NRC-21-0038, Initial License Operator Application Withdrawal: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 13: Line 13:
| document type = Letter type:NRC
| document type = Letter type:NRC
| page count = 1
| page count = 1
| project =
| stage = Other
}}
}}



Revision as of 02:05, 4 October 2021

Initial License Operator Application Withdrawal
ML21153A046
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/02/2021
From: Angel J
DTE Electric Company
To: Patricia Pelke
Document Control Desk, Office of Nuclear Reactor Regulation, NRC/RGN-III
References
NRC-21-0038
Download: ML21153A046 (1)


Text

DTE Electric Company 6400 N. Dixie Highway Newport, MI 48166 DTE June 2, 2021 NRC-21-0038 10 CFR 2.107(a)

Ms. Patricia J. Pelke, Chief, Operations Branch Division of Reactor Safety Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Fermi 2 Initial License Operator Application Withdrawal

References:

1) NRC Letter, "Fermi Power Plant, Unit 2- Confirmation of Initial License Examination," ML20153A387 dated June 1, 2020
2) DTE Letter, NRC-21-0024, "Preliminary Operator License Applications,"

dated April 9, 2021.

3) DTE Letter, NRC-21-0030, "Certified Operator License Applications for 5/10/2021 Examination," dated April 23, 2021.

In accordance with NUREG-102 I Section ES-202 C.1.h, the purpose of this letter is to inform you that Darren Lewis will be leaving the DTE Electric Company and the individuals RO license is no longer required. DTE Electric would like to withdraw the request for the written examination/operating test to be administered for his RO license.

If you have any questions, please contact me at (734) 586-4055.

Si~ _

Ju~

Director - Nuclear Training cc: NRC Project Manager Reactor Projects Chief, Branch 5, Region IIJ NRC Resident Office