ML21133A125: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:MONTHS RELATIVE TO INITIAL FUEL LOAD - UNIT 1 BEGIN FUEL
{{#Wiki_filter:}}
            -15      -14    -13      -12        -11    -10              -8        -7      -6      -5      -4        -3      -2        -1      LOAD      +1        +2        +3 T        T      T        T          T      T                T          T      T        T        T        T        T        T                  '\l        '\l TEST PHASES TEST PHASE 1 - - - - - - - - - - - - - - - - - - - - - - - - - - . . . . . , . 1 1 ~ - Ill      *I*      1v-STARTUP TEST PREOPERATIONAL TEST PROGRAM*                                                                    PROGRAM
                                                                                                                                                                                +
MONTHS RELATIVE TO INITIAL FUEL LOAD - UNIT 2 BEGIN FUEL
~, 15 -14
                -13      -12 T
                                  -11 T
                                            -10 T
                                                      -9 T
                                                              -8 T
                                                                      -7 T
                                                                                -6 T
                                                                                          -5 T
                                                                                                  -4 T        T
                                                                                                            -3      -2 T
                                                                                                                              -1 T
LOAD        +1 V
                                                                                                                                                            +2 V        V
                                                                                                                                                                        +3        +4 V
                                                                                                                                                                                          +5
                                                                                                                                                                                          'v
                                                                                                                                                                                                  +6 TEST PHASES TEST PHASE 1                                                            II -+-    Ill I
I                    IV STARTUP TEST PREOPERATIONAL TEST PAOGRAMx PROGRAM    +
NOTES:                                                                                                                                                  LIMERICK GENERATING STATION UNITS 1 AND 2
(*) REFERENCE FIGURE 14.2-6 FOR PREOPERATIONAL TEST SEQUENCE                                                                                        UPDATED FINAL SAFETY ANALYSIS REPORT (x) REFERENCE FIGURE 14.2-7 FOR PREOPERATIONAL TEST SEQUENCE
(+) REFERENCE FIGURE 14.2-5 FOR STARTUP TEST SEQUENCE INITIAL TEST PROGRAM SCHEDULES FIGURE 14.2-1
 
UNIT2 QA MANAGER                                                      STARTUP MANAGER
( 1)                                                                ( 1)
I I
I STARTUP SUPT                                      1                                STARTUP SUPT SUPPORT                                        :                                OPERATIONS ( 1)
(1)
I I                                                I                                  I I                                                ;                                  I
            ~--------------------J------------------------------ -----------------------'
PROJECT STARTUP QC SUPERVISOR                                                                                                                        ENGINEER
( 1)                                                                                                                              ( 1)
                                                          *----------~-------------~
I I
I I
I I
I ----------------~.--------~
                                          .-----------                          I              a GROUPSUPV.                                  COST & SCHED                              STARTUP TEST                                  PECO OPS. COORD.
l&C ANO PM COORD.                              T&L LEAD ENGINEER                        SU ADMIN COORO.                                SIU GRP. SUPV'S ELEC.                                      SUPV                                  COORDINATOR
( 1)                    ( 1)                  ( 1)              ( 1)                ( 1)                      ( 1)                ( 11)                  (1)
STARTUP                                  SHIFT STARTUP            STARTUP                  DCP QC INSPECTORS      l&C AND PM STAFF      FIELD ENGINEERS          l&C ENGINEERS                                                                          ENGINEERS              COORDINATOR SCHEDULERS                                  ENGINEERS (5 )
(24)                    (6)                  (75)                  (18)                                                                                  (80)                    (1)
ELECTRICAL                l&C                                  CLERICAL                                    ENGINEERING TECHS                  TECHS                                SUPERVISOR  ( 1)                                AIDES (30)                  (65)                                                                                  ( 11 )
CLERICAL STAFF LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT STARTUP ORGANIZATION FIGURE 14.2-2
 
