ML20247M766

From kanterella
Jump to navigation Jump to search
Rev 01 to RT-1 PWR Simulator Real Time Test
ML20247M766
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/01/1988
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20247M747 List:
References
RT-1, NUDOCS 8908020225
Download: ML20247M766 (2)


Text

_ _ - - _ __

g ' /. .-

ATTACHMENT 2 . Test Number RT-1 Revision Number /Date: 01. 10/01/88

(]y Frequency: Ardinal PWR SIMULATOR REAL TIME TEST I. OBJECTIVE The purpose of this procedure is to verify that the simulator is capable of operating in real time As required by ANSI /ANS 3.5-1985 " Nuclear Power Plant Simul, tor's for Use in Operator Training."

II. REFERENCES

1. . ANSI /ANS 3.5-1985: Nuclear Power Plant Simulator's for Use in Operator Training.
2. Reg Guide 1.149: Nuclear Power Plant Simulation Fecilities for Use in Operator License Examinations.

I

3. PWR Operations Guideline #12: Simulator Testing Program.

O 34t/1 5/89 8908020225 890727 DR ADOCK0500g{4 Q-_______-_________ _ .-_

g.

PWR SIMULATOR

, l'h REAL TIME TEST

k. ,0 III. INITIAL CONDITIONS
1. The plant is at zero power, normal operating pressure and no-load temperature.

IV. DATA COLLECTION

1. See test instructions, step 5.

V. TEST INSTRUCTIONS

1. Initialize at a zero power, normal operating pressure, no-load temperature condition (IC-7).
2. Verify / withdraw the shutdown banks.
3. Verify / place rod control in manual.

4 Using a stopwatch, time the interval between Control Bank A at 0 steps until Control Bank A reaches 228 steps.

g ,

{

  • 5. Record the time from Step 4. seconds y,)

VI. ACCEPTANCE CRITERIA

1. The simulator shall take 285 seconds i 1 second to move Control Bank A from 0 steps to 228 steps.

p.

i

~'

)

34t/2 5/89 L- _ _ _ _ _ _ _ _ _