L-21-206, Regulatory Audit for Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:energy                                                 Energy Harbor Nuclear Corp.
{{#Wiki_filter:energy Energy Harbor Nuclear Corp.
harbor                                                   Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081 Rod L. Penfield                                                                   440-280-5382 Site Vice President, Perry Nuclear August 17, 2021 L-21-206                                                               10 CFR 50.90 10 CFR 50.12 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
harbor Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081
 
Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear
 
August 17, 2021 L-21-206 10 CFR 50.90 10 CFR 50.12
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Regulatory Audit for Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme (EPID L-2021-LLA-0067)


Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Regulatory Audit for Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme (EPID L-2021-LLA-0067)
By {{letter dated|date=April 7, 2021|text=letter dated April 7, 2021}} [Agencywide Documents Access and Management System (ADAMS) Accession No. ML21106A027], Energy Harbor Nuclear Corp. submitted to the Nuclear Regulatory Commission (NRC) a license amendment request for the Perry Nuclear Power Plant (PNPP) to revise the Updated Safety Analysis Report (USAR) to change the methodology used for analysis of flooding hazards and drainage within the local intense precipitation (LIP) domain and reflect the results from the new analysis.
By {{letter dated|date=April 7, 2021|text=letter dated April 7, 2021}} [Agencywide Documents Access and Management System (ADAMS) Accession No. ML21106A027], Energy Harbor Nuclear Corp. submitted to the Nuclear Regulatory Commission (NRC) a license amendment request for the Perry Nuclear Power Plant (PNPP) to revise the Updated Safety Analysis Report (USAR) to change the methodology used for analysis of flooding hazards and drainage within the local intense precipitation (LIP) domain and reflect the results from the new analysis.
Based on the new analysis, a new flood hazard protection scheme is also proposed for PNPP. In addition, Energy Harbor Nuclear Corp. requested exemptions in accordance with 10 CFR 50.12 to credit non-safety related protection features including: (1) permanent (passive) and temporary (deployable) flood barriers, and (2) the plant storm drain system in mitigation of flood levels during a LIP event.
Based on the new analysis, a new flood hazard protection scheme is also proposed for PNPP. In addition, Energy Harbor Nuclear Corp. requested exemptions in accordance with 10 CFR 50.12 to credit non-safety related protection features including: (1) permanent (passive) and temporary (deployable) flood barriers, and (2) the plant storm drain system in mitigation of flood levels during a LIP event.
By {{letter dated|date=July 9, 2021|text=letter dated July 9, 2021}} (ADAMS Accession No. ML21165A001), the NRC staff described the terms and conditions of using a regulatory audit to support review of these requests and provided a regulatory audit plan. Energy Harbor Nuclear Corp.
By {{letter dated|date=July 9, 2021|text=letter dated July 9, 2021}} (ADAMS Accession No. ML21165A001), the NRC staff described the terms and conditions of using a regulatory audit to support review of these requests and provided a regulatory audit plan. Energy Harbor Nuclear Corp.
agrees to the terms and conditions set forth in the letter.
agrees to the terms and conditions set forth in the letter.
As part of the NRC audit, the NRC staff requested that executable electronic versions of the input and output files for key scenarios and final selected ones used in the license amendment request to simulate (i) FLO-2D LIP flooding, and (ii) inflows and streams course models for the two streams "Major" and "Diversion" be made available. These files should also be submitted for docketing.
As part of the NRC audit, the NRC staff requested that executable electronic versions of the input and output files for key scenarios and final selected ones used in the license amendment request to simulate (i) FLO-2D LIP flooding, and (ii) inflows and streams course models for the two streams "Major" and "Diversion" be made available. These files should also be submitted for docketing.
Perry Nuclear Power Plant, Unit No. 1 L-21-206 Page2


Perry Nuclear Power Plant, Unit No. 1 L-21-206 Page2 The requested input/output files are provided in their native file format on the enclosed hard drives. Each hard drive contains one copy of the electronic information for the following calculations.
The requested input/output files are provided in their native file format on the enclosed hard drives. Each hard drive contains one copy of the electronic information for the following calculations.
* 50:64.000, PNPP Site Modifications Local Intense Precipitation (Design Basis),
* 50:64.000, PNPP Site Modifications Local Intense Precipitation (Design Basis),
Revision 1
Revision 1
Line 36: Line 45:
Revision 0
Revision 0
* 50:73.000, Design Basis Diversion Stream Probable Maximum Flood (PMF),
* 50:73.000, Design Basis Diversion Stream Probable Maximum Flood (PMF),
Revision 0 There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager-Fleet Licensing, at 330-696-7208.
Revision 0
 
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager Fleet Licensing, at 330-696-7208.
 
