 6 of 33 O __
(0304E/0035E/042088) ---


REV   1                       OPERATOR ACTION  
REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0
1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES-l TRIP RCPS MIEN:
!                          WOG-1A                       FOR 1BEP-0 SERIES PROCEDURES-l TRIP RCPS MIEN:                                 RED PATH  
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                         1   Suberiticality - NUCf. EAR (affected pumps only)                           POWER >57.
o CC water to RCP lost 1
                                            -OR-o   Cnat Phase B actuated                       2. Core cooling - CORE EXIT
Suberiticality - NUCf. EAR (affected pumps only)
                                            -OR-                               TCs >1200*F o   ALL of the following conditions exist:                                     3. Heat sink G .1Gs NR LEVEL <47. (3A7,_f0R_
POWER >57.
* t.ontrollec E S coo 2.ouwn @_t             ~ .Laf CE , rwu               ....m in progress                                 FEEDWATER FLOW <500 GPM             ~
-OR-o Cnat Phase B actuated
                                                  -AND                         AVAILABLE
: 2. Core cooling - CORE EXIT
* RCS pressure - <1370 PSIG
-OR-TCs >1200*F o
                                                  -AND-                     4. Integrity - DECREASE
ALL of the following conditions exist:
* High head SI pump flow indicator             >100'F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                   AND RCS COLD LEG <246*F SI pumps >100 GPM                                                                   ]
: 3. Heat sink G.1Gs NR LEVEL <47. (3A7,_f0R_
SI ACTUATION:                                   5. Containment - CB1T PRESSURE >50 PSIG Actuate SI and.GO TO 1BEP-0.
t.ontrollec E S coo 2.ouwn @_t
                          . REACTOR TRIP OR-SAFETY INJECTION,               IF CST   _ EVE _ <20%, 'iEN Step 1, if:                                     CONSIDE RT   (E FOLLOW.. 9G:               ,
~.Laf CE, rwu
o RCS subcooling - NOT ACCEPTABLE           o Makeup from MUDS or                     -;
....m in progress FEEDWATER FLOW <500 GPM
PER ICONIC DISPLAY OR                       radwaste ATTACHMENT A                           o   Prepare to isolate
-AND AVAILABLE
                                              -OR-                             secondary supply side o   PZR level - CANNOT BE MAINTAINED             of 3 SGs
~
                                    > 47. (387. FOR ADVERSE CNMT)         o   Crosstie unit's CST o   Reduce cooldown rate                   ,
RCS pressure - <1370 PSIG
* IF AUX :EED )UiP JA" TAVK _ EVE     _
-AND-
                          < 16% T i E 9P ER:0R i 'HE :0L _0WI 4G:          1: CST LEVEL <3%, "HF.N P ERFORM TH E FOLLOWLNG:
: 4. Integrity - DECREASE High head SI pump flow indicator
* Refill the day tank
>100'F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM
: a. Verify secondary side of 3 SGs isolated                       i
]
SI ACTUATION:
: 5. Containment - CB1T PRESSURE >50 PSIG Actuate SI and.GO TO 1BEP-0.
. REACTOR TRIP OR-SAFETY INJECTION, IF CST
_ EVE _ <20%,
'iEN Step 1, if:
CONSIDE RT (E FOLLOW.. 9G:
o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 47. (387. FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate IF AUX
:EED )UiP JA" TAVK
_ EVE
< 16% T i E 9P ER:0R i
'HE :0L _0WI 1: CST LEVEL <3%, "HF.N 4G:
P ERFORM TH E FOLLOWLNG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated i
: b. Switch AF suction to SX supply i
: b. Switch AF suction to SX supply i
I l
I (Final) l (0386E/0042E/042488)
(Final)
APPROVED aa 31 m s.o.s.n.
(0386E/0042E/042488)                                   APPROVED aa 31 m                       .        !
J
s.o.s.n.
    - - _ _ _ _ _ _ _ .                                                                                                J


l l
l l
REV. 1             REACTOR TRIP OR SAFETY INJECTION                         1BEP-0 WOG-1A                         UNIT 1 STEP         ACTION / EXPECTED FES GN5E             RESPCNSE NOT OSTAINED Step 5 (continued)
REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED FES GN5E RESPCNSE NOT OSTAINED Step 5 (continued)
: f. FW temprng flow cont valves -         f. Manually close valves.
: f. FW temprng flow cont valves -
: f. Manually close valves.
CLOSED:
CLOSED:
* 1FWO34A                                                                     -
1FWO34A 1FWO34B 13034C 1FWO34D
* 1FWO34B
: g. FW temprng isol valves -
* 13034C
: g. Manually close valves.
* 1FWO34D
: g. FW temprng isol valves -               g. Manually close valves.
CLOSED:
CLOSED:
i
i 1FWO35A IFWO35B e
* 1FWO35A
1FWO35C 1FWO35D
* IFWO35B e   1FWO35C
: h. FW prehtr byp isol valves -
* 1FWO35D                                                                         -
: h. Manually close valves.
: h. FW prehtr byp isol valves -             h. Manually close valves.
. CLOSED:
                                  . CLOSED:                                           .
IFWO39A 1FWO39B 1FWO39C 1FWO39D
* IFWO39A
: 1. FWIV byp isol valves -
* 1FWO39B
: i. Manually close valves.
* 1FWO39C         -
* 1FWO39D
: 1. FWIV byp isol valves -                 i. Manually close valves.
CLOSED:
CLOSED:
* 1FWO43A
1FWO43A IFWO43B 1FWO43C 1FWO43D l
* IFWO43B
* 1FWO43C
* 1FWO43D l
APPROVED FEB 01 1989.
APPROVED FEB 01 1989.
B.O.S.R.
B.O.S.R.
Page 7 of 33 (0304E/0035E/042088)
Page 7 of 33 (0304E/0035E/042088)


e REV 'l                                       OPERATOR ACTION  
e REV 'l OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOG-1A                                     FOR 1BEP-0 SERIES PROCEDURES s
1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES s
TRIP RCPS WHEN:                                               RED PATH  
TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
{
{
o       CC water to RCP lost                                 1. Subcriticality - NU,CTRAR (affected pumpe only)                                     POWER >57.                                   ~
o CC water to RCP lost
                                              -OR-o       Cnat Phase 3 actuated                               2. Core cooling - GQRE EXIT
: 1. Subcriticality - NU,CTRAR (affected pumpe only)
                                              -OR-                                 TCs >1200*F
POWER >57.
: o.     -ALL of the folloving conditions exist:                                               3. Heat sink-AT.T. SGs NL_                                 l LEVTL 3 47. f447,_ FOX _
~
* Controfled nCS cooluvwn ma                         AuvEnSE uind aND TGIAu 4                            in progress                                       F m WATER FLOW <500 GPM
-OR-o Cnat Phase 3 actuated
                                                    -AND                           AVAILABLE
: 2. Core cooling - GQRE EXIT
* RCS pressure - <1370 PSIG
-OR-TCs >1200*F o.
                                                    -AND-                     4. Integrity - DECREASE
-ALL of the folloving conditions exist:
* High head SI pump flow indicator                   >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                         AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                                 5. Containment - CNMT PE SSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                             IF CST           _ EVE   _ <20L T               W EN Step 1, if: .                                                 CONSIDE R TH E FOLLOWI \ G:
: 3. Heat sink-AT.T. SGs NL_
o RCS subcooling - NOT ACCEPTABLE                   o Makeup 2 rom MUDS or PER ICONIC DISPLAY OR                             radwaste ATTACHMENT A                                 o   Prepare to isolate
l LEVTL 3 7. f447,_ FOX _
                                                -OR-                               secendary supply side o     PZR level - CAHMl_BE MAINTAINED                   of 3 SGs
4 Controfled nCS cooluvwn ma AuvEnSE uind aND TGIAu in progress F m WATER FLOW <500 GPM 4
                                  > 47. (38% FOR ADVERSE CNMTS                 o   Crosstie unit's CST o Reduce cooldown rate
-AND AVAILABLE RCS pressure - <1370 PSIG
* IF AUX :E ED                   JUMP DA3' TAVK   _ EVE _
-AND-
Ll6% Ti           E 9 P ERFOR1     rHE 0L _0WI VG:       I:: CST LEVEL <3L NEN P ERFORM TH E FOLLOWL s G:
: 4. Integrity - DECREASE High head SI pump flow indicator
* Refill the day tank
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
: 5. Containment - CNMT PE SSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_ EVE _ <20L T W EN Step 1, if:.
CONSIDE R TH E FOLLOWI \\ G:
o RCS subcooling - NOT ACCEPTABLE o Makeup 2 rom MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secendary supply side o
PZR level - CAHMl_BE MAINTAINED of 3 SGs
> 47. (38% FOR ADVERSE CNMTS o
Crosstie unit's CST o Reduce cooldown rate
* IF AUX
:E ED JUMP DA3' TAVK
_ EVE Ll6% Ti E 9 P ERFOR1 rHE 0L _0WI VG:
I:: CST LEVEL <3L NEN P ERFORM TH E FOLLOWL s G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply l
: b. Switch AF suction to SX supply l
(Final)
(Final)
(0386E/0042E/042488')                                                 APPROVED JM 311989 s.o.s.R.
(0386E/0042E/042488')
l
APPROVED JM 311989 s.o.s.R.
        - _ _ _ _ _ - - _ - - - - - - - - - _ _        --                                                                                l
l l


        , . . . - - . , . . . . -     - - - - - . . - - . - - - - . -            . . . , .     ., - - - - .,_,-.-_--__-- - ,._- --- -              - . - - . . . . . _ - - - . _ . , - . - - _ - - - - . - - - - - - - - - . . - -        _,.--,.---,.. - - . . , , - - . - - -
_,.--,.---,.n
      ' N '-
' N '-
I
'REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A
. UNIT 1 STEP
. ACTION /E"FECTED REE 0N5E PESPCNSE NOT OSTAINED 16l VERIFY ECCS PUMPS RUNNING:
Manually start pumps.
CENT CHG pumps run lights - LIT SI pumps run lights - LIT RH pumps run lights - LIT jil Vt-RIFY LOhri AINMENT ISOLATION PHASE Af
: a. Cnmt Phase A valves - CLOSED:
: a. Manually actuate Cnmt Isol Phase A and verify Group 3 Cnmt Isol valves closed, monitor lights - LIT lHl VERIFY CONTAINMENT VENTILATION ESOLATION:
~
: a. Cnmt Vent Isol valves - C_LOSED:
: a. Manually close valves.
Group 6 Cnmt' Vent Isol monitor lights - LIT lHl VERIFY AF PUMPS RUNNING:
I
I
                                            'REV. 1                                          REACTOR TRIP OR SAFETY INJECTION                                                                                                                              1BEP-0 WOG-1A                                                                                    . UNIT 1 STEP                              . ACTION /E"FECTED REE 0N5E                                                                                                            PESPCNSE NOT OSTAINED 16l VERIFY ECCS PUMPS RUNNING:                                                                                   Manually start pumps.
: a. AF pumps run lights - LIT
* CENT CHG pumps run lights - LIT
: a. Manually start pumps.
* SI pumps run lights - LIT
* RH pumps run lights - LIT jil Vt-RIFY LOhri AINMENT ISOLATION PHASE Af
: a. Cnmt Phase A valves - CLOSED:                                                  a. Manually actuate Cnmt Isol Phase A and verify
* Group 3 Cnmt Isol                                                                                        valves closed, monitor lights - LIT lHl VERIFY CONTAINMENT VENTILATION ESOLATION:
                                                                                              ~
: a. Cnmt Vent Isol valves - C_LOSED:                                              a. Manually close valves.
* Group 6 Cnmt' Vent Isol monitor lights - LIT lHl VERIFY AF PUMPS RUNNING:                                                                                                                                                                                                                    I
: a. AF pumps run lights - LIT                                                      a. Manually start pumps.
lEl VERI:Y RCFCS RUNNING IN.. LOW SPEE7:
lEl VERI:Y RCFCS RUNNING IN.. LOW SPEE7:
: a. RCFC low speed run                                                               a. Manually start RCFCs in lights - LIT                                                                                                 low speed.                                                                                     f l Hl VERIFY CC PUMPS RUNNING:
f
: a. CC pumps run lights - LIT                                                       a. Manually start pumps.
: a. RCFC low speed run
: a. Manually start RCFCs in lights - LIT low speed.
l Hl VERIFY CC PUMPS RUNNING:
: a. CC pumps run lights - LIT
: a. Manually start pumps.
lElyERIFY SX PUMPS RUNNING:
lElyERIFY SX PUMPS RUNNING:
: a. SX pumps run lights - LIT                                                         a. Manually start pumps.
: a. SX pumps run lights - LIT
    ,                                                                                                                                                                                                                                  APPROVED fEB 011989 B.o.S.R.
: a. Manually start pumps.
Ppge 8 of .33 (0304E/0035E/042088)
APPROVED fEB 011989 B.o.S.R.
Ppge 8 of.33 (0304E/0035E/042088)


RE V . 1--                                           OPERATOR ACTION  
RE V.
1--
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0-WOG-1A                                                 FOR'1BEP-0 SERIES PROCEDURES                   ,,
1BEP-F.0-WOG-1A FOR'1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:.
TRIP RCPS WHEN:.                                                                 RED PATH  
RED PATH  


==SUMMARY==
==SUMMARY==
o     CC wat.er to RCP lost                                                     1. Subcriticality. - ECLEAR (affeeted pumps only)                                                         POWER > 57a ,
o CC wat.er to RCP lost
                                                                        -OR-o     Cnat Phase B actuateA                                                     2. Core cooling - CORE EXIT
: 1. Subcriticality. - ECLEAR (affeeted pumps only)
,                                                                      -OR-                                       TCs >1200*F o-   ALL of the following conditions exist:                              ~...
POWER > 57a,
: 3. Heat sink-ATL SGs NR LEYEL_147..J141 FOR 6                          (,outrollea RCb coolouwn dQ1                       eavnet CET)_ er r',4 in progress                                       FrrnWATER FLOW <500 GPM               ~
-OR-o Cnat Phase B actuateA
                                                                              -AND                                 AVAILABLE
: 2. Core cooling - CORE EXIT
* RCS pressure - (1370 PSIG
-OR-TCs >1200*F o-ALL of the following conditions
                                                                              -AND-                           4. Integrity - DECREASE
~...
* High head SI pump flow indicator                   >100*F IN LAST 60 MINUTES.
: 3. Heat sink-ATL SGs NR exist:
(1FI-917) >50 GPM flow or                         AND RCS COLD LEG (246*F                         .
LEYEL_147..J141 FOR
SI' pumps >100 GPM SI ACTUATION:                                                                   5. Containment - CmiI PREESURE >50 PSIG                                 '
(,outrollea RCb coolouwn dQ1 eavnet CET)_ er r',4 6
Actuate SI and'GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                                               IF CST _ EVE _ <20%, "E EN                         'l Step 1,'if:                                                                     CONSIDE RT i E F0 _LOWLh 3:
in progress FrrnWATER FLOW <500 GPM
o                           RCS'subcooling - NOT ACCEPTABLE               o . Makeup from MUDS or PER ICONIC DISPLAY OR                             radwaste ATTACHMENT A                                 o   Prepare to isolate
~
                                                                            -OR-                                   secondary supply side                             j o PZR level - CANNOT BE MAINTAINED                                             of 3 SGs                                           j
-AND AVAILABLE RCS pressure - (1370 PSIG
                                                                > 4% (38% FOR ADVEREE CNMT)                   o   Crosstie unit's CST                               ;
-AND-
_ EVE       _f
: 4. Integrity - DECREASE High head SI pump flow indicator
* y   o   Reduce cooldown r-ate                             I IF AUX :E ED 2. iP JA" TA4K
>100*F IN LAST 60 MINUTES.
                                < 16% T H4P E UOR 1 PHE :0L _0WI 4G:                                           I: CST LEVEL <3%, T"EN EBEORM TH E ,FOLLOWI sG:
(1FI-917) >50 GPM flow or AND RCS COLD LEG (246*F SI' pumps >100 GPM SI ACTUATION:
* Refill the 6ay tank ,
: 5. Containment - CmiI PREESURE >50 PSIG Actuate SI and'GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_ EVE _ <20%, "E EN
'l Step 1,'if:
CONSIDE RT i E F0 _LOWLh 3:
o RCS'subcooling - NOT ACCEPTABLE o. Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side j
o PZR level - CANNOT BE MAINTAINED of 3 SGs j
> 4% (38% FOR ADVEREE CNMT) o Crosstie unit's CST IF AUX
:E ED
: 2. iP JA" TA4K _ EVE _f
* y o
Reduce cooldown r-ate I
< 16% T H4P E UOR 1 PHE :0L _0WI 4G:
I: CST LEVEL <3%, T"EN EBEORM TH E,FOLLOWI sG:
Refill the 6ay tank,
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch /J suction to SX supply (Final)
: b. Switch /J suction to SX supply (Final)
(0386E/0042E/042488)                                                                       APPROVED JNI 311989 s.o.s.R.
(0386E/0042E/042488)
APPROVED JNI 311989 s.o.s.R.


REV. 1               REACTCR TRIP OR SAFETY INJECTION                 1BEP-0 WOG-1A                           U' LIT 1 5TEF         ACTION / EXPECTED REE'Gh5E           i PESPONSE NOT GSTalNED l[1l CHECK.IFMAINSTEAMLINESSHOULD BE ISOLATED:                                           -
REV. 1 REACTCR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A U' LIT 1 5TEF ACTION / EXPECTED REE'Gh5E i
PESPONSE NOT GSTalNED l[1l CHECK.IFMAINSTEAMLINESSHOULD BE ISOLATED:
l 1
l 1
: a. Check one or more of the               a. GO TO Step 14.
: a. Check one or more of the
                                                                    .                                i following conditions:
: a. GO TO Step 14.
ANY STEAMI'NE PPCSS!mE       -
i following conditions:
                                                                            ,                      1 LESS THAN OR EQUAL TO 640 PSIG
ANY STEAMI'NE PPCSS!mE 1
                                          -OR-                                                     ;
LESS THAN OR EQUAL TO 640 PSIG
o   CONTAINMENT PRESSURE GREATER THAN 8.2 PSIG (1PI-CS934 THRU 1PI-CS937)                                                   '(
-OR-o CONTAINMENT PRESSURE GREATER THAN 8.2 PSIG (1PI-CS934 THRU 1PI-CS937)
'(
: b. Verify Main Steamline Isolation:
: b. Verify Main Steamline Isolation:
: b. Manually initiate Main       !
: b. Manually initiate Main manuallycloseMSIVbypass.{
Steamline Isolation and
Steamline Isolation and MSIVs - CLOSED MSIV bypass valves - CLOSED valves.
* MSIVs - CLOSED                       manuallycloseMSIVbypass.{
-llEl VERIFY CONT'AINMENT SPRAY NOT REQUIRED:
* MSIV bypass valves - CLOSED           valves.
: a. Cnmt pressure - HAS
              -llEl VERIFY CONT'AINMENT SPRAY NOT REQUIRED:
: a. Perform the following:
: a. Cnmt pressure - HAS                     a. Perform the following:
REMAINED LESS THAN 20 PSIG, (IPI-CS934 THRU 1PI-CS947; 'or
REMAINED LESS THAN 20 PSIG, (IPI-CS934 THRU 1PI-CS947; 'or             1) Verify Containment recorder IPR-937)
: 1) Verify Containment recorder IPR-937)
V            Spray actuated.         I
)k'p Spray actuated.
                                                    )k'p
I V
                                                      ' '              IF NOT, THEN manually y'                    actuate.
y' IF NOT, THEN manually actuate.
: 2) Verify Cnmt Isol Phase B valves closed:
: 2) Verify Cnmt Isol Phase B valves closed:
All Group 6 Phase B isol monitor lights LIT.
All Group 6 Phase B e
isol monitor lights LIT.
IF NOT, THEN manually close valves.
IF NOT, THEN manually close valves.
: 3) Stop all PCPs.,
: 3) Stop all PCPs.,
APPROVED FEB 011989-l                                                                                   B.O.S.R.
APPROVED FEB 011989-l B.O.S.R.
i-(0304E/0035E/042088)                                         ,
i-(0304E/0035E/042088)


REV   1                     OPERATOR ACTION  
REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOG-1A                     FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                 RED PATH  
1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                   ,  1. Suberiticality - NUCLFAR (affected pumps only)                         POWER >EL
: 1. Suberiticality - NUCLFAR o
                        -OR-o   Cnat Phase B actuated                       2. Core cooling - CORI EXIT
CC water to RCP lost (affected pumps only)
                        -OR-                               TCs >1200*F 0   ALL of the following cond,itions erist:                                     3. Heat sink-ALL SGs NR LEVEL (4% (34% FOR
POWER >EL
* uvatzs n cd m.o cooidown M                 no.z.sE C h , Mw avism in progress                                 FFFDWATER FLOW <500 GPM
-OR-o Cnat Phase B actuated
                              -AND                           AVAILABLE
: 2. Core cooling - CORI EXIT
* RCS pressure - <l370 PSIQ
-OR-TCs >1200*F 0
                              -AND-                       4. Integrity - DEEEASE--
ALL of the following cond,itions erist:
* High head SI pump flow indicator           >100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or                   AND RCS COLD LEG (246*F SI pumps >100 GPM                     :
: 3. Heat sink-ALL SGs NR LEVEL (4% (34% FOR uvatzs n cd m.o cooidown M no.z.sE C h, Mw avism in progress FFFDWATER FLOW <500 GPM
SI ACTUATION:                                   5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,               IF CST _ EVE L <20%, " lien Step 1, if:                                     CONSIDER T 4 E FO'_ LOW 14G:
-AND AVAILABLE RCS pressure - <l370 PSIQ
o   RCS subcooling - NOT ACCEDTABLE         o nakeup from MUDS or PER ICONIC DISPLAY OR                       radwaste ATTACHMENT A                           o   Prepare to isolate
-AND-
                            -OR-                             secondary supply side o   PZR level - CANNOT BE. MAINTAINED           of 3 SGs                                                     d
: 4. Integrity - DEEEASE--
                  > 4? (38% FOR ADVERSE CNMT)             o   Crosstie unit's CST o   Reduce cooldown rate
High head SI pump flow indicator
* IF AUX :E ED )U'iP 3A" TAVK _ EVE'_
>100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG (246*F SI pumps >100 GPM SI ACTUATION:
        < 16% T i E 4P ER :0R 1 HE :0L _0WI:4G:         I: CST LEVEL <3%, T EN P ERFORM TH E FOLLOW 3 G:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
* Refill the day tank
_ EVE L <20%, " lien Step 1, if:
CONSIDER T 4 E FO'_ LOW 14G:
o RCS subcooling - NOT ACCEDTABLE o
nakeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE. MAINTAINED of 3 SGs d
> 4? (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:E ED )U'iP 3A" TAVK
_ EVE'_
< 16% T i E 4P ER :0R 1 HE :0L _0WI:4G:
I: CST LEVEL <3%,
T EN P ERFORM TH E FOLLOW 3 G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply 1
: b. Switch AF suction to SX supply 1
(Final)                                                                     )
(Final)
(0386E/0042E/042488)                                   APPROVED i
)
(0386E/0042E/042488)
APPROVED i
J6N 31 M49 B.O.S.R.
J6N 31 M49 B.O.S.R.
I
I


R$V. 1-                     REACTOR TR'IP OR SAFETY INJECTION                       1BEP-0 1
R$V. 1-REACTOR TR'IP OR SAFETY INJECTION 1BEP-0 1
WOG-1A.                                 UNIT 1 STEP           ACTION / EXPECTED RES?ONSE                     RESPONSE NOT OSTAINED I
WOG-1A.
UNIT 1 STEP ACTION / EXPECTED RES?ONSE RESPONSE NOT OSTAINED I
l3l VERIFY'DIESELGENERATORSRUNNING:
l3l VERIFY'DIESELGENERATORSRUNNING:
: a. DGs run lights - LIT                           4. . Manually stirt DGs.
: a. DGs run lights - LIT
                                                                        ~
: 4.. Manually stirt DGs.
IF DGs can NOT be started iiianually, W EN Ic m 11.y :'a~* rer 1 BOA ELEC-3, LOCAL EMERGENCY START OF A
IF DGs can NOT be started iiianually,
                                                                                                                      , DIESEL GENERATOR.
~
16   ANN 00NCE CONDITION OVER PAGE, U VIT . REACTOR TRIP - SAF ETY I VJEC" ION 17   VERIFY GENERATOR TRIP 30 SECONJS AFT ER TURBINE TRIP:
W EN Ic m 11.y :'a~* rer 1 BOA ELEC-3, LOCAL EMERGENCY START OF A
: a. Unit 1 Main Transformer feed to                 a. Manually open breakers 345KV Swyd breakers-OPEN:                           as necessary:
, DIESEL GENERATOR.
* OCB 3-4                                       o OCB 3-4
16 ANN 00NCE CONDITION OVER PAGE, U VIT
* OCB 4-5                                       o OCB 4-5
. REACTOR TRIP - SAF ETY I VJEC" ION 17 VERIFY GENERATOR TRIP 30 SECONJS AFT ER TURBINE TRIP:
: b. PMG output breaker -                           b. Manually open.PMG output OPEN:                                               breakcr.
: a. Unit 1 Main Transformer feed to
e     41 Brkr
: a. Manually open breakers 345KV Swyd breakers-OPEN:
as necessary:
OCB 3-4 o OCB 3-4 OCB 4-5 o OCB 4-5
: b. PMG output breaker -
: b. Manually open.PMG output OPEN:
breakcr.
e 41 Brkr
: c. Generctor lockout relay trip alarm - LIT APPROVED i
: c. Generctor lockout relay trip alarm - LIT APPROVED i
FEB 011989 I                                                                                                                                             B.O.S.R.
FEB 011989 I
B.O.S.R.
l (0304E/0035E/042088)
l (0304E/0035E/042088)


i REV   1                         OPERATOR ACTION  
i REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP F.0 WOGI1A                       FOR 1BEP-0 SERIES PROCEDURES                               -
1BEP F.0 WOGI1A FOR 1BEP-0 SERIES PROCEDURES
                                    , TRIP RCPS WHEN:                                     RED PATH  
, TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                           1. Suberiticality - NUCf.FAR (affected' pumps only)
o CC water to RCP lost
: 1. Suberiticality - NUCf.FAR (affected' pumps only)
POWER >5%
POWER >5%
                                                          -OR-o   Cnat Phase B actuated                         2. Core cooling - CORE EXIT
-OR-o Cnat Phase B actuated
                                                          -OR-                                 2Cs >1200*F o   ALL of the follow'ng conditions exist:                                       3. Heat sink-AT.T. SGs NR LEVIL <4% (34% FOR
: 2. Core cooling - CORE EXIT
* com. rolled hCS 'chuww DEA
-OR-2Cs >1200*F o
                                                  *                                    ~
ALL of the follow'ng conditions exist:
                                                                                              ~ . m ,i Ciin > 1 2 J !n_
: 3. Heat sink-AT.T. SGs NR LEVIL <4% (34% FOR com. rolled hCS 'chuww DEA
in progress                                   INFnWATER FLOW <500 GPM
~
                                                              -AND                           AVAILABLE
~. m,i Ciin > 1 2 J !n_
* RCS. pressure - <1370 PSIG
in progress INFnWATER FLOW <500 GPM
                                                              -AND-                       4. Integrity - DECREASE
-AND AVAILABLE RCS. pressure - <1370 PSIG
* High head SI pump flos. indicator             >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or*                    AND RCS COLD LEG (246*F SI pumps >100 GPM SI ACTUATION:                                     5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and-GO TO 1BEP-0,                                             .
-AND-
REACTOR TRIP OR SAFETY INJECTION,                 IF CST '_EV E _ <20%, " TEN Step 1, if:                                       CONSIDE R     i E - F0 _LOWL 03:
: 4. Integrity - DECREASE High head SI pump flos. indicator
o   RCS subcooling - NOT ACCEPTABLE           o Makeup from MUDS or PER ICONIC DISPLAY OR                         radwaste           -
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG (246*F SI pumps >100 GPM SI ACTUATION:
ATTACHMENT A                             o Prepare to isolate
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and-GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST '_EV E _ <20%, " TEN Step 1, if:
                                                            -OR-                               secondary supply side o   PZR level - CANNOT BE MAINTAINED               of 3 SGs
CONSIDE R i E - F0 _LOWL 03:
                                                  > 4% (38% FOR ADVERSE CNMT)             o   Crosstie unit's CST o   Reduce cooldown rate
o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o Prepare to isolate
* IF AUX     :EED SUiP :)A" TA4K   _ EVE _
-OR-secondary supply side o
                                        < 16% T i E 4P ER :0R i   'HE ;0L _0WI 4G:         I: CST LEVEL <3%, ''EN P ERFORM TH   E FOLLOWD G:
PZR level - CANNOT BE MAINTAINED of 3 SGs
* Refill the day tank
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:EED SUiP :)A" TA4K
_ EVE I: CST LEVEL <3%, ''EN
< 16% T i E 4P ER :0R i
'HE
;0L _0WI 4G:
P ERFORM TH E FOLLOWD G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF raction to SX supply (Final)
: b. Switch AF raction to SX supply (Final)
(0386E/0042E/042488)                                       APPROVED JM 311989 B.O.S.R.
(0386E/0042E/042488)
APPROVED JM 311989 B.O.S.R.


