ML21175A277: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Human Factors Engineering Review Considerations for Control Room Modifications June 29, 2021 Division of Reactor Oversight, Office of Nuclear Reactor Regulation 1
{{#Wiki_filter:}}
* Standard Review Plan (SRP) Chapter 18 provides guidance for NRC staff reviewing human factors engineering (HFE) considerations of:
  - operating license applications
  - design certifications (DCs)
  - plant modifications
  - important human actions 2
 
From SRP Chapter 18:
3
 
From SRP Chapter 18:
* Applicable NRC guidance:
  - NUREG0711, Human Factors Engineering Program Review Model
  - NUREG0700, HumanSystem Interface Design Review Guidelines
  - NUREG 1764, Guidance for the Review of Changes to Human Actions
* If proposed changes will affect human actions
  - SRP, Chapter 18, Appendix A, Guidance for Evaluating Credited Manual Operator Actions
* If credited manual operator actions are affected 4
 
5 NUREG0711
* NUREG0711, Human Factors Engineering Program Review Model
  - Used by NRC staff to review the HFE aspects of licensing applications.
  - Verifies that the applicants HFE program incorporates HFE practices and guidelines accepted by the staff, as described within the twelve HFE program elements 6
 
NUREG0711 7
 
8 NUREG0700
* NUREG0700, HumanSystem Interface (HSI)
Design Review Guidelines
  - Provides guidance for reviewing the interfaces between plant personnel and the plants systems and components and evaluating conformance with HFE guidelines 9
 
NUREG0700 10
 
NUREG0700
* Expectation:
  - The licensees established program/guidelines for system design should align with the HSI guidance and standards discussed in NUREG0700 11
 
12 NUREG1764
* NUREG 1764, Guidance for the Review of Changes to Human Actions
  - Provides guidance for determining the appropriate level of HFE review of human actions (HAs),
considering their riskimportance
  - Before submitting a change request to the NRC the licensee reviews a proposed plant change to identify HAs that constitute new or modified actions, or involve modified task demands.
13
 
NUREG1764
* Entails a fourstep process for evaluating HAs associated with an amendment request
* Plant modifications and associated HAs are categorized into regions of high, medium, and low risk (similar to Reg Guide 1.174)
* Level of risk associated with affected HAs guides the appropriate level of graded HFE review
  - Informs what program elements in NUREG 0711 should be considered by NRC staff in their review 14}}

Revision as of 07:41, 17 January 2022

Human Factors Engineering Review Considerations for Control Room Modifications
ML21175A277
Person / Time
Issue date: 06/29/2021
From:
Office of Nuclear Reactor Regulation
To:
Marshall M
References
Download: ML21175A277 (14)


Text