ENS 56351: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 27: | Line 27: | ||
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | ||
The licensee is investigating the cause of the two reactor coolant pump trips. | The licensee is investigating the cause of the two reactor coolant pump trips. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230216en.html#en56351 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 |
Latest revision as of 07:30, 16 February 2023
Where | |
---|---|
Arkansas Nuclear Arkansas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-2.38 h-0.0992 days <br />-0.0142 weeks <br />-0.00326 months <br />) | |
Opened: | Bryan Horn 14:40 Feb 14, 2023 |
NRC Officer: | Karen Cotton-Gross |
Last Updated: | Feb 15, 2023 |
56351 - NRC Website
| |