I declare under penalty of perjury that the foregoing is true and correct. Executed on August_IL, 2021.
I declare under penalty of perjury that the foregoing is true and correct. Executed on August_IL, 2021.
i?&rf?r{)
i?&rf?r{)
Rod L. Penfield     ~
 
Rod L. Penfield ~


==Enclosure:==
==Enclosure:==
Hard drive with electronic information (2 hard drives provided)


Hard drive with electronic information (2 hard drives provided) cc:   NRC Region Ill Administrator (w/o Enclosure)
cc: NRC Region Ill Administrator (w/o Enclosure)
NRC Resident Inspector (w/o Enclosure)
NRC Resident Inspector (w/o Enclosure)
NRR Project Manager (w/o Enclosure)
NRR Project Manager (w/o Enclosure)
Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison) (w/o Enclosure)
Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison) (w/o Enclosure)
Utility Radiological Review Board (w/o Enclosure)
Utility Radiological Review Board (w/o Enclosure)
Enclosure L-21-206


Enclosure L-21-206 Hard drive with electronic information (2 hard drives provided)}}
Hard drive with electronic information (2 hard drives provided)}}

Latest revision as of 23:40, 19 November 2024

Regulatory Audit for Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme
ML21237A075
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/17/2021
From: Penfield R
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EPID L-2021-LLA-0067, L-21-206
Download: ML21237A075 (3)


Text

energy Energy Harbor Nuclear Corp.

harbor Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081

Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear

August 17, 2021 L-21-206 10 CFR 50.90 10 CFR 50.12

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Regulatory Audit for Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme (EPID L-2021-LLA-0067)

By letter dated April 7, 2021 [Agencywide Documents Access and Management System (ADAMS) Accession No. ML21106A027], Energy Harbor Nuclear Corp. submitted to the Nuclear Regulatory Commission (NRC) a license amendment request for the Perry Nuclear Power Plant (PNPP) to revise the Updated Safety Analysis Report (USAR) to change the methodology used for analysis of flooding hazards and drainage within the local intense precipitation (LIP) domain and reflect the results from the new analysis.

Based on the new analysis, a new flood hazard protection scheme is also proposed for PNPP. In addition, Energy Harbor Nuclear Corp. requested exemptions in accordance with 10 CFR 50.12 to credit non-safety related protection features including: (1) permanent (passive) and temporary (deployable) flood barriers, and (2) the plant storm drain system in mitigation of flood levels during a LIP event.

By letter dated July 9, 2021 (ADAMS Accession No. ML21165A001), the NRC staff described the terms and conditions of using a regulatory audit to support review of these requests and provided a regulatory audit plan. Energy Harbor Nuclear Corp.

agrees to the terms and conditions set forth in the letter.

As part of the NRC audit, the NRC staff requested that executable electronic versions of the input and output files for key scenarios and final selected ones used in the license amendment request to simulate (i) FLO-2D LIP flooding, and (ii) inflows and streams course models for the two streams "Major" and "Diversion" be made available. These files should also be submitted for docketing.

Perry Nuclear Power Plant, Unit No. 1 L-21-206 Page2

The requested input/output files are provided in their native file format on the enclosed hard drives. Each hard drive contains one copy of the electronic information for the following calculations.

  • 50:64.000, PNPP Site Modifications Local Intense Precipitation (Design Basis),

Revision 1

  • 50:72.000, Design Basis Major Stream Probable Maximum Flood (PMF),

Revision 0

  • 50:73.000, Design Basis Diversion Stream Probable Maximum Flood (PMF),

Revision 0

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager Fleet Licensing, at 330-696-7208.

I declare under penalty of perjury that the foregoing is true and correct. Executed on August_IL, 2021.

i?&rf?r{)

Rod L. Penfield ~

Enclosure:

Hard drive with electronic information (2 hard drives provided)

cc: NRC Region Ill Administrator (w/o Enclosure)

NRC Resident Inspector (w/o Enclosure)

NRR Project Manager (w/o Enclosure)

Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison) (w/o Enclosure)

Utility Radiological Review Board (w/o Enclosure)

Enclosure L-21-206

Hard drive with electronic information (2 hard drives provided)