{{#Wiki_filter:Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-93 93 EPID L-2021-NEW-0003
{{#Wiki_filter:Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 Page 1 of 3 The CR3MP SAR has been updated to create Revision 2. Each change in the SAR document from Revision 1 to Revision 2 is marked by a revision bar on the right-hand side of the page.
Section no. of change Material changed Reason for change 1.2.1 Added statement about pressure vent port and plug Update as a result of Section 2.3.1 change to allow for venting of package during welding for potential use of weld pre-heat or post-heat, which could occur prior to full 28-day grout curing 1.2.1.1 Added statement about pressure vent port and plug and the plug weld Update as a result of including vent port 1.2.1.2 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification Appendix 1.3.2 Updated SAR Drawing to Revision 2
Update as a result of including vent port 2.1.1 Added statement about pressure vent port and plug and the plug weld Update as a result of including vent port 2.2 Added statement about pressure vent port plug Update as a result of including vent port 2.3.1 Removed carbon equivalency requirement for material Allow greater flexibility for procurement 2.3.1 Changed as-cast to wet-cast and added a definition of terms Per customer request, clarify terms 2.3.2 Added statement about pressure vent port plug weld examination requirements Update as a result of including vent port 2.3.2 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification 2.4.5 Added statement about pressure vent port plug Update as a result of including vent port 2.4.8 Added statement about pressure vent port plug Update as a result of including vent port


Table of Changes for CR3MP SAR Revision 2
Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 Page 2 of 3 Section no. of change Material changed Reason for change Appendix 2.12.1 Added Reference 28 Update as a result of including vent port Appendix 2.12.2.1.1 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification Appendix 2.12.2.1.2 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification Table 3.2-3 Changed to As-Cast, from Cast Per customer request, clarify terms 4.1.1 Added statement about pressure vent port plug Update as a result of including vent port 4.1.3 Added statement about pressure vent port plug weld Update as a result of including vent port 5.3.2 Changed as-cast to wet-cast Per customer request, clarify terms 5.4.4 Revised to include statements regarding hydrogen diffusion and clarified the location of grout within the two distinct models for spatial energy deposition and time to reach 5% Hydrogen Clarified per NRC feedback received 5.4.4 Clarified with a statement regarding slurry density and wet-cast density such that LDCC air fraction as minimum 40% is attained Customer-initiated request 7.1.2 Added step regarding installation, welding and examination of the pressure vent port plug Update as a result of including vent port 8.1.2 Added statement about pressure vent port plug weld examination requirements Update as a result of including vent port 8.1.4 Added statement about pressure vent port plug and its weld Update as a result of including vent port 8.1.5.2 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification


The CR3MP SAR has been updated to create Revision 2. Each change in the SAR document from Revision 1 to Revision 2 is marked by a revision bar on the right-hand side of the page.
Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 Page 3 of 3 Section no. of change Material changed Reason for change 8.1.5.2 Changed wet cast density standard from ASTM C567 to ASTM C796/C796M Customer-initiated update to correct the applicable ASTM standard 8.1.5.2 Changed slurry density requirement to an LDCC air fraction requirement Customer-initiated request 8.1.5.3 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification 8.1.5.3 Changed wet cast density standard from ASTM C567 to ASTM C796/C796M Customer-initiated update to correct the applicable ASTM standard Appendix 8.3.1 Updated Reference 4 and added Reference 5 Changed as a result of Section 8.1.2 and Section 8.1.5.2 updates}}
 
Section no. of Material changed Reason for change change
.. $dded statePent aEoXt SressXre 8Sdate as a resXlt of Section..
Yent Sort and SlXg change to alloZ for Yenting of SacNage dXring Zelding for Sotential Xse of Zeld Sre heat or Sost heat Zhich coXld occXr Srior to fXll da\\
groXt cXring
... $dded statePent aEoXt SressXre 8Sdate as a resXlt of inclXding Yent Yent Sort and SlXg and the SlXg Sort Zeld
... &hanged coPSressiYe strength &XstoPer initiated correction to occXrring at da\\ cXre not da\\ sSecification
$SSendi[.. 8Sdated S$R 'raZing to ReYision 8Sdate as a resXlt of inclXding Yent Sort
.. $dded statePent aEoXt SressXre 8Sdate as a resXlt of inclXding Yent Yent Sort and SlXg and the SlXg Sort Zeld
. $dded statePent aEoXt SressXre 8Sdate as a resXlt of inclXding Yent Yent Sort SlXg Sort
.. RePoYed carEon eTXiYalenc\\ $lloZ greater fle[iEilit\\ for reTXirePent for Paterial SrocXrePent
.. &hanged ³as cast' to ³Zet cast' 3er cXstoPer reTXest clarif\\ terPs and added a definition of terPs
.. $dded statePent aEoXt SressXre 8Sdate as a resXlt of inclXding Yent Yent Sort SlXg Zeld e[aPination Sort reTXirePents
.. &hanged coPSressiYe strength &XstoPer initiated correction to occXrring at da\\ cXre not da\\ sSecification
.. $dded statePent aEoXt SressXre 8Sdate as a resXlt of inclXding Yent Yent Sort SlXg Sort
.. $dded statePent aEoXt SressXre 8Sdate as a resXlt of inclXding Yent Yent Sort SlXg Sort
 
Page 1 of 3 Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-93 93 EPID L-2021-NEW-0003
 