LIMERICK PLANT MANAGER TRB CHAIRMAN r
3 MEMBER REVIEW              3 MEMBER REVIEW                3 MEMBER REVIEW COMMITTEE                  COMMITTEE                      COMMITTEE
                +                            +                              +
* PERMANENT MEMBER (MAY ALSO SERVE AS REVIEW COMMITTEE MEMBER)
  + REVIEW MEMBERS ASSIGNED AS REQUIRED (MINIMUM OF 3 PER COMMITTEE).
THE TRB CHAIRMAN MAY SERVE AS ONE MEMBER OF A REVIEW COMMITTEE.
LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT TEST REVIEW .BOARD ORGANIZATION FIGURE 14.2-3
: 1. OBJECTIVES
: 2. ACCEPTANCE CRITERIA
: 3. REFERENCES
: 4. PRECAUTIONS, NOTES, AND DEFINITIONS
: 5. TEST EQUIPMENT
: 6. SYSTEM TEST 6.1 PREREQUISITES 6.2 TEMPORARY INSTALLATIONS 6:3 INITIAL STATUS 6.4 TEST INSTRUCTIONS 6.5 RESTORATION
: 7. APPENDICES, FIGURES, TABLES LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT TEST PROCEDURE STANDARD FORMAT (SHEET 1 of 2)
FIGURE 14.2-4
 
STARTUP TEST PROCEDURE STANDARD FORMAT STPXX.0                          MAIN BODY STPXX.0.1                        OBJECTIVES STPXX.
 
==0.2                        DESCRIPTION==
 
STPXX.0.3                        ACCEPTANCE CRITERIA STPXX.
 
==0.4                        REFERENCES==
 
STPXX.0.5                        PROCEDURE STP:XX.0-A                        GENERAL APPENDICES STPXX.Y                          SUBTEST STPXX.Y.1                        DISCUSSION STPXX.Y.2                        PRECAUTIONS STP:XX.Y.3                        TEST EQUIPMENT STPXX.Y.4                        PREREQUISITES STPXX.Y.5                        INITIAL STATUS STPXX.Y.6                        TEST INSTRUCTIONS STPXX.Y.7                        ANALYSIS STPXX.Y-A                        SPECIFIC APPENDICES LEGEND XX - STARTUP TEST PROCEDURE NUMBER Y - SUBTEST NUMBER A -APPENDIX DESIGNATOR LIMERICK GENERATING STATION UNITS 1 AND2 UPDATED FINAL SAFETY ANALYSIS REPORT TEST PROCEDURE STANDARD FORMAT (SHEET 2 of 2)
FIGURE 14.2~
 