REV. 1             REACTOR. TRIP OR SAFETY INJEC120N                     1BEP-0 WOG-1A                         UNIT 1 STEP         ACTION / EXPECTED RE5:GN5E               FESPC.iSE NOT GSTAINED 18   VERIFY ECCS FLOWa
REV. 1 REACTOR. TRIP OR SAFETY INJEC120N 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED RE5:GN5E FESPC.iSE NOT GSTAINED 18 VERIFY ECCS FLOWa
: a. High head SI pump flow                 a. Manually s. Art CENT CHG                           I indicator (1FI-917) -                   pumps and align valves is GREATER THAN 50 GPM                       necessary.
: a. High head SI pump flow
b.'RCS pressure (1PI-403A/405) -         b. GO TO Step 19.
: a. Manually s. Art CENT CHG I
                                      'ISS m AN :T,0 Pc'e i
indicator (1FI-917) -
: c. SI pumps discharge flow               c. Manually start SI pumps andl indicators (1FI-918/922) -               align valves er necessary. n GREATER THAN 100 GPM       -
pumps and align valves is GREATER THAN 50 GPM necessary.
: d. RCS pressure (1PI-403A/405) -         d. Go To Step 19.
b.'RCS pressure (1PI-403A/405) -
: b. GO TO Step 19.
'ISS m AN :T,0 Pc'e i
: c. SI pumps discharge flow
: c. Manually start SI pumps andl indicators (1FI-918/922) -
align valves er necessary. n GREATER THAN 100 GPM
: d. RCS pressure (1PI-403A/405) -
: d. Go To Step 19.
LESS THAN 300 PSIG
LESS THAN 300 PSIG
: e. RH pumps discharge. flow               e. Manually start RH pumps and indicators (1FI-618/619) -               align valves as necessary. 1 GREATER THAN 500 GPM 19     VERIFY ECCS VALVE ALIGNMENT:                                                                 )
: e. RH pumps discharge. flow
: a. Group 2 Cold Leg Injection             a. Manually align valves as monitor lights required for               necessary.
: e. Manually start RH pumps and indicators (1FI-618/619) -
align valves as necessary. 1 GREATER THAN 500 GPM 19 VERIFY ECCS VALVE ALIGNMENT:
)
: a. Group 2 Cold Leg Injection
: a. Manually align valves as monitor lights required for necessary.
ECCS valve alignment - LIT l
ECCS valve alignment - LIT l
l 1
l 1
Line 563: Line 794:
L.-____--____----_..-------------
L.-____--____----_..-------------


= _ - -                                                            .--
= _ - -
REV 1                         OPERATOR Af" ION  
REV 1
OPERATOR Af" ION  


==SUMMARY==
==SUMMARY==
                      .1BEP-F.0 WOGI1A                               FOR 1BEP-0 SERIES PROCEDURES.
.1BEP-F.0 WOGI1A FOR 1BEP-0 SERIES PROCEDURES.
TRIP PCPS WHEN:                                         Rf-) PATH SUMMAR1:
TRIP PCPS WHEN:
o         CC water to RCP lost                           1. Suberiticality - NUCf.FAR (affected pumps only)                               POWER 35%
Rf-) PATH SUMMAR1:
                                                                                        -OR-o       Cnet Phase B actuated                         2. Core cooling - CORE EXIT
o CC water to RCP lost
                                                                                        -OR-     .
: 1. Suberiticality - NUCf.FAR (affected pumps only)
TCn >1200*F o         ALL of the following coaditions ex3.s t :       -                              3. Heat sink-AT.T. SGs NR LEVEI_< 4L( EFQ1.
POWER 35%
                                                                          -    t.,ontrob'e,c ht;b cvvAcuwia uni     '~ "
-OR-o Cnet Phase B actuated
ADvME Chii1"i r.#w Tv AL in progrecs                                   FrrnWATER FLOW <500 GPM
: 2. Core cooling - CORE EXIT
                                                                                              -AND                           AVAILABLE
-OR-TCn >1200*F o
* RCS preissure - <1370 PSIG
ALL of the following coaditions
        .                                                                                    -AND-                     4. Integrity - DECREASE..
: 3. Heat sink-AT.T. SGs NR ex3.s t :
* High head SI pump flow indicator-             >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                     AND RCS COLD LEG (246*F SI pnaps >100 GPM SI ACTUATION:                                         5. Containment - CNMT PRFRSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                       IF CST   _ EVE _ <20%, TiEN Step 1, if:                                           CONSIDE RT i E F0 _LOWI 6:
LEVEI_< 4L( EFQ1.
                        ,                                                o   RCS subcooling - NOT ACCEPTABLE           o Makeup from MUDS or EER ICONIC DISPLAY OR                           radwaste ATTACHMENT A                             o   Prepare to isolate
t.,ontrob'e,c ht;b cvvAcuwia uni ADvME Chii1"i r.#w Tv AL
                                                                                            -OR-                               secondary supply side o     PZR level - CANNOT BE MAINTAINED               of 3 SGs
'~ "
                                                                                > 47. (38% FOR ADVERSE CNMT)             o   Crosstie unit's CST o   Reduce cooldown rate
in progrecs FrrnWATER FLOW <500 GPM
* IF AUX                   :
-AND AVAILABLE RCS preissure - <1370 PSIG
E ED 'UiP ')A" TA4K _ EVE   _
-AND-
                                                                  < 16% T i E 4P ER :0R i       'HE :0L _0WI 4G:         I: CST LEVEL <3%.       -
: 4. Integrity - DECREASE..
EN P ERFORM TH E FOLLOWL VG:
High head SI pump flow indicator-
                                                                  *.      Refill the day tank
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG (246*F SI pnaps >100 GPM SI ACTUATION:
: 5. Containment - CNMT PRFRSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_ EVE _ <20%, TiEN Step 1, if:
CONSIDE RT i E F0 _LOWI 6:
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or EER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 47. (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
: E ED 'UiP ')A" TA4K
_ EVE
< 16% T i E 4P ER :0R i
'HE :0L _0WI 4G:
I: CST LEVEL <3%.
- EN P ERFORM TH E FOLLOWL VG:
Refill the day tank
: a. Verify secondary side of 3.SGs isolated
: a. Verify secondary side of 3.SGs isolated
: b. Switch AF suction to SX supply f
: b. Switch AF suction to SX supply f
(Final)
(Final)
(0386E/0042E/042488)                                                 APPROVED JM 311989 a.o.s.R.
(0386E/0042E/042488)
_ - _ - - - - - - _ - - - - - - _ - . _ - - - - - - - - - - - - -                                                                                              .I
APPROVED JM 311989 a.o.s.R.
.I


REV.'l             REACTOR TRIP OR SAFETY INJECTION                     1BEP-0 WOG-1A                         UNIT 1 STEF       dCTION/ EXPECTED REE GN5E                   RESPONSE NOT OE 'AiNED CAUTION AF flow must remain GREATER THAN 500 GPM until water level is GREATER THAN J% (34% FOR ADVERSE CNMT) for an indicatien. y SG narrow range I
REV.'l REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEF dCTION/ EXPECTED REE GN5E RESPONSE NOT OE 'AiNED CAUTION AF flow must remain GREATER THAN 500 GPM until water level is GREATER THAN J% (34% FOR ADVERSE CNMT) for an indicatien. y SG narrow range I
20 VERIFY TOTAL AF FLOW:
20 VERIFY TOTAL AF FLOW:
: a. AF flow - GREATER THAN 500 GPM           a. IF SG narrow range level AVAILABLE                                 IE greater than 4% (34% FOR ADVERSE CNMT) in any SG, THEN control feed flm; to maintain SG narrow range.
: a. AF flow - GREATER THAN 500 GPM a.
IF SG narrow range level AVAILABLE IE greater than 4% (34% FOR ADVERSE CNMT) in any SG, THEN control feed flm; to maintain SG narrow range.
level.
level.
IF SG narrow range level Ti less than 4% (34% FOR ADVERSE CNMT) in all SGs, THEN manually start AF pumps and align valves as necessary.
IF SG narrow range level Ti less than 4% (34% FOR ADVERSE CNMT) in all SGs, THEN manually start AF pumps and align valves as necessary.
Line 604: Line 856:
age 12 of 33 (0304E/0035E/042088)
age 12 of 33 (0304E/0035E/042088)


REV   1                       OPERATOR ACTION SUMM/dY                     1BEP-F.0 WOG'1A                       FOR 1BEP-0 SERIES PROCEDURES TRIP'RC_Ps WHEN:                               RED PATH SUPiAR1:
REV 1
o   CC water to RCP lost                       1. Subcritic.tlity - NUCLEAR (aff ected pumps only)                         POWER >5%
OPERATOR ACTION SUMM/dY 1BEP-F.0 WOG'1A FOR 1BEP-0 SERIES PROCEDURES TRIP'RC_Ps WHEN:
                                                -OR-o   Cnmt Phase B actuated                     2. Core cooling - CORE EXIT
RED PATH SUPiAR1:
                                                -OR-                               TCs >1200*F o   ALL of the followir; conditions exist:                                     3. Heat sink-ALL SGs NR LT2W < 41 04% J_0R_
o CC water to RCP lost
* Controlled RCS coo.tdown hsa               I "V"L r., u.MT, AIiu T0 mL in progress                             - FFFDWATER FLOW (500 GPM
: 1. Subcritic.tlity - NUCLEAR (aff ected pumps only)
                                                    -AND                         AVAILABLE
POWER >5%
* RCS pressure - <1370 PSIG
-OR-o Cnmt Phase B actuated
                                                    -AND-                     4. Integrity - DECREASE
: 2. Core cooling - CORE EXIT
* High head SI pump flow indicator           >100*F .N LAST 60 MINUTES (lFI-917) >50 GPM flow or                 AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                   5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,               IF CST     _ EVE _ <20%, T:iEN Step 1, if:                                     CONSIDE RT i E FOLLOWI 1G:
-OR-TCs >1200*F o
o   RCS subcooling - NOT ACCEPTABLE       o Makeup from MUDS or PER ICONIC DISPLAY OR                       radwaste ATTACHMENT A                           o   Prepare to isolate
ALL of the followir; conditions exist:
                                                  -OR-                             secondary. supply side o   PZR level - CANNOT BE MAINTAINED           of 3 SGs
: 3. Heat sink-ALL SGs NR LT2W < 41 04% J_0R_
                                        > 4% (38% FOR ADVERSE CNMT)           o   Crosstie unit's CST o   Reduce cooldown rate
Controlled RCS coo.tdown hsa I "V"L r., u.MT, AIiu T0 mL in progress
* IF AUX     :EED ' vip 3A" TAiK _ EVE _
- FFFDWATER FLOW (500 GPM
                              < 16% T i E 4P ERFOR i 'HE 0L _0WI 4G:           I: CST LEVEL <3%,         EN P ERFORM TH E FOLLOWL NG:
-AND AVAILABLE RCS pressure - <1370 PSIG
* Refill the day tank
-AND-
: 4. Integrity - DECREASE High head SI pump flow indicator
>100*F
.N LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_ EVE _ <20%, T:iEN Step 1, if:
CONSIDE RT i E FOLLOWI 1G:
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary. supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:EED ' vip 3A" TAiK
_ EVE
< 16% T i E 4P ERFOR i
'HE 0L _0WI 4G:
I: CST LEVEL <3%,
EN P ERFORM TH E FOLLOWL NG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                   APPROVED JM 311969 B.O.S.R.
(0386E/0042E/042488)
l
APPROVED JM 311969 B.O.S.R.
- _ _ - - - - - - - - - - -                                                                                          I
I


  >                                  +
+
REV. 1             REACTOR TRIP OR SAFETY _ INJECTION               1BEi-0
REV. 1 REACTOR TRIP OR SAFETY _ INJECTION 1BEi-0
              -WOG-1A                           UNIT 1 1
-WOG-1A UNIT 1 1
5TEP         ACTION /EXF.ECTED RE5?ON5E               PE9PONSE NOT CSieiNED 21 VERIFY AF VALVE ALIGNMENT:
5TEP ACTION /EXF.ECTED RE5?ON5E PE9PONSE NOT CSieiNED 21 VERIFY AF VALVE ALIGNMENT:
a.~AF isol valves - OPEN:                   a. Mrc~ illy OPEN valves.
a.~AF isol valves - OPEN:
* 1AF013A-
: a. Mrc~ illy OPEN valves.
                        *- 1AF013B 1AF013C   "
1AF013A-
                                                                            ~
*- 1AF013B 1AF013C
n   .AF013p
~
* 1AF013E
n
* 1AF013F
.AF013p 1AF013E 1AF013F 1AF013G 1AF013H b._AF flow control valves -
* 1AF013G
: b. Manually throttle valves THROTTLED OPEN:
* 1AF013H b._AF flow control valves -                 b. Manually throttle valves THROTTLED OPEN:                             OPEN.
OPEN.
* 1AF005A
1AF005A 1AF005B 1AF005C 1AF005D 1AF005E 1AF005F 1AF005G
* 1AF005B
-l 1AF005H 1
* 1AF005C
APPROVED FEB 011989i B.O.S.R.
* 1AF005D                       -
* 1AF005E
* 1AF005F                                                             -.
* 1AF005G                                                          -l
* 1AF005H                                                           1 APPROVED FEB 011989i B.O.S.R.
Page 13 of 33 (0304E/0035E/042088)
Page 13 of 33 (0304E/0035E/042088)


REV   1                       OPERATOR ACTION  
REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP F.0 WOG11A                         FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                   RED PATH  
1BEP F.0 WOG11A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                         1. Subtriticality - HIElluE (affected pumps only)                             POWER >5%
o CC water to RCP lost
                                        -OR-                                   .
: 1. Subtriticality - HIElluE (affected pumps only)
o   Cnmt Phase B actuated                         2. Core cooling - G RE EXIT
POWER >5%
                                        -OR-                                 TCs >1200*F o   ALL of the following conditions exist:                                       3. Ec;.t :: ink-ALL SGs NR LEVEL < Q 11A% FOR
-OR-o Cnmt Phase B actuated
* t.,ontrollec KCS
: 2. Core cooling - G RE EXIT
* t.vvitivwa HDI             . ~ T" 4 Jr b a_ ..   .K in progress                                   FEEDWATER P.OW <500 GPM
-OR-TCs >1200*F o
                                              -AND                             AVAILABLE
ALL of the following conditions exist:
* RCS pressure - <1370 PSIG
: 3. Ec;.t :: ink-ALL SGs NR LEVEL < Q 11A% FOR t.,ontrollec KCS
                                              -AND-                       4. Integrity - DEL 2EASX_
* t.vvitivwa HDI
* High head SI pun:p flow indicator             >100*F IN LAST 62. MINUTES (1FI-917) >50 GPM flow or                     ARD RCS COLD LEG <1(th,*E SI pumps >100 GPM SI ACTUATION:                                     5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                 IF CST _ EVE 1 (20%, TiEN Step 1, if:                                       CONSIDE RT i E FOLLOWI 9G:
. ~ T" 4 Jr b a_..
o   RCS subcooling - NOT ACCEPTABLE         o Maheup from MUDS or PER ICONIC DISPLAY OR                         radwaste A'I*fACHMENT A                           o   Prepare to isolate
.K in progress FEEDWATER P.OW <500 GPM
                                          -OR-                                 secondary supply side o   PZR level - CANNOT BE MAINTAINED               of 3 SGs
-AND AVAILABLE RCS pressure - <1370 PSIG
                                  > 4% (38% FOR ADVERSE CNMT)             o     Crosstie unit's CST o     Reduce cooldown rate
-AND-
* IF AUX     :EED DUiP DAl' TA4K _ EVE   __"c.V
: 4. Integrity - DEL 2EASX_
                        < 16% T i EN P ER :0RM 'HE 0L _0WI   W:#         I: CST LEVEL <3%. THEN
High head SI pun:p flow indicator
* Refill the day tank
>100*F IN LAST 62. MINUTES (1FI-917) >50 GPM flow or ARD RCS COLD LEG <1(th,*E SI pumps >100 GPM SI ACTUATION:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_ EVE 1 (20%, TiEN Step 1, if:
CONSIDE RT i E FOLLOWI 9G:
o RCS subcooling - NOT ACCEPTABLE o
Maheup from MUDS or PER ICONIC DISPLAY OR radwaste A'I*fACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:EED DUiP DAl' TA4K
_ EVE __"c.
V
< 16% T i EN P ER :0RM
'HE 0L _0WI W:#
I: CST LEVEL <3%. THEN Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                         pp     g l                                                                               JAN 311989 B.O.S.R.
(0386E/0042E/042488) pp g
l JAN 311989 B.O.S.R.
i
i


j '. ;
j '.
                  ''f.
''f.
        /         $
/
REV. 1                 REACTOR TRIP OR SAFETY INJECTION                             1BEP-0 s
REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 s
                        .,WOG-1A                                       UNIT 1 STEP         ACT80N/ EXPECTED RE5 GN5E                           RESPONSE NOT OSTAiNED s                         .                                                                                    j CAUTION If a radioactive release to the                               i
.,WOG-1A UNIT 1 STEP ACT80N/ EXPECTED RE5 GN5E RESPONSE NOT OSTAiNED j
          ,                                              atmosphere occurs, then Control Room                           i Offices vent fans,-OVVOICA and                 i OVV01CB should be verified tripped                               {
s CAUTION If a radioactive release to the i
g:                                                       at panc1 TiV01J.
atmosphere occurs, then Control Room i
.4,                                                                                                     l 22   VERIFY CONTROL ROOM VENTILATION SYSTEM ALIGNED FOR EMERGENCY i                         OPERATIQN                                                                                 j i
Offices vent fans,-OVVOICA and i
: a. Control Room chillers run                           a. Manually start chiller for lights - LIT:                                         VC train in operation.
OVV01CB should be verified tripped
Train A - MCR CHLR 0A
{
                                .*  Train B - MCR CHLR OB D. M/U' air _ source aligned for                       b. Manually align Train A or B L emergency, operation:                                 makeup air source to emer-gency source as necessary:
g:
o TRAIN A FILTER light - LIT                   -
at panc1 TiV01J.
OVC25Y/09Y- OPEN
.4, l
                                                -OR-                                     o   OVC32Y/16Y - CLOSED     is o TRAIN B FILTER light-a* LIT                         o   OVC281Y/282Y - CLOSED-o   OVC312Y/313Y
22 VERIFY CONTROL ROOM VENTILATION SYSTEM ALIGNED FOR EMERGENCY i
: c. VC train in operaticp,'M U' 1eP                                  , CLOSED
OPERATIQN j
i
: a. Control Room chillers run
: a. Manually start chiller for lights - LIT:
VC train in operation.
Train A - MCR CHLR 0A Train B - MCR CHLR OB D. M/U' air _ source aligned for
: b. Manually align Train A or B L emergency, operation:
makeup air source to emer-gency source as necessary:
o TRAIN A FILTER light - LIT o
OVC25Y/09Y-OPEN
-OR-o OVC32Y/16Y - CLOSED i
s o
TRAIN B FILTER light-a* LIT o
OVC281Y/282Y - CLOSED-1eP o
OVC312Y/313Y
, CLOSED
: c. VC train in operaticp,'M U'
: c. Perform the 'following; air filter unit fan run light
: c. Perform the 'following; air filter unit fan run light
                                  - LIT and-discharge flow control                       1) Place non-operating VC damper - NOT FULLY CLOSED:                                 train equipment in operation:
- LIT and-discharge flow control
o   Train A - M/U Fan OA and
: 1) Place non-operating VC damper - NOT FULLY CLOSED:
* Supply fan           J damper OVC24Y                                           e Return fan
train equipment in operation:
                                              .-OR-                                         e M/U air filter o   Train B - M/U Fan OB and                                   unit fan             k damper OVC08Y
o Train A - M/U Fan OA and Supply fan J
damper OVC24Y e
Return fan
.-OR-e M/U air filter o
Train B - M/U Fan OB and unit fan k
damper OVC08Y
: 2) RETURN TO Step 22a.
: 2) RETURN TO Step 22a.
: d. VC train in operation, recire                         d. Manually close recire charcoal absorber bypass damper:                       charcoal absorber bypass damper on VC train in o   Train A OVC43Y - CLOSED                             operation.
: d. VC train in operation, recire
                                            -OR-                                                   APPROVED o   Train B OVC44Y - CLOSED Step continued on next page
: d. Manually close recire charcoal absorber bypass damper:
* B.O.S.R.
charcoal absorber bypass damper on VC train in o
Train A OVC43Y - CLOSED operation.
-OR-APPROVED o
Train B OVC44Y - CLOSED Step continued on next page B.O.S.R.
(0304E/0035E/042088)
(0304E/0035E/042088)


m                        ;
]%,$di!
]%,$di!, s.
m
3,                     ,o                                                                                                   .
, s.
                ,h.'l ~
3,
3VREV. 1"                                         .
,o
OPERATOR ACTION  
,h.'l ~
3VREV. 1" OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
                        .1BEP-F 1       ,
.1BEP-F 1 WOG-1A' FOR 1BEP-0 SERIES PROCEDURES-c my
FOR 1BEP-0 SERIES PROCEDURES-c   $.
. TRIP RCPS WHEN:
WOG-1A' my RED PATH  
RED PATH  


==SUMMARY==
==SUMMARY==
                      . TRIP RCPS WHEN:
-o-CC water to RCP lost
                  -o-CC water to RCP lost                               1. Suberiticality - NUCLEAR (affected pumps only)                               POWER >5%
: 1. Suberiticality - NUCLEAR (affected pumps only)
                                                  -OR-
POWER >5%
: 2. Core cooling.- CORE EXIT o'        Cnet Phase B actuated
-OR-o' Cnet Phase B actuated
                                                  -OR               .
: 2. Core cooling.- CORE EXIT
TCs >1200'F ALL of-the following conditions o
-OR TCs >1200'F o
exist:                                           3.-Es.: sink-ALL SGs NR-LEHI;_L4% (_34%. FO.R           . . . ,
ALL of-the following conditions exist:
                                    * ~ Contro,Lled RCS .coolaown !!Q1           -
3.-Es.: sink-ALL SGs NR-LEHI;_L4% (_34%. FO.R
ADVERhi, ma',MJTalm"                   '
* ~ Contro,Lled RCS.coolaown !!Q1 ADVERhi, ma',MJTalm" e
in progIess                                e    FFFNdATER FLOW < 500 GPM
FFFNdATER FLOW < 500 GPM in progIess
                                                        -AND                           AVAILABLE
-AND AVAILABLE RCS pressure
* RCS pressure           <1370 PSIG
<1370 PSIG
                                                        -AND-                       4. Integrity.- DECREASE
-AND-
* High head SI pump flow-indicator                 >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                       AND RCS COLD LEG <246*F-SI pumps.>100 GPM SI ACTUATION:                                                 5. Containment - CNMT PRRCSURE >SO PSIG LActuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                             IF CST   _EV E _ <20%, '     "
: 4. Integrity.- DECREASE High head SI pump flow-indicator
EN i E' F0 _LOWM s if Step 1. if:                                                  CONSIDE  R o .RCS subcooling            NOT ACCEPTABLE     o Mckeup from MUDS ~or PER ICONIC DISPL AY OR-                          radwaste ATTACHMENT A                                 o   Prepare to. isolate
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F-SI pumps.>100 GPM SI ACTUATION:
                                                      -OR-                               secondary supply side o   PZR level - CANNOT BE MAINTAINED                 of 3 SGs
: 5. Containment - CNMT PRRCSURE >SO PSIG LActuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
                                        > 41 (381 FOR ADVERKE CNMT)                 o   Crosstie unit's CST o   Reduce cooldown' rate
_EV E _ <20%, '
* IF AUX               :
" EN Step 1. if:
E   ED MP ')A" TA 4K -_! EVE _
CONSIDE R
                        < 16% T i E 4P E ( :0R 1 'HE :0L _0WI 4G:                   IF CST LEVEL <3%, TiEN PER-:0RM TH E FOLLOWI     4 3;
' i E' F0 _LOWM s if NOT ACCEPTABLE o
* Refill the day tank
Mckeup from MUDS ~or o.RCS subcooling AY OR-PER ICONIC DISPL radwaste ATTACHMENT A o
: a. Verify secondary side of 3 SGs ir; sated l                                                                                   b. Switch AF         < tion to SX i                                                                                       supply I'
Prepare to. isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 41 (381 FOR ADVERKE CNMT) o Crosstie unit's CST o
Reduce cooldown' rate
* IF AUX
: E ED MP ')A" TA 4K
-_!EVE IF CST LEVEL <3%, TiEN
< 16% T i E 4P E ( :0R 1
'HE
:0L _0WI 4G:
PER-:0RM TH E FOLLOWI 4 3; Refill the day tank
: a. Verify secondary side of 3 SGs ir; sated l
: b. Switch AF
< tion to SX i
supply I'
L 1
L 1
(Final)
(Final)
(0386E/0042E/042488)                                                     APPROVED JNI 311989 s.o.s.n.
(0386E/0042E/042488)
APPROVED JNI 311989 s.o.s.n.
a
a


y l
y l
                                .REV. 1-             REACTOR TRIP OR SAFETY INJECTION                             1BEP-0'   l WOG-1A                                 UNIT 1                                               1 i
.REV. 1-REACTOR TRIP OR SAFETY INJECTION 1BEP-0' l
jSTEP             ACTION / EXPECTED RE5:0N5E ,                     RE5FONSE NOT OST AiNED Step 22 (continued)-
WOG-1A UNIT 1 1
: e. Control Room pressure.- GREATER                   e. Refer to BOP VC-14, MAIN THAN +0.125" H90, (MCR/TB                           CONTROL ROOM PRESSURE _ LOW, DP, OPDI-VC038)                                     while continuing with)this procedure.
i jSTEP ACTION / EXPECTED RE5:0N5E,
l APPROVED           l ftB 011989 1                                                                                                         B.O.S.R.
RE5FONSE NOT OST AiNED Step 22 (continued)-
: e. Control Room pressure.- GREATER
: e. Refer to BOP VC-14, MAIN THAN +0.125" H90, (MCR/TB CONTROL ROOM PRESSURE _ LOW, DP, OPDI-VC038) while continuing with)this procedure.
l APPROVED l
ftB 011989 1
B.O.S.R.
(')3 04E/0035E/042088 )
(')3 04E/0035E/042088 )


REV   1                       OPERATCR ACTION  
REV 1
OPERATCR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 i;           WOG-1A                       FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                 RED PATH  
1BEP-F.0 i;
WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                       1. Subcriticality - NUCTTAR (affected pumps only)                           POWER 357.
o CC water to RCP lost
                                -OR-o   Cnmt Phase B actuated                       2. Core cooling - CORE EXIT
: 1. Subcriticality - NUCTTAR (affected pumps only)
                                -OR-                               ICs >1200'F o   ALL of the following conditions exist:                                     3. Heat sink-AT.L SGs NR LEYEk_547. ..( 3 4%_I,02_
POWER 357.
* Cont. rolled RCS covAdown h                 il/IERJi, Cmn } Mw _ ?.L in progress                               FEEDWATER FLOW <500 GPM
-OR-o Cnmt Phase B actuated
                                    -AND                           AVAILABLE
: 2. Core cooling - CORE EXIT
* RCS pressure - <1370 PSIG
-OR-ICs >1200'F o
                                    -AND-                     '4. Integrity - DECREASE
ALL of the following conditions exist:
* High head SI pump flow indicator             >100*F IN LAST 60 MINUTES (IFI-917) 250 GPM flow or                 AND RCS COLD LEG <246*F
: 3. Heat sink-AT.L SGs NR LEYEk_547...( 3 4%_I,02_
                        .SI' pumps 1100 GPM SI ACTUATION:                                   5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP'OR SAFETY INJECTION,               IF CST   _ EVE   _ <20L   JEN i E FOLLOWL \ G:
Cont. rolled RCS covAdown h il/IERJi, Cmn } Mw _ ?.L in progress FEEDWATER FLOW <500 GPM
Step 1, if:                                      CONSIDE  R o RCS subcooling - NOT ACCEPTABLE           o   Makeup from MUDS or PER IC6I?TC DISPLAY OR                     radweste ATTACHMFRf_A                           o   Prepare to isolate
-AND AVAILABLE RCS pressure - <1370 PSIG
                                  -OR-                             secondary supply side o   PZR level - CANHOT BE MAINTADIED           of 3 SGs
-AND-
                        -> 47, (38'I FOR ADVERSE CNMT)         o   Crosstie unit's CST
'4. Integrity - DECREASE High head SI pump flow indicator
* IF AUX :EID 'UiP JA" TA4K _ EVE     _
>100*F IN LAST 60 MINUTES (IFI-917) 250 GPM flow or AND RCS COLD LEG <246*F
l
.SI' pumps 1100 GPM SI ACTUATION:
              < 16% T iE 4P ER FOR 1 'HE :0L _0WI 4G:         I : CST LEVEL <3L        T EN          ;
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP'OR SAFETY INJECTION, IF CST
PERFORM THE FOLLQ1GE:                 I
_ EVE _ <20L JEN Step 1, if:
* Refill the day tank
CONSIDE R
' i E FOLLOWL \\ G:
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or PER IC6I?TC DISPLAY OR radweste ATTACHMFRf_A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANHOT BE MAINTADIED of 3 SGs
-> 47, (38'I FOR ADVERSE CNMT) o Crosstie unit's CST l
* IF AUX :EID 'UiP JA" TA4K
_ EVE I : CST LEVEL <3L T EN
< 16% T iE 4P ER FOR 1
'HE :0L _0WI 4G:
PERFORM THE FOLLQ1GE:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply
: b. Switch AF suction to SX supply
                                                                                                      }
}
(Final)
(Final)
(0386E/0042E/042438)                                     APPROVED JM 311989 s.o.s.R.
(0386E/0042E/042438)
APPROVED JM 311989 s.o.s.R.


