ML24142A549

From kanterella
Jump to navigation Jump to search
Adv Rx Stakeholders - Risk Metrics Workshop - Rev 2
ML24142A549
Person / Time
Issue date: 05/21/2024
From: Hanh Phan, Stutzke M
Office of Nuclear Reactor Regulation
To:
References
Download: ML24142A549 (3)


Text

Public Workshop on Technology Inclusive Risk Metrics for Advanced Reactors NRC Working Group on Technology Inclusive Risk Metrics Office of Nuclear Regulatory Research (RES)

  • Matt Humberstone
  • Gerardo Martinez-Guridi Office of Nuclear Reactor Regulation (NRR)
  • Marty Stutzke Periodic Advanced Reactor Stakeholder Meeting May 23, 2024 1

NRC Considering Needs for Non-LWR Risk Metrics and Reliability Data 2

In 1990, the Commission established three risk metrics for new reactors and associated quantitative goals:

Core Damage Frequency (CDF) < 1x10-4/year - A measure of overall safety performance in prevention of severe accidents Large Release Frequency (LRF) < 1x10-6/year - A measure of prevention of significant offsite consequences Conditional Containment Failure Probability (CCFP) < 0.1 - A measure of the capability of design to mitigate a severe accident Traditional risk metrics, e.g., CDF, have been used effectively in NRCs risk-informed decision-making processes May not be applicable to all advanced reactor designs SRM SECY-23-0021 provides direction on applicant proposed risk metrics The staff should revise draft 10 C.F.R. 53.220 to specify that applicants must propose a comprehensive plant risk metric (or set of metrics)

Need to consider alternative risk metrics that:

Are applicable to Non-LWR designs Support NRC licensing and regulatory processes

Public Workshop on Risk Metrics and Reliability Data for Non-LWRs

  • Summarize NRC staffs ongoing efforts on risk metrics and supporting reliability data
  • Gather input from stakeholders
  • Consider how risk metrics can be applied to:
  • Licensing
  • Oversight
  • License amendment requests
  • Other risk-informed regulatory processes
  • Contact if interested in presenting your thoughts on risk metrics
  • jeffery.wood@nrc.gov
  • Planning to schedule workshop, tentative mid-July 2024 3