ML21133A295: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:June 3, 2021 Mr. James L. Folk, Jr.
{{#Wiki_filter:}}
Assistant Manager Waste Disposition U.S. DOE Savannah River Operations Office P.O. Box A Aiken, SC 29802
 
==SUBJECT:==
SECOND REQUEST FOR ADDITIONAL INFORMATION REGARDING THE 2020 SAVANNAH RIVER SITE SALTSTONE DISPOSAL FACILITY PERFORMANCE ASSESSMENT
 
==Dear Mr. Folk:==
 
By {{letter dated|date=July 6, 2020|text=letter dated July 6, 2020}}, the U.S. Department of Energy (DOE) submitted the 2020 DOE Savannah River Site Saltstone Disposal Facility Performance Assessment to the U.S. Nuclear Regulatory Commission (NRC) (NRCs Agencywide Documents Access and Management System [ADAMS] under Package Accession No. Main Library [ML] ML20190A055). That DOE Submittal to the NRC was under Section 3116(b) of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) (i.e., NDAA Monitoring). By {{letter dated|date=July 10, 2020|text=letter dated July 10, 2020}} (ADAMS Accession No. ML20148M201), the NRC acknowledged receipt of that DOE Submittal.
By {{letter dated|date=October 5, 2020|text=letter dated October 5, 2020}} (ADAMS Accession No. ML20254A003), the NRC provided a preliminary review of the DOE Submittal along with NRC Request for Supplemental Information (RSI) Comments. In the NRC Preliminary Review Letter, the NRC indicated plans to prepare Technical Review Reports (TRRs) on specific technical review subjects and issue Request for Additional Information (RAI) Questions, if needed, when drafting those TRRs. Thus, there would be multiple sets of RAI Questions. The NRC Technical Evaluation Report (TER) will reference all those TRRs and the TRRs will be issued at the same time as the TER.
On March 1, 2021, the NRC issued the first set of RAI Questions for those TRRs related to Biosphere, Inventory, Inadvertent Human Intruder, and Site Stability under ADAMS Package Accession No. ML21062A214. The NRC has enclosed the second set of RAI Questions for those TRRs related to Infiltration and Erosion Control, Model Integration, Radionuclide Release, and Far-Field Flow and Transport. As the NRC continues its review of the DOE documents, the DOE responses to the NRC RSI Comments, and the DOE responses to the NRC RAI Questions, the NRC may develop additional RAI Questions for which the NRC will need a response from the DOE.
The NRC requests that the DOE provide responses to the enclosed RAI Questions by 60 calendar days of the date of this letter. If it would be useful to the DOE, then the NRC is willing to host a virtual meeting with the DOE to discuss the NRC RAI Questions and/or the preliminary DOE Responses.
 
J. Folk, Jr.                                    In accordance with 10 Code of Federal Regulations 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html.
If you have any questions, then please contact Mr. Harry Felsher of my staff at 301-415-6559 or by e-mail, Harry.Felsher@nrc.gov.
Sincerely, Signed by Koenick, Stephen on 06/03/21 Stephen S. Koenick, Branch Chief Low-Level Waste and Projects Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards
 
==Enclosure:==
 
Second Request for Additional Information Questions
 
ML21133A293; Ltr ML21133A295 NMSS/DUWP          NMSS/DUWP                            NMSS/DUWP OFFICE                                                  NMSS/DUWP/RTAB
                  /LLWPB              /RTAB                                /LLWPB NAME              HFelsher        HF ARidge        AR CMcKenney      CM SKoenick      SK DATE              May 13, 2021        May 17, 2021    May 24, 2021        Jun 3, 2021}}

Revision as of 14:56, 17 January 2022

Second Request for Additional Information Regarding the 2020 Savannah River Site Saltstone Disposal Facility Performance Assessment
ML21133A295
Person / Time
Site: PROJ0734
Issue date: 06/03/2021
From: Stephen Koenick
NRC/NMSS/DDUWP/LLWB
To: Folk J
US Dept of Energy, Savannah River Operations Office
Felsher H
Shared Package
ML21133A293 List:
References
Download: ML21133A295 (3)


Text