    }
}
REV. 1                   REACTOR TRIP OR SAFETY INJECTION                       IBEP-0 WOG-1A                               UNIT 1 i
REV. 1 REACTOR TRIP OR SAFETY INJECTION IBEP-0 WOG-1A UNIT 1 i
                                ..      .L._                                               .
.L._
5TEP           A; TION / EXPECTED RES GN5E                     PESPONSE NOT OSTAINED emeenemanna**eameneenna*manen**n********
5TEP A; TION / EXPECTED RES GN5E PESPONSE NOT OSTAINED emeenemanna**eameneenna*manen**n********
* NOTE                       *
NOTE Only or9 Aux Bldg Charcoal Booster Fan should be started in each non-accessible area exhaust filter plenum.
* Only or9 Aux Bldg Charcoal Booster
Only two plenums can be used at t n;
* Fan should be started in each
'm o t i me.
* non-accessible area exhaust filter
***,.........**......=*****ne********a YERifhAUXBLDGVENTILAIl0N 23 SYSTF2 ALIGNED FOR EMERJiEHQ' OPERATION:-
* plenum.
: a. Two non-accessible AB Charcoal
Only two plenums can be
: a. Start non-accessible Booster Fans run lights - LIT:
* used at t n; 'm o t i me .                   *
AB Charcoal Booster Fans as necessary per BOP VA-5, o
                                                ***,.........**......=*****ne********a 23     YERifhAUXBLDGVENTILAIl0N SYSTF2 ALIGNED FOR EMERJiEHQ' OPERATION:-
OVA 03CA or OVA 03CB for Plenum A AUX BLDG CHARCOAL BOOSTER o
: a. Two non-accessible AB Charcoal                   a. Start non-accessible Booster Fans run lights - LIT:                     AB Charcoal Booster Fans as
OVA 03CC or OVA 03CD for Plenum B FAN OPERATION.
                                                        .                        necessary per BOP VA-5, o     OVA 03CA or OVA 03CB for Plenum A           AUX BLDG CHARCOAL BOOSTER o     OVA 03CC or OVA 03CD for Plenum B             FAN OPERATION.
o OV.A03CE or OVA 03CF for Plenum C
o     OV.A03CE or OVA 03CF for Plenum C
*ne nn
                                                *ne nn **n **. .*nen..       ****e*************
**n
NOTE
.*nen..
* Only one Fuel Bldg Charcoal Booster
****e*************
* Fan should be run at a time.
NOTE Only one Fuel Bldg Charcoal Booster Fan should be run at a time.
nma...
nma...
                                                        ***.....ne.. * . ***      ant... enamen 24     VERIFY FUEL BLDG VENTILATION S_YSTEM ALIGNED FOR EMERGENCY OPERATION:
***.....ne..
: a. Train A or Train B Fuel                         a. Start Train A or B Bldg Charcoal Booster Fan run light - LIT:
ant...
Charcoal Booster Fan.
enamen 24 VERIFY FUEL BLDG VENTILATION S_YSTEM ALIGNED FOR EMERGENCY OPERATION:
per BOP VA-6, FUEL HANDLING BLDG CHARCOAL o   FHB Booster Fan OA                           BOOSTER FAN OPERATION.
: a. Train A or Train B Fuel
* OVA 04CA
: a. Start Train A or B Bldg Charcoal Booster Charcoal Booster Fan.
                                            -OR-o   FHB Booster Fan OB
Fan run light - LIT:
* OVA 04CB                                         APPROVED FEB 01 1969.
per BOP VA-6, FUEL HANDLING BLDG CHARCOAL o
,                                                                                              s.o.S.R.
FHB Booster Fan OA BOOSTER FAN OPERATION.
: l.            - - ,.                            .
OVA 04CA
-OR-o FHB Booster Fan OB OVA 04CB APPROVED FEB 01 1969.
s.o.S.R.
l.
Page 16 of 33 (0304E/0035E/042088)
Page 16 of 33 (0304E/0035E/042088)


L REV     1                       OPERATOR ACTION SUMMAR7                                                                                               1BEP-F.0 WOG-1A                         FOR 1BEP-0 SERIES PROCEDURES                                                                                                     -
L REV 1
JIIP RCPS WHEN:                                     RED PATH  
OPERATOR ACTION SUMMAR7 1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES JIIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                           1. Suberiticality - MTCT.FAR (affected pumps only)                             POWER >57.
o CC water to RCP lost
                                -OR-o   Cnmt Phase B actuated                         2. Core cooling - CORE EXIT
: 1. Suberiticality - MTCT.FAR (affected pumps only)
                                -Oh-                               TCs >1200*F o   ALL of the following conditions exist:                                         3. Heat sink-ATL SGs NR IZVEL < 47,114_7._FOR_
POWER >57.
* control. Leo RW cooJ,uvwn JQ1                 rw v ERam CIM , 12"3 iJTAL in progress FKrnWATER FLOW <500 GPM
-OR-o Cnmt Phase B actuated
                                    -AND                           AVAILABLE
: 2. Core cooling - CORE EXIT
* RCS pressure - <1370 PSIG
-Oh-TCs >1200*F o
                                    -AND-                     4. Integrity - DECREASE
ALL of the following conditions exist:
* High head SI pump flow indicator               >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                     AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                       5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, '                 IF CST   LEVE _ <20L ' WEN i E F0 _ LOW::
: 3. Heat sink-ATL SGs NR IZVEL < 47,114_7._FOR_
Step 1, if:                                        CONSIDE  R                                                                                        s G:
control. Leo RW cooJ,uvwn JQ1 rw v ERam CIM, 12"3 iJTAL in progress FKrnWATER FLOW <500 GPM
o RCS subcooling - NOT ACCEPTABLE             o   Makeup from MUDS or PER ICONIC DISPLAY OR                         radwaste ATTACHMENT A                             o   Prepare to isolate
-AND AVAILABLE RCS pressure - <1370 PSIG
                                  -0R ,                             secondary supply side o   PZR level - CANNOT BE MAINTAINED               of 3 SGs
-AND-
                        > 47. (3Q7. FOR ADVERSE CNMT)           o   Crosstie unit's CST o   Reduce cooldown rate
: 4. Integrity - DECREASE High head SI pump flow indicator
* IF AUX :E ED PUiP 3A'' TA4X       _ EVE _
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
            < 16% T i E 4 PER 0Ri 'HE ;0L_0WliG1               I: CST LEVEL <3L '                                                                               "EN P ERFORM TH E FOLLOW:: s G:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, '
* Refill the day tank
IF CST LEVE _ <20L ' WEN Step 1, if:
CONSIDE R
' i E F0 _ LOW:: sG:
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-0R,
secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 47. (3Q7. FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:E ED PUiP 3A'' TA4X
_ EVE
< 16% T i E 4 PER 0Ri
'HE ;0L_0WliG1 I: CST LEVEL <3L ' "EN P ERFORM TH E FOLLOW:: sG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                     APPROVED JAN 311969 B.O.S.R.
(0386E/0042E/042488)
APPROVED JAN 311969 B.O.S.R.


i REV. 1           REACTOR TRIP OR SAFETY INJECTION                                                 1BEP-0 WOG-1A                       UNIT 1
i REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1
{
{
l 1
l 1
STEF     ACTION /EXPEC 'ED RES:GN5E                                   RESPONSE NOT OSTAINED 25 CHECK RCS AVERAGE TEMPERATURE:
STEF ACTION /EXPEC 'ED RES:GN5E RESPONSE NOT OSTAINED 25 CHECK RCS AVERAGE TEMPERATURE:
i
i
: a. RCS average temperature -                           a. IF RCS temperature less STABLE AT OR TRENDING TO 557'F                             than 557'F and decreasing,                                           t THEN:
: a. RCS average temperature -
: a. IF RCS temperature less STABLE AT OR TRENDING TO 557'F than 557'F and decreasing, t
THEN:
1)'Stop dumping steam.
1)'Stop dumping steam.
: 2) IF cooldown continues, THEN maintain total feed flow greater than 500 GPM until SG narrow range level greater than 4% (34% FOR ADVERSE CNMT) in at least one SG.
: 2) IF cooldown continues, THEN maintain total feed flow greater than 500 GPM until SG narrow range level greater than 4% (34% FOR ADVERSE CNMT) in at least one SG.
Line 842: Line 1,216:
: 4) IF cooldown continues, THEN close MSIV and MSIV bypass valves.
: 4) IF cooldown continues, THEN close MSIV and MSIV bypass valves.
IF RCS temperature greater than 557'F and increasing, THEN dump steam to condenser:
IF RCS temperature greater than 557'F and increasing, THEN dump steam to condenser:
: 1) Check condenser available.
: 1) Check condenser available.
: 2) Place MS header pressure controller in MANUAL and reduce demand signal to zero.
: 2) Place MS header pressure controller in MANUAL and reduce demand signal to zero.
: 3) Place steam dumps mode selector switch in STEAM PRESSURE mode.
: 3) Place steam dumps mode selector switch in STEAM PRESSURE mode.
Step continued on next page i                                                                                                                               APPROVED FEB 011989 B.O.S.R.
Step continued on next page i
APPROVED FEB 011989 B.O.S.R.
(0304E/0035E/042088)
(0304E/0035E/042088)


L REV    .                      OPERATOR ACTION  
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOGI14                      FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHIN:,                                 RED PATH  
1BEP-F.0 L
REV FOR 1BEP-0 SERIES PROCEDURES WOGI14 TRIP RCPS WHIN:,
RED PATH  


==SUMMARY==
==SUMMARY==
          -o   CC water to RCP lost                       1. Suberiticality - NUCT.vAg (affected pumps only)                           POWER >5%
-o CC water to RCP lost
                            -OR-                                   -
: 1. Suberiticality - NUCT.vAg (affected pumps only)
o   Cnmt Phase B actuated                       2. Core cooling - CORE EXIT
POWER >5%
                            -OR-                               TCs >1200*F o   ALL of the following conditions exist:                                     3. Heat sink-Af1 SGs NR LEVEL < 4% (34*/._EO.R         '-
-OR-o Cnmt Phase B actuated
                -    Controlilen AGS couloown DEA               m cn5c uNM1i ,de luT/t in progress                               FEEDWATER FLOW (500 GPM
: 2. Core cooling - CORE EXIT
                                -AND                           AVAILABLE
-OR-TCs >1200*F o
* RCS pressure - 1Li10 PSIG
ALL of the following conditions exist:
                                -AND-                     4. Integrity - DECREASE
: 3. Heat sink-Af1 SGs NR LEVEL < 4% (34*/._EO.R Controlilen AGS couloown DEA m cn5c uNM1i,de luT/t in progress FEEDWATER FLOW (500 GPM
* High head SI pump flow indicator           >100*F IN LAST 60 MINUTES (IFI-917) >50 GPM flow or                 AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                   5. Containment - CaiI PRESSURE >SO PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,               IF CST _ EVE'_ <20%, '-EN Step 1, if:                                     CONSIDE RT   i E FOLLOWL s G:
-AND AVAILABLE RCS pressure - 1Li10 PSIG
o RCS subcooling - NOT ACCEPTABLE           o Makeup from MUDS or PER ICONIC DISPLAY OR                       radwaste                             .
-AND-
ATTACHMENT A                           o   Prepare to isolate
: 4. Integrity - DECREASE High head SI pump flow indicator
                              -OR-                             secondary supply side o   PZR level - CANNOT ,BE MAINTAINED           of 3 SGs
>100*F IN LAST 60 MINUTES (IFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
                    > 4% (38% FOR ADVERSE CNMT)           o   Crosstie unit's CST o   Reduce cooldown rate
: 5. Containment - CaiI PRESSURE >SO PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
* IF AUX :E ED OU'iP ")A" TA4K _EVEL
_ EVE'_ <20%, '-EN Step 1, if:
          < 16% T i E 9P ERFOR 1 'HE :0L _0 WING:           11: CST LEVEL <3%, " HEN P ERFORM TH E FOLLOW"NG:
CONSIDE RT i E FOLLOWL sG:
* Refill the day tank
o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT,BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate IF AUX
:E ED OU'iP ")A" TA4K
_EVEL
< 16% T i E 9P ERFOR 1
'HE :0L _0 WING:
11: CST LEVEL <3%, " HEN P ERFORM TH E FOLLOW"NG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                   APPROVED J M 3 1 1969 B. O. S. R.
(0386E/0042E/042488)
APPROVED J M 3 1 1969 B. O. S. R.


REV. 1             REACTOR TRIP OR SAFETY INJECTION                             1BEP-0 WOG-1A                           UNIT 1~
REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1~
STEP         ACTION / EXPECTED RES?Of.5E             RE?FONSE NOT OSTArNED Step 25a (continued) 4)' Adjust MS header pressure controller to initiate cooldown rate less than 50*F/Hr.
STEP ACTION / EXPECTED RES?Of.5E RE?FONSE NOT OSTArNED Step 25a (continued) 4)' Adjust MS header pressure controller to initiate cooldown rate less than 50*F/Hr.
E vneble to dump stew &
E vneble to dump stew &
condenser, THEN dump steam using SG PORVs.
condenser, THEN dump steam using SG PORVs.
26 CHECK PZR PORVS AND SPRAY VALVES:
26 CHECK PZR PORVS AND SPRAY VALVES:
: a. PORVs - CLOSED:                           a. E PZR pressure less than 2315 PSIG,
: a. PORVs - CLOSED:
* IRY455A                                 THEN manually close.
: a. E PZR pressure less than 2315 PSIG, IRY455A THEN manually close.
* 1RY456                                   PORVs.
1RY456 PORVs.
I_F any PORV can NOT be closed, THEN manually close its isol valve:
I_F any PORV can NOT be
o   1RY8000A (IRY455A) o   1RY8000B (IRY456)
: closed, THEN manually close its isol valve:
IF PORV isol valve can N6T be closed, THEN Go TO 1BEP-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step               i' 1.
o 1RY8000A (IRY455A) o 1RY8000B (IRY456)
: b. Normal PZR spray valves -             b. I_F PZR pressure less CLOSED:                                 than 2260 PSIG, THEN manually close valves:
IF PORV isol valve can N6T be closed, THEN Go TO 1BEP-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step i'
* 1RY455B
1.
* 1RY455C                             o E spray valve IRY455B can NOT be closed, THEN stop RCP 1D.
: b. Normal PZR spray valves -
APPROVED         o   E spray valve 1RY455C can NOT be closed, THEN stop RCP 1C.
: b. I_F PZR pressure less CLOSED:
fE8 011989 B.O.S.R.
than 2260 PSIG, THEN manually close valves:
Page 18 of 33                                             j (0304E/0035E/042088)                                                                           j
1RY455B 1RY455C o E spray valve IRY455B can NOT be closed, THEN stop RCP 1D.
APPROVED o
E spray valve 1RY455C can NOT be closed, fE8 011989 THEN stop RCP 1C.
B.O.S.R.
Page 18 of 33 j
(0304E/0035E/042088) j


e REV       1                       OPERATOC ACTION  
e REV 1
OPERATOC ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOG-1A                         FOR 1BEF-0 SERIES PROCEDURES TRIP RCPS WHEN:                                         RED PATH  
1BEP-F.0 WOG-1A FOR 1BEF-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o     CC water to RCP lort                             1. Suberiticality - NUCTTAR (aff ected pumps only)                               POWER >5%
o CC water to RCP lort
                                    -OR-o     Cnst Phase B actuated                           2. Core cooling - CORE EXIT
: 1. Suberiticality - NUCTTAR (aff ected pumps only)
                                    -OR-                                     TCs >1200*F-o     ALL of the following conditions exist:                                           3. Heat sink-ALL SGs NR
POWER >5%
                                      -                                        LEVEL (4% (34% FOR
-OR-o Cnst Phase B actuated
                                                                  ~
: 2. Core cooling - CORE EXIT
* controllud'RCb cooldown HQ1                       Auvtx3n CIid , mw moinu
-OR-TCs >1200*F-o ALL of the following conditions exist:
                          ~~ in progress                                       EEEDWATER FLOW <500 GPM
: 3. Heat sink-ALL SGs NR LEVEL (4% (34% FOR controllud'RCb cooldown HQ1 Auvtx3n CIid, mw moinu
                                          -AND                                 AVAILABLE
~
* RCS pressure - <1370 PSIG
~~ in progress EEEDWATER FLOW <500 GPM
                              .          -AND-                           4. Integrity - DECREASE
-AND AVAILABLE RCS pressure - <1370 PSIG
* High head SI pump flow indicator                 >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or
-AND-
                                                                    '~
: 4. Integrity - DECREASE
AND RCS COLD LEG <246',E SI pumps >100 GPM SI ACTUATION:                                         5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0,
.High head SI pump flow indicator
_ <20%,
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246',E
REACTOR TRIP OR SAFETY INJECTION,                     IF CST   _ EVE             FEN i E F0 _LOWL 13:
'~
Step 1, if:                                            CONSIDE  R o RCS,subcooling - NOT ACCEPTABLE               o Makeup from MUDS or PER ICONIC DISPLAY OR                             radwaste                           '
SI pumps >100 GPM SI ACTUATION:
ATTACHMENT A                                 o   Prepare to leolate
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
                                        -OR-                                   secondary supply side o   PZR level - CANNOT BE MAINTAINED                 of 3 SGs
_ EVE _ <20%,
                              > 4% (38% FOR ADVERSE CNMT)                 o   Crosstie unit's CST               i
FEN Step 1, if:
                                                        '""''            o Reduce cooldown r-ate
CONSIDE R
* IF AUX :E ED )UiP JA" TA4K _ EVE
' i E F0 _LOWL 13:
                    < 16% T i E VP ER:0Ri 'HE :0L _0WI il!'n F.          I: CST LEVEL <3%, THEN                 {
o RCS,subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
r                  P ERFORM TH E FOLLOWING.                 i
Prepare to leolate
* Refill the day tank
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST i
o Reduce cooldown r-ate IF AUX
:E ED )UiP JA" TA4K
_ EVE l!'n F.
< 16% T i E VP ER:0Ri
'HE :0L _0WI i I: CST LEVEL <3%, THEN
{
P ERFORM TH E FOLLOWING.
i r
Refill the day tank
: a. Verify seconfsry side of 3 SGs isolated
: a. Verify seconfsry side of 3 SGs isolated
: b. Switch AF suction to SX supply
: b. Switch AF suction to SX supply
                                                                                                                  )
)
l (Final)
l (Final)
(0386E/0042E/042488)                                                 APPROVED JAN 31869 B.O.S.R.
(0386E/0042E/042488)
APPROVED JAN 31869 B.O.S.R.
J
J


[
[
y 4
y 4
!~     ,
!~
i L-REVi 1-                                                                                                             1BEP-0 REACTOR TRIP OR SAFETY INJECTION WOG-1A-                                           UNIT 1
iL-REVi 1-REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A-UNIT 1
                                                                                                                      ~
~
STEP                         ACT ON/ EXPECTED RESPON5E                                       PESFONSE NOT OSTAiNED CAUTION Seal injection must be maintained to all RCPs to prevent seal damage due to overheating.
STEP ACT ON/ EXPECTED RESPON5E PESFONSE NOT OSTAiNED CAUTION Seal injection must be maintained to all RCPs to prevent seal damage due to overheating.
                                            ' Z/ 'CnEEk IF kLPS SHOULD 8E siOveED:
' Z/ 'CnEEk IF kLPS SHOULD 8E siOveED:
: a. ECCS flow:                                   a. GO TO Step 28.
: a. ECCS flow:
o   High head SI flow indicator (IFI-917) -
: a. GO TO Step 28.
o High head SI flow indicator (IFI-917) -
GREATER THAN 50 GPM
GREATER THAN 50 GPM
                                                                                                  -OR-o   Any SI pump discharge
-OR-o Any SI pump discharge
                                                                                      -flow (IFI-918/922) -
-flow (IFI-918/922) -
GREATER THAN 100 GPM
GREATER THAN 100 GPM
  .                                                                          b. RCS pressure - LESS THAN                     b. GO TO Step 28.
: b. RCS pressure - LESS THAN
: b. GO TO Step 28.
1370 PSIG
1370 PSIG
: c. Stop all'RCPs               , . . ,                    ,
: c. Stop all'RCPs
: d. Verify steam dumps in S M                   d. Perform the following:
: d. Verify steam dumps in S M
PRESSURE mode of operaflon                       1) Check condenser                                 ,
: d. Perform the following:
V                                            available.                     I
PRESSURE mode of operaflon
: 2) Place MS header                                   !
: 1) Check condenser V
pressure controller in           !
available.
MANUAL and reduce               I demand signal to zero.
I
: 2) Place MS header pressure controller in MANUAL and reduce demand signal to zero.
: 3) Place steam dumps mode selector switch in STEAM PRESSURE mode.
: 3) Place steam dumps mode selector switch in STEAM PRESSURE mode.
: 4) Adjust MS header pressure controller to         I maintain desired RCS temperature.
: 4) Adjust MS header pressure controller to I
APPROVED                   j j
maintain desired RCS temperature.
fEB 011989                 i B.O.S.R.
APPROVED j
j fEB 011989 B.O.S.R.
Page 19 of 33 (0304E/0035E/047088) 1 j
Page 19 of 33 (0304E/0035E/047088) 1 j


Line 960: Line 1,372:


==SUMMARY==
==SUMMARY==
1BEP-F.0 h*ik                                     FOR 1BEP-0 SERIES PROCEDURES RED PATH  
1BEP-F.0 h*ik FOR 1BEP-0 SERIES PROCEDURES M ' RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
M ' RCPS WHEN:
o CC water to RCP lost
o         CC water to RCP lost                             1. Subcriticality - NUCTTAR (affected pumps only)                               POWER >5%
: 1. Subcriticality - NUCTTAR (affected pumps only)
                                        -OR-o         Cnmt Phase B actuated                             2. Core cooling - CORE EXIT
POWER >5%
                                        -OR-                               TCs >1200'F-o         ALL of the following conditions exist:           ....                            3. Heat sink-ATL SGs NR LEVEL <4%.(.34% FOR.,           .
-OR-o Cnmt Phase B actuated
* Csat.rolted Es esvAduwe M                 ALva3E onrIT + .uis TL,.aL in progress                                 FrrnWATER FLOW <500 GPM
: 2. Core cooling - CORE EXIT
                                                -AND                         AVAILABLE
-OR-TCs >1200'F-o ALL of the following conditions exist:
* RCS pressure - <1370 PSIG
: 3. Heat sink-ATL SGs NR LEVEL <4%.(.34% FOR.,
                                                -AND-                     4. Integrity - DECREASE
Csat.rolted Es esvAduwe M ALva3E onrIT +.uis TL,.aL in progress FrrnWATER FLOW <500 GPM
* High head SI pump flow indicator             >100*F IN LAST 60 MINUTES (1FI-917).>50 GPM flow or                   AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                               5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO IBEP-0, REACTOR TRIP OR SAFETY INJECTION,                           IF CST   _ EVE L <20%,     JEN Step 1, if:                                                 CONSIDE   R     i E F0_ LOW:: s G:
-AND AVAILABLE RCS pressure - <1370 PSIG
o RCS subcooling - NOT ACCEPTABLE                 o Makeup from MUDS or PER ICONIC DISPLAY OR                         radwaste ATTACHMENT A                           o   Prepare to isolate
-AND-
                                              -OR-                             secondary supply side o         PZR level - CANNOT BE MAINTAINED             of 3 SGs
: 4. Integrity - DECREASE High head SI pump flow indicator
                                  > 4% (38% FOR ADVERSE CNMT)             o     Crosstie unit's CST o     Reduce cooldewn rate
>100*F IN LAST 60 MINUTES (1FI-917).>50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
* IF AUX               :E'ED ) UMP DA" TA4K _ EVE _
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO IBEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
              < 16% T             i E 4P ERFOR1 'HE :0L _0WI 4G:           1: CST LEVEL <3%,         J EN P ERFORM TH E FOLLOW:: s G:
_ EVE L <20%,
* Refill the day tank
JEN Step 1, if:
CONSIDE R i E F0_ LOW:: sG:
o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldewn rate
* IF AUX
:E'ED
) UMP DA" TA4K
_ EVE
< 16% T i E 4P ERFOR1
'HE :0L _0WI 4G:
1: CST LEVEL <3%,
J EN P ERFORM TH E FOLLOW:: sG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                               APPROVED l                                                                               m 3 1 1989
(0386E/0042E/042488)
!                                                                                s.o.s.n.
APPROVED l
m 3 1 1989 s.o.s.n.
u _ __ _
u _ __ _


i REV. 1                 REACTOR TRIP OR SAFETY INJECTION                 1BEP-0 WOG-1A                             UNIT 1 STEP           ACTION / EXPECTED FIS ON5E                 PEEFONSE NOT OST A,NED 28       CHECK IF SG(s) SECONDARY PRESSURE BOUNDARIES ARE INTACT:
i REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED FIS ON5E PEEFONSE NOT OST A,NED 28 CHECK IF SG(s) SECONDARY PRESSURE BOUNDARIES ARE INTACT:
: a. Check pressures in all SGs:                 a. GO TO 1BEP-2, FAULTED STEAM GENERATOR ISOLATION, l                         o NO SG PRESSURE DECREASING               Step 1.
: a. Check pressures in all SGs:
IN AN UNCONTROLLED MANNER-u NO SG CO/IPLETELY
: a. GO TO 1BEP-2, FAULTED STEAM GENERATOR ISOLATION, l
o NO SG PRESSURE DECREASING Step 1.
IN AN UNCONTROLLED MANNER-
{
{
D_ PRESSURIZED 29         CHECK IF SG TUBES ARE INTACT:                 GO TO IBEP-3, STEAM GENERATOR TUBE RUPTURE, l                   o       SJAE/ Gland Steam Exhaust Gas         Step 1.
u NO SG CO/IPLETELY D_ PRESSURIZED 29 CHECK IF SG TUBES ARE INTACT:
GO TO IBEP-3, STEAM GENERATOR TUBE RUPTURE, l
o SJAE/ Gland Steam Exhaust Gas Step 1.
radiation - LESS THAN ALERT ALARM SETPOINT:
radiation - LESS THAN ALERT ALARM SETPOINT:
* IPR 27J Grid 1 1PS127 l                     o       SG Blowdown Liquid radiation -
IPR 27J Grid 1 1PS127 l
o SG Blowdown Liquid radiation -
LESS THAN ALERT ALARM SETPOINT:
LESS THAN ALERT ALARM SETPOINT:
* IPR 08J Grid 1 1PS108 l                     o       Main Steamline radiation -
IPR 08J Grid 1 1PS108 l
o Main Steamline radiation -
LESS THAN ALERT ALARM SETPOINT:
LESS THAN ALERT ALARM SETPOINT:
* Main Steamline IA, MSIV Rm:
Main Steamline IA, MSIV Rm:
* 1RT-AR022 Grid 1 4AA122
1RT-AR022 Grid 1 4AA122 1RT-AR023 Grid 1 4AA123 e
* 1RT-AR023 Grid 1 4AA123 e Main Steamline IB, MSIV Rm:
Main Steamline IB, MSIV Rm:
e   IRT-AR022 Grid 1 4AB222
e IRT-AR022 Grid 1 4AB222 1RT-AR023 Grid 1 4AB223 Main Steamline IC, MSIV Rm:
* 1RT-AR023 Grid 1 4AB223
1RT-AR022 Grid 1 4AC322 1RT-AR023 Grid 1 4AC323 Main Steamline 1D, MSIV Rm:
* Main Steamline IC, MSIV Rm:
APPROVED 1RT-AR022 Grid 1 4AD422 1RT-AR023 Grid 1 4AD423 f[6 01 1969 B.O.S.R.
* 1RT-AR022 Grid 1 4AC322
* 1RT-AR023 Grid 1 4AC323
* Main Steamline 1D, MSIV Rm:
APPROVED
* 1RT-AR022 Grid 1 4AD422
* 1RT-AR023 Grid 1 4AD423                       f[6 01 1969 B.O.S.R.
(0304E/0035E/042088)
(0304E/0035E/042088)


REV     1                       OPERATOR ACTION  
REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 l                     WOG-1A                         FOR 1BEP-0 SERIES PROCEDURES 1
1BEP-F.0 l
TRIP RCPS WHEN:                                 RED PATH  
WOG-1A FOR 1BEP-0 SERIES PROCEDURES 1
TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                         1. Suberiticality - NUCLFAR (affected pumps only)                           POWER 35%
o CC water to RCP lost
\                                        -OR-                               ~
: 1. Suberiticality - NUCLFAR (affected pumps only)
l                     o   Cnet Phase B actuated                       2. Core cooling - CORE EXIT
POWER 35%
                                        -OR-                               TCs >1200'F o   ALL of the following conditions exist:                                       3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR 6    Cst." :;Jtied ACs vvido-a IiiI ~ '         c ?'LE T2...T: /1_ JOTI-       -
-OR-
in progress                                 EEEDWATER. FLOW <500 GPM
~
                                              -AND                         .AYelLABLE
\\
* RCS pressure - (1370 PSIG
l o
                                              -AND-                     4. Integrity - DECREASE
Cnet Phase B actuated
* High hea. JI pump flow indicator             >100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or                   AND RCS COLD LEG <246'F SI pumps >100 GPM SI ACTUATION:                                     5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                 IF CST   _EV E'_ <20%, 'i:EN Step 1, if:                                       CONSIDE RT i E FOLLOWL 4G:
: 2. Core cooling - CORE EXIT
o RCS subcooling - NOT ACCEPTABLE           o Makeup from MUDS or PER ICONIC DISPLAY OR                       radwaste
-OR-TCs >1200'F o
                              . ATTACHMENT A                             o   Prepare to isolate
ALL of the following conditions exist:
                                          -OR-                               secondary supply side o   PZR level - CANNOT BE MAINTAINED             of 3 SGs
: 3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR Cst." :;Jtied ACs vvido-a IiiI ~ '
                                  > 4% (38% FOR ADVERSE CNMT)           o   Crosstie unit's CST o   Reduce cooldown rate
c ?'LE T2...T: /1_ JOTI-6 in progress EEEDWATER. FLOW <500 GPM
* IF AUX     :EED 3 UMP 3A" TA4K LEVEL
-AND
                      < 16% T i E 9P ERFORi HE :0L_0 WING 1             l': CST LEVEL <3%, 'iEN P ER :0RM TH E FOLLOWL 4G:
.AYelLABLE RCS pressure - (1370 PSIG
* Refill the day tank
-AND-
: 4. Integrity - DECREASE High hea. JI pump flow indicator
>100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246'F SI pumps >100 GPM SI ACTUATION:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_EV E'_ <20%,
'i:EN Step 1, if:
CONSIDE RT i E FOLLOWL 4G:
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste
. ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:EED 3 UMP 3A" TA4K LEVEL
< 16% T i E 9P ERFORi HE
:0L_0 WING 1 l': CST LEVEL <3%,
'iEN P ER :0RM TH E FOLLOWL 4G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply J
: b. Switch AF suction to SX supply J
(Final)
(Final)
(0386E/0042E/042488)                                     APPROVED JAN 31 M49 B.O.S.R.
(0386E/0042E/042488)
APPROVED JAN 31 M49 B.O.S.R.
l
l


lh REV. 1               REACTOR TRIP OR SAFETY INJECTION                           1BEP-0 WOG-1A                             UNIT 1 STEP         ACTION / EXPECTED RE3:GN5E             PESPONSE NOT OBTAINED 30   CHECK IF RCS IS INTACT:                     GO TO 1BEP-1, LOSS'OF REACTOR OR SECONDARY COOLANT, Step 1.
lh REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED RE3:GN5E PESPONSE NOT OBTAINED 30 CHECK IF RCS IS INTACT:
l     o     Cnmt radiation monitors - LESS THAN ALERT ALARM SETPOINTS:
GO TO 1BEP-1, LOSS'OF REACTOR OR SECONDARY COOLANT, Step 1.
* Cnmt area monitors:
l o
* 1RT-AR014 Grid 4 4AS101 o'   1RT-AR014 Grid 4 4AS202
Cnmt radiation monitors - LESS THAN ALERT ALARM SETPOINTS:
* IRT-ARO14 Grid 4 4AS303
Cnmt area monitors:
* 1RT-AR011 Grid 4 4AS111
1RT-AR014 Grid 4 4AS101 o'
* 1RT-AR012 Grid 4 4AS112
1RT-AR014 Grid 4 4AS202 IRT-ARO14 Grid 4 4AS303 1RT-AR011 Grid 4 4AS111 1RT-AR012 Grid 4 4AS112 1RT-AR020 Grid 4 4AS120 1RT-AR021 Grid 4 4AS121 i
* 1RT-AR020 Grid 4 4AS120 1RT-AR021 Grid 4 4AS121 i     o     Cnmt pressure - LESS THAN 3.4 PSIG l'     o     Cnmt recirc sump' levels - NORMAL:
o Cnmt pressure - LESS THAN 3.4 PSIG l'
* Cnmt sump levels indicator lights - NOT LIT:
o Cnmt recirc sump' levels - NORMAL:
* ILL-SIO75A
Cnmt sump levels indicator lights - NOT LIT:
* ILL-SIO75B APPROVED FEB 011989-B.O.S.R.
ILL-SIO75A ILL-SIO75B APPROVED FEB 011989-B.O.S.R.
Page .21 o'f 33 (0304E/0035E/042088)                                   ,
Page.21 o'f 33 (0304E/0035E/042088) i
i


REV 'l                                   OPERATOR ACTION  
REV 'l OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOG-1A                                 FOR 1BEP-0 SERIES PROCEDURES
1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES
                                                            ^
^
TRIP RCPS WHEii:                                               RED PATH  
TRIP RCPS WHEii:
RED PATH  