Table of Changes for CR3MP SAR Revision 2
 
Section no. of Material changed Reason for change change Appendix 2.12.1 Added Reference 28 Update as a result of including vent port Appendix 2.12.2.1.1 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification Appendix 2.12.2.1.2 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification Table 3.2-3 Changed to As-Cast, from Cast Per customer request, clarify terms 4.1.1 Added statement about pressure Update as a result of including vent vent port plug port 4.1.3 Added statement about pressure Update as a result of including vent vent port plug weld port 5.3.2 Changed as-cast to wet-cast Per customer request, clarify terms 5.4.4 Revised to include statements Clarified per NRC feedback received regarding hydrogen diffusion and clarified the location of grout within the two distinct models for spatial energy deposition and time to reach 5% Hydrogen 5.4.4 Clarified with a statement regarding Customer-initiated request slurry density and wet-cast density such that LDCC air fraction as minimum 40% is attained 7.1.2 Added step regarding installation, Update as a result of including vent welding and examination of the port pressure vent port plug 8.1.2 Added statement about pressure Update as a result of including vent vent port plug weld examination port requirements 8.1.4 Added statement about pressure Update as a result of including vent vent port plug and its weld port 8.1.5.2 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification
 
Page 2 of 3
 
Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-93 93 EPID L-2021-NEW-0003
 
Table of Changes for CR3MP SAR Revision 2
 
Section no. of Material changed Reason for change change 8.1.5.2 Changed wet cast density standard Customer-initiated update to correct from ASTM C567 to ASTM the applicable ASTM standard C796/C796M 8.1.5.2 Changed slurry density requirement Customer-initiated request to an LDCC air fraction requirement 8.1.5.3 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification 8.1.5.3 Changed wet cast density standard Customer-initiated update to correct from ASTM C567 to ASTM the applicable ASTM standard C796/C796M Appendix 8.3.1 Updated Reference 4 and added Changed as a result of Section 8.1.2 Reference 5 and Section 8.1.5.2 updates
 
Page 3 of 3}}

Latest revision as of 19:41, 27 November 2024

Orano Federal Services, LLC, Table of Changes for CR3MP Safety Analysis Report, Revision 2
ML22033A541
Person / Time
Site: 07109393
Issue date: 01/31/2022
From:
Orano Federal Services
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML22033A536 List:
References
EPID L-2021-NEW-0003, FS-22-0015
Download: ML22033A541 (3)


Text

Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 Page 1 of 3 The CR3MP SAR has been updated to create Revision 2. Each change in the SAR document from Revision 1 to Revision 2 is marked by a revision bar on the right-hand side of the page.

Section no. of change Material changed Reason for change 1.2.1 Added statement about pressure vent port and plug Update as a result of Section 2.3.1 change to allow for venting of package during welding for potential use of weld pre-heat or post-heat, which could occur prior to full 28-day grout curing 1.2.1.1 Added statement about pressure vent port and plug and the plug weld Update as a result of including vent port 1.2.1.2 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification Appendix 1.3.2 Updated SAR Drawing to Revision 2

Update as a result of including vent port 2.1.1 Added statement about pressure vent port and plug and the plug weld Update as a result of including vent port 2.2 Added statement about pressure vent port plug Update as a result of including vent port 2.3.1 Removed carbon equivalency requirement for material Allow greater flexibility for procurement 2.3.1 Changed as-cast to wet-cast and added a definition of terms Per customer request, clarify terms 2.3.2 Added statement about pressure vent port plug weld examination requirements Update as a result of including vent port 2.3.2 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification 2.4.5 Added statement about pressure vent port plug Update as a result of including vent port 2.4.8 Added statement about pressure vent port plug Update as a result of including vent port

Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 Page 2 of 3 Section no. of change Material changed Reason for change Appendix 2.12.1 Added Reference 28 Update as a result of including vent port Appendix 2.12.2.1.1 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification Appendix 2.12.2.1.2 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification Table 3.2-3 Changed to As-Cast, from Cast Per customer request, clarify terms 4.1.1 Added statement about pressure vent port plug Update as a result of including vent port 4.1.3 Added statement about pressure vent port plug weld Update as a result of including vent port 5.3.2 Changed as-cast to wet-cast Per customer request, clarify terms 5.4.4 Revised to include statements regarding hydrogen diffusion and clarified the location of grout within the two distinct models for spatial energy deposition and time to reach 5% Hydrogen Clarified per NRC feedback received 5.4.4 Clarified with a statement regarding slurry density and wet-cast density such that LDCC air fraction as minimum 40% is attained Customer-initiated request 7.1.2 Added step regarding installation, welding and examination of the pressure vent port plug Update as a result of including vent port 8.1.2 Added statement about pressure vent port plug weld examination requirements Update as a result of including vent port 8.1.4 Added statement about pressure vent port plug and its weld Update as a result of including vent port 8.1.5.2 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification

Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 Page 3 of 3 Section no. of change Material changed Reason for change 8.1.5.2 Changed wet cast density standard from ASTM C567 to ASTM C796/C796M Customer-initiated update to correct the applicable ASTM standard 8.1.5.2 Changed slurry density requirement to an LDCC air fraction requirement Customer-initiated request 8.1.5.3 Changed compressive strength occurring at 28-day cure, not 7-day Customer-initiated correction to specification 8.1.5.3 Changed wet cast density standard from ASTM C567 to ASTM C796/C796M Customer-initiated update to correct the applicable ASTM standard Appendix 8.3.1 Updated Reference 4 and added Reference 5 Changed as a result of Section 8.1.2 and Section 8.1.5.2 updates