TEST  PROCEDURE DESCRIPTION                                    OPEN    HEAT                                                            WAR-NO.                                                              VESSEL    UP    l    2        3              4    5        6        RANT l    CHEMICAL ANO RADIOCHEMICAL                                X      X      X    X        X                    x<6J      X 2    RADIATION MEASUREMENTS                                    X      X          X      X                                X                LEGEND 3    FUEL LOADING                                              X 4    FULL CORE SHUTDOWN MARGIN                                        x<*I                                                                  X    TEST INDEPENDENT OF FLOW 5    CONTROL ROD DRIVE SYSTEM                                  X      X          X      X(IIJ                            X                      CONTROLLER MODE 6    SRM PERFORMANCE AND CONTROL ROD SEQUENCE                          x<*I                                                                  so    SCRAM DEFINITE 9    WATER LEVEL REFERENCE LEG TEMPERATURE                              X    X    X      X                X    X        X 10    IRM PERFORMANCE                                                  x<*l  X                                                              NOTES 11    LRPM CALIBRATION                                                  X    X            X                                X 12    APRM CALIBRATION                                                  X    X    X      X(I0J                  X        X          X      (1) SEE FIGURE 14.2-9 T~ST CONDITION (5) 13    PROCESS COMPUTER PERFORMANCE VERIFICATION                  X      X    X    X      X                                                        REGION MAP 14    RCIC SYSTEM PERFORMANCE VERIFICATION                              X    X    x<s,6>                                                      (2) PERFORM TEST 5,  TIMING OF 4 SLOJEST 14 .1  RCIC SYSTEM STARTUP AFTER LOSS OF AC P~ER TO THE SYSTEM                  x<6>                                                                  CONTROL RODS IN CONJUNCTION WITH 14.2  RCIC SYSTEM OPERATION WITH A SUSTAINED LOSS OF AC POJER TO              x<*>                                                                  THESE SCRAMS THE SYSTEM 15    HPCI SYSTEM PERFORMACE VERIFICATION                                X                  X                                                  (3)  FULL CLOSURE ON ONE VALVE ONLY 16    SELECTED PROCESS TEMPERATURE VERIFICATION                          X(IO)
X                X(I0J          X(IO)              (4) MAY BE DONE DURING TEST CONDITION 17    SYSTEM EXPANSION                                          X      X          x<6J                                    x<6,a,                  OPEN VESSEL 18    TIP UNCERTAINITY                                                                      X                                X                  (5) SOME TEST DONE DURING APPROACH TO 19    CORE PERFORMANCE                                                        X    X        X                X    X        X          X            TEST CONDITION 20    STEAM PRODUCTION                                                                                                                    X      (6) MAY BE DONE DURING AND EARLIER 21    DELETED                                                                                                                                          TEST CONDITION IF CONDITIONS WARRANT 22      PRESSURE REGULATOR RESPONSE                                              X    X        X                X(I0J X        X                  (7) DONE WITH STEAM BYP.~SS CAPACITY 23    FEED,,IATER CONTROL SYSTEM DEMONSTRATION                                  X    X        X                X    X        x<s1              (8)  SOME TEST DONE AFTE1~ PLANNED TRIPS 24    MAIN TURBINE VALVES SURVEILLANCE TEST                                                  X                                x<s,91                  FROM POJER 25    MAIN STEAM ISOLATION VALVES PERFORMANCE VERIFICATION              X      X            x<l>
                                                                                                                                ~.*~f*            (9) DETERMINE MAXIMUM POWER LEVEL TEST 26    MAIN STEAM RELIEF VALVES PERFORMANCE                              X          X                                                                CAN BE PERFORMED WITHOUT CAUSING 27    TURBINE TRIP AND GENERATOR LOAD REJECTION DEMONSTRATION                        xP>      X,  SD< 2
* 11 >                x  sD< 2 >            REACTOR SCRAM 28    SHUT~N FROM OUTSIDE THE    MAIN CONTROL ROOM DEMONSTRATION                    x SD 121                                                    (10) TEST NOT REQUIRED FOR UNIT 2 29    RECIRCULATION FLOJ CONTROL DEMON ST RA TI ON                                            x<s)                            x<s1              (11) TEST NOT REQUIRED FOR UNIT 2. NO 30    RECIRCULATION SYSTEM                                                          X        X                X              X                      TC-3 SCRAM DURING S"!"P-27. NO. STP-5 31    LOSS OF TURBINE-GENERATOR ANO OFFSITE POJER                                    x.so                                                              SCRAM TIMING TEST DUE TO NO. SCRAM 32    ESSENTIAL HVAC SYSTEM OPERATION ANO CONTAINMENT HOT                X                    X                                X                (12) FOR UNIT 2 ONLY, FULL CLOSURE OF ONE    VALVE PENETRATION TEMPERATURE VERIFICATION 33    PIPING STEADY STATE VIBRATION                                      X          X        xoi                    X        X(S,6,8)                TO DETERMINE THE MAXIMUM PCMER LEVEL 34                                                                                                                              X(S)                    WHICH WILL NOT CAUSE A REACTOR SCRAM WILL OFFGAS SYSTEM    PERFORMANCE VERI FI CATION                        X      X            X 35      RECIRCULATION FLCM  CALIBRATION                                                        x<*>            X    x<***-*1                        BE PERFORMANCE AT TE~T CONDITIONS.
36      PIPING DYNAMIC TRANSIENT (13)                                      X          X        X                              X                (13) MAIN STEAM TURBINE TRIP TEST FOR UNIT 2 37      DELETED                                                                                                                                          (REF. STARTUP TEST STP-36) AT 100"1.
38      DELETED                                                                                                                                          LEVEL WILL BE PERFORMED DURING 70      REACTOR WATER CLEANUP SYSTEM PERFORMANCE VERIFICATION              X                                                                            C~ERCIAL OPERATION OF THAT UNIT.
71      RESIDUAL HEAT  REMOVAL SYSTEM PERFORMANCE VERIFICATION                        x<6>                                    x<*.*1 LIMERICK GENERATING STAT I ON UNI TS 1 & 2 UPDATED  FIN AL  SAFETY  AN ALYS IS REPORT STARTUP TEST SEQUENCE (UNI TS 1 & 2)
FIGURE 14.2-5            REV. 3    NOV. /93
 