==SUMMARY==
==SUMMARY==
o             CC water to RCP icst                             1. Subcriticality - NUCT. EAR (affecte.d pumps only)                               POWER >5%
o CC water to RCP icst
                                        -OR-o             Cnst Phase B actuated                             2. Core cooling - CORE EXIT
: 1. Subcriticality - NUCT. EAR (affecte.d pumps only)
                                        -OR-                                       TCs >l200*F o             ALL of the following conditions exist:                                           3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR
POWER >5%
                                .~.CC1 Lea RCS c:~.1 an C                         .0 . 1SL 2 2:' % :^T_7**
-OR-o Cnst Phase B actuated
in progress                                       EEEDWATER FLOW <500 GPM
: 2. Core cooling - CORE EXIT
                                                -AND                               AVAILABMC
-OR-TCs >l200*F o
* RCS pressure - <1370 PSIG
ALL of the following conditions exist:
                                                -AND-                         4. Integrity - DECREASE
: 3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR
* High head SI pump flow indicator                   >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                         AND RCS COLD LEG <246*F SI pumps >100 GPM' SI ACTUATION:                                                   5   Containment - CNMT EELGURE >50 PSIG Actuate SI and GO TO 1BEP-0                                                         '
.~.CC1 Lea RCS c:~.1 an C
REACTOR TRIP OR' SAFETY INJECTION,                             JF CST                     EN Step 1, if:                                                     CONSIDE     V:i.(20%,
.0. 1SL 2 2:' % :^T_7**
l F0 _LOWL' sG:              "
in progress EEEDWATER FLOW <500 GPM
o RCS succooling - liOT ACCEPTABLE                 o   Makeup from MUDS or PER ICONIC DISPLAY OR                             radwaste ATTACHMENT A                                   o Prepare to isolate
-AND AVAILABMC RCS pressure - <1370 PSIG
                                              -OR-                                 secondary supply side o   PZR level - CANNOT BE MAINTAINED                   of 3 SGe
-AND-
                                > 4% (38% FOR. ADVERSF,,.QMU                   o   Crosstie unit's CST o   Reduce cooldown rate
: 4. Integrity - DECREASE High head SI pump flow indicator
* IF AUX :EED ) UMP DA" TANK _ EVE,
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM' SI ACTUATION:
              < 16% T i E 4P ERFORi 'HE FOL _0W1 4G:                           I: CST LEVEL <3%, '       EN P ERFORM TH E FOLLOWL NG:
5 Containment - CNMT EELGURE >50 PSIG Actuate SI and GO TO 1BEP-0 V:i.(20%, '
* Refill the day tank
EN REACTOR TRIP OR' SAFETY INJECTION, JF CST l
F0 _LOWL sG:
Step 1, if:
CONSIDE o
RCS succooling - liOT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGe
> 4% (38% FOR. ADVERSF,,.QMU o
Crosstie unit's CST o
Reduce cooldown rate IF AUX
:EED
) UMP DA" TANK
_ EVE,
< 16% T i E 4P ERFORi
'HE FOL _0W1 4G:
I: CST LEVEL <3%, '
EN P ERFORM TH E FOLLOWL NG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply
: b. Switch AF suction to SX supply
                                                                                                                              )
)
l l
l l
4 (Final)                                                         1 (0386E/0042E/042488)                                                     APPROVED                                 !
4 (Final) 1 (0386E/0042E/042488)
                                                                                    .J u 3 1 1969 B.O.S.R.
APPROVED
                                                                                                                              )
.J u 3 1 1969 B.O.S.R.
i
)
_ _ -          __ - __ _                                                                                                  i
i i


l                               -
l c
c                                                                         .
REV. 1 REACTOR TRIP OR SAFETY LJJECTION 1BEP-0 WOG-1A UNIT 1 i
REV. 1                     REACTOR TRIP OR SAFETY LJJECTION                                                             1BEP-0 WOG-1A                                   UNIT 1 i
' STEP ACTION / EXPECTED RESPON5E
                ' STEP           ACTION / EXPECTED RESPON5E                                 ~E?FONSE NOT OSTA NED 31       CHECK IF ECCS FLOW SHOULD BE TERMINATE       ):
~E?FONSE NOT OSTA NED 31 CHECK IF ECCS FLOW SHOULD BE TERMINATE ):
: a. Check RCS subcooling                                 a. DO NOT STOP ECCS. pumps.
: a. Check RCS subcooling
ACCEPTABLE per:                                         GO TD Step 33.
: a. DO NOT STOP ECCS. pumps.
o ICONIC DISPLAY
ACCEPTABLE per:
                                            -OR-o ATTACHMENT A
GO TD Step 33.
: b. Secondary heat sink:-                                 b. IF neither condition iidtisfied,                                             .
o ICONIC DISPLAY
Total feed flow to SGs -                             THEN DO NOT STOP ECCS GREATER THAN 500 GPM                                 PUMPS.                                   GD To Step 33.
-OR-o ATTACHMENT A
: b. Secondary heat sink:-
: b. IF neither condition iidtisfied, o
Total feed flow to SGs -
THEN DO NOT STOP ECCS GREATER THAN 500 GPM PUMPS.
GD To Step 33.
AVAILABLE
AVAILABLE
                                                  -OR-o Narrow range level in at least one SG - GREATER THAN 4%                                                                                                           ,
-OR-o Narrow range level in at least one SG - GREATER THAN 4%
: c. T.CS pressure - STABLE OR
: c. T.CS pressure - STABLE OR
                                                    ~
: c. DO NOT STOP ECCS PUMPS-INCREASING
: c. DO NOT STOP ECCS PUMPS-INCREASING                                               Go TD Step 33.
~
: d. PZR level - GREATER THAN 4%                           d. DO NOT STOP ECCS PUMPS.
Go TD Step 33.
: d. PZR level - GREATER THAN 4%
: d. DO NOT STOP ECCS PUMPS.
RETOTifi TO Step 31a.
RETOTifi TO Step 31a.
32       GO TO 1BEP ES-1.1, SI TERMINATION, STEP 1 33       INITLATE MONlTORING OF' CRITICAL SAFE"Y FUNCT :0N STATUS TREES APPROVED FEB 011989 B.O.S.R.
32 GO TO 1BEP ES-1.1, SI TERMINATION, STEP 1 33 INITLATE MONlTORING OF' CRITICAL SAFE"Y FUNCT :0N STATUS TREES APPROVED FEB 011989 B.O.S.R.
                                                                        ~
~
Page 22 cf 33 (0304E/0035E/042088)
Page 22 cf 33 (0304E/0035E/042088)


REV 1                         OPERtTOR ACTION  
REV 1
OPERtTOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 -
1BEP-F.0 WOG-1A FOR 1BLP-0 SERIES PROCEDURES 1
WOG-1A                       FOR 1BLP-0 SERIES PROCEDURES 1
l TRIP RCPS WHEN:
l           TRIP RCPS WHEN:                                 RED PATH  
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to'RCP lost                       1. Subcriticality - NUCTIAR .
o CC water to'RCP lost
(affected pumps only)                           POWER 351
: 1. Subcriticality - NUCTIAR.
                            -OR-o   Cnmt Phsse B actuated                       2. Core cooling - CORE EXII
(affected pumps only)
                            -OR-                                 TCs >12( 3'F o   ALL. of the following conditions exfe :                                     3. Heat sink-ALL SGa_HE_
POWER 351
                              ~                                  LEVEL.<4% (34% FOR-
-OR-o Cnmt Phsse B actuated
* Cvut.tvlA.a how co..adurr !!QI               . uNE .J O. _ _ * . .iik T 'T_'
: 2. Core cooling - CORE EXII
in progress                                 EEERW&TER FLOW <500 GPM
-OR-TCs >12( 3'F o
                                  -AND                           AY).ILABLE
ALL. of the following conditions exfe :
* RCS pressure - <1370 PSIG
: 3. Heat sink-ALL SGa_HE_
                                  -AND-                       4. Integrity - DECREASE _
LEVEL.<4% (34% FOR-
* High head SI pump flow indicator             >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                   6ND RCS COLD LEG <246*F SI pumps >>100 GPM SI ACTUATION:                                   5. Containment - CNMT PRESSURE >56 PSIG Actuate Si and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                       T LEVE _ <20%,               -EN Step 1, if:                                             DERT i E F0_LOWL s G:
~
o RCS subcooling - NOT ACCEPTABLE           o   Makeup from MUDS or EER ICONIC' DISPLAY OR                       radwaste ATTACHMENT A                             o   Prepare to isolate
Cvut.tvlA.a how co.adurr !!QI
                                -OR-                               secondary supply side o PZR level - CANNOT BE_MAIETAINED             of 3 SGs
. uNE.J O. _ _ *..iik T 'T_'
                      > 4% (38% FOR ADVERSE *;NMT)           o   Crosstie unit's CST o   Reduce cooldown rate
in progress EEERW&TER FLOW <500 GPM
* IF AUX :EED')UiP JA" TA4K _EVEL
-AND AY).ILABLE RCS pressure - <1370 PSIG
            < 16% T i E 4P ER :0R 1 'HE :0L _0 WING"         IF CST LEVEL <3%, " FEN PERFORM TH E FOLLOWTIS.                            .
-AND-
I
: 4. Integrity - DECREASE _
* Refill the day tank
High head SI pump flow indicator
>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or 6ND RCS COLD LEG <246*F SI pumps >>100 GPM SI ACTUATION:
: 5. Containment - CNMT PRESSURE >56 PSIG Actuate Si and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, T
LEVE _ <20%,
-EN Step 1, if:
DERT i E F0_LOWL sG:
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or EER ICONIC' DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE_MAIETAINED of 3 SGs
> 4% (38% FOR ADVERSE *;NMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX :EED')UiP JA" TA4K
_EVEL
< 16% T i E 4P ER :0R 1
'HE :0L _0 WING" IF CST LEVEL <3%, " FEN PERFORM TH E FOLLOWTIS.
I Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suctice to SX supply (Final)
: b. Switch AF suctice to SX supply (Final)
(0386E/0042E/042488)                                     APPROVED JM 311969 B.O.S.R.
(0386E/0042E/042488)
APPROVED JM 311969 B.O.S.R.


_---_-----__----------y REV. 1           REACTOR TRIP-OR SAFETY INJECTION                                     1BEP-0 WOG-1A                           UNIT 1 i
_---_-----__----------y REV. 1 REACTOR TRIP-OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 i
STEP.     ACTION / EXPECTED RES?ON5E                                   PE?FONSE NOT USTA NED CAUTION Alternate water sources for AF pumps will be necessary if CST level decreases to LESS THAN 3%.
STEP.
as   OjEu $G LEVEL 5:
ACTION / EXPECTED RES?ON5E PE?FONSE NOT USTA NED CAUTION Alternate water sources for AF pumps will be necessary if CST level decreases to LESS THAN 3%.
: a. Narrow range level - GREATER           a. Maintain total feed flow THAN 4%                                           greater than 500 GPM until
as OjEu $G LEVEL 5:
              .                                                        narrow range level i.s greater than d in'at least one SG.
: a. Narrow range level - GREATER
: b. Control feed flow to maintain           b. IF narrow range level in narrow. range level'- BETWEEN 4%                   any SG continues to AND 50%                                             increase in an uncontrolled manner,
: a. Maintain total feed flow THAN 4%
* THEN GO TO 1BEP-3, STEAM GENERATOR TUBE RUPTURE,
greater than 500 GPM until narrow range level i.s greater than d in'at least one SG.
                  .                                                      Step 1.
: b. Control feed flow to maintain b.
                                            .                                                                          i APPROVED FEB 01.1989.
IF narrow range level in narrow. range level'- BETWEEN 4%
any SG continues to AND 50%
increase in an uncontrolled
: manner, THEN GO TO 1BEP-3, STEAM GENERATOR TUBE RUPTURE, Step 1.
i APPROVED FEB 01.1989.
s.o.S.R.
s.o.S.R.
(0304E/0035E/042088)                                                                                         >
(0304E/0035E/042088)
{
{L-__-__-__-_
L-__-__-__-_


I'
I'
      \
\\
Cd REV             1 OPERATOR ACTION SI iMARY                         'B60-F.0 .
Cd REV 1
WOGilA                                                           FOR 1BEP-0 SERIES Ph0CEDURES TRIP RCPS WHEN:                                                                     RED PATH  
OPERATOR ACTION SI iMARY
'B60-F.0 WOGilA FOR 1BEP-0 SERIES Ph0CEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o       CC water to RCP lost                                                       1. Subericicality - NUCT.FAR (affected pumps only)                                                           POWER >5%
o CC water to RCP lost
                                                                  -OR-0       Cnat Phase B actuated                                                       2. Cere cooling - CORE EXII
: 1. Subericicality - NUCT.FAR (affected pumps only)
                                                                  -OR-                                           TCs >1200*E   .
POWER >5%
o      ALL of the following conditions exist:                                                                     3. Heat sink-ALL SGs NR
-OR-0 Cnat Phase B actuated
                                                                  ,- .                                                      4 IdYEL__L_'L(34%       FOR .
: 2. Cere cooling - CORE EXII
* Lati..'o'.ied RCO cuo2uc .. Lua --                  -
-OR-TCs >1200*E o
                                                                                                                    ^':. m . C MT' ANL ICT~ .
ALL of the following conditions exist:
in progress                                               FERDWATER FLOW (500 GPM
: 3. Heat sink-ALL SGs NR IdYEL__L_'L(34% FOR.
                                                                                    -AND                           AVAILABLE
4 Lati..'o'.ied RCO cuo2uc.. Lua --
* RCS pressure - <1370 PSIG
^':. m. C MT' ANL ICT~.
                                                                                    -AND-                     4   Integrity - DECREASE
in progress FERDWATER FLOW (500 GPM
* High head SI pump flow indicator                           >100'F IN LASt 60 MINUTES (lFI-917) >50 GPM flow or                                 AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                                                         5. Containment - CRiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEF-0 REACTOR TRIP OR SAFETY INJECTION,                                                     IF CST LEVE_ <20%,           JEN Step 1, if:
-AND AVAILABLE RCS pressure - <1370 PSIG
                                                                                ~
-AND-4 Integrity - DECREASE High head SI pump flow indicator
CONSIDER T   i E   F0'_LOWL N G:
>100'F IN LASt 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
o                   RCS subcooling - NOT ACCEPTABLE                       o Makeup from MUDS or PER ICONIC DISPLAY OE                                       radwaste ATTACHMENT A                                           o   Prepare to isolate
: 5. Containment - CRiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEF-0 REACTOR TRIP OR SAFETY INJECTION, IF CST LEVE_ <20%,
                                                                                  -OR-                             secondary supply side o                   PZR level - CANHOT BE MAINTAINED                           of 3 SGs
JEN Step 1, if:
                                                        > 4% (38% FOR ADVERSE CNMT)                   *s       o   Crosstie unit's CST o . Reduce cooldown rate
~
* IF AUX :E'ED )U'iP JAY TAVK _ EVE'_fr,, y
CONSIDER T i E F0'_LOWL N G:
                          < 16% T i E 9P ER:0R i THE :0L _0WI G-                                               I: CST LEVEL <3%, T JEN
o RCS subcooling - NOT ACCEPTABLE o
                                                                                                '              P ERFORM TH   E FOLLOWI NG:
Makeup from MUDS or PER ICONIC DISPLAY OE radwaste ATTACHMENT A o
* Refill the day tank
Prepare to isolate
-OR-secondary supply side o
PZR level - CANHOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT)
*s o
Crosstie unit's CST o. Reduce cooldown rate IF AUX
:E'ED )U'iP JAY TAVK _ EVE'_fr,, y
< 16% T i E 9P ER:0R i THE :0L _0WI G-I: CST LEVEL <3%, T JEN P ERFORM TH E FOLLOWI NG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/% 488)                                                                             gpp         g JAN 311969 B.O.S.R.
(0386E/0042E/% 488) gpp g
JAN 311969 B.O.S.R.


REV. 1               REACTOR TRIP OR SAFETY INJECTION                                               1BEP-0
REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0
                          'WOG-1A                             UNIT 1
'WOG-1A UNIT 1
                          -5TEF         ' ACTION / EXPECTED DES GN5E                           PESPONSE NOT OST AINE.                   l CAUTION Following SI reset., automatic SI will NOT occur, until reactor trip breakers have been. cycled.
-5TEF
' ACTION / EXPECTED DES GN5E PESPONSE NOT OST AINE.
l CAUTION Following SI reset., automatic SI will NOT occur, until reactor trip breakers have been. cycled.
CAUTION If offsite power is lost after SI reset, then manual action may be required to restart safeguards.-
CAUTION If offsite power is lost after SI reset, then manual action may be required to restart safeguards.-
equipment.
equipment.
35' RESET SI:                                     Reset SI per 1 BOA PRI-5, CONTROL ROOM INACCESSIBILITY,
35' RESET SI:
: a. Depress both SI reset                     ATTACHMENT r..
Reset SI per 1 BOA PRI-5, CONTROL ROOM INACCESSIBILITY,
: a. Depress both SI reset ATTACHMENT r..
pushbuttons
pushbuttons
: b. Verify SI ACTUATED permissive light - NOT LIT
: b. Verify SI ACTUATED permissive light - NOT LIT
: c. Verify AUTO SI LLOCKED" " 'y permissivelight-LITf..f         -
: c. Verify AUTO SI LLOCKED" " 'y permissivelight-LITf..f d
d APPROVED
APPROVED I
                      '                                                                                                                  I FEB 01 1989 B.O.S.R.
FEB 01 1989 B.O.S.R.
U (0304E/0035E/042088)                                       .___- ___-__________ _ - - - -
U (0304E/0035E/042088)


y
y
        'REV 1                                       . OPERATOR ACTION-
'REV 1
. OPERATOR ACTION-


==SUMMARY==
==SUMMARY==
1BEP-F.0-WOG11A                                     FOR 1BEP-0 SERIES PROCEDURES TRIP R' CPS WHEN:                                               RED PATH  
1BEP-F.0-WOG11A FOR 1BEP-0 SERIES PROCEDURES TRIP R' CPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o' .CC water to RCP lost                                       1. Suberiticality - NUCT FAR -
o'
(affected pumps only)                                         POWER >5%
.CC water to RCP lost
                                -OR-o   'Cnet Phase B actuated                                     2. Core cooling - CORE EXIT
: 1. Suberiticality - NUCT FAR -
                                -OR-                                         TCs >1200*F o     ALL of.the following cond.itions exist:                                                   3. Heat sink-AT T. SGs NR IJLVEL ^*L .Q_4% F0lt ,
(affected pumps only)
* ControIlied KCSiooAdowr H21                               L.ME'Cm , es .9TAL
POWER >5%
                    'in progress                                               FREDWATER FLOW <500 GPM
-OR-o
                                        -AND                                 AVAILABLE
'Cnet Phase B actuated
                *  .RCS pressure - <1370 PSIG
: 2. Core cooling - CORE EXIT
                                          -AND-                           4. Integrity - DECREASE'
-OR-TCs >1200*F o
* High head SI' pump flow indicator                         >100*F'IN LAS? 60 MINUTES
ALL of.the following cond.itions exist:
                    .(1FI-917) >50 GPM flow or                                 AND RCS COLD LEG <246'T SI. pumps >100 GPM
: 3. Heat sink-AT T. SGs NR IJLVEL
        'SI' ACTUATION:                                                 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                                       T _ EVE _ <20%, T1EN Step 1, if:                                                             DE R TH E F0_LOWI G:
^*L.Q_4% F0lt,
o RCS subcooling - NOT ACCEPTABLE                         o Makeup from MUDS or PER ICONIC DISPLAY OR                                     radwaste ATTACHMENT A                                         o     Prepare to isolate
ControIlied KCSiooAdowr H21 L.ME'Cm, es.9TAL
                                    -OR-                                       secondary supply side o   PZR level - CANNOT BE MAllTAINED                           of 3 SGs
'in progress FREDWATER FLOW <500 GPM
                    > 4% (38% FOR ADVERSE CNMT)                         o     Crosstie unit's CST o     Reduce cooldown r-ate
-AND AVAILABLE
* IF AUX :E ED )UiP DA" TA4K _ EVE.
.RCS pressure - <1370 PSIG
          < 16% Ti E 4P ER :0Ri 'HE 0L _0WI 4G:                           I : CST LEV EL <3%, ~ ENL P ERFORM TH E FOLLOWL s G:
-AND-
* Refill the day tank
: 4. Integrity - DECREASE' High head SI' pump flow indicator
>100*F'IN LAS? 60 MINUTES
.(1FI-917) >50 GPM flow or AND RCS COLD LEG <246'T SI. pumps >100 GPM
'SI' ACTUATION:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, T
_ EVE _ <20%, T1EN Step 1, if:
DE R TH E F0_LOWI G:
o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAllTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown r-ate IF AUX
:E ED )UiP DA" TA4K
_ EVE.
< 16% Ti E 4P ER :0Ri
'HE 0L _0WI 4G:
I : CST LEV EL <3%, ~
L EN P ERFORM TH E FOLLOWL sG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply i
: b. Switch AF suction to SX supply i
(Final)
(Final)
(0386E/0042E/042488)                                                   APPROVED         .
(0386E/0042E/042488)
JM 311969 8.O.S.R.
APPROVED JM 311969 8.O.S.R.


REV. 1             REACTOR TRIP OR SAFETY INJECTION                                     1BEP-0 WOG-1A-                         UNIT 1 STEP       ACTION / EXPECTED RESPON5E                                 RESPONSE NOT OSTAINED -
REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A-UNIT 1 STEP ACTION / EXPECTED RESPON5E RESPONSE NOT OSTAINED -
36 RESET CONTAINMENT ISOLATION:
36 RESET CONTAINMENT ISOLATION:
: a. Reset Cnmt Isol Phase A               a. Reset per 1 BOA PRI-5, CONTROL ROOM INACCESSIBILITY, ATTACHMENT E.
: a. Reset Cnmt Isol Phase A
: b. Reset Cnmt Isol Phase B               b. Reset per.IBOA PRI-5.                         ,
: a. Reset per 1 BOA PRI-5, CONTROL ROOM INACCESSIBILITY, ATTACHMENT E.
: b. Reset Cnmt Isol Phase B
: b. Reset per.IBOA PRI-5.
CONTROL ROOM l
CONTROL ROOM l
3 ACCESSIBILITY ATTACHMENT E.
3 ACCESSIBILITY ATTACHMENT E.
: c. Reset Cnnt Vent Isol
: c. Reset Cnnt Vent Isol
: d. Check SAC run lights - ANY LIT         d. Start one SAC per BOP SA-1, STARTUP AND OPERATION OF THE SAC's.
: d. Check SAC run lights - ANY LIT
: d. Start one SAC per BOP SA-1, STARTUP AND OPERATION OF THE SAC's.
: e. Open Cnmt instrument air
: e. Open Cnmt instrument air
                                                          . isol valves:
. isol valves:
* IIA 065                                                                       .
IIA 065 IIA 066
* IIA 066
: f. Open Cnmt fire protection isol valve:
: f. Open Cnmt fire protection isol valve:
* 1FP010 APPROVED FEB 01.1989 B.O.S.R.
1FP010 APPROVED FEB 01.1989 B.O.S.R.
Page 25 of 33 (0304E/0035E/042088)
Page 25 of 33 (0304E/0035E/042088)


REV. 1                                                           OPERATOR ACTION  
REV. 1 OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
l'1P-F.0
l'1P-F.0 WOG-1A F0R 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
            .        WOG-1A                                                     F0R 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                                                         RED PATH  
RED PATH  


==SUMMARY==
==SUMMARY==
o       CC water to RCP lost                                                             1. Suberiticality'- NUCLEAR (affected pumps only)                                                               PfWES.2.51
o CC water to RCP lost
                                                      -LR-o       Cnet Phase B actuated                                                           2. Core cooling - CORE EXIT
: 1. Suberiticality'- NUCLEAR (affected pumps only)
                                                      -OR-                                                         TCs >1200*F o       E of.the following conditions exist:                                                                           3. Heat sink-ATt SGs ME_
PfWES.2.51
-LR-o Cnet Phase B actuated
: 2. Core cooling - CORE EXIT
-OR-TCs >1200*F o
E of.the following conditions exist:
: 3. Heat sink-ATt SGs ME_
LEVEL <47. (34% FOP._..
LEVEL <47. (34% FOP._..
* Controllec E S cooldu n n2I                                                   k   .m   . J JITS . 1' TOJe. L in progress                                                                   FMhWATER' FLOW (500 GPM
Controllec E S cooldu n n2I k
                                                                -AND                                               AVAILABLE
.m
* RCS pressure.- <1370 PSIG
. J JITS. 1' TOJe. L in progress FMhWATER' FLOW (500 GPM
                                                                -AND-                                         4. Integrity - DECREASE
-AND AVAILABLE RCS pressure.- <1370 PSIG
* High head SI pump flow indicator                                             >100'F IN LAST 60 MINUTEE_
-AND-
(lFI-917) >50 GPM flow or-                                                   6@ RCS COLD LEG < 246
: 4. Integrity - DECREASE High head SI pump flow indicator
* F SI pumps >100 GPM SI ACTUATION:                                                                           5   Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY TNJECTION,                                                       le CST     _EV E _ <20%. ' "
>100'F IN LAST 60 MINUTEE_
EN Step 1, if:                                                                             CONSIDE     RT i E FOLLOWL s 3:
(lFI-917) >50 GPM flow or-6@ RCS COLD LEG < 246
o     RCS subcooling - NOT ACCEPTABLE                                         o   Makeup from MUDS or PER ICONIC DISPLAY OR                                                         radwaste ATTACHMENT A                                                             o   Prepare to isolate
* F SI pumps >100 GPM SI ACTUATION:
                                                            -OR-                                                   secondary supply side o     PZR level - CANNOT BE MAINTAINED                                             of 3 SGs
5 Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY TNJECTION, le CST
                                      > 4% (387. FOR ADVERSE CNMT)                                           o   Crosstie unit's CST o   Reduce cooldown rate
_EV E _ <20%. '
* IF AUX :E ED )UiP JA" TA4K _ EVE                                             _
" EN Step 1, if:
                      < 16% T i E VP ERFOR 1 rHE :0L _0WI 4G:                                                 I: CST LEV EL <3%,         "EN PERFORM TH E FOLLOWL       3:
CONSIDE RT i E FOLLOWL s 3:
* Refill the day tank
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (387. FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate IF AUX
:E ED )UiP JA" TA4K
_ EVE
< 16% T i E VP ERFOR 1 rHE :0L _0WI 4G:
I: CST LEV EL <3%,
"EN PERFORM TH E FOLLOWL 3:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                                                             APPROVED JM 311969 B.O.S.R.
(0386E/0042E/042488)
APPROVED JM 311969 B.O.S.R.
o
o


REV. 1                                   REACTOR TRIP OR SAFETY. INJECTION                 1BEP-0
REV. 1 REACTOR TRIP OR SAFETY. INJECTION 1BEP-0
                'WOG-1A                                               UNIT 1 STEP                             ACTION / EXPECTED RE5?ON5E               RESPONSE NOT OSTAiNED CAUTION RCS pressure should be monitored.
'WOG-1A UNIT 1 STEP ACTION / EXPECTED RE5?ON5E RESPONSE NOT OSTAiNED CAUTION RCS pressure should be monitored.
If RCS pressure decreases to LESS THAN 300 PSIG, then RH pumps must be manually restarted to supply water         -
If RCS pressure decreases to LESS THAN 300 PSIG, then RH pumps must be manually restarted to supply water to the RCS.
to the RCS.
l 37 CHECK IF RH PUMPS SHOULD BE STOPPED:
l 37                       CHECK IF RH PUMPS SHOULD BE STOPPED:
: a. Check RCS pressure:
: a. Check RCS pressure:
: 1) Pressure (1PI-403A/405) -           1) GO TO 1BEP-1, LOSS OF GREATER THAN 300 PSIG                 REACTOR OR SECONDARY COOLANT, Step 1.
: 1) Pressure (1PI-403A/405) -
: 2) Pressure - STABLE OR               2) Go To Step 38.
: 1) GO TO 1BEP-1, LOSS OF GREATER THAN 300 PSIG REACTOR OR SECONDARY COOLANT, Step 1.
: 2) Pressure - STABLE OR
: 2) Go To Step 38.
INCREASING
INCREASING
: b. Stop RH pumps and place in standby lT                         CHECK SECONDARY RADIATION                   GO To 1BEP-3, STEAM NORMAL:                                   GENERATOR TUBE RUPTURE, Step 1.
: b. Stop RH pumps and place in standby lT CHECK SECONDARY RADIATION GO To 1BEP-3, STEAM NORMAL:
GENERATOR TUBE RUPTURE, Step 1.
: a. Sample SGs' blowdown for activity:
: a. Sample SGs' blowdown for activity:
: 1) Open SG blowdown sample isol valves:                                                         .
: 1) Open SG blowdown sample isol valves:
e ISD005A
e ISD005A 1SD005B e
* 1SD005B e ISD005C
ISD005C 1SD005D
* 1SD005D
: 2) Notify Rad Chem to sample SGs' olowdown for activity APPROVED l
: 2) Notify Rad Chem to sample SGs' olowdown for activity APPROVED l
FEB 011989.
FEB 011989.
B.O.S.R.
.l B.O.S.R.
                                                                                                                      .l (0304E/0035E/042088)
(0304E/0035E/042088)
L_______________.   . . _ _ _ _ _ _ - -
L_______________.


