Text
_ _ - - _
' /.-
g ATTACHMENT 2
. Test Number RT-1 Revision Number /Date:
01.
10/01/88
(]y Frequency:
Ardinal PWR SIMULATOR REAL TIME TEST I.
OBJECTIVE The purpose of this procedure is to verify that the simulator is capable of operating in real time As required by ANSI /ANS 3.5-1985 " Nuclear Power Plant Simul, tor's for Use in Operator Training."
II. REFERENCES 1.
. ANSI /ANS 3.5-1985: Nuclear Power Plant Simulator's for Use in Operator Training.
2.
Reg Guide 1.149: Nuclear Power Plant Simulation Fecilities for Use in Operator License Examinations.
I 3.
PWR Operations Guideline #12: Simulator Testing Program.
O 34t/1 5/89 8908020225 890727 ADOCK0500g{4 DR Q-_______-_________
g.
PWR SIMULATOR l'h REAL TIME TEST
, k.,0 III. INITIAL CONDITIONS 1.
The plant is at zero power, normal operating pressure and no-load temperature.
IV. DATA COLLECTION 1.
See test instructions, step 5.
V.
TEST INSTRUCTIONS 1.
Initialize at a zero power, normal operating pressure, no-load temperature condition (IC-7).
2.
Verify / withdraw the shutdown banks.
3.
Verify / place rod control in manual.
4 Using a stopwatch, time the interval between Control Bank A at 0 steps until Control Bank A reaches 228 steps.
g 5.
Record the time from Step 4.
seconds
{
y,)
VI. ACCEPTANCE CRITERIA 1.
The simulator shall take 285 seconds i 1 second to move Control Bank A from 0 steps to 228 steps.
p.
i
)
34t/2 5/89
~'
L-
_ _ _ _ _ _ _ _ _