MONTHS TO INITIAL FUEL LOAD                                                                                                      BEGIN FUEL LOAD
-16      -15            -14                  -13        -12                  -11                            -10            -9            -8                  -7              -6              -5              -4            -3                        -1              0 y        y              T                    T          T                    T                              T            T              T                    T                T              T                y            T                          T              T
* FEEDWATER (P-45.1)
STANDBY DIESEL GENERATOR SYSTEM AND LOADING (P-24.1 & P-100.4)                                                          *
* 125 VOLT DC (p 2 1)
                                      .AC.
UNINTERRUPT.
* EMERGENCY SERVICE WATER REACTOR WATER CLEANUP (P-61.1)                    *
                                                                                  --~~~~~*-*t-------PR_1_M_A_R_Y_c_o_N_T_A~~~M-EN~T~IS~O~L~A~T~IO~N~,~IL~R~T~,~A-N_D_s_u_P_PR_E_s_s_1o_N_P_o_o_L_ _ _ _ _ _~--
                      **~--------~~"'!"!""____.....,______ *
(P-57.1)
CLASS 1 E 440 VOLT LOAD CENTERS (P-5.1)
(P-54.1)
RESIDUAL HEAT REMOVAL (P-49.1)
(P-59.1, P-59.2 & P-59.3)
FUEL HANDLING (P-81.1)
                                                                                                                                                                                                                    * -                STANDBY
                                                                                                                                                                                                                                .GAS TREATMENT.
(P-70.1)
* CLASS 1 E 440111111VOLT MCC'S
                      ---I-N-ST_R___C_O_N_T_R_O_L_R_O_O_M""""'"""'__(..,P--6 .1-),...,.......1111111111111. . . . ._ _ _ _ _ _ _    RH R SERVICE                                  FIRE                                                                            COLD
                          ~                    H&V                CONTROL STRUCTURE H&V                                                                                    PROTECTION                              NUCLEAR INSTRUMENTATION                  FUNCTIONAL
_.............    *      *              *                                                    *
* WATER.                              *            *                          *                                    *    *          *
(P-17.1) (P- 32.1)                                (P-30.1 & P-30.2)                                        (P-16.1)                (P-13.1, P-13.2, P-13.3 & P-13.4)                        (P-78.1, P-78.2, P-78.3)              (P- 100 _1)
INSTRUMENT AIR
* REACTOR                                                                          CONTROL ROD DRIVE HYDRAULICS                                                                    *            ~REACTOR
    *        (P-18.1)                                  ENCLOSURE et------D-1E-S-EL_ _ _                              RE_A_C_T_O_R_ _ _"'!'!      (P!!""-5'!!!5!'"1111"'!")--C-O_N_T_R_O_L___________
* 7W ENCLOSURE CRANE 4KV                COOLING WATER~                                                      FUEL OIL        NON-NUCLEAR INST. .                        DRIVE CON~~gL                                                    (P-99.1)
                      *                    *                                  *          *                        *        *                          *            *        *
* PROCESS & AREA (P-4.1)                                            fP-14.1l(P- 2 3.1)                                                          (P-801)                    (P-56.1)              RADIATION            CONTAINMENT SPRAY POND PUMP                                                                      . MAIN STEAM                              MONITORING            ATMOSPHERIC CONTROL STR~1~1~r~~~~~~vt~DBY                                                    *                          (P-83.1)        CONDENSE~ Al~P-79.1, ,79.2) *                      (P-73.1)    *
* 125/250 VOLT DC (P-2.2)                              *
* ENCLOSURE H&V (P-28.1 & P-28.2)
* STANDBY LIQUID CONTROL
* P- 53 -1)
* REMOVAL (P-43.1)        REACTOR INTERNALS REACTOR RECIRCULATION                                                                      VIBRATION & INSPECTION (P-64.1)                                                                                *    (P-62.1).
LIQUID
* CORE SPRAY (P-51.1)                                *
                                                                                                                        .RADWASTE.
(P-69.1)
* CONDENSATE *
(P-44.1)
HPCI (P-52.1}
* PRIMARY CONTAINMENT VENTILATION
                                                                                                                                                        .---------(P--6-0-.1-)----------4*                                                                                  NOTES:
FUEL POOL COOLING~                                *
* RCIC
* G.SEOUS RADWAS.E (P-36.1) SOLi D                (P-50.1)                                                              (P-72.1)                                SYSTEM NAME
: 1.  *            *
                                                                                                                                            .RADWASTE.                                                                                                                              TEST NUMBER(S)
(P-68.1)
PRIMARY                                  REACTOR ENCLOSURE H&V                                                                      2. LINE DURATION INCLUDES COMPLETION CONTAINMENT INSTRUMENT GAS
                                                                                                                                                          **~--------(~P--34                O      O
___1)-------~**
O OF SYSTEM TEST PREREQUISITES AND PERFORMANCE OF PREOPERATIONAL EXTRACTION STEAM AND                                                .(P- _ ).
* REACT (:-SPBR.l )TECTI N
* TESTING.
25 1                                                        FIRE PROTECTION STANDBY FEEDWATER HEATER CONDENSATE AND                                                                                                                                                                                              HALON              DC LIGHTING REFUELING                                                            * (P-46.1).                                                                                                TURBINE              *      *          *
* WATER TRANSFER                                                CONDENSATE DEMINERALIZER                                                                                        ENCLOSURE HVAC                (P-13.5)          (P-7.1)
        *  (P-37.1)
* COOLING (P- 39 -1)
TOWER
                                                                                                                      *                                                                      (P-33.1) RADWASTE ENCLOSURE HVAC
                                                                      * (P-41.1) *                                                                                                                *      (P-65.1)
* CIRCULATING                                                                                                                            PROCESS WATER                                                                                                                          SAMPLING
                                                            *      (P-42.1)
* MAIN TURBINE                                                                                      PLANT(P- 76.1 l CONTROL                                                                                                                                                                                      LIMERICK GENERATING STATION SEISMOGRAPHICAL (P-93.2)
MONITORING ANNUNCIATOR (P-91.1)          LOSS OF INSTRUMENT AIR UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT
                                                                  ~P-99.2~
PUBLIC ADDRESS (P-100.2)
PREOPERATIONAL TEST SEQUENCE AND EVALUATION                                                                                                                                                                                                                          UNIT 1 SNUBBER TESTING (P-99.3)                                                                                                                                                (P-100.3)                                            FIGURE 14.2-6
 