REV 1                             OPERATOR ACTION  
REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOG-1A                         FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                     RED PATH  
1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o     CC water to RCP lost                           1. Subcriticality - IGCLEAR (affected pumps only)                               POWER >5%
o CC water to RCP lost
                                                    -OR-o   Cnmt Phase B actuated                           2. Core cooling - CORE EXIT
: 1. Subcriticality - IGCLEAR (affected pumps only)
                                                    -OR-                                     TCs >1200'F o   ALL of the .tollowing conditions exist:                                         3. Heat sint- AT T. SGs NR LEYEL.<4% (34% FOR
POWER >5%
                                        -  'wunti vin a . RCo e,c.,c . J u ss. &
-OR-o Cnmt Phase B actuated
3DLtdE CEMT' . .. " " ~"J_f in progress                                     FnnWATER FLOW (500 GPM
: 2. Core cooling - CORE EXIT
                                                          -AND                               AVAIL 6HLE
-OR-TCs >1200'F o
* RCS pressure - <1370 PSIG
ALL of the.tollowing conditions exist:
                                                          -AND-                         4. Integrity - DECREASE
: 3. Heat sint-AT T. SGs NR LEYEL.<4% (34% FOR
* High head SI pump flow indicator                 >100'F IN LAST 60 MINUTES (lFI-917) >50 GEE flow or                       AND RCS COLD LEG (246'F SI pumps >100 G,PE SI ACTUATION:                                       5. Containment - CEMI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, i
'wunti vin a. RCo e,c.,c. J u ss. &
REACTOR TRIP OR SAFETY INJECTION,                   IF CST LEVE_ <20%, JEN
3DLtdE CEMT'... " " ~"J_f in progress FnnWATER FLOW (500 GPM
  .                                Step 1, if:                                         CONSIDER T i E F0 _LOWL s G:
-AND AVAIL 6HLE RCS pressure - <1370 PSIG
o RCS subcooling - NOT ACCEPTABLE               o Makeup.from MUDS or PER ICONIC DISPLAY OR                           radwaste                       .
-AND-
ATTACHMENT A                                 o   Prepare to isolate
: 4. Integrity - DECREASE High head SI pump flow indicator
                                                      -OR-                                 secondary supply side o PZR level - CANNOT BE MAINTAINED                 of 3 SGs
>100'F IN LAST 60 MINUTES (lFI-917) >50 GEE flow or AND RCS COLD LEG (246'F SI pumps >100 G,PE SI ACTUATION:
                                            > 4% (38% FOR ADVERSE CNMT)                 o   Crosstie unit's CST o   Reduce cooldown rate
: 5. Containment - CEMI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, i
* IF AUX :E ED )UiP 3A1' TA4K _ EVE           _
REACTOR TRIP OR SAFETY INJECTION, IF CST LEVE_ <20%,
                                    < 16% T i E 4P ER :0R 1 THE ;0L _0WI 4G:             I: CST LEVEL <3%, " iEN P EP50RM TH E FOLLOWL 4G:
JEN Step 1, if:
* Refill the day tank                                                                                 ;
CONSIDER T i E F0 _LOWL sG:
o RCS subcooling - NOT ACCEPTABLE o
Makeup.from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:E ED )UiP 3A1' TA4K
_ EVE
< 16% T i E 4P ER :0R 1 THE
;0L _0WI 4G:
I: CST LEVEL <3%, " iEN P EP50RM TH E FOLLOWL 4G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply                                           ,
: b. Switch AF suction to SX supply 1
1 (Final)                                                         i (0386E/0042E/042488)                                       APPROVED                                       !;
(Final) i (0386E/0042E/042488)
JAN 31 1969 B.O.S.R.
APPROVED JAN 31 1969 B.O.S.R.
1
1


y REV. 1                       REACTOR TRIP OR SAFETY INJECTION                             1BEP-0 WOG-1A                                   UNIT 1
y REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1
                                . STEP!               ACTION / EXPECTED RESPONSE               RESPONSE NOT 06TAINED l39       CHECX AUXILIARY BUILDING                       Evaluate cause of aonormal RADIATION:                                     conditions.
. STEP!
: a. Aux Bldg vent stack                         IF cause is loss of RCS effluent monitors (IPR 28J) -               idventory outside Cnmt, LESS THAN ALERT ALARM SETPOINT:-           .THEN G0,.TO IBCA-1.2, LOCA OUTSIDE CONTAINMENT, Step 1.
ACTION / EXPECTED RESPONSE RESPONSE NOT 06TAINED l39 CHECX AUXILIARY BUILDING Evaluate cause of aonormal RADIATION:
Grida2 Beta 1PA228 Grid 2 Gas Low IPB128 Grid 2 Iodine IPC328
conditions.
* Grid 2 Gas High IPD428 b Aux Bldg vent stack effluent monitors (1PR30J) -
: a. Aux Bldg vent stack IF cause is loss of RCS effluent monitors (IPR 28J) -
idventory outside Cnmt, LESS THAN ALERT ALARM SETPOINT:-
.THEN G0,.TO IBCA-1.2, LOCA OUTSIDE CONTAINMENT, Step 1.
Grida2 Beta 1PA228 Grid 2 Gas Low IPB128 Grid 2 Iodine IPC328 Grid 2 Gas High IPD428 b Aux Bldg vent stack effluent monitors (1PR30J) -
LESS THAN ALERT ALARM SETPOINT:
LESS THAN ALERT ALARM SETPOINT:
Grid 2 Gas Low IPA 130 Grid 2 Gas Med 1PB230
Grid 2 Gas Low IPA 130 Grid 2 Gas Med 1PB230 Grid 2 Gas High 1PC330 Grid 2 Effluent 1PF430
* Grid 2 Gas High 1PC330 Grid 2 Effluent 1PF430
: c. ECCS cubicle monitors - LESS THAN ALERT ALARM SETPOINT:
: c. ECCS cubicle monitors - LESS THAN ALERT ALARM SETPOINT:
* RH/CS Pump 1A Cubicle (IPR 13J):
RH/CS Pump 1A Cubicle (IPR 13J):
Grid 2 Beta 1PA213
Grid 2 Beta 1PA213 Grid 2 Gas IPB113 RH/CS Pump 1B Cubicle t
* Grid 2 Gas IPB113 t    RH/CS Pump 1B Cubicle (IPR 14J):
(IPR 14J):
Grid 2 Beta 1PA214 Grid 2 Gas IPB114 RH HX 1A Cubicle (IPR 15J):
Grid 2 Beta 1PA214 Grid 2 Gas IPB114 RH HX 1A Cubicle (IPR 15J):
G. rid 2 Beta 1PA215
G. rid 2 Beta 1PA215 Grid 2 Gas IPB115 Stsp continued on next page APPROVED FEB 0 I 1989 B.O.S.R.
                                              '*        Grid 2 Gas IPB115 Stsp continued on next page                                                                             !'
1 Page 27 of 33 (0304E/0035E/042088)
APPROVED FEB 0 I 1989 1
B.O.S.R.
Page 27 of 33 (0304E/0035E/042088)


v.,r                                                                                                                         p 5
v.,r p
REV 1                           OPERATOR' ACTION  
5 REV 1 OPERATOR' ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 W7G-1A                         FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                   RED PATH  
1BEP-F.0 W7G-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
                          ,      o     CC water,to RCP lost                         1. Suber.iticality - NUCf7AR (affected pumps only)                             POWER 351
o CC water,to RCP lost
                                                  -OR-o   Cnat Phase B actuated                         2. Core cooling - CORE EXII
: 1. Suber.iticality - NUCf7AR (affected pumps only)
                                                  -OR-                                   ICs >1200'F o     ALL of the following conditions exist:                                       3. Heat sink-ALL_1GsJ:.tfR_
POWER 351
LEVEL <4% (34% FOR               ,
-OR-o Cnat Phase B actuated
* Lotat.Jolled Rt:b ' cc,g.i.dsw.. 6             nLVERC :NM., AND _'Crfi in progress                                   FmWATER FLOW < 500 GPM
: 2. Core cooling - CORE EXII
                                                      -AND                             AVAILABLE
-OR-ICs >1200'F o
* RCS pressure - <1370 PSIG
ALL of the following conditions exist:
                                                      -AND-                         4. Integrity - DECREASE
: 3. Heat sink-ALL_1GsJ:.tfR_
* High head SI pump flow indicator               >100*F IN LAST 60 MINUIEH_
LEVEL <4% (34% FOR Lotat.Jolled Rt:b ' cc,g.i.dsw.. 6 nLVERC :NM., AND _'Crfi in progress FmWATER FLOW < 500 GPM
t (lFI-917) >50 GPM flow or                     AND RCS COLD LEG <246*F SI pumps.>100 GPM SI ACTUATION:                                     5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                 IF CST LEVE _ (20%, 4 EN Step 1, if:                                       CONSIDER       i E F0 _LOWL s 3:
-AND AVAILABLE RCS pressure - <1370 PSIG
o RCS subcooling - HDT ACCEPTABLE           o Makeup from MUDS or PER ICONIC DISPLAY OR                           radwaste ATTACHMENT A       .                      o   Prepare to isolate
-AND-
                                                    -OR-                                 secondary supply side o PZR level - CANNOT BE MAINTAINED               of 3'SGs
: 4. Integrity - DECREASE High head SI pump flow indicator
                                          > 4% (38% FOR ADVERSE CNMT)             'o   Crosstie unit's CST
>100*F IN LAST 60 MINUIEH_
                                                          .                          o    Reduce cooldown rate
t (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps.>100 GPM SI ACTUATION:
* IF AUX :EED 'UiP DA" TA4K _ EVE       _
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST LEVE _ (20%,
                                  < 16% T 4 E 4P ER:0RM 'HE :0L ;0WI 4G:             I: CST LEVIL <3%,'           EN P ERFORM TH E FOLL6WL     s 3:
4 EN Step 1, if:
* Refill the day tank
CONSIDER i E F0 _LOWL s 3:
o RCS subcooling - HDT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3'SGs
> 4% (38% FOR ADVERSE CNMT)
'o Crosstie unit's CST o
Reduce cooldown rate IF AUX
:EED 'UiP DA" TA4K
_ EVE
< 16% T 4 E 4P ER:0RM
'HE :0L ;0WI 4G:
I: CST LEVIL <3%,'
EN P ERFORM TH E FOLL6WL s 3:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply
: b. Switch AF suction to SX supply
                                                                          '(Final)
'(Final)
(0386E/0042E/042488)                                       APPROVED JAN 3 1 669 B. O. S. R.
(0386E/0042E/042488)
APPROVED JAN 3 1 669 B. O. S. R.


zw               m 3
zw m
i,                ,
3 i,
c.e                                 v.
c.e v
5 y,' *            :*                              ,
5 y,
            .v     .
.v REV. 1 REACTOR TRIP.OR' SAFETY INJECTION
* REV. 1                 REACTOR TRIP.OR' SAFETY INJECTION               '1BEP-0 WOG-1A                               UNIT 1 STEF-         ACTION /E1PECTED RES 0NSE.                 RESPONSE NOT OSTAINED     {
'1BEP-0 WOG-1A UNIT 1 STEF-ACTION /E1PECTED RES 0NSE.
                                -Step 39c (continued)
RESPONSE NOT OSTAINED
        ,, ~
{
RH HX IB Cubicle (IPR 16J):
-Step 39c (continued)
* Grid 2 Beta 1PA216
,, ~
                                            * " Grid 2' Gas 1PB116         ,          ,
*- RH HX IB Cubicle (IPR 16J):
* CENT CPC Pump -1A Cubicle (IPR 17J):
Grid 2 Beta 1PA216
* Grid 2 Beta IPA 217
* " Grid 2' Gas 1PB116 CENT CPC Pump -1A Cubicle (IPR 17J):
* Grid 2 Gas IPB117 Mi
Grid 2 Beta IPA 217 Grid 2 Gas IPB117
* CENT CHG Pump 1B Cubicle (1PR18J).
..Mi CENT CHG Pump 1B Cubicle (1PR18J).
* Grid 2 Beta.1PA218
Grid 2 Beta.1PA218 Grid 2 Gas IPB118
* Grid 2 Gas IPB118
: d. Grid 4 Aux Bldg'arez li radiation monitors - LESS THAN ALERT ALARM SETPOINT l 40 CHECK PRT CONDITIONS:
: d. Grid 4 Aux Bldg'arez li
Evaluate cause of=-abnormal v
      *'                            radiation monitors - LESS THAN ALERT ALARM SETPOINT v              l 40   CHECK PRT CONDITIONS:                           Evaluate cause of=-abnormal conditions.
conditions.
: a. Pressure - LESS THAN 6 PSIG IF any PZR safety valve is
: a. Pressure - LESS THAN 6 PSIG IF any PZR safety valve is
: b. Level - LESS THAN 80%                       ifetermined to'be the source of leakage into the PRT,
: b. Level - LESS THAN 80%
: c. Temperature           LESS THAN 125'F       THEN GO TO IBEP-1, LOSS OF REACTOR OR SECONDARY COOL 7ET, Step 1.
ifetermined to'be the source of leakage into the PRT,
: c. Temperature LESS THAN 125'F THEN GO TO IBEP-1, LOSS OF REACTOR OR SECONDARY COOL 7ET, Step 1.
k h
k h
I APPROVED FEB 01.1989.
I APPROVED FEB 01.1989.
Line 1,400: Line 1,990:


i i
i i
j ' .i n
j '.i n>
R!V             l' OPERATOR ACTION  
R!V l'
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WCG-1A   i                                  FOR 1BEP-0 SERIE
1BEP-F.0 WCG-1A FOR 1BEP-0 SERIE


==S. PROCEDURE==
==S. PROCEDURE==
S                                 -
S i
u.
u.
TRIP RCP' WHEU:                                                       RED PATH  
TRIP RCP' WHEU:
RED PATH  


==SUMMARY==
==SUMMARY==
o             CC water'to RCP lost                                   1. Suberiticality - LUCf.1MR (affected pumps only)                                       POWER 35%
o CC water'to RCP lost
                                                                          -OR-o             Cnmt Phase B actuated                                   2. Core cooling - CORE EXIT
: 1. Suberiticality - LUCf.1MR (affected pumps only)
                                                                          -OR-                                           TCs >1200*F                         :i o             ALL of the fc11owing conditions exist:                                                 3. Heat sink-ATL SGs NR _.
POWER 35%
-OR-o Cnmt Phase B actuated
: 2. Core cooling - CORE EXIT
-OR-TCs >1200*F
:i o
ALL of the fc11owing conditions exist:
: 3. Heat sink-ATL SGs NR _.
LEVEL <4% (34% F_01_
LEVEL <4% (34% F_01_
                                                              -    v'w.4trv11ed RL., cvulow dia                           ,1. L .ir,;.,nTi rum "_Illif in progress                                           FEEDWATER FLOW <500 GPM
v'w.4trv11ed RL., cvulow dia
                                                                                -AND       '
,1. L.ir,;.,nTi rum "_Illif in progress FEEDWATER FLOW <500 GPM
AVAILABLE
-AND AVAILABLE RCS pressure - <1370 PSIG
* RCS pressure - <1370 PSIG
-AND-
                                                                                -AND-                                 4. Integrity - DECREASE
: 4. Integrity - DECREASE ligh head SI pump flow indicator
* ligh head SI pump flow indicator                       >100*F IN LAST 60 MINUTES._
>100*F IN LAST 60 MINUTES._
(1FI-917) >50 GPM flow or                               AND RCS COLD LEG <246*F SI pumps 2.100 GPM SJ ACTUATION:                                                       5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                                   IF CST _ EVE _ <20%, ' HEN Step 1, if: ~                                                       CONSIDE RT i E F0 _ LOW::NG:
(1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps 2.100 GPM SJ ACTUATION:
o RCS subcooling - NOT ACCEPTABLE                       o Makeup from MUDS or PER ICONIC DISPLAY OR                                   radwaste ATTACHMENT A                                     o     Prepare to isolate
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
                                                                            -OR-                                           secondary supply side o     PZR level - CAHNOT BE MAINTAINED                       of'3 SGs
_ EVE _ <20%,
                                                                    > 4% (38% FOR ADVERSE CNM'.[1                     o     Crosstie unit's CST
' HEN Step 1, if: ~
                                                                                                        ..-*  %      o    Reduce cooldown rate
CONSIDE RT i E F0 _ LOW::NG:
* IF AUX :iED ) UMP DA" TANK _ EVE                             V
o RCS subcooling - NOT ACCEPTABLE o
                                                  < 16% T i EN P ERFORM rHE FOL _0WI dg I': CST LEVEL <3%,   ' HEN
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
                                                                                                            ~
Prepare to isolate
P ERFORM TH E FOLLOW::NG:
-OR-secondary supply side o
* Refill the day tank
PZR level - CAHNOT BE MAINTAINED of'3 SGs
: a. Verify secondary sid'e
> 4% (38% FOR ADVERSE CNM'.[1 o
                                                                                              ,                            of 3 SGs isolated
Crosstie unit's CST o
Reduce cooldown rate IF AUX :iED
) UMP DA" TANK
_ EVE V
< 16% T i EN P ERFORM rHE FOL _0WI dg I': CST LEVEL <3%,
' HEN
~
P ERFORM TH E FOLLOW::NG:
Refill the day tank
: a. Verify secondary sid'e of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                                         APPROVED JAN 311969 B.O.S.R.
(0386E/0042E/042488)
        - _ _ - _ _ - _ _ _ _ _ _ _ - - _ _ _                                    _ _ _ _                -        _-                                    _.      i
APPROVED JAN 311969 B.O.S.R.
i


_y 1
_y 1
y           a            .            .
a y
1-               -
1-f._
f._
REV. 1 REAf f0R TRIP OR SAFET INJECTION
,                      REV. 1                             REAf f0R TRIP OR SAFET               INJECTION                           .1BEP-0 4                     WOG-1A                                             UNIT.1 5TEP                         ACTION / EXPECTED R ~5:0N5E                             RESPONSE NOT OBTAINED CAUTION Do NOT exceed DG loadirq-requirements:
.1BEP-0 4
o   5500 KW continuous duty 6                               '
WOG-1A UNIT.1 5TEP ACTION / EXPECTED R ~5:0N5E RESPONSE NOT OBTAINED CAUTION Do NOT exceed DG loadirq-requirements:
                  ,                                              Q%A AMDS g;gi7gg u   5935 AW continuous for zu00. hours 6 1030 AMPS maximum o   6050 KW continuous for 2 hours 6 1050 AMPS maximum.                                   d CAUTION If po'ssible, PZR heaters should be loaded on only one ESF' bus at a time.
o 5500 KW continuous duty 6 Q%A AMDS g;gi7gg u
5935 AW continuous for zu00. hours 6 1030 AMPS maximum o
6050 KW continuous for 2 hours 6 1050 AMPS maximum.
d CAUTION If po'ssible, PZR heaters should be loaded on only one ESF' bus at a time.
Additional NON-ESF loads should be loaded on the other ESF bus.
Additional NON-ESF loads should be loaded on the other ESF bus.
41 CFECK I: DIESEL GENERATORS SF 00LD BE STOPPE7:
41 CFECK I: DIESEL GENERATORS SF 00LD BE STOPPE7:
a.VerifyESF4KVbusses-fkfRh'12ED                                           a. Try to restore offsite BY OFFSITE POWER:         f; '                         power to ESF busses SAT 142-1 Bus alt 0e light -                       Ij[ offsite power can NOT LIT                                                 be restored,
a.VerifyESF4KVbusses-fkfRh'12ED
* ACB 1412 - CLOSED                                   THEN notify System Load
: a. Try to restore offsite BY OFFSITE POWER:
* SAT 142-2 Bus' alive light -                       Dispatcher of existing LIT                                                 conditions so an e ACB-1422 - CLOSED                                   emergency AC restoration program can be implemented.
f; '
power to ESF busses SAT 142-1 Bus alt 0e light -
Ij[ offsite power can NOT e
LIT be restored, ACB 1412 - CLOSED THEN notify System Load SAT 142-2 Bus' alive light -
Dispatcher of existing LIT conditions so an e
ACB-1422 - CLOSED emergency AC restoration program can be implemented.
Step continued on next page APPROVED fEB 01.1989.
Step continued on next page APPROVED fEB 01.1989.
B.O.S.R.
B.O.S.R.
Line 1,455: Line 2,071:


7 t-
7 t-
                    -REV   1                       OPERATOR ACTION  
-REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOG-1A                       FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                     RED PATH  
1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
o   CC water to RCP lost                           1. Subcriticality - NUCLEAR (affecte.d pumps only)                             POWER >57.
o CC water to RCP lost
                                      -OR-o   Cnmt Phase B actuated                         2. Core cooling - CORE EXIT
: 1. Subcriticality - NUCLEAR (affecte.d pumps only)
                                      -OR-                                   ICs >1200*F o   ALL of the following conditions exist:       .
POWER >57.
: 3. Heat sink-ALL SGs NR LEVEL <47, (34% FOR
-OR-o Cnmt Phase B actuated
                          *  .snt *9hl ;Cd Jolkown lJCI          - -
: 2. Core cooling - CORE EXIT
* SE'.'FRSEffE' MID                   "'^*AL., .
-OR-ICs >1200*F o
in progress                                    FEEDWATER FLOW < 500 GPM AVAILABLE
ALL of the following conditions exist:
                                          .-AND
: 3. Heat sink-ALL SGs NR LEVEL <47, (34% FOR SE'.'FRSEffE' MID
* RCS pressure - <1370 PSIG
"'^*AL.,
                                            -AND-                       4     Integrity - DECREASE
.snt *9hl ;Cd Jolkown lJCI FEEDWATER FLOW < 500 GPM in progress AVAILABLE
* High head SI pump flow indicator                 >100*F IN LAST 60 MINUTES _
.-AND RCS pressure - <1370 PSIG
(lFI-917) >50 GPM flow or'                       AND RCS COLD LEG (246'Ti SI pumps >100 GPM SI ACTUATION:                                       5. Containment - C11tiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                   IF CST     _EV E _ <20%, " HEN Step 1, if:                                         CONSIDE RT E FOLLOWLNG:
-AND-4 Integrity - DECREASE High head SI pump flow indicator
i o RCS subcooling - NOT ACCEPTABLE             o Makeup from MUDS or PER ICONIC DISPLAY OR                             radwaste ATTACHMENT A                               o     Prepare to isolate
>100*F IN LAST 60 MINUTES _
                                          -OR-                                   secondary supply side o   PZR level - CANNOT BE MAINTAINED                 of 3 SGs
(lFI-917) >50 GPM flow or' AND RCS COLD LEG (246'Ti SI pumps >100 GPM SI ACTUATION:
                              > 47. (387. FOR ADVERSE CNMT)             o     Crosstie unit's CST o     Reduce cooldown rate
: 5. Containment - C11tiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
* JF AUX E ED )UiP JAV TA 4K .ENEL
_EV E _ <20%, " HEN Step 1, if:
                      < 16% T i E 1P ER :0R 1 THE :0ETWING:
CONSIDE RT i E FOLLOWLNG:
I': CST LEVEL <3%, THEN P ERFORM TH E FOLLOWING:
o RCS subcooling - NOT ACCEPTABLE o
* Refill the day tank
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CANNOT BE MAINTAINED of 3 SGs
> 47. (387. FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate JF AUX
: E ED )UiP JAV TA 4K
.ENEL
< 16% T i E 1P ER :0R 1 THE
:0ETWING:
I': CST LEVEL <3%, THEN P ERFORM TH E FOLLOWING:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                         APPROVED JAN 31 1969 B.O.S.R.
(0386E/0042E/042488)
APPROVED JAN 31 1969 B.O.S.R.


p 1 '.
p 1 '.
g REV. 1           REACTOR TRIP OR SAFETY INJECTION                                     1BEP-0 WOG-1A                           UNIT 1 STEP     ACi!ON/EXPECTE3 REE;ON5E PESPON?E NOT OSTAINED Step 41 (continued)
g REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACi!ON/EXPECTE3 REE;ON5E PESPON?E NOT OSTAINED Step 41 (continued)
I             b. NON-ESF 4 KV Busses:                 b. IF offsite power can NOT be promptly restored,
I
* SAT 142-1 Bus alive light -         THEN establish'necessary LIT                                 NON-ESF loads to maintain
: b. NON-ESF 4 KV Busses:
* ACB 1432 - CLOSED                   plant conditions.
: b. IF offsite power can NOT be promptly restored, SAT 142-1 Bus alive light -
* SAT 14?.-2 Bus a3ive light -
THEN establish'necessary LIT NON-ESF loads to maintain ACB 1432 - CLOSED plant conditions.
                                                ~
SAT 14?.-2 Bus a3ive light -
LIT'                                1) Verify locally all e ACB 1442 - CLOSED                       breakers on Bus 143 and 144 OPEN.
LIT'
~
: 1) Verify locally all e
ACB 1442 - CLOSED breakers on Bus 143 and 144 OPEN.
2)cPlace all~non-running WS pumps in PULL OUT position.
2)cPlace all~non-running WS pumps in PULL OUT position.
: 3) Reset SI recirc sump valves:
: 3) Reset SI recirc sump valves:
                                          .                  e   ISI8811A
e ISI8811A ISI8811B
* ISI8811B
: 4) Energize Bus 143 and 144 from ESF crosstie breakers.
: 4) Energize Bus 143 and 144 from ESF crosstie breakers.
: 5) Open all 480 volt transformer LOW side breakers associated with Bus 143 and 144.
: 5) Open all 480 volt transformer LOW side breakers associated with Bus 143 and 144.
Line 1,504: Line 2,136:
(0304E/0035E/042088)
(0304E/0035E/042088)


REV    1-                        OPERATOR ACTION  
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOG11A                         FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                                     RED PATH  
1BEP-F.0 REV 1-WOG11A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
RED PATH  


==SUMMARY==
==SUMMARY==
:                      l
l o.
: o. CCTwater to RCP lost.                         1. Suberiticality - NUCLEAR l                                       '(affected-pumps only)                             POWER >S%
CCTwater to RCP lost.
l>                                                   ..OR_
: 1. Suberiticality - NUCLEAR l
l                                 o     Cnmt Phase B actuated                         2. Core cooling - CORI EXIT
'(affected-pumps only)
                                                    -OR .                                 TCs >1200;;
POWER >S%
o     ALL of the following conditions exist:                                       3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR
l>
'' '                                    +    Lv uv11cd E S'coc1%..., NM -                 .1 . H._. _, m.~' 'PP 5;-
..OR_
in progress                 --                FERnWATER FLOW'<500 GPM
l o
                                                          -AND                             AYr LABLE
Cnmt Phase B actuated
* RCS pressure - <1370 PSIG
: 2. Core cooling - CORI EXIT
                                                          -AND-                       4. Integrity - DECREASE
-OR.
* High head SI pump flow indicator               >100*F'IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                     AND RCS COLD LEG.<246*F SI pumps >100 GPM-SI ACTUATION:                                       5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                   IF CST       _ EVE _ <20%, "iEN Step 1, if:                                         CONSIDE RT iE F0_LOWL43:
TCs >1200;;
o RCS subcooling - ROT ACCEPTABLE             o Makeup from MUDS or PER ICONIC DISPLAY OR                         radwaste ATTACHMENT A                             o   Prepare to isolate
o ALL of the following conditions exist:
                                                        -0R-                                 secondary supply side o   PZR level - CAHHOT BE MAINTAINED               of 3 SGs
: 3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR Lv uv11cd E S'coc1%..., NM -
                                              > 4% (38% FOR ADVERSE CNMT)             o     Crosstie unit's CST o     Reduce cooldown rate
.1. H._. _, m.~'
* IF AUX     :E ED ) UMP ')A" TA4K   _ EVE _
'PP 5;-
                                  < 16% T 4 E 4P ERFOR i     'HE :0L _0WI   4G:       I : CST LEVEL <3%, " HEN P ERFORM TH       E FOLLOWLNG:
+
* Refill the day tank
in progress FERnWATER FLOW'<500 GPM
-AND AYr LABLE RCS pressure - <1370 PSIG
-AND-
: 4. Integrity - DECREASE High head SI pump flow indicator
>100*F'IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG.<246*F SI pumps >100 GPM-SI ACTUATION:
: 5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
_ EVE _ <20%, "iEN Step 1, if:
CONSIDE RT iE F0_LOWL43:
o RCS subcooling - ROT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-0R-secondary supply side o
PZR level - CAHHOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
:E ED ) UMP ')A" TA4K
_ EVE
< 16% T 4 E 4P ERFOR i
'HE :0L _0WI 4G:
I : CST LEVEL <3%, " HEN P ERFORM TH E FOLLOWLNG:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply (Final)
: b. Switch AF suction to SX supply (Final)
(0386E/0042E/042488)                                       APPROVED JAN 311969                       !
(0386E/0042E/042488)
B. o. s. R.
APPROVED JAN 311969 B. o. s. R.


h,                                                                         '
h, REV. 1 REACTOR TRIP OR SAFETi INJECTION 1BEP-0 WOG-1A UNIT 1 STEP-ACTION / EXPECTED RE5?ONSE RESf 3NSE NOT OSTAINED Step 41b (continued)-
REV. 1                 REACTOR TRIP OR SAFETi INJECTION                 1BEP-0 WOG-1A                             UNIT 1 STEP-           ACTION / EXPECTED RE5?ONSE             RESf 3NSE NOT OSTAINED Step 41b (continued)-
c) Operate PZR heater.
c) Operate PZR heater.
controls.at necessary to control system pressure.
controls.at necessary to control system pressure.
: 7) Start a WE' pump pe:. .A2 WS-1, STARTUP AND OPERATION OF WS SYSTEM,
: 7) Start a WE' pump pe:..A2 WS-1, STARTUP AND OPERATION OF WS SYSTEM, if necessary.
                                                                                                                                      ~
~
e             if necessary.              1
1 e
: 8) Start a SAC per BOP SA-1, STARTUP AND 4
: 8) Start a SAC per BOP SA-1, STARTUP AND OPERATION OF THE SAC's, 4
OPERATION OF THE SAC's,
: 9) Energize other NON-ESF' loads as necessary..
: 9) Energize other NON-ESF' loads as necessary..
: c. Stop any unloaded DG and place in standby per BOP DG-12,                           -
: c. Stop any unloaded DG and place in standby per BOP DG-12, 7.
: 7.                                                                 DIESEL' GENERATOR SHUTDOWN.
DIESEL' GENERATOR SHUTDOWN.
42   RETURN TO STEP 25
42 RETURN TO STEP 25
_ggp_
_ggp_
4 APPROVED FEB 011989 1
4 APPROVED FEB 011989 1
Line 1,551: Line 2,203:
(0304E/0035E/042088)-
(0304E/0035E/042088)-


REV     1                               OPERATOR ACTION  
REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 '
1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:
WOG-1A                               FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:                 ,
BED PATH SLiMARY:
BED PATH SLiMARY:
o     CC water to RCP lost                               1   Subcriticality - NUCLEAR (affecte.d pumps only)                                 POWER >5%
o CC water to RCP lost 1
                                                -OR-o     Cnmt Phase B actuated                             2. Core cooling - CORE EXIT
Subcriticality - NUCLEAR (affecte.d pumps only)
                                                -OR-                                       TCs >1200*F o     ALL of the following conditions
POWER >5%
                                    ' exist: "                                        3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR
-OR-o Cnmt Phase B actuated
                      '-          +    Jsntro11W ... .           . ' 1o5 . X r .. ,     cOVFRo Cm             - "Ic in progress                                       EEEDWATER FLOW <500 GPM
: 2. Core cooling - CORE EXIT
                                                              -AMD                         AVAILABLE
-OR-TCs >1200*F o
* RCS pressure - <1370 PSIG
ALL of the following conditions
                                                              -APD-                     4. Integrity - DECREASE
: 3. Heat sink-ALL SGs NR
                                    ~*  High head SI pump flow indicator                   >100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or                         AND RCS COLD LEG <246*F           >
' exist:
SI pumps >100 GPM SI ACTUATION:                                           5. Containment - CNMT                   l PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR FAFETY INJECTION,                         IF CST   _ EVE _ <20%. TFEN Step 1, if:                                             CONSIDE R TH E F0 _LOWIhG:
LEVEL <4% (34% FOR Jsntro11W....
o RCS subcooli g - HOT ACCEPTABLE                 o Makeup from MUDS or PER ICONIC Li3 PLAY OR                             radwaste ATTAChMEN?...A                                 o   Prepare to isolate
. ' 1o5. X r..,
                                                            -Oh-                             secondary supply side o   PZR level - CAHHQIE,JiMNTAINED                     of 3 SGs
cOVFRo Cm
                                        > 4% (38% FOR ADVERSE CMMT)                   o   Crosstie unit's CST               ;
- "Ic
o    Reduce cooldown rate
+
* IF AUX :E ED )UiP JA" TANK _ EVE           _
in progress EEEDWATER FLOW <500 GPM
                              < 16% T i E 9P ER 0R 1 lie FOL _0WI 9G:                   I: CST LEVEL <3%, TiEN P ERFORM TH E FOLLOWING:
-AMD AVAILABLE RCS pressure - <1370 PSIG
* Refill the day tank
-APD-
: a. Verify secondary side             .'
: 4. Integrity - DECREASE High head SI pump flow indicator
of 3 SGs isolated
>100*F IN LAST 60 MINUTES
~*
(1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
: 5. Containment - CNMT l
PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR FAFETY INJECTION, IF CST
_ EVE _ <20%. TFEN Step 1, if:
CONSIDE R TH E F0 _LOWIhG:
o RCS subcooli g - HOT ACCEPTABLE o
Makeup from MUDS or PER ICONIC Li3 PLAY OR radwaste ATTAChMEN?...A o
Prepare to isolate
-Oh-secondary supply side o
PZR level - CAHHQIE,JiMNTAINED of 3 SGs
> 4% (38% FOR ADVERSE CMMT) o Crosstie unit's CST o
Reduce cooldown rate IF AUX
:E ED )UiP JA" TANK
_ EVE
< 16% T i E 9P ER 0R 1 lie FOL _0WI 9G:
I: CST LEVEL <3%, TiEN P ERFORM TH E FOLLOWING:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX supply
: b. Switch AF suction to SX supply
{
{
(Final)
(Final)
(0386E/0042E/042488)                                               APPROVED                            I MN 311969                         j B.O.S.R.                         )
APPROVED I
1
(0386E/0042E/042488)
__-_-                    _ _ - - -          -    -                                                  a
MN 311969 j
B.O.S.R.
)
1 a


