ML20247M766

From kanterella
Jump to navigation Jump to search
Rev 01 to RT-1 PWR Simulator Real Time Test
ML20247M766
Person / Time
Site: Byron 
Issue date: 10/01/1988
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20247M747 List:
References
RT-1, NUDOCS 8908020225
Download: ML20247M766 (2)


Text

_ _ - - _

' /.-

g ATTACHMENT 2

. Test Number RT-1 Revision Number /Date:

01.

10/01/88

(]y Frequency:

Ardinal PWR SIMULATOR REAL TIME TEST I.

OBJECTIVE The purpose of this procedure is to verify that the simulator is capable of operating in real time As required by ANSI /ANS 3.5-1985 " Nuclear Power Plant Simul, tor's for Use in Operator Training."

II. REFERENCES 1.

. ANSI /ANS 3.5-1985: Nuclear Power Plant Simulator's for Use in Operator Training.

2.

Reg Guide 1.149: Nuclear Power Plant Simulation Fecilities for Use in Operator License Examinations.

I 3.

PWR Operations Guideline #12: Simulator Testing Program.

O 34t/1 5/89 8908020225 890727 ADOCK0500g{4 DR Q-_______-_________

g.

PWR SIMULATOR l'h REAL TIME TEST

, k.,0 III. INITIAL CONDITIONS 1.

The plant is at zero power, normal operating pressure and no-load temperature.

IV. DATA COLLECTION 1.

See test instructions, step 5.

V.

TEST INSTRUCTIONS 1.

Initialize at a zero power, normal operating pressure, no-load temperature condition (IC-7).

2.

Verify / withdraw the shutdown banks.

3.

Verify / place rod control in manual.

4 Using a stopwatch, time the interval between Control Bank A at 0 steps until Control Bank A reaches 228 steps.

g 5.

Record the time from Step 4.

seconds

{

y,)

VI. ACCEPTANCE CRITERIA 1.

The simulator shall take 285 seconds i 1 second to move Control Bank A from 0 steps to 228 steps.

p.

i

)

34t/2 5/89

~'

L-

_ _ _ _ _ _ _ _ _