Begin Months to Fuel Load                                                                                                                        Fuel Load
-16            -15            -14            -13            -12              -11            -10                -9                  -8            -7                -6                -5              -4              -3          -2            -1                0 y              y                y                y              y T                T Electrical systems energized (P3. 1)
Plant annunciator T                  ~              ~
                                                                                                                                                      .*.______        T StandbLDC lighting (P7.1)
T 125 Volt DC T                ~            y              y              y Uninterruptable A.C power (P91.1)              (P57.1)          Fire protection, water and smoke detection (P13.1, P13.4)
Public address and evacuation (P99.3)            *
(P2. 1)
Fire protection, CO2 and Hin *        (P2.2)
* 1251250 Volt DC
* Instrument air P18.1
                                  *--------------1**
Process sarrpling Primary containment instrumen.as
                                                                  *          (P25.1)                                                                          .OSI
                                                                                                                                                                            *  (P13.2, P13.5) accident sampllnit ~0.2)
Loss of instrument air
              * *
* Service water              (P76.1)                                                                                                                (P76.2)        Caiodic and freeze protiiion (P11.1)
Reactor encl. cooling water (P14.1)
                                                                        *                *
* Emergency service water (P54.1) *          (P85.1 and P85.2)
Turbine encl cooling water RHR service water (P15.1)
* Diesel generator fuel oil (P23.1)
Diesel generator encl HVA.C Standby diesel generators (P24.1)
DIG loading (P100.4)
(P16.1)
Loss of offsite power (PHl0.1)
(P28.1)
Fuel handling Fuel pool cooling  *
(P35.1)
Residual heat removal                                                                                          (P81.1)      j&deg;lidradwaste(P68.1-(P49.1)
Equipment drain collection and liquid radwaste
* Core spray RCC (PS0.1)              ***
Gaseous radwaste recorrbiners and filters (P69.1, P69.3)  *
(P51.1)
                                                                                                          -*~------*-
                                                                                        **---------------1**
HPCI                                (P72.1)
* Containment atmospheric control (P 52
* 1)
Area and process radiatiion monitoring Standby liquid control                                                                                          (P73.1)
* Reactor water cleanup
                                                                                                  *      (P53.1)                                                        (P79.1, P79.2)
Reactor vessel
( P61.1)
* Reactor internals, vibration, inspection                                                      instrumentation (P62.1)
* Reactor recirculation                                                                                                                (PS0.1)
(P64.1)
Control rod drive hydraulic system (P55.1)
Control rod drive control *
* Reactor protection, redundant reactivity control system (P58.1, P58.2)
(P56.1)                *
                                                                                                                                                          *Nuclear instrumentation (P78.1, P78.2, P78.3)*                                    NOTES:
* Primary containment isolation, suppression pool and ILRT                                                      System Name 1.
* CooUng tower *                                                                                              (P59.1, P59.2, P59.3)              Condenser and air removal                                                              Test No.
(P 41 *1) Circulating water
                                                        *        **1----------------------~--
Condensate filter demlneralizers                                              (P 43-1)
                        *            (P42.1)                                                    (P39.1)                    *Condensate (P44.1)*
* Feedwater (P45.1)
                                                                                                                                                                                                          **                                  2. Line durations include completion of system test prerequisites and performance
* Extraction steam and feedwater heaters
* of preoperational testing (P46.1)          Main steam, automatic depressurization, steam leak detection
* Turbine supervisory
                                                                                                            *
* Main turbine control (EHC) *                  *
(P83.1, P83.2, P83.3)
(P93.3)    Reactor encl unit cooler (P66.1)                            (P93.2)                                                                                LIMERICK GENERATING STATION UNITS 1 AND 2 Reactor encl and refuel floor HVAC ( P34.1, P34.2)                        Standby gas treatment UPDATED FINAL SAFETY ANALYSIS REPORT
* Drywall HVAC                        *                          (P70.1)
* Turbine encl unit coolers*            (P60.1)                                                                                            PREOPERATIONAL TEST SEQUENCE (P66.2)
* Turbine encl HVAC (P33.1)
* FIGURE 14.2-7 UNIT2
 