,0-REV. 1                           REACTOR TRIP OR SAFETY INJECTION WOG-1A                                                                                                                                                                                                           1BEP-0 UNIT 1 I
,0-REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 I
CNORMAL) 222                         322                           422                             522                                             622                                   720 260%,,,,                             ,    ,,      ,          ,    ,j                     ,
CNORMAL) 222 322 422 522 622 720 260%,,,,
4,   g     ,                '2622 2522 : ,ll1 + "                                                                            '
,j
l          lo             ,,                                                                            ,l     l l                       2s22 2422 ,6*tI        '''''.'e'
'2622 4,
                                                      !i            rsie #
g 2522
iII''
:,ll1 l
                                                                                          #        a
lo
                                                                                                                                                                                          '' 'I if- L
,l l l 2s22
                                                                                                                                                                                                  '    'I '
+
FI 2422 23?2 -W l l I ' ' l ,' l ,4 -- l                                                                                                                                                           l Y-              C                  *
2422
                                                                                                  !      L'- p -         -- ~
'''''.'e'
                                                                                                                                  'T '
- 2422 iII''
2222 ' l.l ' l l l l l '                                                                                              '
'' 'I
f [' l}                            230io
'I '
                  ,          2122                   ll,'             'l l ,
,6*tI !i rsie #
l
a if-L FI 23?2 -W l l I ' ' l,' l,4 -- l L'- p -
                                                                                        '                                                                                                /) [                                2222 l         2002 i l ll ,,l'l
-- ~
(                                                                                ,/    /      ,I                        2122 c 1922          : ::'
'T ' Y-l f [' l}
                                                                                                                                                                                    !// /                             .
230io C
2222 ,
2222 l.l ' l l l l l l
l:ll             ;                            !;                            ,                              fif l                           7 1e2e a
/ ) [
                        <-  1822       'i i
2222 2122 ll,'
                                                                '^CCGPTABtE                                         '                          '                '
'l l,
                                                                                                                                                                          '# J                l y7gg      i t!
(
6n, e
,/ /
liilsiei r<                                                   '
,I 2122 l
il 1                       i                               1832 "
2002 i
                                              ,o.,.,
l ll
e    i       !
,,l'l
tfi               F     4 ft gq
!// /
                .,                   ,                             i,                                                                                                                                                       7gg
. 2222,
_                                                              ,              i m
c 1922 l:ll fif l 7
lllll ri
1e2e a i
                        " 1622       l                             l!,    ,
1822
l-                                                             fj             [j                                                     16 2 2 v t.
'i
3-e 1522    --M                     l- .I'''                 '
'^CCGPTABtE J
                                                                                                                                                        ''I                             /                     '
l 1832 "
                                                                                                                                                                                                                - - 1522
t!
              '!          1422          ;,l                                                   '
e r<
j j      7             ,j                                           '
il 1
1422 J 1322         ' ' l ,'               l'     l ' ;' '                                                                 ij'/                       '
i i
bl 1222                                                                                                                                      ,                                                        1322 J Ihi , l !;l                                                                                     '                '                                                                              ,
6n, liilsiei e
D7 j ,#          j
i tfi F
                                                                                                                                                                                                      --, -        7-       1222 Ul i
4 ft gq y7gg
a    1122 . i,,ei6i......,,i,,j               .ii .
,o.,.,
r .i           r                                                   "'T"                       Ul
i, i
                                                                                                                                                      ,j
7gg m
                                                                                                                                        ,,   g                                                                 -
ri t.
1122         g Cf   1222               l   l'l             '''
" 1622 l
(( [                                                                                     1222 E A       922
lllll l!,
                                        .ieii l.l!l       i ADVERSE i,                  ,
l-fj [j 16 2 2 v 3-
                                                                                                                        , .     // /                                                                                         922         G.
--M l-
ty     :**    i,,,i 1
.I'''
ro              I                              NOT                              i i,i
e 1522
                                                                  . . ICNMTl                                           i1     /- if                                                                                       A~ 2 ''
''I
              ,      L       722   !''[l',''
/
                                                                  '''                                                                              AC C E P TA B L E--                                                                    Ul  I
- - 1522 1422
                                                                                                                    /[ [                                                             l'
;,l j
                      &      yzz     '
j 7,j 1422 J 1322
ti       >
' ' l,'
722            (_)
l' l ' ;' '
ij'/
1322 J bl Ihi
, l
!;l 1222 j
1222 Ul D7 j
.ii.
7-
. i,,ei6i......,,i,,j r.i r
"'T" Ul i
1122 a
,, g
,j 1122 g
Cf 1222 l l'l
(( [
1222 E A
922 l.l!l i,
,. // /
922 G.
.ieii i
1 ADVERSE ro I
NOT i
ty i,,,i i,i
.. ICNMTl i1 /-
if A~ 2 ''
AC C E P TA B L E--
Ul L
722
!''[l',''
I
. /[ [
l' 722
(_)
yzz ti
/[/
1
1
(
(
1'                                                            \
e
                                                                                                            /[/              /
/
e gag           1 522 422
gag 1
                                                  ,                  ,                                f  7 '/                                                                                                 --
1'
522
\\
[                 ! !.                      [             f h go7yggyrgs                                                                                               422 322                 ''''          '''          '        '#'                                          '          '
522 7 /
                                                                                                        /                   '                          '
522 f
322
422
            ;              222             NCRMAL C NM T ; , , , , , , , , 9 M'/                          ''
[
c 222 l               122       ,i ti
[
                                              '!!lli 11, 4- tii l..' _
f h go7yggyrgs 422 322
i rt i             i l
/
i'
322 NCRMAL M ' /
[ 122 r-222                       322                             422                               Saa                                 622                                     722 TEMPERATURE                                                                       C           C)
222 C NM T ;,,,,,,,, 9
APPROVED FIGURE IBEP 0-1 RCS SUBCOOLING MARGIN                                                                                                         fEB 011989 i
; 222 c
l 122
'!!lli l..' _
l
[ 122
,i ti 11, 4-tii i rt i i
i' r-222 322 422 Saa 622 722 TEMPERATURE C
C)
APPROVED FIGURE IBEP 0-1 RCS SUBCOOLING MARGIN fEB 011989 i
(
(
B.O.S.R.                                 l
B.O.S.R.
l
__J1forstwti lasAn wn.' e an" '-
__J1forstwti lasAn wn.' e an" '-


,                                                                                                                      l 1
l 1
  '        REV         1                         OPERATOR ACTION  
REV 1
OPERATOR ACTION  


==SUMMARY==
==SUMMARY==
1BEP-F.0 WOGI1A                               FOR 1BEP-0 SERIES PRIJEDURES                                         ,
1BEP-F.0 WOGI1A FOR 1BEP-0 SERIES PRIJEDURES TRIP RCPS WHEN:
1 TRIP RCPS WHEN:                                                   RED PATH S:JMMARY:
RED PATH S:JMMARY:
o         CC water to RCP lost                                   1. Suberiticality - NUCLEAR (affected pumps only)                                       POWER >53
1 o
                                    -OR-o         Cnmt Phase B actuated                                 2. Core cooling - CORE EXIT.               '
CC water to RCP lost
                                    -OR-                                         TCs >1200*F o         ALL of the following conditions exist:                                                 3. Heat sink-AT.T SGs NR LEVEL <4% (34% FOR
: 1. Suberiticality - NUCLEAR (affected pumps only)
* Contrqlled RCS tooldown N_0T ...                   . -6DVERSE.CNMT! AND_TO.IAL in progress                                             F m WATER FLOW <500 bni
POWER >53
                                        -AND,                    ., ,
-OR-o Cnmt Phase B actuated
AVAILABLE
: 2. Core cooling - CORE EXIT.
* RCS pressure - <1370 PSIG
-OR-TCs >1200*F o
                                        -AND-                               4. Integrity - DECREASE
ALL of the following conditions exist:
* High head SI pump flow indicator                         >100*F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or                               AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:                                                     5. Containment - CMiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION,                                   IF CST _ EVE _ <20%, ' HEN Step 1, it:                                                       CONSIDE RT i E FOLLOW: NG:.
: 3. Heat sink-AT.T SGs NR LEVEL <4% (34% FOR Contrqlled RCS tooldown N_0T...
o RCS subcooling - NOT ACCEPTABLE                     o Makeup from MUDS or PER ICONIC DISPLAY OR                                   radwaste ATTACHMENT A                                       o     Prepare to isolate
. -6DVERSE.CNMT! AND_TO.IAL in progress F m WATER FLOW <500 bni RCS pressure - <1370 PSIG AVAILABLE
                                      -OR-                                         secondary supply side o   PZR level - CAHHOT BE MAINTAINED                         of 3 SGs
-AND,
                          > 4% (38% FOR ADVERSE CNMT)                       o     Crosstie unit's CST o     Reduce cooldown rate
-AND-
* IF AUX         :
: 4. Integrity - DECREASE High head SI pump flow indicator
E ED ) UMP JA'' TAyK _ EVE _
>100*F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:
            < 16% T 1 E 4P ERFOR i 'HE :0L _0WI 4G:                           I: CST LEVEL <3%,         -
: 5. Containment - CMiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST
EN P ERFORM TH E FOLLOWL s G:
_ EVE _ <20%,
* Refill the day tank
' HEN Step 1, it:
CONSIDE RT i E FOLLOW: NG:.
o RCS subcooling - NOT ACCEPTABLE o
Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o
Prepare to isolate
-OR-secondary supply side o
PZR level - CAHHOT BE MAINTAINED of 3 SGs
> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o
Reduce cooldown rate
* IF AUX
: E ED
) UMP JA'' TAyK
_ EVE
' EN
< 16% T 1 E 4P ERFOR i
'HE :0L _0WI 4G:
I: CST LEVEL <3%,
P ERFORM TH E FOLLOWL s G:
Refill the day tank
: a. Verify secondary side of 3 SGs isolated
: a. Verify secondary side of 3 SGs isolated
: b. Switch AF suction to SX
: b. Switch AF suction to SX supply (Final)
                                          .                                        supply (Final)
(0386E/0042E/042488)
(0386E/0042E/042488)                                                     APPROVED JAN311969 B.O.S.R.
APPROVED JAN311969 B.O.S.R.
w _ _--         _ _ _
w _ _--


]
l,,.
l,,.
REV. 1                     REACTOR TRIP OR SAFETY INJECTION               1BEP-0   ]
REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 i
WOG-1A                                   UNIT 1 i
ATTACHMENT A 1
ATTACHMENT A 1
A.                 Determination of Post-Accident RCS Subcooling:
A.
Determination of Post-Accident RCS Subcooling:
: 1. Check Cnmt for ADVERSE conditions:
: 1. Check Cnmt for ADVERSE conditions:
o Cnmt pressure greater than 5 PSIG.
o Cnmt pressure greater than 5 PSIG.
                                                                -OR-o Cnmt radiation greater than 10 5R/hr:
-OR-5 o Cnmt radiation greater than 10 R/hr:
* 1RT-AR020 Grid 4 4AS120
1RT-AR020 Grid 4 4AS120 1RT-AR021 Grid 4 4AS121
* 1RT-AR021 Grid 4 4AS121
: 2. Check RCS pressure on wide range pressure instruments (1PI-403A/405).
: 2. Check RCS pressure on wide range pressure instruments (1PI-403A/405).
: 3. Determine temperature for RCS pressure using NORMAL or ADVERSE Cnmt curves per Figure 1BEP 0-1.
: 3. Determine temperature for RCS pressure using NORMAL or ADVERSE Cnmt curves per Figure 1BEP 0-1.
: 4. Check average of ten highest core exit TCs from MCB indicators (1TI-IT001/IT002).
: 4. Check average of ten highest core exit TCs from MCB indicators (1TI-IT001/IT002).
: 5. If average of ten highest core exit TCs less than temperature for RCS pressure, then acceptable subcooling exists.
5.
If average of ten highest core exit TCs less than temperature for RCS pressure, then acceptable subcooling exists.
APPROVED FEB 011989 B.O.S.R.
APPROVED FEB 011989 B.O.S.R.
(0304E/0035E/042088)
(0304E/0035E/042088)
FfNAE.
FfNAE.
- _              _ _ _ _ _ _ - _ _}}
_ _ _ _ _ _ - _ _}}

Latest revision as of 19:34, 1 December 2024

Rev to 1BEP-0, Reactor Trip or Safety Injection Unit 1
ML20247M866
Person / Time
Site: Byron, 05000000
Issue date: 02/01/1989
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20247M747 List:
References
1BEP, 1BEP-0, NUDOCS 8908020242
Download: ML20247M866 (33)


Text

-

?

i

~ ATTADENT L14 r

REV. - l' REACTOR TRIP C1 SAFETY. INJECTION 1BEP4

'WOG-1A UNIT 1 3

l-1 4

A. PURPOSE)

This procedure provides actions to verify prope'r response of the automatic protection systems following manual 4r automatic actuation of'a Reactor Trip or Safety. Injection, to assess plant conditions, and to identify the. appropriate recovery procedure.

P. S_yptTryo nn. nrMY WITIONS.,

3, y

3

^

1) The'following are symptoms that-may require a Reactor Trip, if.one has not occurred:

o Source range high'1evel 1 105 CPS o

Intermediate range high level 1 25% power o ! Power range lo-level 1 25% power o

Power range hi-level.1 109% power o' Power range positive rate 1 5% power change in 2 seconds-o Power range negative rate 1 5% power change in 2 seconds o.

Overtemperature Delta T 1 116.4% i penalties o,

Overpower Delta T 1 107.2%

-penalties

'o High.PZR pressure 1 2385 psig

'o Low PZR pressure 1 1885 psig 3'

o.

High PZR level 1 92%

.o Single loop loss of flow I 90% loop flow o

Two loop loss of flow I 90% loop flow in 2/4 loops o

RCP breakers - open RCP bus low frequency 1 57.0 Hz o

o RCP bus undervoltage <-5268 volts Turbine trip emergency trip _ header 1 540 psig oil pressure-o or Turbine stop valves shut o

SI manual actuation containment high pressure SI > 3.4 psig o

Low PZR pressure SI i 1829 psIg o

Low steamline pressure SI 1 640 psig (rate sensitive) o o

Steam Generator water level low-low < 40.8% of narrow range span

2) The following are symptoms of a reactor trip:

o Any Reactor Trip first out annunciator lit.

Rapid decrease'in neutron level indicated by nuclear o

instrumentation.

Step continued on next page APPROVED FEB 011989 8908020242 890727 PDR ADOCK 05000454 B.O.S.R.

4 P

PDC

-(0304E/0035E/042088)

W__-__-___---___-_

i REV. 1 OPERATOR ACTION

SUMMARY

1BEP-F.0' WOG-1A FOR 2BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Subcriticality - NUCLEAR (affected pumps only)

POWER >5%

-OR-o Cnmt Phase B actuated 2

Core cooling - CORE EXIT

-OR-TCs >1200*F o

ALL of the following conditions exist:

3. Heat sinh-ALL SGs NR p mi.=r,yo wnn

~'~

Luntrolled Rua cooldown,HQ1

. ADVERSE CNMT) AND TOTAL _

in progress FEEDWATER FLOW <500 GPM

-AND AVAILABLS RCS pressure - <1370 PSIG

-AND-4.

Integrity - DICEIASI_

High head SI pump flow indicator

> 100

  • F Ui LAST 60 MINUTES __

(lFI-917) >50 GPM flow or AND RCS COLD LEG <246*I SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO.lBEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST LEVE_ <20%, THEN Step 1, if:

CONSIDEfL THE FOLLOWING:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CAUNOT BE MAINTAINED of 3 SGs

> 47. (387. FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate IF AUX

EED )UiP JA TANK.fVEL

< 16% T i EN P ER FOR 1

'HE F0E_0 WING:

I: CST LEVEL <3%, TiEN P ERFORfl TH E FOLLOWI 4G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JAN 311989 B.O.S.R.

f**

REV. 1 lWOG-1A' REACTOR. TRIP'OR SAFETY I.JECTION 1BEP-0 UNIT l' l-Stop B-2) (continued) o All shutdown and control rods fully inserted and rod. bottom-lights lit.

g' Rapid.dtcrease in Unit load to zero power.

o 3 ). m' e i nowin n?" ' - -- nne..c.c M at9xc t r e a %a r.or N i a

~

Safety Injection, if one bas not occur' red:

o Low PZR pressure 1 1829 psig.

~ o Low steamline pressure 1 640 psig (ra e sensitive)

Containment high pressure 1 3.4 psig o

4) The following may be symptoms of a Reactor Trip and Safety Injection:

o Any SI first'out annunciator lit.

All Group 2 cold leg injection monitor lights lit.

o o

ESF equipment actuated.

o SI actuated BYPASS-PERMISSIVE light lit.

5) This procedure may also be entered from:

o 1BEP ES-0.1, REACTOR TRIP RESPONSE, Step 7, when PZR pressure 1 1829 psig.

APPROVED FCB011989 B. o. s. R.

=

(0304E/0035E/042088)

i REV 1

OPERA'0R ACTION

SUMMARY

1BEP-F.0 WOGI1A FOR 1BEP-0 SER?ES PROCEDURES i

TRIP RCPS WHEN:

[

RED PATH

SUMMARY

o CC water to RCP lost-

1. Suberiticality - NUCf. EAR (affected pumps only)

POWER >5%

-OR-1 o

Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F o

ALL of the following conditions exic.:

3. Heat sink-ATL SGs NR LT.YEL <4% (34% FOR Concrol' leo.Aca couauvwa E

/eVEuE C..... !.u'D L -

in progress FRRnWATER FLOW <500 GPM j

-AND AVAILABLE q

RCS pressure - <1370 PSin

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF' CST

_ EVE _ <20%,

'iEN Step 1 if:

CONSIDE R'"iE FOLL0tG Q:

o RCS subcooling - NOT ACCEPTAlSLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate IF AUX

E ED jug _ )A" TA4K

_ EVE

< 16% T i E 4P err 6R 4 IHE FOL _0WI 4G:

I: CST LEVEL <3%, TJ EN P ERFORM TH E FOLLOWI G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JM 311989 B. O. S. R.

p :.

I -

1 REV. 1

. REACTOR TRIP OR-SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 i

L

)

1 STEP ACTION / EXPECTED RESPONSE RE?FONSE NOT 0 iTAiNED I

f CAUTION During a loss of offsite power, I

operator action will be necessary to actuate PZR PORVs.

__s I

        • eenen**ene**eenemen**enenemmenen e...

e NOTE

=

With this procedure in effect, notify the Station Director who will*

evaluate for GSEP conditions per BZP-200-A1, BYRON EMERGENCY ACTION '

  • LEVELS.

emene**eneesee

            • enene**ene*********

emmeenen*menneesene** nene**eneseen ****

e e

NOTE Steps 1 through 15 are IMMEDIATE ACTION steps.

    • enene
      • meneme****ene****mene********
                    • senene*******

e**ene*eammenene e

NOTE

" Adverse Containment" as used in Byron Emergency Procedures is defined as:

o Containment pressure GREATER THAN 5 PSIG

-OR-APPROVED o

Contaiment radiation level GREATER THAN 105 R/HR.

FEB 011969 e

n e

IRT-AR020 Grid 4 4AS120 B.O.S.R.

e e

IRT-AR021 Grid 4 4AS121 enemmenene***menennename***eemene*****me lil VERIFY REACTOR TRIP '

Manually trip the Reactor, Rod bottom lights - LIT IF the Reactor will NOT trip, o

Reactor trip and bypass TiiEN GO TO 1BFR-S.1, breakers - OPEN RESPONSE TO NUCLEAR POWER e

Neutron flux - DECREASING GENERATION /ATWS, Step'1.

1 1

Page 3 of 33 (0304E/0035E/042088) 4

- _ _ _ = _ - _ _ _ -

i REV 1

OPERATOR ACTION SU' dARY 1BEP-F.0 i

WOG11A FOR 1BEP-0 SERIES PROCEDURES j

1 j

TRIP RCPS WHEN:

RED PATH ' UMMARY:-

o CC water to RCP lost

1. Subcriticality - NUCLTAR

'(affected pumps only)

POWER >57.

-OR-o Cnat Phase B actuated

2. Core cooling - CORE EXII

-OR-TCs >1200'F o

ALL of the follotdng conditions exist:

3. Heat sink-ALL SGs NR

' 3 VEL. (4% (la_7 F.QB Controlled RCS cooldotm nul

~

IL Eh CET) AND iuT%

in progress FTFDWATER FLOW <500 GPM

-AND AVAILABLE l

RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100'r IN LAST 60 MINUTES (1FI-917) >50 GP2 flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CHMI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%,

JEN Step 1, if:

CONSIDE RT i E F0 _ LOW:: sG:

o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT4's o

Crosstie unit's CST

,, V o

Reduce cooldown rate IF AUX

E ED )UiP :)A" TA4K

_ EVE _P#

< 16% T i E 9P ER:0R i

'HE :0L _0WI1G:

I: CST LEVEL <3%, "iEN P ERFORM TH E FOLLOW:: 4G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final) l (0386E/0042E/042488)

APPROVED JM 311989 B. O. S. R.

l l

REV.-1 REACTOR TRIP OR SAFETY INJECTION 1.,EP-0 WOG-1A UNIT 1 l

STEP ACTION / EXPECTED RESPON5E RESPONSE NOT OBT AINED l2l VERIFY. TURBINE TRIP:

Perfor.n the following:

All Turbine throttle stop

1) Manually trip the turbine valves:- CLOSED 2)_IF turbine will NOT trip, j

All Turbine governor valves -

THEN manually run back

{

CLOSED the turbine at maximum

{

~~~

rate by the follmsic, method:

1 a) Press TURB MAN..

b) Press FAST ACTION and GOV LWR. simultaneously.

1 IF turbine can NOT be run

back, THEN place EH pumps in PULL OUT position.

IF Turbine still will NOT

trip, THEN manually initiate Main Steamline Isolation and manually close MSIV bypass valves.

l31 VERIFY POWER TO 4KV ESF BUSSES:y a.ESFbusses-ATLEASTOlb

a. Try to restore power to at ENERGIZED:

least one ESF bus, y

o Bus 141 alive light -

IF power can NOT be LIT restored to at least one

-OR-ESF bus, o

Bus 142 alive light -

THEN GO TO 1BCA-0.0, LIT LOSS OF ALL AC POWER, Step 1.

b. ESF busses - ALL ENERGIZED:
b. Try to restore power to deenergized ESF bus while Bus 141 alive light - LIT continuing with this

-AND-procedure.

Bus 142 alive light - LIT APPROVED FEB 011989 s.o.S.R.

(0304E/0035E/042088)

i REV :1 OPERATOR ACTION

SUMMARY

1BEP-F.0 WOG '-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS-WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Subcriticality - JiUCT. EAR (affected pumps only)

POWER > 57.

-OR-o Cnat Phase B actuated

2. Core cooling - CORE EXIT-

-OR-TCs >1200*F 0

ALL of the following conditions exist:

3. Heat sink-AT.T. SGs NR I.EVEL <4'l M47. FOR Controttea RC5 anouwn lid J'Ju Cf*MT-m...
10. n ' -

in progress FREDWATER FLOW (500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 'O MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO T0 1BEP-0, REACTOR TRIP OR SAFETY INJECTION.,

IF CST

_ EVE _ <20%,

-EN Step 1, if:

CONSIDE RT i E F0 _LOWL VG:

o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - C_ANNOT BE MAINTAINED of 3 SGs

> 47. (387. FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
E ED )UiP ")A" TANK

_ EVE I: CST LEVEL <3%, '-EN

< 16% T i E 4P ER:0R1 IHE FOL _0W I.4G:

P ERFORM-TH E FOLLOWL s3:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply l

l (Final)

(0386E/0042E/042488)

APPROVED

  1. N 311989 s.o.s.R.

)

l REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED RESPON5E RESPONSE NOT OBTAINED l51 CHECK IF SI ACTUATED:

Check if SI required:

I Any SI first out o

PZR pressure less than annunciator - LIT 1829 PSIG.

e Group 2 Cold Leg

-OR-Injection monitor lights o

Steamline pressure less

- LIT than 640 ?SIG.

-OR-o Containment pressure greater than 3.4 PSIG.

IF SI required, THEN manually actuate.

IF SI NOT required, THEN GO To IBEP ES-0.1, REACTOR TRIP RESPONSE, Step 1.

APPROVED FEB 01 1989 B. O. S. R.

Page 5 of 33 (0304E/0035E/042088)

OPERATOR ACTION

SUMMARY

1F P-F.0 REV 1 WOG'1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Suberiticality - NUCf. TAR (affected pumps only)

POWER >5%

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200'F o

ALL of the following conditions exist:

. Heat sink-ATT.SGs NR LEVJk < 41 04LEQB_. _

Controlled RCS cooloOer. mlI*

ADVElil mGMT"; dGJTOTAL 6

in progress FTEDWATER FLOW <500 GPM

-AND AVAILABLE RCS pressure - (1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%, " FEN Step 1, if:

CONSIDE RT i E FOLLOW 1 3:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate IF AUX

E ED 'UiP JA" TA 4K

_ EVE

< 16% T i E 4P ER :0R i

'HE

0L _0WI 4G:

I: CST LEVEL <3%, "iEN P ERFORM TH E FOLLOWL 4G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JAN 311989 B.O.S.R.

REY. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACT!ON/ EXPECTED RE5 C;N5E RESPONSE NOT OST AINED 4

l$l VERIFY FW ISOLATION:

a. FW purops-TRIPPED:
a. Manually trip pumps.

W PUMPS TRIP alarms - LIT b

FW numpe <94echaran v=1vec

b. Manu 11y clos?

alvec..

- CLOSED:

1FWOO2A 1FWOO2B e

1FWOO2C

c. FW reg valves - CLOSED:
c. Manually close FW reg valves.

1FW510 IFW520 IF any valve vill NOT IFW530

close, 1FW540 THEN close its associated FW shutoff valve:

o IFWOO6A o

IFWOO6B o

IFWOO6C o

1FWOO6D

d. FW reg byp valves - CLOSED:
d. Manually close valves.

IFW510A 1FW520A IFW530A e.

1FW540A

e. FW isol valves - CLOSED:
e. Manually close valves.

IFWOO9A IFWOO9B e

1FW009C 1FWOO9D Step continued on next page APPROVED FEB 011989 B.O.S.R.

Page 6 of 33 O __

(0304E/0035E/042088) ---

REV 1

OPERATOR ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES-l TRIP RCPS MIEN:

RED PATH

SUMMARY

o CC water to RCP lost 1

Suberiticality - NUCf. EAR (affected pumps only)

POWER >57.

-OR-o Cnat Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F o

ALL of the following conditions exist:

3. Heat sink G.1Gs NR LEVEL <47. (3A7,_f0R_

t.ontrollec E S coo 2.ouwn @_t

~.Laf CE, rwu

....m in progress FEEDWATER FLOW <500 GPM

-AND AVAILABLE

~

RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100'F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM

]

SI ACTUATION:

5. Containment - CB1T PRESSURE >50 PSIG Actuate SI and.GO TO 1BEP-0.

. REACTOR TRIP OR-SAFETY INJECTION, IF CST

_ EVE _ <20%,

'iEN Step 1, if:

CONSIDE RT (E FOLLOW.. 9G:

o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 47. (387. FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate IF AUX

EED )UiP JA" TAVK

_ EVE

< 16% T i E 9P ER:0R i

'HE :0L _0WI 1: CST LEVEL <3%, "HF.N 4G:

P ERFORM TH E FOLLOWLNG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated i
b. Switch AF suction to SX supply i

I (Final) l (0386E/0042E/042488)

APPROVED aa 31 m s.o.s.n.

J

l l

REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED FES GN5E RESPCNSE NOT OSTAINED Step 5 (continued)

f. FW temprng flow cont valves -
f. Manually close valves.

CLOSED:

1FWO34A 1FWO34B 13034C 1FWO34D

g. FW temprng isol valves -
g. Manually close valves.

CLOSED:

i 1FWO35A IFWO35B e

1FWO35C 1FWO35D

h. FW prehtr byp isol valves -
h. Manually close valves.

. CLOSED:

IFWO39A 1FWO39B 1FWO39C 1FWO39D

1. FWIV byp isol valves -
i. Manually close valves.

CLOSED:

1FWO43A IFWO43B 1FWO43C 1FWO43D l

APPROVED FEB 01 1989.

B.O.S.R.

Page 7 of 33 (0304E/0035E/042088)

e REV 'l OPERATOR ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES s

TRIP RCPS WHEN:

RED PATH

SUMMARY

{

o CC water to RCP lost

1. Subcriticality - NU,CTRAR (affected pumpe only)

POWER >57.

~

-OR-o Cnat Phase 3 actuated

2. Core cooling - GQRE EXIT

-OR-TCs >1200*F o.

-ALL of the folloving conditions exist:

3. Heat sink-AT.T. SGs NL_

l LEVTL 3 7. f447,_ FOX _

4 Controfled nCS cooluvwn ma AuvEnSE uind aND TGIAu in progress F m WATER FLOW <500 GPM 4

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PE SSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20L T W EN Step 1, if:.

CONSIDE R TH E FOLLOWI \\ G:

o RCS subcooling - NOT ACCEPTABLE o Makeup 2 rom MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secendary supply side o

PZR level - CAHMl_BE MAINTAINED of 3 SGs

> 47. (38% FOR ADVERSE CNMTS o

Crosstie unit's CST o Reduce cooldown rate

  • IF AUX
E ED JUMP DA3' TAVK

_ EVE Ll6% Ti E 9 P ERFOR1 rHE 0L _0WI VG:

I:: CST LEVEL <3L NEN P ERFORM TH E FOLLOWL s G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply l

(Final)

(0386E/0042E/042488')

APPROVED JM 311989 s.o.s.R.

l l

_,.--,.---,.n

' N '-

I

'REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A

. UNIT 1 STEP

. ACTION /E"FECTED REE 0N5E PESPCNSE NOT OSTAINED 16l VERIFY ECCS PUMPS RUNNING:

Manually start pumps.

CENT CHG pumps run lights - LIT SI pumps run lights - LIT RH pumps run lights - LIT jil Vt-RIFY LOhri AINMENT ISOLATION PHASE Af

a. Cnmt Phase A valves - CLOSED:
a. Manually actuate Cnmt Isol Phase A and verify Group 3 Cnmt Isol valves closed, monitor lights - LIT lHl VERIFY CONTAINMENT VENTILATION ESOLATION:

~

a. Cnmt Vent Isol valves - C_LOSED:
a. Manually close valves.

Group 6 Cnmt' Vent Isol monitor lights - LIT lHl VERIFY AF PUMPS RUNNING:

I

a. AF pumps run lights - LIT
a. Manually start pumps.

lEl VERI:Y RCFCS RUNNING IN.. LOW SPEE7:

f

a. RCFC low speed run
a. Manually start RCFCs in lights - LIT low speed.

l Hl VERIFY CC PUMPS RUNNING:

a. CC pumps run lights - LIT
a. Manually start pumps.

lElyERIFY SX PUMPS RUNNING:

a. SX pumps run lights - LIT
a. Manually start pumps.

APPROVED fEB 011989 B.o.S.R.

Ppge 8 of.33 (0304E/0035E/042088)

RE V.

1--

OPERATOR ACTION

SUMMARY

1BEP-F.0-WOG-1A FOR'1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:.

RED PATH

SUMMARY

o CC wat.er to RCP lost

1. Subcriticality. - ECLEAR (affeeted pumps only)

POWER > 57a,

-OR-o Cnat Phase B actuateA

2. Core cooling - CORE EXIT

-OR-TCs >1200*F o-ALL of the following conditions

~...

3. Heat sink-ATL SGs NR exist:

LEYEL_147..J141 FOR

(,outrollea RCb coolouwn dQ1 eavnet CET)_ er r',4 6

in progress FrrnWATER FLOW <500 GPM

~

-AND AVAILABLE RCS pressure - (1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES.

(1FI-917) >50 GPM flow or AND RCS COLD LEG (246*F SI' pumps >100 GPM SI ACTUATION:

5. Containment - CmiI PREESURE >50 PSIG Actuate SI and'GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%, "E EN

'l Step 1,'if:

CONSIDE RT i E F0 _LOWLh 3:

o RCS'subcooling - NOT ACCEPTABLE o. Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side j

o PZR level - CANNOT BE MAINTAINED of 3 SGs j

> 4% (38% FOR ADVEREE CNMT) o Crosstie unit's CST IF AUX

E ED
2. iP JA" TA4K _ EVE _f
  • y o

Reduce cooldown r-ate I

< 16% T H4P E UOR 1 PHE :0L _0WI 4G:

I: CST LEVEL <3%, T"EN EBEORM TH E,FOLLOWI sG:

Refill the 6ay tank,

a. Verify secondary side of 3 SGs isolated
b. Switch /J suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JNI 311989 s.o.s.R.

REV. 1 REACTCR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A U' LIT 1 5TEF ACTION / EXPECTED REE'Gh5E i

PESPONSE NOT GSTalNED l[1l CHECK.IFMAINSTEAMLINESSHOULD BE ISOLATED:

l 1

a. Check one or more of the
a. GO TO Step 14.

i following conditions:

ANY STEAMI'NE PPCSS!mE 1

LESS THAN OR EQUAL TO 640 PSIG

-OR-o CONTAINMENT PRESSURE GREATER THAN 8.2 PSIG (1PI-CS934 THRU 1PI-CS937)

'(

b. Verify Main Steamline Isolation:
b. Manually initiate Main manuallycloseMSIVbypass.{

Steamline Isolation and MSIVs - CLOSED MSIV bypass valves - CLOSED valves.

-llEl VERIFY CONT'AINMENT SPRAY NOT REQUIRED:

a. Cnmt pressure - HAS
a. Perform the following:

REMAINED LESS THAN 20 PSIG, (IPI-CS934 THRU 1PI-CS947; 'or

1) Verify Containment recorder IPR-937)

)k'p Spray actuated.

I V

y' IF NOT, THEN manually actuate.

2) Verify Cnmt Isol Phase B valves closed:

All Group 6 Phase B e

isol monitor lights LIT.

IF NOT, THEN manually close valves.

3) Stop all PCPs.,

APPROVED FEB 011989-l B.O.S.R.

i-(0304E/0035E/042088)

REV 1

OPERATOR ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

1. Suberiticality - NUCLFAR o

CC water to RCP lost (affected pumps only)

POWER >EL

-OR-o Cnat Phase B actuated

2. Core cooling - CORI EXIT

-OR-TCs >1200*F 0

ALL of the following cond,itions erist:

3. Heat sink-ALL SGs NR LEVEL (4% (34% FOR uvatzs n cd m.o cooidown M no.z.sE C h, Mw avism in progress FFFDWATER FLOW <500 GPM

-AND AVAILABLE RCS pressure - <l370 PSIQ

-AND-

4. Integrity - DEEEASE--

High head SI pump flow indicator

>100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG (246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE L <20%, " lien Step 1, if:

CONSIDER T 4 E FO'_ LOW 14G:

o RCS subcooling - NOT ACCEDTABLE o

nakeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE. MAINTAINED of 3 SGs d

> 4? (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
E ED )U'iP 3A" TAVK

_ EVE'_

< 16% T i E 4P ER :0R 1 HE :0L _0WI:4G:

I: CST LEVEL <3%,

T EN P ERFORM TH E FOLLOW 3 G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply 1

(Final)

)

(0386E/0042E/042488)

APPROVED i

J6N 31 M49 B.O.S.R.

I

R$V. 1-REACTOR TR'IP OR SAFETY INJECTION 1BEP-0 1

WOG-1A.

UNIT 1 STEP ACTION / EXPECTED RES?ONSE RESPONSE NOT OSTAINED I

l3l VERIFY'DIESELGENERATORSRUNNING:

a. DGs run lights - LIT
4.. Manually stirt DGs.

IF DGs can NOT be started iiianually,

~

W EN Ic m 11.y :'a~* rer 1 BOA ELEC-3, LOCAL EMERGENCY START OF A

, DIESEL GENERATOR.

16 ANN 00NCE CONDITION OVER PAGE, U VIT

. REACTOR TRIP - SAF ETY I VJEC" ION 17 VERIFY GENERATOR TRIP 30 SECONJS AFT ER TURBINE TRIP:

a. Unit 1 Main Transformer feed to
a. Manually open breakers 345KV Swyd breakers-OPEN:

as necessary:

OCB 3-4 o OCB 3-4 OCB 4-5 o OCB 4-5

b. PMG output breaker -
b. Manually open.PMG output OPEN:

breakcr.

e 41 Brkr

c. Generctor lockout relay trip alarm - LIT APPROVED i

FEB 011989 I

B.O.S.R.

l (0304E/0035E/042088)

i REV 1

OPERATOR ACTION

SUMMARY

1BEP F.0 WOGI1A FOR 1BEP-0 SERIES PROCEDURES

, TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Suberiticality - NUCf.FAR (affected' pumps only)

POWER >5%

-OR-o Cnat Phase B actuated

2. Core cooling - CORE EXIT

-OR-2Cs >1200*F o

ALL of the follow'ng conditions exist:

3. Heat sink-AT.T. SGs NR LEVIL <4% (34% FOR com. rolled hCS 'chuww DEA

~

~. m,i Ciin > 1 2 J !n_

in progress INFnWATER FLOW <500 GPM

-AND AVAILABLE RCS. pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flos. indicator

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG (246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and-GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST '_EV E _ <20%, " TEN Step 1, if:

CONSIDE R i E - F0 _LOWL 03:

o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
EED SUiP :)A" TA4K

_ EVE I: CST LEVEL <3%, EN

< 16% T i E 4P ER :0R i

'HE

0L _0WI 4G

P ERFORM TH E FOLLOWD G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF raction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JM 311989 B.O.S.R.

REV. 1 REACTOR. TRIP OR SAFETY INJEC120N 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED RE5:GN5E FESPC.iSE NOT GSTAINED 18 VERIFY ECCS FLOWa

a. High head SI pump flow
a. Manually s. Art CENT CHG I

indicator (1FI-917) -

pumps and align valves is GREATER THAN 50 GPM necessary.

b.'RCS pressure (1PI-403A/405) -

b. GO TO Step 19.

'ISS m AN :T,0 Pc'e i

c. SI pumps discharge flow
c. Manually start SI pumps andl indicators (1FI-918/922) -

align valves er necessary. n GREATER THAN 100 GPM

d. RCS pressure (1PI-403A/405) -
d. Go To Step 19.

LESS THAN 300 PSIG

e. RH pumps discharge. flow
e. Manually start RH pumps and indicators (1FI-618/619) -

align valves as necessary. 1 GREATER THAN 500 GPM 19 VERIFY ECCS VALVE ALIGNMENT:

)

a. Group 2 Cold Leg Injection
a. Manually align valves as monitor lights required for necessary.

ECCS valve alignment - LIT l

l 1

1 l

APPROVED FEB 011989 B.O.S.R.

e (0304E/0035E/042088)

L.-____--____----_..-------------

= _ - -

REV 1

OPERATOR Af" ION

SUMMARY

.1BEP-F.0 WOGI1A FOR 1BEP-0 SERIES PROCEDURES.

TRIP PCPS WHEN:

Rf-) PATH SUMMAR1:

o CC water to RCP lost

1. Suberiticality - NUCf.FAR (affected pumps only)

POWER 35%

-OR-o Cnet Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCn >1200*F o

ALL of the following coaditions

3. Heat sink-AT.T. SGs NR ex3.s t :

LEVEI_< 4L( EFQ1.

t.,ontrob'e,c ht;b cvvAcuwia uni ADvME Chii1"i r.#w Tv AL

'~ "

in progrecs FrrnWATER FLOW <500 GPM

-AND AVAILABLE RCS preissure - <1370 PSIG

-AND-

4. Integrity - DECREASE..

High head SI pump flow indicator-

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG (246*F SI pnaps >100 GPM SI ACTUATION:

5. Containment - CNMT PRFRSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%, TiEN Step 1, if:

CONSIDE RT i E F0 _LOWI 6:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or EER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 47. (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
E ED 'UiP ')A" TA4K

_ EVE

< 16% T i E 4P ER :0R i

'HE :0L _0WI 4G:

I: CST LEVEL <3%.

- EN P ERFORM TH E FOLLOWL VG:

Refill the day tank

a. Verify secondary side of 3.SGs isolated
b. Switch AF suction to SX supply f

(Final)

(0386E/0042E/042488)

APPROVED JM 311989 a.o.s.R.

.I

REV.'l REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEF dCTION/ EXPECTED REE GN5E RESPONSE NOT OE 'AiNED CAUTION AF flow must remain GREATER THAN 500 GPM until water level is GREATER THAN J% (34% FOR ADVERSE CNMT) for an indicatien. y SG narrow range I

20 VERIFY TOTAL AF FLOW:

a. AF flow - GREATER THAN 500 GPM a.

IF SG narrow range level AVAILABLE IE greater than 4% (34% FOR ADVERSE CNMT) in any SG, THEN control feed flm; to maintain SG narrow range.

level.

IF SG narrow range level Ti less than 4% (34% FOR ADVERSE CNMT) in all SGs, THEN manually start AF pumps and align valves as necessary.

IF AF flow can NOT be established greater than 500 GPM, THEN GO TO 1BFR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, Step 1.

e l

APPROVED FEB 011989.

B.O.S.R.

age 12 of 33 (0304E/0035E/042088)

REV 1

OPERATOR ACTION SUMM/dY 1BEP-F.0 WOG'1A FOR 1BEP-0 SERIES PROCEDURES TRIP'RC_Ps WHEN:

RED PATH SUPiAR1:

o CC water to RCP lost

1. Subcritic.tlity - NUCLEAR (aff ected pumps only)

POWER >5%

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F o

ALL of the followir; conditions exist:

3. Heat sink-ALL SGs NR LT2W < 41 04% J_0R_

Controlled RCS coo.tdown hsa I "V"L r., u.MT, AIiu T0 mL in progress

- FFFDWATER FLOW (500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F

.N LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%, T:iEN Step 1, if:

CONSIDE RT i E FOLLOWI 1G:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary. supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
EED ' vip 3A" TAiK

_ EVE

< 16% T i E 4P ERFOR i

'HE 0L _0WI 4G:

I: CST LEVEL <3%,

EN P ERFORM TH E FOLLOWL NG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JM 311969 B.O.S.R.

I

+

REV. 1 REACTOR TRIP OR SAFETY _ INJECTION 1BEi-0

-WOG-1A UNIT 1 1

5TEP ACTION /EXF.ECTED RE5?ON5E PE9PONSE NOT CSieiNED 21 VERIFY AF VALVE ALIGNMENT:

a.~AF isol valves - OPEN:

a. Mrc~ illy OPEN valves.

1AF013A-

  • - 1AF013B 1AF013C

~

n

.AF013p 1AF013E 1AF013F 1AF013G 1AF013H b._AF flow control valves -

b. Manually throttle valves THROTTLED OPEN:

OPEN.

1AF005A 1AF005B 1AF005C 1AF005D 1AF005E 1AF005F 1AF005G

-l 1AF005H 1

APPROVED FEB 011989i B.O.S.R.

Page 13 of 33 (0304E/0035E/042088)

REV 1

OPERATOR ACTION

SUMMARY

1BEP F.0 WOG11A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Subtriticality - HIElluE (affected pumps only)

POWER >5%

-OR-o Cnmt Phase B actuated

2. Core cooling - G RE EXIT

-OR-TCs >1200*F o

ALL of the following conditions exist:

3. Ec;.t :: ink-ALL SGs NR LEVEL < Q 11A% FOR t.,ontrollec KCS

. ~ T" 4 Jr b a_..

.K in progress FEEDWATER P.OW <500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DEL 2EASX_

High head SI pun:p flow indicator

>100*F IN LAST 62. MINUTES (1FI-917) >50 GPM flow or ARD RCS COLD LEG <1(th,*E SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE 1 (20%, TiEN Step 1, if:

CONSIDE RT i E FOLLOWI 9G:

o RCS subcooling - NOT ACCEPTABLE o

Maheup from MUDS or PER ICONIC DISPLAY OR radwaste A'I*fACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
EED DUiP DAl' TA4K

_ EVE __"c.

V

< 16% T i EN P ER :0RM

'HE 0L _0WI W:#

I: CST LEVEL <3%. THEN Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488) pp g

l JAN 311989 B.O.S.R.

i

j '.

f.

/

REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 s

.,WOG-1A UNIT 1 STEP ACT80N/ EXPECTED RE5 GN5E RESPONSE NOT OSTAiNED j

s CAUTION If a radioactive release to the i

atmosphere occurs, then Control Room i

Offices vent fans,-OVVOICA and i

OVV01CB should be verified tripped

{

g:

at panc1 TiV01J.

.4, l

22 VERIFY CONTROL ROOM VENTILATION SYSTEM ALIGNED FOR EMERGENCY i

OPERATIQN j

i

a. Control Room chillers run
a. Manually start chiller for lights - LIT:

VC train in operation.

Train A - MCR CHLR 0A Train B - MCR CHLR OB D. M/U' air _ source aligned for

b. Manually align Train A or B L emergency, operation:

makeup air source to emer-gency source as necessary:

o TRAIN A FILTER light - LIT o

OVC25Y/09Y-OPEN

-OR-o OVC32Y/16Y - CLOSED i

s o

TRAIN B FILTER light-a* LIT o

OVC281Y/282Y - CLOSED-1eP o

OVC312Y/313Y

, CLOSED

c. VC train in operaticp,'M U'
c. Perform the 'following; air filter unit fan run light

- LIT and-discharge flow control

1) Place non-operating VC damper - NOT FULLY CLOSED:

train equipment in operation:

o Train A - M/U Fan OA and Supply fan J

damper OVC24Y e

Return fan

.-OR-e M/U air filter o

Train B - M/U Fan OB and unit fan k

damper OVC08Y

2) RETURN TO Step 22a.
d. VC train in operation, recire
d. Manually close recire charcoal absorber bypass damper:

charcoal absorber bypass damper on VC train in o

Train A OVC43Y - CLOSED operation.

-OR-APPROVED o

Train B OVC44Y - CLOSED Step continued on next page B.O.S.R.

(0304E/0035E/042088)

]%,$di!

m

, s.

3,

,o

,h.'l ~

3VREV. 1" OPERATOR ACTION

SUMMARY

.1BEP-F 1 WOG-1A' FOR 1BEP-0 SERIES PROCEDURES-c my

. TRIP RCPS WHEN:

RED PATH

SUMMARY

-o-CC water to RCP lost

1. Suberiticality - NUCLEAR (affected pumps only)

POWER >5%

-OR-o' Cnet Phase B actuated

2. Core cooling.- CORE EXIT

-OR TCs >1200'F o

ALL of-the following conditions exist:

3.-Es.: sink-ALL SGs NR-LEHI;_L4% (_34%. FO.R

  • ~ Contro,Lled RCS.coolaown !!Q1 ADVERhi, ma',MJTalm" e

FFFNdATER FLOW < 500 GPM in progIess

-AND AVAILABLE RCS pressure

<1370 PSIG

-AND-

4. Integrity.- DECREASE High head SI pump flow-indicator

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F-SI pumps.>100 GPM SI ACTUATION:

5. Containment - CNMT PRRCSURE >SO PSIG LActuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_EV E _ <20%, '

" EN Step 1. if:

CONSIDE R

' i E' F0 _LOWM s if NOT ACCEPTABLE o

Mckeup from MUDS ~or o.RCS subcooling AY OR-PER ICONIC DISPL radwaste ATTACHMENT A o

Prepare to. isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 41 (381 FOR ADVERKE CNMT) o Crosstie unit's CST o

Reduce cooldown' rate

  • IF AUX
E ED MP ')A" TA 4K

-_!EVE IF CST LEVEL <3%, TiEN

< 16% T i E 4P E ( :0R 1

'HE

0L _0WI 4G:

PER-:0RM TH E FOLLOWI 4 3; Refill the day tank

a. Verify secondary side of 3 SGs ir; sated l
b. Switch AF

< tion to SX i

supply I'

L 1

(Final)

(0386E/0042E/042488)

APPROVED JNI 311989 s.o.s.n.

a

y l

.REV. 1-REACTOR TRIP OR SAFETY INJECTION 1BEP-0' l

WOG-1A UNIT 1 1

i jSTEP ACTION / EXPECTED RE5:0N5E,

RE5FONSE NOT OST AiNED Step 22 (continued)-

e. Control Room pressure.- GREATER
e. Refer to BOP VC-14, MAIN THAN +0.125" H90, (MCR/TB CONTROL ROOM PRESSURE _ LOW, DP, OPDI-VC038) while continuing with)this procedure.

l APPROVED l

ftB 011989 1

B.O.S.R.

(')3 04E/0035E/042088 )

REV 1

OPERATCR ACTION

SUMMARY

1BEP-F.0 i;

WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Subcriticality - NUCTTAR (affected pumps only)

POWER 357.

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-ICs >1200'F o

ALL of the following conditions exist:

3. Heat sink-AT.L SGs NR LEYEk_547...( 3 4%_I,02_

Cont. rolled RCS covAdown h il/IERJi, Cmn } Mw _ ?.L in progress FEEDWATER FLOW <500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

'4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (IFI-917) 250 GPM flow or AND RCS COLD LEG <246*F

.SI' pumps 1100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP'OR SAFETY INJECTION, IF CST

_ EVE _ <20L JEN Step 1, if:

CONSIDE R

' i E FOLLOWL \\ G:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER IC6I?TC DISPLAY OR radweste ATTACHMFRf_A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANHOT BE MAINTADIED of 3 SGs

-> 47, (38'I FOR ADVERSE CNMT) o Crosstie unit's CST l

  • IF AUX :EID 'UiP JA" TA4K

_ EVE I : CST LEVEL <3L T EN

< 16% T iE 4P ER FOR 1

'HE :0L _0WI 4G:

PERFORM THE FOLLQ1GE:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply

}

(Final)

(0386E/0042E/042438)

APPROVED JM 311989 s.o.s.R.

}

REV. 1 REACTOR TRIP OR SAFETY INJECTION IBEP-0 WOG-1A UNIT 1 i

.L._

5TEP A; TION / EXPECTED RES GN5E PESPONSE NOT OSTAINED emeenemanna**eameneenna*manen**n********

NOTE Only or9 Aux Bldg Charcoal Booster Fan should be started in each non-accessible area exhaust filter plenum.

Only two plenums can be used at t n;

'm o t i me.

      • ,.........**......=*****ne********a YERifhAUXBLDGVENTILAIl0N 23 SYSTF2 ALIGNED FOR EMERJiEHQ' OPERATION:-
a. Two non-accessible AB Charcoal
a. Start non-accessible Booster Fans run lights - LIT:

AB Charcoal Booster Fans as necessary per BOP VA-5, o

OVA 03CA or OVA 03CB for Plenum A AUX BLDG CHARCOAL BOOSTER o

OVA 03CC or OVA 03CD for Plenum B FAN OPERATION.

o OV.A03CE or OVA 03CF for Plenum C

  • ne nn
    • n

.*nen..

        • e*************

NOTE Only one Fuel Bldg Charcoal Booster Fan should be run at a time.

nma...

      • .....ne..

ant...

enamen 24 VERIFY FUEL BLDG VENTILATION S_YSTEM ALIGNED FOR EMERGENCY OPERATION:

a. Train A or Train B Fuel
a. Start Train A or B Bldg Charcoal Booster Charcoal Booster Fan.

Fan run light - LIT:

per BOP VA-6, FUEL HANDLING BLDG CHARCOAL o

FHB Booster Fan OA BOOSTER FAN OPERATION.

OVA 04CA

-OR-o FHB Booster Fan OB OVA 04CB APPROVED FEB 01 1969.

s.o.S.R.

l.

Page 16 of 33 (0304E/0035E/042088)

L REV 1

OPERATOR ACTION SUMMAR7 1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES JIIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Suberiticality - MTCT.FAR (affected pumps only)

POWER >57.

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-Oh-TCs >1200*F o

ALL of the following conditions exist:

3. Heat sink-ATL SGs NR IZVEL < 47,114_7._FOR_

control. Leo RW cooJ,uvwn JQ1 rw v ERam CIM, 12"3 iJTAL in progress FKrnWATER FLOW <500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, '

IF CST LEVE _ <20L ' WEN Step 1, if:

CONSIDE R

' i E F0 _ LOW:: sG:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-0R,

secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 47. (3Q7. FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
E ED PUiP 3A TA4X

_ EVE

< 16% T i E 4 PER 0Ri

'HE ;0L_0WliG1 I: CST LEVEL <3L ' "EN P ERFORM TH E FOLLOW:: sG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JAN 311969 B.O.S.R.

i REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1

{

l 1

STEF ACTION /EXPEC 'ED RES:GN5E RESPONSE NOT OSTAINED 25 CHECK RCS AVERAGE TEMPERATURE:

i

a. RCS average temperature -
a. IF RCS temperature less STABLE AT OR TRENDING TO 557'F than 557'F and decreasing, t

THEN:

1)'Stop dumping steam.

2) IF cooldown continues, THEN maintain total feed flow greater than 500 GPM until SG narrow range level greater than 4% (34% FOR ADVERSE CNMT) in at least one SG.
3) IF cooldown continues, THEN shutdown unnecessary main steam roads.
4) IF cooldown continues, THEN close MSIV and MSIV bypass valves.

IF RCS temperature greater than 557'F and increasing, THEN dump steam to condenser:

1) Check condenser available.
2) Place MS header pressure controller in MANUAL and reduce demand signal to zero.
3) Place steam dumps mode selector switch in STEAM PRESSURE mode.

Step continued on next page i

APPROVED FEB 011989 B.O.S.R.

(0304E/0035E/042088)

OPERATOR ACTION

SUMMARY

1BEP-F.0 L

REV FOR 1BEP-0 SERIES PROCEDURES WOGI14 TRIP RCPS WHIN:,

RED PATH

SUMMARY

-o CC water to RCP lost

1. Suberiticality - NUCT.vAg (affected pumps only)

POWER >5%

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F o

ALL of the following conditions exist:

3. Heat sink-Af1 SGs NR LEVEL < 4% (34*/._EO.R Controlilen AGS couloown DEA m cn5c uNM1i,de luT/t in progress FEEDWATER FLOW (500 GPM

-AND AVAILABLE RCS pressure - 1Li10 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (IFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CaiI PRESSURE >SO PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE'_ <20%, '-EN Step 1, if:

CONSIDE RT i E FOLLOWL sG:

o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT,BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate IF AUX

E ED OU'iP ")A" TA4K

_EVEL

< 16% T i E 9P ERFOR 1

'HE :0L _0 WING:

11: CST LEVEL <3%, " HEN P ERFORM TH E FOLLOW"NG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED J M 3 1 1969 B. O. S. R.

REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1~

STEP ACTION / EXPECTED RES?Of.5E RE?FONSE NOT OSTArNED Step 25a (continued) 4)' Adjust MS header pressure controller to initiate cooldown rate less than 50*F/Hr.

E vneble to dump stew &

condenser, THEN dump steam using SG PORVs.

26 CHECK PZR PORVS AND SPRAY VALVES:

a. PORVs - CLOSED:
a. E PZR pressure less than 2315 PSIG, IRY455A THEN manually close.

1RY456 PORVs.

I_F any PORV can NOT be

closed, THEN manually close its isol valve:

o 1RY8000A (IRY455A) o 1RY8000B (IRY456)

IF PORV isol valve can N6T be closed, THEN Go TO 1BEP-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step i'

1.

b. Normal PZR spray valves -
b. I_F PZR pressure less CLOSED:

than 2260 PSIG, THEN manually close valves:

1RY455B 1RY455C o E spray valve IRY455B can NOT be closed, THEN stop RCP 1D.

APPROVED o

E spray valve 1RY455C can NOT be closed, fE8 011989 THEN stop RCP 1C.

B.O.S.R.

Page 18 of 33 j

(0304E/0035E/042088) j

e REV 1

OPERATOC ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BEF-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lort

1. Suberiticality - NUCTTAR (aff ected pumps only)

POWER >5%

-OR-o Cnst Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F-o ALL of the following conditions exist:

3. Heat sink-ALL SGs NR LEVEL (4% (34% FOR controllud'RCb cooldown HQ1 Auvtx3n CIid, mw moinu

~

~~ in progress EEEDWATER FLOW <500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE

.High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246',E

'~

SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%,

FEN Step 1, if:

CONSIDE R

' i E F0 _LOWL 13:

o RCS,subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to leolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST i

o Reduce cooldown r-ate IF AUX

E ED )UiP JA" TA4K

_ EVE l!'n F.

< 16% T i E VP ER:0Ri

