ML21279A167: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:October 22, 2021 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
{{#Wiki_filter:}}
3535 Colonnade Parkway Birmingham, AL 35243
 
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - CLOSEOUT OF BULLETIN 2012-01, DESIGN VULNERABILITY IN ELECTRIC POWER SYSTEM (EPID: L-2017-CRS-0063)
 
==Dear Ms. Gayheart:==
 
The purpose of this letter is to inform you that the U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of Southern Nuclear Operating Company, Inc. (SNC, the licensee) responses to NRCs Bulletin (BL) 2012-01, Design Vulnerability in Electric Power System, dated July 27, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12074A115), for Vogtle Electric Generating Plant (Vogtle), Units 1 and 2, and has closed out BL 2012-01 for Vogtle, Units 1 and 2.
The NRC issued BL 2012-01 on July 27, 2012, to all holders of operating licenses and combined licenses for nuclear power reactors, except those who have ceased operation permanently and have certified that fuel has been removed from the reactor vessel. The BL 2012-01 requested information about each facilitys electric power system designs that would allow the NRC staff to verify the systems capability to address open phase conditions.
Specifically, the NRC requested licensees to:
describe how the protection scheme for engineered safety features buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power source; and describe the operating configuration of engineered safety features buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (i.e., normal operating condition).
The above information was requested to confirm that licensees comply with 10 CFR 50.55a(h)(2), 10 CFR 50.55a(h)(3), and Appendix A to 10 CFR Part 50, GDC 17, or principal design criteria specified in the updated final safety analysis report.
 
C. Gayheart                                      By {{letter dated|date=October 25, 2012|text=letter dated October 25, 2012}} (ADAMS Accession No. ML12300A278), the licensee provided its response to BL 2012-01 for Vogtle. By {{letter dated|date=February 3, 2014|text=letter dated February 3, 2014}} (ADAMS Accession ML14034A405), the licensee provided supplemental information for this facility in response to an NRC staff request for additional information issued on December 20, 2013 (ADAMS Accession No. ML13351A314).
By letters dated October 9, 2013, and March 16, 2015 (ADAMS Accession Nos. ML13333A147 and ML15075A454, respectively), the Nuclear Energy Institute (NEI) submitted a voluntary industry initiative to address open phase conditions at nuclear power plants. The NEI {{letter dated|date=March 16, 2015|text=letter dated March 16, 2015}}, stated, in part: The initiative is a formal commitment by the companies that operate nuclear power plants to follow a specific policy or plan of action. The initiative calls for a proactive plan and schedule for addressing potential design vulnerabilities to the open phase condition.
To evaluate the adequacy of the open phase isolation systems designs, the NRC staff issued Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01), dated October 31, 2017 (ADAMS Accession No. ML17137A416), which provided temporary inspection instructions for the purpose of verifying that licensees appropriately implemented the NEI voluntary industry initiative dated March 16, 2015. The NRC staff piloted the use of TI 2515/194 by inspecting four nuclear power plants with four distinct open phase isolation system designs. A summary of the NRC staffs preliminary observations and issues needing additional clarity were discussed with industry representatives in two public meetings conducted on September 19, 2018, and October 17, 2018. The meeting summaries can be found in ADAMS under Package Accession Nos. ML18268A342 and ML18309A226, respectively.
By {{letter dated|date=June 6, 2019|text=letter dated June 6, 2019}} (ADAMS Accession No. ML19163A176), NEI submitted Revision 3 of the voluntary industry initiative to include an option for plants to perform a risk evaluation under certain boundary conditions to support manual response to an open phase condition.
NEI also submitted NEI 19-02, Guidance for Assessing Open Phase Condition Implementation Using Risk Insights on June 20, 2019 (ADAMS Accession No. ML19172A086). On August 18, 2020, the NRC staff issued Revision 2 of TI 2515/194 (ADAMS Accession No. ML20230A328),
which provided temporary inspection instructions for the purpose of verifying that licensees appropriately implemented Revision 3 of the NEI voluntary industry initiative. The revision accounted for changes reflected in Revision 3 of the NEI voluntary initiative.
In August 2019, the NRC staff performed inspections at Vogtle using TI 2515/194 dated October 31, 2017. In December 2020, the NRC staff performed inspections at Vogtle using TI 2515/194 Revision 2. These inspections at Vogtle were performed to verify the licensees implementation of the voluntary industry initiative at this facility. To address the open phase condition design vulnerability issue at this facility, the licensee implemented open phase isolation system plant modifications, which provide detection and alarm in the control room, and necessary plant procedures that allow operators to diagnose and take manual action to mitigate an open phase condition. The NRC inspection reports listed below document the results of the TI 2515/194 inspections.
Vogtle Electric Generating Plant, Units 1 and 2 - Temporary Instruction 2515/194 Inspection Report 05000424/2019012 and 05000425/2019012, dated September 25, 2019 (ADAMS Accession No. ML19268A063)
 
C. Gayheart                                              Vogtle Electric Generating Plant, Units 1 and 2 - Integrated Inspection Report 05000424/2020004 and 05000425/2020004, dated February 10, 2021 (ADAMS Accession No. ML21041A217)
The NRC staff reviewed the information submitted by the licensee and the results of the TI 2515/194 inspections for Vogtle, Units 1 and 2. No findings or exceptions were identified.
Based on the above, the NRC staff concludes that the licensee provided the necessary information requested in BL 2012-01 and has completed implementation of its open phase isolation system. Therefore, the NRC staff has closed BL 2012-01 for Vogtle, Units 1 and 2.
If you have any questions, please contact me at 301-415-3100 or John.Lamb@nrc.gov.
Sincerely,
                                                /RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424, 50-425 cc: Listserv
 
ML21279A167 OFFICE NRR/DORL/LPL2-1/PM          NRR/DORL/LPL2-1/LA      NRR/DEX/EEEB/BC NAME      JLamb                    KGoldstein              WMorton DATE      10/06/2021              10/22/2021              10/05/2021 OFFICE    NRR/DRA/APOB/BC          NRR/DRO/IOEB/BC          NRR/DORL/LPL2-1/BC NAME      AZoulis                  LRegner                  EMiller for MMarkley DATE      10/06/2021              10/12/2021              10/22/2021 OFFICE    NRR/DORL/LPL2-1/PM NAME      JLamb DATE      10/22/2021}}

Revision as of 19:36, 16 January 2022

Closeout of Bulletin 2012-01, Design Vulnerability in Electric Power System
ML21279A167
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/22/2021
From: John Lamb
Plant Licensing Branch II
To: Gayheart C
Southern Nuclear Operating Co
Lamb J NRR/DORL/LPL2-1
References
BN-12-001, EPID: L-2017-CRS-0063
Download: ML21279A167 (4)


Text