Verified by Date
: 6.        SYSTEM TEST 6.1        PREREQUISITES 6.1.1      SYSTEM LEVEL PREREQUiblTES 6.L 1.1    SYSTEM TURNOVER Turnove r from Bechtel Constru ction to PECo Startup is complete .
6.1.1.2    SYSTEM WALK THROUGH The system has been walked througL and verified complete to the extent required to conduct this test.
6.1.1.3    HYDROSTATIC TESTING AND CLEANNESS VERIFICATIONS Hydrost atic testing and cleanne ss verifica tions have been complete d to the extent required to perform this test, and records are on file.
6.1.1.4    STARTUP WORK LIST The Startup Work List has been reviewed , and outstand ing or closed items (if any) have been evaluate d as to the effect on this test. A summary list of outstand ing items is attached .
6.1.1.5    STARTUP FIELD REPORTS Startup Field Reports pertaini ng to this system have been reviewed , and outstand ing or closed items (if any) have been evaluate d as to their effect on this test.
A summary list of outstand ing items is attached .
6.1.1.6    TEMPORARY MODIFICATIONS The Log of Tempora ry Modific ations has been reviewed , is current, and is satisfac tory for testing.
6.1.1.7    STARTUP WORK ORDERS AND MAINTENANCE REQUEST FORMS Startup Work Orders and Mainten ance Request Forms pertaini ng to this system have been reviewed , and outstand ing items (if any) have been evaluate d as to their effect on this test.
LIMERICK GENERATIN G STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT TYPICAL TEST PREREQUISITES (SHEET 1)
FIGURE 14.2-8
 
Verified by Date 6.1.2  'COMPONENT LEVEL PREREQUISITES 6.1.2.1  COMPONENT TECHNICAL TESTS The required inspections and tests, as indicated in the Component Technical Test Summary, Appendix A, have been
*completed and verified by the responsible group.
6.1.2.2  COMPONENT CALIBRATIONS The required inspections and calibrations, as indicated in the Component Calibration Summary, Appendix B, have been completed and verified by the responsib]e group.
LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT TYPICAL TEST PREREQUISITES.
(SHEET 2)
FIGURE 14.2-8
 
200 180 A. NATURAL CIRCULATION B. MINIMUM RECIRCULATION PUMP SPEED C. ANALYTICAL LOWER LIMIT OF MASTER POWER FLOW CONTROL 160 D. ANALYTICAL UPPER LIMIT OF MASTER POWER FLOW CONTROL 140 120                                                                                  ,~~
                                                                                  ~\>-~\.,
a:                                                                            ~SC w                                                                      \)-,~~
0
...z
~
100 w
0 a:
w
~
80 60 40 TYPICAL STARTUP PATH                                  MINIMUM POWER LINE 20 10      20      30    40      50      60      70      80          90        100 PERCENT CORE FLOW                  LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT POWER-FLOW OPERATING MAP (UNIT 1(UNIT
                                                                              - HISTORICAL) 1)
(SHEET 1 OF 4)
FIGURE 14.2-9                        Rev. 16 09/12
 