'HE :0L _0WI i I: CST LEVEL <3%, THEN

{

P ERFORM TH E FOLLOWING.

i r

Refill the day tank

a. Verify seconfsry side of 3 SGs isolated
b. Switch AF suction to SX supply

)

l (Final)

(0386E/0042E/042488)

APPROVED JAN 31869 B.O.S.R.

J

[

y 4

!~

iL-REVi 1-REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A-UNIT 1

~

STEP ACT ON/ EXPECTED RESPON5E PESFONSE NOT OSTAiNED CAUTION Seal injection must be maintained to all RCPs to prevent seal damage due to overheating.

' Z/ 'CnEEk IF kLPS SHOULD 8E siOveED:

a. ECCS flow:
a. GO TO Step 28.

o High head SI flow indicator (IFI-917) -

GREATER THAN 50 GPM

-OR-o Any SI pump discharge

-flow (IFI-918/922) -

GREATER THAN 100 GPM

b. RCS pressure - LESS THAN
b. GO TO Step 28.

1370 PSIG

c. Stop all'RCPs
d. Verify steam dumps in S M
d. Perform the following:

PRESSURE mode of operaflon

1) Check condenser V

available.

I

2) Place MS header pressure controller in MANUAL and reduce demand signal to zero.
3) Place steam dumps mode selector switch in STEAM PRESSURE mode.
4) Adjust MS header pressure controller to I

maintain desired RCS temperature.

APPROVED j

j fEB 011989 B.O.S.R.

Page 19 of 33 (0304E/0035E/047088) 1 j

OPERATOR ACTION

SUMMARY

1BEP-F.0 h*ik FOR 1BEP-0 SERIES PROCEDURES M ' RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Subcriticality - NUCTTAR (affected pumps only)

POWER >5%

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200'F-o ALL of the following conditions exist:

3. Heat sink-ATL SGs NR LEVEL <4%.(.34% FOR.,

Csat.rolted Es esvAduwe M ALva3E onrIT +.uis TL,.aL in progress FrrnWATER FLOW <500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (1FI-917).>50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO IBEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE L <20%,

JEN Step 1, if:

CONSIDE R i E F0_ LOW:: sG:

o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldewn rate

  • IF AUX
E'ED

) UMP DA" TA4K

_ EVE

< 16% T i E 4P ERFOR1

'HE :0L _0WI 4G:

1: CST LEVEL <3%,

J EN P ERFORM TH E FOLLOW:: sG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED l

m 3 1 1989 s.o.s.n.

u _ __ _

i REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED FIS ON5E PEEFONSE NOT OST A,NED 28 CHECK IF SG(s) SECONDARY PRESSURE BOUNDARIES ARE INTACT:

a. Check pressures in all SGs:
a. GO TO 1BEP-2, FAULTED STEAM GENERATOR ISOLATION, l

o NO SG PRESSURE DECREASING Step 1.

IN AN UNCONTROLLED MANNER-

{

u NO SG CO/IPLETELY D_ PRESSURIZED 29 CHECK IF SG TUBES ARE INTACT:

GO TO IBEP-3, STEAM GENERATOR TUBE RUPTURE, l

o SJAE/ Gland Steam Exhaust Gas Step 1.

radiation - LESS THAN ALERT ALARM SETPOINT:

IPR 27J Grid 1 1PS127 l

o SG Blowdown Liquid radiation -

LESS THAN ALERT ALARM SETPOINT:

IPR 08J Grid 1 1PS108 l

o Main Steamline radiation -

LESS THAN ALERT ALARM SETPOINT:

Main Steamline IA, MSIV Rm:

1RT-AR022 Grid 1 4AA122 1RT-AR023 Grid 1 4AA123 e

Main Steamline IB, MSIV Rm:

e IRT-AR022 Grid 1 4AB222 1RT-AR023 Grid 1 4AB223 Main Steamline IC, MSIV Rm:

1RT-AR022 Grid 1 4AC322 1RT-AR023 Grid 1 4AC323 Main Steamline 1D, MSIV Rm:

APPROVED 1RT-AR022 Grid 1 4AD422 1RT-AR023 Grid 1 4AD423 f[6 01 1969 B.O.S.R.

(0304E/0035E/042088)

REV 1

OPERATOR ACTION

SUMMARY

1BEP-F.0 l

WOG-1A FOR 1BEP-0 SERIES PROCEDURES 1

TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Suberiticality - NUCLFAR (affected pumps only)

POWER 35%

-OR-

~

\\

l o

Cnet Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200'F o

ALL of the following conditions exist:

3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR Cst." :;Jtied ACs vvido-a IiiI ~ '

c ?'LE T2...T: /1_ JOTI-6 in progress EEEDWATER. FLOW <500 GPM

-AND

.AYelLABLE RCS pressure - (1370 PSIG

-AND-

4. Integrity - DECREASE High hea. JI pump flow indicator

>100'F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246'F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_EV E'_ <20%,

'i:EN Step 1, if:

CONSIDE RT i E FOLLOWL 4G:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste

. ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
EED 3 UMP 3A" TA4K LEVEL

< 16% T i E 9P ERFORi HE

0L_0 WING 1 l': CST LEVEL <3%,

'iEN P ER :0RM TH E FOLLOWL 4G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply J

(Final)

(0386E/0042E/042488)

APPROVED JAN 31 M49 B.O.S.R.

l

lh REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACTION / EXPECTED RE3:GN5E PESPONSE NOT OBTAINED 30 CHECK IF RCS IS INTACT:

GO TO 1BEP-1, LOSS'OF REACTOR OR SECONDARY COOLANT, Step 1.

l o

Cnmt radiation monitors - LESS THAN ALERT ALARM SETPOINTS:

Cnmt area monitors:

1RT-AR014 Grid 4 4AS101 o'

1RT-AR014 Grid 4 4AS202 IRT-ARO14 Grid 4 4AS303 1RT-AR011 Grid 4 4AS111 1RT-AR012 Grid 4 4AS112 1RT-AR020 Grid 4 4AS120 1RT-AR021 Grid 4 4AS121 i

o Cnmt pressure - LESS THAN 3.4 PSIG l'

o Cnmt recirc sump' levels - NORMAL:

Cnmt sump levels indicator lights - NOT LIT:

ILL-SIO75A ILL-SIO75B APPROVED FEB 011989-B.O.S.R.

Page.21 o'f 33 (0304E/0035E/042088) i

REV 'l OPERATOR ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES

^

TRIP RCPS WHEii:

RED PATH

SUMMARY

o CC water to RCP icst

1. Subcriticality - NUCT. EAR (affecte.d pumps only)

POWER >5%

-OR-o Cnst Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >l200*F o

ALL of the following conditions exist:

3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR

.~.CC1 Lea RCS c:~.1 an C

.0. 1SL 2 2:' % :^T_7**

in progress EEEDWATER FLOW <500 GPM

-AND AVAILABMC RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM' SI ACTUATION:

5 Containment - CNMT EELGURE >50 PSIG Actuate SI and GO TO 1BEP-0 V:i.(20%, '

EN REACTOR TRIP OR' SAFETY INJECTION, JF CST l

F0 _LOWL sG:

Step 1, if:

CONSIDE o

RCS succooling - liOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGe

> 4% (38% FOR. ADVERSF,,.QMU o

Crosstie unit's CST o

Reduce cooldown rate IF AUX

EED

) UMP DA" TANK

_ EVE,

< 16% T i E 4P ERFORi

'HE FOL _0W1 4G:

I: CST LEVEL <3%, '

EN P ERFORM TH E FOLLOWL NG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply

)

l l

4 (Final) 1 (0386E/0042E/042488)

APPROVED

.J u 3 1 1969 B.O.S.R.

)

i i

l c

REV. 1 REACTOR TRIP OR SAFETY LJJECTION 1BEP-0 WOG-1A UNIT 1 i

' STEP ACTION / EXPECTED RESPON5E

~E?FONSE NOT OSTA NED 31 CHECK IF ECCS FLOW SHOULD BE TERMINATE ):

a. Check RCS subcooling
a. DO NOT STOP ECCS. pumps.

ACCEPTABLE per:

GO TD Step 33.

o ICONIC DISPLAY

-OR-o ATTACHMENT A

b. Secondary heat sink:-
b. IF neither condition iidtisfied, o

Total feed flow to SGs -

THEN DO NOT STOP ECCS GREATER THAN 500 GPM PUMPS.

GD To Step 33.

AVAILABLE

-OR-o Narrow range level in at least one SG - GREATER THAN 4%

c. T.CS pressure - STABLE OR
c. DO NOT STOP ECCS PUMPS-INCREASING

~

Go TD Step 33.

d. PZR level - GREATER THAN 4%
d. DO NOT STOP ECCS PUMPS.

RETOTifi TO Step 31a.

32 GO TO 1BEP ES-1.1, SI TERMINATION, STEP 1 33 INITLATE MONlTORING OF' CRITICAL SAFE"Y FUNCT :0N STATUS TREES APPROVED FEB 011989 B.O.S.R.

~

Page 22 cf 33 (0304E/0035E/042088)

REV 1

OPERtTOR ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BLP-0 SERIES PROCEDURES 1

l TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to'RCP lost

1. Subcriticality - NUCTIAR.

(affected pumps only)

POWER 351

-OR-o Cnmt Phsse B actuated

2. Core cooling - CORE EXII

-OR-TCs >12( 3'F o

ALL. of the following conditions exfe :

3. Heat sink-ALL SGa_HE_

LEVEL.<4% (34% FOR-

~

Cvut.tvlA.a how co.adurr !!QI

. uNE.J O. _ _ *..iik T 'T_'

in progress EEERW&TER FLOW <500 GPM

-AND AY).ILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE _

High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (1FI-917) >50 GPM flow or 6ND RCS COLD LEG <246*F SI pumps >>100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >56 PSIG Actuate Si and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, T

LEVE _ <20%,

-EN Step 1, if:

DERT i E F0_LOWL sG:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or EER ICONIC' DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE_MAIETAINED of 3 SGs

> 4% (38% FOR ADVERSE *;NMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX :EED')UiP JA" TA4K

_EVEL

< 16% T i E 4P ER :0R 1

'HE :0L _0 WING" IF CST LEVEL <3%, " FEN PERFORM TH E FOLLOWTIS.

I Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suctice to SX supply (Final)

(0386E/0042E/042488)

APPROVED JM 311969 B.O.S.R.

_---_-----__----------y REV. 1 REACTOR TRIP-OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 i

STEP.

ACTION / EXPECTED RES?ON5E PE?FONSE NOT USTA NED CAUTION Alternate water sources for AF pumps will be necessary if CST level decreases to LESS THAN 3%.

as OjEu $G LEVEL 5:

a. Narrow range level - GREATER
a. Maintain total feed flow THAN 4%

greater than 500 GPM until narrow range level i.s greater than d in'at least one SG.

b. Control feed flow to maintain b.

IF narrow range level in narrow. range level'- BETWEEN 4%

any SG continues to AND 50%

increase in an uncontrolled

manner, THEN GO TO 1BEP-3, STEAM GENERATOR TUBE RUPTURE, Step 1.

i APPROVED FEB 01.1989.

s.o.S.R.

(0304E/0035E/042088)

{L-__-__-__-_

I'

\\

Cd REV 1

OPERATOR ACTION SI iMARY

'B60-F.0 WOGilA FOR 1BEP-0 SERIES Ph0CEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Subericicality - NUCT.FAR (affected pumps only)

POWER >5%

-OR-0 Cnat Phase B actuated

2. Cere cooling - CORE EXII

-OR-TCs >1200*E o

ALL of the following conditions exist:

3. Heat sink-ALL SGs NR IdYEL__L_'L(34% FOR.

4 Lati..'o'.ied RCO cuo2uc.. Lua --

^':. m. C MT' ANL ICT~.

in progress FERDWATER FLOW (500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-4 Integrity - DECREASE High head SI pump flow indicator

>100'F IN LASt 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CRiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEF-0 REACTOR TRIP OR SAFETY INJECTION, IF CST LEVE_ <20%,

JEN Step 1, if:

~

CONSIDER T i E F0'_LOWL N G:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OE radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANHOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT)

  • s o

Crosstie unit's CST o. Reduce cooldown rate IF AUX

E'ED )U'iP JAY TAVK _ EVE'_fr,, y

< 16% T i E 9P ER:0R i THE :0L _0WI G-I: CST LEVEL <3%, T JEN P ERFORM TH E FOLLOWI NG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/% 488) gpp g

JAN 311969 B.O.S.R.

REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0

'WOG-1A UNIT 1

-5TEF

' ACTION / EXPECTED DES GN5E PESPONSE NOT OST AINE.

l CAUTION Following SI reset., automatic SI will NOT occur, until reactor trip breakers have been. cycled.

CAUTION If offsite power is lost after SI reset, then manual action may be required to restart safeguards.-

equipment.

35' RESET SI:

Reset SI per 1 BOA PRI-5, CONTROL ROOM INACCESSIBILITY,

a. Depress both SI reset ATTACHMENT r..

pushbuttons

b. Verify SI ACTUATED permissive light - NOT LIT
c. Verify AUTO SI LLOCKED" " 'y permissivelight-LITf..f d

APPROVED I

FEB 01 1989 B.O.S.R.

U (0304E/0035E/042088)

y

'REV 1

. OPERATOR ACTION-

SUMMARY

1BEP-F.0-WOG11A FOR 1BEP-0 SERIES PROCEDURES TRIP R' CPS WHEN:

RED PATH

SUMMARY

o'

.CC water to RCP lost

1. Suberiticality - NUCT FAR -

(affected pumps only)

POWER >5%

-OR-o

'Cnet Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F o

ALL of.the following cond.itions exist:

3. Heat sink-AT T. SGs NR IJLVEL

^*L.Q_4% F0lt,

ControIlied KCSiooAdowr H21 L.ME'Cm, es.9TAL

'in progress FREDWATER FLOW <500 GPM

-AND AVAILABLE

.RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE' High head SI' pump flow indicator

>100*F'IN LAS? 60 MINUTES

.(1FI-917) >50 GPM flow or AND RCS COLD LEG <246'T SI. pumps >100 GPM

'SI' ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, T

_ EVE _ <20%, T1EN Step 1, if:

DE R TH E F0_LOWI G:

o RCS subcooling - NOT ACCEPTABLE o Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAllTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown r-ate IF AUX

E ED )UiP DA" TA4K

_ EVE.

< 16% Ti E 4P ER :0Ri

'HE 0L _0WI 4G:

I : CST LEV EL <3%, ~

L EN P ERFORM TH E FOLLOWL sG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply i

(Final)

(0386E/0042E/042488)

APPROVED JM 311969 8.O.S.R.

REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A-UNIT 1 STEP ACTION / EXPECTED RESPON5E RESPONSE NOT OSTAINED -

36 RESET CONTAINMENT ISOLATION:

a. Reset Cnmt Isol Phase A
a. Reset per 1 BOA PRI-5, CONTROL ROOM INACCESSIBILITY, ATTACHMENT E.
b. Reset Cnmt Isol Phase B
b. Reset per.IBOA PRI-5.

CONTROL ROOM l

3 ACCESSIBILITY ATTACHMENT E.

c. Reset Cnnt Vent Isol
d. Check SAC run lights - ANY LIT
d. Start one SAC per BOP SA-1, STARTUP AND OPERATION OF THE SAC's.
e. Open Cnmt instrument air

. isol valves:

IIA 065 IIA 066

f. Open Cnmt fire protection isol valve:

1FP010 APPROVED FEB 01.1989 B.O.S.R.

Page 25 of 33 (0304E/0035E/042088)

REV. 1 OPERATOR ACTION

SUMMARY

l'1P-F.0 WOG-1A F0R 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Suberiticality'- NUCLEAR (affected pumps only)

PfWES.2.51

-LR-o Cnet Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F o

E of.the following conditions exist:

3. Heat sink-ATt SGs ME_

LEVEL <47. (34% FOP._..

Controllec E S cooldu n n2I k

.m

. J JITS. 1' TOJe. L in progress FMhWATER' FLOW (500 GPM

-AND AVAILABLE RCS pressure.- <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100'F IN LAST 60 MINUTEE_

(lFI-917) >50 GPM flow or-6@ RCS COLD LEG < 246

  • F SI pumps >100 GPM SI ACTUATION:

5 Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY TNJECTION, le CST

_EV E _ <20%. '

" EN Step 1, if:

CONSIDE RT i E FOLLOWL s 3:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (387. FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate IF AUX

E ED )UiP JA" TA4K

_ EVE

< 16% T i E VP ERFOR 1 rHE :0L _0WI 4G:

I: CST LEV EL <3%,

"EN PERFORM TH E FOLLOWL 3:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JM 311969 B.O.S.R.

o

REV. 1 REACTOR TRIP OR SAFETY. INJECTION 1BEP-0

'WOG-1A UNIT 1 STEP ACTION / EXPECTED RE5?ON5E RESPONSE NOT OSTAiNED CAUTION RCS pressure should be monitored.

If RCS pressure decreases to LESS THAN 300 PSIG, then RH pumps must be manually restarted to supply water to the RCS.

l 37 CHECK IF RH PUMPS SHOULD BE STOPPED:

a. Check RCS pressure:
1) Pressure (1PI-403A/405) -
1) GO TO 1BEP-1, LOSS OF GREATER THAN 300 PSIG REACTOR OR SECONDARY COOLANT, Step 1.
2) Pressure - STABLE OR
2) Go To Step 38.

INCREASING

b. Stop RH pumps and place in standby lT CHECK SECONDARY RADIATION GO To 1BEP-3, STEAM NORMAL:

GENERATOR TUBE RUPTURE, Step 1.

a. Sample SGs' blowdown for activity:
1) Open SG blowdown sample isol valves:

e ISD005A 1SD005B e

ISD005C 1SD005D

2) Notify Rad Chem to sample SGs' olowdown for activity APPROVED l

FEB 011989.

.l B.O.S.R.

(0304E/0035E/042088)

L_______________.

REV 1

OPERATOR ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Subcriticality - IGCLEAR (affected pumps only)

POWER >5%

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200'F o

ALL of the.tollowing conditions exist:

3. Heat sint-AT T. SGs NR LEYEL.<4% (34% FOR

'wunti vin a. RCo e,c.,c. J u ss. &

3DLtdE CEMT'... " " ~"J_f in progress FnnWATER FLOW (500 GPM

-AND AVAIL 6HLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100'F IN LAST 60 MINUTES (lFI-917) >50 GEE flow or AND RCS COLD LEG (246'F SI pumps >100 G,PE SI ACTUATION:

5. Containment - CEMI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, i

REACTOR TRIP OR SAFETY INJECTION, IF CST LEVE_ <20%,

JEN Step 1, if:

CONSIDER T i E F0 _LOWL sG:

o RCS subcooling - NOT ACCEPTABLE o

Makeup.from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
E ED )UiP 3A1' TA4K

_ EVE

< 16% T i E 4P ER :0R 1 THE

0L _0WI 4G

I: CST LEVEL <3%, " iEN P EP50RM TH E FOLLOWL 4G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply 1

(Final) i (0386E/0042E/042488)

APPROVED JAN 31 1969 B.O.S.R.

1

y REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1

. STEP!

ACTION / EXPECTED RESPONSE RESPONSE NOT 06TAINED l39 CHECX AUXILIARY BUILDING Evaluate cause of aonormal RADIATION:

conditions.

a. Aux Bldg vent stack IF cause is loss of RCS effluent monitors (IPR 28J) -

idventory outside Cnmt, LESS THAN ALERT ALARM SETPOINT:-

.THEN G0,.TO IBCA-1.2, LOCA OUTSIDE CONTAINMENT, Step 1.

Grida2 Beta 1PA228 Grid 2 Gas Low IPB128 Grid 2 Iodine IPC328 Grid 2 Gas High IPD428 b Aux Bldg vent stack effluent monitors (1PR30J) -

LESS THAN ALERT ALARM SETPOINT:

Grid 2 Gas Low IPA 130 Grid 2 Gas Med 1PB230 Grid 2 Gas High 1PC330 Grid 2 Effluent 1PF430

c. ECCS cubicle monitors - LESS THAN ALERT ALARM SETPOINT:

RH/CS Pump 1A Cubicle (IPR 13J):

Grid 2 Beta 1PA213 Grid 2 Gas IPB113 RH/CS Pump 1B Cubicle t

(IPR 14J):

Grid 2 Beta 1PA214 Grid 2 Gas IPB114 RH HX 1A Cubicle (IPR 15J):

G. rid 2 Beta 1PA215 Grid 2 Gas IPB115 Stsp continued on next page APPROVED FEB 0 I 1989 B.O.S.R.

1 Page 27 of 33 (0304E/0035E/042088)

v.,r p

5 REV 1 OPERATOR' ACTION

SUMMARY

1BEP-F.0 W7G-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water,to RCP lost

1. Suber.iticality - NUCf7AR (affected pumps only)

POWER 351

-OR-o Cnat Phase B actuated

2. Core cooling - CORE EXII

-OR-ICs >1200'F o

ALL of the following conditions exist:

3. Heat sink-ALL_1GsJ:.tfR_

LEVEL <4% (34% FOR Lotat.Jolled Rt:b ' cc,g.i.dsw.. 6 nLVERC :NM., AND _'Crfi in progress FmWATER FLOW < 500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUIEH_

t (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps.>100 GPM SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST LEVE _ (20%,

4 EN Step 1, if:

CONSIDER i E F0 _LOWL s 3:

o RCS subcooling - HDT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3'SGs

> 4% (38% FOR ADVERSE CNMT)

'o Crosstie unit's CST o

Reduce cooldown rate IF AUX

EED 'UiP DA" TA4K

_ EVE

< 16% T 4 E 4P ER:0RM

'HE :0L ;0WI 4G:

I: CST LEVIL <3%,'

EN P ERFORM TH E FOLL6WL s 3:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply

'(Final)

(0386E/0042E/042488)

APPROVED JAN 3 1 669 B. O. S. R.

zw m

3 i,

c.e v

5 y,

.v REV. 1 REACTOR TRIP.OR' SAFETY INJECTION

'1BEP-0 WOG-1A UNIT 1 STEF-ACTION /E1PECTED RES 0NSE.

RESPONSE NOT OSTAINED

{

-Step 39c (continued)

,, ~

  • - RH HX IB Cubicle (IPR 16J):

Grid 2 Beta 1PA216

  • " Grid 2' Gas 1PB116 CENT CPC Pump -1A Cubicle (IPR 17J):

Grid 2 Beta IPA 217 Grid 2 Gas IPB117

..Mi CENT CHG Pump 1B Cubicle (1PR18J).

Grid 2 Beta.1PA218 Grid 2 Gas IPB118

d. Grid 4 Aux Bldg'arez li radiation monitors - LESS THAN ALERT ALARM SETPOINT l 40 CHECK PRT CONDITIONS:

Evaluate cause of=-abnormal v

conditions.

a. Pressure - LESS THAN 6 PSIG IF any PZR safety valve is
b. Level - LESS THAN 80%

ifetermined to'be the source of leakage into the PRT,

c. Temperature LESS THAN 125'F THEN GO TO IBEP-1, LOSS OF REACTOR OR SECONDARY COOL 7ET, Step 1.

k h

I APPROVED FEB 01.1989.

s.o.S.R.

(0304E/0035E/042088)

i i

j '.i n>

R!V l'

OPERATOR ACTION

SUMMARY

1BEP-F.0 WCG-1A FOR 1BEP-0 SERIE

S. PROCEDURE

S i

u.

TRIP RCP' WHEU:

RED PATH

SUMMARY

o CC water'to RCP lost

1. Suberiticality - LUCf.1MR (affected pumps only)

POWER 35%

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F

i o

ALL of the fc11owing conditions exist:

3. Heat sink-ATL SGs NR _.

LEVEL <4% (34% F_01_

v'w.4trv11ed RL., cvulow dia

,1. L.ir,;.,nTi rum "_Illif in progress FEEDWATER FLOW <500 GPM

-AND AVAILABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE ligh head SI pump flow indicator

>100*F IN LAST 60 MINUTES._

(1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps 2.100 GPM SJ ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%,

' HEN Step 1, if: ~

CONSIDE RT i E F0 _ LOW::NG:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CAHNOT BE MAINTAINED of'3 SGs

> 4% (38% FOR ADVERSE CNM'.[1 o

Crosstie unit's CST o

Reduce cooldown rate IF AUX :iED

) UMP DA" TANK

_ EVE V

< 16% T i EN P ERFORM rHE FOL _0WI dg I': CST LEVEL <3%,

' HEN

~

P ERFORM TH E FOLLOW::NG:

Refill the day tank

a. Verify secondary sid'e of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JAN 311969 B.O.S.R.

i

_y 1

a y

1-f._

REV. 1 REAf f0R TRIP OR SAFET INJECTION

.1BEP-0 4

WOG-1A UNIT.1 5TEP ACTION / EXPECTED R ~5:0N5E RESPONSE NOT OBTAINED CAUTION Do NOT exceed DG loadirq-requirements:

o 5500 KW continuous duty 6 Q%A AMDS g;gi7gg u

5935 AW continuous for zu00. hours 6 1030 AMPS maximum o

6050 KW continuous for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 6 1050 AMPS maximum.

d CAUTION If po'ssible, PZR heaters should be loaded on only one ESF' bus at a time.

Additional NON-ESF loads should be loaded on the other ESF bus.

41 CFECK I: DIESEL GENERATORS SF 00LD BE STOPPE7:

a.VerifyESF4KVbusses-fkfRh'12ED

a. Try to restore offsite BY OFFSITE POWER:

f; '

power to ESF busses SAT 142-1 Bus alt 0e light -

Ij[ offsite power can NOT e

LIT be restored, ACB 1412 - CLOSED THEN notify System Load SAT 142-2 Bus' alive light -

Dispatcher of existing LIT conditions so an e

ACB-1422 - CLOSED emergency AC restoration program can be implemented.

Step continued on next page APPROVED fEB 01.1989.

B.O.S.R.

Page 29 of 33 (0304E/0035E/042088)

7 t-

-REV 1

OPERATOR ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

o CC water to RCP lost

1. Subcriticality - NUCLEAR (affecte.d pumps only)

POWER >57.

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-ICs >1200*F o

ALL of the following conditions exist:

3. Heat sink-ALL SGs NR LEVEL <47, (34% FOR SE'.'FRSEffE' MID

"'^*AL.,

.snt *9hl ;Cd Jolkown lJCI FEEDWATER FLOW < 500 GPM in progress AVAILABLE

.-AND RCS pressure - <1370 PSIG

-AND-4 Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES _

(lFI-917) >50 GPM flow or' AND RCS COLD LEG (246'Ti SI pumps >100 GPM SI ACTUATION:

5. Containment - C11tiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_EV E _ <20%, " HEN Step 1, if:

CONSIDE RT i E FOLLOWLNG:

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CANNOT BE MAINTAINED of 3 SGs

> 47. (387. FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate JF AUX

E ED )UiP JAV TA 4K

.ENEL

< 16% T i E 1P ER :0R 1 THE

0ETWING:

I': CST LEVEL <3%, THEN P ERFORM TH E FOLLOWING:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JAN 31 1969 B.O.S.R.

p 1 '.

g REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 STEP ACi!ON/EXPECTE3 REE;ON5E PESPON?E NOT OSTAINED Step 41 (continued)

I

b. NON-ESF 4 KV Busses:
b. IF offsite power can NOT be promptly restored, SAT 142-1 Bus alive light -

THEN establish'necessary LIT NON-ESF loads to maintain ACB 1432 - CLOSED plant conditions.

SAT 14?.-2 Bus a3ive light -

LIT'

~

1) Verify locally all e

ACB 1442 - CLOSED breakers on Bus 143 and 144 OPEN.

2)cPlace all~non-running WS pumps in PULL OUT position.

3) Reset SI recirc sump valves:

e ISI8811A ISI8811B

4) Energize Bus 143 and 144 from ESF crosstie breakers.
5) Open all 480 volt transformer LOW side breakers associated with Bus 143 and 144.
6) Reenergize PZR heaters:

a) Close 4160 volt PZR heater transformer's HIGH side breakers at IPM01J.

b) Close 480 volt PZR heater transformer's LOW side breakers at 1PM05J.

APPROVED Step continued on next page B.O.S.R.

(0304E/0035E/042088)

OPERATOR ACTION

SUMMARY

1BEP-F.0 REV 1-WOG11A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

RED PATH

SUMMARY

l o.

CCTwater to RCP lost.

1. Suberiticality - NUCLEAR l

'(affected-pumps only)

POWER >S%

l>

..OR_

l o

Cnmt Phase B actuated

2. Core cooling - CORI EXIT

-OR.

TCs >1200;;

o ALL of the following conditions exist:

3. Heat sink-ALL SGs NR LEVEL <4% (34% FOR Lv uv11cd E S'coc1%..., NM -

.1. H._. _, m.~'

'PP 5;-

+

in progress FERnWATER FLOW'<500 GPM

-AND AYr LABLE RCS pressure - <1370 PSIG

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F'IN LAST 60 MINUTES (1FI-917) >50 GPM flow or AND RCS COLD LEG.<246*F SI pumps >100 GPM-SI ACTUATION:

5. Containment - CNMT PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%, "iEN Step 1, if:

CONSIDE RT iE F0_LOWL43:

o RCS subcooling - ROT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-0R-secondary supply side o

PZR level - CAHHOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
E ED ) UMP ')A" TA4K

_ EVE

< 16% T 4 E 4P ERFOR i

'HE :0L _0WI 4G:

I : CST LEVEL <3%, " HEN P ERFORM TH E FOLLOWLNG:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JAN 311969 B. o. s. R.

h, REV. 1 REACTOR TRIP OR SAFETi INJECTION 1BEP-0 WOG-1A UNIT 1 STEP-ACTION / EXPECTED RE5?ONSE RESf 3NSE NOT OSTAINED Step 41b (continued)-

c) Operate PZR heater.

controls.at necessary to control system pressure.

7) Start a WE' pump pe:..A2 WS-1, STARTUP AND OPERATION OF WS SYSTEM, if necessary.

~

1 e

8) Start a SAC per BOP SA-1, STARTUP AND OPERATION OF THE SAC's, 4
9) Energize other NON-ESF' loads as necessary..
c. Stop any unloaded DG and place in standby per BOP DG-12, 7.

DIESEL' GENERATOR SHUTDOWN.

42 RETURN TO STEP 25

_ggp_

4 APPROVED FEB 011989 1

B.O.S.R.

(0304E/0035E/042088)-

REV 1

OPERATOR ACTION

SUMMARY

1BEP-F.0 WOG-1A FOR 1BEP-0 SERIES PROCEDURES TRIP RCPS WHEN:

BED PATH SLiMARY:

o CC water to RCP lost 1

Subcriticality - NUCLEAR (affecte.d pumps only)

POWER >5%

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT

-OR-TCs >1200*F o

ALL of the following conditions

3. Heat sink-ALL SGs NR

' exist:

LEVEL <4% (34% FOR Jsntro11W....

. ' 1o5. X r..,

cOVFRo Cm

- "Ic

+

in progress EEEDWATER FLOW <500 GPM

-AMD AVAILABLE RCS pressure - <1370 PSIG

-APD-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES

~*

(1FI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CNMT l

PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR FAFETY INJECTION, IF CST

_ EVE _ <20%. TFEN Step 1, if:

CONSIDE R TH E F0 _LOWIhG:

o RCS subcooli g - HOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC Li3 PLAY OR radwaste ATTAChMEN?...A o

Prepare to isolate

-Oh-secondary supply side o

PZR level - CAHHQIE,JiMNTAINED of 3 SGs

> 4% (38% FOR ADVERSE CMMT) o Crosstie unit's CST o

Reduce cooldown rate IF AUX

E ED )UiP JA" TANK

_ EVE

< 16% T i E 9P ER 0R 1 lie FOL _0WI 9G:

I: CST LEVEL <3%, TiEN P ERFORM TH E FOLLOWING:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply

{

(Final)

APPROVED I

(0386E/0042E/042488)

MN 311969 j

B.O.S.R.

)

1 a

,0-REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 I

CNORMAL) 222 322 422 522 622 720 260%,,,,

,j

'2622 4,

g 2522

,ll1 l

lo

,l l l 2s22

+

2422

.'e'

- 2422 iII

'I

'I '

,6*tI !i rsie #

a if-L FI 23?2 -W l l I ' ' l,' l,4 -- l L'- p -

-- ~

'T ' Y-l f [' l}

230io C

2222 l.l ' l l l l l l

/ ) [

2222 2122 ll,'

'l l,

(

,/ /

,I 2122 l

2002 i

l ll

,,l'l

!// /

. 2222,

c 1922 l:ll fif l 7

1e2e a i

1822

'i

'^CCGPTABtE J

l 1832 "

t!

e r<

il 1

i i

6n, liilsiei e

i tfi F

4 ft gq y7gg

,o.,.,

i, i

7gg m

ri t.

" 1622 l

lllll l!,

l-fj [j 16 2 2 v 3-

--M l-

.I

e 1522

I

/

- - 1522 1422

,l j

j 7,j 1422 J 1322

' ' l,'

l' l ' ;' '

ij'/

1322 J bl Ihi

, l

!;l 1222 j

1222 Ul D7 j

.ii.

7-

. i,,ei6i......,,i,,j r.i r

"'T" Ul i

1122 a

,, g

,j 1122 g

Cf 1222 l l'l

(( [

1222 E A

922 l.l!l i,

,. // /

922 G.

.ieii i

1 ADVERSE ro I

NOT i

ty i,,,i i,i

.. ICNMTl i1 /-

if A~ 2

AC C E P TA B L E--

Ul L

722

![l',

I

. /[ [

l' 722

(_)

yzz ti

/[/

1

(

e

/

gag 1

1'

\\

522 7 /

522 f

422

[

[

f h go7yggyrgs 422 322

/

322 NCRMAL M ' /

222 C NM T ;,,,,,,,, 9

222 c

l 122

'!!lli l..' _

l

[ 122

,i ti 11, 4-tii i rt i i

i' r-222 322 422 Saa 622 722 TEMPERATURE C

C)

APPROVED FIGURE IBEP 0-1 RCS SUBCOOLING MARGIN fEB 011989 i

(

B.O.S.R.

l

__J1forstwti lasAn wn.' e an" '-

l 1

REV 1

OPERATOR ACTION

SUMMARY

1BEP-F.0 WOGI1A FOR 1BEP-0 SERIES PRIJEDURES TRIP RCPS WHEN:

RED PATH S:JMMARY:

1 o

CC water to RCP lost

1. Suberiticality - NUCLEAR (affected pumps only)

POWER >53

-OR-o Cnmt Phase B actuated

2. Core cooling - CORE EXIT.

-OR-TCs >1200*F o

ALL of the following conditions exist:

3. Heat sink-AT.T SGs NR LEVEL <4% (34% FOR Contrqlled RCS tooldown N_0T...

. -6DVERSE.CNMT! AND_TO.IAL in progress F m WATER FLOW <500 bni RCS pressure - <1370 PSIG AVAILABLE

-AND,

-AND-

4. Integrity - DECREASE High head SI pump flow indicator

>100*F IN LAST 60 MINUTES (lFI-917) >50 GPM flow or AND RCS COLD LEG <246*F SI pumps >100 GPM SI ACTUATION:

5. Containment - CMiI PRESSURE >50 PSIG Actuate SI and GO TO 1BEP-0, REACTOR TRIP OR SAFETY INJECTION, IF CST

_ EVE _ <20%,

' HEN Step 1, it:

CONSIDE RT i E FOLLOW: NG:.

o RCS subcooling - NOT ACCEPTABLE o

Makeup from MUDS or PER ICONIC DISPLAY OR radwaste ATTACHMENT A o

Prepare to isolate

-OR-secondary supply side o

PZR level - CAHHOT BE MAINTAINED of 3 SGs

> 4% (38% FOR ADVERSE CNMT) o Crosstie unit's CST o

Reduce cooldown rate

  • IF AUX
E ED

) UMP JA TAyK

_ EVE

' EN

< 16% T 1 E 4P ERFOR i

'HE :0L _0WI 4G:

I: CST LEVEL <3%,

P ERFORM TH E FOLLOWL s G:

Refill the day tank

a. Verify secondary side of 3 SGs isolated
b. Switch AF suction to SX supply (Final)

(0386E/0042E/042488)

APPROVED JAN311969 B.O.S.R.

w _ _--

]

l,,.

REV. 1 REACTOR TRIP OR SAFETY INJECTION 1BEP-0 WOG-1A UNIT 1 i

ATTACHMENT A 1

A.

Determination of Post-Accident RCS Subcooling:

1. Check Cnmt for ADVERSE conditions:

o Cnmt pressure greater than 5 PSIG.

-OR-5 o Cnmt radiation greater than 10 R/hr:

1RT-AR020 Grid 4 4AS120 1RT-AR021 Grid 4 4AS121

2. Check RCS pressure on wide range pressure instruments (1PI-403A/405).
3. Determine temperature for RCS pressure using NORMAL or ADVERSE Cnmt curves per Figure 1BEP 0-1.
4. Check average of ten highest core exit TCs from MCB indicators (1TI-IT001/IT002).

5.

If average of ten highest core exit TCs less than temperature for RCS pressure, then acceptable subcooling exists.

APPROVED FEB 011989 B.O.S.R.

(0304E/0035E/042088)

FfNAE.

_ _ _ _ _ _ - _ _