TEST CONDITION (TC) REGION DEFINITIONS TEST CONDITION NO.          POWER-FLOW MAP REGION AND NOTES 1                    BEFORE OR AFTER MAIN GENERATOR SYNCHRONIZATION BETWEEN 5 AND 20%
THERMAL POWER-WITHIN +10, -0% OF M-G SET MINJMUM OPERATING SPEED LINE IN LOCAL MANUAL MODE ..
2                    AFTER MAIN GENERATOR SYNCHRONIZATION BETWEEN THE 45 AND 75% POWER ROD LINES BETWEEN M-G SET MINIMUM SPEEDS FOR LOCAL MAN~AL AND MASTER MANUAL MODES.
3                    FROM 45 TO 75% CONTROL ROD LINES-CORE FLOW BETWEEN 80 AND 100% OF ITS RATED VALUE.
4                    ON THE NATURAL CIRCULATION CORE FLOW LINE-WITHIN +o, -5% OF THE INTERSECTION WITH THE 100% POWER ROD LINE.
5                    WITHIN +o, -5% OF THE 100% CONTROL ROD LINE-WITHIN -0, +5% OF THE ANALYTICAL LOWER LIMIT OF MASTER FLOW CONTROL.
6                    WITHIN +o, -5% OF RATED 100% POWER -WITHIN
                            +o, -5% OF RATED 100% CORE FLOW RATE.
LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT POWER-FLOW OPERATING MAP (UNIT 1 (UNIT
                                                            - HISTORICAL) 1)
(SHEET 2 OF 4)
FIGURE 14.2-9                Rev. 16 09/12
 
110------------------------------------
D A. NATURAL CIRCULATION B. MINIMUM REICRCULATION PUMP SPEED 100 C. ANALYTICAL LOWER LIMIT OF MASTER POWER FLOW CONTROL D. ANALYTICAL UPPER LIMIT OF MASTER POWER FLOW CONTROL 90 80 70 a:
w
~      60 0
0.
....z w
u a:    50 w
0.
40 30 TYPICAL MINIMUM POWER LINE STARTUP 20            PATH 10 10      20      30      40      50      60      70      80      90      100  110 PERCENT CORE FLOW LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT POWER-FLOW OPERATING MAP (UNIT 2(UNIT
                                                                              - HISTORICAL) 2)
(SHEET 3 OF 4)
FIGURE 14.2-9                  Rev. 16 09/12
 
TEST CONDITION (TC) REGION DEFINITIONS TEST CONDITION NO.          POWER-FLOW MAP REGION AND NOTES 1                  BEFORE OR AFTER MAIN GENERATOR SYNCHRONIZATION BETWEEN 5 AND 20%
THERMAL POWER-WITHIN +10, --0% OF M-G SET MINIMUM OPERATING SPEED LINE IN LOCAL MANUAL MODE.
2                    AFTER MAIN GENERATOR SYNCHRONIZATION BETWEEN THE 45 AND 75% POWER ROD LINES BETWEEN M-G SET MINIMUM SPEEDS FOR LOCAL MANUAL AND MASTER MANUAL MODES.
3                    FROM 45 TO 75% CONTROL ROD LINES-CORE FLOW BETWEEN 80 AND 100% OF ITS RATED VALUE.
4                    ON THE NATURAL CIRCULATION CORE FLOW LINE-WITHIN +o, -20% OF THE INTERSECTION WITH THE 100% POWER ROD LINE.
5                    WITHIN +o, -5% OF THE 100% CONTROL ROD LINE-WITHIN -0, +5% OF THE ANALYTICAL LOWER LIMIT OF MASTER FLOW CONTROL.
6                    WITHIN +o, -5% OF RATED 100% POWER -WITHIN
                            +o, -5% OF RATED 100% CORE FLOW RATE.
LIMERICK GENERATING STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT POWER-FLOW OPERATING MAP (UNIT 2 (UNIT
                                                            - HISTORICAL) 2)
(SHEET 4 OF 4)
FIGURE 14.2-9                Rev. 16 09/12}}

Revision as of 14:13, 17 January 2022

0 to Updated Final Safety Analysis Report, Chapter 14, Figures
ML21133A125
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/29/2021
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21138A803 List: ... further results
References
Download: ML21133A125 (14)


Text